Vous êtes sur la page 1sur 77

.

COMPANY PROFILE

ENGINEERING INC. CO.


www.dolsar.com.tr

ANKARA
JANUARY 2019
NAME AND ADDRESS LEGAL STATUS

DOLSAR
Engineering Inc. Co.
DOLSAR House
Kennedy Caddesi 43
Kavaklıdere
06660 Ankara - TURKEY

Telephone : (312) 417 9000 (PBX)


: (312) 412 8000 (PBX)
Telefax : (312) 418 1066
E-mail : dolsar@dolsar.com.tr
Website : www.dolsar.com.tr

Commercial Registration Number : 22711


Chamber of Commerce Reg. No : 3/1231
Turkish Society of Civil Engineers Reg. No : 06-204
Turkish Society of Mechanical Engineers Reg. No. : 04827
Turkish Society of Electrical Engineers Reg. No. : 06/06-938
Turkish Society of Environmental Engineers Reg. No. : 06-211
DOLSAR Engineering Ltd.

FIELDS OF ACTIVITY

W AT E R A N D ENERGY ENVIRONMENT T R A N S P O R TAT I O N BUILDINGS


LAND RESOURCES
DEVELOPMENT

DAMS

TUNNELS

HYDROELECTRIC POWER PLANTS

I R R I G AT I O N

W A T E R S U P P LY A N D D I S T R I B U T I O N

S E W E R A G E A N D S TO R M W AT E R D R A I N A G E

T R E AT M E N T P L A N T S

P U M P I N G S TAT I O N S

RIVER BASIN PLANNING

R U R A L D E V E LO P M E N T P R O J E C T S
DOLSAR Engineering Ltd.

RANGE OF SERVICES

P L A N N I N G S TA G E
o Master Planning
o Te c h n i c a l a n d E c o n o m i c a l F e a s i b i l i t y St u d i e s
o Geological, Geotechnical and Hydrogeological
St u d i e s

D E S I G N S TA G E
o Final Design
o Te c h n i c a l Sp e c i f i c a t i o n s
o Contract Documents
o Loan Application Reports

BIDDING AND
N E G O T I AT I O N S TA G E
o Assistance to the Client with the Bidding and
Negotiation Process for Construction of the
Proposed Facilities and for Procurement of
the Proposed Equipment

CONSTRUCTION AND
O P E R AT I O N S TA G E
o Construction Supervision
o Permanent Equipment Erection Supervision
o Project Management
o Detail Design
o Quality Control
o Cost Control
o Te m p o r a r y a n d F i n a l A c c e p t a n c e
o Commissioning
o Preparation of Operation and,
Maintenance Manuals
o Consultancy for Institutional and
F i n a n c i a l St r u c t u r i n g
.

DOLSAR ENGINEERING INC. CO.


1 GENERAL

DOLSAR Engineering Inc. Co. (DOLSAR), established in 1971, is


a multi-disciplinary engineering firm which performs engineering,
architectural, consultancy and supervision services for large-
scale projects in a wide range of fields. DOLSAR is completely
independent of any contractor or manufacturer and exclusively
represents the interest of its clients. DOLSAR has successfully
performed services in the fields of water and land resources
development, energy production and distribution, environment,
transportation and buildings.

As being one of the leading and most experienced engineering and consultancy companies
in Turkey, DOLSAR has undersigned various significant projects, which are financed by
various financing institutions such as World Bank (WB), International Bank for
Reconstruction and Development (IBRD), European Union (EU), European Investment Bank
(EIB), African Development Bank (AFDB), Asian Development Bank (ADB), Islamic
Development Bank (ISDB), United Nations Development Programme (UNDP), Agence
Française de Développement (AFD) and Kreditanstalt für Wiederaufbau (KfW) in Turkey and
abroad either working alone or by cooperating with worldwide known engineering and
consultancy companies. DOLSAR is a member of International Federation of Consulting
Engineers (FIDIC), European Federation of Consulting Associations (EFCA), Association of
Turkish Consulting Engineers and Architects (TMMMB) and has substantial experience in
the application of FIDIC conditions of contracts and international standards. Being a well-
known engineering and consultancy company internationally, DOLSAR was listed among the
top 150 engineering companies in Europe. DOLSAR is also a member of Turkish National
Committee of World Energy Council (WEC), International Tunneling and Underground
Space Association (ITA-AITES), European Wind Energy Association Turkey Branch, Foreign
Economic Relations Board (DEIK), International Technical Consulting Business Council,
Turkish Association for the Conservation of Nature and National Resources, Turkish Society
for Quality (TKD), World Water Council (WWC), and International Hydropower Association
(IHA) and participates to several international meetings including FIDIC and ICOLD
(International Commission on Large Dams DOLSAR is heavily involved with the activities of
World Water Council (WWC) and reelected as a Governor for term 2018-2021.

The DOLSAR staff, a multi-disciplinary group of experienced civil,


electrical, mechanical, geological, environmental, agricultural, and
forestry engineers, architects, economists, city/regional planners
and sociologists, have been involved in many major projects from
the planning stage to commissioning. This staff of experts, long

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 1


.

employed by the firm, is managed by the DOLSAR Head Office in Ankara; an office having
approximately 2500 m2 of office area and equipped with various facilities. DOLSAR also has
branch offices in Tirana (Albania), Tblisi (Georgia), Lahore (Pakistan), Muscat (Oman) and
Istanbul (Turkey) and site offices at various locations providing design, construction
supervision and consultancy services for the projects undertaken by the firm.

Besides the projects in Turkey, DOLSAR’s experience also covers projects in several other
countries such as Albania, Azerbaijan, Bosnia-Herzegovina, Congo, Cyprus, Djibouti,
Georgia, India, Iraq, Libya, Oman, Pakistan, Saudi Arabia, Senegal, Turkmenistan, Uganda
and Uzbekistan. DOLSAR is committed to excellence through the implementation of the
Quality Management System, Environmental Management System and Occupational Health
and Safety Management System, and hold ISO 9001, ISO 14001 and OHSAS 18001
certificates.

2 FIELDS OF ACTIVITY

DOLSAR have extensive experience in the following fields:

 Water and Land Resources Development: dams, weirs, reservoirs, water supply and
distribution, sewerage and storm water drainage, irrigation and drainage, pump stations,
pipelines, tunnels, basin planning and rural development, small dams.

 Energy Production and Transmission: hydroelectric power plants, thermal power


plants, windfarms, nuclear power plants, switchyards, substations, energy transmission
lines, rehabilitation, upgrading.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 2


.

 Environment: environmental impact assessment, environmental monitoring, waste water


treatment plants, potable water treatment plants, solid waste management, drought
management plans, social impact assessment, action plans, health and safety, sewage
system.

 Transportation: motorways, roads, highways, airports, railways, bridges, viaducts,


tunnels, sea ports, harbours, suspension bridges, LRTS and metro.

 Buildings, Mass Housing, Social Infrastructure: educational facilities, laboratories,


hospitals, mass housing projects, shopping malls, business centres, commercial and
residential complexes, embassies, sports facilities, industrial buildings, office buildings,
hotels.

 Regional Development: Regional and rural development projects, basin planning.

 Socio-economic / Institutional Strengthening / Reorganisation Studies

3 SERVICES

The services provided cover all engineering services that may be required at any stage of a
project from planning to commissioning. These may be summarized as follows:

 Planning Stage: project identification, reconnaissance studies, pre-feasibility studies,


master plan, technical and economical feasibility studies, geological studies, geotechnical
and hydrogeological studies, hydrological studies.

 Design Stage: conceptual design, final / detailed design, design reports, technical
specifications, tender documents, loan application reports, bill of quantities, cost
estimates, preliminary design.

 Assistance During Tendering Stage (Bidding and Negotiation): tender


documentation, prequalification, preparation of special conditions, tender evaluation,
assistance to the client during contract negotiations and finalization of the contracts for all
works, contract finalization.

 Construction/Commissioning and Operation Stage (Implementation): construction


supervision, permanent equipment erection and testing supervision, project and
construction management, application drawings, quality control / assurance, cost control,
field engineering, temporary and final acceptance, commissioning, preparation of
operation and maintenance manuals, consultancy on financial and organization structure.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 3


.

 Lender’s Engineer Services: Services including technical, financial, environmental,


social, health and safety, review and reporting before final closure, monitoring during
investment and construction stage as well as during operation phase.

 Other Services: general engineering and consultancy services, due diligence studies,
environmental impact assessment, environmental and social action plans, environmental
and social management plans, environmental impact monitoring, health and safety,
socio-economic studies, consultancy for institutional and financial strengthening.

4 SUPPORT FACILITIES

Since its establishment 45 years ago, DOLSAR has devoted itself to providing services of
the highest quality using the latest and most advanced technological facilities and methods
in order to achieve its goal. The head office is equipped with a high performance computer
system consisting of some high capacity computers where both commercial and special
software packages together with the programs developed by DOLSAR engineers are used
for various engineering services such as computer aided design, 3 dimensional terrain
modelling, Geographic Information System (GIS), hydrology, structural and hydraulic
analysis.

Documents prepared by the DOLSAR staff are developed by an enhanced computer


system, including B/W and colour laser printers, plotters, scanners and digitizers, and
produced to desired dimensions and amounts in the documentation centre equipped with
plotters and laser photocopying machines. They are then issued in bindings of high quality.

5 PERSONNEL CAPACITY

Being one of the prominent engineering and consultancy


companies in Turkey and abroad, it is a tenet of the DOLSAR
philosophy to carry out successfully all projects that are
undertaken. The strength to do so is derived from DOLSAR's
multi-disciplinary, permanent staff of some 350 people, most
of whom have been with the company for many years.
The DOLSAR staff, a multidisciplinary group of experienced civil
engineers, electrical engineers, mechanical engineers, geological
engineers, environmental engineers, agricultural engineers, forestry
engineers, architects, economists, city/regional planners and
sociologists, have been involved in many major projects from the
planning stage to commissioning.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 4


.

6 INTERNATIONAL EXPERIENCE

The countries which DOLSAR has provided or providing engineering and consultancy
services are given herebelow;

Democratic
Bosnia and
Albania Republic of the
Herzegovinia
Congo
Islamic Republic Kingdom of
Libya
of Pakistan Saudi Arabia

Republic of Republic of Republic of


Azerbaijan Djibouti Georgia

Republic of
Republic of India Republic of Iraq
Senegal

Republic of Republic of
Sultanate of Oman
Turkmenistan Uzbekistan
Turkish Republic
of Northern Uganda
Cyprus

7 MAJOR PROJECTS IN THE LAST 15 YEARS

The important projects for which DOLSAR has provided engineering and consultancy
services in the last 15 years are listed here below. We believe that the wide range of fields
where DOLSAR has successfully completed projects reflects the strong experience,
organizational structure, employees and support services of DOLSAR Engineering.

Water Supply, Sewerage, Storm Water Drainage, Treatment Plants:

İSTANBUL Water Supply and Sewerage Master Plan: Engineering and consultancy
services for preparation of a Water Supply and Sewerage Master Plan for the entire İstanbul
City, including engineering studies, drawings, reports, documents; data collection and
handling; population estimation, determination of water requirements and wastewater loads;
analyzing existing and potential water resources, existing and potential groundwater
conditions; planning of water resources, water treatment plants, water distribution systems;
analyzing water quality and water losses; planning of wastewater collection systems,
wastewater treatment plants; sludge management, odour control, recovery water; planning
of stormwater and drainage, flood management; studies on environmental impact
assessment (EIA), climate change and draught conditions, geographical information systems
(GIS), energy management systems, operation model, earthquake, subscriber/customer
services, asset management, investment and financing plan, organizational structure,
renewable energy. The project consists of five (5) separate sections: A-Water Supply, B-
Wastewater, C-Treatment, D-Stormwater and Drainage, E-Organizational Structure. Client:
General Directorate of İstanbul Water and Sewerage Administration (İSKİ).

ERZINCAN Drinking Water Main Transmission Line and Drinking Water Treatment
Plant Project: Engineering and consultancy services for preparation of detailed design and
construction supervision services in order to provide for year 2065 potable, usage and
industrial water for Erzincan City, from Turnaçayırı Dam; including transmission of the water,
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 5
.

diverted by a floating water intake structure, from Turnaçayırı Dam through a transmission
line to transmission tunnel, detailed design of water transmission tunnel of 13.035 m long
and a diameter of 4,5 m, detailed design of 2215 m long steel penstock, water treatment
plant with a capacity of 80.000 m³/day, drinking water tank having a capacity of 10.000 m³,
f) main transmission line of 6 km length and Ø800 mm diameter. Client: General Directorate
of State Hydraulic Works (DSİ), Drinking Water Department

Engineering Management Consultancy Services for Implementation of KHADIM-E-


PUNJAB Saaf Pani Program in Rural Areas of Punjab - Implementation of 7 Tehsils in
PUNJAB: Main objective of the project is to develop drinking water supply projects for the
rural population, using localized and customized solutions with regards to sources, treatment
technologies and supply options in Punjab. The objectives refer to important corrective,
preventive and improvement measures on public health through implementation, rural and
agricultural development as well as health and socio-economic situation of the population.
Realization of modern and suitable water supply and distribution techniques is the main
device of the project to achieve these objectives within the project which in turns is expected
to achieve the followings: reducing health problems arising from the microbial and chemical
contamination of the drinking water, mitigating health hazards posed by contaminated water
use of to the ground water and surface water sources, reducing aliment costs incurred on
health care and loss of earning time. The projects includes; Khaneway, Kabirwala, Mian
Channu and Jahania Tehsils in Khanewal District and Layyah, Chaubara and Karor Lalisan
Tehsils in Layyah District. Client: Engineering Consultancy Services Punjab (Private) Limited
+ Government of Punjab Pakistan, Punjab Saaf Pani Company, Islamic Republic of
Pakistan.

DÜZBAĞ and KARTALKAYA Drinking Water Treatment Plant Project: Capacity is


1.050.000 m3/day of Engineering and Consultancy services for the preparation of final
design, tender documents, drawings, reports, and design reports; architectural conceptual
design for the treatment plant including permanent camp and social facilities such as water
museum, sport facilities, congress rooms, etc. Final design projects of water treatment
facility and connection lines between existing water tanks and new facilities in project scope.
All infrastructure design of the treatment plant facility is prepared. There are 3 equivalent
treatment plants in the campus. Client: General Directorate of Gaziantep Water and
Sewerage Administration (GASKİ).

SERİK District Capacity Increase and Rehabilitation Project for Waste Water
Treatment Plant: Engineering and consultancy services for review of existing
facilities and preparation of the topographical and geotechnical surveys, engineering
studies, drawings, reports, cost estimate and bidding documents. The project
comprises of pumping stations, transmission lines and biological wastewater
treatment plant with capacity of 130 000 m3/day. Client: Antalya Greater
Municipality, Water and Sewerage Directorate

EDIRNE-ERGENE River Flood Control Works Revised Feasibility Report: Flood Control
For Ergene Basin Feasibility Study; The project includes feasibility studies of basin flood
modelling and design of flood control structures. On the Ergene River stream sections; two-
dimensional hydraulic modeling and the water depth and water width corresponding to the
different recurrences are calculated. Hydraulic parameters that affect hydrodynamic model
results (especially speed and depth) will be determined and sensitivity analysis and model
calibration studies performed. Client: DSİ, 11. Regional Directorate, Edirne

GAZİANTEP City GÖKSU (DÜZBAĞ) Drinking Water Supply Project: Feasibility and final
design for the project consisting of 5.00 m3/s of water will be supplied to Gaziantep City with
population of 3.35 million by gravity. Water is diverted by Düzbağ weir from Göksu River,
and it is pumped by a pump station located next to weir through force main to a loading
chamber which is 120 m higher than weir elevation. Water is conveyed with Ø2600 mm steel
pipeline with the length of 85 km to the Treatment plant which is located at the north of City.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 6


.

From treatment plant, treated water is conveyed to 5 main distribution water tanks of the City
network. Client: GASKİ, Gaziantep Water & Sewerage Administration, Gaziantep.

İZMİT Domestic and Industrial Water Supply Project: Inspection services for all the
structures, facilities and equipment of İzmit Domestic and Industrial Water Supply Project
including dam, reservoir, intake, penstocks, treatment plant, main transmission line, pump
stations and control room. The capacity of the treatment plant is 480.000 m3/day and the
length of the transmission line is 147 km. Client: İZMİT SU Inc.

TÜRKELİ (SİNOP) Deep Seaoutfall Project: Engineering and consultancy services


including population forecast, wastewater estimation, final design, geotechnical and
topographical surveys, technical specifications and tender documents. Final design project
has a capacity of 2500 m3/day for a population of 11 600, pretreatment unıts and seaoutfall
design with auxiliary structures. Client: Bank of Province, Head of Investment Department.

TURKISH REPUBLIC OF NORTHERN CYPRUS (TRNC) Potable Water Supply Project:


Feasibility Study, Final Design, Application Drawings, Technical Specifications, Design
Reports Engineering and Consultancy Services. 75 mio m3/year. Client: General Directorate
of State Hydraulic Works (DSİ) + ALARKO

İZMİR Potable Water Supply Project Çağlayan Dam Project: Topographical surveys,
geological investigations for the preparation of the feasibility report, Client: General
Directorate of State Hydraulic Works (DSİ), 2. Regional Directorate (DSİ).

GİRESUN Deep Sea Outfall Final Project: Topographical surveys, geological


investigations, final design, preparation of tender documents. Capacity= 11 200 m3/d;
Population=48 000. Client: General Directorate of Bank of Provinces.

VAN Waste Water Treatment Plant Project: Topographical surveys, geological


investigations, final design. Client: General Directorate of Bank of Provinces.

KARABÜK Water Supply and Water Treatment Project: Geological investigations,


topographical surveys and detailed design, bill of quantities, cost estimate, tender
documents. Client: General Directorate of State Hydraulic Works (DSI).

ANTALYA KARACAÖREN 2 Dam Water Treatment Plant Project: The detailed design of
treatment of raw water taken from Karacaören 2 Dam, that will serve 1 970 000 civilians
planned in two stages on the years of 2020 and 2040 with a capacity of 700 000 m3/day for
the city of Antalya, complying with the Regulation Concerning Water Intended for Human
Consumption. Client: General Directorate of State Hydraulic Works (DSİ).

MANİSA City Domestic Water Supply and ÇIKRIKÇI Dam Project: Engineering and
consultancy services for preparation of Çıkrıkçı Dam Feasibility Report for Manisa Province
Domestic Water Supply. Client: General Directorate of State Hydraulic Works (DSİ), 2.
Regional Directorate, İzmir.

KASTAMONU KIRIK Dam Domestic Water Facilities Project: Assessment of existing


potable water system, preparation of new potable water system project formulation, project
population 150.721, project domestic water supply capacity 13,82 hm³/year, domestic water
treatment capacity 60.000 m³/day, transmission pipe total length 33.424 m Assessment of
existing potable water system, preparation of new potable water system project formulation.
Client: General Directorate of State Hydraulic Works (DSİ), 23. Regional Directorate,
Kastamonu.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 7


.

GÜLAĞAÇ-DEMİRCİ-GÜLPINAR (AKSARAY) Wastewater Treatment Plant Project:


Engineering and consultancy services including population forecast, wastewater estimate,
final design, geotechnical and topographical surveys, technical specifications and tender
documents. The project has a capacity of 3280 m3/day for a population of 19 300 and design
of collector (3.2 km), design of treatment units as extended aeration (designed according to
ATV-131 standards) and auxiliary structures. Client: Bank of Province, Head of Investment
Department.

3rd Phase Wastewater Treatment Plant Project: Engineering and conusltancy services
including the population forecast, wastewater estimate, final design, technical specifications
and tender documents for Eskişehir City. The project has a capacity of 85 000 m3/day for a
population of 480 000, design of treatment units as extended aeration (designed according
to ATV-131 standards) and auxiliary structures. Client: Eskişehir Greater Municipality,
General Directorate of Water and Sewerage Works.

ELMADAĞ KARGALI 2 Dam Domestic Water Supply Project: Engineering and


consultancy service sor Ankara Elmadağ District Domestic Water Supply, concrete faced
gravel fill dam with a height of 45.75 m. Client: Ankara Metropolitan Municipality, General
Directorate of Water and Sewerage Authority

HASANOĞLAN HASANDERE Dam Domestic Water Supply Project: Preparation of


Feasibilty Report for Ankara Hasanoğlan District domestic water supply study, concrete
faced rockfill dam with a height of 39,00 m. Client: Ankara Metropolitan Municipality, General
Directorate of Water and Sewerage Administrations.

SAMSUN (West) Wastewater Treatment Plant Project: Capacity = 28 400 m3/d;


Population = 120 450, Topographical surveys, final design, preparation of tender documents.
Client: Greater Municipality of Samsun, General Directorate Water and Sewerage
Management.

Niksar (TOKAT) Wastewater Treatment Plant Project: Capacity = 14 800 m3/d;


Population=58 000, Topographical surveys, geological investigations, final design,
preparation of tender documents. Client: General Directorate of Bank of Provinces.

BOLU Wastewater Treatment Plant Project: Capacity = 113 200 m3/d;


Population=300 000, Topographical surveys, geological investigations, final design,
preparation of tender documents. Client: General Directorate of Bank of Provinces.

ESPIYE (GİRESUN) Sea Outfall Project: Capacity= 5 900 m3/d; Population=30 000,
Topographical surveys, geological investigations, final design, preparation of tender
documents. Client: General Directorate of Bank of Provinces.

ŞANLIURFA-SIVEREK Potable Water Treatment Plant Project: The detailed design of


treatment of raw water taken from Atatürk Dam, that will serve 335 230 civilians planned of
2050 year with a capacity of 110 000 m3/day for the town of Şanlıurfa-Siverek, complying
with the Regulation Concerning Water Intended for Human Consumption. Client: General
Directorate of State Hydraulic Works (DSİ).

Water Supply and Sewerage Projects for 10 PROVINCES IN AZERBAIJAN: Preparation


of detailed design, tender documents and provision of construction supervision services for
Shirvan, Salyan, Neftchala, Khacmaz, Yevlakh, Barda, Khizi, Quzar, Gobustan and Naftalan
Provinces. Client: AZERSU Joint Stock Company, Azarbaijan

ANKARA Water Supply Project: Master Plan and Feasibility Study; Client: General
Directorate of State Hydraulic Works (DSİ)

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 8


.

FETHİYE Sewerage Disposal II Project: Engineering and Consultancy Services for the
Elaboration of a Feasibility Study. Client: Municipality of Fethiye + FESKİ + KfW.

ADIYAMAN Water Supply Project: Topographical surveys, geological investigation, final


design, application drawings, bill of quantities, cost estimate, tender documents, engineering
and consultancy services. Client: General Directorate of State Hydraulic Work (DSİ).

ÇANKIRI Water Treatment Plant Project: Final Design and detailed design, bill of
quantities, cost estimate, engineering and consultancy services. Client: General Directorate
of State Hydraulic Work (DSİ) + Çankırı Municipality

İZMİT Water Supply, Sewerage and Storm Water Projects for Various Regions: Soil
investigations, topographic survey and detailed design engineering and consultancy
services. Client: İzmit Municipality.

KIRIKKALE Waste Water Treatment Project: Final design, topographical surveys, final
design design reports, tender documents. Client: Kırıkkale Municipality.

ESKİŞEHİR Waste Water Project: Master plan study, institutional strengthening, training
engineering and consultancy services. Client: Municipality of Greatercity of Eskişehir + EIB.

SİİRT Water Supply and Sewerage Project: Feasibility study engineering and consultancy
services, Client: Siirt Municipality + KfW.

AFYONKARAHİSAR Water Supply and Water Treatment Plant Project: Geological


investigations, topographical surveys and detailed design engineering and consultancy
services. Client: General Directorate of State Hydraulic Works (DSİ).

SUNGURLU (ÇORUM) Waste Water Treatment Plant Project: Topographical surveys,


geological investigations, final design, technical specification. Client: General Directorate of
Bank of Provinces.

KEŞAN (EDIRNE) Waste Water Treatment Plant Project: Topographical surveys,


geological investigations, final design, technical specification. Client: General Directorate of
Bank of Provinces.

SALİHLİ Waste Water Treatment Plant Project: Topographical Surveys, geological


investigations, final design including pumping station. Client: Salihli Municipality.

İZMİR Water Supply, Çağlayan and Gördes Project: Geological investigations,


topographical surveys and final design engineering and consultancy services. Client:
General Directorate of State Hydraulic Works (DSİ).

Domestic and Industrial Water Supply for BODRUM Peninsula: Feasibility study,
geological investigations, topographical surveys and final design engineering and
consultancy services. Client: General Directorate of State Hydraulic Works (DSİ).

BOLU Potable Water Treatment Plant: Geological investigations, topographical surveys


and detailed design engineering and consultancy services. Client: General Directorate of
Bank of Provinces.

ANKARA Potable Water Supply and Distribution System - Long Term Concept and
Feasibility Study: Engineering Services: including mathematical model, Client: ASKİ + KfW

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 9


.

GEBZE (KOCAELİ) Waste Water Treatment Plant: Geological investigations,


topographical surveys and detailed design engineering and consultancy services. Client:
General Directorate of Bank of Provinces.

BERGAMA (İZMİR) Waste Water Treatment Plant: Geological investigations,


topographical surveys and detailed design engineering and consultancy services. Client:
General Directorate of Bank of Provinces.

GÖLMARMARA (Manisa) Waste Water Treatment Plant: Geological investigations,


topographical surveys and detailed design engineering and consultancy services. Client:
General Directorate of Bank of Provinces.

BUCAK (BURDUR) WASTE WATER TREATMENT PLANT: Geological investigations,


topographical surveys and detailed design engineering and consultancy services. Client:
General Directorate of Bank of Provinces.

TOKAT Waste Water Treatment Plant: Geological investigations, topographical surveys


and detailed design engineering and consultancy services. Client: General Directorate of
Bank of Provinces.

KIRŞEHİR Waste Water Treatment Plant: Geological investigations, topographical surveys


and detailed design engineering and consultancy services. General Directorate of Bank of
Provinces.

AHMETLİ (MANİSA) Waste Water Treatment Plant: Geological investigations,


topographical surveys and detailed design engineering and consultancy services. General
Directorate of Bank of Provinces

ZONGULDAK City and Metropolitan Area Drinking Water Treatment Plant: Geological
Investigations, topographical survey, final design, technical specifications. Client: General
Directorate of Bank of Provinces.

Dams and Hydroelectric Power Plants:

Feasibility Study and Detailed Engineering Design of 446 MW KARI MUSKHUR


Hydropower Project Lower Chitral, Kyhber Pakhtunkhwa PAKİSTAN: The project is
consisting of a weir and 24,7 km power tunnel with a diameter of 9,50 m, cavern type
powerhouse, 4 vertical Francis turbines, installed capacity of 446 MW, 177 m gross head,
370 m3/s project discharge. Client: Pakhtunkhwa Energy Development Organization (PEDO
Government of Khyber Pakhtunkhwa, Islamic Republic of Pakistan

Feasibility Study and Detailed Engineering Design of 110 MW GABRAL KALAM


Hydropower Project, SWAT KHYBER Pakhtunkhwa PAKİSTAN: The project is consisting
of a weir and 4 km power tunnel with a diameter of 6 m, installed capacity of 110 MW, 185 m
gross head, 75 m3/s project discharge. Client: Pakhtunkhwa Energy Development
Organization (PEDO) Government of Khyber Pakhtunkhwa, Islamic Republic of Pakistan.

ILISU Dam and Hydroelectric Power Plant: Engineering and consultancy services, revised
final design, construction supervision, preliminary and final acceptances, as built drawings,
commissioning, engineering and consultancy services (height: 136 m, CFRD installed
capacity: 6 x 200 = 1200 MW), Client: General Directorate of State Hydraulic Works (DSİ).

DERİNER Dam and Hydroelectric Power Plant: Final design, technical specifications,
tender documents, loan application report, EIAR, Client: General Directorate of Electrical
Power Resources Survey and Development Administration EİE). Construction supervision,
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 10
.

preliminary and final acceptances, as built drawings, commissioning, engineering and


consultancy services (double curvature arch dam, height: 249 m, installed capacity: 670
MW), Client: General Directorate of State Hydraulic Works (DSİ).

DASU Dam and Hydroelectric Power Plant Project: Engineering and consultancy
services for the review of feasibility, detailed design, tender documents, technical
specifications, assistance during tendering, construction supervision, acceptances. It is a
242 m high RCC dam and a power plant with installed capacity of 4320 MW. Client: Pakistan
Water and Power Development Authority (WAPDA) Islamic Republic of Pakistan. Financing:
World Bank.

ATATÜRK Dam and Hydroelectric Power Plant: Final design, technical specifications,
tender documents, loan application report, evaluation of tenders, construction supervision,
preliminary and final acceptances, as built drawings, commissioning, engineering and
consultancy services (rockfill dam, height: 169 m, installed capacity: 2400 MW), Client:
General Directorate of State Hydraulic Works (DSİ).

YUSUFELİ Dam and HEPP Project: Geological investigations, topographical surveys,


engineering and consultancy services for preparation of final design, technical specifications
(Double Curvature Concrete Arch Dam with a height of 270 m and installed capacity 540
MW). Client: General Directorate of State Hydraulic Works (DSİ)

AMBOULI Friendship Dam Project: Engineering and consultancy services for the review of
existing final design preparation of revised final design, detailed design, construction
supervision for sand gravel rock fill dam with a height of 71 m from foundation. The aim of
the project is flood control and water supply. Client: Republic of Djibouti, Ministry of
Agriculture, Water, Fisheries, Livestock and Marine Resources.

MELEN Hydroelectric Power Plant Project: Engineering and consultancy services for the
preparation of preliminary and final design, tender documents, electromechanical-
hydromechanical equipment selection, detailed design, as built drawings, construction
supervision services. Total installed capacity is 45.223 MW (two vertical francis main and
one horizontal francis eco turbines). Client: İstanbul Energy Industry and Trade Incorporated
Company.

KAHRAMANMARAŞ Helete (Düzbağ) Dam Project: Final design, technical specifications,


tender documents, geological and geotechnical site investigation studies for a concrete
faced rock fill dam, height: 173 m. The aim of the project is to provide potable water to
Gaziantep City. Client: General Directorate of State Hydraulic Works (DSİ), Dams and HEPP
Division.

KHELEDULA-3 HEPP Project: Engineering and consultancy services for review and
approval of the engineering studies, drawings, reports, documents and design changes;
review of bidding documents, giving recommendations and assistance throughout bidding,
consultancy during manufactory, testing, construction and commissioning. The project is a
nun of river type, 3 horizontal Francis turbine, installed capacity of 50.77 MW (3x16.92 MW),
232.41 m gross head, 26 m3/s project discharge. Client: Anadolu Endüstri Holding Kheledula
Energy LLC, Georgia.

ÇETIN AND LOWER ÇETIN Dam and Hydroelectric Power Plant Project: Engineering
and consultancy services for the final design and application drawings. Çetin Dam is a
asphaltic core rockfill dam with a height of 143 m and an installed capacity of 401 MW and
Lower Çetin is concrete fill dam with a height of 46 m and an installed capacity of 116 MW.
Client: Çetin Enerji A.Ş. (Statkraft).

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 11


.

ADJARISTSQALI Hydropower Cascade Project: Engineering and consultancy services


for feasibility study, tender design and tender documents. Client: Adjaristsqali Georgian
Limited, Georgia.

DOĞANLI 1, DOĞANLI 2, DOĞANLI 3 and ÇUKURCA Dams and Hydroelectric Power


Plants: preparation of feasibility report + final desing of 4 power plants namely: Doğanlı 1
dam (96,5 m, CFRD) and hydroelectric power plant (130,15 MW), Doğanlı 2 dam (135 m,
CFRD) and hydroelectric power plant (40 MW), Doğanlı 3 dam (131,5 m, CFRD) and
hydroelectric power plant (319 MW) and Çukurca Dam (111 m, CFRD) and hydroelectric
power plant (282 MW).Pre-feasibility study Client: RÖNESANS Holding.

ERMENEK Dam and Hydroelectric Power Plant: Final design, preparation of technical
specifications, loan application report and Environmental Impact Assessment Report,
engineering and consultancy services (concrete arch dam, height: 218 m, installed capacity:
320 MW), Client: General Directorate of Electrical Power Resources Survey and
Development Administration (EİE)

KAVŞAK Dam and Hydroelectric Power Plant Project: Engineering and consultancy
services for the preparation of final design, technical specification, support during tendering,
technical specifications, application drawings and construction supervision (CFRD, height:
94.5 m, installed capacity 185.85+5.43=191.28 MW). Client: ENERJİSA + SER Energy.

ARKUN Dam and Hydroelectric Power Plant Project: Engineering services for the
preparation of final design, technical specifications, application drawings, Environmental
Impact Assessment Report, (CFRD, height: 140 m, installed capacity: 3x75= 225 MW) (2.6 +
10.4 = 13 MW). Client: EnerjiSA + Verbund.

ALARA Dam and Hydroelectric Power Plant Project: Preparation of final design and
tender documents of a 114 m high concrete faced rockfill dam and hydroelectric power plant
having installed capacity of 72 MW (to produce 195 GWh/year energy) which is located on
Alara River of Alara basin within the boundaries of Antalya province in the mid-
Mediterranean region. Client: Esentepe Enerji Yatırımları Üretim ve Ticaret A.Ş. (Borusan –
EnBW).

SÖYLEMEZ Dam Project Design Work: Engineering services for the final design is
performed. The project is located in Erzurum province Köprüköy district on Aras river.
Approximately 40 000 ha area will be irrigated and 220 GWh/year energy generation will be
provided by the RCC arch+gravity dam which has a height of 113 m from the talweg. Client:
General Directorate of State Hydraulic Works (DSİ).

GAZİANTEP ÇATBOĞAZI Dam Project: Concrete faced rockfill dam for irrigation with
height of 88 m and irrigation area of 13 728 ha, engineering and consultancy services for
final design and technical specifications. Client: General Directorate of State Hydraulic
Works (DSİ).

MENZELET and KILAVUZLU HEPP’s Project: Engineering and consultancy services for
the Due Diligence Study, before privatization technical due dilligence study, determination of
existing condition, energy production study for existing and upstream development
conditions, identifying potential risks, proposals for rehabilitation, total installed capacity 178
(124+54) MWe, total annual energy production 510,88 (397,48+113,40) GWh, vertical axis
francis turbine, Client: ENTEK Electricity Production Inc. Co

DAMLAPINAR HEPP Conveyance Channel and Headpond Projects: Consultancy


services for review of final design, proposals for solving the turbulence in headpond and low
project discharge. The project is a run of river type, 2 vertical Francis turbine having an

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 12


.

installed capacity of 16.60 MW (2x8.30 MW), 80.0 m gross head, 24 m3/s project discharge.
Client: Entek Electricity Generation Company.

GAZİANTEP BALLIKAYA Dam Project: Engineering services for the final design is
performed for the purpose of irrigating 917 ha agricultural land belonging to Hisarköyü and
Sakçagöz towns located within the borders of Nurdağı district of Gaziantep city, project
design work of proposed 61- meters-high (from thalweg) irrigation dam on İçersu river.
Client: General Directorate of State Hydraulic Works (DSI), 20. Regional Directorate.

GÜNDOĞMUŞ Dam and Hydroelectric Power Plant Project: Preparation of final design
and tender documents of a 82 m high concrete gravity dam and hydroelectric power plant
having installed capacity of 58 MW (to produce 185 GWh/year energy) which is located on
Alara River of Alara basin within the boundaries of Antalya province in the mid-
Mediterranean region. Client: Esentepe Enerji Yatırımları Üretim ve Ticaret A.Ş. (Borusan –
EnBW).

ALARAHAN Dam and Hydroelectric Power Plant Project: Preparation of final design and
tender documents of the 57 m high concrete gravity dam and hydroelectric power plant
having installed capacity of 37,6 MW (to produce 96 GWh/year energy) which is located on
Alara River of Alara basin within the boundaries of Antalya province in the mid-
Mediterranean region. Client: Esentepe Enerji Yatırımları Üretim ve Ticaret A.Ş. (Borusan –
EnBW).

SHADALA Dam and Irrigation Project: Engineering and consultancy services for a dam
and irrigation scheme of 8000 hectares. Client: Ministry of Water Resources, Center of
Studies and Engineering Designs.

AFYONKARAHISAR ÇAY Dam Project: Engineering and consultancy services for the
detailed design of a dam and its relevant structures. Client: General Directorate of State
Hydraulic Works (DSİ), 18. Regional Directorate, Isparta.

BURSA-KARACABEY Yeşildere Dam Project: Engineering and consultancy services for


the detailed design of the dam and its relevant structures. Client: General Directorate of
State Hydraulic Works (DSİ).

SHUAKHEVI Hydroelectric Project: Construction Supervision (197 MW + 9 MW), SKALTA


Dam (31 m, concrete gravity). Client: Adjaristsqali Georgian Limited, Georgia.

KEMAH Dam and Hydroelectric Power Plant Project: Providing all the services as the
Owner’s Engineer including preparation of feasibility report, preparation and follow up all the
tenders for railway and highway relocations, NATO gas pipeline relocations as well as
construction supervision (double curvature thin arch, 95 m, 198 MW). Feasibility Report for
Kemah Pumped Storage Project is prepared. Client: AKENERJİ + CEZ.

SORGUN Dam and Irrigation Project, Engineering Services for Preparation of


Feasibility Report and SORGUN Dam Final Design: Preparation of technical and
economical feasibility report and its annexes for the Sorgun Dam and Irrigation Project
comprising 105 high Concrete Faced Rockfill Dam, irrigation of 7010 ha in total and energy
production from 4 hydroelectric power plants with an installed capacity of 18 MW total. The
preparation of final design of Sorgun dam and all geological and topographical investigations
as well as preparation of EIAR are also in the scope of work. Client General Directorate of
State Hydraulic Works (DSİ), 6. Regional Directorate, Adana.

ASLANCIK Dam (Concrete gravity, 29 m, 2x60=120 MW) and Hydroelectric Power


Plant Project: Engineering and consultancy services, assessment / review of feasibility
report and final design, preparation of revised final design drawings, technical specifications
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 13
.

and tender documents for electromechanical equipment, consultancy services during


construction and erection. Client: Aslancık Electricity Production Co.

DİYARBAKIR ÇERMİK-KALE Dam Project: Geological investigations, topographical


surveys, engineering and consultancy services for preparation of final design, technical
specifications (Concrete Faced Rockfill Dam, CFRD, h: 76 m). Client: General Directorate of
State Hydraulic Works (DSİ)

ŞIRNAK – BALLI Dam Project: Geological investigations, topographical surveys,


engineering and consulting services for preparation of final design, technical specifications
(RCC, height: 49 m). Client: General Directorate of State Hydraulic Works.

KIZILIRMAK HAMZALI Hydroelectric Power Plant Project: Engineering and consultancy


services for the preparation of final design, preparation of technical specification for
electromechanical equipment, preparation of detailed design (17.5 MW). Client: MNG
Holding, Ankara

AŞAĞI KELKIT HAVZASI, REŞADIYE Hydroelectric Power Plant Project: Engineering


and consultancy services for preparation of final design and application drawings consulting
of 3 power plants (15.6 MW + 26.5 MW + 22 KW). Client: MNG Holding, Ankara

YAMANLI II Hydroelectric Power Plant Project: Engineering and consultancy services for
the preparation of final design, technical specification, support during tendering, technical
specifications and application drawings 3 weir, 2 hepp (50 MW + 28 MW). Client: ENERJİSA
+ SER Energy.

ANTALYA-KÜÇÜK AKSU Dam and Hydroelectric Power Plant Project: Geological


investigations, topographical surveys, engineering and consultancy services for preparation
of final design, technical specifications. Client: General Directorate of State Hydraulic Works
(DSİ)

KASTAMONU-GÖKIRMAK-KIRIK Dam: Geological investigation, topographical survey,


engineering services for final design (CFRD, height: 90 m). Client: General Directorate of
State Hydraulic Works (DSİ)

ERMENEK Dam and Hydroelectric Power Plant: Detailed design engineering and
consultancy services (concrete arch dam, height: 230 m, installed capacity: 320 MW), Client:
PÖYRY Energy GmbH.

HAKKARİ Dam and Hydroelectric Power Plant: Final design, preparation of technical
specifications, loan application report and Environmental Impact Assessment Report,
engineering and consultancy services (rockfill dam, height: 214 m, installed capacity: 190
MW), Client: General Directorate of State Hydraulic Works (DSİ).

ŞANLIURFA Hydroelectric Power Plant: Final design, technical specifications,


construction supervision, engineering and consultancy services (Installed capacity: 50 MW),
Client: General Directorate of State Hydraulic Works (DSİ).

BERDAN Hydroelectric Power Plant: Final design, technical specification and application
drawings, construction supervision services (Installed capacity: 10 MW), Client: Alarko Altek
Enerji Santralları Tesis ve İşletme A.Ş.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 14


.

GÖNEN Hydroelectric Power Plant: Final design, technical specification and application
drawings, construction supervision services (Installed capacity: 10.6 MW), Client: Gönen
HES A.Ş.

PAMUKOVA Hydroelectric Power Plant: Final design, technical specification and


application drawings, construction supervision services (Installed capacity: 9.6 MW), Client:
Karel Elektrik A.Ş.

TOHMA Hydroelectric Power Plant: Feasibility report, final design, technical specification
and application drawings, construction supervision services (installed capacity: 12.5 MW),
Client: Alarko Altek Enerji Santralleri Tesis ve İşletme A.Ş.

MUSABEYLİ Dam: Geological investigations, topographical surveys, final design,


engineering and consultancy services (earth fill dam, height: 61 m), Client: General
Directorate of State Hydraulic Works (DSİ).

ŞEHİTLER Dam: Final design and preparation of technical specifications engineering and
consultancy services (rockfill dam, height: 78 m), Client: General Directorate of State
Hydraulic Works (DSİ).

OYUK Dam: Final design and preparation of technical specifications engineering and
consultancy services (concrete fill dam, height: 100 m), Client: General Directorate of State
Hydraulic Works (DSİ).

Rehabilitation:

Warsak Hydropower Plant Rehabilitation Project: Consultancy services for Project


Management and Construction Supervision consisting of six main activities and stages,
namely prebidding, bidding and contracting, works phase, services during defects liability
period, supervision of workshop enhancement and training. Warsak Hydropower Plant is
located on Kabul River at 30 km northwest of Peshawar City. The total installed capacity is
243 MW. Client: Pakistan Water and Power Development Authority (WAPDA), Islamic
Republic of Pakistan.

KEBAN Hydroelectric Power Plant: Consultancy and Engineering Services for the
rehabilitation/upgrading works. Review of feasibility report, preparation of tender documents,
prequalification, evaluation of tenders, contract negotiations, project management,
construction supervision (1340 MW). Client: General Directorate of Electricity Generation
Co. (EÜAŞ)

Lower Ceyhan Kesiksuyu Mehmetli Dam I & II Stage Rehabilitation Project:


Engineering services for detailed design, technical specifications, tender documents, loan
application report for the gravity irrigation of 14 072 ha area in Kozan district at Adana and
Sumbas and Kadirli districts at Osmaniye, from the water regulated at Mehmetli Dam and
taken by a water diverting structure at downstream of Yamaç HPP tailrace water, consisting
of; water diverting structure; GRP and steel main transmission line, having 35 km length;
irrigation network consisting of pressurized GRP and PE pipes, with a total length of 350 km;
irrigation structures on pipelines; e) 4 pump stations and 2 pressure braking chamber
structure. Client: General Directorate of State Hydraulic Works, Design & Construction
Division

5th Regional Directorate Small Dams Enlargement/Rehabilitation Project: Preparation of


Feasibility Reports and reports such as hydrology reports, geology reports, natural
construction material Reports, environmental impact assessment reports, agricultural
economy reports, soil drainage reports, expropriation reports for 8 small dams constructed
previously (1979 to 2000) to irrigate 1000 ha of land in the central Anatolia. The purpose is
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 15
.

to develop in order to maximize the usage of water potential to irrigate 2200 ha of land and
make necessary enlargement in the dam, provide pressurized water flow into the irrigation
area. Client: General Directorate of State Hydraulic Works (DSİ) 5. Regional Directorate,
Ankara

Framework for Policy & Decision Making on Dam and Hydro plant REHABILITATION
and UPGRADING: Case study for Turkey Client: Electricite de France (EDF) + World Bank

Energy Efficiency Projects:

Monitoring Consultancy Services for TURSEFF Project: TURSEFF is a credit line provided
by EBRD for industrial companies, commercial enterprises and private households that wish
to invest in energy efficiency or renewable energy projects. Monitoring Consultancy Services
for the projects to which the credit is provided. Client: EBRD

Nuclear Power Plants:

AKKUYU Nuclear Power Plant: A nuclear power plant consisting of four power units of
NPP-2006 project VVER-1200 reactors of a total capacity of 4800 MW. Engineering and
consultancy services related to design review, cost estimates, unit prices, application of
standards applicable in Turkey of various structures of the power plant. Client: Akkuyu
Nuclear Joint Stock Company.

Irrigation:

MUĞLA – DALAMAN Irrigation Project: Geological investigations, topographical surveys


for irrigation area. Engineering consultancy services (12 125 ha). Detailed design works for 6
drainage pump station. Detailed design projects of water intake structure. Analyzing existing
drainage system. Detailed design projects of Dalaman lowland which covers the Dalaman
Airport, Dalaman district and ortaca district. Client: General Directorate of State Hydraulic
Works (DSİ)

ŞANLIURFA – HALFETİ Irrigation Project: The project has an irrigation area of 25 000
hectares which is located on the east side of Birecik reservoir. Land classification, studies for
drainage, agricultural economy, land appropriation, engineering geology and EIA study is
performed. Client: DSI 15th Regional Directorate, Şanlıurfa.

DICLE - KRALKIZI Gravity Irrigation Project; Planning Revision & Final Project
Preparation of 3. Section: Following reports were prepared for the irrigation area of
16 355 ha. Feasibility Report; Irrigation Final Report; Loan Application Report; Bill of
Quantities; Geology Report; Construction Material Report; Unit Cost List & Definitions.
Client: General Directorate of State Hydraulic Works, Head of Project & Construction
Department, Ankara.

GAZİANTEP P2 Pumped Irrigation Project: Geological investigations, topographical


surveys and detailed design engineering and consultancy services (10 590 ha). Client:
General Directorate of State Hydraulic Works (DSİ).

AYDIN-DALAMA Irrigation Project, Engineering Services for Revision of Feasibility Report:


Project covers the engineering services related to the preparation of technical and
economical feasibility report and its annexes for the optimum formulation developed I in
relation with the development of land resources existing between the Dalama Municipality
and Aydın-Çine state road in Büyük Menderes Basin by making use of the water potential of
Akçay creek. Geological and topographical investigations as well as preparation of EIAR are

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 16


.

also in the scope of work. Client General Directorate of State Hydraulic Works (DSİ), 21.
Regional Directorate, Aydın.

VİRANŞEHİR Pumped Irrigation Project: Geological investigations, topographical surveys


and detailed design engineering and consultancy services (38,000 ha), Client: General
Directorate of State Hydraulic Works (DSİ).

Operation, Maintenance and Management of Irrigation Systems within the Scope of


SOUTHEASTERN ANATOLIA PROJECT (GAP): Engineering and consultancy services for
1.7 million hectares of irrigation land, including socio-economic studies, capacity building,
cropping techniques, irrigation model, formation of farmers unions, Client: TR Prime Ministry,
GAP Regional Development Administration.

ŞANLIURFA Tunnels: Design review, construction supervision, as built drawings,


engineering and consultancy services (total length 52.8 km, diameter 7.62 m), Client:
General Directorate of State Hydraulic Works (DSİ).

YASLICA Tunnel and Pumping Station: Final design, technical specifications, construction
supervision, engineering and consultancy services (total length 1.5 km, diameter 5 m,
installed capacity 12.5 MW) (irrigation area 20 000 hectares), Client: General Directorate of
State Hydraulic Works (DSİ).

DENIZLI BOZKURT CUMALI Groundwater Irrigation Project: Engineering and


consultancy for the detailed design, technical specifications, tender documents, loan
application report for the gravity irrigation of 550 ha area in Bozkurt district at Denizli.
Irrigation water has been taken by 10 pumping stations from Cumalı lowland deep wells,
consisting of; a) Water diverting structures; b) HDPE main transmission line, having 5 km
length; c) Irrigation network consisting of pressurized PE pipes, with a total length of 15 km;
d) Irrigation structures on pipelines; e) 4 new pump stations and 6 existing pump station
rehabilitation. Client: General Directorate of State Hydraulic Works (DSİ), 21. Regional
Directorate, Aydın.

BAKIRÇAY Downstream Plains Irrigation Project: Revised Feasibility Study, Geological


investigations, topographical surveys, engineering consultancy services (13 529 ha). Client:
General Directorate of State Hydraulic Works.

LOWER ÇEKEREK Project GELDİNGEN Plain: Geological investigations, topographical


surveys and detailed design engineering and consultancy services (19,000 ha), Client:
General Directorate of State Hydraulic Works (DSİ).

GELİNGÜLLÜ Project, ÇERİKLİ Irrigation Project: Feasibility (11 033 hectars); Client:
General Directorate of State Hydraulic Works (DSİ), 5. Regional Directorate.

KONYA-ÇUMRA III Phase Project: Engineering and consultancy services, irrigation of


251 872 hectares, drinking water supply, flood protection, energy production, Client: General
Directorate of State Hydraulic Works (DSİ).

Basin Planning Studies (energy, irrigation, water supply and flood control):

İSTANBUL ŞILE YILGIN Small Dam and Irrigation Planning and Project Engineering
Services: İstanbul Şile Yılgın Small Dam and Irrigation Planning and Project Engineering
Services. Developing the optimum project formulations with the benefit of available water
potential (irrigation) for Yılgın Small Dam. The scope is preparation of the feasibility Report
and Final Design. Client: General Directorate of State Hydraulic Works, 14. Regional
Directorate, İstanbul.
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 17
.

Engineering and Consultancy Services for the Preparation of BALIKESİR-


BURHANİYE, GÖMEÇ and ŞAHİNLER Plains Irrigation and Burhaniye Reşitköy Dam
BAHADINLI Weir, Transmission Tunnel Project: Detailed design, technical specifications,
tender documents, loan application report for the gravity irrigation of 6 045 ha area in
Burhaniye and Gömeç districts at Balıkesir. The water regulated at Reşitköy Dam and taken
by a water intake structure, consisting of; a) Bahadınlı Weir; b) Transmission Tunnel;
c)Water intake structure; d) GRP and Steel main transmission line, having 40 km length; e)
Irrigation network consisting of pressurized GRP and PE pipes, with a total length of 210 km;
f) Irrigation structures on pipelines; g) 1 pump station and 3 pressure braking chamber
structure. Client: DSİ 25. Regional Directorate, Balıkesir.

2nd Group Dams Planning Reports Engineering Services: Engineering and consultancy
services for planning and designing works of 3 dams and 6 irrigation areas. In the scope of
the work, engineering studies, drawings, design reports, documents, irrigation system final
designs and bill of quantities is performed. The purpose is to irrigate totally ~1630 ha areas
in the vicinity of Kahramanmaraş Province. The height of the dams are changing between
30.0 and 40.0 meters. Three of the irrigation areas are irrigated by the source of natural
spring water. Client: DSİ 20. Regional Directorate.

YAGCILAR DAM Feasibility Report and Final Design Project: Engineering services both
for planning and final design stages, including the preparation of hydrology, geology, natural
construction materials, agricultural economy, land classification-soil drainage and
environmental impact assessment reports together with the feasibility report and drawings.
Thereafter preparation of final design reports and drawings for the related subjects such as
hydraulics, geotechnics, structural analysis, mechanical equipment, construction planning,
quantity-cost estimation and technical specifications. Final and implementation design of the
dam body, spillway, diversion conduit, intake, bottom outlet, valve chamber and access
roads. The purpose of the dam is irrigation of gross 1.062 hectares. Dam body is
homogenous earthfill type and the height is 22 m from thalweg. Since permeable and weak
limestones outcrop, ~1.000.000 m2 sealing will be carried out within the reservoir area by
using geosynthetics. Client: 3. Regional Directorate of State Hydraulics Works (DSI), Turkey.

KIZILIRMAK River Basin Master Plan: Consultancy services to establish master plan that
includes technically, economically and environmentally feasible methods to preserve and
envisage sustainable use of natural resources of Kızılırmak River Basin, which is one of 25
river basins of Turkey. For this purpose, water budget of the basin was established
considering water potential and water quality, land use, soil resources, water consumption
and water demand; priorities were set for estimated water potential; prospective water
demand was estimated and alternative projects were devised to supply demanded water.
Client: General Directorate of State Hydraulic Works (DSİ).

Engineering Services for Planning and Design of Group VII Irrigation Ponds: The
services cover the feasibility and design of 10 projects, namely Mersin-Anamur-Anıtlı (weir),
Mersin-Anamur-Uçarı, Mersin-Anamur-Demirören, Mersin-Gülnar-Üçoluk, Mersin-Gülnar-
Çukurasma, Mersin-Erdemli-Kargıcak, Adana-Karaisalı-Altınova-Demirçit, Adana-Karaisalı-
Çocuklar, Hatay-Samandağ-Eriklikuyu, Hatay-Merkez-Yaylacık. Services include preparation
of Hydrology Planning Reports, Classification and Drainage of Irrigation Fields Planning
Reports, Agricultural Economy Planning Reports, Land Expropriation Planning Reports,
Construction Materials Reports, Engineering Geology Reports, Seismic Hazards Risk
Reports, Environmental Assessment Reports, Preliminary Planning Reports, Final Planning
Reports during the planning works. Preliminary Design Reports, Design Drawings,
Engineering Calculations Reports, Quantity Surveying, Cost Breakdowns, Technical
Specifications, Final Design Reports, and GIS (Geographical Information Systems) are
within the scope of design works. Client: DSİ 6. Regional Directorate, ADANA.

WEST MEDITERRANEAN BASIN 1st Part Dam Feasibility Study Level Engineering
Services: The work consists of Çataloluk Dam Feasibility Studies for irrigation of Çataloluk
plain which located in Fethiye District of Muğla Province, Hisarönü Dam Feasibility Studies
for supplying the domestic water demand of Datça and Bozburun Peninsulas and Aksaz
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 18
.

Naval Base; additionally, preparation of Emecik Small Dam Reconnaissance Report. Client:
General Directorate of State Hydraulic Works (DSİ), 21. Regional Directorate, AYDIN

Technical Assistance On Economic Analyses Within River Basin Management Plans


and Water Efficiency Aspects In 3 Pilot River Basins In TURKEY (Europeaid/136659/IH/
SER/TR): The purpose of the project is to develop River Basin Management Plans (RBMPs)
for the Akarçay, Batı Akdeniz and Yeşilırmak River Basins in accordance with the WFD and
sister directives, and develop necessary capacity of Turkey with detailed studies on
economic analysis and water efficiency issues. The project is composed of three
components: (i) current status of three river basins are evaluated, environmental goals are
determined and measures programs are proposed; (ii) water use, cost effectiveness and
cost-benefit analyses are executed; (iii) conceptual studies are carried out across the basins
in order to evaluate water efficiency and water pricing in Turkey. Proposed solutions are
evaluated on three pilot regions to maintain water efficiency in drinking water supply,
industrial and agricultural water use. Preparation of studies for the best options among the
proposed alternative solutions. Client: Ministry of Agriculture and Forestry Directorate
General of Water Management + CFCU.

TOKAT 4. Group Small Dams (SD) and Irrigation Project: Feasibility Report for 6 small
dams, Tokat-Merkez-Aşağıfırındere SD and Irrigation Project (299 ha), Tokat-Merkez-Bakışlı
SD and Irrigation Project (54 ha),Tokat-Pazar-Bağlarbaşı SD and Irrigation Project (226
ha),Tokat-Pazar-Çayköy SD and Irrigation Project (170 ha),Tokat-Pazar-Dereçaylı SD and
Irrigation Project (274 ha),Tokat-Niksar-Çiçekli SD and Irrigation Project (57 ha). Client:
General Directorate of State Hydraulic Works (DSİ), 7. Regional Directorate, Samsun.

ŞANLIURFA-HALFETI District Irrigation Project Feasibility Study Level Engineering


Services: Irrigation of agricultural lands (25 000 ha)of towns and villages in Halfeti and
Birecik Districts located on the east of Birecik dam reservoir area and northwest of Şanlıurfa
Province is aimed. Preparation of land classification, drainage survey, agricultural economy,
expropriation, engineering jeology and natural construction materials, environmental impact
assessment (EIA) studies and reports. Client: General Directorate of State Hydraulic Works
(DSİ), 15. Regional Directorate, ŞANLIURFA

AMASYA 3. Group Small Dams (SD) and Irrigation Project: Preparation of feasibilty
reports and engineering services for 4 small dams; Amasya-Suluova-Dereköy SD and
Irrigation Project (310 ha), Amasya-Hamamözü Gökdere SD and Irrigation Project (272 ha),
Amasya-Hamamözü-Gölköy SD and Irrigation Project (128 ha), Amasya-Göynücek-Sığırçay
SD and Irrigation Project (263 ha). Client: General Directorate of State Hydraulic Works
(DSİ), 7. Regional Directorate, Samsun.

ÇANKIRI Province 2nd Group Small Dams Project: Preparation of feasibility reports of 7
small dams for irrigation with heights varying between 15~40 m in Çankırı province and
districts, preparation of reports about Hydrology, Geology, Natural Construction Materials,
Environmental Impact Assessment, Agricultural Economy, Soil Drainage and Expropriation.
Within the scope of the project small dams, spillways, diversions and auxiliary structures and
about 1700 ha irrigation network system conceptual design is included design. Client:
General Directorate of State Hydraulic Works (DSİ), 5. Regional Directorate Ankara.

TEKIRDAĞ 4. Group Small Dam (SD) and Irrigation Project: Preparation of Feasibility
Reports for 7 small dams, Tekirdağ Süleymanpaşa Ormanlı SD and Irrigation Project (200
ha), Tekirdağ Süleymanpaşa Avşar SD and Irrigation Project (135 ha), Tekirdağ Saray
Bahçeköy (Balkaya) SD and Irrigation Project (128 ha), Tekirdağ Hayrabolu Hasköy SD and
Irrigation Project (170 ha), Tekirdağ Hayrabolu Aydınlar SD and Irrigation Project (110 ha),
Tekirdağ Muratlı Balabanlı SD and Irrigation Project (190 ha), Tekirdağ Malkara Elmalı SD
and Irrigation (200 ha). Client: General Directorate of State Hydraulic Works (DSİ), 7.
Regional Directorate, Samsun.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 19


.

ÇORUM Province 2nd Group Small Dams Project: Preparation of feasibility reports for 11
small dams for of irrigation with heights varying between 15~40 m in Çorum province and
districts, Preparation of reports about Hydrology, Geology, Natural Construction Materials,
Environmental Impact Assessment, Agricultural Economy, Soil Drainage and Expropriation.
Within the scope of the projects dams, spillways, diversions and auxiliary structures and
about 3500 ha irrigation network system preliminary design is included. Client: General
Directorate of State Hydraulic Works (DSİ) 5. Regional Directorate, Ankara.

KAHRAMANMARAŞ – AKSU Project Feasibility Report Engineering Services: 60 m


high concrete faced rockfill dam and appurtenant structures located at 2 km downstream
from Aksu creek springs 7 km eastward from Çağlayancerit town of Kahramanmaraş
province to irrigate Gölbaşı area (5 000 ha land) by the 11 km long irrigation water
transmission line Client: General Directorate of State Hydraulic Works (DSİ), 20. Regional
Directorate, Kahramanmaraş.

ÇORUM-KOÇHİSAR Project – Revised Feasibility Report: Engineering services for the


preparation of the feasibility report, Client: General Directorate of State Hydraulic Works
(DSİ), 5. Regional Directorate, Ankara.

BOLU – GEREDE DÖRTDİVAN Project Feasibility Report: Engineering services,


topographical surveys, geological investigations. Client: General Directorate of State
Hydraulic Works (DSİ), 5. Regional Directorate, Ankara.

İZMİR BAYINDIR Project, ERGENLİ Dam and Irrigation Feasibility Report: Engineering
services, topographical surveys, geological investigations. Client: General Directorate of
State Hydraulic Works (DSİ), 2. Regional Directorate, İzmir.

ANKARA MOGAN AND EYMİR Lakes Basin Flood Control Planning Report:
Engineering and consultancy services, additional investigations, Client: General Directorate
of State Hydraulic Works (DSİ), 5. Regional Directorate, Ankara.

BOLU-KIBRISCIK ALANHİMMETLER Reservoir Planning Engineering Services:


Engineering and consultancy services, additional investigations, Client: General Directorate
of State Hydraulic Works (DSİ), 5. Regional Directorate, Ankara.

DİKİLİ Project, Dikili Reservoir and Bayat Plain Irrigation: Master plan study,
Environmental Impact Assessment Report (EIAR), engineering and consultancy services,
Client: General Directorate of State Hydraulic Works (DSİ), 2. Regional Directorate, İzmir.

LOWER ARAS Basin: Feasibility study engineering and consultancy services, (218 MW),
Client: General Directorate of Electrical Power Resources Survey and Development
Administration (EİE).

GELİNGÜLLÜ Project, ÇERİKLİ Irrigation: Feasibility study engineering and consultancy


services and preparation of Environmental Impact Assessment Report (9,000 ha), Client:
General Directorate of State Hydraulic Works (DSİ).

YOZGAT-MUSABEYLİ Dam Irrigation and Water Supply Project: Feasibility study and
preparation of final design engineering and consultancy services and preparation of
Environmental Impact Assessment Report (2,500 ha), Client: General Directorate of State
Hydraulic Works (DSİ).

ANKARA-ÇUBUK Project: Feasibility study engineering and consultancy services and


preparation of Environmental Impact Assessment Report (5,000 ha), Client: General
Directorate of State Hydraulic Works (DSİ).
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 20
.

KONYA-ÇUMRA Stage III Irrigation Project: Feasibility study engineering and consultancy
services and preparation of Environmental Impact Assessment Report (251,000 ha), Client:
General Directorate of State Hydraulic Works (DSİ).

ACICAY-KOYUNBABA Project: Feasibility study, land appropriation, water rights studies,


engineering and consultancy services and preparation of Environmental Impact Assessment
Report (12,000 ha), Client: General Directorate of State Hydraulic Works (DSİ).

KIZILIRMAK-HAMZALI Project: Feasibility study engineering and consultancy services and


preparation of Environmental Impact Assessment Report (8,600 ha), Client: General
Directorate of State Hydraulic Works (DSİ).

GAP-SURUÇ Project: Feasibility study engineering and consultancy services and


preparation of Hydrology report, engineering geology report, agricultural economy report,
land appropriation report, water rights report, land use report, drainage report and
environmental impact assessment report (100,000 ha), Client: General Directorate of State
Hydraulic Works (DSİ).

BÜYÜK KARAÇAY Project: Feasibility study engineering and consultancy services and
preparation of environmental impact assessment report, Client: General Directorate of State
Hydraulic Works (DSİ).

*) In all the planning / feasibility studies given here above, Hydrology Report, Energy Geology Report,
Natural Construction Materials Report, Agricultural Economical Analysis Report, Land Appropriation for
the Renovation Area Report, Water Rights Report, Land Classification Report, Drainage Report and
Environmental Impact Assessment Report are prepared.

Drought Management

Drought Management Plan of the KONYA BASIN: Consultancy services to establish


Drought Management Plan for the Konya Closed Basin (50 000 km²), on the basis of
integrated river basin management approach considering water budget and vulnerability to
droughts that includes measures for drought mitigation and prevention of the impacts of
water scarcity on production resources and socio-economical life; drought and water scarcity
indicators and their threshold values to secure wise and sustainable use of limited water
resources, and accordingly, measures to be taken before-, during- and after-drought. Client:
Ministry of Forestry and Water Affairs, General Directorate of Water Management

Drought Management Plan Preparation Project for ANTALYA and BURDUR River
Basins: Preparation of Drought Management Plans for two neighbour basins that lay on
Turkey’s most important karstic region and while Antalya is the second most water richest
river basin and Burdur is the water-poorest river basin of Turkey. In scope of the project:
water resources capacity, crop water requirements, existing agricultural practices in irrigated
and dry land, susceptibility of Antalya and Burdur River Basins to drought hazards are
determined; water budgets of two basins are calculated, potential impacts of climate change
on water resources are assessed, vulnerability of water users to drought hazards are
analyzed, a comprehensive action plan is prepared to mitigate impacts of drought and water
scarcity considering environmental targets that ensure the optimum use and conservation of
water resources, a conceptual framework is constructed for drought management. Client:
Ministry of Forestry and Water Affairs, Directorate General of Water Management,
Department of Flood and Drought Management.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 21


.

Regional Planning:

YEŞİLIRMAK Regional Development Project (NUTS II Region): Consultancy services for


the regional development including SAMSUN, ÇORUM, AMASYA and TOKAT cities with a
total population of 3 million people. Services cover the following:

o Social Structure (demographics, education, health, culture, women and strengthening of


family, income distribution, employment, social security),
o Economical Structure (energy, agriculture, water and land resources, agricultural
production, husbandry, stockbreeding, forestry, water supply, waste water, storm water,
solid waste, industry, mining, transportation, communication, construction, tourism,
financial structure and banking, trade).
o Urban and Rural Infrastructure including transportation corridor development, intermodel
transport, project priorities, traffic forecasting, GIS modelling, by using collected data
related to transportation.
o Environment
o Preparation of strategy and restructuring scenarios and preparation of Regional
Development Main Plan

Client: TR Prime Ministry, State Planning Organization (SPO).

Solid Waste:

SİİRT Solid Waste Disposal and Storage Project: Geological investigations, topographical
surveys and detailed design engineering and consultancy services. Client: TR Prime
Ministry, GAP Regional Development Administration of Southeastern Anatolia Project

ÇORUM Solid Waste Management Project: Feasibility study, final design, tender
documents according to FIDIC, engineering and consultancy services. Beneficiary: Ministry
of Environment and Forestry + Municipality of Çorum. Client: European Union, Prime
Ministry Undersecretary of Treasury, Central Finance and Contracts Unit (CFCU).
EUROPEAID/119860/C/SV.

Wind Farm:

BALIKESİR Wind Farm Project: Engineering Services, assistance and support services for
the review of the existing project documentation, preparation of technical specifications,
assisting in tendering related to civil engineering activities. Client: Bares Elektrik Üretimi A.Ş.
+ Italcementi S.p.a.

Thermal Power Plants:

ÇANKIRI ORTA Lignite Fired Power Plant: Final Feasibility Report, Basic Design, EPC
Tender Documents, Bid Evaluation, (installed capacity: 135 MW), Client: ÇALIK Holding.

KIRKLARELİ Combined Cycle Power Plant: Construction supervision, engineering and


consultancy services (installed capacity: 74.5 MW), Client: ALTEK Inc.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 22


.

Hospitals:

ISPARTA City Hospital: Integrated health campus investment under Public Private
Partnership (PPP) model with a total capacity 755 beds capacity, consisting of a 450 beds
General Hospital, 305 beds Woman’s and Children’s Hospital. It consists of 204 policlinics,
16 surgery rooms, 2 having an area 290 000 m2 project. Engineering and Consultancy
Services before final commitment, during construction phase and during operation phase
including Environmental, Social, H&S monitoring. Investor: Isparta City Hospital Investment
and Operation Inc. Co.

ESKIŞEHIR City Hospital: Integrated health campus investment under Public Private
Partnership (PPP) model with a total capacity 1081 beds capacity, consisting of a 715 beds
for General Hospital and Mental/Psychiatric clinic, 127 for Oncology, 139 for heart dispenses
and 100 beds for special psychiatric cases. It consists of 264 policlinics, 33 surgery rooms,
having an area 333 306 m2. Engineering and Consultancy Services before final commitment,
during construction phase and during operation phase including preparation of
Environmental and Social Due Diligence Report, Environmental and Social Management
Plan and Environmental, Social, H&S monitoring during construction and operation. Investor:
Eskişehir City Hospital Investment and Operation Inc. Co.

TEKIRDAĞ PPP City Hospital Project: Preparation of Preliminary Assessment Report,


Preparation of Monthly Physical and Financial Progress Reports during the investment
period and preparation of Operation Reports during the operation period. Health complex
project having a total of 480 beds consisting of 374 beds in Acute Care Unit (ACUT), 64
beds in Intensive Care Unit (ICU), 32 beds in Neonatal Intensive Care Unit (NICU), 8 beds
Prisoners Service, and 2 beds in Burn Treatment Unit. Client / Lender: QNB Finansbank.

Buildings:

Chancery and Residential Buildings of Embassy of the Federal Republic of ETHIOPIA


to TURKEY: Engineering and consultancy services for conceptual, final and detailed design,
technical specifications, tender documents, construction supervision, preliminary and final
acceptances, as built drawings (a four storey building having a 5975 m2 area), Client:
Embassy of the Federal Republic of Ethiopia to Turkey.

Commercial and Residential Complex in KAMPALA, UGANDA: Engineering and


consultancy services for conceptual, final and detailed design, site investigations, technical
specifications, tender documents, construction supervision, as built drawings, The project
consists of 5 blocks each with 5 storeys having approximately 25.000 m2 and car parking,
green area and kinder garden. Client: Uganda Muslim Education Association, Uganda.

The ARDAHAN KARS ARTVIN Development Project (AKADP): Engineering and


consultancy services for supervision of civil works for the construction of 5 livestock markets
in Ardahan, Kars, and Artvin Provinces. The services include site supervision and
consultancy services of civil works for the rehabilitation of Selim and Hanak Livestock
Markets and construction of Sarıkamış, Posof and Ardanuç Livestock Markets. Client: United
Nations Development Program (UNDP).

Construction Supervision for 2 Buildings in SAMSUN Province Lot 2: Supervision for


construction BAFRA Business and Export Development Unit: Construction supervision
and consultancy services for all facilities. Client: Central Finance and Contracts Unit (CFCU),
EuropeAid/135799/IH/SER/TR.

Constructıon Supervision of GÜMÜŞHANE Traditional and Organic Products


Development Center (İŞGEM): Construction supervision and consultancy services for all

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 23


.

facilities. Client: Central Finance and Contracts Unit (CFCU),


EuropeAid/135873/IH/SER/TR).

Forensic Laboratories in DIYARBAKIR, ADANA, İSTANBUL, İZMIR, Turkey:


Construction supervision and consultancy services: Beneficiaries: Turkish National Police,
Department of Criminal Police Laboratories (KPL) and Turkish Gendarmerie General
Command, Gendarmerie Forensic Department (JKDB). Client: Central Finance and
Contracts Unit (CFCU), EuropeAid/129143/D/SER/TR

Design and Construction Supervision of ETİLER POLİCE VOCATIONAL ACADEMY


Dormitory and 40 SCHOOLS in İstanbul, Turkey: Design and construction supervision,
consultancy services for all facilities under the İstanbul Seismic Risk Mitigation and
Emergency Preparedness Project. Client: İstanbul Special Provincial Administration İstanbul
Project Coordination Unit, Finance: EIB (European Investment Bank)

NATIONAL FOOD REFERENCE LABORATORY, Ankara, Turkey: A laboratory including


administrative building and clean rooms to monitor all food exported to and imported from
Turkey. Construction supervision, engineering and consultancy services during construction
and defects liability period according to FIDIC and EC procedures. Beneficiary: Ministry of
Agriculture and Rural Affairs, General Directorate of Protection and Control. Client: Central
Finance and Contracts Unit (CFCU): CFCU/2005/TR0503.04/SV

Business Centres in KOCAELİ, YALOVA and GÖLCÜK: Construction supervision


(FIDIC), engineering and consultancy services (46 business centers, 52 buildings, 2554
shops, 168500 m2), Client: TR Prime Ministry, Project Implementation Unit PIU+EIB.

MUŞ, BINGÖL, ERZURUM, AĞRI, KARS and ARDAHAN Schools, Lodgings, Sport
Facilities Turkey Basic Education Project: Construction supervision, engineering and
consultancy services during construction and defects liability period according to FIDIC and
EC conditions Beneficiary: Ministry of National Education; Client: European Union
Delegation DELTUR/2006/116-825

DIYARBAKIR, SIIRT, ŞANLIURFA, ADIYAMAN Schools, Lodgings, Sport Facilities


Turkey Basic Education Project: Construction supervision, engineering and consultancy
services during construction and defects liability period according to FIDIC and EC
conditions Beneficiary: Ministry of National Education; Client: European Union Delegation
DELTUR/2006/116-831

İSTANBUL, SAKARYA, BURSA, ANTALYA, ADANA and MERSIN Schools, Lodgings,


Facilities Turkey Basic Education Project: Construction supervision, engineering and
consultancy services during construction and defects liability period according to FIDIC and
EC conditions Beneficiary: Ministry of National Education; Client: European Union
Delegation DELTUR/2006/116-836

ŞANLIURFA, DİYARBAKIR and ADIYAMAN Schools and Turkey Basic Education


Project: Construction supervision, engineering and consultancy services during construction
and defects liability period according to FIDIC and EC conditions Beneficiary: Ministry of
National Education, Client: European Union Delegation EUROPEAID/123010/C/SER/TR

GÜRBULAK, İZMIR Port, MERSIN Port and ANKARA Vehicle Search Sheds and
Archive Center: Detailed Design, Tender Dossiers, Terms of Reference for Construction
Supervision of Works Contract; Beneficiary: Turkish Customs Authority, Client: European
Union, Central Finance and Contracts Unit (CFCU) ALTUN/PAVS/TR0406.01/FWC012/BIS

Incubator Buildings located at KÜTAHYA, ÇORUM, HACIBEKTAŞ and PENDIK:


Preparation of detailed designs and tender dossiers. Beneficiary: Small and Medium Industry
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 24
.

Development Organisation (KOSGEB), Client: European Union, Central Finance and


Contract Unit (CFCU), ALTUN/RIB/TR0406.01/KWC/08-TER

Renovation of 30 Pilot Statement Taking Rooms in TR Gendarmerie: Preparation of


detailed designs and tender dossiers. Client: European Union, Central Finance and Contract
Unit (CFCU),

ERMENEK Permanent Village: Detailed design consisting of lodgements, storages, control


building, heating center, guest house, studios, dormitory for workers, administrative building,
gasoline station, club, dining salons. Client: Pöyry Energy

Transportation:

AYDIN – DENİZLİ Motorway: The Project is 140 km 2x3 motorway with 28 km 2x2
motorway link road, 19 motorway viaducts, 19 motorway bridges, 10 interchanges, 3
service areas, 29 underpasses, 6 overpasses, more than 400 culverts. Preparation
of typical cross sections, design of viaducts/bridges, design of interchanges, design
of motorway and generation of plan-profile, design of culverts, design of drainage
system, design of traffic safety plans, preparation of bill of quantities, design of toll
plazas, design of service areas, design of maintenance and operation centers,
preparation of geotechnical reports of bridges, motorway and interchanges,
preparation of tender documents, and assistance throughout bidding. Client:
Özaltın-Fernas-Mapa Joint Venture (Owner: Republic of Turkey General Directorate
of Highways)

GEBZE – ORHANGAZİ – İZMİR (Including İzmit Bay Bridge) Motorway Project (3.1 km
suspension bridge + 407 km motorway): Suspension Bridge (Osmangazi Bridge, total
length = 2,907 m) of the İzmit Bay, a special launching girder type Approach Viaduct to
Suspension Bridge (Southern Approach Viaduct, 1,379 m), the Orhangazi (Samanlı) Tunnel
(a twin tube 3,650 m each), the Selçukgazi Tunnel (a twin tube tunnel 1,055 m each),
13 viaducts (total length 6.379,35 m), 17 bridges, 24 overpasses, 57 underpasses, 146 box
culverts and 6 intersections, 1 Administrative and Main Traffic Control Campus, 1 one-sided
Motorway Service Facilities, 3 two-sided Motorway Service Facilities, 1 Motorway Operation
& Maintenance Center, 1 Tunnel Operation & Maintenance Centers, ITS (Intelligent
Transportation Systems) and VMS (Vehicle Monitoring Systems) systems. Services include;
review of the design of all structures, reviewing all activities related to expropriation,
environment & social impact, health & safety, review and supervision of construction works,
preparing monthly progress reports including the findings and the comparison of realized
work program and cash flow, review and supervision of operation and maintenance works.
Client: Akbank T.A.Ş., QNB Finansbank A.Ş., T.C. Ziraat Bankası A.Ş., Garanti Bank
International N.V., Türkiye Garanti Bankası A.Ş., Türkiye Halk Bankası A.Ş., Türkiye İş
Bankası A.Ş., Türkiye Vakıflar Bankası T.A.O., Yapı ve Kredi Bankası A.Ş., Deutsche Bank
AG, Bank of China Limited, The Saudi National Commercial Bank, Siemens Bank GMBH.

İSTANBUL New Airport: The Project Area is located on the Black Sea coast. The Site
covers an area of approximately 76.5 km2. The project has 6 independent runways (1x4 100
m, 4x3 750 m, 1x3 500 m), terminal area of 1 300 000 m2, 143 passenger bridges, 600
check-in counters, The BHS will have 11 500 EBS, 50 baggage / hour sorting capacity and
48.5 km long conveyor line, 350 elevators, a multistory car park with a capacity of 18 000
vehicles, 420 aircraft parking capacity, taxiways, apron, 2 ATC towers (main ATC will be 90
m high), deicing areas, cargo facilities, rescue and fire station, fuel farm with a capacity of
(30 000 m3 x 10) 300 000 m3, a jetty with 100 000 gross tons + 50 000 gross tons capacity,
fuel hydrant piping system with a length of 105 km, facilities for waste separation and waste
water treatment plant, GIS Center, Utility Center, Data center, many auxiliary buildings
including main entrance buildings, VIP Terminal building, state guest house, meteorology
center, surveillance towers, apron barrier buildings, airport guard house, customs service
building, airport maintenance center, snow removal center, police and security center, radar
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 25
.

and radio building, dogfarm, railway station for metro and speed train, and mosque. The first
phase will serve to 90 million passengers per year and consists of three runways (4 100 m +
2 x 3 750 m). When fully developed, the airport will have a capacity of 150 Million
passengers per year, 165 passenger-boarding bridges, four terminals connected with a
railway system, three maintenance buildings, eight air traffic control towers, six runways, 16
taxiways, an airport hangar of 6.5 million m2 with a capacity of 500 airplanes, a parking lot
with a capacity of about 70,000 vehicles, 600 check in counters, 50 km BHS conveyor line, a
clinic, fire department, hotels. Definition: Consultancy for technical advisory services,
environment, social and H&S Issues. Client: T.C. Ziraat Bankası, QNB Finansbank A.Ş.,
Türkiye Garanti Bankası A.Ş., Türkiye Vakıflar Bankası A.Ş., Türkiye Halk Bankası A.Ş.,
Denizbank.

Independent Engineer Services for the MILOT-MORINE Highway Concession Project:


Project Features are 89.5 km 2x2 motorway, 25 km 2x1 motorway will be dualized, 1 twin
tube tunnels (5.6 km long) and viaducts of total length of 4420 m, 3 interchanges, 3
underpasses, 4 overpasses, ITS system, 2 service areas, culverts: Engineering and
consultancy services for construction supervision including operation period. Client: Ministry
of Energy and Infrastructure, Republic of Albania.

HAVELIAN-THAKOT Motorway (120 km): Consultancy services as assistant to Employer's


Representative (AER) for China Pak Economic Corridor. Project Features are; 39.3 km 2x2
motorway, 78.82 km 2x1 class II highway, 2 twin tube tunnels (2096 m long) and 4 single
tube tunnels (3585 m long), 42 motorway bridges, 58 class II highway bridges, 3
interchanges, 24 intersections, ITS system, 2 service areas, 491 culverts. Services provided
include design review, engineering, construction supervision services including operation
period. Client: National Highway Authority (NHA), Pakistan.

KAYAŞ-KIRIKKALE (80 km) Double Track Railway Project: mapping and topographical
surveys, geological, geotechnical investigations, corridor study, choosing the most
appropriate route from technical and economical point of view, EIA Report, land
appropriation plan; design, engineering and consultancy services for the track, stations,
viaducts, culverts, bridges, land scapping, preparation of bill of quantities and cost estimate
Client: Turkish Railways Authority (TCDD).

MENEMEN ALIAĞA ÇANDARLI Motorway: Project features are 51.9 km 2x3 motorway, 23
km 2x2 motorway link road, 7 motorway bridges, 15 interchanges, 6 intersections, 3 service
areas. Assistance to the investor to submit a proposal for a Built – Operation Transfer (BOT)
project preparation of typical cross sections, design of bridges, design of interchanges,
design of motorway and generation of plan-profile, design of culverts, design of drainage
system, preparation of geotechnical reports of bridges, motorway and interchanges,
preparation of tender documents supervision of bidding duration. Client: Özaltın Construction
Inc. Co.

ANKARA-NIĞDE Motorway Project: Project Features are; 276.85 km 2x3 motorway, 12


km 2x2 motorway link road, 1 viaduct (1200 m long), motorway bridges, 10 interchanges, 1
service areas, 1 toll plaza relocation. Assistance to the investor to submit a proposal for a
Built-Operate-Transfer (BOT) project, preparation of typical cross sections, design of
bridges, design of interchanges, design of motorway and generation of plan-profile, design of
culverts, design of drainage system, preparation of conceptual design report, preparation of
geotechnical reports of bridges, motorway and interchanges, preparation of motorway
design and construction report. Client: RBI Turkey (China Road and Bridge Corporation
Turkey Branch).

MERSIN State Highway Project Between (ANAMUR-KALEDRAN) Km:231+127.50 –


247+860: Final design and preparation of application drawings including geometrical design
aspects of a state highway (2 lanes at both directions) that has a length of 13.6 km. All
design aspects including the horizontal and vertical geometries, surveying (aerial), 2 junction
designs, 7 viaduct that have 2,690.00 m total length and 6 tunnel which have 6,465.00 m
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 26
.

total length. Also the project includes, traffic and safety designs, drainage designs,
superstructure design, geological investigations program including boreholes, investigation
drills and laboratory programs. Client: Turkish Highways Authority, 5. Regional Directorate,
Mersin.

KEMALIYE-DUTLUCA State Road Project: Engineering and conusltancy services for


preparation of 21 km long, 2 way state road including geological investigations and reports,
tunnel construction designs (3 tunnels that are 3000 m, 2500 m and 2000 m), tunnel
ventilation, electrification, lightning, communication, CCTV, signalization, control system,
power supply system, firefighting system designs. Client: General Directorate of Highways
(KGM).

Master Plan Study for the HINTERLAND HIGHWAY AND RAILWAY CONNECTIONS OF
THE SEA PORTS IN TURKEY: This study aims at development of hinterland railway and
highway connections of seaport facilities in Turkey, and providing complementary and more
efficient usage of these facilities by integrating them to the existing main highway and
railway lines. The scope of the project includes as of year 2035 the relevant issues related
with the connection of existing seaports with the highways and railways; capacities of
existing seaports; possibilities of expansion; determination of which coastal facilities should
be evaluated within the scope of this study; determination of under what criteria the seaports
whose highway and railway connections are to be made or reinforced will be evaluated; and
estimation of existing and likely to be attained capacities of seaports. Client: Republic of
Turkey, Ministry of Transport, Maritime and Communications, Directorate of General
Infrastructure Investments

PALU-GENÇ-MUŞ Railway Project: Review of the geological investigations, geological,


geotechnical reports, choosing the most appropriate route from technical and economical
point of view, preparation of the final design, design of all the structures including, tunnels,
bridges, underpasses, culverts on the route, preparation of the bill of quantities and cost
estimate for Phase I (Km 0-18), checking the design of Phase II (km 0-9 + km 31-67). Client:
Turkish Railways Authority (TCDD).

KARAKORAM Highway: Consultancy services for design, tender documents and


construction supervision: 62 km long state highway including auxiliary structures and town
crossing, final design, assistance during tendering, construction supervision. Client: Pakistan
Water and Power Development Authority (WAPDA). Financing: World Bank.

State Highway Connecting ADAPAZARI City Centre - New Settlement Areas and
Karaman Camili District: Detailed design, including 2 bridges, 5 crossings, 2x2 lanes + 2x1
emergency lane, preparation of as built drawings, topographical surveys, geological
investigations, construction supervision (FIDIC), engineering and consultancy services (12
km), Client: ADAPAZARI Municipality + EIB.

ARTVİN-ERZURUM State Highway: Geological investigations, topographical surveys and


detailed design engineering and consultancy services (28 km state highway including 13
tunnels, 8 bridges, 4 balanced cantilever bridges, 3 viaducts, culverts, 6.5 km concrete
retaining walls), Client: General Directorate of State Hydraulic Works (DSİ) and General
Directorate of State Highways (KGM).

TORTUM-UZUNDERE Highway (I. Section) Project: 30 km 2x2 state highway, 9 2x2


highway bridges (760 m long), 14 intersections, 7 twin tube tunnels (3935 m long).
Engineering and consultancy services for preparation of typical cross sections, design of
tunnels, design of bridges, design of interchanges, design of highway and generation of
plan-profiles, design of traffic safety projects and traffic markings, design of culverts, design
of drainage system, design of cross sections, preparation of tunnel geological reports,
preparation of geotechnical reports of bridges, highway and interchanges, preparation of

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 27


.

mass-haul diagrams, preparation of BOQ, preparation of tender documents. Client: Republic


of Turkey, General Directorate of Highways.

(OLTU-AKŞAR) Joint - GAZILER Province Road (II. Section) Project: Engineering and
consultancy services for the preparation of all design for the 36 km long 2 way 1 lane
province road including corridor studies, alignment studies, hydraulic and hydrological
studies, at-grade junctions, final design drawings, drainage designs, bridges (4 bridges),
small engineering structures and shoring-retaining wall designs, traffic designs, EIA report,
geological investigations and reports. Client: General Directorate of Highways (KGM), 12.
Regional Directorate, Erzurum.

Preparation of Revised Design of 8 at-grade Railway-Road Intersections to Grade


Separated Intersections Within 2nd Regional Directorate Region: Preparation of grade
separated intersection designs of railway crossings at 8 different locations including
coordination between Client and other Governmental and Local Authorities, topographical
surveys, geological investigations and reports, design of intersections, design of all
engineering structures including overpasses and underpasses. Client: 2. Regional
Directorate of State Railways (TCDD).

AKÇAKOCA-MELENAĞZI State Highway Consultancy Services for Survey and Design:


Preparation of all design aspects of the 23 km long 2 way 2 lane state road including
Corridor studies, Alignment studies, Hydraulic and Hydrological studies, At-grade and grade
separated junctions, Final design drawings, Drainage designs, Bridge, small engineering
structures and retaining wall designs, Traffic designs, Environment Impact Assessment (EIA)
Report, Geological investigations and reports, Tunnel designs and Superstructure designs.
Client: General Directorate of State Highways (KGM).

BALIKESİR Northern Ring Road Consultancy Services for Survey and Design:
Preparation of all design aspects of the 17 km long 2 way 2 lane state road including
Corridor studies, Alignment studies, Hydraulic and Hydrological studies, At-grade and grade
separated junctions, Final design drawings, Drainage designs, Bridge, small engineering
structures and retaining wall designs, Traffic designs, Geological investigations and reports,
Tunnel designs and Superstructure designs. Client: General Directorate of State Highways
(KGM).

NALLIHAN-MUDURNU Junction-Göynük Junction-Dokurcun State Highway (0+000-


46+000) Consultancy Services for Survey and Design: Preparation of all design aspects
of the 46 km long 2 way 2 lane state road including Corridor studies, Alignment studies,
Hydraulic and Hydrological studies, At-grade and grade separated junctions, Final design
drawings, Drainage designs, Bridge, small engineering structures and retaining wall designs,
Traffic designs, Environment Impact Assessment (EIA) Report, Geological investigations
and reports, Tunnel designs and Superstructure designs. Client: General Directorate of State
Highways (KGM).

ANAMUR-3rd Region Border Province State Highway Consultancy Services for Survey
and Design: Preparation of all design aspects of the 66 km long province road including
Corridor studies, Alignment studies, Hydraulic and Hydrological studies, At-grade and grade
separated junctions, Final design drawings, Drainage designs, Bridge, small engineering
structures and retaining wall designs, Traffic designs, Environment Impact Assessment (EIA)
Report, Geological investigations and reports, Tunnel designs and Superstructure designs.
Client: General Directorate of State Highways (KGM).

NALLIHAN-MUDURNU Junction-Göynük Junction-Dokurcun State Highway (46+000-


74+000) Consultancy Services for Survey and Design: Preparation of all design aspects
of the 28 km long 2 way 2 lane state road including Corridor studies, Alignment studies,
Hydraulic and Hydrological studies, At-grade and grade separated junctions, Final design
drawings, Drainage designs, Bridge, small engineering structures and retaining wall designs,

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 28


.

Traffic designs, Environment Impact Assessment (EIA) Report, Geological investigations


and reports, Tunnel designs and Superstructure designs. Client: General Directorate of State
Highways (KGM).

ERUH-FINDIK (Including Bağgöze Connection) State Highway: Geological


investigations, topographical surveys and detailed design engineering and consultancy
services (74 km), Client: General Directorate of State Highways (KGM).

SEYDİŞEHİR-13.Bl.HD. Road Tınaztepe Tunnel and Connection Roads (Km: 0+000.00-


17.967.16) Project: topographical surveys, geological and geotechnical investigations,
intersection design, hydraulic design, brückner diagrams, detailed design and engineering
services for all the structures, drainage, traffic safety and signalling design, land scapping,
EIA/Pre EIA Report. Client: General Directorate of State Highway (KGM).

KEMER-KUMLUCA State Highway: Geological investigations, topographical surveys and


detailed design engineering and consultancy services (38 km), Client: General Directorate of
State Highways (KGM).

ÇANKIRI-KASTAMONU State Highway: Geological investigations, topographical surveys


and detailed design engineering and consultancy services (84 km), Client: General
Directorate of State Highways (KGM).

TOPÇAM-MESUDİYE State Highway: Geological investigations, topographical surveys and


detailed design engineering and consultancy services (20 km), client: General Directorate of
State Highways (KGM).

EMİRDAĞ – ÇİFTELER (Emirdag-4. Bl. Hd. Section) State Highway: Geological


investigations, topographical surveys and detailed design engineering and consultancy
services (25 km), Client: General Directorate of State Highways (KGM).

FISHERY COASTAL STRUCTURES: Master plan for all the coastal structures in Turkey,
Client: Ministry of Transportation General Directorate of DLH.

SİLİFKE-MUT State Highway: Geological investigations, topographical, surveys and


detailed design engineering and consultancy services (75 km), Client: General Directorate of
State Highways (KGM).

DÜZCE-AKÇAKOCA State Highway: Geological investigations, topographical surveys and


detailed design engineering and consultancy services (33 km), Client: General Directorate of
State Highways (KGM).

KALE-(DENİZLİ-SERİNHİSAR) Junction State Highway: Geological investigations,


topographical surveys and detailed design engineering and consultancy services (41 km),
Client: General Directorate of State Highways (KGM).

FETHİYE-DALAMAN (II. REGION BORDER) State Highway: Geological investigations,


topographical surveys and detailed design engineering and consultancy services (38 km),
Client: General Directorate of State Highways (KGM)

ÇANDARLI Port: Feasibility Report and preparation of Environmental Impact Assessment


Report (national + EU directives), engineering and consultancy services, Client: Ministry of
Transportation General Directorate of DLH.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 29


.

DERİNCE Port: Master Plan and Feasibility Report engineering and consultancy services,
Client: TCDD, Turkish State Railways + EIB.

ERMENEK-GÜLNAR-KAZANCI Road: Detailed design, engineering and consultancy


services (72 km, road including 2 bridges and culverts including all auxiliary structures).
Client: PÖYRY Energy, General Directorate of State Hydraulic Works (DSİ) and General
Director of State Highways (KGM)

İNEBOLU-ÇATALZEYTİN State Highway: Geological investigations, topographical surveys


and detailed design engineering and consultancy services (46 km), Client: General
Directorate of State Highways (KGM).

SALİHLİ-KÖPRÜBAŞI State Highway: Geological investigations, topographical surveys


and detailed design engineering and consultancy services (46 km), Client: General
Directorate of State Highways (KGM).

GÜNEYSU-BÜYÜKKÖY State Highway: Geological investigations, topographical surveys


and detailed design engineering and consultancy services (12 km), Client: General
Directorate of State Highways (KGM).

PORT of MERSİN: Due diligence engineering assessment, Client: Hutchison Port Holding.

PORT of İSKENDERUN: Due diligence engineering assessment, Client: Hutchison Port


Holding.

Environmental and Social Impact:

Tüpraş Refineries HSE Due Diligence Study: Tüpraş the largest industrial company of
Turkey and is Turkey’s only oil refinary, operating four refineries (Batman, İzmir, İzmit,
Kırıkkale) with a total capacity to handle an annual 28.1 mn tons of crude. The project covers
review and reporting about National and EU legislation applicable to the refineries and EIB’s
Environmental and Social Standards; HSE policies, plans, procedures and management –
corporate and site level; HSE and industrial safety permits; incident reporting system and
appropriate follow up procedures; emergency response plans and procedures; HSE audit
reports (internal and external audits), health and safety incidents, accidents and lost time
injury reports and details of remediation and corrective actions. Client: European Investment
Bank (EBRD).

DASU Hydropower Project: Social and Environmental Management Plan, baseline study,
public consultation and participation plan, resettlement framework, resettlement action plan,
gender action plan, public health action plan, grievances readiness plan, communication
plan, Environmental Impact Assessment, terrestrial ecology, aquatic ecology, cultural
resources, environmental management action plan. Client: Pakistan Water and Power
Development Authority (WAPDA). Financing: World Bank.

ÇORUM-KOÇHİSAR Project: Environment Impact Assessment Report (EIAR). Client:


General Directorate of State Hydraulic Works (DSİ), 5. Regional Directorate, Akara.

KASTAMONU – GÖKIRMAK – KIRIK Dam Project: Environment Impact Assessment


Report (EIAR). Client: General Directorate of State Hydraulic Works (DSİ).

TURKISH REPUBLIC OF NORTHERN CYPRUS (TRNC) Potable Water Supply Project:


Environment Impact Assessment Report (EIA). Client: ALSİM - ALARKO.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 30


.

BOLU GEREDE DÖRTDİVAN Project: Environment Impact Assessment Report (EIAR).


Client: General Directorate of State Hydraulic Works (DSİ), 5. Regional Directorate.

İZMİR BAYINDIR Project Ergenli Dam and Irrigation: Environmental Impact Assessment
Report (EIAR). Client: General Directorate of State Hydraulic Works (DSİ), 2. Regional
Directorate, İzmir.

ARKUN Dam and Hydroelectric Power Plant Project: Environment Impact Assessment
Report (EIAR). Client: Unit International, DOKA Energy.

ÇORUM Solid Waste Management Project: Environment Impact Assessment Report


(EIAR). Beneficiary: Republic of Turkey Ministry of Environment and Forestry + Çorum
Municipality Client: Republic of Turkey Central Finance and Contract Units (CFCU).
EUROPEAID/119860/C/SV

REVIEW AND EVALUATION OF THE ENVIRONMENTAL LEGISLATION IN TURKEY:


Comprehensive review of Turkish environmental legislation. Client: Confidential

KONYA ÇUMRA III STAGE Project: Environmental Impact Assessment Report (EIAR).
Client: General Directorate of State Hydraulic Works (DSİ)

KIRIK DAM AND QUARRY AREAS Project: Environmental Impact Assessment Report.
Client: General Directorate of State Hydraulic Works (DSİ), 23. Regional Directorate.

GELİNGÜLLÜ Project: Environmental Impact Assessment. Client: General Directorate of


State Hydraulic Works (DSİ), 5. Regional Directorate

YOZGAT MUSABEYLİ (Dam + Water Supply) Project: Environmental Impact Assessment


Report (EIAR) (Yozgat). Client: General Directorate of State Hydraulic Works (DSİ), 12.
Regional Directorate

YEŞİLIRMAK Regional Development Plan: Environmental Impact Assessment (Samsun,


Amasya, Çorum, Tokat). Client: State Planning Organization (SPO)

ANKARA ÇUBUK Project: Environmental Impact Assessment Report (EIAR). Client:


General Directorate of State Hydraulic Works (DSİ), 5. Regional Directorate

Environmental Protection for Potable Water Resources of DİYARBAKIR: Environmental


management plan, pollution control measures, site investigations, implementation
schedules, solid waste management disposal concept. Client: General Directorate of State
Hydraulic Works (DSİ)

ÇANDARLI Port Project: Environmental Impact Assessment Report (EIAR). Client: Ministry
of Transportation, General Directorate of Railways, Ports and Airport (DLH)

HAKKARİ Dam and HEPP Project: Environmental Impact Assessment Report (EIAR).
Client: General Directorate of State Hydraulic Works (DSİ)

GAP SURUÇ (Irrigation) Project: Environmental Impact Assessment. Pre Evaluation


Report Client: General Directorate of State Hydraulic Works (DSİ)

CLUB VARUNA Holiday Village: Environmental Impact Assessment – Pre-Assessment.


Client: Varan Tourism
DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 31
.

ERMENEK Dam and HEPP Project: Environmental Impact Assessment Report (EIAR).
Client: General Directorate of Electrical Power Resources Survey and Development
Administration (EİE)

MERSİN Thermal Power Plant: Environmental Impact Assessment Report (EIAR). Client:
Çukurova Electric Company (ÇEAŞ)

ANKARA Water Supply Project - Gerede System Environmental Impact Assessment


Report.(EIAR). Client: General Directorate of State Hydraulic Works (DSİ)

BEŞKONAK 1 + BEŞKONAK 2 (Köprüçay) Project: Environmental Impact Assessment


Report (EIAR). Client: KEPEZ

ILISU Dam and Hydroelectric Power Plant (1200 MW): Environmental Impact Assessment
Report (EIAR). Client: Sulzer Hydro

ACIÇAY-KOYUNBABA Dam and HEPP Project: Environmental Impact Assessment


Report (EIAR). Client: General Directorate of State Hydraulic Works (DSI)

KIZILIRMAK-HAMZALI Dam and HEPP Project: Environmental Impact Assessment


Report-Pre Assessment. Client: General Directorate of State Hydraulic Works (DSI)

BÜYÜK KARAÇAY Project: Environmental Impact Assessment Report (EIAR). Client:


General Directorate of State Hydraulic Works (DSI)

IZMIR Water Supply Gördes and Çağlayan Project: Environmental Impact Assessment
Report (EIAR). Client: General Directorate of State Hydraulic Works (DSI)

BODRUM Drinking, Domestic and Industrial Water Supply Project: Environmental


Impact Assessment Report (EIAR). Client: General Directorate of State Hydraulic Works
(DSI)

LOWER ARAS Basin Feasibility Report: Environmental Impact Assessment Report


(EIAR). Client: General Directorate of Electrical Power Resources Survey and Development
Administration (EIE)

GÜNEYSU-BÜYÜKKÖY Province Road: Environmental Impact Assessment Report


(EIAR). Client: General Directorate of State Highways (KGM)

ANAMUR - ALAKÖPRÜ Dam and HEPP Project: Environmental Impact Assessment


Report (EIAR), Client: General Directorate of Electrical Power Resources Survey and
Development Administration (EİE)

KIZILIRMAK - KARGI Dam and HEPP Project: Environmental Impact Assessment Report
(EIAR), Client: General Directorate of Electrical Power Resources Survey and Development
Administration (EİE)

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 32


.

Socio-economic/Institutional Strengthening/Reorganisation Studies:

Operation, Maintenance and Management of Irrigation Systems within the Scope of


SOUTHEASTERN ANATOLIA PROJECT (GAP): Socio economic surveys, training of
farmers, capacity building activities, monitoring of implementation, formation of institutional
structures to develop the water management, agricultural extension, environmental
management, public participation meetings, capacity building, cropping techniques, irrigation
model, formation of farmers unions, Client: TR Prime Ministry, GAP Regional Development
Administration.

YEŞİLIRMAK Region Development Project (NUTS II Region): Consultancy services for


SAMSUN, ÇORUM, AMASYA and TOKAT cities for the preparation of regional development
plan, strategy and restructuring scenarios, social structure (demographics, education, health,
culture, women and strengthening of family, income distribution, employment, social
security), economical structure (agriculture, water and land resources, agricultural
production, husbandry, stockbreeding, forestry, water supply, waste water, storm water, solid
waste, industry, mining, energy, transportation, communication, construction, tourism,
financial structure and banking, trade), urban and rural infrastructure, GIS modelling. Client:
TR Prime Ministry, State Planning Organization (SPO).

ESKİŞEHİR Waste Water Project: Master plan study, determination of customer profiles,
payment capacities, socio economical characteristics, analysis of institutional, financial and
legal status of the municipality, institutional strengthening, organization of
workshops/seminars, training, engineering and consultancy services. Client: Municipality of
Greatercity of Eskişehir + EIB.

ÇORUM Solid Waste Management Project: Legal framework, demographic trends,


identification of critical problems, economic growth forecasts, financial analysis, public
participation meetings. Beneficiary: Republic of Turkey Ministry of Environment and Forestry
+ Çorum Municipality Client: Republic of Turkey Central Finance and Contract Units (CFCU).
EUROPEAID/119860/C/SV

SİİRT Water Supply and Sewerage Project: Socio-economic surveys, preliminary


information campaign, institutional strengthening/reorganization, improvement of customer
relations, recommendations for restructuring and capacity building, investment schedule,
technical assistance. Client: Siirt Municipality + KfW.

Simulation / Hydrological Modelling:

YEŞİLIRMAK Simulation Model: For water demand and supply balance in the Yeşilırmak
River basin, Client: State Planning Organization (SPO).

ANKARA City Water Distribution Network Model: Hydraulic model of the existing
distribution system, Client: Ankara Water and Sewerage Administration (ASKİ).

ŞANLIURFA IRRIGATION CHANNEL Simulation by ONDA Hydraulic Model: Canal


system which consist of complex control regulators and conveyance channels serving to
irrigate Harran and Mardin Ceylanpınar Plains is simulated. Client: Southeastern Anatolia
Regional Development Administration (GAP-RDA).

EUPHRATES and TIGRIS Hydrology and Water Resources Modelling: Prepared to


determine the reliability of system yield as a function of operating policy and the variability of
the inflows. Client: Southeastern Anatolia Regional Development Administration (GAP-RDA).

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 33


.

Dam Monitoring/Geodetic Measurements:

ATATÜRK Dam and Hydroelectric Power Plant: (rockfill dam, height: 169 m, installed
capacity: 2400 MW), Periodical dam monitoring and geodetical measurements, p reparation
of reports. Client: General Directorate of State Hydraulic Works (DSİ).

DERİNER Dam and Hydroelectric Power Plant: (double curvature arch dam, height: 249
m, installed capacity: 670 MW), Periodical dam monitoring and geodetical measurements, p
reparation of reports. Client: General Directorate of State Hydraulic Works (DSİ).

KÖPRÜBAŞI Dam and Hydroelectric Power Plant: Located at Mengen-Bolu-Filyos river.


Evaluation of the dam monitoring reports and preparation of the relevant reports. Client.
Yüksel Energy Electric Production and Trade Inc. Co.

Various:

UNIT PRICE DEFINITIONS and UNIT PRICE ANALYSES: Preparation for all units of a
construction for all pay items and supplies the unit prices, definitions and analysis, Client:
General Directorate of State Hydraulic Works (DSİ)

Due Diligence / Evaluation Services:

İZMİR-FAHRETTİN ALTAY TO NARLIDERE İSTİHKAM Metro Line: Preparation of “Due


Diligence Report” for the extension of the existing metro line from Fahrettin Altay to Narlidere
Istihkam which includes the construction of a 7.2-km extension and seven underground
stations linking the western districts of Izmir to the public transportation network (the
“Project”). The Izmir Metro A.S. (IM) is a municipal enterprise which is owned 100% by Izmir
Metropolitan Municipality (IMM). Client: EBRD (European Bank for Reconstruction and
Development).

ISTANBUL ATAKOY-İKITELLI Metro Line: Preparation of “Due Diligence Report” for


construction of Ataköy-İkitelli double lane Metro Line. Total underground alignment of 13.4
km in length. TBM, NATM and cut&cover type tunnel construction methods. Totally 12
underground stations and 1 depot area. Project cost 338 million Euro. Annual passenger
capacity 150 million. Client: EBRD (European Bank for Reconstruction and Development).

MANAVGAT Dam and HEPP Project: Preparation of the Due Diligence Report for the
optimization of Manavgat Dam and HEPP reservoir operation, identification of the ecologic
flow and preparation of Feasibility Report. Manavgat Dam has a height of 29,0 m the
installed capacity of the powerhouse is 48 MW and the annual energy production is 220
GWh. Client: Assan Alüminyum A.Ş.

AZMAK I, AZMAK II and KIRPILIK HEPP’s Project: Engineering and consultancy services
for the Due Diligence Study, before the procurement, Technical Due Diligence study,
determination of existing conditions, energy production study for existing and upstream
development conditions, identification of potential risks, proposals for rehabilitation, total
installed capacity 24,41 MWe, total annual energy production 217,55 GWh, S Type
horizontal axis kaplan turbine, Client: ENTEK Electricity Production Inc. Co.

ŞANLIURFA HEPP Project: Before privatization Technical Due Dilligence Study for
determination of existing conditions, energy production study for existing and future
conditions, identifying potential risks, Installed capacity 51 MWe, annual energy production
124 GWh, horizontal axis francis turbine. Client: Rönesans Energy Production Inc. Co.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 34


.

Transportation Projects: Due diligence engineering services. Port of MERSİN, Port of


İSKENDERUN, Client: Hutchison Port Holding + Halcrow

Energy Projects: Due diligence engineering services. Client: ENERJİ-SA, E.ON, Verbund,
OMW, Fortum, RWE Innogy GmbH, Anadolu Holding, Georgian Co-Investment Fund,
Borusan EnBW, ENEL Green Power, ALARKO-ALTEK, MNG Holding

Lender’s Technical/Environmental/Social Advisory Services:

ISTANBUL, Mandarin Oriental Bosphorus Hotel Project: Lender’s Technical Advisor


(LTA) services for evaluation and monitoring of project budget, time schedule, permits and
licenses, physical and financial progress, sub-contractors, HSE aspects and risks. The
project, which has 6 basement floors, ground floor and 2 above ground floors with total
closed area of 73.000 m2, is suited on the Bosphorus in Kuruçeşme district. Special
bosphorus-view suites, the exclusive presidential suite, a ball room with capacity for 800
people, 5 different sized meeting rooms, 2500 m2 SPA, restaurants and bars, 500 vehicle
capacity car park and many more unique and exclusive spaces are included in the hotel.
Client: Akbank T.A.Ş.

ISTANBUL, Marmara Forum Shopping Mall Improvement and Maintenance Project:


Lender’s Technical Advisor (LTA) services for evaluation and monitoring of design, project
budget, time schedule, permits and licenses, physical and financial progress, sub-
contractors, HSE aspects and risks. The total closed area of the shopping mall is
362.000 m2. Improvement and maintenance works include the structural revisions to
entrances and corridors to achieve a simpler design for optimal visitor flow, improvement of
look and feel of the mall through refurbishment (floors, ceiling, signage, furniture etc.),
catching up with new retail concepts driven by shopping as an experience (gastronomy,
terrace improvements, fitness center) and driving footfall growth through capitalizing on new
metro station and new municipality office. Client: Türkiye Garanti Bankasi A.Ş.

GEBZE – ORHANGAZİ – İZMİR (Including İzmit Bay Bridge) Motorway Project (3.1 km
suspension bridge + 407 km motorway): Client / Lenders: Akbank T.A.Ş., QNB
Finansbank A.Ş., T.C. Ziraat Bankası A.Ş., Garanti Bank International N.V., Türkiye Garanti
Bankası A.Ş., Türkiye Halk Bankası A.Ş., Türkiye İş Bankası A.Ş., Türkiye Vakıflar Bankası
T.A.O., Yapı ve Kredi Bankası A.Ş., Deutsche Bank AG, Bank of China Limited, The Saudi
National Commercial Bank, Siemens Bank GMBH.

İSTANBUL New Airport: Annual passenger capacity 160 million, 76.5 million m2 area, 165
passenger-boarding bridges, four terminals connected with a railway system, three
maintenance buildings, eight air traffic control towers, six runways, 16 taxiways, an airport
hangar of 6.5 million m2 with a capacity of 500 airplanes, a parking lot with a capacity of
about 70,000 vehicles, a clinic, fire department, hotels. Client/Lender: T.C. Ziraat Bankası
A.Ş., QNB Finansbank A.Ş., Türkiye Garanti Bankası A.Ş., Türkiye Vakıflar Bankası T.A.O,
Türkiye Halk Bankası A.Ş., Denizbank.

NORTHERN MARMARA Motorway Remaining Sections Project (KINALI-ODAYERI


&KURTKÖY AKYAZI): Project features are 198.29 km 2x4 motorway, 84.12 km 2x3
motorway link road, 26 viaduct (12 0005 m long, special construction methods; 1 mss, 2
push sliding viaducts), 8 twin tube 2x4 motorway tunnels (15 102 m long), 113 motorway
bridges, 40 interchanges, 11 service areas, 459 culverts, 80 overpasses, 105 underpasses,
ITS system. Services includes preparation of Due Diligence Reports for Pre Financial Close,
and Post Financial Close, Due Diligence Reports for monitoring during construction and
operation periods. Client / Lenders: QNB Finansbank A.Ş., Türkiye Garanti Bankası A.Ş.,
Türkiye Halk Bankası A.Ş., Türkiye İş Bankası A.Ş., Türkiye Vakıflar Bankası T.A.O, T.C.
Ziraat Bankası A.Ş.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 35


.

MENEMEN-ALİAĞA-ÇANDARLI Motorway Project: Project features are 51.9 km 2x3


motorway, 23 km 2x2 motorway link road, 7 motorway bridges, 15 interchanges, 6
intersections, 3 service areas. Assistance to the investor to submit a proposal for a Built –
Operation Transfer (BOT) project preparation of typical cross sections, design of bridges,
design of interchanges, design of motorway and generation of plan-profile, design of
culverts, design of drainage system, preparation of geotechnical reports of bridges,
motorway and interchanges, preparation of tender documents supervision of bidding
duration. Lenders: QNB Finansbank A.Ş., Türkiye Halk Bankası A.Ş., Türkiye
Vakıflar Bankası T.A.O., T.C. Ziraat Bankası A.Ş.

YUKARI KALEKÖY Dam (RCC, 150 m) and Hydroelectric Power Plant (3x201+29=632
MW) Project: including 68 km railway. Client Lender: Yapı ve Kredi Bankası A.Ş.,
Finansbank A.Ş., T.C. Ziraat Bankası A.Ş., Türkiye Halk Bankası A.Ş.

ISPARTA City Hospital: Integrated health campus investment under Public Private
Partnership (PPP) model with a total capacity 755 beds capacity, consisting of a 450 beds
General Hospital, 305 beds Woman’s and Children’s Hospital. It consists of 204 policlinics,
16 surgery rooms, 2 having an area 290 000 m2 project. Engineering and Consultancy
Services before final commitment, during construction phase and during operation phase
including Environmental, Social, H&S monitoring. Client/Lender: Türkiye İş Bankası A.Ş

PETKIM Container Terminal: It is located within the boundaries of İzmir Province and has a
capacity of 1.3 million TEU capacity, 1.0 million tones general cargo. Client/Lender: Akbank
T.A.Ş.

ESKIŞEHIR City Hospital: Integrated health campus investment under Public Private
Partnership (PPP) model with a total capacity 1081 beds capacity, consisting of a 715 beds
for General Hospital and Mental/Psychiatric clinic, 127 for Oncology, 139 for heart dispenses
and 100 beds for special psychiatric cases. It consists of 264 policlinics, 33 surgery rooms,
having an area 333 306 m2. Engineering and Consultancy Services before final commitment,
during construction phase and during operation phase including preparation of
Environmental and Social Due Diligence Report, Environmental and Social Management
Plan and Environmental, Social, H&S monitoring during construction and operation.
Client/Lender: Türkiye Garanti Bankası A.Ş.

MOMENT Business Center Project: Total of 30 floors consisting of 4 basements, 1 ground


floor, 1 suspended deck and 24 floors and total of 34 916 m2 and total of 30 floors
consisting of 4 basements, 1 ground floor, 1 suspended deck and 24 floors and total of 22
658 m2. Client/Lender: T.C. Ziraat Bankası A.Ş.

PARAVANI (Georgia) Hydro Power Plant Project: 87 MW run-of river power plant, 13.77
km tunnel, 32 km of 220 kV transmission line. Investor: Georgian Urban Energy Ltd.
(Anadolu Endüstri Holding A.Ş. and Anadolu Kafkasya Yatırımlar A.Ş.) Client/Lender: EBRD.

TEKIRDAĞ PPP City Hospital Project: Preparation of Preliminary Assessment Report,


Preparation of Monthly Physical and Financial Progress Reports during the investment
period and preparation of Operation Reports during the operation period. Health complex
project having a total of 480 beds consisting of 374 beds in Acute Care Unit (ACUT), 64
beds in Intensive Care Unit (ICU), 32 beds in Neonatal Intensive Care Unit (NICU), 8 beds
Prisoners Service, and 2 beds in Burn Treatment Unit. Client / Lender: QNB Finansbank.

AŞAĞI KALEKÖY Dam (RCC, 122,5 m) and Hydroelectric Power Plant (3x158,66 +
34,22 = 510 MW) Project: Client: Türkiye Garanti Bankası A.Ş.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 36


.

BOYABAT Dam (concrete gravity, 190 m) and Hydroelectric Power Plant (528 MW)
Project: Client/Lender: Türkiye Sınai Kalkınma Bankası A.Ş., Yapı ve Kredi Bankası A.Ş.,
Türkiye Garanti Bankası A.Ş., Türkiye İş Bankası A.Ş.

TAURUS (LAVITA) Shopping Mall Project (50 000 m2): Client/Lender: T.C. Ziraat Bankası

KAYABAŞI Weir and Hydroelectric Powar Plant: A weir and a hydrolelectric power plant
project (3.37 MW) to be constructed on Sakaltutan creek. Client/Lender: Türkiye Cumhuriyeti
Ziraat Bankası A.Ş.

ALMUS-KÖKLÜCE Hydroelectric Power Plant Project: A project comprising of


hydroelectric power plants having a total (27+90) 117 MW at Tokat. Client/Lender: Türkiye
Cumhuriyeti Ziraat Bankası A.Ş., Türkiye İş Bankası A.Ş., Türkiye Sınai Kalkınma Bankası
A.Ş.

EGE 2, 3, 4 Hydroelectric Power Plant Project: Project comprises of the civil, electrical,
mechanical works, operation, maintenance activites of the EGE 2, 3 and 4 hydroelectric
power plants. Client/Lender: Akbank T.A.Ş.

KAYSERİ ERCİYES-4A Boutique Hotel and G2 Daily Operational Trade Facility Project:
Client/Lender: T.C. Ziraat Bankası A.Ş.

BEYHANI I Dam (RCC, 97 m) and Hydroelectric Power Plant (3x201+29=550 MW)


Project: Client Lender: Yapı ve Kredi Bankası A.Ş., Türkiye İş Bankası A.Ş.

ALKUMRU Dam (clay core rockfill, 134 m) and Hydroelectric Power Plant (260 MW)
Project: Client/Lender: Yapı ve Kredi Bankası A.Ş. + Türkiye İş Bankası A.Ş.

UZUNÇAYIR Dam (sand + gravel fill, 70 m) and Hydroelectric Power Plant (90 MW)
Project: Client/Lender: Türkiye İş Bankası A.Ş.

ADUAŞ Project (Beyköy HEPP (16.8 MW) , Çıldır HEPP (15.36 MW) , Ataköy HEPP (5.5
MW), Kuzgun HEPP (20.9 MW), Mercan HEPP (20.4 MW) , Tercan HEPP (15 MW),
İkizdere HEPP (18.6+60 MW), Denizli Kızıldere Geothermal Power Plant (15+60 MW)):
Client/Lender: Türkiye Garanti Bankası A.Ş. + Akbank T.A.Ş.

BAĞIŞTAŞ I Dam (61 m) and Hydroelectric Power Plant (122 MW) Project:
Client/Lender: Yapı ve Kredi Bankası A.Ş.

PEMBELİK Dam (RCC, 90 m) and Hydroelectric Power Plant (122.4 MW) Project:
Client/Lender: Yapı ve Kredi Bankası A.Ş.

TATAR Dam (sand+gravel fill, 84 m) and Hydroelectric Power Plant (115.8 MW)
Project: Client/Lender: Yapı ve Kredi Bankası A.Ş.

ASLANCIK Dam (Concrete gravity, 29 m, 2 x 60 = 120 MW) and Hydroelectric Power


Plant Project: Client/Lender: Türkiye Sınai Kalkınma Bankası A.Ş., Türkiye İş Bankası A.Ş.,
Türkiye Garanti Bankası A.Ş., Yapı ve Kredi Bankası A.Ş.

YAVUZ and MİDİLLİ Hydroelectric Power Plant (23.4 MW + 33.4 MW) Project:
Client/Lender: Yapı ve Kredi Bankası A.Ş.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 37


.

EREN Weir and Hydroelectric Power Plant (37 MW) Project: Client: Turkiye İş Bankası
A.Ş.

BOZTEPE Hydroelectric Power Plant (13 MW) Project: Client/Lenders: Yapı ve Kredi
Bankası A.Ş.

KİRAZLIK Dam and Hydroelectric Power Plant Project: Client/Lender: Denizbank A.Ş. +
Türkiye İş Bankası A.Ş.

AYVALI Dam (RCC, 177m) and Hydroelectric Power Plant (118,60 MW) Project:
Client/Lender: Türkiye Garanti Bankası A.Ş.

GÜVERCİN Weir and Hydroelectric Power Plant (16,32 MW) Project: Client/Lender: Yapı
ve Kredi Bankası A.Ş.

DELİÇAY Weir and Hydroelectric Power Plants (31,90 MW + 12,60 MW) Project:
Client/Lender: Yapı ve Kredi Bankası A.Ş.

CEMEL I-II Hydroelectric Power Plants (6.8 MW + 6.6 MW) and ÇAMLICA Hydroelectric
Power Plant (17.85 MW) Project: Client/Lender: Türkiye İş Bankası A.Ş.

DAMLA and SUDE Weirs and Hydroelectric Power Plants (6.12 MW + 6.32 MW)
Project: Client/Lender: Yapı ve Kredi Bankası A.Ş.

AVANOS Weir and CEMEL III Hydroelectric Power Plant (6.59 MW) Project:
Client/Lender: Türkiye İş Bankası A.Ş.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 38


.

8 EXPERIENCE IN THE FIELD OF WATER RESOURCES PROJECTS

DOLSAR is the leading engineering firm in Turkey in the


field of water resources development and management.
Firm’s remarkable vast amount of experience covering a
period of more than 40 years in this field can be
summarized as follows:

 DOLSAR has performed engineering services for more than 100 dams of various
types with the heights ranging from few meters up to 273 m.

 DOLSAR has performed engineering services for more than 100 hydroelectric power
plants with heads ranging from 5 m to 650 m with a total installed capacity of some
15000 MW.

 DOLSAR has performed engineering services for small and large scale irrigation
projects covering an area of about 2 million hectares.

 DOLSAR has performed engineering services for water supply, waste water,
sewerage and storm water projects of many cities including some large cities with
population more than 2 million.

 DOLSAR has performed engineering services for water conveyance tunnels including
one of the longest water tunnels in the world.

 DOLSAR has performed engineering services for water supply and distribution
projects of many cities including some large cities such as Ankara, Adana and İzmir.

DOLSAR ENGINEERING - INTRODUCTION AND GENERAL EXPERIENCE 39


.

9. MAJOR PROJECTS
 Dasu Dam & Hydroelectric Power Plant Project : The
project, comprising a RCC dam of 242 m high and a
power plant of 4320 MW, is the key project of Pakistan
and one of the largest hydropower developments of the
world. The Project is located at 7 km North of Dasu
village in the Kohistan District of the Khyber

Pakhtunkhwa Province, and 350 km North from Islamabad, the


capital city of Pakistan. The RCC fill volume is 4.08 x 106 m3.
The investment cost of the project is USD 5-6 billion. DOLSAR
has been involved in the services covering the preparation of
the revised feasibility study, detailed engineering design,
bidding documents and ESIA studies. DOLSAR is currently
performing contract management and construction
supervision services.

 Atatürk Dam & Hydroelectric Power Plant Project : The project, comprising a rock fill dam of
169 m high and a power plant of 2400 MW, is the key
project of the Southeastern Anatolia Project (GAP)
which is the most ambitious regional development
project in the world. With the realization of the project
8.9 billion kWh of energy is produced annually and in
addition to this, an area of 900,000 hectares will be
irrigated. The power plant is the biggest hydropower
plant in Turkey and ranked 23rd in the world. With
respect to its volume (84.5 mio m3, height (169 m)
3
and reservoir capacity (48.7 bio m ), the dam is ranked 6th, 13th and 20th respectively in the
world. DOLSAR has been involved in the services covering the planning and preparation of
final design, contract documents, technical specifications. DOLSAR also performed
construction supervision, engineering, consultancy and commissioning services. The dam
and HEPP is in operation since 1992.

 Karakaya Dam & Hydroelectric Power Plant Project: The project


comprises a 174 m high concrete gravity dam and a power plant of 1800 MW.
The power plant produces 7.4 billion kWh of energy annually and is the
second largest hydropower plant in Turkey. DOLSAR has been involved in the
services covering the planning, preparation of final design, contract
documents, technical specifications and loan application report and also
performed construction supervision, engineering, consultancy and
DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 40
.

commissioning services. The dam and HEPP is in operation since 1987.

 Keban Dam & Hydroelectric Power Plant Project: The


project is located 10 km downstream of the confluence of
Karasu and Murat rivers and comprises a 211 high dam and a
1340 MW capacity hydroelectric power plant with 8 units.
DOLSAR had prepared the detailed drawings of units 5,6,7
and 8 and also performed the engineering and construction
supervision services during the construction and erection of
these units. The dam and HEPP is in operation since 1975.

 Deriner Dam & Hydroelectric Power Plant Project: The


project comprises 249 m high double curvature concrete arch
dam and an underground power plant of 670 MW. The power
plant will produce 2.1 billion kWh of energy per annum. With
respect to its height the dam is ranked 5th among the concrete
dams in the world. DOLSAR has been involved in the services
covering the preparation of final design, technical
specifications, as well as construction supervision,
engineering, consultancy and commissioning services. The
dam and power plant is in operation since 2013.

 Hakkari Dam & Hydroelectric Power Plant Project: Hakkari project is the first of the three
consecutive dam and hydroelectric power plant projects planned to be constructed on the Zap River
in the south eastern Anatolia. Hakkari project comprises a rock fill
dam of 220 m from the foundation and an underground power plant
with an installed capacity of 190 MW. The power plant will produce
648 million kWh per year. DOLSAR performed the services covering
the revision and update of feasibility study, final design,
preparation of contract documents, technical specifications, loan
application report and environmental impact assessment report.

 Ilısu Dam & Hydroelectric Power Plant Project: The project


comprises 136 m high concrete faced rockfill dam (CFRD) and a
hydroelectric power plant of 1200 MW comprising six 200 MW units.
The power plant will produce 3.8 billion kWh of energy per annum.
The power plant will be the 4th largest hydroelectric power plant
after Atatürk, Karakaya and Keban hydroelectric power plants.
DOLSAR will perform the engineering and consultancy services
including construction supervision, preliminary and final

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 41


.

acceptances, as built drawings and commissioning. The contract related to the civil works
and supply/erection of electromechanical equipment was signed in August 2007. The dam and
HEPP is under construction since 2008 and the completion is more than 80%.

 Ermenek Dam & Hydroelectric Power Plant Project: Ermenek project is located on the Göksu
river and comprises a concrete thin arc dam 230 m high above the foundation and an
hydroelectric power plant with an installed capacity of 320 MW which will produce an energy of
1.04 billion kWh/year. DOLSAR had performed the services covering the revision of feasibility
study, preparation of the final design, contract documents, technical specifications, loan
application report and environmental impact assessment report and currently prepares the
detailed drawings for the project including the roads. The dam and HEPP is under in operation
since 2012.

 Hasan Uğurlu Dam & Hydroelectric Power Plant Project: The


project comprises a 179 m rock fill dam and an underground
power plant of 500 MW with five units. The power plant produces
1.2 billion kWh of energy per annum and is the first underground
hydroelectric power plant constructed in Turkey. DOLSAR has
prepared the detailed drawings (civil, architectural, mechanical,
and electrical) for all the underground structures including the
power plant, transformer hall, water intake structures, switchyard
and etc. The project is in operation since 1981.

 Borçka Dam & Hydroelectric Power Plant Project: The project is located on Çoruh river and
comprises a rockfill dam of 93 m high the foundation and a
hydroelectric power plant of 300 MW installed capacity with 2
units which will produce an annual energy of 1.04 billion kWh.
DOLSAR has revised the feasibility study and prepared the
final design, contract documents, technical specifications,
and loan application report. The dam and HEPP is under
construction since 1998 and will start operation in 2006.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 42


.

 Muratlı Dam & Hydroelectric Power Plant Project: The


project comprises a 44 m high concrete face rock fill dam
(CFRD) and a power plant of 115 MW with two units. The
power plant produces 444 million kWh of energy per annum.
DOLSAR has revised the feasibility study and prepared the
final design, contract documents, technical
specifications, and loan application report. The project is
in operation since 2005.

 Şanlıurfa Hydroelectric Power Plant Project: The project is located at the outlet of the
Şanlıurfa Tunnels, for which the engineering services were also
performed by DOLSAR. Power plant has an installed capacity
of 50 MW and produces 124 million kWh of energy per year.
DOLSAR had prepared the final design, contract documents,
technical specifications, and also performed construction
supervision, engineering, consultancy and commissioning
services. The HEPP will start operation in 2006.

 Buğra Weir and Kızılırmak-Hamzalı Hydroelectric Power Plant Project: Buğra Weir and
Kızılırmak-Hamzalı Hydroelectric Power Plant Project is located on Kızılırmak river one of the
biggest and longest rivers of Turkey. Buğra Weir is located at 609 m thalweg elevation, equipped
with 10 radial gates and has a maximum water level of 615.50 m. The water is conveyed to the
power plant by first 17850 m conveyance channel, then through forebay of 62 x 70 m in size and
finally by 2 penstocks each 80 m in length and 3.30 m in diameter. The power plant with an
installed capacity of 17 MW has two Kaplan units each with 8.5 MW capacity producing 127
million kWh of energy per year.

This project is implemented by a private investor under the Turkish Energy Market Law and has
started operation in 2008. In relation with this project DOLSAR has prepared the feasibility
report, final design (civil, architectural, mechanical, electrical, geological), technical
specifications and detailed drawings. DOLSAR also performed the consultancy services
during the construction and erection of the permanent equipment.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 43


.

 Tohma Hydroelectric Power Plant Project: Tohma HEPP is located on Tohma river, 6km
downstream of Medik dam and has two units with an installed capacity of 12.5 MW. This project
is implemented by a private investor under the BOT regulation and it is in operation since 1999.
In relation with this project DOLSAR has prepared the feasibility report, final design (civil,
architectural, mechanical, electrical, geological), technical specifications and detailed
drawings. DOLSAR also performed the construction supervision services during the
construction and erection of the permanent equipment.

 Berdan Hydroelectric Power Plant Project: Berdan HEPP is located on Berdan river, next to
the Berdan dam and has two units with an installed capacity of 10 MW. This project is
implemented by a private investor under the BOT regulation and it is in operation since 1996. In
relation with this project DOLSAR has prepared the feasibility report, final design (civil,
architectural, mechanical, electrical, geological), technical specifications and detailed
drawings. DOLSAR also performed the construction supervision services during the
construction and erection of the permanent equipment.

 Gönen Hydroelectric Power Plant Project: Gönen HEPP is located on Gönen river, next to the
Gönen dam and has two units with an installed capacity of 10.6 MW. This project is implemented
by a private investor under the BOT regulation and it is in operation since 1998. In relation with
this project DOLSAR has prepared the feasibility report, final design (civil, architectural,
mechanical, electrical, geological), technical specifications, loan application report and
contract documents. DOLSAR also performed the construction supervision services during
the construction and erection of the permanent equipment.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 44


.

 Pamukova Hydroelectric Power Plant Project: Pamukova HEPP is located on Sakarya river, 7
km southwest of Pamukova province situated on the right bank of Pamukova weir and has three
units with an installed capacity of 9.3 MW. This project is implemented by a private investor under
the auto producer regulation and it is in operation since 2000. In relation with this project
DOLSAR has prepared the feasibility report, final design (civil, architectural, mechanical,
electrical, geological), technical specifications, loan application report and contract
documents. DOLSAR also performed the construction supervision services during the
construction and erection of the permanent equipment.

 Konya-Çumra Stage III Irrigation Project: Services performed cover the engineering services
for the flood control, irrigation of 251,000 ha land in Konya closed basin, discharge facility of
Konya main drainage channel and energy production. Project also included the preparation of
Environmental Impact Assessment Report.

 Management, Operation and Maintenance of GAP Irrigation


Systems (GAP-MOM): A multi-purpose project including the
identification of the most appropriate management, operation and
maintenance model for the irrigation systems in 1.7 million hectares
land to be irrigated, implementation of the identified model, provision
of necessary training services, monitoring of results related with the
model and making necessary modification and proposals. The
purpose of the project are summarized as follows:

 Maximize the farmer’s income and accelerate social development


the region

 Increase the water use efficiency and obtain higher yield per unit area, thus maximum
income,

 Minimise irrigation management, costs and identify an organizational model to maximise


farmer’s contribution to operate the irrigation systems,

 Secure sustainability of the irrigation system and agricultural activities,

 Provide precautionary measures to reduce the adverse effects of irrigation on the


environment,

 Monitor and evaluate all implementations as from the commencement of the project.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 45


.

The project has been executed in two stages. During the first stage of the project various
reports as well as management, operation and maintenance manuals were prepared. Some
of the reports prepared are as follows:

Water charges and revenue collection, Agronomic factors, Assessment of current irrigation
projects in Turkey, Review of the scope for environmental studies, Assessments of potential
impact upon ecology, Institutional framework, Legislations relevant to irrigation development,
Impact monitoring Systems-proposed approach and implementation, Farmer support service,
Hydraulic modelling, Drainage requirements, Hydrology and water resources modelling, Planning
the training programme, Credit, marketing and inputs, Review of Groundwater Resources in the
Harran and Ceylanpınar Plains, Environmental Health, Soil Conservation and Water Quality,
Socio-economic Studies, Assessment of Current Engineering Designs and Practices, Potential
Impact of Large Scale Irrigation Development in the GAP Region, Hydraulic Modelling of
Irrigation Systems, Effect of Irrigation of Farm Budgets, Water Balance Study.

During the second stage of the project services such as; water management techniques, on-
farm water management, training of technical staff, training of farmers, demonstrators,
and monitoring & evaluation are provided.

The Owner of the project was Prime Ministry, Southeastern Anatolia Project Regional
Development Administrative.

 Euphrates-Karasu Master Plan Study: During the Fırat (Euphrates) - Karasu Basin Master Plan
Studies various alternatives were considered and eventually a formulation consisting of 7 dams
and hydroelectric power plants has been proposed. According to this formulation 2.3 billion kWh
of energy will be produced annually versus 576 MW of installed total capacity. Furthermore, the
Sivas-Erzurum railway has been relocated within the scope of the studies.

 Adana Water Supply Project: With this project it is planned to meet the water demand of about
4 million inhabitants in 2040 by the water which will be diverted from Çatalan Dam. The project
consists of intake structure and tunnel, 20 km long water transmission line, treatment plant,
water tanks, pumping station and a mains distribution network approximately 500 km
long. Furthermore, the Loan Application Report and Preliminary Environmental Impact
Assessment Report have also been prepared within the scope of the project.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 46


.

 Şanlıurfa Tunnels Project: This project comprises two parallel 7.62


m tunnels, each 26.4 km long. These tunnels with a total length of
52.8 km and with a total capacity of 328 m3/s are among the
longest irrigation tunnels in the world. The services performed
for this project include feasibility study, preparation of final
design andtechnical specifications and supervision for
construction and equipment hydromechanical erection works.

 Ankara Water Supply Project: This project aims to meet the drinking, domestic and industrial
water demand of 7 million inhabitants in the target year of 2050. The project is divided into two
phases. The first phase, which will be commissioned in 2004 and called the Gerede system,
consists of the Işıklı and Körler Dams about 65 km of water transmission lines, 44 and 41 MW
pumping stations, Çamlıdere hydroelectric power plant, and expansion of Ivedik Treatment Plan.
The second phase which will be commissioned at a later date and called the Kızılırmak system,
consists of a water transmission lines some 63 km long, two pumping stations of 73 and 88 MW
respectively, intermediate storage facilities, hydroelectric power plant and a new treatment plant.
Within the scope of this project the Master Plan and Feasibility studies have been conducted.

 Keban Hydroelectric Power Plant Rehabilitation Project:

Keban Hydroelectric Power Plant is the third biggest


hydroelectric power plant in Turkey. It is located on Euphrates
River and with 1330 MW installed capacity it produces 6.6
billion kWh of energy per year. The first 4 units (Keban 1)
each with 157.5 MW capacity were commissioned in 1974
and the remaining 4 units each with 175 MW capacity were
commissioned in 1982. DOLSAR performs the engineering
and consultancy services related to the rehabilitation and
modernisation of the power plant. Services comprise
preparation of the feasibility report, conduction of
performance tests, preparation of technical specifications
and tender documents, evaluation of the tenders of the
contractors, participation to contract negotiations,
supervision of design and erection, performance of tests
and commissioning.

 Diyarbakır Sewerage and Storm Water Drainage Project: Within


the scope of the project a sewerage network totaling 740 km and
a main collector system of 4.5 km have been designed for a
population of 2.5 million people. The total design discharge is 17

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 47


.
3
m /s. The project also included the design of the storm water
drainage system.

 Artvin-Erzurum State Highway : Engineering and Consultancy Services: A state highway of


about 28 km between Artvin and Erzurum (km 40+750.000 –km 68+502.214) consisting of the
following structures: 13 tunnels with a total length of 6.25 km (T1 Öcübet Tunnel-99.75 m, T2
Zeytinlik Tunnel 274.00 m, T3 Kapan-1 Tunnel 699.50 m, T4 Kapan-2 Tunnel 262.00 m, T5
Karataş Tunnel 1475.50 m, T6 Eskikışla Tunnel 339.50 m, T7 Cinsaklı Tunnel 178,50m, T8 Elevit
Tunnel 293.25 m, T9 Kale Tunnel 386.00 m, T10 Ötekibağ Tunnel 155.50 m, T11 Sameli Tunnel
1472.75 m, T12 Zeytincik Tunnel 122.50 m, T13 Yarbaşı Tunnel 486.00 m); 8 bridges with
different spans (K1 Kınalı Bridge

70.96 m, K2 Büyükdere Bridge


60.00 m, K3 Hohmele Bridge
91.26 m, K4 Çermik Bridge 111.20
m, K5 Sarıbudak Bridge 149.35 m,
K6 Karıncalı Bridge 46.83 m, K7
Tilyan Bridge 93.22 m, K8 Dağtat
Bridge 72.00 m); 4 balanced
cantilever bridges (V1 Budan
Viaduct 350 m, V2 Segan Viaduct
190.00 m, V3 Akarsın Viaduct
275.00 m, Berta Bridge 340 m); 3
viaducts with a total length of 750
m (V4 Narlık Viaduct 263.65 m, V5
Yarbaşı Viaduct 225.50 m, V6
Yağcılar Viaduct 263.60 m) and
retaining wall of a total length of
6.5 km.

DOLSAR performed the following services: Engineering and consultancy, preparation of the
map by photogrammetric surveying, longitudinal section from numerical terrain model, cross
section from numerical terrain model, layout preparation, project geometry, hydraulic and
hydrological surveys, geological and geotechnical investigations, engineering geology, drillings,
soil investigations and laboratory works, design and preparation of application drawings of
bridges, road, tunnels, retaining structures, viaducts, electrification, communication, signalization,
lighting, CCTV, ,ventilation, fire fighting and security systems in tunnels, mechanical works, bill of
quantities, cost estimates.

The Client was General Directorate of Turkish Highway Authority (TCK) and General Directorate
of State Hydraulic Works (DSİ).
DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 48
.

Yeşilırmak Basin Regional Development


Project: Project covers the NUTS II Region
including 4 provinces; Amasya, Çorum,
Samsun and Tokat. Project scope includes
determination and analysis of the existing
economical, social and infrastructural status
in the region, developing strategies and
scenarios, and preparation of the Regional
Development Plan for 5, 10 and 20 year
terms, covering all the sectors according to
the selected scenario. The project scope also covers preparation of pre feasibility studies basing
on the main plan. The population of the area under the study is 3 million according to the latest
census conducted in 2000.

Yesilırmak Basin Development Project aims the preparation of a most favourable and economical
planning without disturbing the ecological balance, up to day monitoring and management of
natural resources in order to reduce the difference with respect to socio-economic development
existing with the region under planning and other regions and improve the existing productivity
and welfare as well as its participation in the economic conditions in Turkey

The services provided by DOLSAR are as follows: preparation of existing situation and
analysis report, in the following main sectors and sub sectors; (i) Social Structure
(demographics, migration, education, health, culture, women and strengthening of family, income
distribution, employment, labour life and social security services, poverty, non-governmental
organizations and institutionalization), (ii) Economical Structure (agricultural production,
stockbreeding, forestry, fishery, water and land resources, water supply, industry, mining, energy,
transportation, communication, construction, services, tourism, financial structure and banking,
trade, public investments), (iii) Urban and Rural Infrastructure (water resources, their usage
and sewerage, storm water, energy, communication, transport, corridor development, inter model
transport, traffic forecasting, settlement pattern and urbanization, housing, disaster risks and
proneness to earthquake, GIS modelling), (iv) Environment (environmental pollution and
pollutant sources, water contamination, air pollution, noise pollution, soil contamination, erosion,
flora, fauna, hydrophilic /aquatic organisms and watery fields).

Development of simulation model for water supply and demand balance in Yeşilırmak river basin,
evaluation of the best use of the water potential is achieved, preparation of strategy and
restructuring scenarios, preparation of Regional Development Main Plan, preparation of pre
feasibility studies for selected investments for each city are also performed under the scope of
the study. The Owner was State Planning Organization (SPO) of Turkey.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 49


.

 Drought Management Plan of the


Konya Basin: Consultancy services to
establish Drought Management Plan for
the Konya Closed Basin (50 000 km²), on
the basis of integrated river basin
management approach considering
water budget and vulnerability to
droughts that includes measures for
drought mitigation and prevention of the
impacts of water scarcity on production
resources and socio-economical life;
drought and water scarcity indicators and
their threshold values to secure wise and
sustainable use of limited water resources, and accordingly, measures to be taken before-,
during- and after-drought. Services cover the following:

 Drought analyses performed by utilizing the indices that are appropriate for basin
conditions; and drought vulnerability of the basin are determined.

 Regional climate models ran for 2015-2050 period and meteorological parameters such as
temperature, precipitation, evaporation are estimated.

 The basin is simulated by hydrological and hydrogeological modelling approach and water
budget is computed for projected periods.

 Drought vulnerability on four main sectors (municipal water, agriculture, industry and
ecosystem) is analyzed.

 Suggestions are presented for sustainable use of available water resources under existing
conditions and different drought severity conditions, considering sectoral vulnerability
assessment.

 Economic, social and environmental impacts of expected drought conditions are


determined. Drought-oriented problems and their impacts are evaluated and reported
along with solution recommendations.

 An action plan which includes measures to be taken before-, during- and after-drought
conditions for drought mitigation and measures for optimum use and savings of water
resources is established.

 A Conceptual management organization is established to take actions and inspect them


considering institutional and legal framework.

 A Drought Database which enables monitoring of indicators and their threshold values is
established for drought mitigation and prevention of water scarcity.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 50


.

 Development of Derince Port: Derince Port


located in İzmit Gulf which is operated by TCDD
General Directorate. The port has been established
for handling load groups such as dry bulk cargo,
general cargo, container and RO–RO loads and
1,314,688 tons, 698,861 and 673,794 tons of
loads respectively has been handled in 1998, 1999
and 2000. In this region, there are automobile
factories and also other factories relating to various
load groups are located in the surroundings.
Derince Port is the greatest port of the gulf in terms
of both of the diversity of services, the background
and the quay infrastructures.

The services provided by DOLSAR are: (i) forecast of traffic flows: reviewof the traffic
forecasts and port requirements, carrying out an appropriate market study for Marmara Sea and
IZMIT BAY region for different types of cargo using Porter’s 5 forces analysis, evaluating present
flow of traffics to existing ports in the region, developing mid-term (5- 10 years) and long-term (15
– 20 years) scenarios, (ii) Port location - best option, environmental impacts: critically assessing
the potential of Derince Port location compared to other potential port locations, assessing
external port conditions, e.g. transport to and from (sea, road, rail), power supply, employment
and etc., identifying and justifying best port location, with the help of SWOT analysis, review
existing designs for port, prepare options for port layouts in line with needs identified for mid-term
and long-term port development, incl. connection to different transport modes, quay types and
depths, crane rail locations and all other features, assessing environmental impacts and identify
appropriate mitigating measures, preparing a first environmental impact assessment in line with
national and EU EIA Directive requirements, estimating cost of construction, extension and
rehabilitation, preparing an economic and financial analysis, basing on full cost recovery, cash
flow, profit and loss and balance sheet projection, (iii) Investment programme, implementation
schedule and finance plan: developing investment programme, spliting into mid-term and long –
term development, determining national and international works and equipment supplies,
developing implementation schedule, developing finance plan, propose a procurement plan,
(iv) Proposing most appropriate port management concept and justifying proposal, (v) Terms of
References for further studies, developing Terms of References for further studies,
environmental impact assessment, feasibility studies, final designs, economic, financial and tariff
studies, etc.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 51


.

 Seven Run-off River Hydroelectric Power


Plant Projects on Bosnia River (in Bosnia
Herzegovina): 7 hydropower projects using
44.36 m head for energy generation
between Doboj and Modrica on Bosnia river.
For each project the structures consist of
diversion dam, powerhouse, spillway, stilling
basin, fish ladder and stoplog areas. In the
scope of the services, dikes were planned to
protect the agricultural lands from 100 years floods
on the upstream of the diversion dams. The names
of the projects and their installed capacities are;
Doboj (2x4.20=8.40 MW), Cijevna 1
(2x7.05=14.10 MW), Cijevna 2 (2x7.10=14.20
MW), Civejna 3 (2x6.95=13.90 MW), Cijevna 5
(2x6.60=13.20 MW), Civejna 6 (2x6.45=12.90 MW)
making a total of 90.59 MW with an annual average energy production of 438.8 GWh. Types of
the turbines are specified as bulb. The the Client is Alpine Bau of Austria. DOLSAR has
performed the optimization studies, prepared the technical reports as well as the basic
calculations for hydraulics and stability of structures. The basic/conceptual design is
prepared with relevant drawings and bill of quantities including excavation works, backfilling,
concrete works, access roads, side dikes, powerhouse architectural finishing, switchyard and
pump stations.

 Turkish Republic of Northern Cyprus (TRNC)


Portable Water Supply Project: The purpose of the
project is to convey 75 Mio m3 water per year to TRNC
(Turkish Republic of Northern Cyprus) from Turkey in
order to meet the existing domestic water demand
shortage and to irrigate 7700 ha of land where wet
farming is limited to only 4% of the total land of TRNC.
Thus the project provides substantial contribution to the
development of TRNC. The project consists of the
following structures:

On the Turkish Side:

 Alaköprü Dam; upstream concrete faced rockfill dam with a height of 87 m having energy,
domestic water supply and irrigation purposes.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 52


.
 21 788 m long conveyance pipeline between Alaköprü Dam and Anamurium Balancing
Chamber, composed of ductile iron pipe of 1500 mm diameter with a capacity of 2.38 m³/s.

 Anamurium Balancing Chamber (V= 10 000 m³)

 858 m long conveyance pipeline between Anamurium Balancing Chamber and Sea
Entrance Valve Chambers, composed of ductile iron pipe of 1500 mm diameter.

Mediterranean Sea Crossing:

 80 152 m long suspended pipeline, composed of high density polyethylene pipe of 1600
m diameter with a maximum depth of 250 m below the sea level.

On the Cyprus Side:

 Güzelyalı Pumping Station with a capacity of 3.20 MW.

 3 095 m long pipeline between Güzelyalı Pumping Station and Geçitköy Dam, composed
of ductile iron pipe of 1400 mm diameter.

 Geçitköy Dam; central clay core rockfill dam with a height of 58 m having; domestic water
supply and irrigation purposes.

 Geçitköy Pumping Station with a capacity of 12.80 MW.

The engineering services for the project is given to ALSİM ALARKO by a Council Minister’s
Degree no:98/11202 dated May 1998.

During the I. Stage of the project, the Feasibility Report for the project is prepared by DOLSAR.
During the II Stage of the project, DOLSAR prepared the technical design criteria, final design
and application drawings (including all civil, mechanical, electrical, hydromechanical, geological
drawings), design reports, technical specifications, bill of quantities, cost estimates and
tender documents of the onshore structures including roads of the project. Environmental
Impact Assessment Report (EIAR) for the project is also prepared by DOLSAR.

 Turkmenistan Water Supply and Sanitation Project: The overall objectives of the study for the
Turkmenistan Water Supply and Sanitation Project were to (1) provide baseline information on
socio-economic conditions, water supply, hygiene and sanitation practices in the area, (2) to help
identify suitable locations for planned pilot projects on sanitation methods in schools and for
standpipe repair, and (3) to help identify the most critical interventions to be undertaken
immediately to improve the water supply and sanitation situation in the project area. The Owner
of the project is Ministry of Land Reclamation and Water Management of Turkmenistan.

Studies conducted by DOLSAR are mainly on the following topics.

 Water Supply: Urban Water Supply, Rural Water Supply

 Sanitation : Disposal and Sewerage, Assessment of Current Practices, Alternative Designs

 Public Health: Assessment of the Existing Situation, Project Activities,


DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 53
.
 Institutional Review

 Environmental Review

 Demonstration Projects

DOLSAR has acted as a subconsultant to the main engineering company for the performance of
the engineering and consultancy services.

 Kishanganga Dam and HEPP (Jammu and


Kashmere, Hindistan): The project has a total
gross head of 600 m and composed of 35 m high
concrete face rockfill dam (CFRD) founded on
30 m thick alluvium layer, diversion tunnel having
a diameter of 6.5 m and length of 560 m, totally
23.5 km long power tunnel of which 8.75 km (5.4
m diameter, horseshoe cross section) is to be
excavated by drill&blast method whereas the
remaining 14.75 km (5.20 m diameter, circular
cross section) will be excavated by TBM,
underground powerhouse with an installed capacity of 330 MW. Client: Gammon India Limited
(Mumbai, India) and National Hydro Power Corporation (NHPC, Faridabad, India).

DOLSAR prepared the tender/conceptual design and prepared the bill of quantities of the project.

 Lata Tapovan Barrage and HEPP (Uttarakhand State,


India): The project has a barrage structure with 12 no.s
11x13.2 m radial gates, total spillway capacity of 2000
m3/s and height of 20 m, continuous flushing desilting
basin of 79.25 m3/s discharge capacity and 600 m long silt
fluhing tunnel, 7.3 km long and 4.8 m diameter modified
horseshoe cross section power tunnel, 7 m diameter 137
m high surge tank, power caven with an installed capacity
of 171 MW, transformer cavern and tailwater tunnel. Client:
Gammon India Limited (Mumbai, India) and National
Thermal Power Corporation Hydro Limited (NTPC Hydro
Limited, Noida, India).

DOLSAR prepared the tender/ conceptual design and prepared the bill of quantities of the
project.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 54


.
 Rammam Stage III HEPP (West Bengal and
Sikkim States, India): The project has a 32 m
high gravity type concrete dam with 5 no.s 11x7
m radial gates, total spillway capacity of 1825
m3/s, continuous flushing 2 desilting chambers
having 12x7.5x140 m dimensions and total 33
m3/s discharge capacity 200 m long silt flushing
tunnel, 8.2 km long and 3.5 m diameter modified
horseshoe cross section power tunnel, 14.5 m
diameter 52 m high surge tank, surface type
power house with an installed capacity of 120
MW and 750 m long tailrace channel. Client:

Gammon India Limited (Mumbai, India) and National Thermal Power Corporation Hydro Limited
(NTPC Hydro Limited, Noida, India).

DOLSAR prepared the tender/conceptual design and prepared the bill of quantities of
the project.

 Special Assistance for Project


Implementation (SAPI) for the Provincial
Cities Water Supply and Sewerage Project in
the Republic of Azerbaijan: With regard to
water supply and sewerage sector in the
Republic of Azerbaijan, water supply coverage
ratio of the capital city of Baku is estimated to
be 95%, while that of provincial cities is only
approx. 33% and 24 hours continuous water
supply is not performed in the most cities. The
existing water supply and sewerage facilities
were constructed in the former Soviet Union
era. However, operation and maintenance of
the facilities were not done appropriately due to
lack of finance since several years back from
the year 1991 when the former Soviet Union
collapsed. As a result, the water supply facilities
including pipes and machineries have become
decrepit and repair and rehabilitation has not
been done properly, that resulted in
malfunctioning of most facilities.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 55


.
The Government of Azerbaijan requested to the Government of Japan for improvement of water
supply and sewerage facilities (new construction and rehabilitation) and strengthening of project
management as well as operation and maintenance techniques in the 10 provincial cities, namely
Sirvan, Salyan Neftchala, Khachmaz, Barda, Yevlakh, Khizi, Gusar, Gobustan and Naftalan.

The main objectives of this study is to identify the current situation and examine the technical
issues in the two provincial cities of Khachmaz and Gusar, to collect basic information necessary
for detailed design and to realize prompt and smooth implementation of the project.

The main objectives of the study are as follows:

 To identify the current situation and examine the technical issues in the two provincial cities
of Khachmaz and Gusar.
 To collect basic information necessary for detailed design after selection of the
Consultants.
 To realize prompt and smooth implementation of the project.

The study is carried out by a team composed of Tokyo Engineering of Japan and DOLSAR
Engineering of Turkey. DOLSAR’s scope of services include review of existing reports, data
collection, preparation of design criteria, pipeline design, guiding topographical
surveyors, hydraulic analysis, pipeline drawings, technical specifications, material
procument plan, detailed design of mechanical and electrical facilities and technical
specifications.

 The Shadala Dam and Irrigation Project (Iraq): The


Shadala dam site is located on the Chermaga River on
the upper reaches of the Lesser Zab River. The site is
some 50 km nothwest of Sulaimaniya and is close to the
village of Shadala from which it takes its name. The
region is particularly arid and irrigation offers the only
opportunity for the growth of crops. The purpose of the
project is to store water for irrigation of 8,000 ha, in the
Chermaga and Tabin valley, which is located above the
reservoir.

The project consists of a dam with a height of 43 m


earthfill dam, embankment volume of 6.2 Mio m3, chute
type spillway and an irrigation of 8000 ha of farmland in
the Chermaga and Tabin valleys upstream of the
reservoir. Given that water will be drawn from the
reservoir via an outlet operating under some head there
may be an opportunity to install a mini hydro power plant
on this outlet.
DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 56
.
The works include mainly providing consulting engineering services as follows: reviewing the
project reports, updating the economic study, and study the possibility of adding mini power
generation to the design, carrying out additional geological investigations and preparation of a
final report, preparation of detailed designs and drawings for the dam, spillway, bottom outlet,
diversion structures and irrigation project, including detailed layout of primary and secondary
canals and drains, design of the irrigation and drainage network over the 8000 ha, detailed
design of typical canal drop structures as well as typical canal regulation and off-take structures,
preparation of tender document for general construction contracts (assuming separate contracts
for dam works, irrigation works and advance works)., including preparation of special conditions
and technical specifications, in accordance with Iraqi standard General Conditions. Water
resources, flood hydrology and sedimentation, soils, land classification and drainage, cropping
pattern and crop water requirements are studied.

DOLSAR together with an international company from UK performed the engineering services.

 The Shamiyah Redevelopment Plan Makkah Al-Mukarramah – Design of Tunnels –


Kingdom of Saudi Arabia: This project is located adjacent to Masjid-Alharaam in Makkah Al
Mukarramah. Saudi Consulting Services (Saudconsult) in Riyadh, Saudi Arabia was in charge
of the infrastructure design. The tunnel works are awarded to DOLSAR.

The characteristics of tunnels included in the project scope are 700 m long tunnel, double tube
and 180 m long tunnel, single tube.

The project comprises of various specialized components like development of spines (multilevel
structures), design of tunnels, geological and hydrological studies as well as road, bridges and
infrastructure utilities. The services provided by DOLSAR include design of tunnels including
structure, finishers, lighting, ventilation, emergency equipment, CCTV, asphalt road, sidewalks,
directional signs etc. This included layout plans, profiles and cross sections, structural portal
details, details of structural support system, details of ventilation, lighting, fire fighting, monitoring
and control systems. Also a comprehensive scope of works for geotechnical field investigations
desired for tunnel design is prepared. DOLSAR carried out an evaluation of general geological
and geotechnical conditions of redevelopment project area. Structural design and proposal for
coring systems for the required tunnel profile interface with existing tunnel structure and effect of
structures above on the tunnel in the design is evaluated.

DOLSAR ENGINEERING- INTRODUCTION AND GENERAL EXPERIENCE 57


MÜHENDİSLİK ANONİM ŞİRKETİ
DOLSAR ENGINEERING INC. CO.

(1/4)
DOLSAR’IN KAYITLI BULUNDUĞU KURULUŞLAR
ORGANIZATIONS TO WHICH DOLSAR IS REGISTERED

Ankara Ticaret Odası


Chamber of Commerce - Ankara

Türk Müşavir Mühendisler ve Mimarlar Birliği


Association of Turkish Consulting Engineers and Architects

Müşavir Mühendisler Uluslararası Federasyonu


International Federation of Consulting Engineers and Architects

Avrupa Müşavirlik Mühendislik Birlikleri Federasyonu


European Federation of Engineering Consultancy Associations

Uluslararası Büyük Barajlar Komisyonu


International Commission on Large Dams

Dünya Su Konseyi
World Water Council

Uluslararası Hidroelektrik Enerji Birliği


International Hydropower Association
MÜHENDİSLİK ANONİM ŞİRKETİ
DOLSAR ENGINEERING INC. CO.

(2/4)
DOLSAR’IN KAYITLI BULUNDUĞU KURULUŞLAR
ORGANIZATIONS TO WHICH DOLSAR IS REGISTERED

Dünya Enerji Konseyi Türk Milli Komitesi


Dünya Enerji Konseyi World Energy Council
Türk Milli Komitesi

Uluslararası Tünelcilik ve Yeraltı Yapıları Derneği


International Tunneling and Underground Space Association

Dünya Bankası
The World Bank

Asya Kalkınma Bankası


Asian Development Bank

İslam Ülkeleri Müşavirler Federasyonu


Federation of Consultants from Islamic Countries

İnşaat Mühendisleri Enstitüsü


Institution of Civil Engineers
MÜHENDİSLİK ANONİM ŞİRKETİ
DOLSAR ENGINEERING INC. CO.

(3/4)
DOLSAR’IN KAYITLI BULUNDUĞU KURULUŞLAR
ORGANIZATIONS TO WHICH DOLSAR IS REGISTERED

Amerika İnşaat Mühendisleri Derneği


American Society of Civil Engineers

Uluslararası Zemin Mekaniği ve


Geoteknik Mühendislik Derneği
International Society of Soil Mechanics and
Geotechnical Engineering

Kalite Derneği
Turkish Society for Quality (TSQ)

Türkiye Tabiatını Koruma Derneği


Turkish Association for the Conservation of
Nature and Natural Resources

TMMOB İnşaat Mühendisleri Odası


Turkish Chamber of Civil Engineers

TMMOB Makine Mühendisleri Odası


Turkish Chamber of Mechanical Engineers

TMMOB Elektrik Mühendisleri Odası


Turkish Chamber of Electrical Engineer
MÜHENDİSLİK ANONİM ŞİRKETİ
DOLSAR ENGINEERING INC. CO.

(4/4)
DOLSAR’IN KAYITLI BULUNDUĞU KURULUŞLAR
ORGANIZATIONS TO WHICH DOLSAR IS REGISTERED

TMMOB Çevre Mühendisleri Odası


Turkish Chamber of Environmental Engineers

DEİK Dış Ekonomik İlişkiler Kurulu


Foreign Economic Relations Board

Türkiye’de İsviçre Ticaret Odası Derneği Ankara Şubesi


Schweizer Handelskammer in der Türkei Filiale Ankara

TABA Türk Amerikan İş Adamları Derneği


AmCham Turkish American Business Association

Arnavutluk – Türkiye Ticaret ve Sanayi Odası


Dhoma E Tregtisë Dhe Industrisë Shqipëri - Turqi
ORGANISATION CHART (MAIN OFFICE)

BOARD OF DIRECTORS
LEGAL ADVISORS
GENERAL MANAGER
INTEGRATED MANAGEMENT SYSTEMS (IMS)
FINANCIAL ADVISORS
REPRESENTATIVE
TECHNICAL ADVISORS
QUALITY MANAGEMENT SYSTEMS (QMS)
OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS (OHSAS)
JHSU (Occup.Doctor & HSE Specialist)
ENVIRONMENTAL MANAGEMEN SYSTEMS (EMS) 

BRANCH OFFICES/
BUSINESS DEVELOPMENT INTERNATIONAL PROJECTS TECHNICAL GROUPS ADMINISTRATIVE GROUPS
SUPERVISION GROUPS

ACCOUNTANCY /
LENDERS ENGINEERING  ADMINISTRATION
PLANNING DESIGN SUPPORT / TECHNICAL DUE 
DILLIGENCE

DAMS / REGULATORS GENERAL TECHNICAL BUILDINGS /


ENERGY HUMAN RESOURCES
/ WATER STRUCTURES SUPPORT INDUSTRIAL FACILITIES

WATER AND BUILDINGS / GEOLOGY /


LAND RESOURCES ENERGY
INDUSTRIAL FACILITIES GEOTECHNICS
PROCUREMENT

TRANSPORTATION HYDROLOGY /
ENERGY STRUCTURES WATER
METEROLOGY
DOCUMENTATION
/ ARCHIVE
DRINKING WATER / ELECTRICAL /
TRANSPORATION
IRRIGATION MECHANICAL

SEWERAGE/
STRUCTURAL DESIGN
TREATMENT

TRANSPORTATION ENVIRONMENT

INFORMATION 
TECHNOLOGY

DOL-DO1-EP502
DRAFTING / AUTOCAD Rev. No. : 02 Date : 30.06.2015
OPERATIONS
A REPORT FROM THE SWEDISH FEDERATION
OF CONSULTING ENGINEERS AND ARCHITECTS DECEMBER 2018

STRONG SECTOR UNDERGOING CHANGE


FROM GLOBALISATION AND DIGITALISATION

A Swedish, Nordic
and International Survey of
The Consulting Engineering
and Architectural Groups
THE INTERNATIONAL MARKET

Average
Annual number of (Previous Turnover
2018 2017 Group Services Country report employees year) MEUR CEO/Managing director
Bittner, Grotz, Hantschk, Ropertz,
155 79 Müller-BBM Holding GmbH * MD Germany 17 400
Schierer & Schröder
156 156 Amberg Group * CE,S,PM Switzerland 17 400 400 Felix Amberg
157 183 Aveco de Bondt BV * CE Netherlands 17 400 310 Gerald Paalman
158 160 Herzog & de Meuron Architekten AG * A Switzerland 17 400 380 Pierre de Meuron, Jacques Herzog
159 165 Holinger Group CE Switzerland 17 396 373 Peter Rudin
160 170 Curtins Group CE,PM UK 17 389 351 Rob Melling
161 168 Insta Automation Oy I Finland 17 387 358 58.3 Timo Lehtinen
162 147 PBR Planungsbüro Rohling AG * MD Germany 17 385 440 39.5 Heinrich Eustrup
163 178 BAC Engineering Consultancy Group MD Spain 17 370 325 22.5 Joan Franco Poblet
164 176 Bjerking AB CE,M Sweden 17 367 332 49.2 Anders Wärefors
165 161 Burckhardt+Partner AG * A Switzerland 17 360 380 Philipp Bruhlmeier
166 169 ABT Holding BV MD Netherlands 16 357 357 42.8 Gerard Doos, Rudi Roijakkers
167 164 Sheppard Robson * A UK 16/17 352 374 22.0 Andrew German
168 171 Chapman Taylor LLP A UK 16/17 350 350 40.9 Chris Lanksbury
Gunter Henn (CEO), Martin Henn, Stefan
169 175 HENN Architekten * A Germany 17 350 341 35.9
Sinning, Frank Hoffmeister
170 182 Lievense (fmr Bartels Engineering) * CE,S,PM Netherlands 17 350 311 Taco Klevering, Pieter van Boom
171 206 HaCon * I,CE Germany 17 350 270 Michael Frankenberg
172 234 RKW Architektur + * A Germany 17 350 220 Wojtek Grabianowski
173 162 Zaha Hadid Architects A UK 16/17 345 379 52.8 Zaha Hadid, Patrik Schumacher
174 203 Planungsgruppe M+M AG , PGMM * E,M,PM, Enr Germany 17 345 275 36.0 Hermann Ott
175 186 Efla hf MD Iceland 17 339 303 55.5 Guðmundur Þorbjörnsson
176 177 Barton Willmore Group A,PM UK 16/17 336 329 Stephen Toole
177 184 INBO Architects/Consultants * A,PM Netherlands 17 330 308 Aaron Bogers
178 167 Verkís hf MD Iceland 17 322 364 48.0 Sveinn Ingi Ólafsson
179 179 Stride Treglown Group PLC A UK 17 319 321 25.2 David Hunter
180 198 IPROconsult GmbH * CE, Env, A Germany 2017 319 282 Lutz Junge
181 205 Pascall+Watson A UK 17 317 271 44.5 Steve West
182 195 SALFO & Associates SA Greece 17 313 292 22.9 Ioannis Foteinos
183 180 Hifab Group (acquired Byggkultur Mittkonsult) * PM Sweden 17 312 320 46.3 Patrik Schelin
T. Behnke, H. Chef-Hendriks, A. Gyalokay,
184 200 Heinle, Wischer und Partner A,PM Germany 17 310 280 36.2 T. Heinle, M. Kill, J. Krauße, C. Pelzeter,
E.Schultz
185 181 GPO Group (GPO Ingenieria, S.A.) MD Spain 17 303 320 20.0 Xavier Montobbio
186 187 Purcell Architects * A UK 16 302 302 24.3 Mark Goldspink
187 190 Allies & Morrison Architects Ltd * A UK 17 300 300 Bob Allies
188 193 O.M.A. Office for Metropolitan Architecture * A Netherlands 17 300 295 Rem Koolhaas
189 185 Vahanen Group Oy CE Finland 17 296 306 28.6 Risto Räty
190 197 Mannvit hf. MD Iceland 17 292 282 47.9 Sigurður Sigurjónsson
191 194 PRP Architects Ltd * A UK 17 292 292 Neil Griffiths
192 202 Henning Larsen Architects A Denmark 17/18 288 275 37.6 Mette Kynne Frandsen
193 192 C.F.Møller Architects A Denmark 17 286 297 40.9 Klaus Toustrup
194 238 Protacon group I,E,PM Finland 17 286 219 31.0 Timo Akselin
PM, CE,
195 166 DOLSAR Engineering Inc. Co. Turkey 17 286 371 14.4 H. Îrfan Aker
Env,E,M,MD
196 250 Eurocon Consulting (acquired KLT Konsult) * I Sweden 17 285 204 28.8 Peter Johansson
197 199 Steinbacher-Consult GmbH * CE, PM Germany 17 280 280 Stefan Steinbacher
198 201 IUB Engineering AG * CE,PM Switzerland 17 280 280 Urs Müller
199 216 Iproplan Planungsges. Mbh * MD Germany 17 280 250 Jörg Thiele
200 O'Connor Sutton Cronin MD Ireland 17 280 Tony Horan

PM = Project Management, A = Architecture, CE = Civil-/S = Structural Engineering, CT = Certification and testing, Env = Environment, Enr = Energy,
E = Electrical, M = Mechanical/HEVAC, I = Industrial, MD = Multi Disciplinary – (*) = lack of conforming figure/proforma/assumed

SECTOR REVIEW • THE SWEDISH FEDERATION OF CONSULTING ENGINEERS AND ARCHITECTS • DECEMBER 2018 71

Vous aimerez peut-être aussi