QA team supports Group Head and Delivery Group Managers with these activities
The Process Groups will evaluate the changes to Organization level processes like
project management processes and engineering processes.
Periodic external audits are organized for the purpose of third party
certifications.
The QA team collects and summarizes metrics data periodically and helps project
managers analyze the metrics.
Process Performance Baseline (PPB)
Causal analysis help teams to learn better and initiate timely course corrections
when faced with issues.
The decision analysis process helps teams to select the right course of action when
you have multiple alternatives in front of you.
Decision Analysis and Resolution-Proactive Interventions.
process change request template available under QMS.
SSI is an ISO 9001 certified company and has been appraised at level 3 for CMMI for
development.
Capability Maturity Model Integration or CMMI is a process level improvement
training and appraisal program.
Project management templates and a few engineering templates are available in QMS
however, most engineering templates are to be taken from OUM
X - General document
D – Delivery Framework
C - Checklist
T - Templates
W - Work Instructions
G - Guidelines
S - Standards
Achieve average ESM rating of 4.5
Defect leakage < 6%
Service level index 99% for P1 tickets and 90% for P2 and P3 tickets
Which is the tool/repository where the SSI Organization level processes, templates
and guidelines are stored?
GPA
OUM
QMS
IQA tool
-----------------------------------------------------------------------------------
------------------------------------------------------------------------
Oracle Consulting (OC) receives Request for Proposal (RFP) from Customer and shares
details to SSI Client Engagement Manager (CEM)
This contract is called as ICCPO in SSI.
PM needs to conduct a kickoff meeting along with PMO, QA, KM and QC.
Close all SQA check findings and internal audit findings within a week of being
raised.
Vertical Traceability
Provides trace from requirements to code and code to requirements.
Horizontal Traceability
Shows the relationship among requirements , objects or Modules. This would help in
impact analysis for any changes.
Bi-directional traceability is when both vertical and horizontal traceability are
present.
In SSI we use the following methods to show traceability. In release notes the list
of related documents are captured in the order of the lifecycle. During Peer
reviews the reviewer ensures that all the requirements are covered. For Saas or
cloud engagements the traceability is built into the accelerator assets.
Ensure all planned revenue has been recovered. ETC should be made to zero. Request
DBO to Close project in GPA
PM needs to update the Closure Report and conduct a closure meeting along with
PMO/DGM, QA, KM and QC.
PMO/QA will update the closure date in BIMS and the project manager needs to change
project status to Closed
-----------------------------------------------------------------------------------
-------------------------------------------------------------------
Once all testing defects have been incorporated the solution can be baselined and
placed in the repository.
QC
Assess adequacy of Quality Control activities (Peer Reviews / Testing) within
project and update RAG status in BIMS (monthly or as per QC / SME calendar)
In Oracle SSI Beehive or GCDP is used as Configuration System.
Configurable Item or CI are any work product which are subjected to Change.
Project Manager is responsible for planning of review for all Configurable Items.
RCL is used to log the review comments of code, Engineering documents, project
management documents and Internal Testing defects.
In Deliverable Type do not use “Release Pack” option, this is reserved for QA.
DAR
if the solution is selected Update Decision analysis and resolution Document with
Final Solution Details and Inform Stake Holders
PPQA covers independent review of project processes, work products and services by
Quality Analyst against the applicable process descriptions, standards, and
procedures to ensure process compliance.
SQA checks
Process Compliance Score (PCS)
SQA findings
PM score
Release verification
RCL with findings
CM tool is selected (SVN in GCDP is the preferred CM tool) for project repository
Collect and share best practices and reusable's within and outside the project
Knowledge- learning
CAR, DAR, Reusables, Project End Report.
Release
Releases zip, RCLs, Release mails, Daily/weekly Health Check Reports(Annuity)
Version number of Test Case document and code in release packs is 1.1. This is
because the TC and code is baselined after peer review as 1.0 and updated to 1.1
after updating test results and incorporating code changes
all versions (Draft and Baseline) of the CI’s in the Configuration system
If the re-release effort is less than one day the Project lead or Project Manager
reviews the pack and releases else release needs to go through QA review.
QA Collects metrics from all completed of closed projects and places into
Measurement repository. Metrics Coordinator Consolidate metrics data for the period
(half yearly for dev and quarterly for services) and creates draft Process
Performance Baseline or PPB. Quality manager reviews the org level PPB and provides
review comments. Metrics Coordinator Incorporates any review comments and presents
the PPB to Process group for review. Quality Manager, Process group Coordinator and
Process Group reviews and approves org level PPB. Metrics coordinator publishes PPB
reports. KSS coordinator presents metrics trends to product pillar.
PPBs show the overall organization performance benchmark for the different metrics
used in the organization
Schedule variance
Goal -4.0% to +4.0%
SV = Slippage * 100/Planned Duration
In actual calculation for slippage and planned duration, weekends are not
considered.
Goal - 20% to 40% for non Saas and 10% to 50% for Saas
Goal - less than 6 % for non Saas and less than 18% for Saas
Data sources for IDL and EDL are RCL and Issue log or issue tracking system and
data points are review defects, testing defects and customer reported defects.