Contractor complaince to practuilar project specification section 19 clause II Part-2 Product item 5
Compressed Air dryer, for a Desiccant type is not accepted since contractor propose refrigerant air
C.
dryer instead which can't control the dew point compare to Desiccant type. contractor is to comply
strictly with project specificationand provide adsorption dryer accordignly refrigerant type dryer to be used as per project
specifications and QCS , and as per the laundry specialist
the refrigerant dryer is appropriate with laundry equipments
In addition to above point 1-b contractor complaince to particular project specification Section 19,
D. Part-07 Clause 7.2.2 replacment for air dryer unit construction is not accepted since the air dryer type
is not accepted. Contractor is to comply strictly with the specified air dryer construction
The Proposed material list for compressor package are noted . However full described bill of material
2 showing item numbers , description, quantities , manufacturer & COO Including controller, reciever Noted and will be provided
rank & air dryer is yet to be submitted
Proposed Material for scroll compressor Model S08-10A & S8-8A are noted , However contractor to
3 provide capacity calculation for system pressure drop and flow verification along with material Noted and Submitted
submittal
Proposed material for Pre-filter Model CF0012G1/2'' B is not adequate since the offered caontractor
5 Noted and Submitted
did not support the selection with the data sheet for the same.
Contractor is to provide scale drawing for compressor room furniture showing all compressed air
a scale drawing included all component will attached with
6 system component as exact dimension, Maintenance space & space for stage-2 future equipment for
the revised submittal
review and check prior tp approve the compressor sizing
Proposed Manufacturer Standard Warranty is not accepted, Warranty shall follow the unified warranty
7 certificate part of the IFT Documents and deemed to be finalized during the project close out Noted and Submitted
document
Clear Spare Parts list for 2 Years is required as per QCS and the same is to enclosed with the
8 Noted and will be provided the soonest