Node No Parameter Guideword Cause Consequence Current Safeguards Recommendations/Action Action Assigned To: Action Outcome
No. Completion Date Open/Closed

Lower conversion within 03-R- The pressure rating of pipes and


002, as a higher temperature the whole boiler feed water
process stream from 02-WHB-001 system was designed to
Temperature (Process Boiler Feedwater supply failure.
3 More enters 03-R-002. This results in 36.5bar, above the operating
Gas) Pipe 52 leakage/rupture.
reduced productivity for the plant pressure of 33 bar. Appropriate
an possibe thermal decompostion external corosion allowance
of the catalyst. was taken into consideration.

Lower conversion within 03-R-


Strat up procedure in place, the
002, as a higher temperature
boiler feed water system will
process stream from 02-WHB-001
Temperature (Process Drain valve turned on first, menaing that in
3 More enters 03-R-002. This results in
Gas) MV082 is open case of such malfunction, the
reduced productivity for the plant
fault will be identifed before full
an possibe thermal decompostion
process opeation begins.
of the catalyst.

Heat excahgers were desinged


with a fouling coeffficent in
Lower converison achineved in the
mind. The waste heat boiler
HT WGS (03-R-002). The process
Higher temperature the process tubes we considred to have a
stream not cooled enough thus
Temperature (Process stream caused by fouling of the fouling coefficent of 5000 W/(m
3 More due to the exotheric nature of the
Gas) tubes in the Waste Heat Boiler K^2). Moreover, the internal
WGS reaction, it may cause
02-WHB-001. bypass allows to control the
thermal degradation of the
temperature before the tubes
catalyst.
reach maximum fouling
allownce.
Identify wether the internal
A temperature control valve is bypass can be manually
All process stream passes through
installed on the 02-WHB-001 adjusted. If so, consider manual
the tubes of 02-WHB-001 and this
Temperature (Process Internal bypass of 02-WHB-001 that allows the process stream operation unit repair solutions
3 Less leads to a lower than required
Gas) fails closed to pass via internal bypass thus are provided. Reveiew as a
temperature entering 03-R-002.
reducing the likelyhood of team the possibility of the intral
Reduced productivity of 03-R-002
condensation. bypass control vale failing in
place rather than fail closed.
The tubes carrying the process
stream within 02-WHB-001
Reduced productivity of the plant, A pressure indcator PI209 is
have a rupture causing water to
due to reduced conversion within installed on pipe PG-017-250-
leak into the tubes of 02-WHB-
3 Pressure Less 03-R-002. Efficiency of the B2PD-H will transimt any
001. This results in in a larger
reactions taking place within 03- pressure deviations to the
pressure drop within the tubes.
R-002 is lowered control room.
Thus pressure within pipe
number 17 will be lower.

Waste Heat Boiler (02-WHB-


001) is desinged to deal with a
High molar flowrate of process
20% higher duty than when
Increased process gas flow will stream entering 02-WHB-001 will
operating at 60 tonnes of Cosider a flow indicator on the
be caused by steam control mean insufficient cooling of
hydrogen output (Maximum process pipe (PG-014-250-
3 Flow (Process Gas) More valve (FCV02) failing open. process stream within 02-WHB-
operating duty). The pressure E2PD-H) after process stream
Excess steam will be fed into 001. Pipe 17 could be damaged
rating of pipes and the whole and steam mixing.
the process stream. due to handelling higher
system was designed to 26.4
temperature fluids than intended.
bar, above the operating
pressure of 24 bar.

Heat excahgers were desinged


More process stream will leave with a fouling coeffficent in
02-WHB-001 and there will a mind. The waste heat boiler
Leaking of boiler feed water into
higher molar flowrate in the tubes we considred to have a
Flow (Process Gas) More heat exchanger tubes within 02- ??
stream 17 because of partial fouling coefficent of 5000 W/(m
WHB-001.
vaparisation of the boiler feed K^2). The pressure indactor
water in the tubes. PI209 will show a pressure
deviation the steam 17.

Build up of toxic CO and


The pressure rating of pipes and
Pipe 17 rupture or leakegae flammable H2 into the Regular inspection of the pipe
the whole system was designed
3 Flow (Process Gas) Less resulting in decreased flow of atmosphere. Ths may lead to surfaces and thickness using
to 26.4 bar, above the operating
procss stream to 03-R-002. respiratory issues, fires or an ultrasonic sensors.
pressure of 24 bar.
explosion
The pressure rating of pipes and
Build up of pressure within tubes the whole system was designed
of 02-WHB-001, leading to tube to 26.4 bar, above the operating
Closure of Spectacle blind on
rupture and pressurisation of pressure of 24 bar. Pressure
outlet pipe from 02-WHB-001 or
3 flow (Process Gas) None upstream units within the plant. relief valves PSV02A/B are
possible rupture of pipe 17
Potential for dangerous pressure installed on the pipe that the
exiting 02-WHB-001
build up with the chance of an steam is fed to (PG-014-250-
explosion. E2PD-H), in case high pressure
surge.

Increased steam production. The pressure rating of pipes and


Higher flowrate will be casued by the whole boiler feed water
Increased duty of the waste
4 Flow (Boiler Feedwater) More grater convection which in turn is system was designed to
heat boiler (02-WHB-001)
caused by increased duty of the 36.5bar, above the operating
02-WHB-001. pressure of 33 bar.

Page 1 of 6
University of Nottingham Rev:03
Department of Chemical and Environmental Engineering Date: September 2017
HAZOP RECORD SHEET
Project Title: P&ID Title/Description P&ID No. Rev No.:

Group No.: Meeting Attendees HAZOP Meet Date

Design Intent/Process Outline:

Action Required Status


Node No Parameter Guideword Cause Consequence Current Safeguards Recommendations/Action Action Assigned To: Action Outcome
No. Completion Date Open/Closed

A temperature control valve is


Temperature of process stream
installed on the 02-WHB-001
will leave at a temperature below
Level in 02-V-001 High, because that allows the process stream
4 Flow (Boiler Feedwater) More the set point for the reaction
FCV03 fails open. to pass via internal bypass thus
which takes place in 03-R-002.
reducing the likelyhood of
Reduced productivity of the plant.
condensation.

Reduced productivity of 02-WHB- A low-low level in the steam


001 and 03-R-002 as the main drum will trigure ESD01 which
process stream will not be cooled will close AV01 which will close
to the required temperature for all of the natural gas supply
4 Flow (Boiler Feedwater) Less Low level in 02-V-001 the reaction in 03-R-002. This is feed, and open steam bypass
due to no Boiler Feedwater via AV03 and AV04 to feed
entering the shell for for 02-WHB- steam from the header to cool
001. Lower conversion for the the process stream tubes down
reaction within 03-R-002 and will flare all of it off.

Reduced productivity of 02-WHB-


001 and 03-R-002 as the main
process stream will not be cooled
Damage to pipe 52 carrying The pressure rating of pipes and
to the required temperature for
boiler feedwater to 02-WHB- the whole system was designed
4 Flow (Boiler Feedwater) less the reaction in 03-R-002. This is
001, may result in pipe rupture to 33 bar, above the operating
due to no Boiler Feedwater
or leakage. pressure of 36.5 bar.
entering the shell for for 02-WHB-
001. Lower conversion for the
reaction within 03-R-002

In order not to reduce steam


flowrate in the Steam
There is a pressure reilef valve Superheating coil 01-CE-003,
High flow of boiler feedwater (PSV03A/B) on the steam drum, implement a pressure relief
into the shell of 02-WHB-001 to relieve dangerous pressure valve (PSV) after the coil. This
Increased pressure within pipe 53
due increased level in the steam build ups within 02-V-001. The way the PSV after the coil will
5 Flow (Steam) More and 02-V-001 due to higher
drum 02-V-001. This results in pressure rating of pipes and 02- be activated first, decreasing
flowrate of boiler feed water.
increased steam flow in pipe 53 V-001 was designed to the pressure within the pipe 57.
out of 02-WHB-001. 36.5bar, above the operating If pressure in the steam drum
pressure of 33 bar. contntinues to increase the
existing PSV03A/B will be
activated.

In order not to reduce steam


flowrate in the Steam
Increased temp of process There is a pressure reilef valve Superheating coil 01-CE-003,
stream within 02-WHB-001 from (PSV03A/B) on the steam drum, implement a pressure relief
the reformer results in to relieve dangerous pressure valve (PSV) after the coil. This
Increased pressure within pipe 53
increased phase change of build ups within 02-V-001. The way the PSV after the coil will
5 Flow (Steam) More and 02-V-001, due to increased
boiler feedwater to steam. This pressure rating of pipes and 02- be activated first, decreasing
duty for 02-WHB-001
results in increased flow of V-001 was designed to the pressure within the pipe 57.
boiler feedwater out of 02-WHB- 36.5bar, above the operating If pressure in the steam drum
001 within pipe 53. pressure of 33 bar. contntinues to increase the
existing PSV03A/B will be
activated.

Less Steam within steam drum.


This results in reduced
Drain valve productivity of exported steam.
5 Flow (Steam) Less
MV082 open Excessive draining, and continued
wear of MV082. This can lead to
valve failure or rupture.

Reduced productivity of steam The pressure rating of pipes and


Damage to pipe carrying steam Regular inspection of the pipe
export. Leakage can result in hot the whole system was designed
5 Flow (Steam) Less to 02-V-001, can result in pipe surfaces and thickness using
temperature steam coming into to 36.5 bar, above the operating
rupture or leakage ultrasonic sensors.
contact with nearby personnel pressure of 33 bar.

Build up of Boiler feedwater and


steam withinn the shell of 02-
WHB-001, this can result in
increased corrosion, in particular
Shell side outlet spectacle blinds stress corrosion cracking at the The pressure rating of pipes and
Regular inspection of the pipe
for 02-WHB-001 are closed. nozzles and welds of the shell. the whole system was designed
5 Flow (Steam) None surfaces and thickness using
Ruptured pipe (pipe No. 53) out Cracks may develop ending in to 36.5 bar, above the operating
ultrasonic sensors.
of 02-WHB-001 fracture. This can lead to rupture pressure of 33 bar.
of the heat exchanger and slip
hazards. Pressure build up within
the shell of 02-WHB-001 with the
potential for an explosion

Page 2 of 6
University of Nottingham Rev:03
Department of Chemical and Environmental Engineering Date: September 2017
HAZOP RECORD SHEET
Project Title: P&ID Title/Description P&ID No. Rev No.:

Group No.: Meeting Attendees HAZOP Meet Date

Design Intent/Process Outline:

Action Required Status


Node No Parameter Guideword Cause Consequence Current Safeguards Recommendations/Action Action Assigned To: Action Outcome
No. Completion Date Open/Closed

Increased duty of the 02-WHB- Increased pressure within pipe 53 The pressure rating of pipes and
001 will result in a greater and 02-V-001, due to increased the whole system was designed
5 Pressure More
fraction of boiler feed water duty for 02-WHB-001 and higher to 36.5 bar, above the operating
turning into steam in pipe 53. steam fraction. pressure of 33 bar.

Reduced pressure drop across The pressure rating of pipes and


The preesure of the stream in
the waste heat boiler (02-WHB- the whole system was designed
5 Pressure More pipe 53 will have a higher
001) as a result of lower to 36.5 bar, above the operating
pressure as a result.
operating capacity. pressure of 33 bar.

If the pressure of the steam


Steam + Boiler Feedwater produced drops below 30 barg
Increased pressure drop due to
pressure entering 02-V-001 will in pipe 56, a split range control
flouing between the tubes on
5 Pressure Less be lower leading to a lower loop (PIC203) on the outlet pipe
the shell side of the waste heat
operating pressure within 02-V- from 02-DS-001, will flare of
boiler (02-WHB-001)
001 steam which is off specification,
for the client's steam headerr

There are two level transimitters


The liquid water will flow into the LT 206 and LT211 to monitor Regulatly check the flow control
'steam superheat' tubes which is the high water level. The Level valve and level transmitter.
Flow Control valve FCV03 fails connected to the coil heat Gauge (LG204) can show the Make sure the level
10 level More 11.1
open exchanger. Water will boil in tubes curruent level of water in the measurement is accurate and
and pressure increases. Tubes steam drum. The LAHH with the energency shut dowm
may rupture. ESD and LSHH 212 can ensure system can work.
that the liquid level is limited.

There are two level transimitters


LT 206 and LT210 to monitor Regulatly check the flow control
The boiler tubes will run dry when
the low water level. The Level valve and level transmitter.
the liquid water level is too low in
Flow Control valve FCV03 fails Gauge (LG204) can show the Make sure the level
Less the steam drum. It will cause 11.2
open curruent level of water in the measurement is accurate and
overheat and rupture for the
steam drum. The LALL with ESD the energency shut dowm
tubes.
and LSLL 210 can ensure that system can work.
the liquid level is limited.

Too much water in steam drum


can lead the vapour pressure Pressure relief valave is
Pressure gauge can be used to
increases. High steam pressure installed which can reduce the
monitor the pressure in steam
Flow Control valve FCV03 fails has higher steam temperature pressure in steam drum. The
pressure more 11.3 drum. Pressure also can be
open and it has negetative effect for LAHH will also work and the
controled by the level contol
the system. The usable energy pressure can be controled
system.
latent heat is decrease. manually.

The water level is too low can lead


Pressure gauge can be used to
the vapour pressure decreases.
The LSLL will work and the monitor the pressure in steam
Flow Control valve FCV03 fails The steam temperature will also
Less pressure can be controlled 11.4 drum. Pressure also can be
open decrease and the steam outlet
manually. controled by the level contol
rate can be affected. The
system.
efficiency is lower.

Overpressure in pipe resulting in Flow on the line of steam out


pipe rupture; More steam into from the drum is measured and
Increased pressure in steam
reformer coil could cause transmit to bias controller to
9 Flow (steam) More drum (02-V-001) forces steam
temperature of superheated control the flow into steam
out from steam drum
steam from coil lower than drum and the level in steam
intended drum to maintain the pressure

Page 3 of 6
University of Nottingham Rev:03
Department of Chemical and Environmental Engineering Date: September 2017
HAZOP RECORD SHEET
Project Title: P&ID Title/Description P&ID No. Rev No.:

Group No.: Meeting Attendees HAZOP Meet Date

Design Intent/Process Outline:

Action Required Status


Node No Parameter Guideword Cause Consequence Current Safeguards Recommendations/Action Action Assigned To: Action Outcome
No. Completion Date Open/Closed

Overpressure in pipe resulting in


pipe rupture; More steam into
Increased pressure in steam Pipe wall thickness has been
reformer coil could cause Regular maintenance performed
More drum (02-V-001) forces steam designed to handle high
temperature of superheated on pipeline
out from steam drum pressure at 44 barg
steam from coil lower than
intended

Flow on the line of steam out


Low pressure in steam drum Less flow of steam resulting in from the drum is measured and
(02-V-001) causing less steam reduced productivity; steam used transmit to bias controller to
Less
can be forced out from steam in process and steam export control the flow into steam
drum decrease drum and the level in steam
drum to maintain the pressure
Steam will leak from pipeline to
atmosphere resulting in the
Install a isolation valve on the
pressure in steam drum
pipeline to prevent pressure
Damage of pipeline causing decreases; Leakage of high
Less loss in steam drum; Regular
leakage or rupture temperature and pressure steam
maintenance performed on
could resulting in danger to
pipeline
operators and reduced
productivity
Steam cannot flow out resulting in
the pressure in steam drum
Damage of pipeline causing increases and potential of rupture; Pressure relief valves has been Regular maintenance performed
None
blockage No steam can be provided to installed on the steam drum on pipeline
process and export resulting in
reduced productivity
Increased pressure in steam Pressure indicator has been
drum (02-V-001) forces high Overpressure in pipe resulting in installed on the steam out line;
pressure More
pressure steam out from steam pipe rupture pressure relief valves has been
drum installed on the steam drum
Increased pressure in steam Pipe wall thickness has been
Overpressure in pipe resulting in Regular maintenance performed
More drum (02-V-001) forces steam designed to handle high
pipe rupture on pipeline
out from steam drum pressure at 44 barg
Pressure indicator has been
Low pressure in steam drum Less flow of steam resulting in
installed on the steam out line;
(02-V-001) causing less steam reduced productivity; steam used
Less Level control will keep the level
can be forced out from steam in process and steam export
in steam drum constants to
drum decrease
maintain the pressure
Level control on steam drum to
Flow control valve (FCV03) open More water into steam drum; high keep the level constants; high
10 Level More more than intended leading to level in steam drum could level alarms will sound if level is
flowrate above set point resulting in flooding (or overflow?) high and the drain valve will be
manually opened
Level control on steam drum to
keep the level constants; high
More water into steam drum; high level alarms will sound if level is
Flow control valve (FCV03) fail
More level in steam drum could high and the drain valve will be
open
resulting in flooding (or overflow?) manually opened, the control
valve will be fixed to correct
position

Less or no water flow to waste


Level control on steam drum to
heat boiler and reformer so that
Damage of pipe causing keep the level constants; high
less steam can be produced and Regular maintenance performed
More blockage on water outlet level alarms will sound if level is
liquid level in steam drum on pipeline
streams high and the drain valve will be
increases; high level in steam
manually opened
drum could resulting in flooding

Level control on steam drum to


Less heat can be transferred
keep the level constants; high Install a temperature indicator
Decreased temperature of water between water and steam
More level alarms will sound if level is on the water into steam drum
into steam drum resulting in steam condense and
high and the drain valve will be line to inform control room
could cause flooding
manually opened

Less water into steam drum and Level control on steam drum to
Flow control valve (FCV03) close the level steam drum will keep the level constants; low
Less more than intended leading to decreases, less steam can be level alarms will sound if level is
flowrate lower than set point produced resulting in reduced low and the control valve will be
productivity fixed to correct position

Level control on steam drum to


High temperature and pressure
keep the level constants; low
Drain valve (MV083) fails (? Not liquid flow out through drain valve
Less level alarms will sound if level is
sure) could resulting in danger to
low to inform operators to fix
operators
the valve

More heat can be transferred


between water and steam causes
Pressure relief valves has been Install a pressure indicator on
Increased temperature of water more water in steam drum can be
Pressure More installed on the steam drum to steam drum to inform control
into steam drum vaporised to steam, resulting in
reduce the pressure room if the pressure is high
pressure in steam drum increases
and potential of rupture

Page 4 of 6
University of Nottingham Rev:03
Department of Chemical and Environmental Engineering Date: September 2017
HAZOP RECORD SHEET
Project Title: P&ID Title/Description P&ID No. Rev No.:

Group No.: Meeting Attendees HAZOP Meet Date

Design Intent/Process Outline:

Action Required Status


Node No Parameter Guideword Cause Consequence Current Safeguards Recommendations/Action Action Assigned To: Action Outcome
No. Completion Date Open/Closed

Install a pressure indicator on


Steam cannot flow out resulting in Pressure relief valves has been
Damage of steam outlet pipeline steam drum; regular
More the pressure in steam drum installed on the steam drum to
causing blockage maintenance performed on
increases and potential of rupture reduce the pressure
pipeline

Less heat can be transferred


Level control on steam drum to Install a pressure indicator on
Decreased temperature of water between water and steam
Less decrease the level and then steam drum to inform control
into steam drum resulting in steam condense and
maintain the pressure room if the pressure is low
could cause flooding

Flow of BFW into steam drum LAH and LAHH are in place on
Control fault/failure: Flow
increases. Level in steam drum the steam drum. This will notify
6 Flow (BFW) more control valve FCV03 fail open
increases which will decrease the operator to take corrective
(remains open)
pressure in steam drum. action to resolve the problem

Low flowrate through pipe 51, A low-low level in the steam


means level in 02-V-001 will drum will trigure ESD01 which
decrease, reulting in a pressure will close AV01 which will close
increase within the vessel. This all of the natural gas supply
6 Less Low level in 04-V-003 could lead to a potentially feed, and open steam bypass
dangerous build up of pressure via AV03 and AV04 to feed
within 02-V-001, with the steam from the header to cool
possibility of an explosion the process stream tubes down
occuring. and will flare all of it off.

Low flowrate through pipe 51,


means level in 02-V-001 will
The pressure rating of pipes and
decrease, reulting in a pressure
the whole boiler feed water
increase within the vessel. This
system was designed to
could lead to a potentially
6 Less Pipe 51 leakage/rupture 36.5bar, above the operating
dangerous build up of pressure
pressure of 33 bar. Appropriate
within 02-V-001, with the
external corosion allowance
possibility of an explosion
was taken into consideration.
occuring. Potential for burns and
slip hazards.

A low-low level in the steam


No flow through pipe 51, means
drum will trigure ESD01 which
level in 02-V-001 will decrease, Consider the implementation of
will close AV01 which will close
reulting in a pressure increase a step by step operating
all of the natural gas supply
within the vessel. This could lead procedure for the ioperator to
6 None 04-P-002A/B failure feed, and open steam bypass
to a potentially dangerous build manuall shutdown the plant for
via AV03 and AV04 to feed
up of pressure within 02-V-001, a hot restart, with the pilot light
steam from the header to cool
with the possibility of an explosion still active.
the process stream tubes down
occuring.
and will flare all of it off.

The pressure rating of pipes and


Boiler Feedwater pressure Consider the installation of
the whole boiler feed water
Pressure drop across 03-E-001 entering 02-V-001 will be higher Pressure indicators on pipe
6 Pressure More system was designed to
and 04-E-002 is reduced leading to a higher operating BFW-050-100-B2SA-H, and
36.5bar, above the operating
pressure within 02-V-001. pipe BFW-051-100-B2SA-H.
pressure of 33 bar.

If the pressure of the steam


produced drops below 30 barg
Boiler Feedwater pressure Consider the installation of
in pipe 56, a split range control
Pressure drop across 03-E-001 entering 02-V-001 will be lower Pressure indicators on pipe
6 Less loop (PIC203) on the outlet pipe
and 04-E-002 is increased leading to a lower operating BFW-050-100-B2SA-H, and
from 02-DS-001, will flare of
pressure within 02-V-001. pipe BFW-051-100-B2SA-H.
steam which is off specification,
for the client's steam headerr

Level in steam drum increases


which will decrease pressure in
steam drum. This will lead to an LAH and LAHH are in place on
High level in 02-V-001 resuting increased hydrostatic pressure of the steam drum. This will notify
7 Flow (BFW) More
a higher head of water BFW leaving the steam drum to the operator to take corrective
the heating coil 01-EC-004, action to resolve the problem
therefore a greater flow out of the
steam drum.

Increased steam production. The pressure rating of pipes and


Higher flowrate will be casued by the whole boiler feed water
7 Flow (BFW) More Increased duty in the 01-EC-004 grater convection which in turn is system was designed to
caused by grate duty in the 36.5bar, above the operating
convection bank of 01-H-001. pressure of 33 bar.

Page 5 of 6
University of Nottingham Rev:03
Department of Chemical and Environmental Engineering Date: September 2017
HAZOP RECORD SHEET
Project Title: P&ID Title/Description P&ID No. Rev No.:

Group No.: Meeting Attendees HAZOP Meet Date

Design Intent/Process Outline:

Action Required Status


Node No Parameter Guideword Cause Consequence Current Safeguards Recommendations/Action Action Assigned To: Action Outcome
No. Completion Date Open/Closed

A low-low level in the steam


Low level in steam drum will lead
drum will trigure ESD01 which
to a decreased hydrostatic
will close AV01 which will close
Low level in 02-V-001 due to pressure of BFW leaving the
all of the natural gas supply
decreased flowrate of boiler steam drum to the heating coils
7 Flow (BFW) Less feed, and open steam bypass
feed water to the steam drum (01-EC-004). More steam will be
via AV03 and AV04 to feed
via pipe 51. genrated in the coil. As a result
steam from the header to cool
pressure in the steam drum will
the process stream tubes down
increase.
and will flare all of it off.

Reduced effciecy of steam


geration and energy recovery in
Damage to pipe 54 carrying The pressure rating of pipes and
the convection bank resuling in
boiler feedwater to 01-CE-004, the whole system was designed
7 Flow (Boiler Feedwater) Less less steam being produced. The
may result in pipe rupture or to 36.5 bar, above the operating
temperature of air being
leakage pressure of 33 bar.
preheated in the 01-EC-005 will
increase.

In order not to reduce steam


flowrate in the Steam
There is a pressure reilef valve Superheating coil 01-CE-003,
High flow of boiler feedwater
(PSV03A/B) on the steam drum, implement a pressure relief
out of 02-V-001 due to FCV03
to relieve dangerous pressure valve (PSV) after the coil. This
failing open results in increased
build ups within 02-V-001. The way the PSV after the coil will
8 Flow (Steam) More flow into the steam gerating coil
pressure rating of pipes and 02- be activated first, decreasing
01-CE-004. This results in
V-001 was designed to the pressure within the pipe 57.
increased steam flow in pipe 55
36.5bar, above the operating If pressure in the steam drum
out of 01-CE-004.
pressure of 33 bar. contntinues to increase the
existing PSV03A/B will be
activated.

In order not to reduce steam


Increased temperature of the flowrate in the Steam
flue gases in the convection There is a pressure reilef valve Superheating coil 01-CE-003,
bank of the reformer (01-H- (PSV03A/B) on the steam drum, implement a pressure relief
001) will result in a higher duty to relieve dangerous pressure valve (PSV) after the coil. This
Increased pressure within pipe 55
in steam generating coil (01-CE- build ups within 02-V-001. The way the PSV after the coil will
8 Flow (Steam) More and 02-V-001, due to increased
004). In turn more boiler feed pressure rating of pipes and 02- be activated first, decreasing
duty for 01-CE-004.
water will turn into steam V-001 was designed to the pressure within the pipe 57.
leading a higher flowrate of the 36.5bar, above the operating If pressure in the steam drum
boiler feed water in the stream pressure of 33 bar. contntinues to increase the
55. existing PSV03A/B will be
activated.

Reduced productivity of steam The pressure rating of pipes and


Damage to pipe carrying steam Regular inspection of the pipe
export. Leakage can result in hot the whole system was designed
8 Flow (Steam) Less to 02-V-001, can result in pipe surfaces and thickness using
temperature steam coming into to 36.5 bar, above the operating
rupture or leakage ultrasonic sensors.
contact with nearby personnel pressure of 33 bar.

Increased duty of the 01-CE- Increased pressure within pipe 55 The pressure rating of pipes and
004 will result in a greater and 02-V-001, due to increased the whole system was designed
8 Pressure More
fraction of boiler feed water duty for 01-CE-004 and higher to 36.5 bar, above the operating
turning into steam in pipe 55. steam fraction. pressure of 33 bar.
The pressure rating of pipes and
Reduced pressure drop across The preesure of the stream in
the whole system was designed
8 Pressure More 01-CE-004 as a result of lower pipe 55 will have a higher
to 36.5 bar, above the operating
operating capacity. pressure as a result.
pressure of 33 bar.

If the pressure of the steam


Steam + Boiler Feedwater produced drops below 30 barg
Increased pressure drop due to
pressure entering 02-V-001 will in pipe 56, a split range control
flouing between the tubes on
8 Pressure Less be lower leading to a lower loop (PIC203) on the outlet pipe
the shell side of the waste heat
operating pressure within 02-V- from 02-DS-001, will flare of
boiler (02-WHB-001)
001 steam which is off specification,
for the client's steam headerr

Page 6 of 6