3.40 445.16 1.00 81.83 1.60 3.40 445.16 1.00 81.83 3.40 278.22
6.80 890.31 1.00 81.83 1.60 6.80 890.31 1.00 81.83 6.80 556.44
2.95 242.47 1.00 51.37 1.60 2.95 242.47 1.00 51.37 2.95 151.54
5.90 484.93 1.00 51.37 1.60 5.90 484.93 1.00 51.37 5.90 303.08
2.95 58.67 1.00 12.43 1.60 2.95 58.67 1.00 12.43 2.95 36.67
5.90 117.34 1.00 12.43 1.60 5.90 117.34 1.00 12.43 5.90 73.34
2.45 93.45 1.00 23.84 1.60 2.45 93.45 1.00 23.84 2.45 58.41
4.90 186.91 1.00 23.84 1.60 4.90 186.91 1.00 23.84 4.90 116.82
- Desperdicio - Desperdicio -
+ Desperdicio 2,519.23 Sub total + Desperdicio 2,519.23 Sub total + Desperdicio 1,574.52
creto (m3). 2,519.30 Total excavacion (m3). 2,519.30 Total Encofrado (m2). 1,574.60
RESUMEN DE METRADOS
TIPO: EDIFICACION
SECTOR: UI-CREO
REGIMEN: ORDINARIO
MODULO: TOPICO
CODIGO: E-06
ITEM DESCRIPCION
OE.2
ESTRUCTURAS
OE.2.1
MOVIMIENTO DE TIERRAS
OE.2.1.2
EXCAVACIONES
OE.2.1.2.1 EXCAVACION MANUAL EN TERRENO NATURALHASTA h=1.00 m
OE.2.1.2.2 EXCAVACION ZANJA P/CIMIENTO C/EQUIPO TERRENO NATURAL, HASTAh=1.50m
OE.2.1.2.3 EXCAVACION ZANJA P/CIMIENTO C/EQUIPO TERRENO NATURAL, HASTAh=2.00m
OE.2.1.4
RELLENOS
OE.2.1.4.1 RELLENO COMPACTADO C/MATERIAL PROPIO SELECCIONADO C/EQUIPO LIVIANO
OE.2.1.4.2 ACARREO DE MATERIAL PROPIO SELECCIONADO PARA RELLENO
OE.2.1.4.3 RELLENO COMPACTADO C/EQUIPO. MATERIAL DE PRESTAMO CON EQUIPO LIVIANO
OE.2.1.5 NIVELACIÓN INTERIOR Y APISONADO
OE.2.1.5.1 NIVELACION Y COMPACTACION DE FONDO DE CIMENTACIÓN
OE.2.1.5.2 NIVELACIÓN INTERIOR Y COMPACTADO P/ FALSOPISO
OE.2.1.6 ELIMINACIÓN DE MATERIAL EXCEDENTE
OE.2.1.6.1 ACARREO INTERNO MAT. PROCED. DE EXCAV. MASIVA
OE.2.1.6.2 ACARREO INTERNO MAT. PROCED. DE EXCAV. DE ZANJAS
OE.2.1.6.3 ELIMINACION DE MATERIAL EXCEDENTE D<1O KM
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.1 CIMIENTOS CORRIDOS
CIMIENTO CORRIDO, CONCRETO PREMEZCLADO f'c=1OO kg/cm2 + 30% P.G. MAX.=6" (CEMENTO
OE.2.2.1.1
TIPO V)
OE.2.2.1.2 CIMIENTO CORRIDO, ENCOFRADO Y DESENCOFRADO (NORMAL)
OE.2.2.2 FALSA ZAPATA
OE.2.2.2.1 FALSA ZAPATA, CONCRETO PREMEZCLADO f'c=1OO kg/cm2 + 30% P.G. MAX.=6" (Cemento Tipo V)
OE.2.6 VARIOS
OE.2.6.1 JUNTAS
OE.2.6.1.5 JUNTA DE DILATACION HORIZONTAL e=25mm
OE.2.6.1.6 JUNTA DE DILATACION VERTICAL e=25mm
OE.2.6.1.6.1 RELLENO DE JUNTA CON POLIESTIRENO EXPANDIDO e=25mm
OE.2.6.1.6.2 SELLO DE JUNTA FLEXIBLE CON POLIURETANO e=25mm x h=1Omm
OE.2.6.1.7 JUNTA DE CONTRACCION e=10mm
OE.2.6.2 FIJACIONES
OE.2.6.2.1 FIJACION SUPERIOR DE COLUMNETAS A VIGA
OE.2.6.3 FALSA COLUMNA
OE.2.6.3.1 FALSA COLUMNA (0.20X0.20) DE C° A° PARA PROTECCION DE BAJANTES H=3.00M
OE.2.6.6 CURADO DE CONCRETO
S
m3 1.12 0.00
m3 13.30 0.00
m3 34.24 0.00
m3 19.01 0.00
m3 19.01 0.00
m3 9.74 0.00
m2 32.76 0.00
m2 49.98 0.00
m3 -
m3 35.79 0.00
m3 35.79 0.00
m3 1.44 0.00
m2 5.74 0.00
m3 9.25 0.00
m2 28.55 0.00
m2 12.66 0.00
m3 0.09 0.00
m2 1.37 0.00
m2 49.98 0.00
m3 -
m2 -
m3 9.25 0.00
m2 28.55 0.00
kg 411.20 0.00
m3 5.28 0.00
m2 47.40 0.00
kg 698.25 0.00
m3 4.26 0.00
m3 -
m2 61.14 0.00
kg 187.15 0.00
m3 2.43 0.00
m2 46.57 0.00
kg 145.83 0.00
m3 3.56 0.00
m3 4.32 0.00
m2 67.40 0.00
m2 59.24 0.00
kg 1,398.20 0.00
m3 0.12 0.00
m3 4.74 0.00
m2 1.84 0.00
m2 37.10 0.00
kg 612.38 0.00
m3 0.80 0.00
m2 4.00 0.00
kg 110.53 0.00
m3 3.62 0.00
m2 41.37 0.00
kg 255.02 0.00
Und 345.00 0.00
m -
m2 14.04 0.00
m 162.98 0.00
m -
TIPO: EDIFICACION
SECTOR: UI-CREO
MODULO: TOPICO CREO
OE.2 ESTRUCTURAS
OE.2.1.2 EXCAVACIONES
OE.2.1.2.1 EXCAVACION MANUAL EN TERRENO NATURAL HASTA h=1.00m
CIMIENTOS CORRIDOS
TOPICO 1.00
1.00
OE.2.1.4 RELLENOS
DISMINUCION SOLADO
EJE A-A -1.00
EJE B-B, C-C -2.00
EJE D-D -1.00
EJE 2-2 -1.00
EJE 3-3 -1.00
Gabinete electronico
EJE A-A, B-B -2.00
EJE 1-1, 2-2 -2.00
DISMINUCION VIGA DE CIMENTACION
EJE A-A -1.00
EJE B-B, C-C -2.00
EJE D-D -1.00
EJE 2-2 -1.00
EJE 3-3 -1.00
Gabinete electronico
EJE A-A, B-B -2.00
EJE 1-1, 2-2 -2.00
DISMINUCION CIMIENTO CORRIDO
Topico -1.00
-1.00
DISMINUCION ZAPATAS
Z-1 -7.00
Gabinete electronico
Z-1 -4.00
DISMINUCION COLUMNAS
C-1 -8.00
Gabinete electronico
C-1 -4.00
DISMINUCION DE SOBRECIMIENTOS ARMADOS
EJE A-A -1.00
Ingreso -1.00
EJE B-B -1.00
Ingreso -1.00
EJE D-D -1.00
EJE 2-2 -1.00
Ingreso -1.00
EJE 3-3 -1.00
Gabinete electronico
EJE A-A, B-B -1.00
-1.00
EJE 1-1, 2-2 -1.00
-1.00
EXCAVACION SUPERFICIAL
Espera topico 1.00
Topico 1.00
SS HH 1 1.00
Gabinete electronico 1.00
OE.2 ESTRUCTURAS
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.1 CIMIENTO CORRIDO
CIMIENTO CORRIDO, CONCRETO PREMEZCLADO f'c=1OO kg/cm2 + 30% P.G. MAX.=6"
OE.2.2.1.1
(CEMENTO TIPO V)
Topico 1.00
1.00
OE.2.2.3 SOLADOS
OE.2.2.3.1 SOLADO, CONCRETO f'c= 100 kg/cm2 e=0.10 m (Cemento Tipo V)
VIGA DE CIMENTACION
EJE A-A 1.00
EJE B-B, C-C 2.00
EJE D-D 1.00
EJE 2-2 1.00
EJE 3-3 1.00
Gabinete electronico
EJE A-A, B-B 2.00
EJE 1-1, 2-2 2.00
OE.2.2.6 SOBRECIMIENTOS
OE.2.2.6.1.1 SOBRECIMIENTO, CONCRETO fc=140 Kg/cm2 C:H1:8 +25% P.M.MAX.=3" (Cemento Tipo V)
Topico 1.00
1.00
DIMENSIONES
PARCIAL Total Und
LARGO ANCHO ALTO
1.12 m3
13.30 m3
34.24 m3
19.01 m3
1.12
13.30
34.24
19.01 m3
19.01 19.01
9.74 m3
32.77 m3
49.98 m2
area 16.32 16.32
area 26.82 26.82
area 2.33 2.33
area 4.51 4.51
Vol. f 35.88 m3
1.12 1.30 1.46
13.30 1.30 17.29
34.24 1.30 44.51
19.01 1.44 -27.37
35.79 m3
1.44 m3
5.76 m2
1.55 0.90 2.79
1.65 0.90 2.97
9.25 m3
28.55 m2
5.30 0.50 18.55
5.00 0.50 10.00
12.67 m2
0.09 m3
1.37 m2
1.16 0.35 0.81
0.80 0.35 0.56
49.98 m2
TIPO: EDIFICACION
SECTOR: UI-CREO
MODULO: TOPICO CREO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 ZAPATA, CONCRETO PREMEZCLADO FC=210 Kg/cm2 (CEMENTO TIPO V)
ZAPATAS CORRIDAS
Z-1 7.00 1.25 1.40 0.50 6.13 7.00 5.30 0.50
Gabinete electronico
Desperdicio - Desperdicio
EJE A-A 1.00 3.90 0.25 0.50 0.49 1.00 7.80 0.50
EJE B-B, C-C 2.00 4.20 0.25 0.50 1.05 2.00 8.40 0.50
EJE D-D 1.00 3.90 0.17 0.50 0.33 1.00 15.60 0.50
EJE 2-2 1.00 9.55 0.25 0.50 1.19 1.00 19.10 0.50
EJE 3-3 1.00 9.55 0.25 0.50 1.19 1.00 19.10 0.50
Gabinete electronico
Eje A-A, B-B 2.00 2.50 0.25 0.50 0.63 2.00 5.00 0.50
EJE 1-1, 2-2 2.00 1.60 0.25 0.50 0.40 2.00 3.20 0.50
Sub total Sub total 5.28 Sub total
Desperdicio - Desperdicio
gabinete electronico
EJE A-A 1.00 0.97 0.13 1.00 0.13 2.00 0.97
Desperdicio - Desperdicio
EJE A-A
albardilla 1.00 A= 0.05 4.70 0.24 1.00 1.00 4.70
EJE B-B
colgajo 1.00 1.17 0.13 0.70 0.11 1.00 1.53 1.17
EJE D-D
albardilla 1.00 A= 0.05 4.70 0.24 1.00 1.00 4.70
EJE 2-2
albardilla 1.00 A= 0.05 10.85 0.54 1.00 1.00 10.85
EJE 3-3
albardilla 1.00 A= 0.05 10.85 0.54 1.00 1.00 10.85
gabinete electrico
EJE A-A, B-B
albardilla 2.00 A= 0.05 3.00 0.30 2.00 1.00 3.00
Desperdicio - Desperdicio
EJE B-B
CA-1 2.00 0.13 0.20 3.58 0.19 2.00 3.58 0.53
EJE D-D
CA-1 3.00 0.13 0.20 3.58 0.28 3.00 3.58 0.53
EJE 2-2
CA-1 9.00 0.13 0.20 3.58 0.84 9.00 3.58 0.53
EJE 3-3
CA-2 6.00 0.13 0.20 3.58 0.56 6.00 3.58 0.53
gabinete electronico
EJE A-A
CA-1 3.00 0.13 0.20 3.63 0.28 3.00 3.63 0.53
EJE B-B
CA-2 2.00 0.23 0.20 3.63 0.33 2.00 3.63 0.63
EJE 1-1
CA-1 2.00 0.13 0.20 3.63 0.19 2.00 3.63 0.53
EJE 2-2
CA-2 2.00 0.23 0.20 3.63 0.33 2.00 3.63 0.63
Desperdicio - Desperdicio
Sub total + Desperdicio 3.57 Sub total + Desperdicio
TOTALES. Total Concreto (m3). 3.60 Total Encofrado (m2).
gabinete electronico
Primer nivel
C-1 4.00 0.25 0.25 4.15 1.04 4.00 1.00 4.15
Desperdicio - Desperdicio
EJE 2-2
VA-1 1.00 3.68 0.13 0.20 0.10 1.00 3.68
gabinete electronico
EJE A-A
VA-1 1.00 0.93 0.13 0.20 0.02 1.00 0.93
Desperdicio - Desperdicio
Desperdicio - Desperdicio
OE.2.3.9 LOSAS
OE.2.3.9.1 LOSAS MACIZAS
OE.2.3.9.1.1 LOSAS MACIZA , CONCRETO PREMEZCLADO FC=210 Kg/cm2 (CEMENTO TIPO I)
Desperdicio - Desperdicio
Sub total + Desperdicio 0.80 Sub total + Desperdicio
TOTALES. Total Concreto (m3). 0.80 Total Encofrado (m2).
PRIMER NIVEL
PAÑO A 1.00 9.85 4.20 0.09 3.62 1.00 9.85 4.20
Desperdicio - Desperdicio
LADRILLO
PAÑO A 1.00 41.37 8.33 344.61 345.00
O DE METRADOS DE ESTRUCTURAS
Acero longitudinal
4.70 1.00 18.00 1.04 3/8 - - 18.72 - - - -
1.00 2.00 4.86 3/8 - - 9.72 - - - -
1.79 1.00 4.00 1.24 3/8 - - 4.96 - - - -
1.00 3.00 1.29 3/8 - - 3.87 - - - -
Acero longitudinal - - - - - - -
1.79 1.00 4.00 1.24 3/8 - - 4.96 - - - -
1.00 3.00 1.29 3/8 - - 3.87 - - - -
Acero longitudinal - - - - - - -
4.70 1.00 18.00 1.04 3/8 - - 18.72 - - - -
1.00 2.00 4.86 3/8 - - 9.72 - - - -
Acero longitudinal - - - - - - -
10.85 1.00 43.00 1.04 3/8 - - 44.72 - - - -
1.00 2.00 11.01 3/8 - - 22.02 - - - -
1.79 1.00 4.00 0.84 3/8 - - 3.36 - - - -
1.00 3.00 1.29 3/8 - - 3.87 - - - -
Acero longitudinal - - - - - - -
10.85 1.00 43.00 0.64 3/8 - - 27.52 - - - -
1.00 2.00 11.01 3/8 - - 22.02 - - - -
- - - - - - -
Acero longitudinal - - - - - - -
6.00 2.00 12.00 1.04 3/8 - - 24.96 - - - -
2.00 2.00 3.16 3/8 - - 12.64 - - - -
Acero longitudinal - - - - - - -
4.20 2.00 8.00 1.04 3/8 - - 16.64 - - - -
2.00 2.00 2.26 3/8 - - 9.04 - - - -
- - - - - - -
46.67 sub total en ml. - - 261.33 - - - -
% de Desperdicios por Ø
- Desperdicios en ml. - - - - - -
Peso por ml. 0.250 0.395 0.560 0.994 1.552 2.235 3.973
sperdicio 46.67 sub total en Kg. - - 146.34 - - - -
o (m2). 46.70 Total Acero (Kg). 146.40 61.00
Acero longitudinal
3.79 2.00 4.00 4.90 3/8 - - 39.20 - - - -
Estribos - - - - - - -
2.00 21.00 0.54 1/4 22.68 - - - - - -
Acero longitudinal - - - - - - -
3.79 2.00 4.00 4.90 3/8 - - 39.20 - - - -
Estribos - - - - - - -
2.00 21.00 0.54 1/4 22.68 - - - - - -
Acero longitudinal - - - - - - -
5.69 3.00 4.00 4.90 3/8 - - 58.80 - - - -
Estribos - - - - - - -
3.00 21.00 0.54 1/4 34.02 - - - - - -
Acero longitudinal - - - - - - -
17.08 9.00 4.00 4.90 3/8 - - 176.40 - - - -
Estribos - - - - - - -
9.00 21.00 0.54 1/4 102.06 - - - - - -
Acero longitudinal - - - - - - -
1.01 1.00 4.00 3.23 3/8 - - 12.92 - - - -
Estribos - - - - - - -
1.00 14.00 0.54 1/4 7.56 - - - - - -
Acero longitudinal - - - - - - -
2.08 1.00 4.00 4.90 3/8 - - 19.60 - - - -
Estribos - - - - - - -
1.00 21.00 0.59 1/4 12.39 - - - - - -
Acero longitudinal - - - - - - -
3.90 1.00 8.00 4.90 3/8 - - 39.20 - - - -
Estribos - - - - - - -
1.00 21.00 1.10 1/4 23.10 - - - - - -
Acero longitudinal - - - - - - -
11.38 6.00 4.00 4.90 3/8 - - 117.60 - - - -
Estribos - - - - - - -
6.00 21.00 0.54 1/4 68.04 - - - - - -
Acero longitudinal
5.77 3.00 4.00 4.95 3/8 - - 59.40 - - - -
Estribos - - - - - - -
3.00 21.00 0.54 1/4 34.02 - - - - - -
Acero longitudinal - - - - - - -
4.57 2.00 4.00 4.95 3/8 - - 39.60 - - - -
Estribos - - - - - - -
2.00 21.00 0.74 1/4 31.08 - - - - - -
Acero longitudinal - - - - - - -
3.85 2.00 4.00 4.95 3/8 - - 39.60 - - - -
Estribos - - - - - - -
2.00 21.00 0.54 1/4 22.68 - - - - - -
Acero longitudinal - - - - - - -
4.57 2.00 4.00 4.95 3/8 - - 39.60 - - - -
Estribos - - - - - - -
2.00 21.00 0.74 1/4 31.08 - - - - - -
Acero longitudinal
42.64 8.00 6.00 5.43 5/8 - - - - 260.64 - -
Estribos - - - - - - -
8.00 30.00 1.28 3/8 - - 307.20 - - - -
- - - - - - -
Acero longitudinal
16.60 4.00 8.00 5.48 5/8 - - - - 175.36 - -
Estribos - - - - - - -
4.00 30.00 0.98 3/8 - - 117.60 - - - -
Acero longitudinal
0.40 1.47 1.00 4.00 4.88 3/8 - - 19.52 - - - -
Estribos
1.00 33.00 0.54 1/4 17.82 - - - - - -
Acero longitudinal
0.40 0.37 1.00 4.00 1.43 3/8 - - 5.72 - - - -
Estribos
1.00 10.00 0.54 1/4 5.40 - - - - - -
Acero longitudinal - - - - - - -
0.35 2.10 2.00 4.00 3.82 5/8 - - - - 30.56 - -
0.15 0.75 Estribos - - - - - - -
0.25 1.25 2.00 22.00 1.08 3/8 - - 47.52 - - - -
Acero longitudinal - - - - - - -
0.35 1.47 2.00 4.00 2.92 5/8 - - - - 23.36 - -
0.15 0.48 Estribos - - - - - - -
0.25 0.80 2.00 18.00 1.08 3/8 - - 38.88 - - - -
- - - - - - -
- - - - - - -
37.10 sub total en ml. - - 405.00 - 235.60 - -
% de Desperdicios por Ø
- Desperdicios en ml. - - - - - -
Peso por ml. 0.250 0.395 0.560 0.994 1.552 2.235 3.973
sperdicio 37.10 sub total en Kg. - - 226.80 - 365.65 - -
o (m2). 37.10 Total Acero (Kg). 592.50 123.44
Refuerzo superior
4.00 2.00 12.00 2.42 1/2 - - - 58.08 - - -
Refuerzo inferior - - - - - - -
2.00 8.00 3.32 1/2 - - - 53.12 - - -
- - - - - - -
- - - - - - -
4.00 sub total en ml. - - - 111.20 - - -
% de Desperdicios por Ø
- Desperdicios en ml. - - - - - -
Peso por ml. 0.250 0.395 0.560 0.994 1.552 2.235 3.973
sperdicio 4.00 sub total en Kg. - - - 110.53 - - -
o (m2). 4.00 Total Acero (Kg). 110.60 138.25
Refuerzo superior
41.37 1.00 23.00 2.62 1/2 - - - 60.26 - - -
Refuerzo inferior - - - - - - -
1.00 23.00 5.02 1/2 - - - 115.46 - - -
Acero de temperatura - - - - - - -
1.00 39.00 4.20 1/4 163.80 - - - - - -
1.00 16.00 9.85 1/4 157.60 - - - - - -
- - - - - - -
- - - - - - -
41.37 sub total en ml. 321.40 - - 175.72 - - -
% de Desperdicios por Ø
- Desperdicios en ml. - - - - - -
Peso por ml. 0.250 0.395 0.560 0.994 1.552 2.235 3.973
sperdicio 41.37 sub total en Kg. 80.35 - - 174.67 - - -
o (m2). 41.40 Total Acero (Kg). 255.10 68.95
PLANILLA DE METRADOS SUSTENTO DE ESTRUCTU
PROYECTO:
ENTIDAD:
LUGAR:
FECHA:
TIPO:
SECTOR:
MODULO:
ITEM
OE.2.6
OE.2.6.1
OE.2.6.1.6
OE.2.6.1.6.1
OE.2.5.2.2.2
OE.2.6.2
OE.2.6.2.1
OE.2.6.3
OE.2.6.3.1
OE.2.6.6
PLANILLA DE METRADOS SUSTENTO DE ESTRUCTURAS
MEJORAMIENTO DEL SERVICIO DE READAPTACION SOCIAL EN EL E.P CHINCHA" CODIGO SNIP N°23
OFICINA DE INFRAESTRUCTURA PENITENCIARIA - INPE
DEP. ICA - PROV. ICA - DIST. CHINCHA
AGOSTO, 2017
EDIFICACION
UI-CREO
TOPICO CREO
DESCRIPCION
VARIOS
JUNTAS
JUNTA DE DILATACION VERTICAL e=25mm
RELLENO DE JUNTA CON POLIESTIRENO EXPANDIDO e=25mm
EJE D-D
EJE 2-2
EJE 3-3
GABINETE ELECTRONICO
EJE A-A
EJE B-B
EJE 1-1
EJE 2-2
EJE D-D
EJE 2-2
EJE 3-3
GABINETE ELECTRONICO
EJE A-A
EJE B-B
FIJACIONES
FIJACION SUPERIOR DE COLUMNETAS A VIGA
EJE 3-3
GABINETE ELECTRONICO
EJE A-A, B-B
EJE 1-1, 2-2
FALSA COLUMNA
FALSA COLUMNA (0.20X0.20) DE C° A° PARA PROTECCION DE BAJANTES H=3.00M
SH 1
GABINETE
CURADO DE CONCRETO
CIMIENTO CORRIDO
FALSA ZAPATA
SOBRECIMIENTOS
FALSO PISO
ZAPATAS
VIGAS DE CIMENTACION
SOBRECIMIENTOS REFORZADOS
PANTALLAS BARANDAS Y SIMILARES
COLUMNAS Y COLUMNETAS
VIGAS Y VIGAS DE AMARRE
LOSAS MACIZAS
LOSAS ALIGERADAS
O DE ESTRUCTURAS
DIMENSIONES
N° VECES PARCIAL Total Und
LARGO ANCHO ALTO
14.06 m2
162.98 m
4.00 2.83 11.30
4.00 2.66 10.64
4.00 2.83 11.30
2.00 3.85 7.70
8.00 2.83 22.60
2.00 1.15 2.30
2.00 5.82 11.64
12.00 2.83 33.90
2.00 9.40 18.80
128.00 und
Cant. N° Aceros
2.00 2.00 4.00 16.00
1.00 3.00 4.00 12.00
1.00 8.00 4.00 32.00
1.00 1.00 8.00 8.00
1.00 6.00 4.00 24.00
2.00 und
1.00 1.00 1.00
1.00 1.00 1.00
480.25 m2
1.00 AREA = 5.74 5.74
1.00 AREA = 28.55 28.55
1.00 AREA = 1.37 1.37
1.00 AREA = 49.98 49.98
1.00 AREA = 28.55 28.55
1.00 AREA = 47.40 47.40
1.00 AREA = 61.14 61.14
1.00 AREA = 46.57 46.57
1.00 AREA = 126.64 126.64
1.00 AREA = 38.94 38.94
1.00 AREA = 4.00 4.00
1.00 AREA = 41.37 41.37