Vous êtes sur la page 1sur 44

IATF

16949:2016
Key Changes from ISO/TS 16949: 2009

Quality Growth Services Pvt. Ltd.


H-13, Kirti Nagar, New Delhi-110 015
Tel.: +91-11-25431737, 25918332
e-mail: qgs@qgspl.com

PresentaGon Overview
IATF 16949 history

IATF Approach

Overview of IATF 16949

Risk Based Thinking

IATF 16949- Changes to Focus & by whom


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 2

Quality Growth Services 1


ISO/TS 16949

First ediGon: Second ediGon: Third ediGon: First ediGon:


ISO/TS ISO/TS ISO/TS IATF
16949-1999 16949-2002 16949-2009 16949-2016
•  Base document •  Base document •  Base document is •  Base document is
was ISO was ISO ISO 9001-2008 ISO 9001-2015
9001-1994 9001-2000

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 3

Approach of IATF 16949

Key is to engage three gears


PDCA

Process
Approach

Risk Based
Thinking

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 4

Quality Growth Services 2


IATF 16949 REQUIREMENTS
ISO 9001:2015

IATF
16949:2016
Auto specific
Supplemental
requirements

ISO/TS 16949: 8 Clauses & ISO


9001 imbedded in the standard IATF 16949: 10 Clauses & Only
supplemenal requirements

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 5

Model of ISO 9001: 2015


QUALITY MANAGEMENT SYSTEM
Organization & Customer
Its Context Support Satisfaction
(4) (7)
Operation
(8) DO
PLAN

Performance Result of
Customer Planning Leadership Evaluation
Requirements (6) (5) the QMS
(9)

Needs and CHECK


ACT
Expectations of
relevant Products
Improvement
interested and Services
(10)
Parties
(4)

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 6

Quality Growth Services 3


4.1, 4.2 & 6. 1
Understanding Contextual Issues, Related Interested ParGes & Risk
Assessment

§  Determine
§  Issues Affecting Organization QMS
§  Interested Parties in the Issues
§  Requirements of Interesting Parties
§  Impact on Customer, Operational Loss and Legal
compliance
§  Impact Score
§  Existing Controls & Related QMS Documents
§  Occurrence Rate of Non-compliance despite control
§  Overall Risk = Impact Score X Occurrence Rate
§  Actions Plan if Risk Score is high.

Implementation Responsibility: All Departments


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 7

6.1.2.1 : While doing Risk Analysis


Must include:
•  lessons learned from product recalls,
•  product audits,
•  field returns and repairs,
•  complaints, scrap, and rework.

Implementation Responsibility:
APQP Team Leader, Engineering, Production & QA

6.1.2.2
Take PrevenGve AcGons based on PotenGal Risks
idenGfied
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 8

Quality Growth Services 4


Corporate Responsibility

Personnel of company should be aware about


an anA-bribery policy,

an employee code of conduct, and

an ethics escalaAon policy ("whistle-blowing policy").

Implementation Responsibility: HR & All HODs

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 9

4.4..1.2 Product Safety


•  Be conversant with the process requirements
•  Safety CharacterisGcs of the product to be include it in FMEA,
including control in the event of rework & Control Plan
•  Display these on the related machines
•  Keep records of training to related operators
•  In case, any BOP/Job Work has Safety CharacterisGcs, it should
be defined in PO/Drawing
Implementation Responsibility:
1.  1st : APQP Team, Production, QA & Purchase
2.  2nd & 3rd Bullet: APQP Team
3.  4th Bullet: Production & QA
4.  5th Bullet: Purchase/SQA
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 10

Quality Growth Services 5


5.2 Policy

Linkage of Quality Policy with Vision & Mission

Policy to be made available to the relevant Interested


ParAes

Implementation Responsibility : MR

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 11

5.3.1 Ensuring Customer Req. are met

Define who will interact with customers for following &


convey in the company:
•  SelecGon of special characterisGcs: APQP Team
•  Se`ng quality objecGves and related training: APQP Team/QA
•  CorrecGve and prevenGve acGons: QA
•  Product design and development: APQP Team
•  Capacity analysis: ProducGon Team/APQP Team
•  LogisGcs informaGon: APQP Team/Sales
•  Customer scorecards and customer portals: Sales/QA

5.3.2 Authority to stop producGon : QA Team


Authority to stop shipment : Head (QA)
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 12

Quality Growth Services 6


6.1.2.3 : ConGngency Plans
Include following Risk and their Impact in ConAngency plan:

•  Infrastructure disrupAon
•  interrupAon from externally provided products,
processes, and services;
•  recurring natural disasters
•  Cyber ARack; and fire;

6.1.2.3 : Prepare plan for tesGng conGngent condiGons


•  Periodically Tested
•  Review at least annually –Involve top management

Res: Production, Maintenance, Purchase, HR/Admin & IT


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 13

CONTINGENCY PLAN
S. ConKn. Impact ExisKng Control Related Recovery Resp Outsourci Is If Yes, If No,
No. Cond. (Internal Work Time Limit ng (App. / TesKn Freq. Reasons
Performance, InstrucKon Not App.) g Reqd
Customer / / Format if
Legal Any
Compliance)
1 Non No Take power from DG 15 Electrical NA No N/A At Least
availabilit ProducGon/ set and conGnue Minutes Shig I/C once /
y of Less minimum operaGon and week of
Power ProducGon like minimum lighGng OperaGon DG
than target etc. Shig I/C. working
carried
out
2 ParGal Less Feeder redundancy is 2 Hours Electrical NA Yes Once
availabilit ProducGon available, follow Shig I/C / Year
y of than target change over and
Power procedure OperaGon
(Single Shig I/C
Feeder /
Incomer
Working)

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 14

Quality Growth Services 7


6.2.2.1 : Quality ObjecAves

AcAon plan for objecAves to be prepared. Which


should include:
What will be done

What resources will be required

Who will be responsible

When it will be completed

How the results will be evaluated

Implementation Resp : All HODs


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 15

7.3 AWARENESS

7.4
7.2 COMPETENCE
COMMUNICATION

7.1 RESOURCES
7 7.5 DOCUMENTED
SUPPORT INFORMATION

Clause-7

SUPPORT
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 16

Quality Growth Services 8


7.1. Resources

7.1.2 PEOPLE: Keep records of number of


personnel required and available: Resp: HR

7.1.3 INFRASTRUCTURE : Maintain details of


Infrastructure Required & available: Resp:ProducGon,
Maintenance, QA, HR/Admin
7.1.4 ENVIRONMENT: Maintain details of Environmental
CondiGons Required & Controls to maintain in
Environment matrix
Resp: HR
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 17

IDENTIFICATION AND MONITORING OF OPERATIONAL ENVIRONMENT


NAME OF DEPT.(S)
{Details related to Temperature, LighGng, Noise, Humidity and House Keeping} Keep separate details for Shop Floor and
offices, if applicable.
S. OperaGonal Desired Desired Controlling Means Resp. for Env. Cond. Related
No. Environmental CondiGon CondiGon Maint. Ok / Not Ok WI / IMP
Parameters Office Plant Area

1 IlluminaGon Minimum Minimum AutomaGc ON/OFF Elect OK


Level 500 Lux 100 Lux Timers/ Lux Meter
checking

2 Noise Level 60 dB 90 dB PPEs as defined for high Mech OK


noise area
4 Humidity Ambient Ambient Regular Monitoring Elect OK
5 Air Quality OperaGon OK
6 Work Place <25 Degree <40 Air CondiGoning /Heat OperaGon OK
Temperature Celcius Degree Shields / VenGlaGon Fans
Celcius

7 Waste Disposal Zero Waste Zero Waste Bins at designated Mech/Elect OK


at Dept Waste at areas + Regular disposal
Level Dept Level

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 18

Quality Growth Services 9


IDENTIFICATION AND MONITORING OF INFRASTRUCTURE

{Details related to Hardware (machines /equipment/drives/motors/transformers etc.), UGliGes, Material TransportaGon


Means (Cranes etc.) , InspecGon & TesGng Aids (Measuring instruments/Gauges etc.) and Computer Hardware &
Sogware required as applicable to Processes of the department.}

In case, Present CondiGon of exisGng infrastructure quanGty available is


"Not Ok" to meet department objecGves or new to be installed, iniGate Improvement Plans (AcGon Plan) preparaGon.

S. Required Responsibility Qty. Reqd. (Including in Qty. Gap of QuanKty to Present Planned
No. Infrastructure for Maintenance OperaKonal & Stand Availabl meet OrganizaKonal CondiKon AcKon if not
By/Spare) e Targets of Qty. OK
If any (E-F) Available
Ok/Not OK

1 Tunnel Furnaces OPRN/MECH/ 2 2 0 OK


ELECT

2 TF Blower motors ELECT 12 12 0 OK

3 TF Roller drives ELECT 435 410 25 OK

4 TF thermocouple ELECT 81 81 0 OK

5 TF Actutators ELECT 202 202 0 OK

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 19

7.1.3.1 Plant Facility and Equipment Planning


•  Carry out Risk Assessment for developing &
improving plant, facility & equipments plan
•  For new product(s) or new operaAons evaluate
manufacturing feasibility.
•  Carry out capacity planning as a part of
manufacturing feasibilty and proposed changes
to exisAng operaAons.
Implementation Resp.:
1.  1st
& 2nd
Bullet : APQP Team
2.  3 Bullet: Production/PPC
rd

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 20

Quality Growth Services 10


7.1.5.2.1 Calibra<on Record

CalibraAon / VerificaAon Records to include:

•  Check that Associated standard’s last calibraAon


date and the next due date on the calibraAon report
is provided.
•  Maintain List of soZware versions used for product
and process control equipment

Implementation Resp : QA, Engineering &


Maintenance
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 21

Socware and Control


S. No. Process / Test Socware Provided by Type of Control / Version Date
Method DescripKon TesKng No.

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 22

Quality Growth Services 11


7.1.5.3.2 External Laboratory
Verify that relevant calibraGon
service in the scope of the
accreditaGon (cerGficate) of
laboratory

Verify that cerAficate issued for


calibraAon or test report contains
mark of related naAonal
accreditaAon body,

Implementation Resp : QA

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 23

7.1.6 OrganizaGonal Knowledge

Determine the knowledge for operaAon of its processes

Maintain the knowledge

Make knowledge available to the extent necessary

Determine how to acquire or access any necessary addiAonal


knowledge and required updates.

Implementation Resp : All HODs


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 24

Quality Growth Services 12


OperaKonal Knowledge Accessibility
FuncKon Quality Assurance
Level Reference Based Knowledge Required Accessibility LocaKon*
for operaKon of its processes

Manager QA Test Method for product tesGng Hard Copy (QA Department)
ASTM Standards Hard Copy (QA Department)
IMS Procedures Shared Drive
Core Tools books referred in IATF Hard Copies (QA Department)

Customer Specific Requirements Hard Copy (QA Department)


Equipment Manuals Hard Copy (QA Department)
Internal Training Material Sog Copy (Head QA Computer)

* Accessibility can be through WI/Processes displayed/available at wok locaGon, SAP,


Share Point, etc.

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 25

7.2.2 Competence: On the Job Training

Ensure these persons are competent on the basis of


appropriate education, training or experience

On Job Training to include customer requirements where it


affects quality requirements & legal requirements

Applicable to all personnel in New or Modified Responsibili<es


(affecAng quality, internal and regulatory requirements)

Implementation Resp :
Direct: HR & Support: Production, QA and Maintenance
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 26

Quality Growth Services 13


COMPETENCE MATRIX FOR EMPLOYEES
Name of Department:
Date of EvaluaKon:
Knowledge Inputs Required to Afain Desired Present Status Further
Competence AcKons
Level Required
Desired Knowledge & Skill for Edu. Exp. Training Edu. Exp. Trg.
Assigned PosiKon

HOD 1. Planning & Organizing Departmental Degree 10 1. Safety Norms


(Process OperaGons Engg. / Years applicable in Mill
Owner) 2. Knowledge of XYZ Department Science OperaGons
Machines, Graduate 2 CommunicaGon
3. Knowledge of HSE related to Skills
Departmental OperaGons 3 Finance for non
4. Knowledge of Applicable IATF finance
requirements 4. IATF Awareness
5. SAP OperaGons
6. CommunicaGon Skill
7. PresentaGon Skill

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 27

COMPETENCE MATRIX FOR EMPLOYEES


Name of Department:
Date of EvaluaKon:
Knowledge Inputs Required to Afain Desired Present Status Further
Competence AcKons
Level
Required
Desired Knowledge & Skill for Edu. Exp. Training Edu. Exp. Trg.
Assigned PosiKon
SecGon 1. Planning & Organizing SecGon Degree / 7 1. Safety Norms
Head working Diploma / Years applicable in related
2. Knowledge of XYZ SecGon machines, Science machine OperaGons
3. Knowledge of HSE related to SecGon Graduate 2. IATF Awareness
machines OperaGons 3. Peer
4. Knowledge of Applicable IATF CommunicaGon
requirements 4. AIA as per ISO
5. MS Office OperaGon 14001
6. Core Quality Tools: Core Tools-APQP, 5. Core Tools-APQP,
PPAP, FMEA, SPC PPAP, FMEA, SPC
7. SAP OperaGons 6. Internal Auditor for
8. Add necessary Technical knowledge IATF
7. Internal Auditor
for ISO 14001
8. Add Necessary
Technical Training

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 28

Quality Growth Services 14


7.2.3 & 7.2.4 Auditor competency
Maintain list of qualified auditors:
AutomoAve Process Approach

Risk-based thinking;

Customer-specific requirements;

ISO 9001 and IATF 16949

Core tool requirements

Plan, conduct, report, and close out audit findings.

Implementation Resp : MR
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 29

List of Qualified Internal Auditors


S. Name Emp Quall Wor IAT Trai Core Tools PS CSR Process Related Measurement / Approved for
No. No. k F ned P Competence Test Method
Exp. by (Define Process Knowledge
where he / she
can Audit)

APQ FMEA/ PP SP MS Inte Proc Pro Seco


P Contr AP C A rnal ess duc rd
ol Plan QM t Part
S y

1 DME 20 YES YES YES YESYESYESYES YES Engi Prod Qu Q Dim √ √ √ √


yrs neer ucGoalit MS ensi
In ing n y onal
Engg

2 DME 10 YES YES YES YESYESYESYES YES Dim Co √ √


Yrs ensi aG
in onal ng
Prod
.

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 30

Quality Growth Services 15


7.4 CommunicaAon

Maintain a CommunicaGons Matrix relevant to the QMS

•  what it will communicate


•  when to communicate
•  with whom to communicate
•  how to communicate
•  who communicates

Implementation Resp : All HODs

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 31

COMMUNICATION MATRIX
Dept. / Sec : QA As On: 1 June, 2017
S. DescripKon of Mode Resp. Freq. / To be Communicated
No. Comm. When
Plant Head Prod Head Lab Dispat QA SAP Custo Supplier
Head Prod. Sup. (QA) Chemi ch Intern mer
st al
Record
s

1 Daily Quality E-Mail QA (O) Daily ✓




✓ ✓ ✓



Report

2 In-Process E-Mail QA Every ✓




✓ ✓




Sample Report Chem. Shig

3 Finished Good Hard QA Daily





✓ ✓



Test Reports Copy Chem.

Include all types of applicable CommunicaGons emerging from the FuncGon / SecGon and communicated with in
organizaGon OR to concerned External Interested Party (individual/group/organizaGon).

Mode of communicaGon can vary from Hard/Sog Copy, MeeGng(s), Display at NoGce Boards, Circulars, Verbal or through
Company BulleGns / News Levers etc.

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 32

Quality Growth Services 16


7.5 Documented informaAon

Maintain a matrix detailing customer-specific


requirements & related QMS Processes / Work
InstrucAons / Check Sheets

Implementation Resp : APQP Team

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 33

S. Customer Name Client 1 Name Client 2 Related IATF Owner


No. Specific Processes / Clause
Requirement WI / Check No.
List

1 Delivery 1. 100% on-Gme delivery (page a) As per Extranet


Requirements 32/46) same for sub suppliers. b) Returnable packaging
2. communicate any delay or as per GPS
risk to the affected Ford
customer

2 Specific 1. InspecGon and a) Traceability record as


records to be Measurement Records-min 2 per customer manual
maintained years (refer page 19/46).
2. QMS Audit records & MRM
records - min 3 years.
3. APQP/PPAP record - Gll
product live for producGon/
service requirement+1
calendar year.
4. Training records-min 3 years
from the date of training

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 34

Quality Growth Services 17


7.5.3.2.2 Engineering specificaAons (earlier 4.2.3.1)

Control of Engg. Specs as per related process.

Review to be done within 10 working days

Implementation Resp : QA

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 35

8.4 CONTROL OF
EXTERNALLY PROVIDED
8.3 DESIGN AND PROCESS, PRODUCTS AND
DEVELOPMENT OF SERVICES
PRODUCTS AND SERVICES 8.5 PRODUCTION AND
SERVICE PROVISION

8.2
REQUIREMENTS 8.6 RELEASE OF
FOR PRODUCTS PRODUCTS AND
AND SERVICES SERVICES

8.1 OPERATIONAL 8.7 CONTROL OF


PLANNING AND 8 OPERATION NONCONFORMING
CONTROL OUTPUTS

Earlier the Title was Product RealizaKon & Clause No-7

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 36

Quality Growth Services 18


8.2
REQUIREMENTS FOR
PRODUCTS AND SERVICES

8.2.1 8.2.2 8.2.3 8.2.4


CUSTOMER DETERMINING THE REVIEW OF THE CHANGES TO
COMMUNICATION REQUIREMENTS REQUIREMENTS FOR REQUIREMENTS
FOR PRODUCTS PRODUCTS AND FOR PRODUCTS
AND SERVICES SERVICES AND SERVICES

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 37

8.3.3.1 Product design input (earlier 7.3.2.1)

Boundary and interface requirements,

ConsideraAon of design alternaAves

Assessment of Risk

Consider preservaAon, health, safety and


environment

NOTE One approach for considering design alternaAves is


the use of trade-off curves.
Implementation Resp : Engg
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 38

Quality Growth Services 19


Trade-off Curve Resolve Contradic<ons

A good soluGon resolves the


contradicGon that is the cause of the
problem.

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 39

Tradeoff Examples

•  The product gets stronger (good)


–  but the weight increases (bad).
•  The faster the automobile airbag deploys, the better it
protects the occupant (good),
–  but the more likely it is to injure or kill small people or out-of-position people
(bad)

•  Software is made easier to use (good)


–  but versatility decreases (bad).
•  The hot coffee is enjoyable to drink (good)
–  but can burn the customer (bad).
•  Training gets more thorough (good)
–  but requires more time (bad).

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 40

Quality Growth Services 20


8.2.3.1.2 OrganizaAon manufacturing feasibility

•  As a part of APQP/Change Requirements, ensure :


–  manufacturing processes are capable of consistently producing
product that meets all of the engineering and capacity
requirements specified by the customer.
–  Conduct feasibility analysis for any manufacturing or product
technology new to the organizaAon and for any changed
manufacturing process or product design.
–  ValidaAon records of Rate of Run (ProducAon Rate to customer
desired delivery rate).

Implementation Resp : APQP Team


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 41

8.3.3.2 Manufacturing process design input


(earlier 7.3.2.2)
•  Product specificaAons including special characterisAcs;
•  targets for producAvity, process capability, Aming, and
cost;
•  manufacturing technology alternaAves;
•  customer requirements, if any;
•  experience from previous developments;
•  new materials;
•  product handling and ergonomic requirements;

Implementation Resp :
APQP Team / Engineering / HR
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 42

Quality Growth Services 21


8.3.3.3 Special CharacterisAcs (earlier 7.3.2.3)

•  Prepare Special CharacterisAcs symbol conversion


table detailing customer-specified definiAons and
symbols or the organizaAon's equivalent symbols or
notaAons

Implementation Resp : Engineering


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 43

SPECIAL CHARACTERISTICS CONVERSION TABLE

S. Company Cust Cust Cust Cust Cust Cust


Cate. Type Sev.
No. Symbol 1 2 3 4 5 6

Safety Cr

1 CriGcal ≥9
Legal Cr

Performance Maj

2 Major 5-8
FuncGon Maj

Fitment Maj

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 44

Quality Growth Services 22


8.3.5.1 Design and development outputs —
supplemental – (Product Related)
•  Results of product design error-proofing, such as DFSS, DFMA,
and FTA;
•  Product definiAon including 3D models, technical data
Packages, product manufacturing informaAon, and geometric
dimensioning & tolerancing(GD&T);
•  2D drawings, product manufacturing informaAon, and
geometric dimensioning & tolerancing(GD&T);
•  Service part requirements;
•  Packaging and labeling requirements for shipping.

Implementation Resp : Engineering

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 45

8.3.5.2 Manufacturing process Design and development


outputs — supplemental (earlier 7.3.3.2)

•  Special characterisAcs for product and manufacturing process;


•  IdenAficaAon of process input variables that impact
characterisAcs;
•  Tooling and equipment for producAon and control, including
capability studies of equipment and process(es);
•  Linkage of product, process, and tooling;
•  Capacity Analysis;
•  Tools & Equipment Maintenance Plans and Instruc<ons;
•  Method of CorrecAon of Products (when found non-conforming in
rapid detecAon)

Implementation Resp :
APQP Team / Engineering & Production
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 46

Quality Growth Services 23


8.4.1.2 Supplier selecAon process (earlier 7.4.1)

Implement modified supplier selecAon criteria with


following addiAons: :
•  volume of automoAve business (absolute and as a percentage of
total business);
•  financial stability;
•  adequacy of available resources (e.g., people, infrastructure);
•  manufacturing capability;
•  change management process;
•  business conAnuity planning (e.g., disaster preparedness,
ConAngency planning);
•  logisAcs process;
Implementation Resp :
Purchase/SQA: For Changes in supplier selection process
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 47

8.4.2.1 Control on Outsourced Processes


Typically these will be :

•  CalibraAon
•  Transport Services
•  Shipping Services
•  Job Work

Monitor their performance as defined

Implementation Resp : Purchase

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 48

Quality Growth Services 24


8.4.2.2 Statutory and regulatory requirements (earlier
7.4.1.1 regulatory conformity)

Before placing purchase orders, ensure that


products are in compliance to countries of:
•  of receipt,
•  shipment, and
•  desAnaAon (where given customer OR product is for export)

Where defined by customer, ensure compliance to


statutory & regulatory requirements, by self and
suppliers,
Implementation Resp : Purchase
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 49

8.4.2.3 Supplier quality management system


development(earlier 7.4.1.2)
•  Ensure that suppliers are cerGfied to ISO
9001 by IAF-MLA accredited body
•  Those not cerGfied make plan for second
party audit leading to acGons eventually
MAQMSR
cerGficaGon to ISO 9001: 2015 CONTROL PLANS
•  Those CerGfied make their development PROCESS APPROACH
plan with customer-defined QMS PERFORMANCE
requirements, such as “Min. Auto QMS INTERNAL AUDITING
Req. for Sub-Tier Suppliers” (MAQMSR) or CONTROL OF NON-
equivalent through second-party audits; CONFORMING
PRODUCT
•  No acGons required for those cerGfied to PART APPROVAL
IATF 16949 MANAGEMENT
Implementation Resp : SQA RESPONSIBILITY
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 50

Quality Growth Services 25


8.4.2.4.1 Second-party audits

Prepare Second Party audits plan and carry out. Plan


be based on:
•  Product safety / regulatory requirements,
•  Performance of the supplier, and
•  QMS cerAficaAon level,

Retain records of the second-party audit reports.

Implementation Resp : SQA


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 51

8.4.2.5 Supplier development


Prepare plan for supplier development acGons for
acGve suppliers based on:
•  Performance issues idenGfied through supplier monitoring
•  Second-party audit findings (see SecGon 8.4.2.4.1);
•  Third-party quality management system cerGficaGon status;
•  Risk analysis.
AcGons are :
•  ResoluGon of open (unsaGsfactory) performance issues and
•  pursuing opportuniGes for conGnual improvement.

Implementation Resp : SQA


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 52

Quality Growth Services 26


8.5.1.1 Control Plan (earlier 7.5.1.1)
Review the Control Plans at set frequency –
Recommended once/Year

For transiAon audit, review them once before audit.

In case, number of control plans are large, do partly


now and make acAon plan for balance

Implementation Resp :
Production, Engineering and QA
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 53

8.5.1.2 Standardised work — Operator InstrucAons and


visual standards

Ensure operator safety guidelines are


included in Work Area(s)

Work InstrucGons should be in the language


understood by the operators

Implementation Resp : Production


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 54

Quality Growth Services 27


8.5.1.3 VerificaAon of job set-ups

first-off parts should


be retained for
last-off-parts should be
comparison with the
retained for comparison
last-off parts;
with first-off parts in
subsequent runs;

Earlier ONLY Last Off Comparison was recommended

Implementation Resp : Production


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 55

8.5.1.4 VerificaAon aZer shutdown

Define and implement the necessary acAons to ensure


product compliance with requirements aZer a planned or
unplanned producAon shutdown period.

Implementation Resp : Production

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 56

Quality Growth Services 28


8.5.1.5 Total produc<ve maintenance (earlier 7.5.1.4
Preven<ve and predic<ve maintenance)

TPM System to include


• Monitor Maintenance objecAves : OEE, MTBF, MTTR
and PrevenAve Maintenance compliance metrics.
• Prepare correcAve AcAon Plans when not achieved
• Report Maintenance ObjecAves Performance in MRM
• Prepare Periodic Overhaul Plan and implementaAon.

Implementation Resp : Maintenance


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 57

8.5.1.6 Management of producAon tooling and manufacturing,


test, inspecAon tooling and equipment

Establish system for:


§  Tool design modificaGon documentaGon, including
engineering change level of the product
§  Tool IdenAficaAon by serial / asset number
•  Permanent marking on each customer-owned tools,
manufacturing equipment,& test / inspecGon
equipment to enable their ownership and applicaGon
Implementation Resp : Tool Room / QA / Production
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 58

Quality Growth Services 29


8.5.1.7 ProducAon scheduling (earlier 7.5.1.6)

While preparing ProducAon Scheduling


pay due aRenAon to line stoppage due
to prevenAve maintenance:

Implementation Resp : PPC


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 59

8.5.2.1 IdenAficaAon and traceability – supplemental

Develop system that:

•  Enables idenAfying & segregaAng nonconforming and/or


suspect product;
•  Ensures ability to meet the customer and/or regulatory
response Ame requirements;
•  Serial no. to individual products, if specified by the
customer or regulatory standards;
•  Ensures idenAficaAon and traceability details of externally
provided products with safety/regulatory characterisAcs.

Implementation Resp.: Store / Prod. / QA /Dispatch


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 60

Quality Growth Services 30


8.5.3 Property belonging to Customers OR external
providers

•  Added control on external providers property too in


addiAon to Customers property
•  These can be materials, components, tools and
equipment, premises, intellectual property and personal
data

Implementation Resp.:
Store / Production / QA / Dispatch

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 61

8.5.6.1 Control of changes – supplemental

•  In addiAon to ECN & PCN now addresses 4M Change


too.

Implementation Resp.: Production / QA

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 62

Quality Growth Services 31


8.5.6.1 Control of changes – supplemental (earlier 7.1.4)

•  noGfy the customer of any planned product realizaGon


changes ager the most recent product approval;
•  obtain documented approval, prior to implementaGon of the
change;
•  complete addiGonal verificaGon or idenGficaGon
requirements, such as producGon trial run and new product
validaGon.

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 63

8.5.6.1.1 Temporary change of process controls


Prepare Primary Process Control and approved back-up or alternate
methods in prescribed format.

For both methods


•  Maintain a list of process controls,
•  inspecGon, measuring, test, and
•  error-proofing devices
Approved alternate process control methods be referenced in the
control plan

Ensure that for each alternate process control method, standard


work instrucGons is maintained.

Implementation Resp.:
APQP Team / Engineering & QA
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 64

Quality Growth Services 32


8.5.6.1.1 Temporary change of process controls
Obtain approval of Head (ProducGon) & Head (QA) before
use of alternate method

When Alternate Process Control is in use, at least once a day


review the operaGon of alternate process controls to verify
implementaGon of standard work with the goal

On daily basis, Head ProducGon to evaluate readiness for


returning to standard process

Implementation Resp : Production & QA


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 65

8.5.6.1.1 Temporary change of process controls

Obtain customer approval before shipping


product inspected or tested using the
alternate method

Implementation Resp : QA
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 66

Quality Growth Services 33


8.5.6.1.1 Temporary change of process controls

Maintain restart verificaGon records for a defined period based


on severity and confirmaGon that all features of the error-
proofing device or process are effecGvely reinstated.

Implement traceability of products produced when any


alternate process control devices or processes are being used

Implementation Resp : QA
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 67

LIST OF PRIMARY AND ALTERNATE/ TEMPORARY PROCESS CONTROLS


NAME OF DEPARTMENT:
Sr. Process LocaKon of use DescripKon Type of Alternate Control Linked Resp. for Approval
No (Stage / of Primary Control Method/device WI / to be
Machine / Controls (Prev. / Det.) Format Daily Daily taken for
OperaKon) review audit use of
of Opn. alternate
methods
/ device

1 Charging of Pressure Vessel Weight PrevenGve Manual Charging and WI/OP/ P - HOD
Base oil control Weight Checking 16 (Prod.)
Pressure through PLC Through Weight
Vessel indicator

2 Charging Of Pressure Vessel Weight DetecGve External Weighing WI/OP/ P - HOD


favy Acid to indicator of Machine 01 (Prod.)
pressure pressure
vessel vessel

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 68

Quality Growth Services 34


8.6.5 Statutory and regulatory conformity

Prior to release of externally provided products


into its producAon flow,

•  confirm & provide evidence that externally provided


processes, products, and services conform to the
latest applicable statutory, regulatory, and other
requirements in the countries:
•  where they are manufactured &
•  customer-idenAfied desAnaAon

Implementation Resp : SQA


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 69

8.7.1.4 & 8.7.1.5Control of repair & rework


•  Include risk of rework & repair in FMEA
•  Rework controls be defined in the control plan or other relevant
documented informaAon to verify compliance to original
specificaAons.
•  Repair controls be defined in the control plan or other relevant
documented informaAon to comply with relevant specificaAon
•  Retain records of the disposiAon of reworked / repaired products
including quanAty, disposiAon, disposiAon date, and traceability
•  Obtain customer approval, if proposed to send repaired items to
customers.
Implementation Responsibility :
1 , 2 & 3 Bullets: Engineering
st nd rd

4th & 5th Bullets: QA


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 70

Quality Growth Services 35


List of Risk Analysis for Rework / Repair

Sr. Prod. Type of Type of Risk involved Impact on ExisKng Any


No. Process rework repair on during rework / Subsequent Controls further
product repair Processes / (During acKon
Customer repair / planned to
rework) & improve
verificaKon
1 PainGng Filling Puvy 1. Under filling 1. Life of WI-XYZ
to fill pin 2. Incomplete Product
holes/ Bonding reduces
Uneven 2. Poor
Surface Appearance
2 Machini Burr 1. Burr Fully not 1. Fitment WI-XYZ
ng Removal removed during
2. Injury to person assembly
during deburring 2. Scratches
on maGng
parts

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 71

9.2 Internal
audit
9.1 Monitoring,
9.3
measurement,
Management
analysis and
review
evaluaGon

9
Performance
evaluaGon

9. PERFORMANCE EVALUATION
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 72

Quality Growth Services 36


9.1.2.1 Customer saKsfacKon – supplemental (earlier 8.2.1)

§  Ensure that following are evaluated as a part of


customer saAsfacAon process:
§  Performance indicators to include: recalls, field failure &
rejecAon / failure at client end
§  online customer portals and customer scorecards, where
provided

Implementation Resp : QA
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 73

9.2.2.1 Internal audit programme (earlier 8.2.2.4)

•  PrioriAzed based on risk


•  Audit frequency to be adjusted based on change in
management / occurrence of process changes

Implementation Resp : MR

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 74

Quality Growth Services 37


9.2.2.2 Quality management system audit

Make three-year Audit calendar

Use process approach to verify


compliance

Sample CSR controls for effecAve


implementaAon.

Implementation Resp : MR
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 75

9.2.2.3 Manufacturing process audit (earlier 8.2.2.2)


Plan Audit of all manufacturing processes over each three-year
calendar period,

Where customer-specific required approaches defined, Use it

Audit should be planned for all shigs especially focus during


during shig change over

Audit to focus on effecGve implementaGon of the PFMEA,


control plan, WIs & check sheets

Implementation Resp : QA
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 76

Quality Growth Services 38


9.2.2.4 Product audit (earlier 8.2.2.3)

•  Using customer-specific required approaches else define the
approach to be used.

Implementation Resp : QA
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 77

9.3.2 Management Review Input (earlier 5.6 review input)


Carry out Review which should include:
•  changes in external and internal issues & feedback from interested parAes
•  Performance of external providers;
•  EffecAveness and Efficiencies of product realizaGon & support processes
•  the effecAveness of acAons taken to address risks and opportuniAes
•  Review Actual ObjecAve Achieved V/S Planned
•  EffecAveness of the audit programme
•  Performance Target defined by Customer V/S Achieved
•  Review of Customer Scorecard
•  Assessments of manufacturing feasibility made for changes to exisGng
operaGons and for new faciliGes or new product
•  Warranty performance (where applicable);
•  IdenGficaGon of potenGal field failures idenGfied in FMEA
•  Actual field failures and their impact on safety or the environment.


Implementation Resp : MR
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 78

Quality Growth Services 39


9.3.3.1 Management Review outputs – supplemental


•  document and implement an acAon plan when customer
performance targets are not met.

Implementation Resp : MR
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 79

10.2
Nonconformity
and correcGve
acGon
10.3
10.1
ConGnual
General
improvement

10
Improvement

10. IMPROVEMENT

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 80

Quality Growth Services 40


Clause 10: Improvement

10.1 General (adopted from ISO 9001:2015)



•  address future needs and expectaGons;
•  correcGng, prevenGng or reducing undesired effects;

NOTE Examples of improvement can include correc<on,


correc<ve ac<on, con<nual improvement, breakthrough
change, innova<on and re-organiza<on

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 81

10.2.3 Problem solving (earlier 8.5.2.1)


§  Understand process established for problem solving & use
prescribed format. Demonstrate capability to use quality tools
like
§  Pareto Analysis
§  F/B Diagram and
§  Why-Why Analysis
§  Either make separate process OR Work InstrucAon / Guideline
supporAng CorrecAve AcAon Process

Implementation Resp : MR
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 82

Quality Growth Services 41


10.2.3 Problem solving (earlier 8.5.2.1)
Following Logical Problem Solving Steps have been defined:

containment, interim acAons, and related acAviAes necessary for control of


nonconforming outputs

root cause analysis, methodology used, analysis, and results;

systemic correcGve acGons, including consideraGon of the impact on similar


processes and products;

verificaGon of the effecGveness of implemented correcGve acGons;

reviewing and, where necessary, updaGng the appropriate documented


informaGon (e.g., PFMEA, control plan).

Use customer specific prescribed processes, tools, or systems


© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 83

10.2.4 Error proofing (earlier 8.5.2.2)


Prepare List of Error Proofing Devices;

Ensure they are referred in PFMEA

Include these control in Control Plan & also define reacAon plan
of device these failures

Keep records of their tesAng for failure or simulated failure.

Implementation Responsibility:
1.  Defining Error Proofing devices in FMEA/Control : APQP Team
2.  Testing of Error Proofing devices: Production/QA
© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 84

Quality Growth Services 42


LIST OF ERROR PROOFING IMPEMENTED IN ----------------------- AND THEIR EFFECTIVENESS MONITORING PLAN

Department Month;
Sr. Machine/ Pot . / Actual Error Related Prev. / TesGng/ Res. ReacGon 1 2 3
No. Equip. failure or proofing to Det. VerificaGon plan /
Descrip. situaGon / details / (Quality Freq. Alternate
charact. to be Devices /Safety) method if
controlled used mistake
through error proofing fail
proofing
1 Grease To prevent rise PLC Quality Prev. Once / Year Maint. OpGcal

Cooking & Fall in Control & Safety Temp.


Oven cooking Sensors
Temperature
beyond
tolerance limit

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 85

Master Pieces (Challenge Part) Control


Challenge Fixture ID / Control method Frequency of Resp. Date Shig
Part details Serial No. (VerificaGon / (verificaGon/
calibraGon) calibraGon)

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 86

Quality Growth Services 43


10.2.5 Warranty management systems
•  Implement a warranty management process; (follow
customer specified approach, where specified)

•  Process to include a method for warranty part analysis,
including NTF (No Trouble Found).

Implementation Responsibility: QA

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 87

END OF SESSION

© February 18, Quality Growth Services. Unpublished proprietary work available only under license. All rights reserved. 88

Quality Growth Services 44

Vous aimerez peut-être aussi