Work description : MV VOLTAGE ITP No. 1.00
ITP No. Inspection and Test Items Grade Form No. Remark

1.00 MV VOLTAGE
1.00.01 H.T. Equipment Installation Check A
1.00.02 H.T. Equipment Insulation Resistance Test A
1.00.03 H.T. Equipment Dielectric Test A
1.00.04 Torque check A
1.00.05 Final Visual Inspection Punch List A
EXHIBIT A
FIELD INSPECTION AND TEST PLAN FOR ELECTRICAL
Work description : LV SWITCHGEAR
ITP No. Inspection and Test Items Grade

2.00 LV SWITCHGEAR
2.00.01 L.T. Equipment Insulation Test A
2.00.02 Relay Setting for LV Swtchgear A
2.00.03 Phase Rotation Test A
2.00.04 Sequence and Function Test A
2.00.05 Meter Operation Check A
2.00.06 Grounding Test A
2.00.07 Torque check B
2.00.08 Thermo Check C
2.00.09 Final Visual Inspection Punch List A
EXHIBIT A
AND TEST PLAN FOR ELECTRICAL

Form No. Remark


EXHIBIT A
FIELD INSPECTION AND TEST PLAN FOR CIVIL WORK
Work description : Structural Steel
ITP No. Inspection and Test Items Grade

6.00 Structural Steel


6.00.01 Inspection for Structure Steel Installation
-Main member : Alignment Check (Vertical & Centerline) B
- Bolt : Bolt Tightening Check B
-Grating, Platform & Other appurtenances B
(Alignment check, Visual inspection)
6.00.02 Inspection of Structural Steel Installation Tolerances B
6.00.03 Visual Inspection (Welding) C
6.00.04 Final Visual Inspection Punch List B
EXHIBIT A
AND TEST PLAN FOR CIVIL WORK
ITP No. 1.00
Form No. Remark
EXHIBIT A
FIELD INSPECTION AND TEST PLAN FOR ELECTRICAL
Work description : TRANSFORMER
ITP No. Inspection and Test Items Grade

3.00 TRANSFORMER A
3.00.01 Foundation Check A
3.00.02 Check Rating on Name Plate and List of Drawing A
3.00.03 Damage or Missing Parts A
3.00.04 Oil Level Indicator A
3.00.05 Operation of Manual Tap Changers (Tap Select No) A
3.00.06 LV Cables Connection A
3.00.07 Cable Connection and Termination A
3.00.08 Earthing Connection (Grounding Pad) A
3.00.09 Insulation Resistance Test A
3.00.10 Oil Insulation Test (Factory test) A
3.00.11 Function Test A
3.00.12 Ratio Test (Factory test) A
3.00.13 Polarity Test (Factory test) A
3.00.14 Vector Group Test (Factory test) A
3.00.15 Polarization Index Test (Factory test) A
3.00.16 Pressure and Safety Valve (Factory test) A
3.00.17 Thermometer with Contacts (Factory test) A
3.00.18 Final Visual Inspection Punch List A
EXHIBIT A
AND TEST PLAN FOR ELECTRICAL
ITP No.
Form No. Remark

Vender Form
Vender From
Vender From
Vender From
Vender From
Vender From
Vender From
Vender From
EXHIBIT A
FIELD INSPECTION AND TEST PLAN FOR ELECTRICAL
Work description : CABLE
ITP No. Inspection and Test Items Grade

4.00 CABLE
4.00.01 Insulation Resistance Test B
4.00.02 Continuity Test
4.00.03 Power Cable MV Voltage Test (Um > 1000 V) A
4.00.04 Power Cable LV Voltage Test (Um < 1000 V) A
4.00.04 Power Cable LV Voltage Test (Um < 100 V) A
4.00.05 Final Visual Inspection Punch List A
EXHIBIT A
AND TEST PLAN FOR ELECTRICAL
ITP No.
Form No. Remark
EXHIBIT A
FIELD INSPECTION AND TEST PLAN FOR ELECTRICAL
Work description : CONDUIT AND CABLE TRAY
ITP No. Inspection and Test Items Grade

5.00 CONDUIT
5.00.01 Conduit Installation Check
5.00.02 Grounding Jumper Check
5.00.03 Final Visual Inspection Punch List

5.01 CABLE TRAY


5.01.01 Cable Tray Installation Check
5.01.02 Grounding Jumper Check
5.01.03 Final Visual Inspection Punch List