Instructions:
Enter user data in cells with highlighted borders only.
All personnel hour entries are to be total man hours.
Example: 2 excavators to be disassembled, loaded, and reassembled at the job site.
Labor per excavator for disassembly prior to loading and assembly of machine at jobsite
2 mechanics for 4 hours = 8 man hours
8 man hours (disassembly) + 8 man hours (assembly) = 16 man hours
Enter only the man hours for one unit. Enter 16 in Mech. Hrs. column.
Note: System will calculate demobilization at end of job based on mobilization input.
Assumptions:
Equipment rates from CT August, 2008 rental book and are approximate.
Labor rates from http://www.dir.ca.gov/DLSR/PWD/Northern.html and are approximate.
Portable Plants:
Quantity Mob $ Demob $
Portable HMA Plant (Inc. RAC) 150,000.00 60,000.00
Portable PCCP Plant 150,000.00 60,000.00
Lime Treatment Equipment 15,000.00 8,000.00
Concrete and AC Recycle Plant 40,000.00 15,000.00
Drayage Types:
Description Rate
1 Flatbed trailer and tractor 90.00
2 Low bed and tractor (small) 90.00
3 Low bed and tractor (med) 125.00
4 Low bed and tractor w/ pilot car 170.00
5 Tractor 170.00
6 Teamster driver for unit (Unit driven to and from project) 65.00
7 Freight included in rental cost -
8 User Defined -
Permits:
1
Rolling Equipment:
2
Total Cost of Mobilization: 726,319.50
Margins:
Comments::