UTILITY SUMMARY SHEET

Client Saudi Aramco Revision A


Location Abu Ali Date 9/30/2015
BI Number BI-10-00640 Originated By RUK Page 1 of 1
Plant Number - Checked By BNS
Document Number PP-A-12402.001 Approved By BNS
Electrical Instrument Wash
Nitrogen Hot Oil Fuel Gas
Power Air Water
Case Description Remarks
MW SCFM SCFM MBD MBD SCFM

Abu Ali Base Case 300 MBCD GOSP + 550 MBCD Stabilizer 69 576 455 490.7 714.0 7330
Abu Ali Alternate-1 Case 240 MBCD GOSP + 490 MBCD Stabilizer 61.3 576 445 474 650.8 6684
Abu Ali Alternate-2 Case 240 MBCD GOSP + 550 MBCD Stabilizer 65.8 576 445 473 672.4 6931.3
Abu Ali Alternate-3 Case 240 MBCD GOSP Only 55.1 576 443 470 559.0 5765.4
South Jubail Alternate-1 Case 60 MBCD GOSP + 60 MBCD Stabilizer 10.6 576 35 40.9 69.8 730.4
South Jubail Alternate-2 Case 60 MBCD GOSP Only 9.4 576 35 40.3 52.7 553.3
South Jubail Alternate-3 Case 60 MBCD GOSP + 550 MBCD Stabilizer 17.6 576 115 40.9 338.7 3500.5

NOTES:
1) Electrical power indicated excludes standby equipment.
2) Utilities estimate excludes intermitent requirment.
3) Utilities estimated are preliminary and shall be furnished during next stage of the Project.