University of Nottingham Rev:03
Department of Chemical and Environmental Engineering Date: September 2017
HAZOP RECORD SHEET
Project Title: P&ID Title/Description P&ID No. Rev No.:
Page 2 of 6
University of Nottingham Rev:03
Department of Chemical and Environmental Engineering Date: September 2017
HAZOP RECORD SHEET
Project Title: P&ID Title/Description P&ID No. Rev No.:
Increased duty of the 02-WHB- Increased pressure within pipe 53 The pressure rating of pipes and
001 will result in a greater and 02-V-001, due to increased the whole system was designed
5 Pressure More
fraction of boiler feed water duty for 02-WHB-001 and higher to 36.5 bar, above the operating
turning into steam in pipe 53. steam fraction. pressure of 33 bar.
Page 3 of 6
University of Nottingham Rev:03
Department of Chemical and Environmental Engineering Date: September 2017
HAZOP RECORD SHEET
Project Title: P&ID Title/Description P&ID No. Rev No.:
Less water into steam drum and Level control on steam drum to
Flow control valve (FCV03) close the level steam drum will keep the level constants; low
Less more than intended leading to decreases, less steam can be level alarms will sound if level is
flowrate lower than set point produced resulting in reduced low and the control valve will be
productivity fixed to correct position
Page 4 of 6
University of Nottingham Rev:03
Department of Chemical and Environmental Engineering Date: September 2017
HAZOP RECORD SHEET
Project Title: P&ID Title/Description P&ID No. Rev No.:
Flow of BFW into steam drum LAH and LAHH are in place on
Control fault/failure: Flow
increases. Level in steam drum the steam drum. This will notify
6 Flow (BFW) more control valve FCV03 fail open
increases which will decrease the operator to take corrective
(remains open)
pressure in steam drum. action to resolve the problem
Page 5 of 6
University of Nottingham Rev:03
Department of Chemical and Environmental Engineering Date: September 2017
HAZOP RECORD SHEET
Project Title: P&ID Title/Description P&ID No. Rev No.:
Increased duty of the 01-CE- Increased pressure within pipe 55 The pressure rating of pipes and
004 will result in a greater and 02-V-001, due to increased the whole system was designed
8 Pressure More
fraction of boiler feed water duty for 01-CE-004 and higher to 36.5 bar, above the operating
turning into steam in pipe 55. steam fraction. pressure of 33 bar.
The pressure rating of pipes and
Reduced pressure drop across The preesure of the stream in
the whole system was designed
8 Pressure More 01-CE-004 as a result of lower pipe 55 will have a higher
to 36.5 bar, above the operating
operating capacity. pressure as a result.
pressure of 33 bar.