Vous êtes sur la page 1sur 1

GRID LOCATION

+13.100 T10-5/T-D

609
W177
W175 W104 W104 26 557 26
W169

W169 W150

21
W175 PIPE_1- 1/4''_SCH._80
1 * Ø10
W175

100

100
W143 BS 1 * Ø10 1 * Ø10
2 * Ø14
W134
W134 W144 PL6X100

197

197

W147 1 * Ø10
PIPE_1- 1/4''_SCH._80

1072 26

989 (PIPE_1- 1/4''_SCH._80 x 917) B 1098 16

300
3 75 640 182 68 21
300

300
300
186
6006 PIPE_1- 1/4''_SCH._80 X 917

41

R 69
161 26

37
41

W177
ELBOW_1- 1/ 4''_SCH._80_L
177

2 x TYP.
1 * Ø10
W144

279
237

250 1 * Ø10 W148

41
PIPE_1- 1/4''_SCH._80

202
75 4 x TYP. 41 41

W150 W148 59

W175

237
26
34
W142
938 1 * Ø10
41 41
W143
W135
300

41 141 PL6X100
W142
PIPE_1- 1/4 ''_SCH._80

300

100
W150 W148 W144

300
PIPE_1- 1/ 4''_SCH._80

W142
W142
W143
PIPE_1- 1/4 ''_SCH._80 129
W143

129
394

394
30 60
60 30
W147

W147

394
1 * Ø10
W135

35
70
35
W135
W104 2 * Ø18
W147

18
25
PL10X70

R
141

178
50

36

W104
66

36
W134

50 25
W175
35 35

W147
PL3X36

60 60
A - A 60 60

66
75 640 223
ELBOW_1-1/4''_SCH._80_L
POST REF. DRAWING NO. 1805 000-G001 FOR GENERAL NOTES
W104
A 35 35 0 19.03.2019 ISSUED FOR FABRICATION CA-669 CA-327 CA-366
PO ST REV DATE DESCRIPTION DRAWN CHK'D APPD.
B - B
DRAWING NO. : 1805249M-3LP034-6006 REV.: 0
Kingdom of Saudi Arabia
ERECTION MARK : 1805249M-3LP034-6006 DESCRIPTION : HANDRAIL QTY : 1 NOS Saline Water Conversion Corporation
HOLD : N TYPE : W TREAT : GPX COST CODE : OP-2.5 REMARKS : SLEEVE ROD DIA
B TOP RAIL
LENGTH : 1001 WIDTH : 253 HEIGHT : 1145 TOTAL S.AREA : 1.0 (M2)
CLIENT
ID
REVISION

POS QTY UNIT TOTAL


ABB'NID
Treatment

SWI NO

PER SECTION LENGTH WEIGHT GRADE REMARKS Project : CONSTRUCT OF DESALINATION


PART

NO. ASSLY (Kg) QTY WEIGHT SLEEVE ROD DIA AND POWER PLANTS-YANBU PHASE 3
Contract No. : 20314
M6006 1 PIPE_1-1/4''_SCH._80 917 4.1 1 4.1 A53 GR-B TYPE-E 1 MM GPN 20314 :

W104 2 PL10X70 180 1.0 2 2.0 A36 1 WI GPX PL


ENGINEER
W134 1 PL6X100 197 0.9 1 0.9 A36 1 WI GPX TP

50
W135 1 PL6X100 938 4.4 1 4.4 A36 1 WI GPN TP
1CO
W142 2 PIPE_1-1/4''_SCH._80 59 0.3 2 0.5 A53 GR-B TYPE-E 1 WI GPN MR CONTRACTOR
W143 2 PIPE_1-1/4''_SCH._80 129 0.6 2 1.2 A53 GR-B TYPE-E 1 WI GPN MR SAMSUNG ENGINEERING
W144 1 PIPE_1-1/4''_SCH._80 129 0.6 1 0.6 A53 GR-B TYPE-E 1 WI GPN TR P.O.Box : 41017 Jeddah 21521,K.S.A
1CO
W147 2 PIPE_1-1/4''_SCH._80 1098 4.9 2 9.8 A53 GR-B TYPE-E 1 WI GPN P Tel. : +966 2 591 0999
1CO
W148 2 PIPE_1-1/4''_SCH._80 186 0.8 2 1.7 A53 GR-B TYPE-E 1 WI GPN MR SPLICE DETAIL Fax : +966 2 591 0099
2CO E-mail : aic@aicsteel.com
W150 2 PIPE_1-1/4''_SCH._80 609 2.7 2 5.4 A53 GR-B TYPE-E 1 WI GPN MR
ARABIAN INTERNATIONAL COMPANY Site : www.aicsteel.com
W169 2 ELBOW_1-1/4''_SCH._80_L 108 0.5 2 1.0 A53 GR-B TYPE-E 1 WI GPN EL For Steel Structures arabian international company

W175 3 PL3X36 36 0.0 3 0.1 A36 1 WI GPN PL arabian international com pany
ENGINEERING DEPARTMENT - AIC BUIL'D DESC. STEAM TURBINE BUILDING3 UNIT#4
W177 1 ELBOW_1-1/4''_SCH._80_L 108 0.5 1 0.5 A53 GR-B TYPE-E 1 WI GPN EL PROJECT YANBU POWER AND DESALINATION PLANT - PHASE 3
UNIT WEIGHT :- 32.1 CUSTOMER SEPCOIII Electric Power Construction Corporation Branch

TOTAL WEIGHT :- 32.1


19.03.2019 SITE LOCATION YANBU WEST COAST
Tekla structures

ERECTION BOLT:- JOB NO. 1805249M-3LP034 CAD FILES:


FOR CONSTRUCTION 1805249M-3LP034-6006
B1N1W 12 X 35 2 A307 GR.A GN FULL THREADED 1 NO. HANDRAIL MKD' 1805249M-3LP034-6006 DRAWING TITLE:
DRAWING NO. :
B1N1W 16 X 45 4 A307 GR.A GN FULL THREADED HANDRAIL
1805249M-3LP034-6006
ENG/DET-F11

Vous aimerez peut-être aussi