Maximum No. of workers to be employed on single Day :- ( Please Fill Names of all Persons On Last Page.)
Sr.No. Particulars
1 Method of payment of wages Monthly/weekly/Daily
2 Date/Day Of payment of Wages
3 Pf Code No.
4 Workers Compation Policy No.,
Validity
Name of Insurer & Address
5 Labour License No.
Signature
Verified By
(Human Resources)
I have explained the safety precautions to be taken and the work may be started.
……………………………………………………………………………………………………………………
Before work permit closing permit holder has to check following points
1. Clean the floor after work is finished so that no oil, grease, water traces will not remain
2. Keep all electrical instruments like welding machine, electrical drill & grinder etc. at safe place. Don’t keep
near flammable substances.
3. House keeping for area should be properly maintained & if work is going to continue on next day, all
equipments to be kept properly, especially liquid should be kept in tightly condition.
4. Put all hand gloves, face masks in allocated dust bin only.
I certify that I have completed the work specified in this permit. All my workmen and equipment have been
removed from the vicinity of he above work. I hereby handover the permit or cancellation and for testing &
energizing / putting apparatus back into service whenever applicable.
I confirm that all above instructions of closing permit is completed by permit holder
Signature
Initiating dept
Date- Time-
_______________________________________________________________________________________
Note
Distribution Of Copies-
I. White Copy- Submit to Main gate
II. Red copy – Retained by Initiating Dept
III. Blue Copy – Retained by Contractor on work location.
Safety Instructions *
1. Always use proper safety belt, which should be tied to firm support at the time of
working.
2. Platform scaffolding being used to climb should be adequate strength. Platforms being
used at height must have railing and foot rest to prevent fall of person.
3. While working at height it should be checked that no live electric connection exists in
vicinity.
4. While working on Asbestos roof, roof ladder must be used.
1. Before starting Hot Work, check that no combustible material is lying in the vicinity.
2. Check that adequate Fire fighting appliances and water is available.
3. Use suitable protective equipment such as welding shield hand gloves etc.
4. Never use empty chemical drums or gas cylinders as a platform to stand upon while carrying out Hot
work.
5. If the work is to be carried out at height then depute one person for warning passer-by and watch for
possible fire.
6. After 15 minutes of completion of the job, inspect the work area again for fire and then only leave the
place.
1. Before starting any work on electrical installations check that electric supply has been cut off positively.
2. While working on High-tension lines, use protective equipments like electric resistant shoes, gloves, etc.
3. Cautionary board such as “Men at work” must be displayed on respective switchboard till job is
completed.
1. Only flameproof electrical equipments should be used while working on LPG yard.
2. While using hand tools precautions to be taken that no spark is generated during the operation.
3. Security dept. must e informed prior to such an activity.
4. Fire fighting arrangements should be made before the work starts.
1. Before starting work in confined space check that the area is free from any explosive /injurious material.
2. Use proper protective equipments such as respirator etc. Person working in the confined space should
were safety belt and person deputed outside should hold lifeline of this belt.
3. If required use electric supply strictly below 24 Volts.
4. Ensure proper ventilation and lighting inside confined space.
5. If work is inside the tank, then ensure that all supply lines to tank are blinded properly. If there are
impellers / agitator in the tank then ensure that they are properly locked
6. Keep one person outside the confined space to render assistance in case of emergency.
7. After ensuring that all working persons in the confined space have came out then only leave the site.