Vous êtes sur la page 1sur 39

SUSTENTO DE DE METRADOS DE ESTRUCTURAS

Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09


MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

01 ESTRUCTURAS
01.01 OBRAS PRELIMINARES
01.01.01 CARTEL DE OBRA CON BANNER (GIGANTOGRAFIA) Y BASTIDORES DE MADERA DE 2 UND 1 0.50 0.50 UND
Nota: Se esta considerando 50% pues es provicional su ubicación .
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL CON RETROEXCAVADORA m3 0.00 m3
BLOQUE Nº01 m3 1 0.00 0.00
BLOQUE Nº02 m3 1 0.00 0.00
PATIO m3 1 0.00 0.00

01.02.02 EXCAVACION DE ZANJAS PARA CIMIENTOS Y ZAPATAS m3 190.01 m3


BLOQUE Nº02
Calculando en la dirección X-X
Eje H, entre eje 10 y 12 - Sección A'-A' m3 1 3.65 0.60 2.00 4.38 4.38
Calculando en la dirección Y-Y
Eje 10, entre eje A y B - Sección A'-A' m3 1 1.00 0.60 2.00 1.20 1.20
Eje 10, entre eje B y C - Sección A'-A' m3 1 1.10 0.60 2.00 1.32 1.32
Eje 10, entre eje C y D - Sección A'-A' m3 1 2.17 0.60 2.00 2.60 2.60
Eje 10, entre eje D y E - Sección A'-A' m3 1 1.05 0.60 2.00 1.26 1.26
Eje 10, entre eje E y F - Sección A'-A' m3 1 1.48 0.60 2.00 1.78 1.78
Eje 10, entre eje F y G - Sección C'-C' m3 1 1.58 0.60 2.00 1.90 1.90
Eje 10, entre eje G y H- Sección A'-A' m3 1 0.83 0.60 2.00 0.99 0.99
Eje 12, entre eje A y B - Sección A'-A' m3 1 1.00 0.60 2.00 1.20 1.20
Eje 12, entre eje B y C - Sección A'-A' m3 1 1.10 0.60 2.00 1.32 1.32
Eje 12, entre eje C y D - Sección A'-A' m3 1 2.17 0.60 2.00 2.60 2.60
Eje 12, entre eje D y E - Sección A'-A' m3 1 1.05 0.60 2.00 1.26 1.26
Eje 12, entre eje E y F - Sección A'-A' m3 1 1.48 0.60 2.00 1.78 1.78
Eje 12, entre eje F y G - Sección A'-A' m3 1 1.58 0.60 2.00 1.90 1.90
Eje 12, entre eje G y H - Sección A'-A' m3 1 2.40 0.60 2.00 2.88 2.88
Eje 12, entre eje H y I - Sección A'-A' m3 1 0.62 0.60 2.00 0.74 0.74
Calculando en los SS.HH
Direccion X-X, entre eje C y D - Sección E' y E' m3 2 5.90 0.60 2.00 7.08 14.16
Direccion X-X, entre eje C y D - Sección E' y E' m3 1 0.38 0.60 2.00 0.45 0.45
Direccion Y-Y, entre eje 10 y 12 - Sección B'-B' m3 2 0.40 0.60 2.00 0.48 0.96
Direccion Y-Y, entre eje 10 y 12 - Sección B'-B' m3 2 0.85 0.60 2.00 1.02 2.04
Direccion Y-Y, entre eje 10 y 12 - Sección D'-D' m3 4 0.90 0.60 2.00 1.08 4.32
Calculando en la dirección X-X
Eje G, entre eje 12 y 13 - Sección A'-A' m3 1 0.90 0.60 2.00 1.08 1.08
Entre Eje G y H, entre eje 12 y 13 - Sección A-A m3 1 1.50 0.60 2.00 1.80 1.80
Entre Eje G y H, entre eje 12 y 13 - Sección A-A y A'-A' m3 1 0.55 0.60 2.00 0.66 0.66
Eje I, entre eje 6 y 13 - Sección N-N perimetro m3 1 17.97 0.60 2.00 21.56 21.56
Eje F, entre eje 6 y 9 - Sección A'-A' m3 1 6.80 0.60 2.00 8.16 8.16
Eje F y G, entre eje 8 y 9 - Sección A'-A' m3 2 0.53 0.60 2.00 0.64 1.27
Calculando en la dirección Y-Y
Eje 8 y 9, entre eje F y H - Sección E'-E', D' - D' m3 1 4.16 0.60 2.00 4.99 4.99
Eje 8 y 9, entre eje F y H - Sección C'-C' m3 1 0.70 0.60 2.00 0.84 0.84
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

BLOQUE Nº02
ZAPATA Z-8 m3 1 3.72 1.20 2.00 8.93 8.93
ZAPATA Z-9 m3 1 8.70 1.20 2.00 20.88 20.88
ZAPATA Z-10 m3 6 2.00 1.80 2.00 7.20 43.20
ZAPATA Z-11 m3 1 3.68 1.65 2.00 12.14 12.14
ZAPATA Z-12 m3 1 1.88 1.80 2.00 6.77 6.77
ZAPATA Z-7 m3 1 2.56 1.45 1.80 6.68 6.68
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST= 2
01.02.04
KM.
BLOQUE 2-ZAPATAS Y CIMENTACION m3 (Ver cuaderno de Obra) 488.40 488.40 488.40

Nota: no se considero en la Valorizacion del mes de febrero.

01.03 OBRAS DE CONCRETO SIMPLE


01.03.01 FALSA ZAPATA
01.03.01.01 FALSA ZAPATA CONCRETO 1:12 CEMENTO HORMIGON + 30% DE PIEDRA GRANDE m3 38.39 m3
BLOQUE Nº02
ZAPATA Z-8 m3 1 8.70 1.20 0.60 6.26 6.26
ZAPATA Z-9 m3 1 8.70 1.20 0.60 6.26 6.26
ZAPATA Z-10 m3 10 2.00 1.80 0.60 2.16 21.60
ZAPATA Z-11 m3 1 0.00 1.65 0.60 0.00 0.00
ZAPATA Z-12 m3 1 1.88 1.80 0.60 2.03 2.03
ZAPATA Z-7 m3 1 2.56 1.45 0.60 2.23 2.23
01.03.02 CIMIENTO
01.03.02.01 FALSA CIMENTACION MEZCLA 1:12 CEMENTO-HORMIGON + 30 % DE PIEDRA GRA m3 28.33 m3
BLOQUE Nº02
Calculando en la dirección X-X
Eje H, entre eje 10 y 12 - Sección A'-A' m3 1 3.65 0.60 0.70 1.53 1.53
Calculando en la dirección Y-Y
Eje 10, entre eje A y B - Sección A'-A' m3 1 1.00 0.60 0.70 0.42 0.42
Eje 10, entre eje B y C - Sección A'-A' m3 1 1.10 0.60 0.70 0.46 0.46
Eje 10, entre eje C y D - Sección A'-A' m3 1 2.17 0.60 0.70 0.91 0.91
Eje 10, entre eje D y E - Sección A'-A' m3 1 1.05 0.60 0.70 0.44 0.44
Eje 10, entre eje E y F - Sección A'-A' m3 1 1.48 0.60 0.70 0.62 0.62
Eje 10, entre eje F y G - Sección A'-A' m3 1 1.58 0.60 0.70 0.66 0.66
Eje 10, entre eje G y H- Sección A'-A' m3 1 0.83 0.60 0.70 0.35 0.35
Eje 10, entre eje H y I- Sección A'-A' m3 1 0.00 0.60 0.70 0.00 0.00
Eje 12, entre eje A y B - Sección A'-A' m3 1 1.00 0.60 0.70 0.42 0.42
Eje 12, entre eje B y C - Sección A'-A' m3 1 1.10 0.60 0.70 0.46 0.46
Eje 12, entre eje C y D - Sección A'-A' m3 1 2.17 0.60 0.70 0.91 0.91
Eje 12, entre eje D y E - Sección A'-A' m3 1 1.05 0.60 0.70 0.44 0.44
Eje 12, entre eje E y F - Sección A'-A' m3 1 1.48 0.60 0.70 0.62 0.62
Eje 12, entre eje F y G - Sección A'-A' m3 1 1.58 0.60 0.70 0.66 0.66
Eje 12, entre eje G y H - Sección A'-A' m3 1 2.40 0.60 0.70 1.01 1.01
Eje 12, entre eje H y I - Sección A'-A' m3 1 0.62 0.60 0.70 0.26 0.26
Calculando en los SS.HH
Direccion X-X, entre eje C y D - Sección E' y E' m3 2 5.90 0.60 0.70 2.48 4.96
Direccion X-X, entre eje C y D - Sección E' y E' m3 1 0.38 0.60 0.70 0.16 0.16
Direccion Y-Y, entre eje 10 y 12 - Sección B'-B' m3 2 0.40 0.60 0.70 0.17 0.34
Direccion Y-Y, entre eje 10 y 12 - Sección B'-B' m3 2 0.85 0.60 0.70 0.36 0.71
Direccion Y-Y, entre eje 10 y 12 - Sección D'-D' m3 4 0.70 0.60 0.70 0.29 1.18
Calculando en la dirección X-X
Eje G, entre eje 12 y 13 - Sección A'-A' m3 1 2.02 0.60 0.70 0.85 0.85
Entre Eje G y H, entre eje 12 y 13 - Sección A'-A' m3 1 1.50 0.60 0.70 0.63 0.63
Entre Eje G y H, entre eje 12 y 13 - Sección A'-A' m3 1 1.55 0.60 0.70 0.65 0.65
Eje I, entre eje 6 y 13 - Sección N-N perimetro m3 1 17.97 0.60 0.60 6.47 6.47
Eje F, entre eje 6 y 9 - Sección A'-A' m3 1 0.00 0.60 0.50 0.00 0.00
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

Eje F y G, entre eje 8 y 9 - Sección A'-A' m3 2 0.00 0.60 0.50 0.00 0.00
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

Calculando en la dirección Y-Y


Eje 8 y 9, entre eje F y H - Sección A'-A' m3 1 0.00 0.60 0.70 0.00 0.00
Eje 8 y 9, entre eje F y H - Sección A'-A' m3 1 0.00 0.60 0.70 0.00 0.00
Eje 6, entre eje F y G - Sección A'-A' m3 1 0.00 0.60 0.70 0.00 0.00
Eje 13, entre eje G y H - Sección N-N m3 1 4.35 0.60 0.50 1.31 1.31
Eje 13, entre eje H-I - Sección N-N m3 1 3.00 0.60 0.50 0.90 0.90
Nota: se rectifico altos de seccion A'-A' y en el eje 13 es N-N, no es 0.50 Mt. como
figura metrado expediente, es 0.70 manda planos, mayor metrado.
01.03.02.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE m3 33.39 m3
BLOQUE Nº02
Calculando en la dirección X-X
Eje H, entre eje 10 y 12 - Sección A'-A' m3 1 3.65 0.60 0.70 1.53 1.53
Calculando en la dirección Y-Y
Eje 10, entre eje A y B - Sección A'-A' m3 1 1.00 0.60 0.70 0.42
Eje 10, entre eje B y C - Sección A'-A' m3 1 1.10 0.60 0.70 0.46 0.46
Eje 10, entre eje C y D - Sección A'-A' m3 1 2.17 0.60 0.70 0.91 0.91
Eje 10, entre eje D y E - Sección A'-A' m3 1 1.05 0.60 0.70 0.44 0.44
Eje 10, entre eje E y F - Sección A'-A' m3 1 1.48 0.60 0.70 0.62 0.62
Eje 10, entre eje F y G - Sección A'-A' m3 1 1.58 0.60 0.70 0.66 0.66
Eje 10, entre eje G y H- Sección A'-A' m3 1 0.83 0.60 0.70 0.35 0.35
Eje 12, entre eje A y B - Sección A'-A' m3 1 1.00 0.60 0.70 0.42 0.42
Eje 12, entre eje B y C - Sección A'-A' m3 1 1.10 0.60 0.70 0.46 0.46
Eje 12, entre eje C y D - Sección A'-A' m3 1 2.17 0.60 0.70 0.91 0.91
Eje 12, entre eje D y E - Sección A'-A' m3 1 1.05 0.60 0.70 0.44 0.44
Eje 12, entre eje E y F - Sección A'-A' m3 1 1.48 0.60 0.70 0.62 0.62
Eje 12, entre eje F y G - Sección A'-A' m3 1 1.58 0.60 0.70 0.66 0.66
Eje 12, entre eje G y H - Sección A'-A' m3 1 2.40 0.60 0.70 1.01 1.01
Eje 12, entre eje H y I - Sección A'-A' m3 1 0.62 0.60 0.70 0.26 0.26
Calculando en los SS.HH
Direccion X-X, entre eje C y D - Sección E' y E' m3 2 5.90 0.60 0.70 2.48 4.96
Direccion X-X, entre eje C y D - Sección E' y E' m3 1 0.38 0.60 0.70 0.16 0.16
Direccion Y-Y, entre eje 10 y 12 - Sección B'-B' m3 2 0.40 0.60 0.70 0.17 0.34
Direccion Y-Y, entre eje 10 y 12 - Sección B'-B' m3 2 0.85 0.60 0.70 0.36 0.71
Direccion Y-Y, entre eje 10 y 12 - Sección B'-B' m3 1 1.70 0.60 0.70 0.71 0.71
Calculando en la dirección X-X
Eje G, entre eje 12 y 13 - Sección A'-A' m3 1 2.02 0.60 0.70 0.85 0.85
Entre Eje G y H, entre eje 12 y 13 - Sección A-A m3 1 1.50 0.60 0.70 0.63 0.63
Entre Eje G y H, entre eje 12 y 13 - Sección A-A y A'-A' m3 1 1.55 0.60 0.70 0.65 0.65
Eje I, entre eje 6 y 13 - Sección N-N perimetro m3 1 21.37 0.60 0.70 8.98 8.98
Eje F, entre eje 6 y 9 - Sección A'-A' m3 1 6.80 0.60 0.70 2.86 2.86
Eje F y G, entre eje 8 y 9 - Sección A'-A' m3 2 0.53 0.60 0.70 0.22 0.45
Calculando en la dirección Y-Y
Eje 8 y 9, entre eje F y H - Sección A'-A' m3 1 4.16 0.60 0.70 1.75 1.75
Eje 8 y 9, entre eje F y H - Sección A'-A' m3 1 0.70 0.60 0.70 0.29 0.29
Eje 6, entre eje F y G - Sección A'-A' m3 1 0.70 0.60 0.70 0.29 0.29
Nota: el eje 13 pertenece a concreto armado Fc'=210 Kg/cm2
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 56.04 m3
BLOQUE Nº02
ZAPATA Z-8 m3 1 8.70 1.20 0.80 8.35 8.35
ZAPATA Z-9 m3 1 8.70 1.20 0.80 8.35 8.35
ZAPATA Z-10 m3 10 2.00 1.80 0.80 28.80 28.80
ZAPATA Z-11 m3 1 3.68 1.65 0.80 4.86 4.86
ZAPATA Z-12 m3 1 1.88 1.80 0.80 2.71 2.71
ZAPATA Z-7 m3 1 2.56 1.45 0.80 2.97 2.97
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

Nota: Z-7 pertenece al bloque Nº 02 y no al bloque Nº 01 como aparece en el Expediente.


SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

01.04.01.02 ACERO PARA ZAPATAS F'Y=4,200 KG/CM2 GRADO 60 KG 1369.76 1369.76 1369.76 KG

01.04.02 CIMIENTOS REFORZADOS


01.04.02.01 CONCRETO EN CIMIENTOS REFORZADOS F'C=210 KG/CM2 m3 6.39 m3
BLOQUE Nº02
Calculando en la dirección X-X
Eje I, entre eje 6 y 7 - Sección N-N - Perimetro m3 1 0.00 0.60 0.60 0.00 0.00
Eje I, entre eje 7 y 8 - Sección N-N - Perimetro m3 1 0.00 0.60 0.60 0.00 0.00
Eje I, entre eje 8 y 9 - Sección N-N - Perimetro m3 1 0.00 0.60 0.60 0.00 0.00
Eje I, entre eje 9 y 10 - Sección N-N - Perimetro m3 1 0.00 0.60 0.60 0.00 0.00
Eje I, entre eje 10 y 11 - Sección N-N - Perimetro m3 1 5.22 0.60 0.60 1.88 1.88
Eje I, entre eje 11 y 12 - Sección N-N - Perimetro m3 1 2.63 0.60 0.60 0.95 0.95
Eje I, entre eje 12 y 13 - Sección N-N - Perimetro m3 1 3.05 0.60 0.60 1.10 1.10
Calculando en la dirección Y-Y
Eje 13, entre eje G y H - Sección N-N - Perimetro m3 1 4.35 0.60 0.60 1.57 1.57
Eje 13, entre eje H-I - Sección N-N Perimetro m3 1 2.50 0.60 0.60 0.90 0.90

01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA CIMIENTOS m2 0.00 m2


BLOQUE Nº02
Calculando en la dirección X-X
Eje I, entre eje 6 y 7 - Sección N-N - Perimetro m2 1 0.00 0.60 0.60 0.00 0.00
Eje I, entre eje 7 y 8 - Sección N-N - Perimetro m2 1 0.00 0.60 0.60 0.00 0.00
Eje I, entre eje 8 y 9 - Sección N-N - Perimetro m2 1 0.00 0.60 0.60 0.00 0.00
Eje I, entre eje 9 y 10 - Sección N-N - Perimetro m2 1 0.00 0.60 0.60 0.00 0.00
Eje I, entre eje 10 y 11 - Sección N-N - Perimetro m2 1 0.00 0.60 0.60 0.00 0.00
Eje I, entre eje 11 y 12 - Sección N-N - Perimetro m2 1 0.00 0.60 0.60 0.00 0.00
Calculando en la dirección Y-Y 0.00
Eje 13, entre eje G y H - Sección N-N - Perimetro m2 1 0.00 0.60 0.60 0.00 0.00
Eje 13, entre eje H-I - Sección N-N Perimetro m2 1 0.00 0.60 0.60 0.00 0.00
Nota: No se ejecuto pues se acondisiono el molde al terreno (Deductivo)
01.04.03 SOBRECIMIENTOS ARMADO
01.04.03.01 CONCRETO EN CIMIENTOS REFORZADOS F'C=210 KG/CM2 m3 4.13 m3
BLOQUE Nº02
Calculando en la dirección Y-Y
Eje A, entre eje 10 -12- Sección J-J (sobrecimiento armado) m3 1 0.00 VER HOJA A 2.08 4.13
Eje A, entre eje 10 -12- Sección J-J (viga de cimentacion) 1 VER HOJA A 1.30
Eje F, entre eje 10 -12- Sección M-M (viga de cimentacion) VER HOJA A 0.75

01.04.03.02 ACERO EN CIMIENTO REFORZADO F'Y=4,200 KG/CM2 GRADO 60 kg 321.51 321.51 321.51 kg
01.04.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.40M 19.22 m2
Eje A entre 10y12
cara exterior ( ver hoja A) 2.90 2.90
cara interior ( ver hoja A) 9.82 9.82
Eje F entre 10y12 2 6.50 0.50 6.50 6.50
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

01.04.04 MUROS DE CONCRETO ARMADO


01.04.04.01 CONCRETO EN MURO REFORZADO F'C=210 KG/CM2 m3 10.88 m3
BLOQUE Nº02
Calculando en la dirección X-X
Eje I, entre eje 6 y 7 - Sección N-N - Perimetro m3 1 0.00 0.13 2.40 0.00 0.00
Eje I, entre eje 7 y 8 - Sección N-N - Perimetro m3 1 0.00 0.13 2.80 0.00 0.00
Eje I, entre eje 8 y 9 - Sección N-N - Perimetro m3 1 0.00 0.13 3.20 0.00 0.00
Eje I, entre eje 9 y 10 - Sección N-N - Perimetro m3 1 0.00 0.13 3.60 0.00 0.00
Eje I, entre eje 10 y Columna 12 - Sección N-N - Perimetro m3 1 2.21 0.25 2.40 1.33 1.33
1 2.21 0.13 0.50 0.14 0.14
Eje I, entre Columna 12 y Eje 12 - Sección N-N - Perimetro m3 1 4.80 0.25 2.40 2.88 2.88
1 4.80 0.13 0.60 0.37 0.37
Eje I, entre Eje 12 y 13 - Sección N-N - Perimetro m3 1 1.90 0.25 2.40 1.14 1.14
1 1.90 0.13 0.60 0.15 0.15
Calculando en la dirección Y-Y
Eje 13, entre eje G y H - Sección N-N - Perimetro m2 1 3.95 0.25 3.00 2.96 2.96
Eje 13, entre eje H-I - Sección N-N Perimetro m2 1 2.54 0.25 3.00 1.91 1.91

01.04.04.02 ACERO EN MURO F'Y=4,200 KG/CM2 GRADO60 kg 548.39 kg


BLOQUE Nº02
Calculando en la dirección X-X
horizontal Eje I, entre eje 6 y 7 - Sección N-N - Perimetro Kg 0 0.00 0.13 2.40 3/8 0.00 0.00 0.00
verical 0 0.00 0.13 2.40 3/8 0.00 0.00 0.00
horizontal Eje I, entre eje 7 y 8 - Sección N-N - Perimetro Kg 0 0.00 0.13 2.80 3/8 0.00 0.00 0.00
verical 0 0.00 0.13 2.80 3/8 0.00 0.00 0.00
horizontal Eje I, entre eje 8 y 9 - Sección N-N - Perimetro Kg 0 0.00 0.13 3.20 3/8 14.00 0.00 0.00
verical 0 0.00 0.13 3.20 3/8 0.00 0.00 0.00
horizontal Eje I, entre eje 9 y 10 - Sección N-N - Perimetro Kg 0 0.00 0.13 3.60 3/8 16.00 0.00 0.00
verical 0 0.00 0.13 3.60 3/8 0.00 0.00 0.00
horizontal Eje I, entre eje 10 y C-12- Sección N-N - Perimetro Kg 2 3.12 0.00 0.00 3/8 12.00 20.97 64.66
horizontal 2 3.12 0.00 0.00 3/8 1.00 1.56
Vertical 2 0.00 0.13 4.18 3/8 9.00 42.13
horizontal Eje I, entre C-12 y 12 - Sección N-N - Perimetro Kg 2 4.19 0.00 0.00 3/8 12.00 28.16 135.96
horizontal 2 4.19 0.00 0.00 3/8 1.00 2.35
Vertical 2 0.00 0.00 4.28 3/8 22.00 105.46
horizontal Eje I, entre eje 12 y 13 Sección N-N - Perimetro Kg 2 2.40 0.00 0.00 3/8 12.00 16.13 60.47
horizontal 2 2.40 0.00 0.00 3/8 1.00 1.20
Vertical 2 0.00 0.00 4.28 3/8 9.00 43.14
horizontal Eje 13, entre eje G-H - Sección N-N Perimetro kg 2 4.12 0.00 0.00 3/8 12.00 27.69 191.12
horizontal 2 4.12 0.00 0.00 3/8 1.00 55.37
Vertical 2 0.00 0.00 5.36 3/8 18.00 108.06
horizontal Eje 13, entre eje H-I - Sección N-N Perimetro kg 2 3.12 0.00 0.00 3/8 12.00 20.97 96.18
horizontal 2 3.12 0.00 0.00 3/8 1.00 1.56
Vertical 2 0.00 0.00 5.48 3/8 12.00 73.65
ya Nota: El proyectista considero 01 malla siendo en el plano 02 mallas Plano E-03
Sección N-N, se toma techo 506.48 siendo el mayor metrado 41.91 Kg.
Nota: por error en la 1ra. Valorizacion se considero 236.88 Kg. Lo que correspondia
al Modulo 2 del cerco perimetrico, para lo cual debieron considerarse las partidas
antecedentes las cuales son vinculantes.
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

01.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO REFORZADO m2 59.05 m2


BLOQUE Nº02
Calculando en la dirección X-X
Eje I, entre eje 6 y 7 - Sección N-N - Perimetro m2 1 0.00 0.13 0.00 0.00 0.00 0.00
Eje I, entre eje 7 y 8 - Sección N-N - Perimetro m2 1 0.00 0.13 0.00 0.00 0.00 0.00
Eje I, entre eje 8 y 9 - Sección N-N - Perimetro m2 1 0.00 0.13 0.00 0.00 0.00 0.00
Eje I, entre eje 9 y 10 - Sección N-N - Perimetro m2 1 0.00 0.13 0.00 0.00 0.00 0.00
Eje I, entre eje 10 y Columna 12-Sección N-N - Perimetro m2 1 2.21 0.13 2.90 4.42 13.57 13.57
Eje I, entre eje C-12 y Eje 13 - Sección N-N - Perimetro m2 1 0.70 0.13 3.00 1.40 4.98 4.98
Calculando en la dirección Y-Y
Eje 13, entre eje G y H - Sección N-N - Perimetro m2 1 3.95 0.13 3.00 7.90 24.48 24.48
Eje 13, entre eje H-I - Sección N-N Perimetro m2 1 2.54 0.13 3.00 5.08 16.02 16.02

01.04.05 COLUMNAS

01.04.05.01 CONCRETO EN COLUMNETAS F'C=175 KG/CM2 m3 0.00 m3


C-A m3 0 0.13 0.25 0.00 0.00 0.00

01.04.05.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 1.51 m3


C-07 Entre Eje I y 10 m3 1 Ver Area 2.90 0.18 0.52 0.52
C-12 Entre Eje 10 y 11 m3 1 Ver Area 2.90 0.07 0.20 0.20
C-10 Entre Eje I y 12 m3 1 Ver Area 3.00 0.08 0.24 0.24
C-11 Entre Eje I y 13 m3 1 Ver Area 3.00 0.11 0.33 0.33
C-12 Entre Eje 13 y H m3 1 Ver Area 3.00 0.07 0.21 0.21
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

01.04.05.03 ACERO EN COLUMNAS F'Y=4,200 KG/CM2 GRADO 60 kg 2541.50 kg


ACERO COLUMNAS kg 2541.50 2541.50

ACERO COLUMNETAS kg 0.00 0.00

01.04.05.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 19.87 m2


ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 PERIMETRO
C-07 Entre Eje I y 10 m2 1 1.80 2.90 5.22 5.22
C-12 Entre Eje 10 y 11 m2 1 1.10 2.90 3.19 3.19
C-10 Entre Eje I y 12 m2 1 1.26 3.00 3.78 3.78
C-11 Entre Eje I y 13 m2 1 1.46 3.00 4.38 4.38
C-12 Entre Eje 13 y H m2 1 1.10 3.00 3.30 3.30
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2


BLOQUE Nº01

01.04.06 VIGAS
01.04.06.01 CONCRETO EN VIGUETAS F'C=210KG/CM2 m3 3.90 m3
VIGUETA C-A m3 150 0.13 0.20 3.90

01.04.06.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 57.33 m3


PORTICO 02 m3 1 10.10 0.23 0.35 0.81
PORTICOS 3,4,5,6 m3 4 10.10 0.35 0.40 5.66
PORTICO 07 m3 1 10.10 0.23 0.35 0.81
PORTICO 08 m3 2 10.10 0.23 0.35 1.63
PORTICOS 09 m3 1 10.10 0.23 0.40 0.93
1 6.78 0.23 0.55 0.86
PORTICO A m3 1 22.45 0.20 0.55 2.47
PORTICO C m3 1 22.45 0.20 0.55 2.47
PORTICO A y F m3 2 10.10 0.23 0.35 1.63
PORTICO B m3 1 10.10 0.35 0.40 1.41
1 8.50 0.35 0.55 1.64
PORTICO C, D y E m3 3 10.10 0.35 0.40 4.24
3 7.30 0.35 0.55 4.22
PORTICO F m3 1 4.33 0.25 0.40 0.43
1 3.80 0.23 0.35 0.31
1 5.00 0.23 0.35 0.40
1 4.10 0.25 0.40 0.41
1 6.90 0.25 0.55 0.95
PORTICO G m3 1 13.20 0.35 0.40 1.85
1 11.00 0.35 0.55 2.12
PORTICO H m3 1 18.80 0.20 0.55 2.07
PORTICO 10 m3 2 25.80 0.20 0.55 5.68
PORTICO 12 m3 1 28.50 0.20 0.55 3.14
PORTICO 13 m3 1 4.50 0.20 0.55 0.50
VS-1 (13x40) m3 1 13.20 0.13 0.40 0.69
VCH-3 (13x20) m3 1 8.00 0.13 0.20 0.21
VIGA C-A m3 1 101.00 0.13 0.20 2.63
VIGA 15X40 m3 1 120.00 0.15 0.40 7.20

01.04.06.03 ACERO EN VIGAS F'Y=4,200 KG/CM2 GRADO 60 kg 4634.22 kg


ACERO FY = 4200 KG/CM2 GRADO 60 kg 4634 4634.22
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

01.04.06.04 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 502.39 m2


PORTICO 02 m2 1 10.10 0.23 0.35 9.39
PORTICOS 3,4,5,6 m2 4 10.10 0.35 0.40 11.62
PORTICO 07 m2 1 10.10 0.23 0.35 9.39
PORTICO 08 m2 2 10.10 0.23 0.35 9.39
PORTICOS 09 m2 1 10.10 0.23 0.40 10.40
1 6.78 0.23 0.55 9.02
PORTICO A m2 1 22.45 0.20 0.55 29.19
PORTICO C m2 1 22.45 0.20 0.55 29.19
PORTICO A y F m2 2 10.10 0.23 0.35 9.39
PORTICO B m2 1 10.10 0.35 0.40 11.62
1 8.50 0.35 0.55 12.33
PORTICO C, D y E m2 3 10.10 0.35 0.40 11.62
3 7.30 0.35 0.55 10.59
PORTICO F m2 1 4.33 0.25 0.40 4.55
1 3.80 0.23 0.35 3.53
1 5.00 0.23 0.35 4.65
1 4.10 0.25 0.40 4.31
1 6.90 0.25 0.55 9.32
PORTICO G m2 1 13.20 0.35 0.40 15.18
1 11.00 0.35 0.55 15.95
PORTICO H m2 1 18.80 0.20 0.55 24.44
PORTICO 10 m2 2 25.80 0.20 0.55 33.54
PORTICO 12 m2 1 28.50 0.20 0.55 37.05
PORTICO 13 m2 1 4.50 0.20 0.55 5.85
VS-1 (13x40) m2 1 13.20 0.13 0.40 12.28
VCH-3 (13x20) m2 1 8.00 0.13 0.20 4.24
VIGA 15X40 m2 1 120.00 0.15 0.40 114.00
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS
BLOQUE Nº01
Calculando en la dirección X-X
VIGA C-A m2 1 101.00 0.13 0.20 40.40

01.04.07 LOSA ALIGERADA H=0.20 M.


01.04.07.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 59.65 m3
Ver metrado de encofrado y multiplicar por factor 0.087545/m2 UND 1.00 metrado encofrado = 681.37 Fact.= 0.087545 cantidad de Concreto = 59.65 59.65

01.04.07.02 ACERO EN LOSAS ALIGERADAS F'Y=4,200 KG/CM2 GRADO 60 KG 3140.75 3140.75 3140.75 KG

01.04.07.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 681.37 m2


BLOQUE 1 m2 1 195.82 195.82
BLOQUE 2 m2 1 485.55 485.55

01.04.07.04 LADRILLO HUECO DE ARCILLA DE 15x30x30 PARA LOSA ALIGERADO h=20 cm UND 5675.81 UND
Ver metrado de encofrado y multiplicar por factor 8.33/m2 UND 1.00 metrado encofrado = 681.37 Fact.= 8.33 cantidad de ladrillos = 5675.81 5675.81

01.04.08 ESCALERAS
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

01.04.08.01 CONCRETO EN ESCALERAS F'c= 210 KG/CM2 m3 3.96 m3


ESCALERA METRADO DEL TRAMO INICIAL m3 1 Ver Area Long. = 1.53 Area = 1.55 2.37 2.37
ESCALERA METRADO DEL TRAMO FINAL m3 1 Ver Area Long. = 1.53 Area = 1.04 1.59 1.59

01.04.08.02 ACERO EN ESCALERAS F'Y=4,200 KG/CM2 GRADO 60 KG 299.71 KG


ESCALERA TRAMO INICIAL - Acero Longitudinal total kg 1 5.58 1/2 8.00 44.37 44.37
ESCALERA TRAMO INICIAL - Acero Longitudinal superior 1 kg 1 2.48 1/2 8.00 19.72 19.72
ESCALERA TRAMO INICIAL - Acero Longitudinal superior 2 kg 1 2.15 1/2 8.00 17.10 17.10
ESCALERA TRAMO INICIAL - Acero Longitudinal inferior kg 1 2.53 1/2 8.00 20.12 20.12
ESCALERA TRAMO INICIAL - Acero Transversal superior 1 kg 1 1.53 1/2 13.00 19.77 19.77
ESCALERA TRAMO INICIAL - Acero Transversal superior 2 kg 1 1.53 1/2 4.00 6.08 6.08
ESCALERA TRAMO INICIAL - Acero Transversal inferior kg 1 1.53 1/2 19.00 28.90 28.90
ESCALERA TRAMO FINAL - Acero Longitudinal total kg 1 5.26 1/2 8.00 41.83 41.83
ESCALERA TRAMO FINAL - Acero Longitudinal superior kg 1 2.10 1/2 8.00 16.70 16.70
ESCALERA TRAMO FINAL - Acero Longitudinal inferior 1 kg 1 2.26 1/2 8.00 17.97 17.97
Area Transv. = 1.5512 m2
ESCALERA TRAMO FINAL - Acero Longitudinal inferior 2 kg 1 1.56 1/2 8.00 12.41 12.41
ESCALERA TRAMO FINAL - Acero Transversal superior 1 kg 1 1.53 1/2 5.00 7.60 7.60
Perimetro = 12.62 ml.
ESCALERA TRAMO FINAL - Acero Transversal superior 2 kg 1 1.53 1/2 12.00 18.25 18.25
ESCALERA TRAMO FINAL - Acero Transversal inferior kg 1 1.53 1/2 19.00 28.90 28.90
Area Transv. = 1.0380 m2
01.04.08.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2
Perimetro = 9.97 ml. 72.23 m2
TRAMO
ESCALERA METRADO DEL INICIAL
TRAMO INICIAL m2 1 Perimetro = 12.62 Long. = 1.53 38.62 38.62
ESCALERA METRADO DEL TRAMO INICIAL - Lados m2 1 Area = 1.55 3.10 3.10
ESCALERA METRADO DEL TRAMO FINAL m2 1 Perimetro = 9.97 Long. = 1.53 30.51 30.51
ESCALERA METRADO DEL TRAMO FINAL - Lados m2 1 Area = 1.04 TRAMO FINAL
2.08 2.08

01.04.09 GARGOLAS
01.04.09.01 CONCRETO EN GARGOLAS F'C=175 KG/CM2 m3 0.01 m3
GARGOLA m3 2 0.20 0.20 0.10 0.004 0.01
GARGOLA m3 4 0.20 0.05 0.15 0.002 0.01

01.04.09.02 ACERO EN ESCALERAS F'Y=4,200 KG/CM2 GRADO 60 KG 2.11 KG


Ø 1/4” 4 1.29 1/4 1.00 0.32 1.29
Ø 1/4” 4 0.82 1/4 1.00 0.21 0.82

01.04.09.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 0.51 m2


m2 2 0.70 0.20 0.14 0.28
m2 4 0.20 0.10 0.02 0.08
m2 4 0.15 0.05 0.01 0.03
m2 4 0.15 0.20 0.03 0.12
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

01.05 COBERTURA
01.05.01 COBERTURA LADRILLO PASTELERO DE 30X30X1" ASENTADO CON MEZCLA m2 540.65 m2
Aulas 3 y 4 m2 1 235.45 235.45
Aulas 1 y 2 m2 1 275.64 275.64
Psicomotricidad m2 1 29.56 29.56

01.04.09 GARGOLAS
01.04.09.01 CONCRETO EN GARGOLAS F'C=175 KG/CM2 m3 0.01 m3
GARGOLA m3 2 0.20 0.20 0.10 0.004 0.01
GARGOLA m3 4 0.20 0.05 0.15 0.002 0.01

01.04.09.02 ACERO EN ESCALERAS F'Y=4,200 KG/CM2 GRADO 60 KG 2.11 KG


Ø 1/4” 4 1.29 1/4 1.00 0.32 1.29
Ø 1/4” 4 0.82 1/4 1.00 0.21 0.82

01.04.09.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 0.51 m2


m2 2 0.70 0.20 0.14 0.28
m2 4 0.20 0.10 0.02 0.08
m2 4 0.15 0.05 0.01 0.03
m2 4 0.15 0.20 0.03 0.12

01.04.10 #N/A
01.04.10.01 #N/A m3 0.21 m3
COCINA m3 1 3.45 0.60 0.10 0.21 0.21

01.04.10.02 #N/A KG 14.17 KG


Ø 3/8” 1 3.45 3/8 3.00 5.80 5.80
Ø 3/8” 1 0.65 3/8 23.00 8.37 8.37

01.04.10.03 #N/A m2 2.48 m2


m2 1 3.45 0.60 2.07 2.07
m2 1 4.05 0.10 0.41 0.41

01.04.11 #N/A
01.04.11.01 #N/A m3 0.25 m3
ESPERA m3 1 4.59 0.55 0.10 0.25 0.25

01.04.11.02 #N/A KG 10.31 KG


Ø 1/4” 1 0.65 1/4 16.00 2.60 2.60
Ø 3/8” 1 4.59 3/8 3.00 7.71 7.71

01.04.11.03 #N/A m2 3.04 m2


m2 1 4.59 0.55 2.52 2.52
m2 1 5.14 0.10 0.51 0.51

01.05 COBERTURA
01.05.01 COBERTURA LADRILLO PASTELERO DE 30X30X1" ASENTADO CON MEZCLA m2 540.65 m2
Aulas 3 y 4 m2 1 235.45 235.45
Aulas 1 y 2 m2 1 275.64 275.64
Psicomotricidad m2 1 29.56 29.56

01.06 OTROS
01.06.01 JUNTA DE CONSTRUCCION CON TEKNOPORT DE 1" m2 24.13 m2
Aulas 3 y 4 m2 18 3.46 0.13 0.45 8.10
Aulas 1 y 2 m2 17 2.68 0.13 0.35 5.92
Comedor m2 16 4.86 0.13 0.63 10.11

01.06.02 JUNTA SELLADA CON POLIURETANO ml 327.46 ml


Aulas 3 y 4 ml 36 3.46 3.46 124.56
Aulas 1 y 2 ml 34 2.68 2.68 91.12
Comedor ml 23 4.86 4.86 111.78
SUSTENTO DE DE METRADOS DE ESTRUCTURAS
Proyecto #NAME? PERIODO: DEL 01.MAR.09 AL 31.MAR.09
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO f 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Provincia HUANUCO W(kg/ml) 0.250 0.560 0.994 1.552 2.235 3.970
Región HUANUCO W(kg/vrll) 2.250 5.040 8.946 13.968 20.115 35.760
DIMENSIONES LONGITUD AREA VOLUMEN PESO
AREA VOLUMEN SUB-
PARTIDA DESCRIPCION UNIDAD Nº ELM. LARGO ANCHO ALTO LONGITUD PARCIAL PARCIAL PARCIAL PARCIAL UNIDAD
(m) (m) (m) f N° VAR.
(m) (m2)
UNITARIA
(m3)
UNITARIO
(Kg)
TOTAL
(m2) (m3)

01.06.03 TAPAJUNTAS METALICAS DE 1/8" X 6" SEGUN DISEÑO ml 15.69 ml


En Muros ml 3 5.23 5.23 15.69

01.06.04 JUNTA METALICA EN PISO DE 1/8" X 6" SEGUN DISEÑO EN SEGUNDO NIVEL ml 3.93 ml
Junta entre estructuras ml 1 2.68 2.68 2.68
ml 1 1.25 1.25 1.25

01.06.05 LIMPIEZA FINAL DE OBRA Gbl 1 1.00 1.00 Gbl

01.06.06 PLACA RECORDATORIA DE OBRA ACRILICO DE 0.55x0.45 SEGUN DISEÑO Und 1 1.00 1.00 Und
METRADO DE ACERO DE ESTRUCTURAS

Proyecto #NAME?

Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

Nº DE Nº DE LONGITUD DIAMETRO LONGITUD PESO/ SUB-TOTAL SUB-TOTAL


DESCRIPCION PISO EJE TIPO
TIPOS VARILLAS (m) (pulg) TOTAL (m) ml (kg) (kg)
4 10 0.00 5/8 0.00 1.552 0.00
Z-1
4 7 0.00 5/8 0.00 1.552 0.00
4 8 0.00 5/8 0.00 1.552 0.00
Z-2
4 9 0.00 5/8 0.00 1.552 0.00
1 7 0.00 5/8 0.00 1.552 0.00
Z-3
1 52 0.00 5/8 0.00 1.552 0.00
1 7 0.00 5/8 0.00 1.552 0.00
ZAPATAS BLOQUE 01 Z-4
1 52 0.00 5/8 0.00 1.552 0.00
1 7 0.00 5/8 0.00 1.552 0.00
Z-5
1 52 0.00 5/8 0.00 1.552 0.00
1 7 0.00 5/8 0.00 1.552 0.00
Z-6
1 52 0.00 5/8 0.00 1.552 0.00
1369.76
1 17 1.35 5/8 22.95 1.552 35.62
Z-7
1 10 2.46 5/8 24.60 1.552 38.18
1 58 1.10 5/8 63.80 1.552 99.02
Z-8
1 8 8.60 5/8 68.80 1.552 106.78
1 58 1.10 5/8 63.80 1.552 99.02
Z-9
1 8 8.60 5/8 68.80 1.552 106.78
10 13 1.70 5/8 221.00 1.552 342.99
ZAPATAS BLOQUE 02 Z-10
10 12 1.90 5/8 228.00 1.552 353.86
1 25 1.55 5/8 38.75 1.552 60.14
Z-11
1 11 3.58 5/8 39.38 1.552 61.12
1 12 1.75 5/8 21.35 1.552 33.14
Z-12
1 12 1.83 5/8 21.35 1.552 33.14
e=23cm 1 2 7.84 5/8 15.68 1.552 24.34
Eje F entre 10-12

e=23cm 1 6 7.84 1/2 47.04 0.994 46.76


e=23cm 1 16 0.50 1/2 8.00 0.994 7.95
e=23cm 1 50 2.26 3/8 113.00 0.560 63.28
e=23cm 1 2 7.84 5/8 15.68 1.552 24.34
CIMIENTO e=23cm 1 6 7.84 1/2 47.05 0.994 46.76
Eje A entre 10-12

REFORZADO+ BLOQUE 02 321.51


SOBRECIMIENTO e=23cm 1 50 2.26 3/8 113.00 0.560 63.28
e=23cm 1 13 1.66 1/2 21.58 0.994 21.45
e=23cm 1 7 1.26 1/2 8.82 0.994 8.77
e=23cm 1 2 3.92 3/8 7.84 0.560 4.39
e=23cm 1 2 7.44 3/8 14.88 0.560 8.33
e=23cm 1 1 7.44 1/4 7.44 0.250 1.86
METRADO DE ACERO DE ESTRUCTURAS

Proyecto #NAME?

Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

Nº DE Nº DE LONGITUD DIAMETRO LONGITUD PESO/ SUB-TOTAL SUB-TOTAL


DESCRIPCION PISO EJE TIPO
TIPOS VARILLAS (m) (pulg) TOTAL (m) ml (kg) (kg)
2 4 7.59 5/8 60.72 1.552 94.24
2 6 7.59 1/2 91.08 0.994 90.53
C-01
2 22 1.40 3/8 61.60 0.560 34.50
2 22 1.50 3/8 66.00 0.560 36.96
12 4 7.59 5/8 364.32 1.552 565.42
12 8 7.59 1/2 728.64 0.994 724.27
C-02
12 22 1.70 3/8 448.80 0.560 251.33
12 22 1.50 3/8 396.00 0.560 221.76

1 4 7.59 5/8 30.36 1.552 47.12


1 3 7.59 1/2 22.77 0.994 22.63
C-06
1 22 1.25 3/8 27.50 0.560 15.40
1 22 1.50 3/8 33.00 0.560 18.48
1 4 7.59 5/8 30.36 1.552 47.12
1 4 7.59 1/2 30.36 0.994 30.18
C-07
1 22 1.70 3/8 37.40 0.560 20.94
1 22 1.30 3/8 28.60 0.560 16.02

Primer y Segundo
COLUMNAS Piso 2541.50
BLOQUE 01 - 02

1 4 8.10 1/2 32.40 0.994 32.21


C-12
1 21 1.10 3/8 23.10 0.560 12.94
1 6 7.49 1/2 44.94 0.994 44.67
C-10 1 22 0.80 3/8 17.60 0.560 9.86
1 22 1.20 3/8 26.40 0.560 14.78
1 8 6.95 1/2 55.60 0.994 55.27
C-11 1 22 1.15 3/8 25.30 0.560 14.17
1 22 1.15 3/8 25.30 0.560 14.17
Primer y Segundo
COLUMNAS Piso 2541.50
BLOQUE 01 - 02 METRADO DE ACERO DE ESTRUCTURAS

Proyecto #NAME?

Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

Nº DE Nº DE LONGITUD DIAMETRO LONGITUD PESO/ SUB-TOTAL SUB-TOTAL


DESCRIPCION PISO EJE TIPO
TIPOS VARILLAS (m) (pulg) TOTAL (m) ml (kg) (kg)
1 4 6.95 1/2 27.80 0.994 27.63
C-12
1 22 1.10 3/8 24.20 0.560 13.55

2 4 5.11 1/2 40.88 0.994 40.63


C-05
2 23 0.96 3/8 44.16 0.560 24.73
METRADO DE ACERO DE ESTRUCTURAS

Proyecto #NAME?

Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

Nº DE Nº DE LONGITUD DIAMETRO LONGITUD PESO/ SUB-TOTAL SUB-TOTAL


DESCRIPCION PISO EJE TIPO
TIPOS VARILLAS (m) (pulg) TOTAL (m) ml (kg) (kg)

BLOQUE 01
METRADO DE ACERO DE ESTRUCTURAS

Proyecto #NAME?

Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

Nº DE Nº DE LONGITUD DIAMETRO LONGITUD PESO/ SUB-TOTAL SUB-TOTAL


DESCRIPCION PISO EJE TIPO
TIPOS VARILLAS (m) (pulg) TOTAL (m) ml (kg) (kg)

BLOQUE 02
2 6 7.00 5/8 84.00 1.552 130.37
2 31 1.50 3/8 93.00 0.560 52.08
VIGAS 4634.22
2 10 1.72 3/8 34.40 0.560 19.26
PORTICO C, D y E 1 5 7.45 5/8 37.25 1.552 57.81
1 4 2.55 1/2 10.20 0.994 10.14
1 1 3.30 3/4 3.30 2.235 7.38
1 38 1.80 3/8 68.40 0.560 38.30
1 2 9.90 1/2 19.80 0.994 19.68
1 2 10.20 1/2 20.40 0.994 20.28
1 1 5.50 5/8 5.50 1.552 8.54
1 1 4.80 5/8 4.80 1.552 7.45
1 2 7.25 1/2 14.50 0.994 14.41
1 2 6.20 1/2 12.40 0.994 12.33
1 28 1.30 3/8 36.40 0.560 20.38
PORTICO F
1 56 0.96 3/8 53.76 0.560 30.11
1 11 1.72 3/8 18.92 0.560 10.60
1 5 4.30 5/8 21.50 1.552 33.37
1 28 1.60 3/8 44.80 0.560 25.09
1 4 7.90 1/2 31.60 0.994 31.41
1 2 3.10 1/2 6.20 0.994 6.16
2 38 0.96 3/8 72.96 0.560 40.86
1 3 9.25 5/8 27.75 1.552 43.07
1 3 10.30 5/8 30.90 1.552 47.96
1 3 6.15 5/8 18.45 1.552 28.63
1 3 7.30 5/8 21.90 1.552 33.99
1 89 1.50 3/8 133.50 0.560 74.76
PORTICO G 1 11 1.72 3/8 18.92 0.560 10.60
1 5 12.20 5/8 61.00 1.552 94.67
1 1 3.30 3/4 3.30 2.235 7.38
1 2 3.05 1/2 6.10 0.994 6.06
1 2 2.55 1/2 5.10 0.994 5.07
1 66 1.80 3/8 118.80 0.560 66.53
2 6 21.2 5/8 254.40 1.552 394.83
PORTICO H
METRADO DE ACERO DE ESTRUCTURAS

Proyecto #NAME?

Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

Nº DE Nº DE LONGITUD DIAMETRO LONGITUD PESO/ SUB-TOTAL SUB-TOTAL


DESCRIPCION PISO EJE TIPO
TIPOS VARILLAS (m) (pulg) TOTAL (m) ml (kg) (kg)
PORTICO H
2 134 1.50 3/8 402.00 0.560 225.12
2 6 29.20 5/8 350.40 1.552 543.82
PORTICO 10
2 197 1.50 3/8 591.00 0.560 330.96
2 6 31.90 5/8 382.80 1.552 594.11
PORTICO 12
2 220 1.50 3/8 660.00 0.560 369.60
2 6 5.00 5/8 60.00 1.552 93.12
PORTICO 13
2 37 1.50 3/8 111.00 0.560 62.16
1 6 14.00 1/2 84.00 0.994 83.50
VS-1 (13x40)
1 96 1.06 3/8 101.76 0.560 56.99
1 4 8.55 1/2 34.20 0.994 33.99
VCH-3 (13x20)
1 60 1.06 3/8 63.60 0.560 35.62
1 4 150.00 3/8 600.00 0.560 336.00
VIGA C-A
1 850 0.76 1/4 646.00 0.250 161.50
VIGA 15X40 1 2 150.00 1/2 300.00 0.994 298.20
METRADO DE ACERO DE ESTRUCTURAS

Proyecto #NAME?

Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

Nº DE Nº DE LONGITUD DIAMETRO LONGITUD PESO/ SUB-TOTAL SUB-TOTAL


DESCRIPCION PISO EJE TIPO
TIPOS VARILLAS (m) (pulg) TOTAL (m) ml (kg) (kg)
1 21 22.50 1/2 472.50 0.994 469.67
1 21 3.50 1/2 73.50 0.994 73.06
1 21 1.50 1/2 31.50 0.994 31.31
1 21 2.20 1/2 46.20 0.994 45.92
1 21 2.55 1/2 53.55 0.994 53.23
BLOQUE 01 PRIMER PISO 1 21 2.55 1/2 53.55 0.994 53.23
1 21 2.20 1/2 46.20 0.994 45.92
1 21 2.00 1/2 42.00 0.994 41.75
1 21 1.16 1/2 24.36 0.994 24.21
1 21 1.15 1/2 24.07 0.994 23.92
1 21 1.15 1/2 24.07 0.994 23.92
1 17 27.00 1/2 459.00 0.994 456.25
1 17 1.05 1/2 17.85 0.994 17.74
1 17 2.20 5/8 37.40 1.552 58.04
1 17 2.55 5/8 43.35 1.552 67.28
1 17 2.55 5/8 43.35 1.552 67.28
1 17 2.20 5/8 37.40 1.552 58.04
1 17 2.15 5/8 36.55 1.552 56.73
1 17 2.55 5/8 43.35 1.552 67.28
1 17 1.50 1/2 25.50 0.994 25.35
PRIMER PISO 1 2 3.40 1/2 6.80 0.994 6.76
1 2 3.60 1/2 7.20 0.994 7.16
1 6 4.30 1/2 25.80 0.994 25.65
LOSA ALIGERADA 1 6 4.00 1/2 24.00 0.994 23.86 3140.75
1 8 6.05 1/2 48.40 0.994 48.11
1 8 0.90 5/8 7.20 1.552 11.17
1 8 2.30 5/8 18.40 1.552 28.56
1 8 0.90 1/2 7.20 0.994 7.16
1 14 4.90 1/2 68.60 0.994 68.19
BLOQUE 02
1 14 1.35 1/2 18.90 0.994 18.79
1 19 27.00 1/2 513.00 0.994 509.92
1 19 1.05 1/2 19.95 0.994 19.83
1 19 2.20 5/8 41.80 1.552 64.87
1 19 2.55 5/8 48.45 1.552 75.19
1 19 2.55 5/8 48.45 1.552 75.19
1 19 2.20 5/8 41.80 1.552 64.87
1 19 2.15 5/8 40.85 1.552 63.40
1 19 2.55 5/8 48.45 1.552 75.19
SEGUNDOPISO
LOSA ALIGERADA 3140.75

METRADO DE ACERO DE ESTRUCTURAS


BLOQUE 02
Proyecto #NAME?

Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

Nº DE Nº DE LONGITUD DIAMETRO LONGITUD PESO/ SUB-TOTAL SUB-TOTAL


DESCRIPCION PISO EJE TIPO
TIPOS VARILLAS (m) (pulg) TOTAL (m) ml (kg) (kg)
SEGUNDOPISO 1 19 1.50 1/2 28.50 0.994 28.33
1 2 3.40 1/2 6.80 0.994 6.76
1 2 3.60 1/2 7.20 0.994 7.16
1 6 4.30 1/2 25.80 0.994 25.65
1 6 4.00 1/2 24.00 0.994 23.86
1 8 6.05 1/2 48.40 0.994 48.11
1 8 0.90 5/8 7.20 1.552 11.17
1 8 2.30 5/8 18.40 1.552 28.56
1 8 0.90 1/2 7.20 0.994 7.16
SUSTENTO DE METRADOS
ACERO KG/ML

PROYECTO : CONSTRUCCION DE INFRAESTRUCTURA EDUCATIVA DEL CENTRO EDUCATIVO 004 PP.JJ. APARICIO POMARES - HUANUCO 1/4" 0,25
3/8" 0,58
OBRA : MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRI 1/2" 1,02
5/8" 1,6
FECHA : MARZO DEL 2009 HECHO POR: CEJAR 3/4" 2,26
1" 4,04
ESPECIALIDAD : ARQUITECTURA HOJA N°

MEDIDAS Nº SUB TOTAL


Nº DESCRIPCION UND DE TOTAL
LARGO ANCHO ALTO VECES LONG. AREA VOL. KG.

04 INSTALACIONES ELECTRICAS

04.01 CONEXIONES EXTERNAS E INTERNAS

04.01.01 EXCAVACION DE ZANJAS PARA CONEXION INTERNA DE 0.40x0.65 M3 39.51


Acometida 22.00 0.40 0.65 1.00 5.72

De TG a ST-2 65.50 0.40 0.65 1.00 17.03

Ilumiinacion Externa 64.45 0.40 0.65 1.00 16.76

04.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO (TIERRA CERNIDAM3 39.51


Acometida 22.00 0.40 0.65 1.00 5.72

De TG a ST-2 65.50 0.40 0.65 1.00 17.03

Ilumiinacion Externa 64.45 0.40 0.65 1.00 16.76

04.01.03 LINEA INTERNA SUBTERRANEA CON CABLE DE 2X16 MM2 NYY + 1X16Ml 151.95
Acometida 22.00 1.00 22.00

De TG a ST-2 65.50 1.00 65.50

Ilumiinacion Externa 64.45 1.00 64.45

04.01.04 EMPALME PARA CONDUCTOR DE CABLE DE ENERGIA SUBTERRANEO


UND 6.00 6.00
04.02 SALIDA DE LUZ Y FUERZA

04.02.01 SALIDA DE TECHO - CENTROS DE LUZ Pto 63.00 63.00


04.02.02 SALIDA CON PVC PARA SPOT LIGTH Pto 9.00 9.00
04.02.03 SALIDA DE PARED (BRAQUETES) CON PVC Pto 11.00 11.00
04.02.04 SALIDA PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA Pto 47.00 47.00
04.02.05 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A TIERRA Pto 18.00 18.00
04.03 SALIDA PARA COMUNICACIONES Y SEÑALES

04.03.01 SALIDA PARA SISTEMA DE INFORMATICA CON CONCENTRADORA DE UND 1.00 1.00
04.03.02 SALIDA PARA TELEFONO DIRECTO (DE SERVICIO PUBLICO) Pto 3.00 3.00
04.03.03 SERVICIO DE INSTALACION DE PUNTOS PARA SISTEMA DE COMPUTOUND 1.00 1.00
04.04 TABLEROS Y CAJAS

04.04.01 TABLERO TERMOMAGNETICO GENERAL Pza 1.00 1.00


04.04.02 TABLERO DE DISTRIBUCION TERMOMAGNETICO (ST-1,ST-2) Pza 1.00 1.00
04.04.03 TABLERO DE CONTROL P/REFLECTORES Pza 1.00 1.00
04.04.04 SALIDA PARA CAJA DE PASE GALVANIZADA DE 100x50 mm CON TAPAPza 5.00 5.00
04.04.05 SALIDA PARA CAJA DE PASE Pto 2.00 2.00
04.05 ARTEFACTOS

04.05.01 FOCOS DE 50W. INCLUIDO WALL SOCKET DE BACKELITA EN EXTERI UND 11.00 11.00
04.05.02 FLUORESCENTE RECTO 2 x 40 W CON EQUIPO COMPLETO PARA ADOSAR SEGUN DISEÑO 63.00 63.00
04.05.03 FLUORESCENTE RECTO 2 x 20 W CON EQUIPO COMPLETO PARA ADOSAR SEGUN DISEÑO 9.00 9.00
04.05.04 REFLECTOIRES ALOGENO SODIO DE 125 W. 8.00 8.00
04.06 VARIOS

04.06.01 SALIDA PARA TIMBRE TIPO GONG CON PVC Pto 2.00 2.00
04.06.02 POZO DE TIERRA INCLUIDO INSTALACION GLB 2.00 2.00
GOBIERNO
REGIONAL
HUANUCO

RESUMEN DE METRADOS TOTALES


PROYECTO #NAME?
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

PARTIDA DESCRIPCION UNIDAD TOTAL

01 ESTRUCTURAS #REF!
01.01 OBRAS PRELIMINARES
01.01.01 CARTEL DE OBRA CON BANNER (GIGANTOGRAFIA) Y BASTIDORES DE MADERA DE 2.40 x 3.60 M. SEGUN DISEÑO UND 0.50
01.01.02 #N/A #N/A #N/A
01.01.03 #N/A #N/A #N/A
01.01.04 #N/A #N/A #N/A
01.01.05 #N/A #N/A #N/A
01.01.06 #N/A #N/A #N/A
01.01.07 #N/A #N/A #N/A
01.01.08 #N/A #N/A #N/A
01.01.09 #N/A #N/A #N/A
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL CON RETROEXCAVADORA DE 5Y3 m3
01.02.02 EXCAVACION DE ZANJAS PARA CIMIENTOS Y ZAPATAS m3 190.01
01.02.03 #N/A #N/A #N/A
01.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST= 2 KM.
01.02.05 #N/A #N/A #N/A
01.03 OBRAS DE CONCRETO SIMPLE
01.03.01 FALSA ZAPATA
01.03.01.01 FALSA ZAPATA CONCRETO 1:12 CEMENTO HORMIGON + 30% DE PIEDRA GRANDE m3 38.39
01.03.02 CIMIENTO
01.03.02.01 FALSA CIMENTACION MEZCLA 1:12 CEMENTO-HORMIGON + 30 % DE PIEDRA GRANDE m3 28.33
01.03.02.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE m3 33.39
01.03.03 #N/A #N/A #N/A
01.03.03.01 #N/A #N/A #N/A
01.03.03.02 #N/A #N/A #N/A
01.03.04 #N/A #N/A #N/A
01.03.04.01 #N/A #N/A #N/A
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 56.04
01.04.01.02 ACERO PARA ZAPATAS F'Y=4,200 KG/CM2 GRADO 60 KG 1,369.76
01.04.02 CIMIENTOS REFORZADOS
01.04.02.01 CONCRETO EN CIMIENTOS REFORZADOS F'C=210 KG/CM2 m3 6.39
01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA CIMIENTOS m2
01.04.03 SOBRECIMIENTOS ARMADO
01.04.03.01 CONCRETO EN CIMIENTOS REFORZADOS F'C=210 KG/CM2 m3 4.13
01.04.03.02 ACERO EN CIMIENTO REFORZADO F'Y=4,200 KG/CM2 GRADO 60 kg 321.51
01.04.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.40M 19.22
01.04.04 MUROS DE CONCRETO ARMADO
01.04.04.01 CONCRETO EN MURO REFORZADO F'C=210 KG/CM2 m3 10.88
01.04.04.02 ACERO EN MURO F'Y=4,200 KG/CM2 GRADO60 kg 548.39
01.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO REFORZADO m2 59.05
01.04.05 COLUMNAS
01.04.05.01 CONCRETO EN COLUMNETAS F'C=175 KG/CM2 m3
01.04.05.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 1.51
01.04.05.03 ACERO EN COLUMNAS F'Y=4,200 KG/CM2 GRADO 60 kg 2,541.50
01.04.05.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 19.87
01.04.06 VIGAS
01.04.06.01 CONCRETO EN VIGUETAS F'C=210KG/CM2 m3 3.90
01.04.06.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 57.33
01.04.06.03 ACERO EN VIGAS F'Y=4,200 KG/CM2 GRADO 60 kg 4,634.22
01.04.06.04 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 502.39
01.04.07 LOSA ALIGERADA H=0.20 M.
01.04.07.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 59.65
01.04.07.02 ACERO EN LOSAS ALIGERADAS F'Y=4,200 KG/CM2 GRADO 60 KG 3,140.75
01.04.07.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 681.37
01.04.07.04 LADRILLO HUECO DE ARCILLA DE 15x30x30 PARA LOSA ALIGERADO h=20 cm UND 5,675.81
01.04.08 ESCALERAS
01.04.08.01 CONCRETO EN ESCALERAS F'c= 210 KG/CM2 m3 3.96
01.04.08.02 ACERO EN ESCALERAS F'Y=4,200 KG/CM2 GRADO 60 KG 299.71
01.04.08.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 72.23
01.04.09 GARGOLAS
01.04.09.01 CONCRETO EN GARGOLAS F'C=175 KG/CM2 m3 0.01
01.04.09.02 ACERO EN ESCALERAS F'Y=4,200 KG/CM2 GRADO 60 KG 2.11
01.04.09.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 0.51
01.04.10 #N/A
01.04.10.01 #N/A m3 0.21
01.04.10.02 #N/A KG 14.17
01.04.10.03 #N/A m2 2.48
01.04.11 #N/A
01.04.11.01 #N/A m3 0.25
01.04.11.02 #N/A KG 10.31
01.04.11.03 #N/A m2 3.04
01.05 COBERTURA
01.05.01 COBERTURA LADRILLO PASTELERO DE 30X30X1" ASENTADO CON MEZCLA m2 540.65
01.06 OTROS
01.06.01 JUNTA DE CONSTRUCCION CON TEKNOPORT DE 1" m2 24.13
01.06.02 JUNTA SELLADA CON POLIURETANO ml 327.46
01.06.03 TAPAJUNTAS METALICAS DE 1/8" X 6" SEGUN DISEÑO ml 15.69
01.06.04 JUNTA METALICA EN PISO DE 1/8" X 6" SEGUN DISEÑO EN SEGUNDO NIVEL ml 3.93
01.06.05 LIMPIEZA FINAL DE OBRA Gbl 1.00
01.06.06 PLACA RECORDATORIA DE OBRA ACRILICO DE 0.55x0.45 SEGUN DISEÑO Und 1.00
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE CABEZA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENA 1:5 M2 9.71
02.01.02 #N/A #N/A #N/A
02.01.03 #N/A #N/A #N/A
02.02 #N/A #N/A #N/A
02.02.01 #N/A #N/A #N/A
02.02.02 #N/A #N/A #N/A
02.02.03 #N/A #N/A #N/A
02.02.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA 1:5 M2 458.13
02.02.05 TARRAJEO PULIDO BOLEADO GRIS EN PARAPETO M2 2.81
02.02.06 VESTIDURA DE DERRAMES CON CEMENTO ARENA 1:5 - ANCHO 0.15 M. Ml 486.88
02.02.07 BRUÑAS E= 1 CM. Ml 1103.41
02.03 CIELORRASOS
02.03.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA 1:4 M2 681.37
02.03.02 VESTIDURA DE SUPERFICIE DE FONDO ESCALERA CON CEMENTO-CAL-ARENA M2 15.20
GOBIERNO
REGIONAL
HUANUCO

RESUMEN DE METRADOS TOTALES


PROYECTO #NAME?
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

PARTIDA DESCRIPCION UNIDAD TOTAL

02.04 PISOS Y PAVIMENTOS


02.04.01 PISOS
02.04.01.01 CONTRAPISO DE 48 mm 92.93
02.04.01.02 CONTRAPISO DE 48 mm PARA PISO CERAMICO EN SEGUNDO PISO 135.55
02.04.01.03 PISO DE CERAMICO DE 45x45 TRANSITO INTENSO TIPO RUSTICO DIFERENTES COLORES M2 368.71
02.04.01.04 PISO DE CERAMICO DE 30x30 TIPO RUSTICO COLOR TRANSITO INTENSO M2 43.26
02.05 ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS
02.05.01 ZOCALOS
02.05.01.01 ZOCALO EXTERIOR FROTACHADO FINO H= Variable M2 57.04
02.05.01.02 ZOCALO DE CERAMICA 20x30 Cm. M2 165.76
02.05.02 CONTRAZOCALOS
02.05.02.01 CONTRAZOCALO CEMENTO PULIDO SIN COLOREAR H = 20 cm Ml 319.61
02.05.03 REVESTIMIENTOS DE ESCALERA
02.05.03.01 FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS DE CEMENTO PULIDO Ml 30.00
02.05.03.02 FORJADO Y REVESTIMIENTO DE DESCANZO DE ESCALERAS DE CEMENTO PULIDO M2 4.80
02.06 CARPINTERIA DE MADERA
02.06.01 PUERTAS
02.06.01.01 PUERTA DE MADERA TORNILLO TABLERO REBAJADO SEGUN DISEÑO M2 67.62
02.06.01.02 PUERTA CONTRAPLACADA DE 50 MM. CON TRIPLEY DE 6 MM SEGUN DISEÑO ACABADO LAQUEADO M2 7.69
02.06.01.03 COLOCACION DE PUERTAS UND 42.00
02.06.02 VENTANAS
02.06.02.01 VENTANA DE MADERA CON SEGURIDAD SEGUN DISEÑO M2 0.79
02.06.02.02 COLOCACION DE VENTANAS UND 4.00
02.07 CARPINTERIA METALICA
02.07.01 PUERTAS
02.07.01.01 PUERTA DE INGRESO METALICO SEGUN DISEÑO DE 2.25x2.56 M. UND 1.00
02.07.02 VENTANAS
02.07.02.01 VENTANA METALICA CON SEGURIDAD SEGUN DISEÑO M2 78.43
02.07.02.02 COLOCACION DE VENTANAS UND 69.00
02.07.03 CERRAJERIA
02.07.03.01 CERRADURA DE 03 GOLPES TIPO FORTE Pza 2.00
02.07.03.02 CERRADURA DE 02 GOLPES TIPO FORTE Pza 18.00
02.07.03.03 CERRADURA DE PERILLA PARA PUERTA DE BAÑO CON SEGURO INTERIOR Pza 14.00
02.07.03.04 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 20.00
02.07.03.05 CERROJO ALUMINIZADO PARA PUERTAS UND 8.00
02.07.04 ESCALERAS
02.07.04.01 BARANDA DE ESCALERA C/ PARANTES DE TUBO DE FIERRO GALVANIZADO DE Ø 2" Y 1.1/2" + PARANTES DE PLATINA DE 1.1/2" S/DISEÑO Ml 16.05
02.07.04.02 BARANDAS AISLADOS DE TUBERIA FIERRO GALVANIZADO DE 2" SEGUN DISEÑO Ml 54.69
02.07.04.03 CANTONERAS METALICAS CON PLANCHAS ESTRIADAS SEGUN DISEÑO Pza 19.00
02.08 VIDRIOS, CRISTALES Y SIMILARES
02.08.01 VIDRIO SEMIDOBLE IMPORTADO COLOCADO CON SILICONA M2 79.23
02.09 PINTURA
02.09.01 PINTURA EN INTERIORES Y EXTERIORES
02.09.01.01 PINTURA LATEX EN MUROS INTERIORES
02.09.01.02 PINTURA LATEX EN MUROS EXTERIORES
02.09.01.03 PINTURA EN VIGAS Y COLUMNAS M2 755.51
02.09.01.04 PINTURA EN ZOCALO CON ESMALTE COLOR GRIS NIEBLA M2 120.96
02.09.02 PINTURA EN CIELORRASOS
02.09.02.01 PINTURA LATEX EN CIELORRASO SOBE CEMENTO ARENA COLOR BLANCO M2 681.37
02.09.02.02 PINTURA LATEX EN CIELORRASO FONDO ESCALERA M2 15.20
02.09.03 PINTURA EN ESTRUCTURA METALICA
02.09.03.01 PINTURA EN PUERTA METALICA COLOR NEGRO CON ANTICORROSIVO ZINCROMATO ACABADO CON ESMALTE SINTETICO M2 5.76
02.09.03.02 PINTURA EN VENTANAS METALICAS CON ESMALTE Y ANTICORROSIVO M2 78.43
02.09.03.03 PINTURA CON ESMALTE Y ANTICORROSIVO EN PASAMANOS DE 2" COLOR BAYO Ml 54.69
02.09.03.04 PINTURA CON ESMALTE ANTICORROSIVO ZINCROMATO EN CANTONERAS METALICAS COLOR NEGRO Ml 19.00
02.09.03.05 PINTURA CON ESMALTE Y ANTICORROSIVO EN TAPAJUNTAS METALICAS COLOR BAYO Ml 15.69
03 INSTALACIONES SANITARIAS
03.01 SISTEMA DE DESAGUE
03.01.01 SALIDA DE DESAGUE
03.01.01.01 SALIDA DE DESAGUE PVC DE 4" (INODORO) Pto 18.00
03.01.01.02 SALIDA DE DESAGUE CON PVC DE 2" (URINARIO Y LAVADERO) Pto 19.00
03.01.01.03 SALIDA DE REGISTRO ROSCADO DE BRONCE DE 4" Pto 10.00
03.01.01.04 SALIDA DE REGISTRO ROSCADO DE BRONCE DE 2" Pto 7.00
03.01.01.05 SALIDA DE DESAGUE CON PVC DE 2" (SUMIDERO) Pto 24.00
03.01.01.06 SALIDA DE VENTILACION PVC 2" Pto 12.00
03.01.02 REDES DE DISTRIBUCION
03.01.02.01 EXCAVACION DE ZANJAS DE 0.40x0.50 PARA TUBERIA DE DESAGUE DE 2", 4" Y 6" Ml 137.02
03.01.02.02 RELLENO Y COMPACTADO DE ZANJAS DE 0.40x0.50 PARA TUBERIA DE DESAGUE DE 2", 4" Y 6" CON MATERIAL PROPIO ZARANDEADO Ml 137.02
03.01.02.03 RED DE DISTRIBUCION TUBERIA PVC SAL DE 6" Ml 12.42
03.01.02.04 RED DE DISTRIBUCION TUBERIA PVC SAL DE 4" Ml 82.51
03.01.02.05 RED DE DISTRIBUCION TUBERIA PVC SAL DE 2" Ml 113.81
03.01.03 ACCESORIOS DE REDES
03.01.03.01 CODO PVC SAL PARA DESAGUE 4"X45° Pza 5.00
03.01.03.02 CODO PVC SAL PARA DESAGUE 4"X90° Pza 2.00
03.01.03.03 CODO PVC SAL PARA DESAGUE 2"X90° Pza 2.00
03.01.03.04 CODO PVC SAL PARA DESAGUE 2"X45° Pza 6.00
03.01.03.05 YEE PVC SAL PARA DESAGUE 4"x4" Pza 4.00
03.01.03.06 YEE PVC SAL PARA DESAGUE 4"x2" Pza 19.00
03.01.03.07 YEE PVC SAL PARA DESAGUE 2"x2" Pza 12.00
03.01.03.08 YEE PVC SAL DOBLE PARA DESAGUE DE 2" - PESADO Pza 2.00
03.01.03.09 REDUCCION PVC SAL PARA DESAGUE DE 4"x2" Pza 6.00
03.01.03.10 #N/A #N/A #N/A
03.01.03.11 #N/A #N/A #N/A
03.01.04 ADITAMENTOS VARIOS
03.01.04.01 REGISTRO ROSCADO DE BRONCE DE 4" Pza 10.00
03.01.04.02 REGISTRO ROSCADO DE BRONCE DE 2" Pza 7.00
03.01.04.03 SUMIDERO CROMADO DE 2" EN LAVADERO Pza 3.00
03.01.04.04 SUMIDERO CROMADO DE 2" EN URINARIO Pza 4.00
03.01.04.05 SUMIDERO CROMADO DE 2" EN PISO Pza 16.00
03.01.04.06 #N/A #N/A #N/A
03.01.05 CAMARAS DE INSPECCION
03.01.05.01 CAJA DE DESAGUE DE 0.50x0.80x0.80 DE CONCRETO CON TAPA DE FIERRO FUNDIDO Pza 1.00
03.01.05.02 CAJA DE REGISTRO DE 12"x24 Pza 5.00
03.02 SISTEMA DE AGUA FRIA
03.02.01 APARATOS SANITARIOS Y ACCESORIOS
03.02.01.01 INODORO TANQUE BAJO BLANCO TIPO BABY CON ACCESORIOS Pza 12.00
03.02.01.02 INODORO TANQUE BAJO BLANCO CON ACCESORIOS Pza 6.00
03.02.01.03 LAVATORIO DE PARED LOSA BLANCA INCLUIDO ACCESORIOS Pza 12.00
03.02.01.04 URINARIO CADET DE LOZA BLANCO CON ACCESORIOS Pza 2.00
GOBIERNO
REGIONAL
HUANUCO

RESUMEN DE METRADOS TOTALES


PROYECTO #NAME?
MODULO 01: COCINA COMEDOR, 04 AULAS, SALON DE USOS MULTIPLES, OFICINAS ADMINISTRATIVAS, TALLER PSICOMOTRIZ Y SALA DE COMPUTO
Distrito HUANUCO
Provincia HUANUCO
Región HUANUCO

PARTIDA DESCRIPCION UNIDAD TOTAL

03.02.01.05 PAPELERA DE LOZA COLOR CELESTE CIELO DE 15 x 15 Pza 18.00


03.02.01.06 LAVADERO DE COCINA ACERO UNOXIDABLE 1 POZA+ESCURRIDOR S/DISEÑO Pza 2.00
03.02.01.07 COLOCACION DE APARATOS SANITARIOS Pza 34.00
03.02.01.08 COLOCACION DE ACCESORIOS SANITARIOS Pza 34.00
03.02.02 SALIDA DE AGUA FRIA
03.02.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" Pto 45.00
03.02.03 REDES DE DISTRIBUCION
03.02.03.01 EXCAVACION DE ZANJAS DE 0.30x0.40 PARA TUBERIA DE AGUA DE 1/2" HASTA 1.1/2" Ml 132.72
03.02.03.02 RELLENO Y COMPACTADO DE ZANJAS DE 0.30x0.40 PARA TUBERIA DE AGUA DE 1/ 2" HASTA 1.1/2" CON MATERIAL PROPIO ZARANDEADO Ml 132.72
03.02.03.03 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP Ml 164.32
03.02.03.04 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP Ml 65.52
03.02.04 ACCESORIOS DE REDES
03.02.04.01 TEE PVC - SAP Ø 3/4" PARA AGUA UND 10.00
03.02.04.02 TEE PVC - SAP Ø 1/2" PARA AGUA UND 18.00
03.02.04.03 REDUCCION PVC - SAP Ø 3/4" A 1/2" PARA AGUA UND 8.00
03.02.04.04 CODO PVC - SAP Ø 3/4" PARA AGUA UND 16.00
03.02.04.05 CODO PVC - SAP Ø 1/2" PARA AGUA UND 14.00
03.02.05 LLAVES Y VALVULAS
03.02.05.01 VALVULA DE PASO TIPO ESFERICO METALICO DE 3/4" Pza 1.00
03.02.05.02 VALVULA DE PASO TIPO ESFERICO METALICO DE 1/2" Pza 18.00
03.02.05.03 VALVULA CHECK DE BRONCE DE 3/4" Pza 1.00
03.02.05.04 LLAVES TIPO ESFERICOS METALICOS PARA LAVADERO DE CONCRETO Pza 4.00
03.02.05.05 LLAVE CROMADO PARA LAVATORIO TIPO VAINZA Pza 12.00
03.02.06 PIEZAS VARIAS
03.02.06.01 CAJA CON TAPA METALICA PARA VALVULAS DE 12" x 12" Pza 18.00
03.02.06.02 CAJA DE REGISTRO PARA MEDIDOR DE AGUA DE 12" x 12" INCLUYE TAPA Y MARCO DE FIERRO GALVANIZADO Pza 1.00
03.02.06.03 TANQUE DE POLIETILENO PARA AGUA DE 2.5 M3 Pza 1.00
03.02.06.04 ESTRUCTURA METALICA PARA TANQUE DE AGUA SEGUN DISEÑO UND 1.00
03.03 URINARIO
03.03.01 OBRAS DE CONCRETO SIMPLE
03.03.01.01 MUROS DE CONCRETO PARA URINARIO F'C=175 KG/CM2 M3 0.03
03.03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN URINARIO M2 1.36
03.03.02 REVOQUES Y ENLUCIDOS
03.03.02.01 TARRAJEO PRIMARIO RAYADO EN URINARIO CORRIDO M2 1.53
03.03.02.02 BRUÑAS E= 1 CM. Ml 3.40
03.03.03 REVESTIMIENTOS
03.03.03.01 REVESTIMIENTO EN URINARIO CORRIDO CON CERAMICA TIPO AZULEJO DE 20x20 CM. COLOR CELESTE CIELO M2 1.53
03.03.04 PIEZAS VARIAS
03.03.04.01 TUBO DE FIERRO GALVANIZADO DE 3/4" SEGUN DISEÑO EN URINARIO Ml 3.40
03.04 LAVADERO CORRIDO DE CONCRETO
03.04.01 OBRAS DE CONCRETO
03.04.01.01 CONCRETO EN LAVADERO CORRIDO F'C=175 KG/CM2 M3 1.44
03.04.01.02 ENCOFRADO Y DESENCOFRADO EN LAVADERO CORRIDO M2 4.70
03.04.01.03 ACERO EN LAVADERO DE CONCRETO F'C=4,200 KG/CM2 GRADO 60 Kg 31.90
03.04.02 REVOQUES Y ENLUCIDOS
03.04.02.01 TARRAJEO PRIMARIO RAYADO EN LAVADERO M2 4.79
03.04.02.02 BRUÑAS E= 1 CM. Ml 5.80
03.04.03 REVESTIMIENTOS
03.04.03.01 REVESTIMIENTO EN LAVADERO CORRIDO CON CERAMICA TIPO AZULEJO DE 20x20 CM. COLOR CELESTE CIELO M2 4.79
04 INSTALACIONES ELECTRICAS
04.01 CONEXIONES EXTERNAS E INTERNAS
04.01.01 EXCAVACION DE ZANJAS PARA CONEXION INTERNA DE 0.40x0.65 M3 39.51
04.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO (TIERRA CERNIDA) PARA CONEXIONES EXTERNAS - MANUAL M3 39.51
04.01.03 LINEA INTERNA SUBTERRANEA CON CABLE DE 2X16 MM2 NYY + 1X16 MM2 NYY Ml 151.95
04.01.04 EMPALME PARA CONDUCTOR DE CABLE DE ENERGIA SUBTERRANEO TIPO 3M UND 6.00
04.02 SALIDA DE LUZ Y FUERZA
04.02.01 SALIDA DE TECHO - CENTROS DE LUZ Pto 63.00
04.02.02 SALIDA CON PVC PARA SPOT LIGTH Pto 9.00
04.02.03 SALIDA DE PARED (BRAQUETES) CON PVC Pto 11.00
04.02.04 SALIDA PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA Pto 47.00
04.03 SALIDA PARA COMUNICACIONES Y SEÑALES
04.03.01 SALIDA PARA SISTEMA DE INFORMATICA CON CONCENTRADORA DE REDES PARA 24 PUERTOS UND 1.00
04.03.02 SALIDA PARA TELEFONO DIRECTO (DE SERVICIO PUBLICO) Pto 3.00
04.03.03 SERVICIO DE INSTALACION DE PUNTOS PARA SISTEMA DE COMPUTO UND 1.00
04.04 TABLEROS Y CAJAS
04.04.01 TABLERO TERMOMAGNETICO GENERAL Pza 1.00
04.04.02 TABLERO DE DISTRIBUCION TERMOMAGNETICO (ST-1,ST-2) Pza 1.00
04.04.03 TABLERO DE CONTROL P/REFLECTORES Pza 1.00
04.04.04 SALIDA PARA CAJA DE PASE GALVANIZADA DE 100x50 mm CON TAPA Pza 5.00
04.04.05 SALIDA PARA CAJA DE PASE Pto 2.00
04.04.06 #N/A #N/A #N/A
04.04.07 #N/A #N/A #N/A
04.04.08 #N/A #N/A #N/A
04.05 ARTEFACTOS
04.05.01 FOCOS DE 50W. INCLUIDO WALL SOCKET DE BACKELITA EN EXTERIOR UND 11.00
04.05.02 FLUORESCENTE RECTO 2 x 40 W CON EQUIPO COMPLETO PARA ADOSAR SEGUN DISEÑO 63.00
04.05.03 FLUORESCENTE RECTO 2 x 20 W CON EQUIPO COMPLETO PARA ADOSAR SEGUN DISEÑO 9.00
04.06 VARIOS
04.06.01 SALIDA PARA TIMBRE TIPO GONG CON PVC Pto 2.00
04.06.02 POZO DE TIERRA INCLUIDO INSTALACION GLB 2.00
04.06.03 #N/A #N/A #N/A
04.06.04 #N/A #N/A #N/A
04.07 #N/A #N/A #N/A
04.07.01 #N/A #N/A #N/A
04.07.02 #N/A #N/A #N/A
04.07.03 #N/A #N/A #N/A
04.07.04 #N/A #N/A #N/A
04.07.05 #N/A #N/A #N/A
04.07.06 #N/A #N/A #N/A
04.08 #N/A #N/A #N/A
04.08.01 #N/A #N/A #N/A
Item Descripción Und. Metrado
01 ESTRUCTURAS
01.01 OBRAS PRELIMINARES
01.01.01 CARTEL DE OBRA CON BANNER (GIGANTOGRAFIA) Y BASTIDORES DE MADERA DE 2.40 x 3 Pza 1.00
01.01.02 DESMONTAJE DE COBERTURA DE CALAMINA M2 376.00
01.01.03 DEMOLICION DE MUROS DE ADOBE M2 457.63
01.01.04 DEMOLICION DE VEREDAS M2 61.50
01.01.05 DEMOLICION DE PISO DE CONCRETO e=4" M2 323.99
01.01.06 DESMONTAJE DE PUERTAS Y VENTANAS UND 15.00
01.01.07 REMOSION Y ELIMINACION DE ESTRUCTURAS DEMOLIDAS CON MAQUINARIA DIST.= 1 KM. M3 221.60
01.01.08 LIMPIEZA DE TERRENO MANUAL M2 752.05
01.01.09 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 752.05
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL CON RETROEXCAVADORA DE 5Y3 M3 522.37
01.02.02 EXCAVACION DE ZANJAS PARA CIMIENTOS Y ZAPATAS M3 425.85
01.02.03 RELLENO CON MATERIAL PROPIO EN ZANJAS M2 118.30
01.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 2 KM. M3 1,078.90
01.02.05 NIVELACION INTERIOR Y APISONADO P/RECIBIR FALSO PISO E= 4" C/EQUIPO LIVIANO CO M2 578.42
01.03 OBRAS DE CONCRETO SIMPLE
01.03.01 FALSA ZAPATA
01.03.01.01 FALSA ZAPATA CONCRETO 1:12 CEMENTO HORMIGON + 30% DE PIEDRA GRANDE M3 88.25
01.03.02 CIMIENTO
01.03.02.01 FALSA CIMENTACION MEZCLA 1:12 CEMENTO-HORMIGON + 30 % DE PIEDRA GRANDE M3 40.43
01.03.02.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE M3 45.19
01.03.03 SOBRECIMIENTO
01.03.03.01 CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO HORMIGON + 25% PIEDRA MEDIANA M3 8.78
01.03.03.02 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO M2 128.37
01.03.04 FALSO PISO
01.03.04.01 CONCRETO EN FALSO PISO DE 4" CEM:HOR 1:8 PARA PISO PULIDO M2 330.58
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 M3 109.03
01.04.01.02 ACERO PARA ZAPATAS F'Y=4,200 KG/CM2 GRADO 60 Kg 2,853.52
01.04.02 CIMIENTOS REFORZADOS
01.04.02.01 CONCRETO EN CIMIENTOS REFORZADOS F'C=210 KG/CM2 M3 6.80
01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA CIMIENTOS M2 26.28
01.04.03 SOBRECIMIENTOS ARMADO
01.04.03.01 CONCRETO EN CIMIENTOS REFORZADOS F'C=210 KG/CM2 M3 16.57
01.04.03.02 ACERO EN CIMIENTO REFORZADO F'Y=4,200 KG/CM2 GRADO 60 Kg 1,982.05
01.04.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.40 M. M2 198.31
01.04.04 MUROS DE CONCRETO ARMADO
01.04.04.01 CONCRETO EN MURO REFORZADO F'C=210 KG/CM2 M3 15.88
01.04.04.02 ACERO EN MURO F'Y=4,200 KG/CM2 GRADO60 Kg 553.87
01.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO REFORZADO M2 166.63
01.04.05 COLUMNAS
01.04.05.01 CONCRETO EN COLUMNETAS F'C=175 KG/CM2 M3 14.41
01.04.05.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 49.69
01.04.05.03 ACERO EN COLUMNAS F'Y=4,200 KG/CM2 GRADO 60 Kg 7,480.72
01.04.05.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 879.65
01.04.06 VIGAS
01.04.06.01 CONCRETO EN VIGUETAS F'C=210KG/CM2 M3 2.38
01.04.06.02 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 70.92
01.04.06.03 ACERO EN VIGAS F'Y=4,200 KG/CM2 GRADO 60 Kg 8,004.50
01.04.06.04 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 593.83
01.04.07 LOSA ALIGERADA H=0.20 M.
01.04.07.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 M3 62.22
01.04.07.02 ACERO EN LOSAS ALIGERADAS F'Y=4,200 KG/CM2 GRADO 60 Kg 3,558.34
01.04.07.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 710.69
01.04.07.04 LADRILLO HUECO DE ARCILLA DE 15x30x30 PARA LOSA ALIGERADO h=20 cm UND 5,920.03
01.04.08 ESCALERAS
01.04.08.01 CONCRETO EN ESCALERAS F'c= 210 KG/CM2 M3 3.96
01.04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS M2 72.23
01.04.08.03 ACERO EN ESCALERAS F'Y=4,200 KG/CM2 GRADO 60 Kg 299.71
01.04.09 GARGOLAS
01.04.09.01 CONCRETO EN GARGOLAS F'C=175 KG/CM2 M3 0.02
01.04.09.02 ACERO EN GARGOLAS F'Y=4,200 KG/CM2 GRADO 60 M2 0.71
01.04.09.03 ENCOFRADO Y DESENCOFRADO NORMAL EN GARGOLAS Kg 3.17
01.04.10 MESA COCINA
01.04.10.01 CONCRETO EN MESA F'C=175 KG/CM2 M3 0.02
01.04.10.02 ACERO EN MESA F'Y=4,200 KG/CM2 GRADO 60 M2 0.71
01.04.10.03 ENCOFRADO Y DESENCOFRADO NORMAL EN MESA Kg 3.17
01.04.11 BANCAS ESPERA
01.04.11.01 CONCRETO EN BANCAS F'C=175 KG/CM2 M3 0.02
01.04.11.02 ACERO EN BANCAS F'Y=4,200 KG/CM2 GRADO 60 M2 0.71
01.04.11.03 ENCOFRADO Y DESENCOFRADO NORMAL EN BANCAS Kg 3.17
01.05 COBERTURA
01.05.01 COBERTURA LADRILLO PASTELERO DE 30X30X1" ASENTADO CON MEZCLA M2 520.00
01.06 OTROS
01.06.01 JUNTA DE CONSTRUCCION CON TEKNOPORT DE 1" M2 8.82
01.06.02 JUNTA SELLADA CON POLIURETANO Ml 80.50
01.06.03 TAPAJUNTAS METALICAS DE 1/8" X 6" SEGUN DISEÑO Ml 12.00
01.06.04 JUNTA METALICA EN PISO DE 1/8" X 6" SEGUN DISEÑO EN SEGUNDO NIVEL Ml 1.55
01.06.05 JUNTA EN PISO ENTRE ESCALERA Y AULA BREA + ARENA Ml 1.55
01.06.06 LIMPIEZA FINAL DE OBRA GLB 1.00
01.06.07 PLACA RECORDATORIA DE OBRA ACRILICO DE 0.55x0.45 SEGUN DISEÑO Pza 1.00
2 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE CABEZA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO AREM2 220.97
02.01.02 MURO DE SOGA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA CEMENTO ARENAM2 648.19
02.01.03 MURO DE CANTO LADRILLO KING-KONG CON CEMENTO-CAL-ARENA M2 32.13
02.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA 1:5 M2 1,243.65
02.02.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA 1:5 (FACHADA HASTA 2do PI M2 572.89
02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 M2 293.68
02.02.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA 1:5 M2 400.60
02.02.05 TARRAJEO PULIDO BOLEADO GRIS EN PARAPETO M2 10.53
02.02.06 VESTIDURA DE DERRAMES CON CEMENTO ARENA 1:5 - ANCHO 0.15 M. Ml 563.91
02.02.07 BRUÑAS E= 1 CM. Ml 1,211.18
02.03 CIELORRASOS
02.03.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA 1:4 M2 731.95
02.03.02 VESTIDURA DE SUPERFICIE DE FONDO ESCALERA CON CEMENTO-CAL-ARENA M2 15.20
02.04 PISOS Y PAVIMENTOS
02.04.01 PISOS
02.04.01.01 CONTRAPISO DE 48 mm M2
02.04.01.02 CONTRAPISO DE 48 mm PARA PISO CERAMICO EN SEGUNDO PISO M2
02.04.01.03 PISO DE CERAMICO DE 45x45 TRANSITO INTENSO TIPO RUSTICO DIFERENTES COLORES M2 511.08
02.04.01.04 PISO DE CERAMICO DE 30x30 TIPO RUSTICO COLOR TRANSITO INTENSO M2 41.60
02.04.01.05 PISO DE CEMENTO PULIDO e=2" - BRUÑADO COLOREADO M2 96.57
02.04.01.06 PISO DE CERAMICO DE 30x30 CM. TIPO RUSTICO COLOR TRANSITO MEDIO M2 84.53
02.05 ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS
02.05.01 ZOCALOS
02.05.01.01 ZOCALO EXTERIOR FROTACHADO FINO H= Variable M2 52.22
02.05.01.02 ZOCALO DE CERAMICA 20x30 Cm. M2 186.68
02.05.02 CONTRAZOCALOS
02.05.02.01 CONTRAZOCALO CEMENTO PULIDO SIN COLOREAR H = 20 cm Ml 174.76
02.05.03 REVESTIMIENTOS DE ESCALERA
02.05.03.01 FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS DE CEMENTO PULIDO Ml 30.00
02.05.03.02 FORJADO Y REVESTIMIENTO DE DESCANZO DE ESCALERAS DE CEMENTO PULIDO M2 4.80
02.06 CARPINTERIA DE MADERA
02.06.01 PUERTAS
02.06.01.01 PUERTA DE MADERA TORNILLO TABLERO REBAJADO SEGUN DISEÑO M2 70.21
02.06.01.02 PUERTA CONTRAPLACADA DE 50 MM. CON TRIPLEY DE 6 MM SEGUN DISEÑO ACABADO M2 3.58
02.06.01.03 COLOCACION DE PUERTAS UND 37.00
02.06.02 VENTANAS
02.06.02.01 VENTANA DE MADERA SEGUN DISEÑO M2
02.06.02.02 COLOCACION DE VENTANAS UND
02.06.03 ARMARIO-CLOSET
02.06.03.01 CLOSET TIPO 1 DE MELAMINE SEGUN DISEÑO UND 4.00
02.07 CARPINTERIA METALICA
02.07.01 PUERTAS
02.07.01.01 PUERTA DE INGRESO METALICO SEGUN DISEÑO DE 2.25x2.56 M. UND 1.00
02.07.02 VENTANAS
02.07.02.01 VENTANA METALICA CON SEGURIDAD SEGUN DISEÑO M2 98.30
02.07.02.02 COLOCACION DE VENTANAS UND 87.00
02.07.03 CERRAJERIA
02.07.03.01 CERRADURA DE 03 GOLPES TIPO FORTE Pza 2.00
02.07.03.02 CERRADURA DE 02 GOLPES TIPO FORTE Pza 19.00
02.07.03.03 CERRADURA DE PERILLA PARA PUERTA DE BAÑO CON SEGURO INTERIOR Pza 14.00
02.07.03.04 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 22.00
02.07.03.05 CERROJO ALUMINIZADO PARA PUERTAS UND
02.07.04 ESCALERAS
02.07.04.01 BARANDA DE ESCALERA C/ PARANTES DE TUBO DE FIERRO GALVANIZADO DE Ø 2" Y 1.1/2" Ml 10.75
02.07.04.02 BARANDAS AISLADOS DE TUBERIA FIERRO GALVANIZADO DE 2" SEGUN DISEÑO Ml 21.48
02.07.04.03 CANTONERAS METALICAS CON PLANCHAS ESTRIADAS SEGUN DISEÑO Pza 19.00
02.08 VIDRIOS, CRISTALES Y SIMILARES
02.08.01 VIDRIO SEMIDOBLE IMPORTADO COLOCADO CON SILICONA M2 103.50
02.09 PINTURA
02.09.01 PINTURA EN INTERIORES Y EXTERIORES
02.09.01.01 PINTURA LATEX EN MUROS INTERIORES M2 1,244.13
02.09.01.02 PINTURA LATEX EN MUROS EXTERIORES M2 572.89
02.09.01.03 PINTURA EN VIGAS Y COLUMNAS M2 694.46
02.09.01.04 PINTURA EN ZOCALO CON ESMALTE COLOR GRIS NIEBLA M2 102.61
02.09.02 PINTURA EN CIELORRASOS
02.09.02.01 PINTURA LATEX EN CIELORRASO SOBE CEMENTO ARENA COLOR BLANCO M2 731.95
02.09.02.02 PINTURA LATEX EN CIELORRASO FONDO ESCALERA M2 15.20
02.09.03 PINTURA EN ESTRUCTURA METALICA
02.09.03.01 PINTURA EN PUERTA METALICA COLOR NEGRO CON ANTICORROSIVO ZINCROMATO ACAB M2 5.76
02.09.03.02 PINTURA EN VENTANAS METALICAS CON ESMALTE Y ANTICORROSIVO M2 98.30
02.09.03.03 PINTURA CON ESMALTE Y ANTICORROSIVO EN PASAMANOS DE 2" COLOR BAYO Ml 21.48
02.09.03.04 PINTURA CON ESMALTE ANTICORROSIVO ZINCROMATO EN CANTONERAS METALICAS CO Ml 19.00
02.09.03.05 PINTURA CON ESMALTE Y ANTICORROSIVO EN TAPAJUNTAS METALICAS COLOR BAYO Ml 12.00
03 INSTALACIONES SANITARIAS
03.01 SISTEMA DE DESAGUE
03.01.01 SALIDA DE DESAGUE
03.01.01.01 SALIDA DE DESAGUE PVC DE 4" (INODORO) Pto 17.00
03.01.01.02 SALIDA DE DESAGUE CON PVC DE 2" (URINARIO Y LAVADERO) Pto 3.00
03.01.01.03 SALIDA DE REGISTRO ROSCADO DE BRONCE DE 4" Pto 1.00
03.01.01.04 SALIDA DE REGISTRO ROSCADO DE BRONCE DE 2" Pto 7.00
03.01.01.05 SALIDA DE DESAGUE CON PVC DE 2" (SUMIDERO) Pto 22.00
03.01.01.06 SALIDA DE VENTILACION PVC 2" Pto 8.00
03.01.02 REDES DE DISTRIBUCION
03.01.02.01 EXCAVACION DE ZANJAS DE 0.40x0.50 PARA TUBERIA DE DESAGUE DE 2", 4" Y 6" Ml 130.51
03.01.02.02 RELLENO Y COMPACTADO DE ZANJAS DE 0.40x0.50 PARA TUBERIA DE DESAGUE DE 2", 4" Ml 130.51
03.01.02.03 RED DE DISTRIBUCION TUBERIA PVC SAL DE 6" Ml 9.30
03.01.02.04 RED DE DISTRIBUCION TUBERIA PVC SAL DE 4" Ml 129.21
03.01.02.05 RED DE DISTRIBUCION TUBERIA PVC SAL DE 2" Ml 53.81
03.01.03 ACCESORIOS DE REDES
03.01.03.01 CODO PVC SAL PARA DESAGUE 4"X45° Pza 5.00
03.01.03.02 CODO PVC SAL PARA DESAGUE 4"X90° Pza 15.00
03.01.03.03 CODO PVC SAL PARA DESAGUE 2"X90° Pza 2.00
03.01.03.04 CODO PVC SAL PARA DESAGUE 2"X45° Pza 4.00
03.01.03.05 YEE PVC SAL PARA DESAGUE 4"x4" Pza
03.01.03.06 YEE PVC SAL PARA DESAGUE 4"x2" Pza 13.00
03.01.03.07 YEE PVC SAL PARA DESAGUE 2"x2" Pza 10.00
03.01.03.08 YEE PVC SAL DOBLE PARA DESAGUE DE 2" - PESADO Pza 2.00
03.01.03.09 REDUCCION PVC SAL PARA DESAGUE DE 4"x2" Pza 8.00
03.01.04 ADITAMENTOS VARIOS
03.01.04.01 REGISTRO ROSCADO DE BRONCE DE 4" Pza 1.00
03.01.04.02 REGISTRO ROSCADO DE BRONCE DE 2" Pza 11.00
03.01.04.03 SUMIDERO CROMADO DE 2" EN LAVADERO Pza 2.00
03.01.04.04 SUMIDERO CROMADO DE 2" EN URINARIO Pza 1.00
03.01.04.05 SUMIDERO CROMADO DE 2" EN PISO Pza 3.00
03.01.04.06 SOMBRERO PARA VENTILACION DE PVC DE 2" UND 8.00
03.01.05 CAMARAS DE INSPECCION
03.01.05.01 CAJA DE DESAGUE DE 0.50x0.80x0.80 DE CONCRETO CON TAPA DE FIERRO FUNDIDO Pza 5.00
03.01.05.02 CAJA DE REGISTRO DE 12"x24 Pza 1.00
03.02 SISTEMA DE AGUA FRIA
03.02.01 APARATOS SANITARIOS Y ACCESORIOS
03.02.01.01 INODORO TANQUE BAJO BLANCO TIPO BABY CON ACCESORIOS Pza 12.00
03.02.01.02 INODORO TANQUE BAJO BLANCO CON ACCESORIOS Pza 7.00
03.02.01.03 LAVATORIO DE PARED LOSA BLANCA INCLUIDO ACCESORIOS Pza 8.00
03.02.01.04 URINARIO CADET DE LOZA BLANCO CON ACCESORIOS Pza 2.00
03.02.01.05 PAPELERA DE LOZA COLOR CELESTE CIELO DE 15 x 15 Pza 11.00
03.02.01.06 LAVADERO DE COCINA ACERO UNOXIDABLE 1 POZA+ESCURRIDOR S/DISEÑO Pza 1.00
03.02.01.07 COLOCACION DE APARATOS SANITARIOS Pza 11.00
03.02.01.08 COLOCACION DE ACCESORIOS SANITARIOS Pza 11.00
03.02.02 SALIDA DE AGUA FRIA
03.02.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" Pto 49.00
03.02.03 REDES DE DISTRIBUCION
03.02.03.01 EXCAVACION DE ZANJAS DE 0.30x0.40 PARA TUBERIA DE AGUA DE 1/2" HASTA 1.1/2" Ml 135.72
03.02.03.02 RELLENO Y COMPACTADO DE ZANJAS DE 0.30x0.40 PARA TUBERIA DE AGUA DE 1/ 2" HAST Ml 135.72
03.02.03.03 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP Ml 154.32
03.02.03.04 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP Ml 54.00
03.02.04 ACCESORIOS DE REDES
03.02.04.01 TEE PVC - SAP Ø 3/4" PARA AGUA UND 9.00
03.02.04.02 TEE PVC - SAP Ø 1/2" PARA AGUA UND 35.00
03.02.04.03 REDUCCION PVC - SAP Ø 3/4" A 1/2" PARA AGUA UND 4.00
03.02.04.04 CODO PVC - SAP Ø 3/4" PARA AGUA UND 2.00
03.02.04.05 CODO PVC - SAP Ø 1/2" PARA AGUA UND 18.00
03.02.05 LLAVES Y VALVULAS
03.02.05.01 VALVULA DE PASO TIPO ESFERICO METALICO DE 3/4" Pza
03.02.05.02 VALVULA DE PASO TIPO ESFERICO METALICO DE 1/2" Pza 12.00
03.02.05.03 VALVULA CHECK DE BRONCE DE 3/4" Pza 1.00
03.02.05.04 LLAVES TIPO ESFERICOS METALICOS PARA LAVADERO DE CONCRETO Pza
03.02.05.05 LLAVE CROMADO PARA LAVATORIO TIPO VAINZA Pza 8.00
03.02.05.06 LLAVE CROMADO PARA LAVATORIO TIPO CUELLO DE CISNE Pza
03.02.05.07 LLAVE DE DUCHA CROMADO TIPO VAINZA Pza
03.02.05.08 LLAVE DE RIEGO CON GRIFO DE 1/2" Pza
03.02.05.09 LLAVES TIPO ESFERICOS METALICOS PARA URINARIO Pza 2.00
03.02.06 PIEZAS VARIAS
03.02.06.01 CAJA CON TAPA METALICA PARA VALVULAS DE 12" x 12" Pza 1.00
03.02.06.02 CAJA DE REGISTRO PARA MEDIDOR DE AGUA DE 12" x 12" INCLUYE TAPA Y MARCO DE FI Pza 1.00
03.02.06.03 TANQUE DE POLIETILENO PARA AGUA DE 2.5 M3 Pza 1.00
03.02.06.04 ESTRUCTURA METALICA PARA TANQUE DE AGUA SEGUN DISEÑO UND 1.00
03.03 URINARIO
03.03.01 OBRAS DE CONCRETO SIMPLE
03.03.01.01 MUROS DE CONCRETO PARA URINARIO F'C=175 KG/CM2 M3 0.08
03.03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN URINARIO M2 1.76
03.03.02 REVOQUES Y ENLUCIDOS
03.03.02.01 TARRAJEO PRIMARIO RAYADO EN URINARIO CORRIDO M2 8.44
03.03.02.02 BRUÑAS E= 1 CM. Ml 2.60
03.03.03 REVESTIMIENTOS
03.03.03.01 REVESTIMIENTO EN URINARIO CORRIDO CON CERAMICA TIPO AZULEJO DE 20x20 CM. CO M2 4.04
03.03.04 PIEZAS VARIAS
03.03.04.01 TUBO DE FIERRO GALVANIZADO DE 3/4" SEGUN DISEÑO EN URINARIO Ml 4.80
03.04 LAVADERO CORRIDO DE CONCRETO
03.04.01 OBRAS DE CONCRETO
03.04.01.01 CONCRETO EN LAVADERO CORRIDO F'C=175 KG/CM2 M3 0.75
03.04.01.02 ENCOFRADO Y DESENCOFRADO EN LAVADERO CORRIDO M2 6.60
03.04.01.03 ACERO EN LAVADERO DE CONCRETO F'C=4,200 KG/CM2 GRADO 60 Kg 65.20
03.04.02 REVOQUES Y ENLUCIDOS
03.04.02.01 TARRAJEO PRIMARIO RAYADO EN LAVADERO M2 5.30
03.04.02.02 BRUÑAS E= 1 CM. Ml 3.80
03.04.03 REVESTIMIENTOS
03.04.03.01 REVESTIMIENTO EN LAVADERO CORRIDO CON CERAMICA TIPO AZULEJO DE 20x20 CM. C M2 5.30
04 INSTALACIONES ELECTRICAS
04.01 CONEXIONES EXTERNAS E INTERNAS
04.01.01 EXCAVACION DE ZANJAS PARA CONEXION INTERNA DE 0.40x0.65 M3 39.51
04.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO (TIERRA CERNIDA) PARA CONEXIONES M3 39.51
04.01.03 LINEA INTERNA SUBTERRANEA CON CABLE DE 2X16 MM2 NYY + 1X16 MM2 NYY Ml 151.95
04.01.04 EMPALME PARA CONDUCTOR DE CABLE DE ENERGIA SUBTERRANEO TIPO 3M UND 6.00
04.02 SALIDA DE LUZ Y FUERZA
04.02.01 SALIDA DE TECHO - CENTROS DE LUZ Pto 72.00
04.02.02 SALIDA CON PVC PARA SPOT LIGTH Pto
04.02.03 SALIDA DE PARED (BRAQUETES) CON PVC Pto 17.00
04.02.04 SALIDA PARA TOMACORRIENTE SIMPLE CON PUESTA A TIERRA Pto 66.00
04.02.05 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A TIERRA Pto 22.00
04.03 SALIDA PARA COMUNICACIONES Y SEÑALES
04.03.01 SALIDA PARA SISTEMA DE INFORMATICA CON CONCENTRADORA DE REDES PARA 24 PUE UND 1.00
04.03.02 SALIDA PARA TELEFONO DIRECTO (DE SERVICIO PUBLICO) Pto 3.00
04.03.03 SERVICIO DE INSTALACION DE PUNTOS PARA SISTEMA DE COMPUTO UND 19.00
04.04 TABLEROS Y CAJAS
04.04.01 TABLERO TERMOMAGNETICO GENERAL Pza 1.00
04.04.02 TABLERO DE DISTRIBUCION TERMOMAGNETICO (ST-1,ST-2) Pza 1.00
04.04.03 TABLERO DE CONTROL P/REFLECTORES Pza
04.04.04 SALIDA PARA CAJA DE PASE GALVANIZADA DE 100x50 mm CON TAPA Pza 1.00
04.04.05 SALIDA PARA CAJA DE PASE Pto 7.00
04.04.06 CAJA PLASTICA P/ADOSAR 2"x4" C/DOS SALIDAS P/C UTP CAT 5E Pto
04.05 ARTEFACTOS
04.05.01 FOCOS DE 50W. INCLUIDO WALL SOCKET DE BACKELITA EN EXTERIOR UND
04.05.02 FLUORESCENTE RECTO 2 x 40 W CON EQUIPO COMPLETO PARA ADOSAR SEGUN DISEÑO UND
04.05.03 FLUORESCENTE RECTO 2 x 20 W CON EQUIPO COMPLETO PARA ADOSAR SEGUN DISEÑO UND 9.00
04.05.04 REFLECTOIRES ALOGENO SODIO DE 125 W. Pza 89.00
04.06 VARIOS
04.06.01 SALIDA PARA TIMBRE TIPO GONG CON PVC Pto
04.06.02 POZO DE TIERRA INCLUIDO INSTALACION GLB 2.00
Precio (S/.) Parcial (S/.)
455,218.07
7,687.56
504.20 504.20
3.00 1,128.00
4.74 2,169.17
4.26 261.99
2.13 690.10
5.69 85.35
6.00 1,329.60
0.71 533.96
1.31 985.19
37,452.97
10.18 5,317.73
34.10 14,521.49
51.55 6,098.37
6.84 7,379.68
7.15 4,135.70
48,778.84
15,745.57
178.42 15,745.57
15,744.04
178.42 7,213.52
188.77 8,530.52
7,130.51
252.45 2,216.51
38.28 4,914.00
10,158.72
30.73 10,158.72
340,969.81
46,228.74
314.34 34,272.49
4.19 11,956.25
2,840.06
306.43 2,083.72
28.78 756.34
20,973.65
306.43 5,077.55
4.19 8,304.79
38.28 7,591.31
15,446.44
412.71 6,553.83
4.19 2,320.72
39.44 6,571.89
91,886.97
370.70 5,341.79
412.71 20,507.56
4.19 31,344.22
39.44 34,693.40
85,165.65
316.11 752.34
330.59 23,445.44
4.19 33,538.86
46.19 27,429.01
72,326.27
315.37 19,622.32
4.19 14,909.44
28.44 20,212.02
2.97 17,582.49
6,102.03
376.01 1,489.00
46.48 3,357.25
4.19 1,255.78
52.70
331.74 6.63
46.19 32.79
4.19 13.28
52.70
331.74 6.63
46.19 32.79
4.19 13.28
52.70
331.74 6.63
46.19 32.79
4.19 13.28
17,243.20
33.16 17,243.20
3,032.99
10.81 95.34
26.86 2,162.23
16.86 202.32
45.85 71.07
6.06 9.39
336.15 336.15
156.49 156.49
277,316.69
53,478.88
82.16 18,154.90 x
52.35 33,932.75 0 x
43.30 1,391.23 x
58,240.13
16.43 20,433.17 x
21.06 12,065.06 x
19.62 5,762.00 f
29.02 11,625.41 f
22.25 234.29 x
8.30 4,680.45 x
2.84 3,439.75
26,456.08
35.65 26,094.02
23.82 362.06
53,331.85
53,331.85

83.38 42,613.85
70.63 2,938.21
30.23 2,919.31
57.50 4,860.48
17,571.44
15,599.92
12.53 654.32
80.06 14,945.60
1,268.76
7.26 1,268.76
702.76
20.79 623.70
16.47 79.06
20,875.33
17,766.08
226.60 15,909.59
151.26 541.51
35.54 1,314.98

3,109.25
672.27 2,689.08
22,790.51
891.00
891.00 891.00
12,799.32
109.24 10,738.29
23.69 2,061.03
3,215.47
133.07 266.14
103.07 1,958.33
63.07 882.98
4.91 108.02

5,884.72
331.32 3,561.69
30.68 659.01
87.58 1,664.02
5,308.52
51.29 5,308.52
19,263.95
12,828.25
4.23 5,262.67
5.15 2,950.38
5.74 3,986.20
6.13 629.00
5,588.69
7.48 5,474.99
7.48 113.70
847.01
8.79 50.63
6.53 641.90
3.36 72.17
2.21 41.99
3.36 40.32
29,769.52
9,126.85
3,150.08
55.16 937.72
43.35 130.05
39.18 39.18
22.79 159.53
43.35 953.70
51.65 413.20
2,703.81
4.26 555.97
4.01 523.35
27.95 259.94
8.72 1,126.71
4.42 237.84
1,039.70
14.82 74.10
15.24 228.60
15.24 30.48
11.01 44.04

15.30 198.90
12.72 127.20
23.23 46.46
14.82 118.56
1,196.49
16.97 16.97
13.69 150.59
30.32 60.64
27.73 27.73
26.40 79.20
107.67 861.36
1,036.77
185.03 925.15
111.62 111.62
18,762.73
7,086.96
260.00 3,120.00
207.00 1,449.00
146.00 1,168.00
235.00 470.00
16.00 176.00
169.25 169.25
35.54 390.94
13.07 143.77
1,978.62
40.38 1,978.62
1,320.69
2.44 331.16
2.39 324.37
3.18 490.74
3.23 174.42
208.22
3.96 35.64
3.12 109.20
2.97 11.88
2.80 5.60
2.55 45.90
1,261.02

44.39 532.68
49.98 49.98

75.73 605.84
36.26 72.52
6,907.22
90.32 90.32
90.32 90.32
2,096.74 2,096.74
4,455.00 4,455.00
679.99
80.00
333.38 26.67
30.30 53.33
119.38
13.27 112.00
2.84 7.38
270.80
67.03 270.80
209.81
43.71 209.81
1,199.95
717.57
325.86 244.40
30.30 199.98
4.19 273.19
127.12
13.27 70.33
2.84 10.79
355.26
67.03 355.26
48,383.79
7,301.62
21.31 841.96
22.93 905.96
35.65 5,417.02
22.78 136.68
14,271.88
84.00 6,048.00

63.04 1,071.68
80.15 5,289.90
84.65 1,862.30
696.71
489.02 489.02
69.23 207.69

1,669.25
344.84 344.84
1,242.05 1,242.05

9.07 9.07
10.47 73.29

18,594.64

646.62 5,819.58
143.54 12,775.06
4,566.07

641.81 1,283.62