Académique Documents
Professionnel Documents
Culture Documents
VOLUME
MATERIAL &
NO JENIS PEKERJAAN
JASA
SATUAN QUANTITY
Jumlah 4,701,000
NDIRI
L INSTALASI
SAR
KET.
TOTAL
SPESIFIKASI
67,600,000 Local/Setara
25,200,000 Local/Setara
110,400,000 Local/Setara
5,100,000 Local/Setara
Setara Panasonic
400,000
Clipsal
Setara Panasonic
900,000
Clipsal
489,200,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 02 ELECTRICAL INSTALASI
SUB BILL NO 02.1 Lt 05 S/D Lt 22 TYPICAL
VOLUME
NO JENIS PEKERJAAN PER Lt
SATUAN QUANTITY MATERIAL
& JASA
Bill No. 02,1 Electrical Lighting
B. Fixtures Unit Room Lantai Lima 5 s/d
22 Type 36 (Typical)
Jumlah 4,711,000
IRI
NSTALASI
ICAL
KET.
TOTAL
SPESIFIKASI
443,520,000 Local/Setara
73,920,000 Local/Setara
809,600,000 Local/Setara
2,843,136,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 02 ELECTRICAL INSTALASI
SUB BILL NO 02.2 Lt 05 S/D Lt 22 TYPICAL
VOLUME
NO JENIS PEKERJAAN PER Lt
SATUAN QUANTITY MATERIAL &
JASA
Bill No. 02,2 Elektrikal Lighting
C. Fixtures Unit Room Type 24 Lt 05 s/d
Lt 22 (Typical)
Down light fitting couple SL/13 w type
1 PCS 1056 59 360,000
24 room Lt 5 s/d 22 typical
2 Table lamp PCS 176 10 420,000
Jumlah 5,071,000
DIRI
INSTALASI
PICAL
KET.
TOTAL
SPESIFIKASI
380,160,000 Local/Setara
73,920,000 Local/Setara
323,840,000 Local/Setara
2,173,916,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 02 ELECTRICAL INSTALASI
SUB BILL NO 02.3 Lt 05 s/d Lt 22 TYPICAL
VOLUME
NO JENIS PEKERJAAN PER Lt
SATUAN QUANTITY
Jumlah
IK MANDIRI
TRICAL INSTALASI
Lt 22 TYPICAL
KET.
TOTAL
MATERIAL SPESIFIKASI
& JASA
Metal, Indo
140,000 200,200,000
Supreme Eterna
Metal, Indo
180,000 18,720,000
Supreme Eterna
Metal, Indo
140,000 80,080,000
Supreme Eterna
Metal, Indo
180,000 205,920,000
Supreme Eterna
Metal, Indo
230,000 131,560,000
Supreme Eterna
Metal, Indo
180,000 102,960,000
Supreme Eterna
Metal, Indo
140,000 73,920,000
Supreme Eterna
230,000 3,401,492,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 03 ELECTRONIC SYSTEM
SUB BILL NO 03.1 Lt 05 s/d 22
VOLUME
NO JENIS PEKERJAAN PER Lt
SATUAN QUANTITY MATERIAL &
JASA
Bill No. 03,1 Electronic Fire Alarm
E. System CCTV/CAMERA System
Lantai 05 s/d 22
Jumlah 230,000
I
YSTEM
KET.
TOTAL
SPESIFIKASI
93,500,000 HC/Hounchang
324,000,000 HC/Hounchang
287,100,000 HC/Hounchang
7,700,000 HC/Hounchang
45,000,000 HC/Hounchang
4,000,000 HC/Hounchang
250,000,000 HC/Hounchang
33,000,000 HC/Hounchang
19,800,000 HC/Hounchang
15,400,000 HC/Hounchang
NYM 1,5 mm,
18,150,000
Metal Indo Suprame
NYM 1,5 mm,
141,570,000
Metal Indo Suprame
NYM 1,5 mm,
138,000,000
Metal Indo Suprame
NYM 1,5 mm,
280,800,000
Metal Indo Suprame
NYM 1,5 mm,
4,180,000
Metal Indo Suprame
NYM 1,5 mm,
4,180,000
Metal Indo Suprame
NYM 1,5 mm,
4,180,000
Metal Indo Suprame
1,670,560,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY 03 ELECTRONIC SYSTEM
SUB BILL NO 03,2
VOLUME
NO JENIS PEKERJAAN PER Lt
SATUAN QUANTITY
Jumlah
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY 03
SUB BILL NO 03.3
VOLUME
NO JENIS PEKERJAAN PER Lt
SATUAN QUANTITY
- Peralatan Utama
3 Rak kabinet LS 1 1
4 Management kabel LS 1 1
5 Accersoris / material bantu LS 1 1
Jumlah
K MANDIRI
RONIC SYSTEM
2
KET.
TOTAL
MATERIAL & SPESIFIKASI
JASA
14,780,000 39,030,000
K MANDIRI
Y 03
3
KET.
MATERIAL & TOTAL
SPESIFIKASI
JASA
VOLUME
NO JENIS PEKERJAAN PER Lt
SATUAN QUANTITY
JUMLAH
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 04 ELECTRICAL INSTALATIO
SUB BILL NO 04,2
Jumlah
K MANDIRI
ICAL INSTALATION
1
250,000,000 250,000,000
25,000,000 25,000,000
45,000,000 45,000,000
670,000,000 2,350,000,000
K MANDIRI
ICAL INSTALATION
2
1,800,000 287,000,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 04 ELECTRICAL INSTALATIO
SUB BILL NO 04.3
Jumlah 2,050,800,000
RI
TALATION
KET.
TOTAL
SPESIFIKASI
210,000,000
4,663,000,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 05 ELECTRICAL INSTALATIO
SUB BILL NO 05,1
JUMLAH 3,374,000
RI
TALATION
KET.
TOTAL
SPESIFIKASI
661,394,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 06 ELECTRICAL INSTALATIO
SUB BILL NO 06.1
JUMLAH 63,900,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 06 ELECTRICAL INSTALATIO
SUB BILL NO 06.2
VOLUME MATERIAL &
NO JENIS PEKERJAAN PER Lt
SATUAN QUANTITY JASA
VOLUME
MATERIAL &
NO JENIS PEKERJAAN PER Lt
SATUAN QUANTITY JASA
Jumlah 85,780,000
I
ALATION
KET.
TOTAL
SPESIFIKASI
63,900,000
I
ALATION
KET.
TOTAL
SPESIFIKASI
KET.
TOTAL
SPESIFIKASI
25,000,000
117,000,000
202,000,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 06 ELECTRICAL INSTALAT
SUB BILL NO 06.4
VOLUME
NO JENIS PEKERJAAN MATERIAL &
SATUAN QUANTITY JASA
JUMLAH 405,001,050
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 07 ELECTRICAL INSTALAT
SUB BILL NO 07,3
VOLUME
MATERIAL &
NO JENIS PEKERJAAN
JASA
SATUAN QUANTITY
10,500,000
14,000,000
35,000,000
7,000,000
7,000,000
185,000,000
MANDIRI
AL INSTALATION
NAN
1,147,500,000
MANDIRI
AL INSTALATION
1,087,500,000
MANDIRI
AL INSTALATION
240,000,000 LED
180,000,000 Local / Setara
Kabel Indo, Kabel Indo,
152,000,000
Suprame
64,000,000 Panel Maker Bima
102,000,000 Local / Setara
Kabel Indo, Kabel Indo,
67,000,000
Suprame
30,000,000 Local Setara
835,000,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 08 HYDRANT SYSTEM
SUB BILL NO 08,1 Hydrant
JUMLAH 1,081,988,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 08 HYDRANT SYSTEM
SUB BILL NO 08,2 HYDRANT
VOLUME
NO JENIS PEKERJAAN MATERIAL &
SATUAN QUANTITY JASA
VOLUME
MATERIAL &
NO JENIS PEKERJAAN
JASA
SATUAN QUANTITY
JUMLAH 4,900,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 10 PLUMBING
SUB BILL NO 10,1
JUMLAH 8,550,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 10 PLUMBING
SUB BILL NO 10,2
Pipa PPR PN 20
JUMLAH 108,715,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 10 PLUMBING
SUB BILL NO 10,3
VOLUME
MATERIAL &
NO JENIS PEKERJAAN
JASA
SATUAN QUANTITY
- Head = 100
- Kw = 40 Kw
- Merek = Ebara
- Head = 50
- Kw = 30
JUMLAH 243,400,000
ANDIRI
NT SYSTEM
nt
KET.
TOTAL
SPESIFIKASI
135,000,000 Groundpos
150,000,000 Local
35,000,000 Local
80,000,000 Local
130,000,000 Local
46,000,000 Local
1,912,600,000
ANDIRI
NT SYSTEM
NT
KET.
TOTAL
SPESIFIKASI
6,500,000 Australia
240,000,000 Kitzt / Setara
120,000,000 Local / Setara
120,000,000 Ozeky
308,000,000 Ozeky
8,000,000 Ozeky
12,000,000 Spindo
10,000,000 Spindo
35,000,000
25,000,000
1,435,400,000
ANDIRI
INSTALATION
RANT
KET.
TOTAL
SPESIFIKASI
KET.
TOTAL
SPESIFIKASI
By Scope PT.
-
CAKRA
By Scope PT.
-
CAKRA
By Scope PT.
-
CAKRA
452,500,000
ANDIRI
UMBING
KET.
TOTAL
SPESIFIKASI
168,000,000
255,000,000
150,000,000
95,000,000
42,500,000
37,500,000
748,000,000
ANDIRI
UMBING
KET.
TOTAL
SPESIFIKASI
240,000,000
145,000,000
240,000,000
95,000,000
85,000,000
56,250,000
81,250,000
78,400,000
60,000,000
62,500,000
56,250,000
60,000,000
40,000,000
1,299,650,000
ANDIRI
UMBING
KET.
TOTAL
SPESIFIKASI
160,000,000 Ebara
6,050,000 Spindo
1,994,550,000
PT. ADITEK SALIM TEKNIK MANDIRI
BILL OF QUANTITY NO 10 PLAMPING
SUB BILL NO 10,3
JUMLAH 205,500,000
DIRI
PING
KET.
TOTAL
SPESIFIKASI
13,600,000
14,000,000
11,400,000
12,750,000
10,200,000
18,000,000 Groundpos
9,500,000
7,200,000
8,800,000
Isazu For Word &
11,400,000
Ebara
40,000,000
52,000,000
60,000,000
60,000,000
67,500,000 Local
35,000,000 Local
105,000,000 Local
15,000,000 Local
117,000,000 Local
18,200,000
96,000,000
36,000,000
20,000,000
1,090,750,000
REKAPITULASI
HARGA
No. URAIAN PEKERJAAN
Kuantitas Harga Satuan Jumlah
Bill No. 01,1 Electrical lighting fixtures
1 1 489,200,000 489,200,000
lantai dasar
Bill No. 02,1 Electrical Lighting Fixtures
2 Unit Room Lantai Lima 5 s/d 22 Type 36 18 157,952,000 2,843,136,000
(Typical)