Bahan
Semen PC 326.00 Kg 1,200 391,200
Pasir Pasang / Beton 0.54 M³ 125,000 67,857
Kerikil Beton 0.76 M³ 250,000 190,556
Air 215.00 Ltr 125 26,875
Tenaga
Pekerja 1.65 Org / Hari 150,000 247,500
Tukang batu 0.28 Org / Hari 175,000 48,125
Kepala Tukang 0.03 Org / Hari 200,000 5,600
Mandor 0.08 Org / Hari 150,000 12,450
Total 990,163
Biaya Untuk 1 M3 990,163
Tenaga
Pekerja 0.01 Org / Hari 150,000 1,050
Tukang batu 0.01 Org / Hari 175,000 1,225
Kepala tukang 0.00 Org / Hari 200,000 140
Mandor 0.00 Org / Hari 150,000 60
Total 16,425
Biaya Untuk 1 kg 16,425
Tenaga
Pekerja 0.66 Org / Hari 150,000 99,000
Tukang batu 0.33 Org / Hari 175,000 57,750
Kepala tukang 0.03 Org / Hari 200,000 6,600
Mandor 0.03 Org / Hari 150,000 4,950
Total 433,400
Biaya Untuk 1 M2 433,400
1 m2 Pasang lantai batu alam polos
Bahan
batu alam ukuran 30 x 30 cm 1.00 m2 200,000 200,000
semen 0.20 zak 65,000 13,000
pasir 0.02 m3 250,000 4,250
nat MU 408 0.65 kg 15,000 9,750
Tenaga
tukang batu 0.40 Org / Hari 150,000 60,000
pekerja 0.50 Org / Hari 175,000 87,500
Kepala Tukang 0.05 Org / Hari 200,000 10,000
Mandor 0.00 Org / Hari 150,000 375
Total 384,875
Biaya Untuk 1 M2 384,875
Tenaga
tukang batu 0.40 Org / Hari 150,000 60,000
pekerja 0.50 Org / Hari 175,000 87,500
Kepala Tukang 0.05 Org / Hari 200,000 10,000
Mandor 0.00 Org / Hari 150,000 375
Total 456,875
Biaya Untuk 1 M2 456,875