MATERIAL SUBMITTAL FORM

Asset Management Directorate


Power Planning and Development Department
Power Network Performance Section
Project Name: Material Description :

Contract No. : Quantity of Material :


Manufacturer /Supplier
Contractor : Name :
Place of Origin :

Consultant : Model / Type :

E-mail Address:
Supply Arrangement
Request No. : Concernd contact
person information in
Project Start Date: UAE: Tel:
Project Finish Date: Fax:

Attachments (shall be in a Folder splited with separators) :


A Copy of Approved Supply Arrangement Request Yes. No.
ADEWA Technical Data Sheet (DTS) Compliance with Consultant
B Remarks and Stamps
Yes. No.

C Copy of Contract Drawing/Sketch Yes. No.

D Copy of AADC Approved Single Line Diagram for the Project Yes. No.

E Catalogue / Brochure (Original + 3 copies) Drawings Yes. No.


Consultant's Stamp, Signature &
Date
F Manufacturer Quality Certificate (ISO or Other) Yes. No.

G Copy of Certificates (Type test, Non-Toxicity or Other) Yes. No.

H Copy of Previous Approvals Yes. No.

FAT to be witnessed by AADC Engineers, cost shall be bourne by


I Contractor
Yes. No.

J FAT Protocols and Procedures Yes. No.

Any Deviation from the Project's Specification


K (If yes, please give Justifications on a separate sheet)
Yes. No.

Contractor's Stamp, Signature &


L Other Enclosure (if any) Yes. No.
Date
For Use of AADC :

Status : Approved Approved with Comments Not Approved

Comments :

Engineer Head of Section Department Manager


AADC Stamp
Signatures & Date

Note:-
The above Comments and/or approvals do not relieve the Contractor from his obligation under the Contract to ensure conformance to the specification.