Post-tensioned timber Hybrid floor system

frame using hardwood using beech and


concrete
At ETH Zurich, a new very effective The new floor system was realised in
post-tensioned timber frame structure a timber-concrete composite system
using hardwood was developed. using the excellent material proper-
ties of beech laminated veneer
From research into The result is an efficient
practice In 2010, a project connection which auto- lumber.
to develop a new post-ten- matically centres itself.
sioned timber frame Innovative designs with structural components
structure has started at beech Beech has fanta- using beech laminated
the Institute of Structural stic mechanical material veneer lumber (LVL).
Engineering (IBK). properties, but is now-
adays typically used for The timber-concrete
The beam-column energy production and composite floor system
connection using furniture making. In order uses beech LVL as
ETH House of glued-laminated timber Construction of the pre-stressed timber frame to support the use of formwork during the
impresses with a high beech as a building ma- construction and rein-
Natural Resources controlled quality and The post-tensioned terial, the development forcement when it is in
a fast on-site erection timber frame has been of innovative structures service. Additionally, a
due to the simple design successfully implemen- and novel applications for visibly appealing slab

Modern timber const- of the system. It shows


the great potential of
ted in the top two storeys
of the ETH House of
beech is necessary. underside is achieved.

ruction: Office building post-tensioned timber


frames in particular
Natural Resources and
forms the framework for
The composite slab is
designed to have a ductile
and research lab for multi-storey timber
buildings.
the floor elements. The
construction is – apart
structural behaviour; a
property that appreciates
from the steel tendon to every engineer.
Fast and flexible cons- apply the prestressing
Winner of Schweighofer Award 2015 truction Columns and – realised without any Construction of hybrid floor In addition to the im-
beams are prefabricated. metallic fasteners in the pressive mechanical
The post-tensioning is connection. An extension At the Institute of Struc- and practical building
done on-site. of the structure to add tural Engineering of ETH properties, the composite
additional storeys Zurich, a comprehensive slab is ecological and
IBK - Institute of Structural Engineering upwards is possible. research project has been also economical (price)
initiated to develop new competitive.
Map of
Monitoring Questions & Answers
Campus ETH Hönggerberg, Zurich
and dynamic tests Advantages & Arguments

The comprehensive measuring sys-


tem serves to detect the behaviour of
the building over a period of several
years.

Each movement is In addition, optical strain


documented In the measurement systems Timber frame structure of ETH House of Natural Resources
ETH House of Natural were installed, which
Resources a dense record the strain distribu- Why building like that? What does it cost?
sensor network has been tion in the timber frame Wood is a renewable, The construction of the
installed to detect the in the long term. particularly sustainable ETH House of Natural
behaviour of the structure and locally available Resources and the
during construction and Recorded data improves building material. The extensive monitoring of
ETH House of Natural Resources operation. design models The com- high degree of prefab- the innovative building
posite slab is monitored rication ensures a high systems leads to accura-
For example, 16 load by measuring the relative quality and a fast on-site te in-depth information
cells were installed to displacement between erection. of the structural beha-
monitor the prestressing the beech LVL plate and viour. Experience shows
force in each tendon of the concrete plate. The Who is interested in this that the timber-concrete
the post-tensioned tim- absolute deformations structure? Innovative, composite floor and the
Contact ber frame construction. of the entire building are modern builders and in- post-tensioned timber
further recorded with a vestors who are planning frame are competitive
ETH Zürich tachymeter. an office or residential with conventional const-
Institute of Structural Engineering (IBK) building or topping up of ruction systems.
Prof. Dr. Andrea Frangi Recorded datas are used existing buildings.
Stefano-Franscini-Platz 5 to develop new design
8093 Zürich models and constantly Who can build like that?
improve existing design Contact us if you are
frangi@ibk.baug.ethz.ch Monitoring during construction
models. interested to realise your
www.ibk.ethz.ch building as an innovative
and eco-friendly timber

© ETH Zürich, January 2016


system. www.honr.ethz.ch →