Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

BILL NO. 21.01 - SUBWAY (IC G1 - SU01)

CLASS B : GROUND INVESTIGATION

Site tests and observations

A Geophysical survey to locate possible cavities at


abutments and piers B900.1 Item

B Grouting and Backfilling of cavities encountered in


the above items as directed by the Engineer B900.2 Item

C Perform test to check the soil capacity B900.3 Item

D Additional Geotechnical investigation to verify soil


condition and required bearing capacity B900.4 Item

E Soil Strengthening to achieve the required load


capacity B900.5 Item

IA 14/15 C 014 ST G4/P4B/B21.01/1 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

IA 14/15 C 014 ST G4/P4B/B21.01/2 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate
CLASS E : EARTHWORKS

Excavation for foundations

Excavation for foundations, material other than


top soil or artificial hard material

A Maximum depth 1.0 - 2.0m E324 m3 -

B Maximum depth 2.0 - 5.0m E325 m3 -

C Maximum depth 5.0 - 10.0m E326 m3 1,389

D Maximum depth 10.0 - 15.0m E327 m3 -

Excavation ancillaries

Preparation of excavated surfaces

E Preparation of excavated surface to receive permanent


works E522 m2 264

Disposal of excavated materials

F Disposal of surplus excavated materials (suitable /


unsuitable) off site; including loading / unloading, site
handling and transportation to approved designated
site.
E532 m3 1,055

IA 14/15 C 014 ST G4/P4B/B21.01/3 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

IA 14/15 C 014 ST G4/P4B/B21.01/4 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Filling

Filling to structures

A Filling to structure using suitable treated


excavated material E614 m3 334

Filling ancillaries

Preparation of filled surfaces

B Preparation of filled surface to receive permanent


works E722 m2 58

IA 14/15 C 014 ST G4/P4B/B21.01/5 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

IA 14/15 C 014 ST G4/P4B/B21.01/6 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

CLASS F : IN SITU CONCRETE

Provision of concrete

Designed mix

A Grade C30; 20 (SRC) F263 m3 33

B Grade C40; 20 (OPC) F283 m3 446

C Grade C50; 20 (OPC) F293 m3 166

Placing of concrete

Mass

D Blinding; thickness not exceeding 150mm F511 m3 33

Reinforced

E Approach Slab F623 m3 80

F Footing; thickness exceeding 500mm F624 m3 176

G Roof deck slab; thickness exceeding 500mm F634 m3 166

H Walls; various thickness F644 m3 190

IA 14/15 C 014 ST G4/P4B/B21.01/7 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

IA 14/15 C 014 ST G4/P4B/B21.01/8 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

CLASS G : CONCRETE ANCILLARIES

Formwork: Specification F1

Plane vertical

A Vertical sides of approach slab G343 m2 56

B Vertical sides of footing G344.1 m2 104

C Vertical sides of wall G344.2 m2 277

Formwork: Specification F3

Plane horizontal

D Horizontal soffit of slab G314 m² 176

Plain vertical

E Vertical sides of roof slab G344.1 m² 51

F Vertical sides of wall G344.2 m² 270

IA 14/15 C 014 ST G4/P4B/B21.01/9 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

CLASS G : CONCRETE ANCILLARIES

Reinforcement

Deformed high yield steel bars (type 2) Grade


B500B or B500C to BS EN 10080 and BS 4449,
including cutting, bending & fixing using tie wires
as detailed on Drawings and Specifications

A Various diameter: (10mm & above) G52* t 123

IA 14/15 C 014 ST G4/P4B/B21.01/10 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

IA 14/15 C 014 ST G4/P4B/B21.01/11 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

CLASS G : CONCRETE ANCILLARIES

Joints

Joints complete as detailed on Drawings and as per


Specifications

Expansion Joint

A Expansion joint at footing G699.1 m -

B Expansion joint at walls G699.2 m -

C Expansion joint at roof slab G699.3 m -

D Expansion joint between approach slab & roof slab G699.4 m 44

E Expansion joint between approach slabs G699.5 m -

Construction Joint

F Construction joint between wall-ftg-roof slab G699.6 m 88

IA 14/15 C 014 ST G4/P4B/B21.01/12 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

CLASS G : CONCRETE ANCILLARIES

Concrete accessories

Finishing of unformed surface

A U2 finish: as per Engineer's Specification G890 m2 146

Finishing of top surfaces

B Finishing of top of slab Class U4 finish G819 m2 339

Finishing of formed surfaces

C Penetrating film forming Silane-Siloxane Acrylic G823.1 m² 403


Hydrophobic Primer as Flood Coat to exposed
concrete surfaces.

D Protective / Decorative coating system to exposed G823.2 m² 403


concrete surfaces.

E Protective penetrative primer for inner faces of voids G823.3 m2 -

CLASS I : PIPEWORK - PIPES

IA 14/15 C 014 ST G4/P4B/B21.01/13 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

F 150mm Ø Perforated pipe wrapped in filter fabric I511 m 44

Carried to Collection page

IA 14/15 C 014 ST G4/P4B/B21.01/14 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

CLASS R : ROADS AND PAVINGS

Sub-bases, flexible road bases and surfacing

Asphalt layer as specified

A 40mm thick AC wearing layer (PMB) R232 m2 176

B 60mm thick Base course (Class B) R232 m2 176

C 150mm aggregate subbase R124 m2 176

D Fill under asphalt at cover slab, thickness not


exceeding 1.00m E619 m³ 207

Bituminous spray

E Bituminous spray prime coat R351.1 m2 176

F Bituminous spray tack coat R351.2 m2 176

Kerbs

G Precast flush/dropped concrete kerb R611.1 m -

H Precast upstand concrete kerb (median) R611.2 m -

Paving Blocks

J 80mm thick paving blocks R793 m2 -

IA 14/15 C 014 ST G4/P4B/B21.01/15 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

IA 14/15 C 014 ST G4/P4B/B21.01/16 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

CLASS W : WATERPROOFING

Tanking

Waterproofing system to buried concrete as shown on


Drawings and Specifications

A Footings W23* m2 426

B Wall W233 m2 314

C Approach Slab W231 m2 320

D Roof/Cover Slab W231 m2 207

IA 14/15 C 014 ST G4/P4B/B21.01/17 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

IA 14/15 C 014 ST G4/P4B/B21.01/18 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Protective layers

Flexible Sheeting
A 12mm thick (min) hardboard protection as shown on
Drawings and Specifications W423 m² 418

B Permeable Material for walls (50mm single sized


gravel in approved filter fabric) W493 m² 212

Sand & Cement Screed

C Screed Protection for approach slab W441.1 m² 132

D Screed Protection for Footings W441.2 m² 146

E Screed Protection for Roof Slab W441.3 m² 207

IA 14/15 C 014 ST G4/P4B/B21.01/19 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

CLASS X: MISCELLANEOUS WORK

Fences

Fences/Barriers ; including all necessary fixing, joints,


transition, protective coating etc. as specified and
indicated on drawing

A Concrete Barrier inside the subway X193 m -

IA 14/15 C 014 ST G4/P4B/B21.01/20 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Carried to Collection page

IA 14/15 C 014 ST G4/P4B/B21.01/21 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

Collection

Page G4/P4B/B21.01/1

Page G4/P4B/B21.01/2

Page G4/P4B/B21.01/3

Page G4/P4B/B21.01/4

Page G4/P4B/B21.01/5

Page G4/P4B/B21.01/6

Page G4/P4B/B21.01/7

Page G4/P4B/B21.01/8

Page G4/P4B/B21.01/9

Page G4/P4B/B21.01/10

Page G4/P4B/B21.01/11

Page G4/P4B/B21.01/12

IA 14/15 C 014 ST G4/P4B/B21.01/22 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
FINANCIAL SUBMISSION BILLS OF QU
SECTION G - PART 4 BILL NO. 21.01 - SUBWAY (IC G

Item Description CESMM3 Unit Quantity Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

TOTAL FOR Carried to BILL Summary QAR


BILL NO. 21.01 - SUBWAY (IC G1 - SU01)

IA 14/15 C 014 ST G4/P4B/B21.01/23 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/24 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/25 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/26 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/27 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/28 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/29 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/30 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/31 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/32 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/33 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/34 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/35 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/36 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/37 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/38 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/39 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/40 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/41 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/42 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/43 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/44 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/45 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)
BILLS OF QUANTITIES
BILL NO. 21.01 - SUBWAY (IC G1 - SU01)
REV. 00
Amount
(QAR)

IA 14/15 C 014 ST G4/P4B/B21.01/46 April 2017


Construction of Al Khor Expressway (PACKAGE 4B)