Vous êtes sur la page 1sur 31

OptiX RTN 980L Radio Transmission System V100

Quick Installation Guide (Split LH, Outdoor


Components, Compact BU)

Issue: 02

Date: 2019-01-30

Copyright © Huawei Technologies Co., Ltd. 2019 All rights reserved.


No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Address: Huawei Industrial Base


Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website: http://www.huawei.com
Email: support@huawei.com

HUAWEI TECHNOLOGIES CO., LTD.


Safety Precautions

General safety precautions Device safety

To ensure human and equipment safety, observe all the safety precautions marked on the equipment and provided Before operating a device, check the electrical connection of the device to ensure that the device is securely
in this document. The WARNING , CAUTION , and NOTE marks in the document do not cover all the grounded.
safety precautions that must be followed; they only supplement general safety precautions as a whole. Electrostatics produced by human bodies may damage electrostatic-sensitive components on boards, for
When performing operations on Huawei products or equipment, strictly observe related safety precautions and example, a large-scale integration (LSI). Therefore, take proper safety measures, such as wearing an
special safety instructions. The safety precautions in this document are only some that Huawei can predict. Huawei electrostatic discharge (ESD) wrist strap or ESD gloves, to avoid damage to the components when operating
is not liable for any consequences that result from violation of common safety regulations or equipment production the boards.
and usage regulations. When operating storage batteries, take steps to prevent battery short circuits and electrolyte overflow or
leakage. Electrolyte overflow may corrode metal parts and boards, and ultimately cause equipment rust or
Local rules and regulations
board short circuits.
When operating a device, obey local rules and regulations. Corrosion

Personnel Anti-corrosion measures are required if an RTN 980L is installed in a location that is prone to corrosion. Contact
your local Huawei office for details. A location is prone to corrosion if it is:
Installation and maintenance personnel must be trained to perform operations correctly and safely. Within 3.7 km (12139 ft ) of an ocean or a salt water lake
Within 3 km ( 9843 ft ) of a heavy pollution source, such as a smelting factory or coal mine
Elevated locations
Within 2 km ( 6562 ft ) of a medium pollution source, such as a chemical, rubber, or electroplating plant
Within 1 km ( 3281 ft ) of a light pollution source, such as a food or leather processing plant or industrial boiler
The RTN 980L is usually installed in an elevated location, such as on the roof of a building. Adhere to the following
guidelines for installations in elevated locations:

Installation personnel must have the proper training and qualifications, and meet health requirements. Microwave
Installation personnel must wear helmets and safety belts and should work in pairs or teams.
Do not work in high places during thunderstorms, blizzards, gales, or other extreme weather conditions. When High-power radio frequency signals are harmful. Avoid exposure to transmissions from the antennas of
working outdoors, installation personnel must wear clothes and gloves appropriate to the weather conditions, and anti- microwave equipment that has the radiation warning symbol . When you are installing or performing
slip footwear. maintenance on an antenna located on a tower that has multiple antennas, be careful not to exposure yourself
Hoisting tools should be tested before use. to radiation from the other antennas.
All installation personnel and visitors onsite must wear helmets.

Hoisting heavy objects IF Cable

Before hoisting heavy objects, clear the area to avoid hurting anyone nearby. Before installing or removing an IF cable, turn off power switch.
Before hoisting heavy objects, ensure that the hoisting tools are complete
and in good condition.
Before hoisting heavy objects, ensure that the hoisting tools are fixed to a
secure object or wall with good weight-bearing capacity. Max 90°
Ensure that the angle between the two lifting slings is less than or equal to
90 degrees during the hoisting, as shown in the figure.

Devices and installation components


When operating devices and installation components, wear clean gloves.
Avoid direct contact with devices and installation components with bare
hands or dirty gloves.

2
Installation Precautions in a Harsh Environment

Definition of harsh environment

Within 3.7 km (12139 ft ) of an ocean or a salt water lake

When outdoor equipment or cabinets are installed in a harsh environment, ensure that the following requirements
are met:

Antenna installation requirements

If glue dispensing is not done on the rivets or screws of the center plate and reflective surface of an
antenna before delivery, apply matching outdoor adhesive to them.
Apply thread adhesive to screws used for installing antennas. This can prevent the screws from becoming
loose and improve corrosion resistance.
After you finish installing screws, spread oil or spray paint on the surface of the screws.
In areas with many birds, install protective covers to prevent birds' droppings from corroding antennas.

Branching unit installation requirements

Spread oil or spray paint onto the clamps of flexible/elliptical waveguides.


After you finish installing exposed screws, spread oil or spray paint on the surface of the screws.
In areas with many birds, install protective covers to prevent birds' droppings from corroding branching
units.

IDU cabinet installation requirements

Outdoor cabinets must be equipped with heat exchangers or air conditioners.


The air exhaust vent of an air conditioner must not face equipment.
Equipment rooms must be airtight. Equipment rooms and dust filters of equipment must be cleaned
regularly.
Equipment room doors must not face the wind.
Install filler panels in vacant slots of the IDU to prevent dust accumulation in the slots and corrosion
caused by salt fog.

3
Site Preparation
Pole requirements
A pole must meet the following requirements: When installing a branching unit and an antenna onto one pole, adjust the distance (h2) between the branching unit and
A pole must be able to withstand the total weight of the antenna, branching uniting, and RFU. antenna based on the antenna diameter to ensure that the branching unit does not block the antenna during antenna alignment.
The diameter of a pole is 114 mm ( 4.5 in.). If three BUs need to be installed on a pole, the spacing between the upper and lower BUs must be greater than or equal to
The pole length varies depending on the branching unit and antenna installation mode. The flexible waveguide length 0.3 m. The actual spacing can be adjusted based on the length of the flexible waveguide.
also varies accordingly. For details, see Table 1. Table 1 Pole length selection criteria If the antenna is far from the branching unit, connect them using two flexible waveguides. Install a spacer between the two
flexible waveguides.
Antenna Installation Recommended Pole Length (≥) Flexible Waveguide Branching units are cascaded using 1.8 m (5.9 ft )flexible waveguides.
Diameter Mode Length
4+0/8+0 12+0 16+0 24+0 4+0/8+0 12+0/16+0/
24+0
0.9m (35.4 3.2m (10.5
One pole 1.6m(5.2 ft) 2.2m(7.2 ft) 1.8m (5.9 ft)
in) ft)
One-pole installation
1.2m (3.9 3.5m (11.5 h3
One pole 1.9m (6.2 ft) 2.5m (8.2 ft) 1.8m (5.9 ft)
ft) ft)

1.8m (5.9
2.9m 3.8m (12.5 ft)+0.9 m Two-pole installation
One pole 2.2m (7.2 ft) 2.7m (8.9 ft) 1.8m (5.9 ft)
(9.5 ft) ft) (3.0 ft)
1.8m (5.9
ft)
Antenna 2.0m (6.6 ft) 2.0m (6.6 ft) 2.0m (6.6 ft) 1.8m (5.9 1.8m (5.9 120mm (4.7
Two in)<h1<180mm (7.1 in)
ft)+0.9 m ft)+1.8m (5.9
poles Branchi
1.0m (3.3 ft) 1.6m (5.2 ft) 2.2m (7.2 ft) (3.0 ft) ft)
ng Unit
h2
1.8m (5.9
3.3m (10.8 3.5m 4.2m (13.8
One pole 2.8m (9.2 ft) 1.8m (5.9 ft) ft)+0.9 m
ft) (11.5 ft) ft)
(3.0 ft)
2.4m (7.8 Flexible
ft) Antenna 2.0m (6.6 ft) 2.0m (6.6 ft) 2.0m (6.6 ft) waveguide
Two
1.8m (5.9 ft)+1.8m (5.9 ft)
poles Branchi
1.0m (3.3 ft) 1.6m (5.2 ft) 2.2m (7.2 ft)
ng Unit
1.8 m (5.9
1.8m (5.9 1.8m (5.9 ft) flexible
3.5m 3.7m 4.4m (14.4 waveguide
One pole 3.0m (9.9 ft) ft)+0.9 m ft)+1.8m (5.9
(11.5 ft) (12.1 ft) ft)
(3.0 ft) ft)
3.0m (9.8
ft) Antenna 2.7m (8.9 ft) 2.7m (8.9 ft) 2.7m (8.9 ft)
Two Spacer
1.8m (5.9 ft)+1.8m (5.9 ft)
poles Branchi
1.0m (3.3 ft) 1.6m (5.2 ft) 2.2m (7.2 ft)
ng Unit

1.8m (5.9 1.8m (5.9


4.5m (14.8 4.7m 5.4m (17.7 Flexible
One pole 4.0m (13.2 ft) ft)+0.9 m ft)+1.8m (5.9
ft) (15.4 ft) ft) waveguide
(3.0 ft) ft) Wind resistance requirements
3.7m (12.1
ft) Antenna 2.7m (8.9 ft) 2.7m (8.9 ft) 2.7m (8.9 ft) The following table describes the wind resistance requirements for a pole after a branching unit and an antenna are installed onto it.
Two
poles Branchi 1.8m (5.9 ft)+1.8m (5.9 ft) At a 30 m (99 ft)/s or lower wind speed, an antenna must not rotate beyond one-third of the antenna's half-power angle.
1.0m (3.3 ft) 1.6m (5.2 ft) 2.2m (7.2 ft)
ng Unit
Antenna Operating Wind Survival Wind Speed Antenna Diameter Operating Wind Speed Survival Wind
1. It is recommended that you preferentially select a single-pole installation mode.
Diameter Speed Speed
2. If two poles are used, the pole positions vary according to onsite environment, and flexible waveguide lengths must be determined
according to site survey. Flexible waveguide lengths provided in this table are recommended values. 1.8 m (5.9 ft) 200 km (656168 ft)/h
3. Table 1 shows the minimum pole length required in different installation modes. It is recommended that the pole length selection
criteria be simplified as follows: 2.4 m (7.8 ft)
If the minimum pole length required is less than or equal to 1.0 m (3.3 ft), select a 1.0 m (3.3 ft) pole. 0.9 m (35.4 in.) 200 km (656168 200 km
If the minimum pole length required is greater than 1.0 m (3.3 ft) and less than or equal to 2.0 m (6.6 ft), select a 2.0 m (6.6 ft) pole. 250 km (820210 ft)/h
ft)/h 3.0 m (9.8 ft) 110 km (360892 ft)/h (656168 ft)/h
If the minimum pole length required is greater than 2.0 m (6.6 ft) and less than or equal to 2.5 m (8.2 ft), select a 2.5 (8.2 ft) m pole.
If the minimum pole length required is greater than 2.5 m (8.2 ft) and less than or equal to 3.0 m (9.9 ft), select a 3.0 m (9.9 ft) pole.
If the minimum pole length required is greater than 3.0 m (9.9 ft) and less than or equal to 3.7m (12.1 ft) , select a 3.7 m (12.1 ft) pole. 1.2 m (3.9 ft) 3.7 m (12.1 ft)
If the minimum pole length required is greater than 3.7 m (12.1 ft) and less than or equal to 4.7 (15.4 ft) m, select a 4.7 m (15.4 ft) pole.

4
Purchase List (North
(NorthAmerica)
America)

Item Sub-item Remarks

(1) IDU indoor power cable 10 AWG electronic power cables, each of which spans over a maximum distance of 3 m (10 ft)

IDU power cable (2) IDU power cable terminal (connected to a power supply device) Terminal specifications depend on the power supply device.

(3) IDU power cable terminal (connected to an IDU) OT bare crimp terminal, 10 AWG, M6

(4) IDU ground cable You are advised to use 6 AWG electronic power cables.
IDU ground cable (5) IDU ground cable terminal (connected to an IDU) Dual OT-M6 terminal, stud spacing 15.875 mm (0.625 in.)

(6) IDU ground cable terminal (connected to a ground bar) Terminal specifications depend on the ground bar.

(7) IF cable connector (connected to an IDU) RF coaxial connector, type TNC connector, 50 ohms, elbow/plug, male, nut installation

(8) IF cable connector (connected to an RFU) Coaxial connector, type N connector, 50 ohms, straight/plug, male, nut installation

If cables with a diameter larger than 7.6 mm (0.3, in.) such as RG-8U or 1/2 inch cables, are used as IF cables, IF jumpers are required to
(9) IF jumper
facilitate cable routing.
IF cable
(10) IF cable -

(11) Ground clip for an IF cable Ground clips matching IF cables must be used for surge protection.

IF cable fixing clip IF cable fixing clips must match IF cables.

Cable tie -

(12) RFU/BU ground cable You are advised to use 6 AWG electronic power cables, which support a maximum transmission distance of 20 m (65.62 ft).

(13) RFU ground cable terminal (connected to an RFU)/BU ground cable terminal (connected
Single OT-M6 terminal
RFU/BU ground cable to a BU)

(14) RFU ground cable terminal (connected to a ground bar)/BU ground cable terminal
Terminal specifications depend on the ground bar.
(connected to a ground bar)

(6) IDU ground


cable terminal
(connected to a
ground bar)
DC Power Supplier

(2) IDU power cable


Ground bar terminal (connected to
(4) IDU ground (13) BU ground cable
a power supply device)
cable terminal (connected to a
(13) RFU ground BU)
(1) IDU indoor cable terminal (8) IF cable
power cable (connected to an RFU) connector
(12) BU ground cable
(connected to an
(5) IDU ground RFU)
(12) RFU ground
cable terminal cable
(connected to an (14) BU ground cable
IDU) (14) RFU ground cable
terminal (connected to a
terminal (connected to a
ground bar)
ground bar)
(3) IDU power
cable terminal (7) IF cable
(connected to an connector (11) Ground clip for
IDU) (connected to an an IF cable
IDU)
(10) IF cable
(9) IF jumper

5 5
Installation Tools

Measuring tape Level Phillips screwdriver Flat-head screwdriver Adjustable wrench Socket suite Torque wrench Hex key Crimping tool

Wire clippers Wire stripper RJ45 crimping tool Segmented blade


Diagonal pliers COAX crimping tool Needle-nose pliers Open-end wrench Combination pliers
utility knife

Multimeter Heat gun Hammer drill Marker Network cable tester Claw hammer Safety gloves ESD gloves File

Waterproof
Ladder Soldering iron Impact tool Vacuum cleaner Fiber binding tape PVC tape COAX stripper ESD wrist strap
insulation tape

Pulley Lifting sling Compass Flaring tool kit Hoisting grip Hacksaw Safety belt Protection belt Slip-proof glove

Safety helmet Anti-skid shoes

6
Equipment Components

1 Branching Unit (SD) 2 Branching Unit (Non-SD)


Guide trough
RFU port Guide trough
RFU port

Lifting eye
Lifting eye

310mm
(12.21 in.) 310mm
220mm (8.67 in.) (12.21 in.)

Size:610mm (24.03 in.) 220mm (8.67 in.)

Wight: 25kg (55.1 lb) Size:610mm (24.03 in.)


Wight: 25kg (55.1 lb)

Main antenna port SD antenna port Ground bolt Antenna port


SD cascade port Main cascade port Ground bolt Cascade port

7
Equipment Components

3 RFU 4 RFU
Mounting Kits

91 mm
Slip-proof U-shaped
228 mm (9 (3.58 in.) bracket clamp
in.)

Size: 228 mm (9
in.)
Wight: 5.5kg (12lb)

RSSI test port

Ground screw
5 Load and Short-circuit module
IF port
Load at an RFU port Load at a antenna port
or a cascade port
Guide pin

Facing
upwards

Short-circuit module

Loads or short-circuit modules must be installed on


RFU ports, cascade ports, and antenna ports that are
not in use to prevent signal reflection.

8
Equipment Components

6 Cables 7 IDU
Flexible
waveguide RTN 980L IDU

Elliptical
waveguide

SD cable Logical slot layout of the RTN


980L IDU

IF cable
RF coaxial cable connector,
N-type, male
RG-8U cable or 1/2-inch cable

RF coaxial cable connector,


5D cable TNC-type, male

Ground cable
PGND cable
Ground bar

Naked crimping
connector (OT
The ground terminal can be connected to the ground bar or U-shaped
type)
ground clip. Connect the ground bar to whichever is most appropriate for
the scenario.
See the usage instructions released with the ground clip for more details.

9
Installation Scenarios

1 4+0/3+1 (Single-polarized Antenna) 2 4+0/3+1 (Single-polarized Antenna, SD)

Branching Unit

Branching unit
Antenna
Ground cable
Main Load
Load Antenna
Flexible
Ground cable waveguide

Elliptical
Flexible waveguide
waveguide

IF cable IF cable

Flexible
SD waveguide
Antenna

Installation procedure
Connection of the flexible waveguide/elliptical
Install the RFU under the tower. For details, go waveguide
Flexible waveguide 1 Branching unit
Installation procedure to Page 16. Main antenna
connection

2 Install the branching unit. For details, go to


1 Install the RFU under the tower. For details, Branching unit Antenna Pages 16 and 17.
go to Page 16.
Install the branching unit. For details, go to 3 Install the antennas.
2
Pages 16 and 17.

3 Install the antenna. For details about how to install the antennas, see
the specific installation guide.

For details about how to install the antenna, see the 4 Install ground cables for the branching unit SD antenna
installation guide provided by the supplier. and RFU. For details, go to Page 18.

4 Install ground cables for the branching unit 5 Install the flexible waveguide. For details, 6 Install the elliptical waveguide or SD cable.
Ground cables must be installed for all branching For details, go to Pages 21-25.
and RFU. For details, go to Page 18. go to Pages 18, 19 and 20.
units and RFUs.

6 Install the IF cables. For details, go to Pages 5 Install the flexible waveguide. For details, go
to Pages 18, 19 and 20. Use an elliptical waveguide plus a flexible waveguide or an SD
Ground cables must be installed for all branching 25 and 26.
cable to connect an SD antenna port and an SD antenna.
units and RFUs.
7 Install the IF cables. For details, go to Pages 25
and 26.

10
Installation Scenarios

3 8+0/7+1 (Dual-polarized Antenna) 4 8+0/7+1 (Dual-polarized Antenna, SD)


Branching Unit-2
Branching Unit-2 Connection of the flexible
waveguide/elliptical waveguide
Branching Branching Unit-2
Branching Unit-1
Unit-1

Flexible waveguide
connection
Branching Unit-2 Ground
Ground cable
cable Load
Flexible
Flexible waveguide
waveguide
Load

Antenna SD Main
Antenna Antenna

Main Elliptical
Antenna waveguide

IF cable
SD
Antenna
Flexible Branching Unit-1
waveguide

IF cable
Branching Unit-1

Installation procedure
Installation procedure

1 Install the RFU under the tower. For details,


go to Page 16. 1 Install the RFU under the tower. For
details, go to Page 16.
2 Install the branching units from the top
downwards. For details, go to Pages 16 and Install the branching units from the top downwards. 5 Install the flexible waveguides. For details, go
2
17. For details, go to Pages 16 and 17. to Pages 18, 19 and 20.
3 Install the antennas. Install the elliptical waveguide or SD cable. For details, go
5 Install the flexible waveguides. For details, go 6
3 Install the antennas. to Pages 21-25.
to Pages 18, 19 and 20.

For details about how to install the antenna, see the 6 Install the IF cables. For details, go to
installation guide provided by the supplier. Pages 25 and 26. For details about how to install the antennas, see
the installation guide provided by the supplier. Use an elliptical waveguide plus a flexible waveguide or an SD
4 Install ground cables for the branching unit and cable to connect an SD antenna port and an SD antenna. SD
RFU. For details, go to Page 18. 4 Install ground cables for the branching unit cables are recommended for the 5 GHz LH.
and RFU. For details, go to Page 18.
7 Install the IF cables. For details, go to Pages 25 and 26.
Ground cables must be installed for all branching Ground cables must be installed for all branching
units and RFUs. units and RFUs.

11
Installation Scenarios

5 8+0/7+1 (Single-polarized Antenna)

Branching unit-2

When two branching units are cascaded, the frequencies of the TX high and TX low sites are arranged
Branching in an opposite order. As shown in the following figure, f1-f8 are in ascending order, and f'1-f'8 are in
unit-1 ascending order.
TX spacing

f1 f2 f3 f4 f5 f6 f7 f8 f ’1 f ’2 f ’3 f ’4 f ’5 f ’6 f ’7 f ’8
Flexible waveguide connection

Branching unit-2
TX
Ground TX low TX high frequency
cable site site
Flexible
waveguide Determine the TX high or low site type of a branching unit based on its nameplate. Determine the
frequencies of the main and secondary branching units based on the nameplates of the RFU ports.
Load

Branching unit-1 TX low site TX high site

Pole Pole

RFU Port1 RFU Port2 RFU Port1 RFU Port2

f1 Branching f2 f ’8 Branching f ’7
Unit-1 Unit-1
RFU Port3 RFU Port4 RFU Port3
Top Side Top Side RFU Port4
f3 f4 f ’6 f ’5
IF cable

Antenna
Pole Pole

RFU Port1 RFU Port2


RFU Port1 RFU Port2
f5 Branching f6 Branching
Unit-2 f ’4 Unit-2 f ’3
Installation procedure
RFU Port3 RFU Port4 RFU Port3
Top Side RFU Port4
Top Side
1 Install the RFU under the tower. For details, f7 f8 f ’2 f ’1
go to Page 16.

2 Install the branching units from the top


downwards. For details, go to Pages 16 and
17. Nameplate of the branching unit
3 Install the antenna. 5 Install the flexible waveguides. For details, go to
Pages 18, 19 and 20.

For details about how to install the antenna, see the 6 Install the IF cables. For details, go to TX high/low site
installation guide provided by the supplier. Pages 25 and 26.

4 Install ground cables for the branching unit and


RFU. For details, go to Page 18.

Ground cables must be installed for all branching


units and RFUs.

12
Installation Scenarios

6 8+0/7+1 (Single-polarized Antenna, SD)


Branching unit-2 Connection of the flexible
waveguide/elliptical
When two branching units are cascaded, the frequencies of the TX high and TX low sites are arranged
Branching waveguide
in an opposite order. As shown in the following figure, f1-f8 are in ascending order, and f'1-f'8 are in
unit-1 Branching unit-2 ascending order.
TX spacing

f1 f2 f3 f4 f5 f6 f7 f8 f ’1 f ’2 f ’3 f ’4 f ’5 f ’6 f ’7 f ’8

Load
Ground cable TX
Branching unit-1 TX low TX high frequency
Flexible site site
waveguide
Determine the TX high or low site type of a branching unit based on its nameplate. Determine the
frequencies of the main and secondary branching units based on the nameplates of the RFU ports.

TX low site TX high site

Main Elliptical
antenna waveguide
Pole Pole
SD IF cable RFU Port1 RFU Port2 RFU Port2
RFU Port1
antenna
Flexible f1 Branching f2 f ’8 Branching f ’7
Unit-1 Unit-1
waveguide
RFU Port3 RFU Port4 RFU Port3 RFU Port4
Top Side Top Side
f3 f4 f ’6 f ’5

SD Main
antenna antenna

Pole Pole

RFU Port1 RFU Port2 RFU Port1 RFU Port2


Installation procedure f5 f6 f ’4 Branching f ’3
Branching
Unit-2 Unit-2
1 Install the RFU under the tower. For RFU Port3 RFU Port4 RFU Port3 RFU Port4
details, go to Page 16. Top Side Top Side
5 Install the flexible waveguides. For details, go f7 f8 f ’2 f ’1
2 Install the branching units from the top downwards. to Pages 18, 19 and 20.
For details, go to Pages 16 and 17.
Install the flexible waveguide connecting the SD antenna and Nameplate of the branching unit
3 Install the antennas.
elliptical waveguide upon installation of the elliptical waveguide.
6 Install the elliptical waveguide or SD cable.
For details about how to install the antennas, see For details, go to Pages 21-25.
the installation guide provided by the supplier. TX high/low site
4 Install ground cables for the branching unit Use an elliptical waveguide plus a flexible waveguide or an SD
and RFU. For details, go to Page 18. cable to connect an SD antenna port and an SD antenna.

7 Install the IF cables. For details, go to Pages 25 and 26.


Ground cables must be installed for all branching
units and RFUs.

13
Installation Scenarios

7 12+0/11+1 (Single-polarized Antenna)

Connection of the
Branching Unit-3 flexible Branching Unit-3 When two branching units are cascaded, the frequencies of the TX high and TX low sites are arranged in
waveguide/elliptical an opposite order. As shown in the following figure, f1-f8 are in ascending order, and f'1-f'8 are in ascending
waveguide order.
TX spacing

Branching Unit-1 f ’1 f ’2 f ’3 f ’4 f ’5 f ’6 f ’7 f ’8 f ’9 f ’10 f ’11 f ’12


f 1 f 2 f 3 f 4 f 5 f 6 f 7 f 8 f 9 f 10 f 11 f 12

Branching Load
Unit-2 Branching Unit-2
TX low site TX high site TX frequency
Determine the TX high or low site type of a branching unit based on its nameplate. Determine the
frequencies of the main and secondary branching units based on the nameplates of the RFU ports.

TX low site TX high site

Ground cable Pole


Branching Unit-1 Pole
Flexible
waveguide RFU Port2 RFU Port1 RFU Port2
f1 Branching f2 f ’12 Branching
Unit-1 Unit-1
f ’11
Load
RFU Port4 RFU Port3 RFU Port4
Top Side Top Side
f3 f4 f ’10 f ’9

Pole Pole
RFU Port1 RFU Port2
RFU Port1 RFU Port2
Branching
f5 f6 f ’8
Antenna Unit-2 Branching f ’7
Unit-2
RFU Port4
RFU Port3 RFU Port3
Top Side Top Side RFU Port4
IF cable f7 f8 f ’6 f ’5
Installation procedure
Pole
RFU Port2 Pole
1 Install the RFU under the tower. For details,
go to Page 16. RFU Port1 RFU Port2
f9 Branching f10
Unit-3
2 Install the branching units from the top f ’4 Branching
f ’3
Unit-3
downwards. For details, go to Pages 16 and 17. RFU Port4
Top Side
Install the antenna.
f11 f12
RFU Port3 RFU Port4
3 Install the flexible waveguides. For details, go to Top Side
5
Pages 18, 19 and 20. f ’2 f ’1

For details about how to install the antenna, see the 6 Install the IF cables. For details, go to Nameplate of the branching unit
installation guide provided by the supplier. Pages 25 and 26.
4 Install ground cables for the branching unit and
RFU. For details, go to Page 18. TX high/low site

Ground cables must be installed for all branching


units and RFUs.

20/21 >> 14
Installation Scenarios

7 Height Difference Between the Main Antenna and SD Antenna Being Greater Than 20 m (66 ft)

Example (Single-Polarized Antennas) Example (Dual-Polarized Antennas)


The waveguide length difference between the BU-to-main antenna and BU-to-SD
antenna must less than 25 m (82 ft).
If SD is configured and the height difference between the main antenna and SD
antenna is greater than 20 m (66 ft), the BU must be installed at the middle position
between the two antennas, and elliptical waveguides are used to connect the BU
and antennas. Usually, a flexible waveguide is used to connect the BU and the
upstream elliptical waveguide.

Flexible
waveguide

Flexible
waveguide
Wave guide
Wave guide
Main antenna Length ≤ 25 m
Length ≤ 25 m
(82 ft )
(82 ft )
Elliptical Elliptical
waveguide waveguide

BU/RFU Δh > 20 m
(66 ft )

Flexible
SD antenna waveguide

Flexible
waveguide
Wave guide
Length ≤ 25 m Wave guide
Elliptical
Elliptical (82 ft ) waveguide Length ≤ 25 m
waveguide (82 ft )

An SD cable can substitute for the elliptical waveguides.

Flexible
waveguide Flexible
waveguide

15
Installation References

1 Installing RFUs Under a Tower 2 Installing Branching Units


11 Check whether the frequency band information about the RFU to be installed is consistent with that about the corresponding
RFU port on the branching unit. a Installing a Slip-proof Bracket

1 2
120 (4.7 in.)
Select an appropriate location on a Tighten the screws.
pole for the slip-proof bracket to fit <h<180mm (7 in.)
RFU frequency into and then align the screws with
information Frequency band the holes.
information about the
RFU port

2 Align the guide pin on the RFU with the guide trough on the BU. Install the RFU onto the BU.

Guide trough

Reserve a space of 120 mm to 180 mm (4.7 in to 7 in ) between slip-


proof brackets when two branching units are installed.

b
Guide pin
Installing One Branching Unit

Fixed
pulley

Gas-proof film Lifting


Install a load on any port on the branching unit that is not mounted with an RFU. sling
For details about how to install a load, go to Page 18.
Be careful not to damage the gas-proof film over the waveguide port of a branching
unit. When hoisting a branching unit, tie the branching unit to the
lifting sling using a pulley or hoisting ring, with the goal of easily
After the RFU is unpacked, it must be powered on within 24 hours to avoid moisture hoisting the branching unit and reducing friction damage to the
accumulation in it. No touch
lifting sling.
Do not damage the coating when you install or replace an RFU.

3 Partially tighten the four M6 screws of the RFU and then fully tighten them in a diagonal sequence.
Screwing-stop Traction sling
surface
Installation
surface
If the screwing-stop surface of the
captive screw is in complete contact with
the installation surface of the bolt holes,
it indicates that the screws are tightened.
1
Lead the lifting sling through the lifting eyes of the
branching unit, tie the branching unit securely, and tie
4 Apply anti-seize grease to the four M6 captive screws If RFUs were purchased half a year ago and now they need to be installed
on BUs, do not use the anti-seize grease with the RFUs. Instead, you must the handle securely using traction slings. Lift the
and the hook on the RFU. branching unit to the slip-proof bracket.
locally purchase new anti-seize grease by yourselves.

16
Installation References

2 Installing Branching Units


b Installing One Branching Unit C Installing Two Branching Units
Install an upper branching unit. Refer to the operations Lead the lifting sling through the lifting eyes of the
2 Fit U-shaped clamps into the installation holes
on the branching unit.
3 Tighten the screws on the U-shaped clamps using 1 for installing one branching unit. 2 branching unit, tie the branching unit securely, and tie the
a wrench. Untie the lifting slings. handle securely using traction slings. Lift the branching
unit to the slip-proof bracket.

Install the upper branching unit first.

3 Adjust the azimuth of the branching unit to facilitate installation of the


U-shaped clamp.

The elevation angle between two branching units


must be between 135 degrees to 180 degrees.

4 Fit U-shaped clamps into the installation holes on the branching unit.

5 Tighten the screws on the U-shaped clamps using an adjustable wrench.


Untie the lifting slings.

17
Installation References

Installing Loads Or Short-circuit Modules Installing Flexible Waveguides

a Connecting a Flexible Waveguide


Loads or short-circuit modules must be installed for
RFU ports that are not in use.
1 Align the arrow on the load
with the guide trough. Fit the
Use flexible waveguides when connections are required:

load into the RFU.  The branching unit and the main antenna
 Two branching units
 In the SD configuration, the elliptical waveguide is connected to the antenna through a flexible waveguide.

1 After verifying that the flexible waveguide and the waveguide cavity of the branching unit or antenna are in the same
direction, tighten the screws. Fix the flexible waveguide using fixtures.

2 Tighten the M6 screws


securely.

Spacer

M5 screw

Spacer

 The flexible waveguide is available in multiple types. This procedure for installing
Installing Ground Cables the flexible waveguide is provided for reference only. In actual installation, follow
the instructions delivered with the flexible waveguide.
 Spacers are used for optimal waterproof performance when PDR flange Flexible
interfaces are interconnected.For example, Spacers are required when a flexible waveguide
waveguide is connected to a 6 GHz antenna.

Upon delivery, the antenna ports of branching unit have been covered with protective caps. Loads have been installed on
cascade ports. Do not remove the caps or loads until these ports are going to be used.
Waterproof the connectors between the flexible waveguide and the branching unit or antenna. For details about how to
waterproof the connectors, see "Waterproofing Outdoor Connectors".

2 Apply waterproofing and anti-corrosion treatments


on the connecting point of the flexible waveguide

Wrapping area: L≥10cm


• Distance (H) from the connecting point of the flexible outdoor
waveguide to the connector side ≥ 1 cm binding
• Distance (L) from the connecting point of the flexible waveguide straps
to the cable side ≥ 10 cm
H≥1cm
Wrapping Method:
1. Wrap one layer of PVC tape around the Wrapping area.
2. Wrap three layers of waterproof insulation tape outside the PVC tape.
Ground bar
3. Wrap three layers of PVC tape outside the waterproof insulation tape.
In this example, a flexible waveguide
Ground cables must be installed for all branching units and RFUs. 4. Secure the tape by using outdoor binding straps at the positions 1 cm is connected to an antenna. The
Apply anti-rusting grease to the ground bar or ground point after procedure for connecting a flexible
to the wrapping edges.
waveguide to another device is the
installing the ground cable. same.

18
Installation References

Installing Flexible Waveguides

b Precautions for Installing Flexible Waveguides

The flexible waveguide can be bent only within its maximum twist angle and at the side with a larger area. The E-bend
radius and H-bend radius cannot be smaller than the minimum bending radius. For details about the minimum bending
radius, see the following table.
H-Plane E-Plane
Cracks
Server deformation

Waveguide deformed Waveguide damaged


Frequency Band Minimum Minimum Maximum because of being over bent because of being over bent
H-bend radius ① E-bend radius ② Twist Degree

5 GHz 272 mm (10.7 inch.) 136 mm (5.4 inch.) 155 (deg/m)

6 GHz 204 mm (8.0 inch.) 102 mm (4.0 inch.) 214 (deg/m)

7/8 GHz 152 mm (6.0 inch.) 76 mm (3.0 inch.) 264 (deg/m)

10/11 GHz 127 mm (5.0 inch.) 64 mm (2.5 inch.) 310 (deg/m)

Keep protective covers of flexible waveguides well for future use.

Protective covers for flexible waveguides

Flexible waveguide over bent

19
Installation References

Installing Flexible Waveguides

b Fixing a Flexible Waveguide

Components of a Flexible 2 Installing flexible waveguide sheaths


Waveguide Fixture When fixing a 4G flexible waveguide, use the 4G flexible waveguide sheath.

When fixing a 5G flexible waveguide, use both the 4G and 5G flexible waveguide sheaths. Place the flexible waveguide in the 5G flexible
Flexible Flexible waveguide sheath, and then place the 5G flexible waveguide sheath in the 4G flexible waveguide sheath.
Hose clamp Fixture Supporting bolt waveguide waveguide
sheath clip

5G
4G

When fixing a 6G flexible waveguide, use the 6G flexible When fixing a 7G&8G flexible waveguide, use the
waveguide sheath. 7G&8G flexible waveguide sheath.

When fixing a 10/11G flexible waveguide, use both the 7G&8G and 10/11G waveguide sheaths. Place the flexible waveguide in the 10/11G
flexible waveguide sheath, and then place the 10/11G flexible waveguide sheath in the 7G&8G flexible waveguide sheath.

10/11G 7G&8G

1 Fixing a flexible waveguide fixture on a pole

Fix a flexible waveguide fixture on a pole using a hose clamp, and then adjust the length of the bolt
according to the position of the flexible waveguide.

3 Installing a flexible waveguide clip


4 Fastening screws
Fix the flexible waveguide in the fixture securely.

Fasten the
screws

Nut

Tighten the flexible


waveguide clip
Hex key
Flat-head screwdriver

20
Installation References

Installing Elliptical Waveguides

a Installation Process b Assembling Connectors

1 Cutting an elliptical waveguide

Start

① Assemble connectors. Keep the cutting area down, in order to avoid dirt or
copper shavings falling into the waveguide.

② Hoist an elliptical waveguide.

Lay out and install the elliptical


③ waveguide.

④ Waterproof connectors.

End

When cutting an elliptical waveguide and


assembling connectors, clear residues in the
elliptical waveguide.

Flexible 2 Assembling connectors


waveguide

For the method of assembling connectors for elliptic When assembling an elliptical waveguide connector,
③ waveguides, see the delivered connector assembling ensure that the connector is intact and all screws are
tightened.
description.


③ ③

Elliptical waveguide The elliptical waveguide connector is over Elliptical waveguide connector with
hammered, the surface of the elliptical waveguide good quality
④ connector is uneven and has cracks.

21
Installation References

Installing Elliptical Waveguides

c Hoisting an Elliptical Waveguide d Laying Out and Installing an Elliptical Waveguide

Bending an elliptical waveguide


Hoisting grip
1 Laying out an elliptical waveguide

Use a hoisting grip to hoist an elliptical waveguide Antenna Flexible


to prevent the elliptical waveguide from being waveguide
deformed due to unbalanced force.
Bend an elliptical waveguide by applying
Sling tie
When using the hoisting grip, firmly secure the two force evenly along the bent parts. Do not
ends of the hoisting grip. apply force only on the bent parts.
After hoisting an elliptical waveguide, remove the
hoisting grip and keep it well, because it can be used Changing the bending plane of an
again if the elliptical waveguide needs to be replaced elliptical waveguide
in the future. Elliptical waveguide
Elliptical waveguide
Before hoisting an elliptical waveguide, use clean
cloth or paper to wrap elliptical waveguide connectors Sling tie
for protection. Branching Unit

h ≥ 50cm (20 in.)

Protect the
The part behind an elliptic waveguide connector must be kept
connector.
straight for a certain length before being bent.
When connecting an elliptical waveguide to the branching unit, r
route the elliptical waveguide straightly for at least 50cm (1.6 ft)
before bending it.
Ensure that the bending radius of an elliptical waveguide is
larger than the minimum value of each plane.
Do not twist an elliptical waveguide. To change the direction of The bending radius The elliptic waveguide
a plane, bend it twice. must be large enough. must not be over bent.
Elliptical Waveguide Parameters

(Optional) Bending tool Item Frequency Band

5GHz L6/U6 GHz 7/8 GHz 10/11 GHz

Andrew model EWP43 EWP63-59W EWP77-71W EWP90S

Minimum bending radius of 381 (14 in.) (bent multiple 260 (10 in.) (bent multiple 230 (9 in.) (bent multiple 180 (7 in.) (bent multiple
plane E (mm) (in.) times) times) times) times)
280 (10 in.) (bent once) 180 (7 in.) (bent once) 180 (7 in.) (bent once) 180 (7 in.) (bent once)

Minimum bending radius of 889 (34 in.) (bent multiple 740 (29 in.) (bent multiple 635 (25 in.) (bent multiple 480 (19 in.) (bent multiple
plane H (mm) (in.) times) times) times) times)
711 (27 in.) (bent once) 510 (20 in.) (bent once) 510 (20 in.) (bent once) 300 (12 in.) (bent once)

Purchase bending tools as required for bending elliptical Outer diameter (mm) (in.) 71 (3 in.) x 41 (2 in.) 51.1 (2 in.) x 29.5 (1 in.) 43.6 (2 in.) x 25.4 (1 in.) 33.5 (1 in.) x 20.3 (1 in.)
waveguides.
Flange type PDR48 PDR70 PBR84 PBR100

22
Installation References

Installing Elliptical Waveguides

d Laying Out and Installing an Elliptical Waveguide

2 Securing the elliptical waveguide 3 Connecting the elliptical waveguide

a Connect the elliptical waveguide to the branching unit.

SD antenna port

Elliptical
waveguide

Blind via

a. Assembling fixture b. Screw

a b Connect the flexible waveguide to the antenna.


Install clamps.

6 GHz antenna Antenna

Spacer
Flexible Flexible
waveguide waveguide

b
Secure the elliptical waveguide.
c Connect the elliptical waveguide to the flexible
waveguide. A spacer is required when a flexible waveguide is connected
to a 6 GHz antenna.
Elliptical
A spacer is required when an elliptical waveguide is
waveguide
connected to a flexible waveguide.
When elliptical waveguides, flexible waveguides, antennas,
waveguide Spacer and branching units are connected, fix long screws into
Flexible
through-holes and short screws into blind vias.
Fasten all screws for connecting elliptical waveguides, flexible
waveguides, antennas, and branching units.
8mm (0.3 in.)
a. Install a clamp onto the elliptic waveguide. b. Tighten the screw on the clamp until the gap is 8
mm (0.3 in.). Through-hole

Install clamps at 1m (3.28 ft) intervals in the horizontal or vertical direction.


Install clamps at the two ends of each bent part.

23
Installation References

Installing Elliptical Waveguides Installing SD Cables

e Waterproofing Connectors
In the SD scenario, you can use an elliptical waveguide plus a flexible waveguide or an SD cable to connect an SD antenna
port and an SD antenna.

1 Route an SD cable. 2 Fix the SD cable.

Clamp

SD
cable

Waterproof the connectors between the elliptical waveguide and flexible waveguide and between Clamp
the elliptical waveguide and branching unit.
For details about how to waterproof elliptical waveguide connectors, see "Waterproofing Outdoor
Connectors” on page 27. SD cable

3 Install the SD cable.


A washer is required when a waveguide-to-coaxial
converter is installed on a 6 GHz antenna port.
a Install waveguide-to-coaxial converters.

6G Antenna

Waveguide-to-
coaxial converter

SD antenna Washer
port

Waveguide-to-
coaxial converter

24
Installation References

Installing SD Cables Installing IF Cables

b Connect the SD cable to the branching unit and antenna. a Routing IF Cables and Making Drip Loops

1 Route an IF cable. For details about how to make an IF cable, go to Pages 29 and 30.

A. The IF cable should be routed from the top downwards


and should be bound at the time of routing.
B. Make drip loops for IF cables below the RFU and near a
room entry.
C. The bending radius of the IF cable should be larger than
30 cm (11.8 in.).
D. The IF cable should be bound using outdoor cable ties or
feeder clamps every meter (3.28 ft).

2 Fix the IF cable using outdoor cable ties or feeder


clamps.
3 Make drip loops.

4 Waterproof the connectors between the SD cable and the branching unit or antenna. For
details about how to waterproof the connectors, see "Waterproofing Outdoor Connectors".
Waterproof area

Drip loop

Outdoor binding straps Feeder clamps


Drip loop

After making a drip loop for an IF cable below the


4 Bind the labels of IF cables. RFU, coil the IF cable around the pole to form a loop
with a diameter of 0.6 m ( 23.6 in.) for future
antenna position adjustment.

20 cm (8 in.)

It is recommended that you bind IF cable labels to two ends of an IF


cable and the exit from the tower.
It is recommended that you use the silkscreen of an RFU port on the
branching unit as the label identification, for example, To RFU Port 1.

25
Installation References

Installing IF Cables

b Connecting an RFU to an IDU c Grounding IF Cables

1 Select ground points.

Bind the IF cable first to prevent its type-N connector from being
a The place about 0.5 to 1 meter (1.64 ft to 3.28 ft ) away from the cable entry of
pulled out.
° the equipment room or outdoor cabinet
Make drip loops for IF cables below the RFU and near a room
entry. b The place on the roof edge about 1 meter (3.28 ft ) away from the turning
point of the wiring ladder

c The middle point of the cable (when the cable is longer than 60 meters (197
ft ))

1.7 N·m
c

The ground point depends on the installation mode and the


length of the IF cable. Generally, the IF cable should be
grounded to a minimum of two points. When the IF cable is
b a longer than 60 meters (197 ft), add a grounding point for every
extra 30 meters (98.5 ft).

Waterproof the connector. For details,


see "Waterproofing Outdoor IDU
Connectors".
As recommended in ITU K.56, the IF cable does not need to
be separately grounded under the RFU if the RFU is properly
IF cable grounded.
2 Install the ground clip.

a Select the installation position of the ground clip and strip off the cable sheath.

1 2 3

IF jumper

If the equipment is configured with N+1 protection, the IF cable connecting to the RFU that provides the active The angle of the ground cable of
channel is connected to the IF jumper from the main IF board. The IF cable connecting to the RFU that provides the clip and the IF cable should not
the standby channel is connected to the IF jumper from the standby IF board. b Fix and waterproof the ground clip. For details, see "Waterproofing Outdoor be larger than 15 degrees. When
Connectors". the IF cable is vertically routed, the
If the XPIC function is enabled on the IF boards, the IF cable connecting to the vertically polarized RFU is 1 2 3 ground cable of the clip should be
connected to the IF jumper from the IF board that processes vertically polarized waves, and the IF cable
led downwards.
connecting to the horizontally polarized RFU is connected to the IF jumper from the IF board that processes
horizontally polarized waves.

26
Installation References

Waterproofing Outdoor Connectors

3 Wrap three layers of PVC tape over the waterproof insulation tape.
Connectors between the elliptical Connectors between the IF
waveguide and flexible waveguide cable and RFU
Waterproof the following outdoor connectors and components:
Connectors between the elliptical waveguide and branching unit
Connectors between the elliptical waveguide and flexible waveguide
Connectors between the flexible waveguide and branching unit
Connectors between the flexible waveguide and antenna
Connectors between the IF cable and RFU
Ground clips for IF cables
The following part describes how to waterproof the connectors between the elliptical waveguide and
flexible waveguide and connectors between the IF cable and RFU as an example. The method for
waterproofing other outdoor connectors or components is the same.

Use the outdoor bundling strap to bind the PVC tape tight at both ends. Cut off the extra cable strap after the PVC tape is
1 Wrap one layer of PVC tape. 4 tightened.
Connectors between the elliptical waveguide Connectors between the IF Connectors between the elliptical Connectors between the IF
and flexible waveguide cable and RFU waveguide and flexible waveguide cable and RFU

2 Wrap three layers of waterproof insulation tape.


Connectors between the elliptical Connectors between the IF
waveguide and flexible waveguide cable and RFU

27
Installation Check

Checking Installation of the Branching unit, RFU, and antenna Checking Installation of Cables

No. Requirement No. Requirement

1 Poles can bear the weight of branching units and antennas. 1 All outdoor connectors and ground clips are waterproofed.

2 The installation position and direction of branching units meets the requirements specified in the engineering 2 IF cable connectors are made according to specifications. They are in good condition.
design document.
3 IF cables are not bent or twisted. The shield layer is not exposed.
3 The installation position and direction of antennas meets the requirements specified in the engineering design
document.
4 Drip loops are made for IF cables that are led out of an RFU.
4 Antennas are correctly installed. Specifically, the side with a wider shroud faces upwards and the side with a
narrower shroud faces downwards. 5 Before IF cables enter windows, they are grounded and have drip loops.
5 Branching units are securely installed on poles. The connections meet wind loading requirements.
6 The minimum bending radius of IF cables is larger than 30 cm (11.8 in.).
6 Antenna supports are securely installed on poles. The connections meet wind loading requirements.
7 IF cables are routed separately and tidily.
7 Loads are installed for cascade ports, and RFU ports that are not in use on branching units.
8 When IF cables are bundled on the cable ladder or cable rack, a spacing of 1 m (3.28 ft) is left.
8 All branching units and RFUs are grounded.
9 Excess cables are reserved for future use.
9 Branching units, flexible waveguides, and elliptical waveguides, and antennas are securely connected.
10 IF cable labels are attached and bundled according to related requirements. The labels are arranged neatly,
facing the same direction.
10 The frequency bands of RFUs are consistent with these of the TX high and low sites of branching units.
11 Redundant IF cables are coiled around a pole or tower to form a loop with a diameter of at least 60 cm (23.62
11 The main antenna ports, SD antenna ports, and cascade ports on branching units are connected correctly. in.).

12 IF cable ground points meet requirements.


12 Branching units are not damaged or deformed.

13 IF cables are not bent within a range 0.5 m (1.64 ft) above and below the ground clip.
13 The bending radius and twisted angle of flexible waveguides and elliptical waveguides are within the allowed
range.
14 Ground cables are led from the top downwards and the angle between ground cables and IF cables is less
14 Antennas, branching units, and RFUs are in the protection range of the lightning arrester. (The protection angle than 15 degrees.
of the lightning arrester for antennas is less than 45 degrees. In mountainous and thunder prone areas, the
angle is less than 30 degrees). 15 For an elliptical waveguide, the portion 50 cm (1.64 ft ) to the connector is straight.

15 An antenna support bar must be vertical with an antenna radome. 16 Elliptical waveguides are not damaged or deformed.

16 Ensure that the drainage holes on an antenna are on a vertical line. After the antenna is installed, open the
lower drainage hole.

28
Appendixes

Making IF Cables

a Making Connectors for IF Cables b Making Type-N/TNC Connectors for IF Cables

1 Connect an RG-8U cable or 1/2-inch cable to an 1 Strip off the cable sheath. 2 Glide the lock nut and clamp 1 over the cable.
IDU through an IF jumper.

( 0.63 in )
16mm
RFU

IDU

Lock nut Clamp 1

RG-8U cable or 1/2-


inch cable

IF jumper
Type-N
connector
3 Fold back the braided shield to cover clamp 1,
and bind the braided shield using clamp 2.
4 Strip off the dielectric insulation layer.

2 Connect a 5D cable to an IDU directly. (0.27 in.)


6 mm

RFU

IDU
Clamp 2

Cut off the redundant part of (0.02 in.)


Type-N the shield layer. 0.5 mm
connector

TNC connector

5D cable

File the core wire head into an arc shape.

29
Appendixes

Making IF Cables

b Making Type-N/TNC Connectors for IF Cables

5 Install the body of the connector.


Assembling a Type-N connector Assembling a TNC connector

Type-N
connector
cap

TNC connector
cap
Tighten the Rotate to tighten the
connector. lock nut.
15 N·m

Rotate to tighten
the lock nut.
15 N·m
Tighten the
connector.

c Testing IF Cable Connectivity

Short-
circuiting line

At one end of the IF cable, use a short-circuiting line to short circuit the internal and external conductors, and then
a
use a multimeter to test the resistance. The resistance should be 0 ohms.
b Remove the short-circuiting line, and use a multimeter to test the resistance between the internal conductor and the
external conductor The resistance is infinite.

30
Appendixes

BNC Voltage (for RSSI) and Receive Signal Level Look Up Table

HUAWEI TECHNOLOGIES CO., LTD.


Huawei Industrial Base Bantian Longgang
Shenzhen 518129
People's Republic of China
www.huawei.com