Process control: important for goods movement >>> go to overview to see the different control keys listed (it is
valid for both CO11 and CO11N)
process control key type: it defines if automatic goods receipt should be posted within the confirmation, at which point the
data should be posted; ‘immediately online’ means if many data are posted this might result in a performance issue, it is
needed to see in dialog if there is an error while posting the goods movements; it is recommended to use ‘immediately in
upgrade program’ or ‘later in background job’ if customer posts many goods movements (see Note 208477 among the
related notes)
Operation sequence check: you can set here for example whether it should be possible to post the confirmation
for the successor operation (e.g. operation 20) even if the preceding operation (e.g. operation 10) had not been
confirmed before
Under-/overdelivery: you can define the system reaction of an under- or overdelivery (it refers to CO03-header -
> Goods receipt tab -> Tolerances)
QM Recording: inspection lot assignment; if we activate it, then the system checks whether there is an
inspection lot assigned
Dates in the future: it determines whether it is possible to post the confirmations in the future
HR Update: should we call the HR function in handover the confirmation data or not (if it is set, then no data is
handed over to HR)
Selection: if it is set, only open orders are confirmed (in milestone or progress confirmation); in this case open
means not (finally) confirmed
Goods movements: this setting is related to the Goods Movement screen of confirmation; a material is not set as
backflush, but the component is proposed; if the flag is not set, then the backflush is no longer proposed, only
the movement (see KBA 1872575 among the related notes)
Propose time units: ‘automatic optimization’ means if minutes are detailed enough, e.g. customer has 1,2 hours
rounded, the system checks if it would be better to display 1,176 hours in minutes (the lowest rounding error is
automatically proposed); this makes sense if customer uses high units
‘automatic final confirmation’ means if the planned quantity is reached, then the system posts automatically final
confirmation and as long as the planned quantity is not reached, the system posts partial confirmation
Error Handling/Logs: if you activate the flag for goods movements, then the system sends a message and says
there was an error in the goods movement; if we set termination, then it is not allowed to post the confirmation at
all, if there is an error in the goods movement (Termination for Incorrect Goods Movements: it ONLY works,
when the goods movements are posted in dialog! this means, that in the Generally Valid settings tab -> Process
control -> Overview should be at the column ‘auto GR’ ‘immediately online’ set, because the system can send a
dialog only in this case)
only for CO11
precondition for each confirmation: the order needs to be released! (otherwise the reservations might not be active or the
availability of the order might not be given)
- New entries
Area selection tab: define here any setup of this transaction, what should be displayed on the screens (header
area, detail areas, closed/not closed buttons…)
Default tab: proposal (should the quantities be proposed immediately or during the saving ), hide/show activities:
set the flag as standard in OPK0
SU3 (User Profile Maintenance) -> Parameters tab -> Parameter ID=CORUPROF, Parameter value=the defined profile ->
save
As a new member of the PP team, at first I faced with problems in understanding the logic of backflushing. I
was aware of the places where it can be set, but I could not imagine the effect of it in practice. Now I would
like to share with you the basic effects of this setting.
The most important facts:
if a component is set as backflush, then this component will be posted within the confirmation
if you confirm e.g. operation 10, then the system checks which components are assigned to operation 10
and then choose the material, which is assigned and backflush this material post to goods movement
it is important, which components are assigned to which operation, we need to define this allocation
system proposes automatically both components from the assigned BOM and if no connection is added
here, the system is automatically added to the first valid operation (New Assignment button)
Let’s start with the example! Here is my material BOM, which consists of a semi-finished material
(MITYU_TEST2) and raw materials (one discountinuated and two alternatives):
Important: if you change the material master after creating the order, the existing order
won’t get updated, you have to reread the master data (CO02 -> Functions -> Read PP
master data
3. work center (CR02 -> Basic data -> Backflush)
1. Setting the ‘Movement Allowed’ flag (CO02-component overview-details -> General data tab -> General
Indicators -> Movement Allowd)
if it is not set: not possible to post goods movements even if the backflush indicator is set,
because it has the highest priority
backflushing does not automatically set this flag, it is set during the order creation
setting the ‘Movement Allowed’ indicator can only be carried out for a released order
2. Either ‘Automatic Goods Receipt’ is set in OPKP or the operation has a control key, with ‘Automatic
Goods Movement’
– if you do not set this indicator then the control key of the operation decides how the automatic
goods receipt is carried out
Basic example scenario:
No ‘Automatic Goods Receipt’ is set in OPKP
No control key has automatic goods receipt indicator
None of the materials are backflushed
No backflush in work center
Goods movements flag is unset in OPK4
Confirmation in CO11
Scenario 1:
set the ‘Goods movements flag’ in OPK4 (all other settings are fixed)
Scenario 2:
Scenario 4: