0.30x0.50 0.30*0.50
1 0.3
junta=0 0.5
junta=0
2 0.3
1
junta=0 0.30*0.50
5 MCP TECHO
junta=0
3 0.3
2.5 A L B L C
6.9 6.9
A B C
20 ton
D L E L F
6.9 6.9
1) HIPERESTATICIDAD
NUMERO DE REACCIONES = 9
NUMERO DE ECUACIONES = 3
GRADO DE HIPERESTATICIDAD = 6
2 ) PREDIMENSIONAMIENTO
LOSA ALIGERADA = 0.19 m
3) CARACTERISTICAS GEOMETRICAS
5) METODO DE CROSS
A B C
20 ton
D 6.9 E 6.9 F
0.30 0
K= 1.00
K= 2.32
Σ= 3.32
Momentos de Empotramiento
WD = 2.82
W= 2.82
L= 6.90
A B MAB=MBA = 11.17
6.9
0.30 0
-11.17 11.17 M= -11.17
3.37
1.68
MF -7.80 12.85
WL = 0.95
W= 0.95
L= 6.90
A B MAB=MBA = 3.77
6.9
0.30 0
-3.77 3.77 M= -3.77
-14.21
-7.10
MF -17.98 -3.33
RESULTADO ANALISIS ESTRUCTURAL
-7.80 -7.80
7.80
7.80
0
3.33 -3.33
-17.98 -17.98
17.98
17.98
0
EJE 2 4.75
13.8
El peso estimado del Edificio por m^2 se asume --> 0.85 T/m2
ELEVACIÓN DE LA EDIFICACIÓN
V-A
N-1
8.36
C-1
3.7
NPT +0.15 m
ZAPATA
N CIMENT -0.70 m
PRIMER NIVEL
Do(tn/m) = 12EKo/h^2
Do = 1815.56
8.36
1 1
3.7 m
1.879 1.879 1.879
H= 8.36
A B C
6.9 6.9
N+ 3.7
V1(025*0.70) V1(025*0.70)
6.9 6.9
DESPLAZAMIENTO HORIZONTAL
ico Central
2.68
7.80
3.90 -8.99
6.9 m
2 3
Datos wD wL
Nudo 2
2.82 0.95
Nudo 3
TRAMO 12
COMBO
W última
C1 = 1.4D + 1.7L 5.56
C2 = 1.25(D+L) + S 4.71
C3 = 1.25(D+L) - S 4.71
C4 = 0.9D + S 2.53
C5 = 0.9D - S 2.53
CARGA VIVA "L" SISMO
2.68
-17.98
5.03
6.9 m 6.9
2 3 2
MD ML S
-7.80 -17.98 2.68
12.85 3.33 4.31
NUDO 1 NUDO 2
M° último M° último
-41.48 23.66
-29.55 24.54
-34.90 15.93
-4.35 15.87
-9.70 7.26
SISMO
4.31
4.31
5.35
m
3
APLICACIONES HOJA DE CALCULO MICROSOFT EXCELL
MUTO SECCIONES EN TEE, ELE= Ien
Por C.E. Zapatel S.-Ing CIP 17258
COMENTARIO (DEL AUTOR DEL FORMATO)
Se presenta un formato en hoja de calculo Excell, para aplicar
Metodo de MUTO EN PORTICOS DE SECCION CTE REF ANALISIS DE EDIFICIOS
Este formzap permite una facil verificacion de los resultados SAN BARTOLOME PAG 183
CUIDADO : NO BORRAR FORMULAS REEMPLAZAR VALORES COLOREADOS
Se conoce las dimensiones de cada figura, Unidades(m,tonf)
EJEMPLO.- Se solicita resolver el portico plano según E-020, E-030, E-060
0 F(t)
V1 V2
0 C1 C2 C1
COL COL COL
0
V1 V2
0 C1 C2 C1
COL COL COL
12
V1 V2
3 C1 C2 C1
COL COL COL
8
V1 V2
3 C1 C2 C1
COL COL COL
5
V1 V2
3.6 C3 C4 C3
COL COL COL
L(m) 4.5 5
FIG.- MODELO MATEMATICO PORTICO EJE B
0.45 0.45
1 1
0.3
Planta Columna RECT Planta Col Secc Viga
Vista Frontal
FIG.- MODELO MATEMATICO PORTICO EJE B-Secciones de elementos(m)
Solucion(C Zapatel)
Es una estructura tipo Portico sometido solo a cargas horizopntales en los nudos, se resolvera
según el Metodo de Muto, Normas
1,-Determinacion de las caracteristicas geometricas
0 Kv 1.11 Kv 1.00
Kc 0.00 0.00
k #DIV/0! #DIV/0! Q5=
a #DIV/0! #DIV/0! 0
D #DIV/0! #DIV/0! SumK=
0 K #DIV/0! #DIV/0! #DIV/0!
V #DIV/0! #DIV/0! S5=Q/SumK
Yo 0.2 0.35 #DIV/0!
0 Kv 1.11 Kv 1.00
Kc 0.00 0.00
k #DIV/0! #DIV/0! Q4=
0 a #DIV/0! #DIV/0! 0
D #DIV/0! #DIV/0! SumK=
K #DIV/0! #DIV/0! #DIV/0!
V #DIV/0! #DIV/0! S4=Q/SumK
Yo 0.35 0.45 #DIV/0!
12 Kv 1.11 Kv 1.00
Kc 4.05 4.05
k 0.27 0.52 Q3=
3 a 0.12 0.21 12
D 0.49 0.84 SumK=
K 814 1396 2952
V 3.31 5.67 S3=Q/SumK
Yo 0.45 0.45 0.0041
8 Kv 1.11 Kv 1.00
Kc 4.05 4.05
k 0.27 0.52 Q2=
3 a 0.12 0.21 20
D 0.49 0.84 SumK=
K 814 1396 2952
V 5.52 9.46 S2=Q/SumK
Yo 0.4 0.45 0.0068
5 1.11 1.00
Kc 3.38 3.38
k 0.33 0.63 Q1=
3.6 a 0.36 0.43 25
D 1.20 1.45 SumK=
K 1391 1674.5 4420
V 7.87 9.47 S1=Q/SumK
Yo 0.6 0.55 0.0057
4.5 5
Ejemplo
DIAGRAMA MOMENTO FLECTOR COL V(t)= 21.15
h(m)= 4
16.92 Y(m)=0,8h= 3.2
h(m)= h1(m)= 3.2
4 h2 h2(m)= 0.8
7.87 M=V*hi
h1 Minf( t*m)= 67.68
VISTA Msup( t*m)= 16.92
67.68
SISMO IZQ A DER(HORARIO)
DMF COLUMNAS SISMO M=V*%h
DIAGRAMA FUERZA CORTANTE COL
7.87
h(m)=
4
7.87
7.87
SISMO IZQ A DER
DFC COLUMNAS SISMO FC=V=(Mi+Mj)/H
Ejemplo
DIAGRAMA MOMENTO FLECTOR VIGA
Sumar los mtos flectores de las columnas que llegan al nudo
Repartir este valor proporcional a las rigideces de las vigas
Suma Mtos Col= 40
Kv1 1
Kv2 1.5 Mv1 25
SumKv 2.5
k=1 K=1,5
Mv1=(40/2,5)*1=10 16 15
Mv2=(40/2,5)*1,5=11 24
Observese que los mtos viga son mtos horarios
M1 M2 M1( t*m)= 16
M2( t*m)= 24
L L(m)= 5
FC(t)=ƩM/L 8
FC=ƩM/L
8
8.00
FZA CORTE 15 15 12 12
Sum Vector 15 3 12
15 3 12
VERIFIC RH
8,-DETERMINACION DEL DMF(t*m)-FZA CTE(t) EN LAS VIGAS, FZA AXIAL COL(t)
Kv 1.11 1.00
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
4.50 5.00
#DIV/0! #DIV/0! #DIV/0! REACCION
NALISIS DE EDIFICIOS
ARTOLOME PAG 183
ES COLOREADOS
Fzas horizontales(t)
h(m)
L(m)
V(T)
M(t*m)
Fza Axial(t)
0.5
, se resolvera
Kv1 Kv2
Kc
0.00
#DIV/0! k=SumKv/2Kc
#DIV/0! a=k/(2+k)
#DIV/0! D=a*k
#DIV/0! K=D*Do
#DIV/0! V=K*Si #DIV/0!
0.35 Do= 1666.67
4.05
0.25 k=SumKv/2Kc
0.11 a=k/(2+k)
0.45 D=a*k
742 K=D*Do
3.02 V=K*Si Ʃ V = 12.0
0.45 Do= 1666.67
4.05
0.25 k=SumKv/2Kc
0.11 a=k/(2+k)
0.45 D=a*k
742 K=D*Do
5.03 V=K*Si Ʃ V = 20.0
0.4 Do= 1666.67
3.38
0.30 k=SumKv/Kc
0.35 a=(0,5+k)/(2+k)
1.17 D=a*k
1355 K=D*Do
7.66 V=K*Si Ʃ V = 25.0
0.6 Do= 1157.41
#DIV/0!
24.39
40.66
33.94
21
28
74.60
7.46 CM
S>3+0,004(1620-500)= 3.88 cm
USE 4 CM
VERIFICION ƩFv=0
0= #DIV/0!
V-A (0.30Xh)
3
2m
T1
VC
V-1(0.30Xh) V-1(0.30Xh) V-1(0.30Xh)
L + 0.5 VC(0.15x0.20)
8 Muro e = 15cm
V-A (0.30Xh) V-A (0.30Xh) h = 1.2m
Columna arriostra muro ladrillo separacion < 3,50m, Nace Piso NO llega Techo
La Edificacion de una Planta Tíópica (altura de piso a techo 2.80m) - determinar la Altura portico
Fig 1.-PLANTA TECHO ALIGERADO H=20CM
EJE B
4.25
PLANTA DE EDIFICACIÓN
12.19 Kv 1.07 Kv
Kc 4.39 4.39
k 0.24 0.47
3 m a 0.11 0.19
3000 mm D 0.48 0.84
K 2029 3570
V 3.29 5.79
Yo 0.25 0.3
8.40 Kv 1.07 Kv
Kc 4.39 4.39
k 0.24 0.47
3 m a 0.11 0.19
3000 mm D 0.48 0.84
K 2029 3570
V 5.56 9.78
Yo 0.5 0.5
4.61 Kv 1.07 Kv
Kc 3.61 3.61
k 0.30 0.57
3.65 m a 0.35 0.42
3650 mm D 1.25 1.51
K 3607 4340
V 7.90 9.51
Yo 0.8 0.715
7.5
8- DIAGRAMAS:
2.25 2.10
3.29 5.79 3.11
0.75 0.90
8.40 8.340 14.670
2.469 5.211 2.330
1.50 1.50
5.56 9.78 5.25
1.50 1.50
4.61 4.743 8.130
8.340 14.670 7.872
0.60 0.86
7.90 9.51 7.78
2.40 2.15
PLANTA DE EDIFICACIÓN
EJE 2
7.75
9.65
13.84 Kv 1.13 Kv
Kc 2.95 2.95
k 0.38 0.72
3 m a 0.16 0.26
3000 mm D 0.47 0.78
K 1922 3178
V 3.89 6.43
Yo 0.25 0.35
9.54 Kv 1.13 Kv
Kc 2.95 2.95
k 0.38 0.72
3 m a 0.16 0.26
3000 mm D 0.47 0.78
K 1922 3178
V 6.57 10.86
Yo 0.5 0.5
5.23 Kv 1.13 Kv
Kc 2.42 2.42
k 0.46 0.88
3.65 m a 0.39 0.48
3650 mm D 0.95 1.16
K 2607 3189
V 8.97 10.97
Yo 0.8 0.72
4
12- DIAGRAMAS:
2.25 1.95
3.89 6.43 3.52
0.75 1.05
9.54 9.852 16.290
2.916 6.751 2.639
1.50 1.50
6.57 10.86 5.94
1.50 1.50
5.23 5.381 9.214
9.852 16.290 8.916
0.60 0.84
8.97 10.97 8.67
2.40 2.16
2- PREDIMENSIONAMIENTO DE VIGAS:
V1
VC(0.15x0.20) Lp = (7.5 + 8)/2 = 7.75
Muro e = 15cm h = Lp/10 = 0.775 0.80
h = 1.2m DIMENSIÓN DE "VIGA 1" = 0.80
VA
Lp = (4 + 4.5)/2 = 4.25
h = Lp/10 = 0.425
DIMENSIÓN DE "VIGA A" = 0.45
Sobre muro VC AL DISEÑAR SE CAMBIA POR 0.65 0.65
En el techo VC
ENTONCES: b (m) h (m)
V1 0.30 0.80
VA 0.30 0.65
ZAPATEL RECOMIENDA e
≥ 20cm T.A. (5Losa + 15 LADRILLO)
ico Central El peso estimado del Edificio por m^2 se asume -->
Piso Nivel h(m) hi Area(m2)
3 8.95 3 9.65 65.88
2 5.95 3 6.65 65.88
1 2.95 3.65 3.65 65.88
NivelCim -0.7
Peso Total
VERIFICACIÓN
1.00
4.39
DESPLAZAMIENTO HORIZONTAL
Q3= 0.23
12.188 0.10 Nivel Si(m)
SumK= 0.45 SumV =
3 0.00162
7514 1915 12.188
S3=Q/SumK 3.11
2 0.00274
0.00162 0.25
1.00
1 0.00219
4.39
Q2= 0.23 Shorz 0.00655
20.587 0.10
SumK= 0.45 La Deformacioó n Horizontal Maó xima de la Estru
7514 1915 SumV =
S2=Q/SumK 5.25 20.587
0.00274 0.5 Smax = hc*7/1000 =
1.00
3.61 3° Nivel
Q1= 0.28 2° Nivel
25.197 0.34 1° Nivel
SumK= 1.23
11499 3552 SumV = FACTOR DE SEGURIDAD
S1=Q/SumK 7.78 25.197
0.00219 0.82
2.25
7.406 5.883 1.61
0.75
7.872 2.81 10.261
1.50
10.808 9.620 2.19
1.50
4.203 3.31 11.768
0.54
13.082 11.032 1.90
2.46
7.5 m 8m
ico Central El peso estimado del Edificio por m^2 se asume -->
Piso Nivel h(m) hi Area(m2)
3 8.95 3 9.65 74.79
2 5.95 3 6.65 74.79
1 2.95 3.65 3.65 74.79
NivelCim -0.7
Peso Total
VERIFICACIÓN
1.00
2.95
DESPLAZAMIENTO HORIZONTAL
Q3= 0.34
13.837 0.14 Nivel Si(m)
SumK= 0.43 SumV =
3 0.00202
6839 1739 13.837
S3=Q/SumK 3.52
2 0.00342
0.00202 0.25
1.00
1 0.00344
2.95
Q2= 0.34 Shorz 0.00888
23.372 0.14
SumK= 0.43 La Deformacioó n Horizontal Maó xima de la Estru
6839 1739 SumV =
S2=Q/SumK 5.94 23.372
0.00342 0.5 Smax = hc*7/1000 =
1.00
2.42 3° Nivel
Q1= 0.41 2° Nivel
28.606 0.38 1° Nivel
SumK= 0.92
8316 2520 SumV = FACTOR DE SEGURIDAD
S1=Q/SumK 8.67 28.606
0.00344 0.84
4.5
7.92 3.85 6.638
2.25
8.749 5.900 3.07
0.75
8.916 6.24 12.198
1.50
12.769 10.843 4.39
1.50
4.161 7.18 13.502
0.48
15.233 12.002 3.59
2.52
4m 4.5 m
4- PREDIMENSIONAMIENTO DE COLUMNA:
- VIGAS QUE SOPORTAN EL TECHO: VA, VB Y VC
A POSICIOÓ N - VIGAS QUE NO SOPORTAN EL TECHO: V1, V2 Y V3
(V1) V1 (0.30x80)
(VA)
65 VA (0.30x65)
TECHO
0.30
80
VIGA QUE SOPORTA TECHO
DIMENSIONAMIENTO DE COLUMNAS
ENTONCES: COLUMNA(60x75)
DE 3 NIVELES
ELEVACIÓN DE EDIFICACIÓN
0.85 T/m2
Peso(t/m2) Peso(t) N-3 N+8.95m
0.85 55.99 12.19
0.85 55.99
0.85 55.99 3m
* P
25.20 3m V-A
N-1 N+2.95m
4.61
oderado) C-1
Fhi(t) 3.65 m
12.19
8.40 NPT +0.15 m
4.61
25.20
Zapata
H = Sum (Fi) N CIMENT -0.70 m
S LA RIGIDEZ LATERAL
NDAR (Do) IDEALIZACIÓN DEL PÓRTICO EN EL Eje B-B
CER NIVEL
12EKo/h^2 H= 25.20
t/m 7.5 8
1 2 3
1 2 3
LAZAMIENTO HORIZONTAL
39.32
Si(mm) Si*6(mm)
9.73
1.62 9.73
16.44
2.74 16.44
13.15
2.19 13.15
6.55 39.32
21 mm > 9.73 mm
21 mm > 16.44 mm
25.55 mm > 13.15 mm
10.31
SI CUMPLE
3 NIVELES
ELEVACIÓN DE EDIFICACIÓN
0.85 T/m2
Peso(t/m2) Peso(t) N-3 N+8.95m
0.85 63.57 13.84
0.85 63.57
0.85 63.57 3m
* P
28.61 3m V-A
N-1 N+2.95m
5.23
derado) C-1
Fhi(t) 3.65 m
13.84
9.54 NPT +0.15 m
5.23
28.61
Zapata
H = Sum (Fi) N CIMENT -0.70 m
S LA RIGIDEZ LATERAL
NDAR (Do) IDEALIZACIÓN DEL PÓRTICO EN EL Eje 2-2
MER NIVEL 13.84 1.13 1.00
12EKo/h^2
t/m 3m 2.95 2.95
CER NIVEL
12EKo/h^2 H= 28.61
t/m 4 4.5
A B C
LAZAMIENTO HORIZONTAL
53.28
Si(mm) Si*6(mm)
12.14
2.02 12.14
20.50
3.42 20.50
20.64
3.44 20.64
8.88 53.28
21 mm > 12.14 mm
21 mm > 20.50 mm
25.55 mm > 20.64 mm
7.61
SI CUMPLE
7.92 3.85 3.07
V1 (30 x 80)
0.75
b = 80 - 5 = 75 cm
h = 65 - 5 = 60 cm
Colum ( 75 x 60)
CIMENT -0.70 m
V1(0.30*0.80) V1(0.30*0.80)
4.39
V1(0.30*0.80) V1(0.30*0.80)
4.39
V1(0.30*0.80) V1(0.30*0.80)
3.61
75 C(0.60*0.75) C(0.60*0.75)
3
3
ISOMÉTRICO DE LA COLUMNA
EJE 2-2
V1 (30 x 80)
EJE B-B 75
VA (30 x 65)
60
b = 80 - 5 = 75 cm
h = 65 - 5 = 60 cm
Colum ( 75 x 60)
CIMENT -0.70 m
VA(0.30*0.65) VA(0.30*0.65)
2.95
VA(0.30*0.65) VA(0.30*0.65)
2.95
VA(0.30*0.65) VA(0.30*0.65)
2.42
60 C(0.60*0.75) C(0.60*0.75)
C
B-B EDIFICIO DE 3 NIVELES
N + 8.95
V1(0.30*0.80)
N + 5.95 3
V1(0.30*0.80)
N + 2.95 3
V1(0.30*0.80)
C(0.60*0.75) 3.65
2 (EDIFICIO DE 3 NIVELES)
N + 8.95
VA(0.30*0.65)
N + 5.95 3
VA(0.30*0.65)
N + 2.95 3
VA(0.30*0.65)
C(0.60*0.75) 3.65