LOCATION
AT NEW BONGAIGAON, ASSAM.
CLIENT
RITES LIMITED
REPORT NO.:
REVISION NO.:
CHANGE :
PREPARED BY :
CHECKED BY :
AUTHORISED BY :
1 GENERAL 1
2 SITE LOCATION 1
3 OBJECT OF INVESTIGATION 1
4 SCOPE OF WORK 1
6 FIELD INVESTIGATIONS 3
8 LABORATORY TESTING 4
13 NOTATIONS 13
14 REFERENCES 14
15 ANNEXURES -
DESCRIPTION OF NEW New Bongaigaon is a city in the Indian state of Assam. The
BONGAIGAON : City included or new part of municipal board of Bongaigaon
District. The town, divided into two parts – Old Bongaigaon and
New Bongaigaon, is situated 180 kilometers (112 mi) north
west of Guwahati. To meet the demands of Bodos of Assam,
Bongaigaon was divided to give way for Chirang district.
Bongaigaon has a major petrochemical industry, the Indian Oil
Corporation Limited(IOCL BGR).
The town occupied a place in the map of Indian Railway with
the establishment of the railway station in the year 1908. Most
of the institutions like ITI, Bongaigaon College, Office of
the Assam State Electricity Board, in the early 60’s and in fact
the very base of the development of the town was laid in this
decade only. The development further gained momentum with
the establishment of the Bongaigaon Refinery and Petrochemi-
cals Limited (BRPL) Complex in the year 1972
at Dhaligaon and also Thermal Power Plant at Salakati.
Though these area are not within the limit of Bongaigaon Mu-
nicipality the town also caters to the demand of this population.
The Bongaigaon Town Committee was first constituted in the
year 1961 and was upgraded to a Municipal Board in the year
1977. Presently the Municipal Area consists of 25 nos. of
wards covering an area of 14.31 sq m.
New Bongaigaon falls under the Northeast Frontier Rail-
way zone of the Indian Railways.There are two stations in
Bongaigaon - New Bongaigaon railway station (2nd largest
railway junction of Assam state) with a population around
1,74,160.
It is situated 36 m above mean sea level with average annual
temperature around 26 Co , climate condition in new bongaiga-
on is semi arid with annual precipitation around 1717 millimeter
It is situated near banks of Manas & Champabati river
(Tributary of the Brahmputra river)
New Bongaigaon Falls under earthquake zone V according to
IS 1893(part 1) : 2016.
FIELD INVESTIGATION :
6 No. of 150 mm. dia bores were drilled down up to the depth
FIELD BORING & SAMPLING :
of 15.00 mt. at proposed site of construction by our skilled and
experienced site personnel by using percussion drilling in Feb-
ruary 2018 as suggested by client.
2) Atterberg Limit
3) Specific Gravity
5) Direct Shear Test : The direct shear tests were carried out
by small size box shear test in accordance with IS- 2720
(Part-13 )-1986 and apparatus confirming to IS- 11229-
1985.
5
BH-2
The first layer from 0.00mt.to 1.70mt. consists of brownish
medium to fine grained non plastic sandy silt.
The layer from 1.70mt.to 15.00mt. consists of brownish medi-
um to fine grained non plastic silty sand mixed with kankkars.
BH-3
The first layer from 0.00mt.to 2.10mt. consists of brownish me-
dium to fine grained non plastic sandy silt.
The layer from 2.10 mt.to 13.70mt. consists of brownish medi-
um to fine grained non plastic silty sand mixed with little kank-
kars.
The layer from 13.70mt.to 15.00mt. consists of brownish medi-
um to fine grained non plastic sandy silt.
BH-4
The first layer from 0.00mt.to 5.20mt. consists of brownish
medium to fine grained non plastic silty sand mixed with little
kankkars.
The layer from 5.20mt.to 6.90mt. consists of brownish medium
to fine grained non plastic sandy silt.
The layer from 6.90mt.to 15.00mt. consists of brownish medi-
um to fine grained non plastic silty sand mixed with little kank-
kars.
BH-5
The first layer from 0.00mt.to 8.20mt. consists of brownish me-
dium to fine grained non plastic silty sand mixed with little
kankkars.
The layer from 8.20mt.to 10.10mt. consists of brownish medi-
um to fine grained non plastic sandy silt.
The layer from 10.10mt.to 15.00mt. consists of brownish medi-
um to fine grained non plastic silty sand mixed with little kank-
kars.
BH-6
The first layer from 0.00mt.to 15.00mt. consists of brownish
medium to fine grained non plastic silty sand mixed with kank-
kars.
The water table was encountered at 2.10mt in the borehole
WATER TABLE :
during the investigation in February 2018.
7
VOID RATIO:- Void ratio of a soil mass is defined as the ratio of volume of voids to the volume of solids.
e0 VOID RATIO = ((G * ϒw)/ϒd) - 1 0.88
In Case of
General shear Qd = C*Nc*sc*dc*ic + q*(Nq-1)*sq*dq*iq + 0.5*B*ϒ*Nr*sr*dr*ir*W'
failure
Where,
VOID RATIO:- Void ratio of a soil mass is defined as the ratio of volume of voids to the volume of solids.
e0 VOID RATIO = ((G * ϒw)/ϒd) - 1 0.8832
In Case of Local
q'd = 2/3*C*N'C*sC*dC*iC + q*(N'q-1)*sq*dq*iq + 0.5*B*ϒ*N'r*sr*dr*ir*W'
shear failure
Where,
VOID RATIO:- Void ratio of a soil mass is defined as the ratio of volume of voids to the volume of solids.
e0 VOID RATIO = ((G * ϒw)/ϒd) - 1 0.8832
Ultimate bearing capacity for mixed shear failure can be obtained by linear inter pollation between general shear
failure and local shear failure.
2
SBC calculation for local shear failure = 16.51 t/m
2
SBC CALCULATION FOR MIXED SHEAR FAILURE = 9.54 t/m
10
WHERE,
B = WIDTH OF FOUNDATION IN m 3 m
3
FIELD DENSITY OF SOIL IN /m = 1.52 t/m3
DEPTH OF FOUNDATION IN m 4 m
Cb= Grain Size Correction Factor as per Foundation Engineering by N.V.NAYAK on page no 2.42 1
The ultimate load capacity of pile (Qu) for medium & coarse sand is given as :
Qu = 40N Ap +
.
For non-plastic silt or very fine sand the equation has modified as ;
Qu = 30N Ap +
.
where,
N = average N value at pile tip 34
Lb = effective length of penetration of pile in the baring strata in m 7
D = diameter or minimum width of pile shaft in m 0.45
Ap = cross sectional are of pile tip in m2 0.15896
N' = average N along the pile shaft 21
As = surface area of pile shaft in m2 9.891
RECOMMENDATIONS & : 1) Water table was encountered in all of the boreholes during
the investigation in February 2018.
CONCLUSIONS
2) We have determined Safe Bearing Capacity as mentioned
below for the proposed structure. Suitable values may be
used for design purpose.
3) We have determine the liquefaction potential as soil is
fine sand and mixture of silt with presence of ground water
table.
BH - 4
3.00 3.00 6.36 3.85 3.00
4.00
4.00 4.00 6.38 3.68 3.00
3.00 3.00 8.01 3.45 3.00
Isolated 5.00
4.00 4.00 7.95 3.29 3.00
3.00 3.00 9.72 2.63 2.00
6.00
4.00 4.00 9.57 2.40 2.00
2.00 15.00 100.00 4.64 3.06 3.00
Raft
3.00 15.00 100.00 5.82 4.01 4.00
BH - 5
3.00 3.00 5.48 6.42 5.00
4.00
4.00 4.00 5.51 5.81 5.00
3.00 3.00 6.89 7.09 6.00
Isolated 5.00
4.00 4.00 6.85 6.75 6.00
3.00 3.00 8.35 9.12 8.00
6.00
4.00 4.00 8.29 8.71 8.00
2.00 15.00 100.00 3.96 3.52 3.00
Raft
3.00 15.00 100.00 4.99 4.10 4.00
BH - 6
3.00 3.00 9.43 3.04 3.00
4.00
4.00 4.00 9.43 2.90 2.00
3.00 3.00 11.92 3.04 3.00
Isolated 5.00
4.00 4.00 11.77 2.90 2.00
3.00 3.00 14.54 3.04 3.00
6.00
4.00 4.00 14.21 2.90 2.00
2.00 15.00 100.00 7.24 2.28 2.00
Raft
3.00 15.00 100.00 8.93 2.26 2.00
14
Safe
Effective Total Length
Foundation Dia. Of Pile Liquefaction Bearing
BH No. Cutoff (m) Length of Of Pile
type (m) potential (m) capacity
pile (m) (m)
(tonnes)
NOTATIONS
BH Bore Hole
N SPT Value
DS Disturbed Sample
UDS Undisturbed sample
DU Direct Shear Undrained Test
TU Trialxial Shear Undrained Test
LL Liquid Limit
PL Plastic Limit
PI Plasticity Index
NP Non Plastic
SC Clayey Sand
SM Silty sand
SW Well graded sand
SP Poorly graded sand
CH Clay of high plasticity
CI Clay of Intermediate plasticity
CL Clay of Low plasticity
MH Inorganic silt of high plasticity
MI Inorganic silt of Intermediate plasticity
ML Inorganic silt of low plasticity
GC Clayey Gravels
ɸ Angle of internal friction
qd Net ultimate bearing capacity
Cc Compression Index
C Cohesion
Ɣb Bulk density
MC Moisture Content
B Width of Footing in mt.
Nc, Nq & NƔ Bearing Capacity Factors
Sc, Sq & SƔ Shape Factors.
dc, dq & dƔ Depth Factors
ic, iq & iƔ Inclination Factors.
w Correction factor for water table.
16
GENERAL REFERENCES
Indian Standards IS 2720 Part -II, Part -III, Part -IV, Part -V, Part -XIII Part -XXXI,
Part -XXVII, Part -XXXI, Part -XXV
IS - 1948, IS - 6403, IS - 1904, IS:6409-1981
IS : 6403-1971 IS 456-2000
IS 2720(Part IV & V)-1985.
IS 9259-1979 & 11196-1985
IS-11229-1985.
IS-1893 (Part –1 ) : 2016
Thickness
Soil
Legend
DEPTH OF STRATA
(meter)
(m)
DEPTH TYPE NO. N1, N2 , N3 N REMARKS
Depth
(m)
(m)
100
12345678
20
40
60
80
12345678
12345678
12345678 1.90
brownish medium to fine
ML 12345678
12345678
12345678
1 grained non plastic sandy 12345678
12345678
silt. 12345678
12345678
12345678
12345678 1.50 SPT 1 2,2,4 6 .
0 -
12345678
1.90 12345678
SM 5.10
3 3.00 SPT 2 4,4,5 9 .
0 -
6.00 UDS 1 - - -
13
13.50 SPT 8 21,25,27 52 .
0 -
DESCRIPTION
Thickness
Soil
Legend
DEPTH OF STRATA
(meter)
(m)
DEPTH TYPE NO. N1, N2 , N3 N REMARKS
Depth
(m)
(m)
100
12345678
20
40
60
80
12345678
12345678
12345678 2.40
ML 12345678
brownish medium to fine 12345678
12345678
1 grained non plastic sandy 12345678
12345678
silt. 12345678
12345678
12345678 1.50
12345678
12345678
UDS 1 - - -
12345678
12345678
12345678
2.40 12345678
12345678
SM 12.60
3 3.00 SPT 1 4,5,5 10 .
0 -
13
13.50 SPT 7 25,27,30 57 .
0 -
Thickness
Soil
Legend
DEPTH OF STRATA
(meter)
(m)
DEPTH TYPE NO. N1, N2 , N3 N REMARKS
Depth
(m)
(m)
100
12345678
20
40
60
80
12345678
12345678
12345678 1.70
brownish medium to fine
ML 12345678
12345678
12345678
1 grained non plastic sandy 12345678
12345678
silt. 12345678
12345678
1.70
12345678
12345678
12345678
1.50 SPT 1 2,2,4 6 .
0 -
SM 13.30
3 3.00 UDS 1 - - -
DESCRIPTION
Thickness
Soil
Legend
DEPTH OF STRATA
(meter)
(m)
DEPTH TYPE NO. N1, N2 , N3 N REMARKS
Depth
(m)
(m)
100
20
40
60
80
SM 5.20
1
1.50 UDS 1 - - -
4.50 UDS 2 - - -
5.20 5 123456789
123456789
123456789
123456789
brownish medium to fine ML 123456789
123456789 1.70
123456789
grained non plastic sandy 123456789 .
123456789
123456789
6.00 SPT 2 3,3,5 8 0 -
silt. 123456789
123456789
123456789
6.90 123456789
7
SM 8.10
7.50 SPT 3 3,4,4 8 .
0 Sample not
recovered
9 9.00 .
SPT 4 5,6,6 12 0 -
13
13.50 SPT 7 8,12,15 27 .
0 -
Thickness
Soil
Legend
DEPTH OF STRATA
(meter)
(m)
DEPTH TYPE NO. N1, N2 , N3 N REMARKS
Depth
(m)
(m)
100
20
40
60
80
SM 8.20
1
1.50 SPT 1 3,4,5 9 .
0 -
3 3.00 UDS 1 - - -
brownish medium to fine
grained non plastic silty sand
mixed with little kankkars.
4.50 SPT 2 3,6,9 15 .
0 -
5
DESCRIPTION
Thickness
Soil
Legend
DEPTH OF STRATA
(meter)
(m)
DEPTH TYPE NO. N1, N2 , N3 N REMARKS
Depth
(m)
(m)
100
20
40
60
80
SM 15.00
1
1.50 UDS 1 - - -
7
7.50 SPT 3 2,3,4 7 .
0 -
9 9.00 .
SPT 4 3,5,5 10 0 -
13
13.50 SPT 7 11,15,19 34 .
0 -
Type of structure: Railway Workshop GROUND WATER TABLE: 4.30 mt. Northing: 90.512144 TABLE NO.: 1 of 1
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26)
SPECIFIC GRAVITY
SWELL PRESSURE
TYPE OF SAMPLE
CLASSIFICATION
INSITU WATER
POROSITY (%)
CONTENT (%)
SPT-N VALUE
INSITU BULK
REMARKS
UNIT WT.
(gm/cm³)
(gm/cm³)
DEPTH
TYPE OF TEST
(kg/cm²)
LIQUID LIMIT
COMP.INDEX
GRAVEL (%)
SAND (%)
PLASTICITY
C (kg/cm²)
INDEX (%)
RATIO eo
LIMIT (%)
CLAY (%)
IN. VOID
PLASTIC
SILT (%)
I.S.
BELOW
Ø( ° )
, Cc
(%)
COARSE
G.L. (mt.)
MED.
FINE
1.50 SPT 6 - - - 0 0 1 20 79 -- NP -- ML - - - - - - - - - -
3.00 SPT 9 - - - 2 1 31 50 16 -- NP -- SM - - - - - - - - - -
4.50 SPT 16 - - - 0 0 24 66 10 -- NP -- SM - - - - - - - - - -
0
6.00 UDS - 1.52 1.33 14.5 0 0 6 59 35 -- NP -- SM DU 0.00 22 12' 2.50 - 0.88 - - 47 -
7.50 SPT 18 - - - 0 1 38 34 27 -- NP -- SM - - - - - - - - - -
9.00 SPT 15 - - - 0 1 45 46 8 -- NP -- SM - - - - - - - - - -
10.50 SPT 22 - - - 5 2 51 39 3 -- NP -- SM - - - - - - - - - -
12.00 SPT 39 - - - 2 3 48 46 1 -- NP -- SM - - - - - - - - - -
13.50 SPT 52 - - - 26 17 45 11 1 -- NP -- SM - - - - - - - - - -
15.00 SPT 64 - - - 25 16 35 17 7 -- NP -- SM - - - - - - - - - -
Note: Values are taken from graph of relationship between and N-values from IS 6403:1981 in absence of UDS samples
LOCATION: AC shop at Railway Workshop, New Bongaigaon, Assam.
PROJECT: Geo-technical investigation work for setting up of workshop for refurbishing TERMINATION DEPTH(mt.): 15.00 mt. Easting: 26.468156 BH No.: 2
of LHB coahes at New Bongaigaon, Assam
Type of structure: Railway Workshop GROUND WATER TABLE: 3.50 mt. Northing: 90.512933 TABLE NO.: 1 of 1
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26)
SWELL PRESSURE
TYPE OF SAMPLE
CLASSIFICATION
SIEVE ANALYSIS ATTERBERG LIMITS SHEAR PARAMETERS CONSOLIDATION
INSITU WATER
POROSITY (%)
CONTENT (%)
SPT-N VALUE
INSITU BULK
REMARKS
UNIT WT.
(gm/cm³)
(gm/cm³)
GRAVITY
DEPTH
SPECIFIC
(kg/cm²)
COMP.INDE
GRAVEL (%)
SAND (%)
PLASTICITY
C (kg/cm²)
INDEX (%)
RATIO eo
LIMIT (%)
LIMIT (%)
CLAY (%)
IN. VOID
TYPE OF
PLASTIC
SILT (%)
I.S.
LIQUID
BELOW
Ø( ° )
TEST
COARSE
Cc
X,
G.L. (mt.)
MED.
FINE
0
1.50 UDS - 1.40 1.26 10.7 0 0 2 25 73 -- NP -- ML DU 0.00 18 00' 2.50 - 0.98 - - 49 -
3.00 SPT 10 - - - 0 0 4 84 12 -- NP -- SM - - - - - - - - - -
6.00 SPT 15 - - - 0 0 24 72 4 -- NP -- SM - - - - - - - - - -
7.50 SPT 19 - - - 0 0 31 64 5 -- NP -- SM - - - - - - - - - -
9.00 SPT 17 - - - 0 0 36 59 5 -- NP -- SM - - - - - - - - - -
10.50 SPT 14 - - - 0 0 31 52 17 -- NP -- SM - - - - - - - - - -
12.00 SPT 52 - - - 2 2 35 56 5 -- NP -- SM - - - - - - - - - -
13.50 SPT 57 - - - 1 0 29 63 7 -- NP -- SM - - - - - - - - - -
15.00 SPT 55 - - - 12 7 40 37 4 -- NP -- SM - - - - - - - - - -
Note: Values are taken from graph of relationship between and N-values from IS 6403:1981 in absence of UDS samples
LOCATION: Between WPS & Gas Crown at Railway Workshop, New Bongaigaon, Assam.
PROJECT: Geo-technical investigation work for setting up of workshop for refurbishing TERMINATION DEPTH(mt.): 15.00 mt. Easting: 26.466786 BH No.: 3
of LHB coahes at New Bongaigaon, Assam
Type of structure: Railway Workshop GROUND WATER TABLE: 4.50 mt. Northing: 90.512693 TABLE NO.: 1 of 1
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26)
SPECIFIC GRAVITY
SWELL PRESSURE
TYPE OF SAMPLE
CLASSIFICATION
INSITU WATER
POROSITY (%)
CONTENT (%)
SPT-N VALUE
INSITU BULK
REMARKS
UNIT WT.
(gm/cm³)
(gm/cm³)
TYPE OF TEST
DEPTH
(kg/cm²)
LIQUID LIMIT
COMP.INDEX
GRAVEL (%)
SAND (%)
PLASTICITY
C (kg/cm²)
INDEX (%)
RATIO eo
LIMIT (%)
CLAY (%)
IN. VOID
PLASTIC
SILT (%)
I.S.
BELOW
Ø( ° )
, Cc
(%)
COARSE
G.L. (mt.)
MED.
FINE
1.50 SPT 6 - - - 0 0 1 40 59 -- NP -- ML - - - - - - - - - -
0
3.00 UDS - 1.42 1.27 11.5 0 0 4 67 29 -- NP -- SM DU 0.00 20 30' 2.52 - 0.98 - - 49 -
4.50 SPT 17 - - - 0 0 11 80 9 -- NP -- SM - - - - - - - - - -
7.50 SPT 36 - - - 0 0 34 63 3 -- NP -- SM - - - - - - - - - -
9.00 SPT 32 - - - 0 1 42 54 3 -- NP -- SM - - - - - - - - - -
10.50 SPT 42 - - - 0 0 53 44 3 -- NP -- SM - - - - - - - - - -
12.00 SPT 18 - - - 0 0 62 34 4 -- NP -- SM - - - - - - - - - -
Samle Not
13.50 SPT 8 - - - 8 3 55 33 1 -- NP -- SM - - - - - - - - - Recovered
15.00 SPT 20 - - - 0 0 0 3 97 -- NP -- ML - - - - - - - - - -
Note: Values are taken from graph of relationship between and N-values from IS 6403:1981 in absence of UDS samples
LOCATION: Between Foundry shop & BSS at Railway Workshop, New Bongaigaon, Assam.
PROJECT: Geo-technical investigation work for setting up of workshop for refurbishing TERMINATION DEPTH(mt.): 15.00 mt. Easting: 26.466635 BH No.: 4
of LHB coahes at New Bongaigaon, Assam
Type of structure: Railway Workshop GROUND WATER TABLE: 2.50 mt. Northing: 90.514391 TABLE NO.: 1 of 1
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26)
SPECIFIC GRAVITY
SWELL PRESSURE
TYPE OF SAMPLE
CLASSIFICATION
INSITU WATER
POROSITY (%)
CONTENT (%)
SPT-N VALUE
INSITU BULK
REMARKS
UNIT WT.
(gm/cm³)
(gm/cm³)
TYPE OF TEST
DEPTH
(kg/cm²)
LIQUID LIMIT
COMP.INDEX
GRAVEL (%)
SAND (%)
PLASTICITY
C (kg/cm²)
INDEX (%)
RATIO eo
LIMIT (%)
CLAY (%)
IN. VOID
PLASTIC
SILT (%)
I.S.
BELOW
Ø( ° )
, Cc
(%)
COARSE
G.L. (mt.)
MED.
FINE
0
1.50 UDS - 1.40 1.28 9.4 0 0 4 84 12 -- NP -- SM DU 0.00 20 12' 2.51 - 0.96 - - 49 -
3.00 SPT 13 - - - 0 1 31 62 6 -- NP -- SM - - - - - - - - -
0
4.50 UDS - 1.51 1.32 14.4 2 2 53 42 1 -- NP -- SM DU 0.00 21 30' 2.54 - 0.92 - - 48 -
6.00 SPT 8 - - - 0 0 5 41 54 -- NP -- ML - - - - - - - - - -
Sample Not
7.50 SPT 8 - - - 0 0 40 59 1 -- NP -- SM - - - - - - - - - Recovered
9.00 SPT 12 - - - 9 1 21 42 27 -- NP -- SM - - - - - - - - - -
10.50 SPT 34 - - - 0 0 33 65 2 -- NP -- SM - - - - - - - - - -
12.00 SPT 21 - - - 0 1 13 79 7 -- NP -- SM - - - - - - - - - -
13.50 SPT 27 - - - 0 0 27 42 31 -- NP -- SM - - - - - - - - - -
15.00 SPT 50 - - - 7 2 50 30 11 -- NP -- SM - - - - - - - - - -
Note: Values are taken from graph of relationship between and N-values from IS 6403:1981 in absence of UDS samples
LOCATION: Scrap Yard at Railway Workshop, New Bongaigaon, Assam.
PROJECT: Geo-technical investigation work for setting up of workshop for refurbishing TERMINATION DEPTH(mt.): 15.00 mt. Easting: 26.466416 BH No.: 5
of LHB coahes at New Bongaigaon, Assam
Type of structure: Railway Workshop GROUND WATER TABLE: 4.80 mt. Northing: 90.515450 TABLE NO.: 1 of 1
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26)
SPECIFIC GRAVITY
SWELL PRESSURE
TYPE OF SAMPLE
CLASSIFICATION
INSITU WATER
POROSITY (%)
CONTENT (%)
SPT-N VALUE
INSITU BULK
REMARKS
UNIT WT.
(gm/cm³)
(gm/cm³)
DEPTH
TYPE OF TEST
(kg/cm²)
LIQUID LIMIT
COMP.INDEX
GRAVEL (%)
SAND (%)
PLASTICITY
C (kg/cm²)
INDEX (%)
RATIO eo
LIMIT (%)
CLAY (%)
IN. VOID
PLASTIC
SILT (%)
I.S.
BELOW
Ø( ° )
, Cc
(%)
COARSE
G.L. (mt.)
MED.
FINE
1.50 SPT 9 - - - 0 0 9 86 5 -- NP -- SM - - - - - - - - - -
0
3.00 UDS - 1.42 1.29 9.7 0 0 20 72 8 -- NP -- SM DU 0.00 21 30' 2.51 - 0.94 - - 48 -
4.50 SPT 15 - - - 2 0 41 49 8 -- NP -- SM - - - - - - - - - -
6.00 SPT 24 - - - 1 0 57 37 5 -- NP -- SM - - - - - - - - - -
7.50 SPT 10 - - - 0 0 11 78 11 -- NP -- SM - - - - - - - - - -
9.00 SPT 19 - - - 0 0 14 21 65 -- NP -- ML - - - - - - - - - -
10.50 SPT 29 - - - 3 1 36 58 2 -- NP -- SM - - - - - - - - - -
12.00 SPT 27 - - - 2 1 32 64 1 -- NP -- SM - - - - - - - - - -
13.50 SPT 36 - - - 2 1 39 57 1 -- NP -- SM - - - - - - - - - -
15.00 SPT 36 - - - 1 1 33 64 1 -- NP -- SM - - - - - - - - - -
Note: Values are taken from graph of relationship between and N-values from IS 6403:1981 in absence of UDS samples
LOCATION: Behind BSS for Boitank at Railway Workshop, New Bongaigaon, Assam.
PROJECT: Geo-technical investigation work for setting up of workshop for refurbishing TERMINATION DEPTH(mt.): 15.00 mt. Easting: 26.467079 BH No.: 6
of LHB coahes at New Bongaigaon, Assam
Type of structure: Railway Workshop GROUND WATER TABLE: 2.10 mt. Northing: 90.515980 TABLE NO.: 1 of 1
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26)
SPECIFIC GRAVITY
SWELL PRESSURE
TYPE OF SAMPLE
CLASSIFICATION
INSITU WATER
POROSITY (%)
CONTENT (%)
SPT-N VALUE
INSITU BULK
REMARKS
UNIT WT.
(gm/cm³)
(gm/cm³)
TYPE OF TEST
DEPTH
(kg/cm²)
LIQUID LIMIT
COMP.INDEX
GRAVEL (%)
SAND (%)
PLASTICITY
C (kg/cm²)
INDEX (%)
RATIO eo
LIMIT (%)
CLAY (%)
IN. VOID
PLASTIC
SILT (%)
I.S.
BELOW
Ø( ° )
, Cc
(%)
COARSE
G.L. (mt.)
MED.
FINE
0
1.50 UDS - 1.48 1.36 9.00 0 0 22 61 17 -- NP -- SM DU 0.00 21 45' 2.52 - 0.86 - - 46 -
3.00 SPT 8 - - - 0 0 34 58 8 -- NP -- SM - - - - - - - - - -
4.50 SPT 9 - - - 0 0 44 53 3 -- NP -- SM - - - - - - - - - -
7.50 SPT 7 - - - 0 0 23 74 3 -- NP -- SM - - - - - - - - - -
9.00 SPT 10 - - - 0 0 22 70 8 -- NP -- SM - - - - - - - - - -
10.50 SPT 20 - - - 0 0 25 73 2 -- NP -- SM - - - - - - - - - -
12.00 SPT 29 - - - 0 0 34 65 1 -- NP -- SM - - - - - - - - - -
13.50 SPT 34 - - - 0 0 18 77 5 -- NP -- SM - - - - - - - - - -
15.00 SPT 43 - - - 0 0 18 80 2 -- NP -- SM - - - - - - - - - -
Note: Values are taken from graph of relationship between and N-values from IS 6403:1981 in absence of UDS samples
ANNEXURE-3
GRAINSIZE GRAPHS
Grain Size Analysis
PROJECT : Geo-technical investigation work for setting up of workshop for DEPTH : 15.00 mt.
refurbishing of LHB coahes at New Bongaigaon, Assam.
110
100
90
80
Passing (%)
70
60
50
40
30
20
10
0
0.010 0.100 Log Sieve Size
1.000 10.000
Grain Size Analysis
PROJECT : Geo-technical investigation work for setting up of workshop for DEPTH : 15.00 mt.
refurbishing of LHB coahes at New Bongaigaon, Assam
110
100
90
80
Passing (%)
70
60
50
40
30
20
10
0
0.010 0.100 Log Sieve Size
1.000 10.000
Grain Size Analysis
PROJECT : Geo-technical investigation work for setting up of workshop for DEPTH : 15.00 mt.
refurbishing of LHB coahes at New Bongaigaon, Assam
LOCATION : Between WPS & Gas crown At Railway Workshop,New Bongaigaon, BH No.: 3
Assam
110
100
90
80
Passing (%)
70
60
50
40
30
20
10
0
0.010 0.100 Log Sieve Size
1.000 10.000
Grain Size Analysis
PROJECT : Geo-technical investigation work for setting up of workshop for DEPTH : 15.00 mt.
refurbishing of LHB coahes at New Bongaigaon, Assam
LOCATION : Between Foundry shop & BSSAt Railway Workshop,New Bongaigaon, BH No.: 4
Assam
110
100
90
80
Passing (%)
70
60
50
40
30
20
10
0
0.010 0.100 Log Sieve Size
1.000 10.000
Grain Size Analysis
PROJECT : Geo-technical investigation work for setting up of workshop for DEPTH : 15.00 mt.
refurbishing of LHB coahes at New Bongaigaon, Assam
110
100
90
80
Passing (%)
70
60
50
40
30
20
10
0
0.010 0.100 Log Sieve Size
1.000 10.000
Grain Size Analysis
PROJECT : Geo-technical investigation work for setting up of workshop for DEPTH : 15.00 mt.
refurbishing of LHB coahes at New Bongaigaon, Assam
LOCATION : Behind BSS for Boitank at Railway Workshop,New Bongaigaon, Assam BH No.: 6
110
100
90
80
Passing (%)
70
60
50
40
30
20
10
0
0.010 0.100 Log Sieve Size
1.000 10.000
ANNEXURE-4
SOIL CHEMICAL RESULTS
CHEMICAL ANALYSIS OF SOIL SAMPLE
3 Cl (Chloride) (PPM) 20 16 16 16
3 Cl (Chloride) (PPM) 55 62 49 69
CLASSIFICATION
SIEVE ANALYSIS ATTERBERG LIMITS CBR VALUE
REMARKS
DEPTH SAND (%)
GRAVEL (%)
SAMPLE
PLASTICITY
MOISTURE
MAX. DRY
OPTIMUM
INDEX (%)
CONTENT
UNIT WT.
LIMIT (%)
LIMIT (%)
(gm/cm³)
PLASTIC
LIQUID
I.S.
BELOW
COARSE
(%)
(%)
MED.
FINE
G.L. (mt.)
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit 01 - 01 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 08/02/2018
2
Plunger Area : in cm 19.635
12.00
Load Penetration Data :
SIDE-1 10.00 12.50, 10.10
Corrected
Load
Penetrat CBR
Cell stress 8.00
ion VALUE in
stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 6.00
0.00 0 0.00
0.50 18.1 0.92
1.00 35.3 1.80 4.00
1.50 50.4 2.57
2.00 69.2 3.52
2.00
2.50 86.4 4.40 6.31
4.00 110.5 5.63
5.00 124.3 6.33 6.05 0.00
7.50 151.2 7.70 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 172.9 8.81 penetration (mm)
12.50 198.4 10.10
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit 01 - 02 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 08/02/2018
2
Plunger Area : in cm 19.635
12.00
Load Penetration Data :
SIDE-1 10.00
Corrected 12.50, 9.56
Load
Penetrat CBR
Cell stress 8.00
ion VALUE in
stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 6.00
0.00 0 0.00
0.50 18.7 0.95
1.00 36.4 1.85 4.00
1.50 61.3 3.12
2.00 81.4 4.15
2.00
2.50 97.6 4.97 7.12
4.00 120.7 6.15
5.00 134.2 6.83 6.53 0.00
7.50 152.7 7.78 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 170.1 8.66 penetration (mm)
12.50 187.8 9.56
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit 01 - 03 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 08/02/2018
2
Plunger Area : in cm 19.635
12.00
Load Penetration Data :
SIDE-1 10.00 12.50, 9.75
Corrected
Load
Penetrat CBR
Cell stress 8.00
ion VALUE in
stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 6.00
0.00 0 0.00
0.50 21.5 1.09
1.00 49.1 2.50 4.00
1.50 75.8 3.86
2.00 91.4 4.65
2.00
2.50 105.6 5.38 7.71
4.00 127.1 6.47
5.00 141.8 7.22 6.90 0.00
7.50 159.3 8.11 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 178.7 9.10 penetration (mm)
12.50 191.5 9.75
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit 02-0.5 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 08/02/2018
2
Plunger Area : in cm 19.635
2.50
Load Penetration Data :
12.50, 2.21
SIDE-1
Corrected 2.00
Load
Penetrat CBR
Cell stress
ion VALUE in
stress (kg/cm2)
2
Reading (kg/cm ) 1.50
(mm) (from
(kg)
GRAPH)
0.00 0 0.00
0.50 4.7 0.24 1.00
1.00 9.2 0.47
1.50 13.5 0.69
2.00 17.7 0.90 0.50
2.50 21.2 1.08 1.55
4.00 27.4 1.40
5.00 31.2 1.59 1.52 0.00
7.50 37.5 1.91 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 40.7 2.07
penetration (mm)
12.50 43.3 2.21
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial Pit-02 - 1.50 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 08/02/2018
2
Plunger Area : in cm 19.635
8.00
Load Penetration Data :
12.50, 7.39
SIDE-1 7.00
Corrected
Load 6.00
Penetrat CBR
Cell stress
ion VALUE in
stress (kg/cm2)
2 5.00
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 4.00
0.00 0 0.00
0.50 22.6 1.15 3.00
1.00 41.5 2.11
1.50 62.3 3.17 2.00
2.00 79.5 4.05
2.50 91.5 4.66 6.68 1.00
4.00 110.5 5.63
5.00 121.6 6.19 5.92 0.00
7.50 131.2 6.68 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 139.8 7.12
12.50 145.2 7.39 penetration (mm)
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial Pit - 02 - 2.50 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 08/02/2018
2
Plunger Area : in cm 19.635
14.00
Load Penetration Data :
SIDE-1 12.00 12.50, 12.21
Corrected
Load
Penetrat CBR 10.00
Cell stress
ion VALUE in
stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from 8.00
(kg)
GRAPH)
0.00 0 0.00
6.00
0.50 32.6 1.66
1.00 58.5 2.98
1.50 82.3 4.19 4.00
2.00 104.2 5.31
2.50 120.9 6.16 8.82 2.00
4.00 161.0 8.20
5.00 177.4 9.03 8.63 0.00
7.50 198.5 10.11 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 224.3 11.42
12.50 239.7 12.21 penetration (mm)
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 03 - 01 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 08/02/2018
2
Plunger Area : in cm 19.635
4.00
Load Penetration Data :
SIDE-1 3.50 12.50, 3.43
Corrected
Load 3.00
Penetrat CBR
Cell stress
ion VALUE in
stress (kg/cm2)
2 2.50
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 2.00
0.00 0 0.00
0.50 9.7 0.49 1.50
1.00 20.1 1.02
1.50 32.6 1.66 1.00
2.00 38.6 1.97
2.50 42.5 2.16 3.10 0.50
4.00 51.7 2.63
5.00 56.1 2.86 2.73 0.00
7.50 61.4 3.13 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 64.2 3.27 penetration (mm)
12.50 67.3 3.43
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 03 - 02 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 08/02/2018
2
Plunger Area : in cm 19.635
9.00
Load Penetration Data :
8.00 12.50, 8.14
SIDE-1
Corrected 7.00
Load
Penetrat CBR
Cell stress 6.00
ion VALUE in
stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg) 5.00
GRAPH)
0.00 0 0.00 4.00
0.50 30.5 1.55
1.00 46.1 2.35 3.00
1.50 59.6 3.04
2.00 75.3 3.83 2.00
2.50 84.1 4.28 6.14
1.00
4.00 107.1 5.45
5.00 116.7 5.94 5.68 0.00
7.50 134.5 6.85 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 149.1 7.59 penetration (mm)
12.50 159.8 8.14
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 03 - 03 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 08/02/2018
2
Plunger Area : in cm 19.635
9.00
Load Penetration Data :
12.50, 8.42
8.00
SIDE-1
Corrected 7.00
Load
Penetrat CBR
Cell stress 6.00
ion VALUE in
stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg) 5.00
GRAPH)
0.00 0 0.00 4.00
0.50 30.1 1.53
1.00 52.4 2.67 3.00
1.50 69.7 3.55
2.00 89.7 4.57 2.00
2.50 107.5 5.47 7.85
1.00
4.00 131.6 6.70
5.00 139.8 7.12 6.80 0.00
7.50 150.3 7.65 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 158.9 8.09 penetration (mm)
12.50 165.4 8.42
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 04 - 0.5 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 09/02/2018
2
Plunger Area : in cm 19.635
6.00
Load Penetration Data :
SIDE-1 5.00 12.50, 4.96
Corrected
Load
Penetra CBR
Cell stress 4.00
tion 2 VALUE in
stress (kg/cm2)
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 3.00
0.00 0 0.00
0.50 16.9 0.86
1.00 29.2 1.49 2.00
1.50 41.2 2.10
2.00 48.5 2.47
1.00
2.50 54.2 2.76 3.96
4.00 68.4 3.48
5.00 73.1 3.72 3.56 0.00
7.50 81.4 4.15 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 91.6 4.67 Penetration (mm)
12.50 97.4 4.96
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 04 - 1.50 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 09/02/2018
2
Plunger Area : in cm 19.635
7.00
Load Penetration Data :
12.50, 6.40
SIDE-1 6.00
Corrected
Load
Penetrat CBR 5.00
Cell stress
ion VALUE in
Stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from 4.00
(kg)
GRAPH)
0.00 0 0.00
3.00
0.50 20.6 1.05
1.00 38.6 1.97
1.50 52.7 2.68 2.00
2.00 65.2 3.32
2.50 75.0 3.82 5.47 1.00
4.00 92.4 4.71
5.00 98.9 5.04 4.81 0.00
7.50 109.3 5.57 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 119.8 6.10 penetration (mm)
12.50 125.7 6.40
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 04 - 2.50 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 09/02/2018
2
Plunger Area : in cm 19.635
9.00
Load Penetration Data :
8.00 12.50, 8.11
SIDE-1
Corrected 7.00
Load
Penetrat CBR
Cell stress 6.00
ion VALUE in
Stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg) 5.00
GRAPH)
0.00 0 0.00 4.00
0.50 20.8 1.06
1.00 44.6 2.27 3.00
1.50 62.7 3.19
2.00 80.4 4.09 2.00
2.50 97.3 4.96 7.10
1.00
4.00 128.0 6.52
5.00 141.4 7.20 6.88 0.00
7.50 147.7 7.52 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 153.4 7.81 penetration (mm)
12.50 159.3 8.11
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 05 - 1.0 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 09/02/2018
2
Plunger Area : in cm 19.635
6.00
Load Penetration Data :
SIDE-1 5.00 12.50, 4.90
Corrected
Load
Penetra CBR
Cell stress 4.00
tion VALUE in
Stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 3.00
0.00 0 0.00
0.50 17.4 0.89
1.00 31.4 1.60 2.00
1.50 42.3 2.15
2.00 49.7 2.53
1.00
2.50 57.8 2.94 4.22
4.00 72.4 3.69
5.00 79.6 4.05 3.87 0.00
7.50 85.2 4.34 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 91.4 4.65 Penetration (mm)
12.50 96.3 4.90
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 05 - 2.0 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 09/02/2018
2
Plunger Area : in cm 19.635
7.00
Load Penetration Data :
SIDE-1 6.00 12.50, 6.06
Corrected
Load
Penetra CBR 5.00
Cell stress
tion VALUE in
Stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from 4.00
(kg)
GRAPH)
0.00 0 0.00
3.00
0.50 27.1 1.38
1.00 41.6 2.12
1.50 52.9 2.69 2.00
2.00 63.2 3.22
2.50 72.5 3.69 5.29 1.00
4.00 86.4 4.40
5.00 91.3 4.65 4.44 0.00
7.50 101.2 5.15 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 111.5 5.68 Penetration (mm)
12.50 118.9 6.06
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 05 - 3.0 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 09/02/2018
2
Plunger Area : in cm 19.635
3.50
Load Penetration Data :
SIDE-1 3.00 12.50, 2.98
Corrected
Load
Penetra CBR 2.50
Cell stress
tion VALUE in
Stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from 2.00
(kg)
GRAPH)
0.00 0 0.00
1.50
0.50 7.3 0.37
1.00 14.0 0.71
1.50 20.8 1.06 1.00
2.00 27.2 1.39
2.50 32.1 1.63 2.34 0.50
4.00 40.5 2.06
5.00 44.9 2.29 2.18 0.00
7.50 50.7 2.58 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 54.7 2.79 Penetration (mm)
12.50 58.6 2.98
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 06 - 0.50 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
3.00
Load Penetration Data :
12.50, 2.80
SIDE-1 2.50
Corrected
Load
Penetrat CBR
Cell stress 2.00
ion VALUE in
Stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 1.50
0.00 0 0.00
0.50 9.2 0.47
1.00 15.8 0.80 1.00
1.50 20.2 1.03
2.00 24.4 1.24
0.50
2.50 28.9 1.47 2.11
4.00 36.8 1.87
5.00 40.8 2.08 1.99 0.00
7.50 46.7 2.38 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 51.4 2.62 penetration (mm)
12.50 54.9 2.80
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 06 - 1.50 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
9.00
Load Penetration Data :
8.00 12.50, 8.11
SIDE-1
Corrected 7.00
Load
Penetrat CBR
Cell stress 6.00
ion VALUE in
Stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg) 5.00
GRAPH)
0.00 0 0.00 4.00
0.50 27.1 1.38
1.00 48.6 2.48 3.00
1.50 68.1 3.47
2.00 87.4 4.45 2.00
2.50 102.5 5.22 7.48
1.00
4.00 121.5 6.19
5.00 131.8 6.71 6.41 0.00
7.50 141.5 7.21 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 151.6 7.72 penetration (mm)
12.50 159.2 8.11
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 06 - 2.50 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
8.00
Load Penetration Data : 12.50, 7.55
SIDE-1 7.00
Corrected
Load 6.00
Penetrat CBR
Cell stress
ion VALUE in
Stress (kg/cm2)
2 5.00
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 4.00
0.00 0 0.00
0.50 15.2 0.77 3.00
1.00 34.5 1.76
1.50 52.1 2.65 2.00
2.00 69.8 3.55
2.50 86.9 4.43 6.34 1.00
4.00 117.5 5.98
5.00 128.3 6.53 6.24 0.00
7.50 136.2 6.94 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 142.7 7.27 penetration (mm)
12.50 148.2 7.55
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 07 - 01 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
3.50
Load Penetration Data :
12.50, 3.14
SIDE-1 3.00
Corrected
Load
Penetra CBR 2.50
Cell stress
tion VALUE in
stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from 2.00
(kg)
GRAPH)
0.00 0 0.00
1.50
0.50 17.5 0.89
1.00 25.1 1.28
1.50 32.7 1.67 1.00
2.00 38.2 1.95
2.50 41.6 2.12 3.04 0.50
4.00 47.9 2.44
5.00 51.5 2.62 2.51 0.00
7.50 55.7 2.84 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 58.9 3.00 penetration (mm)
12.50 61.7 3.14
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 07 - 02 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
3.00
Load Penetration Data :
12.50, 2.73
SIDE-1 2.50
Corrected
Load
Penetra CBR
Cell stress 2.00
tion VALUE in
stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 1.50
0.00 0 0.00
0.50 14.7 0.75
1.00 21.5 1.09 1.00
1.50 27.6 1.41
2.00 32.2 1.64
0.50
2.50 36.5 1.86 2.66
4.00 41.8 2.13
5.00 44.5 2.27 2.17 0.00
7.50 48.2 2.45 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 51.4 2.62 penetration (mm)
12.50 53.6 2.73
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 07 - 03 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
3.00
Load Penetration Data :
12.50, 2.76
SIDE-1 2.50
Corrected
Load
Penetra CBR
Cell stress 2.00
tion VALUE in
stress (kg/cm2)
2
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 1.50
0.00 0 0.00
0.50 13.9 0.71
1.00 22.1 1.13 1.00
1.50 26.5 1.35
2.00 31.8 1.62
0.50
2.50 35.9 1.83 2.62
4.00 40.9 2.08
5.00 44.7 2.28 2.18 0.00
7.50 49.1 2.50 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 52.8 2.69 penetration (mm)
12.50 54.1 2.76
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 08 - 1.0 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
4.00
Load Penetration Data :
12.50, 3.64
SIDE-1 3.50
Corrected
Load 3.00
Penetra CBR
Cell stress
tion VALUE in
Stress (kg/cm2)
2 2.50
Reading (kg/cm )
(mm) (from
(kg)
GRAPH) 2.00
0.00 0 0.00
0.50 11.1 0.57 1.50
1.00 20.4 1.04
1.50 29.9 1.52 1.00
2.00 35.9 1.83
2.50 41.2 2.10 3.01 0.50
4.00 48.6 2.48
5.00 51.2 2.61 2.49 0.00
7.50 59.7 3.04 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 67.1 3.42 Penetration (mm)
12.50 71.5 3.64
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 08- 2.0 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
7.00
Load Penetration Data :
SIDE-1 6.00 12.50, 5.90
Corrected
Load
Penetra CBR 5.00
Cell stress
tion 2 VALUE in
stress (kg/cm2)
Reading (kg/cm )
(mm) (from 4.00
(kg)
GRAPH)
0.00 0 0.00
3.00
0.50 18.0 0.92
1.00 35.7 1.82
1.50 51.8 2.64 2.00
2.00 68.7 3.50
2.50 82.5 4.20 6.02 1.00
4.00 95.4 4.86
5.00 101.2 5.15 4.92 0.00
7.50 108.6 5.53 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 111.4 5.67 penetration (mm)
12.50 115.8 5.90
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 08 - 3.0 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
7.00
Load Penetration Data :
12.50, 6.42
SIDE-1 6.00
Corrected
Load
Penetra CBR 5.00
Cell stress
tion 2 VALUE in
stress (kg/cm2)
Reading (kg/cm )
(mm) (from 4.00
(kg)
GRAPH)
0.00 0 0.00
3.00
0.50 18.4 0.94
1.00 32.5 1.66
1.50 50.6 2.58 2.00
2.00 71.8 3.66
2.50 82.9 4.22 6.05 1.00
4.00 101.7 5.18
5.00 108.9 5.55 5.30 0.00
7.50 118.6 6.04 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 121.7 6.20 penetration (mm)
12.50 126.1 6.42
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 09 - 0.50 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
8.00
Load Penetration Data :
SIDE-1 7.00 12.50, 7.04
Corrected
Load 6.00
Penetra CBR
Cell stress
tion 2 VALUE in
stress (kg/cm2)
Reading (kg/cm ) 5.00
(mm) (from
(kg)
GRAPH) 4.00
0.00 0 0.00
0.50 14.2 0.72 3.00
1.00 33.6 1.71
1.50 51.6 2.63 2.00
2.00 71.2 3.63
2.50 81.6 4.16 5.96 1.00
4.00 110.3 5.62
5.00 120.2 6.12 5.85 0.00
7.50 129.8 6.61 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 134.2 6.83 penetration (mm)
12.50 138.2 7.04
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 09 - 1.50 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
8.00
Load Penetration Data :
12.50, 7.38
SIDE-1 7.00
Corrected
Load 6.00
Penetra CBR
Cell stress
tion 2 VALUE in
stress (kg/cm2)
Reading (kg/cm ) 5.00
(mm) (from
(kg)
GRAPH) 4.00
0.00 0 0.00
0.50 19.4 0.99 3.00
1.00 38.8 1.98
1.50 59.7 3.04 2.00
2.00 78.5 4.00
2.50 95.7 4.87 6.99 1.00
4.00 120.8 6.15
5.00 129.9 6.62 6.32 0.00
7.50 136.2 6.94 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 141.1 7.19 penetration (mm)
12.50 144.9 7.38
REF.NO.: 649/ATEC-02/17-18
SAMPLE ID Trial pit - 09 - 2.50 m
PROJECT setting up of railway workshop for refurbishing of LHS
coaches at New Bongaigaon , Assam
Date of test 12/02/2018
2
Plunger Area : in cm 19.635
7.00
Load Penetration Data :
12.50, 6.45
SIDE-1 6.00
Corrected
Load
Penetra CBR 5.00
Cell stress
tion 2 VALUE in
stress (kg/cm2)
Reading (kg/cm )
(mm) (from 4.00
(kg)
GRAPH)
0.00 0 0.00
3.00
0.50 19.4 0.99
1.00 34.6 1.76
1.50 51.3 2.61 2.00
2.00 72.5 3.69
2.50 83.6 4.26 6.10 1.00
4.00 101.2 5.15
5.00 110.3 5.62 5.37 0.00
7.50 117.6 5.99 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
10.00 122.4 6.23 penetration (mm)
12.50 126.7 6.45