GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.

00

BETA Report for:


GE Oil & Gas

Report Reference # and Scope


US00365-01-1: Field Pulsation, Vibration, and Torsional Analysis

Related Reports and Scope


208642: Pulsation and Mechanical Natural Frequency Analysis (DA3: M2-M5)
208643: Torsional Vibration Analysis
US00091-01-01: Skid Dynamic and Lifting Analysis

BETA Machinery Analysis Representative


Michal Gaca, B.Sc., EIT
Project Engineer
mgaca@betamachinery.com

Owner Italfluid
Location Egypt
Unit U-150.2.5
Customer Reference # GE PO#1100015460 (9964423)
Most Recent Revision 00
Original Report Date June 13, 2016

Rev # Rev Date Description Prepared By


00 June 13, 2016 Original Report Michal Gaca, B.Sc., EIT

The information in this report was prepared by BETA Machinery Analysis for GE Oil & Gas. Distribution of this
material is limited to the staff of GE Oil & Gas unless specific permission is obtained from BETA Machinery
Analysis.

Vibration, Dynamics & Noise Page 1 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Summary

Reciprocating compressors produce mechanical forces and moments due to the action of reciprocating and
rotating components, as well as pulsation forces due to the intermittent movement of gas. These forces can be
minimized, but cannot be eliminated. Direct and stiff connections to adequate foundation are required to
ensure vibrations of components are maintained at amplitudes low enough for long-term reliability. That
requires design, construction and installation in accordance with good practices.
Many of the high vibration areas found are due to inadequate supports and poor connection to a solid
foundation. This results in a system that is unable to resist the normal forces and moments produced by the
compressor and engine. Vibration of skid beams should ideally be less than 0.05 in/s pk, especially where
stiffness is critically needed. Skid vibrations of 0.10 in/s pk would be marginally acceptable at those critical
locations. In this case there are many areas on the main and secondary scrubber skids with vertical vibrations
near or above 0.20 in/s pk. Those locations are at the base of the scrubbers, engine pedestal, cylinder wedge
supports, and skid outriggers used to support process piping. Additionally, there are also areas beyond skid
limits, near the coolers, where the installed pipe support posts have inadequate stiffness, poor fit up, and are
not well connected to the concrete foundation.
It is paramount that the main compressor and the secondary scrubber skids be a solid part of the foundation
system, and are well connected to the concrete foundation through a good epoxy grout layer. If proper
foundation and adequate connection between skid beams and the foundation cannot be achieved, the addition
of bracing and gussets as recommended will not be sufficient to ensure long-term reliability.
This report contains recommendations to replace existing supports or increase support stiffness after the
foundation issues are corrected. While the recommendations such as braces and gussets made in this report are
one way of improving the existing support stiffness, there are other acceptable solutions that may be
implemented. If required, an alternative approach to increase support stiffness, or implement the
recommendations may be discussed with BETA Machinery Analysis to ensure best practices are followed.

Vibration, Dynamics & Noise Page 2 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Table of Contents
Summary ............................................................................................................................................................. 2
Table of Contents ................................................................................................................................................ 4
List of Figures ...................................................................................................................................................... 5
List of Tables ........................................................................................................................................................ 7
1 Introduction and History .............................................................................................................................. 9
2 Physical Layout .......................................................................................................................................... 11
3 Summary of Problem Areas........................................................................................................................ 13
4 Recommendations and Analyses ................................................................................................................ 15
4.1 Speeds to Avoid.................................................................................................................................. 17
4.2 Correct Cooler Area Pipe Supports ..................................................................................................... 22
4.3 Replace Existing Grout and Repair the Foundation Connection ........................................................... 31
4.4 Stage 2, 3, and 4 Suction Scrubber Recommendations (TP# 210, 300, and 400) .................................. 35
4.5 Stage 2 Scrubber Liquid Level Gauge Support Design (TP# 210 Sight Glass) ......................................... 42
4.6 Modify Existing Support Clamp and Post Design ................................................................................. 44
4.7 Correct Stage 1 and Stage 2 Scrubber Outlet Spool Flange Misalignment............................................ 48
4.8 Stage 4 Scrubber Outlet Spool (TP# 399)............................................................................................. 49
4.9 Stage 2, 3, and 4 Discharge PSV (TP# 250, 350, and 450)..................................................................... 52
4.10 Stage 3 and 4 Bottle Wedge and Inboard Support Recommendations................................................. 58
4.11 Cylinder 2, Stage 4 Suction and Discharge Bottles ............................................................................... 63
4.12 Cylinder 1, Stage 3 Suction Bottle and Suction Inlet Spool................................................................... 68
4.13 Stage 1 Bypass – Scrubber Inlet Spool (TP# 105) ................................................................................. 72
4.14 Secondary Suction Bottle and Stage 1 and 2 Discharge Bottle Recommendations ............................... 73
4.15 Coupling ............................................................................................................................................. 76
4.16 Additional Site Visit Details and Observations ..................................................................................... 77
4.17 General .............................................................................................................................................. 78
APPENDIX A Machine Details | Operating Conditions | Test Equipment.......................................................... 79
A.1 Machine and Operating Details .......................................................................................................... 79
A.2 Test Equipment .................................................................................................................................. 80
A.2.1 Instrumentation.......................................................................................................................... 80
A.2.2 Sensors ....................................................................................................................................... 80
A.2.3 Data Acquisition Setups .............................................................................................................. 80
APPENDIX B Data Summary | Vibration | Pulsation |Impact Response Data ................................................... 82
B.1 Data Plot Example .............................................................................................................................. 82
B.2 Vibration Data Summary .................................................................................................................... 83
B.3 Pulsation Plot Index ............................................................................................................................ 93
B.4 Torsional Data Summary .................................................................................................................... 94
B.5 Impact Response Plot Index................................................................................................................ 95

Vibration, Dynamics & Noise Page 4 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.6 Vibration Data .................................................................................................................................... 97


B.6.1 Vibration Data – As Found Vibration ........................................................................................... 97
B.6.2 Vibration Data – Engine/Compressor Alignment Done .............................................................. 146
B.6.3 Vibration Data – Elbow at TP# 436 Braced ................................................................................ 154
B.6.4 Vibration Data – Braced Wedge Supports ................................................................................. 160
B.6.5 Vibration Data – Night Operation no Side Stream ..................................................................... 164
B.6.6 Vibration Data – Night Operation with Side Stream) ................................................................. 179
B.7 Pulsation Data .................................................................................................................................. 190
B.8 Torsional Data .................................................................................................................................. 195
B.9 Impact Response Data ...................................................................................................................... 203
APPENDIX C Pulsation | Vibration | Mechanical Natural Frequency Guidelines............................................. 276
C.1 Guidelines ........................................................................................................................................ 276
C.2 Vibration Guidelines for Piping ......................................................................................................... 276
C.3 Acoustical Pulsation Guidelines for Field Measurements .................................................................. 276
C.3.1 Line Side Pulsation Limits (Based on API 618 4th Edition) ........................................................... 276
C.3.2 Compressor Side Pulsation Limits (Based on API 618 4th Edition) ............................................... 277
C.4 Mechanical Natural Frequency Guidelines ........................................................................................ 277
C.5 Vibration Guidelines for Skid Vibrations for Reciprocating Compressors ........................................... 277
C.6 Vibration Guidelines for Relief Valves and Small Bore Appendages. .................................................. 277
C.6.1 Relief Valves ............................................................................................................................. 277
C.6.2 Small Bore Appendages ............................................................................................................ 277
APPENDIX D Common Issues ........................................................................................................................ 279
D.1 Orifice Plates .................................................................................................................................... 279
D.2 Pipe Strain ........................................................................................................................................ 280
D.3 Flange Alignment.............................................................................................................................. 282
D.4 Fastener Preload .............................................................................................................................. 284
D.5 Vibration Control Products ............................................................................................................... 285

List of Figures
Figure 2.1 – Physical Layout – Stage 1 and Stage 2 ............................................................................................. 11
Figure 2.2 – Physical Layout – Stage 3 and Stage 4 ............................................................................................. 12
Figure 4.1.1 – Summary of Speeds to Avoid (Day Test without Side Stream) ...................................................... 18
Figure 4.1.2 – Summary of Speeds to Avoid (Day Test with Side Stream)............................................................ 19
Figure 4.1.3 – Summary of Speeds to Avoid (Night Test without Side Stream) .................................................... 20
Figure 4.1.4 – Summary of Speeds to Avoid (Night Test with Side Stream) ......................................................... 21
Figure 4.2.1 – Cooler Inlet and Outlet Pipe Spool Support Structure ................................................................... 23
Figure 4.2.2 – Stage 2 and Stage 3 Cooler Inlet Pipe Spool Support Posts ........................................................... 23
Figure 4.2.3 – Stage 1 Discharge Cooler Outlet Pipe Spool Missing Support........................................................ 24
Figure 4.2.4 – Stage 1 Discharge Cooler Outlet Spool (Near TP# 200) ................................................................. 24
Figure 4.2.5 – Cooler Inlet and Outlet Pipe Spool Support Recommendations .................................................... 25
Figure 4.2.6 – Alternative Cooler Pipe Spool Concrete Pile Support Recommendations ...................................... 25
Figure 4.2.7 – BETA Standard PS-1 – Pipe Support Post Design........................................................................... 26
Figure 4.2.8 – BETA Standard CL-1 – Flat Bar Clamp ........................................................................................... 27

Vibration, Dynamics & Noise Page 5 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.2.9 – Existing Stage 1 Cooler Outlet Pipe Support Post.......................................................................... 28


Figure 4.2.10 – Cooler Inlet Spool Riser .............................................................................................................. 29
Figure 4.2.11 – Cooler Inlet and Outlet Spool Support Posts............................................................................... 29
Figure 4.2.12 – Existing Cooler Inlet and Outlet Pipe Spool Brace Beam ............................................................. 30
Figure 4.3.1 – Stage 4 Outrigger Grout Pad Concerns ......................................................................................... 32
Figure 4.3.2 – Stage 3 Outrigger Grout Pad Concerns ......................................................................................... 33
Figure 4.3.3 – Stage 3 and 4 Skid Outrigger Attachment Concerns...................................................................... 33
Figure 4.3.4 – Skid Vibrations Measured Near Engine and Compressor Pedestal ................................................ 34
Figure 4.3.5 – Secondary Skid Concrete/Grout Condition – Back Side ................................................................. 34
Figure 4.4.1 – Stage 2 Suction Scrubber Recommendations (TP# 210) ................................................................ 36
Figure 4.4.2 – Stage 3 Suction Scrubber Recommendations (TP# 300) ................................................................ 36
Figure 4.4.3 – Stage 4 Suction Scrubber Recommendations (TP# 400) ................................................................ 37
Figure 4.4.4 – BETA Standard SC-6 – Scrubber Brace with Band Connection ....................................................... 38
Figure 4.4.5 – Stage 3 Suction Scrubber ODS Plot of Scrubber and Skid Vibration at Skirt ................................... 40
Figure 4.4.6 – Scrubber Skid Vibrations (Values shown in/s pk during ODS Measurement at Fixed Speed) ......... 41
Figure 4.5.1 – BETA Standard SA-8 – Small Bore Level Gauge Support Design..................................................... 42
Figure 4.6.1 – Stage 2 and Stage 4 Support Post Gusset Recommendations ....................................................... 44
Figure 4.6.2 – Stage 2 and Stage 4 Support Post Brace Recommendation........................................................... 45
Figure 4.6.3 – Support Post and Inadequate Shimming (First Support Downstream of TP# 436) ......................... 46
Figure 4.6.4 – Stage2 Support Post and Skid Outrigger (First Support Downstream of TP# 237).......................... 47
Figure 4.6.5 – Stage 4 Discharge Bottle Outlet Flange Misalignments ................................................................. 47
Figure 4.7.1 – Stage 1 and Stage 2 Scrubber Outlet Pipe Spool Misalignments ................................................... 48
Figure 4.8.1 – Stage 4 Suction Scrubber Outlet Spool Recommendations ........................................................... 49
Figure 4.8.2 – Double Band Clamp Support Sketch ............................................................................................. 50
Figure 4.8.3 – Stage 4 Suction Scrubber Outlet Spool (TP# 399) ......................................................................... 51
Figure 4.9.1 – Stage 2 and Stage 4 Discharge PSV Recommended Support Post ................................................. 52
Figure 4.9.2 – BETA Standard PS-2 – Multiple Stacked Pipe Support Post Design ................................................ 53
Figure 4.9.3 – BETA Standard FS-1 – Flange Support Details ............................................................................... 54
Figure 4.9.4 – Stage 2 Discharge PSV ODS Vibration (TP# 250) ........................................................................... 56
Figure 4.9.5 – Stage 3 Discharge PSV ODS Vibration (TP# 350) ........................................................................... 56
Figure 4.9.6 – Stage 4 Discharge PSV ODS Vibration (TP# 450) ........................................................................... 57
Figure 4.10.1 – Stage 3 and Stage 4 Wedge Support Design Recommendations ................................................. 59
Figure 4.10.2 – Inboard Support Design Recommendations ............................................................................... 59
Figure 4.10.3 – Cylinder 2 Vertical and Axial Vibrations and Impact Test Overlay Plots ....................................... 60
Figure 4.10.4 – Cylinder 2 Inboard Support High Relative Vibrations .................................................................. 61
Figure 4.11.1 – Stage 4 Discharge System Pulsation Analysis Recommendations ................................................ 63
Figure 4.11.2 – Stage 4 Suction Inlet Riser Brace Recommendations .................................................................. 64
Figure 4.11.3 – Stage 4 Suction Bottle Recommended Bottle Knee-Brace........................................................... 64
Figure 4.11.4 – BETA Standard SB-4 – Suction Bottle Head Knee-Brace .............................................................. 65
Figure 4.11.5 – Stage 4 Suction Inlet Riser (TP# 414) .......................................................................................... 66
Figure 4.12.1 – Stage 3 Suction and Discharge Spool Recommendations ............................................................ 68
Figure 4.12.2 – Stage 3 Discharge Outlet Spool Recommendations .................................................................... 69
Figure 4.12.3 – Stage 3 Suction Bottle Inlet Riser (TP# 314) ................................................................................ 69
Figure 4.12.4 – Stage 3 Discharge Bottle Wedge Support ................................................................................... 71
Figure 4.13.1 – Stage 1 Scrubber Bypass inlet Spool Recommendation............................................................... 72
Figure 4.14.1 – Secondary Suction Bottle Recommendations (Typical for Stage 3 and Stage 4) ........................... 73
Figure 4.14.2 – BETA Standard WS-7 – Discharge Bottle Restraint ...................................................................... 74
Figure 4.14.3 – Low Profile Wedge Support Sketch ............................................................................................ 75
Figure 4.14.4 – Stage 3 Secondary Suction Bottle (TP# 309 & 310) ..................................................................... 75
Figure A.2.1 – Pulsation, Vibration and Torsional Data Acquisition Setup ........................................................... 80

Vibration, Dynamics & Noise Page 6 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure A.2.2 – Transient Torsional Data Acquisition Setup .................................................................................. 80


Figure A.2.3 – Impact Test Data Acquisition Setup ............................................................................................. 81
Figure B.1.1 – Example of a Spectrum Plot for a Variable Speed Machine........................................................... 82
Figure B.8.1 – Cold Start – Run 58, Waterfall and Time History of Response at Compressor Lube Oil Pump ...... 195
Figure B.8.2 – Controlled Shutdown – Run 60, Waterfall and Time History of Response at Compressor Lube Oil
Pump ............................................................................................................................................................... 196
Figure B.8.3 – Warm Start – Run 61, Waterfall and Time History of Response at Compressor Lube Oil Pump ... 197
Figure B.8.4 – Unloaded Speed Sweep – Run 62, Waterfall and Time History of Response at Compressor Lube Oil
Pump ............................................................................................................................................................... 198
Figure B.8.5 – Loading at 900 rpm – Run 63, Waterfall and Time History of Response at Compressor Lube Oil
Pump ............................................................................................................................................................... 199
Figure B.8.6 – Loaded Speed Sweep – Run 64, Waterfall and Time History of Response at Compressor Lube Oil
Pump ............................................................................................................................................................... 200
Figure B.8.7 – Cold Start – Run 177, Waterfall and Time History of Response at Compressor Lube Oil Pump .... 201
Figure B.8.8 – Loaded ESD – Run 196, Waterfall and Time History of Response at Compressor Lube Oil Pump . 202
Figure C.1 – Guidelines for Recip. Compressors (1800 RPM max.) – Vibration Amplitude (in/s Peak) ................ 278
Figure D.2.1 – Pipe Strain Examples ................................................................................................................. 280
Figure D.2.2 – Pipe Clamp Packer and Oversized Hole Example ........................................................................ 281

List of Tables
Table 1.1 – Summary of Definitions, Directions and Abbreviations ..................................................................... 10
Table 3.1 – Summary of Problem Areas.............................................................................................................. 13
Table 3.2 – Summary of Problem Areas (Skid Vibration) ..................................................................................... 14
Table 4.2.1 – Vibration Observation Summary (Cooler Inlet and Outlet Spool Vibrations) .................................. 28
Table 4.3.1 – Vibration Observation Summary (Compressor and Secondary Skid Vibration) ............................... 32
Table 4.4.1 – Vibration Observation Summary (Stage 2 Suction Scrubber) ......................................................... 39
Table 4.4.2 – Vibration Observation Summary (Stage 3 Suction Scrubber) ......................................................... 39
Table 4.4.3 – Vibration Observation Summary (Stage 4 Suction Scrubber) ......................................................... 40
Table 4.5.1 – Vibration Observation Summary (TP# 210 Sight Glass – Stage 2 Scrubber Liquid Level Gauge) ...... 43
Table 4.6.1 – Vibration Observation Summary (Stage 4 Discharge Spool Downstream of Discharge Bottle) ........ 46
Table 4.7.1 – Vibration Observation Summary (Stage 2 Scrubber Outlet Pipe Spool) .......................................... 48
Table 4.8.1 – Vibration Observation Summary (Stage 4 Scrubber Outlet Spool).................................................. 51
Table 4.9.1 – Vibration Observation Summary (Stage 2, 3, and 4 PSVs – Velocity Guideline) .............................. 55
Table 4.9.2 – Vibration Observation Summary (Stage 2, 3, and 4 PSVs – Acceleration Guideline) ....................... 55
Table 4.10.1 – Vibration Observation Summary (Cylinder 2 and Discharge Bottle).............................................. 60
Table 4.10.2 – Vibration Observation Summary (Cylinder 4 Vertical Vibration)................................................... 61
Table 4.10.3 – Vibration Observation Summary (Skid Vibration at Stage 4 Wedge Supports) .............................. 62
Table 4.11.1 – Vibration Observation Summary (Elevated Stage 4 Suction Elbow TP# 414) ................................ 66
Table 4.11.2 – Vibration Observation Summary (Suction Bottle) ........................................................................ 67
Table 4.11.3 – Pulsation Observation Summary (Stage 4 Discharge TP# 460) ..................................................... 67
Table 4.12.1 – Vibration Observation Summary (Cylinder 1 and Stage 3 Suction Bottle) ..................................... 70
Table 4.12.2 – Vibration Observation Summary (Stage 3 Suction Inlet Spool TP# 314) ........................................ 70
Table 4.13.1 – Vibration Observation Summary (Stage 1 Suction Bypass Spool) ................................................. 72
Table B.2.1 – Vibration Data Summary (Anomaly Report: As-Found Vibration) ................................................... 83
Table B.2.2 – Vibration Data Summary (Anomaly Report: After Alignment Done)............................................... 87
Table B.2.3 – Vibration Data Summary (Anomaly Report: After Pipe at TP# 436 Braced) .................................... 88
Table B.2.4 – Vibration Data Summary (Anomaly Report: Stage 4 Discharge Bottle Wedges Braced) .................. 89

Vibration, Dynamics & Noise Page 7 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Table B.2.5 – Vibration Data Summary (Anomaly Report: Night Operation, no Side Stream) .............................. 90
Table B.2.6 – Vibration Data Summary (Anomaly Report: Night Operation, with Side Stream) ........................... 92
Table B.4.1 – Torsional Data Summary (Anomaly Report)................................................................................... 94
Table B.5.1 – Impact Response Plot Index .......................................................................................................... 95
Table D.1.1 – Typical Orifice Plate Thickness .................................................................................................... 279

Vibration, Dynamics & Noise Page 8 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

1 Introduction and History

BETA Machinery performed a field vibration analysis on compressor U-150.2.5 at the Agiba gas plant in Egypt on
May 28 – June 5, 2016. High vibrations and failures of the stage 4 suction and discharge bottles were previously
reported. Additionally, three couplings have failed during operation on this, and second nominally identical
compressor package installed at site.
The unit was tested through an operating speed range of 800 – 1000 rpm and vibration and pulsation data was
collected. Additionally, torsional vibration data was collected for the compressor package at compressor
auxiliary pump end for various operating scenarios including compressor cold and warm startup, compressor
unloaded speed sweep, compressor loaded speed sweep, and normal and ESD compressor shutdown.
Vibrations in many areas, including at components away from the compressor such as scrubbers and piping
were found to exceed guideline as discussed in the report. Detailed measurements and troubleshooting has
shown high skid vibrations in the vertical direction are present on the main and on the secondary scrubber skids.
Various concerns including inadequate foundation installation, flexible support design, and pulsations exceeding
guideline on stage 4 discharge were identified and details are provided in this report. Recommendations such as
improvement of existing supports, installation of gussets and braces are made in this report; however it is
paramount that the main compressor and the secondary scrubber skids be a solid part of the foundation system
and are well connected to the concrete foundation through a good epoxy grout layer. If proper foundation and
adequate connection between skid beams and the foundation cannot be achieved, the addition of the bracing
and gussets as recommended will not be sufficient to ensure long-term reliability.
Torsional measurements were found to similar to values predicted during the torsional vibrational analysis
completed under BETA Ref. # 208643. The primary concern from the torsional perspective is the long startup
time when the engine and compressor are cold due to ambient temperatures. The slow ramp up rate results in
high torsional vibration as the compressor passes through the first torsional natural frequency. The slow ram up
is believed to be a result of the following operating concerns:
1. Engine has not been equipped with heater. Ambient temperatures below 10°C have significant impact
on engine startup and ramp up.
2. Fuel gas quality: Fuel gas has been noted to be saturated resulting in condensation collection during
startup and operation.
3. Loaded startup: Compressor is currently starting up with an initial load of 40-50%. Startup at loads
exceeding 30% is not recommended by engine manufacturer. And typically torsionally soft couplings
require an unloaded start to ensure reliability.

A detailed list of measurements and plots are presented in Appendix B.

Vibration, Dynamics & Noise Page 9 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Definitions, Directions, and Abbreviations


This report refers to various measurements and directions. Unless specified otherwise, BETA uses the following
abbreviations and conventions as required:

Table 1.1 – Summary of Definitions, Directions and Abbreviations


Mechanical Natural
MNF expressed in Hz
Frequency
Front / Back F/B driver is front of unit
Left / Right L/R viewing driver from driven machine
perpendicular to main shaft axis (parallel to piston
Horizontal H
motion)
Vertical V up / down
Axial A parallel to main shaft (crankshaft) axis
Clockwise / Counterclockwise CW / CCW viewing driver from driven machine
Process System Names 1S, 2D … 1S = stage 1 suction, 2D = stage 2 discharge …
Order of Run Speed 1X, 2X ... 1X = run speed, 2X = twice run speed ...
Acceleration g pk at a discrete frequency
Overall Acceleration g true-pk OA from time waveform
Velocity in/s pk at a discrete frequency
Overall Velocity in/s true-pk OA from time waveform
Displacement mil pk-pk at a discrete frequency
Overall Displacement mil true-pk-pk OA from time waveform
Pulsation psi pk-pk at a discrete frequency

Measurement Method
Unless specified otherwise, BETA uses the following measurement methods as required:
 Vibrations are measured using magnet-mounted Integral Electronic Piezo-Electric (IEPE) velometers.
 Pulsations are measured using IEPE pressure sensors.
 Shaft speed / position is measured using a photo-optical sensor aimed at the rotating shaft.
 Impact force used in response tests is measured using an instrumented hammer.
 Torsional vibration is measured using a through bore encoder connected to auxiliary pump connection.
 All signals are fed to a PC-based data acquisition and analysis system for display and storage.

Vibration, Dynamics & Noise Page 10 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

2 Physical Layout

Figure 2.1 – Physical Layout – Stage 1 and Stage 2

Vibration, Dynamics & Noise Page 11 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 2.2 – Physical Layout – Stage 3 and Stage 4

Vibration, Dynamics & Noise Page 12 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

3 Summary of Problem Areas

Table 3.1 – Summary of Problem Areas


Test Point Dir'n Amplitude Freq Speed Order GL % of MNF Likely Causes
( in/s pk ) (Hz) (rpm) Type GL (Hz)
Day: 105 -a 2.19 76.9 920 5 P 219 77.5 MR
Day: 200 a 1.73 13.4 800 1 P 409 - MR, WS
Day: 200 h 1.22 13.4 820 1 P 288 - MR, WS
Night SS: 210 h 1.86 33.4 1000 2 P 186 35.0 WS, MR
Night: 212 h 2.84 90.3 900 6 P 284 91.6 MR, PS, MA
Day: 237 v 2.62 76.9 920 5 P 262 78.1 WS, MR
Day: 270 h 1.86 30.6 920 2 P 193 32.8 WS, MR
Night: 300 a 3.90 31.9 950 2 P 390 31.6 WS, MR
Day: 314 (After Align) a 1.87 30.9 920 2 P 192 31.9 MR, PS, WS
Night SS: 314 -a 1.90 62.8 940 4 P 190 55.9 MR, PS, WS
Night: 314 -h 2.73 61.9 920 4 P 273 61.6 MR, PS, WS
Day: 315 (After Align) a 1.58 30.6 920 2 P 164 - WS
Night SS: 336 h 1.88 161.3 880 11 P 188 - WS, PS
Night SS: 336 h 1.54 83.4 1000 5 P 154 - WS, PS
Day: 336 (After Align) -h 1.57 180.9 985 11 P 157 - WS, PS
Night SS: 336 v 3.41 83.4 1000 5 P 341 - WS, PS
Day: 360 h 1.95 26.6 800 2 P 233 26.3 WS, MR
Day: 390 a 4.10 41.9 840 3 P 410 42.8 WS, MR
Day: 399 a 2.67 28.1 840 2 P 302 29.4 MR, PS, WS
Night SS: 399 a 2.75 79.1 940 5 P 275 79.4 MR, PS, WS
Night SS: 400 a 3.55 28.8 860 2 P 392 29.37 WS, MR
Day: 408 h 1.52 85.3 860 6 P 152 86.5 MR, WS
Night SS: 414 -a 5.00 57.8 880 4 P 500 59.7 MR, WS, CM
Night SS: 414 h 2.53 66.3 1000 4 P 253 - WS, CM
Day: 414 h 2.41 43.8 880 3 P 241 45.0 MR, WS, CM
Night SS: 414 h 1.65 120.6 920 8 P 165 120.6 MR, WS, CM
Night SS: 415 v 2.04 65.6 980 4 P 204 - CM, MR
Night SS: 415 v 1.88 73.8 880 5 P 188 74.7 CM, MR
Day: 415 (436 Braced) v 1.81 57.8 860 4 P 181 - CM, MR
Day: 420 (Braced Wedge) h 1.62 83.1 1000 5 P 162 - CM, MR
Night SS: 420 -h 2.31 73.4 880 5 P 231 74.7 CM, MR
Night SS: 420 -h 1.81 65.6 980 4 P 181 - CM
Night SS: 420 v 3.01 74.4 900 5 P 301 74.7 CM, MR
Day SS: 420 (Vary SS, 1000rpm) v 1.53 83.1 1000 5 P 153 - CM
Night SS: 430 -a 1.61 47.5 960 3 P 161 - WS, CM
Day: 430 (Braced Wedge) v 2.20 83.4 1000 5 P 220 - WS, CM
Night SS: 435 -a 1.58 47.5 960 3 P 158 - WS, CM
Night SS: 436 a 2.33 66.9 1000 4 P 233 - PS, CM, WS
Night SS: 436 a 1.54 118.4 880 8 P 154 - PS, CM, WS
Night SS: 436 h 3.43 174.1 940 11 P 343 - PS, CM, WS
Night: 436 h 3.30 132.5 1000 8 P 330 125.9 MR, PS, CM, WS
Night: 436 h 2.06 170.0 940 11 P 206 - PS, CM, WS
Day: 436 (Braced) h 1.72 152.2 840 11 P 172 156.6 MR, PS, CM, WS
Day: 436 (Braced) v 2.15 115.0 860 8 P 215 - PS, CM, WS
Night SS: 436 v 1.96 118.4 880 8 P 196 - PS, CM, WS
Day: 437 h 4.51 46.9 920 3 P 451 - WS

Vibration, Dynamics & Noise Page 13 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Day: 438 h 2.28 75.9 920 5 P 228 73.8 MR, WS


Day: 470 a 1.49 16.9 1000 1 P 281 17.5 MR, WS
Day: 470 a 1.71 33.4 1000 2 P 171 - WS
Day: 490 h 3.70 31.9 960 2 P 370 32.2 MR, WS
Day: 210 Sight Glass tan 3.30 96.9 960 6 P 330 97.8 MR, MA, PS
Day: 250 PSV a 2.33 59.7 880 4 P 233 - WS
Day: 250 PSV h 3.25 59.7 900 4 P 325 60.0 MR, WS
Day: 350 PSV -a 1.70 176.3 960 11 P 170 175.3 MR, MA, PS
Day: 350 PSV h 2.94 180.0 980 11 P 294 179.4 MR, MA, PS
Day: 450 PSV a 1.71 71.6 860 5 P 171 74.1 MR, MA, PS
Day: 450 PSV h 2.11 75.0 900 5 P 211 75.0 MR, MA, PS
Day: Cylinder 1 (After Align) a 1.05 30.9 920 2 C 155 32.8 MR, WS
Night: Cylinder 2 -a 1.14 31.6 940 2 C 164 35.3 MR, WS
Day: Cylinder 2 (436 Braced) v 1.60 64.4 960 4 C 228 - WS
Day: Cylinder 4 v 1.32 64.7 960 4 C 189 67.2 MR, WS

Table 3.2 – Summary of Problem Areas (Skid Vibration)


Test Point Dir'n Amplitude Freq Speed Order GL % of MNF Likely Causes
( in/s pk ) (Hz) (rpm) Type GL (Hz)
414 Outrigger v 0.98 182.8 1000 11 S 975 - WS
414 Outrigger -a 0.77 70.31 840 5 S 766 - WS
414 Outrigger -a 0.51 133.4 1000 8 S 510 - WS
Skid Edge Back Right Frame -a 0.19 175.9 800 13 S 192 - WS
Skid at Engine Ped. Front Left v 0.16 31.88 940 2 S 160 - WS
Skid at Engine Ped. Front Right v 0.16 30.94 920 2 S 158 - WS
4D Right Wedge Skid L v 0.23 81.6 980 5 S 234 - WS
4D Left Wedge Skid R v 0.20 61.3 920 4 S 199 - WS
4D Right Wedge Skid R v 0.16 61.3 920 4 S 162 - WS
4D Right Wedge Skid R v 0.16 33.4 1000 2 S 157 - WS
Stage 3 Scr. Skid Back v 0.22 31.6 940 2 S 220 - WS
Stage 3 Scr. Skid Front v 0.22 31.6 940 2 S 220 - WS
Stage 3 Scr. Skid Back Right v 0.16 31.6 940 2 S 160 - WS
Stage 3 Scr. Skid Back Right 2 v 0.12 31.6 940 2 S 117 - WS
Stage 3 Scr. Skid Back Left v 0.12 31.6 940 2 S 117 - WS
Stage 3 Scr. Skid Front Left v 0.20 31.6 940 2 S 197 - WS
Stage 3 Scr. Skid Front Right v 0.19 31.6 940 2 S 193 - WS
Stage 3 Scr. Skid Front Right 2 v 0.17 31.6 940 2 S 170 - WS
Stage 4 Scr. Skid Back v 0.18 28.1 840 2 S 184 - WS
Stage 4 Scr. Skid Back Right v 0.12 28.1 840 2 S 121 - WS

Legend:
Guideline Type Likely Causes
C – cylinder CF – component failure
E – frame (engine) CM – cylinder motion
F – frame (compressor) FM – unbalanced forces & moments
M – motor MA – misalignment
P – piping MR – mechanical resonance
S – skid, foundation PA – pulsation & acoustic resonance
PS – pipe strain
TR – torque reaction
WS – weak or loose support

Vibration, Dynamics & Noise Page 14 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4 Recommendations and Analyses

The following Recommendation Punch List provides an overview of the recommendations made in the report.
Review all sections to ensure the recommendations are implemented as intended and to ensure all detailed
notes are followed.

Recommendation Punch List


# Brief Summary
 4.1  Avoid operating in specified speed ranges
 Install new cooler support structure and properly support cooler inlet and outlet risers
 Install a new support at the back end of the cooler, directly below stage 1 cooler outlet
 4.2
 Implement support modification to ensure adequate support stiffness is achieved
 Replace existing U-bolts and clamps with CL-1 type flat bar clamps
 Repair or replace existing grout under the compressor skid, secondary skid, and below the skid
 4.3
outriggers
 Check vibrations after recommendations in section 4.3 have been implemented. Implement the
following if required:
 4.4 o Install a scrubber to scrubber brace between stage 2 and stage 1 suction scrubbers
o Install the missing gussets in the axial direction for stage 3 suction scrubber
o Install the missing gussets in the axial and horizontal direction for stage 4 suction scrubber
 Check vibrations after recommendations in section 4.3 have been implemented. Implement the
following if required:
 4.5
o Check scrubber liquid gauge for proper alignment to ensure no pipe strain is introduced
o Remote mount the scrubber liquid level gauge
 Install gussets in the existing skid outrigger beams at the support post locations
 Install knee braces at the recommended support post locations
 4.6  Install a support post and appropriate brace at elbow near TP# 436
 Check all existing pipe clamps for proper alignment and to ensure all supports are properly shimmed
while the compressor is at operating temperature
 4.7  Correct the stage 1 and stage 2 suction scrubber outlet spool misalignments at flanges
 Check vibrations of the stage 4 scrubber outlet spool after recommendations in section 4.3 have been
implemented. Implement the following if required:
 4.8 o Check stage 4 scrubber outlet spool for proper alignment and to ensure no pipe strain is introduced
due to misaligned clamps or flanges
o Install a double band clamp pipe support at the TP# 399 as recommended
 Check all PSV connections for proper alignment upstream and downstream of the PSV and to ensure no
 4.9 pipe strain is introduced
 Install support posts as recommended for stage 2, 3, and 4 discharge PSVs
 Check cylinder 1, cylinder 2, and cylinder 4 vibrations after recommendations in section 4.3 have been
implemented. Implement the following if required:
o Improve the existing wedge support design by installing additional gussets as noted
 4.10 o Ensure all wedge supports are properly adjusted while the compressor is at its normal operating
temperature
o Improve the existing inboard support to increase the vertical support stiffness and reduce the
relative motion in the vertical direction

Vibration, Dynamics & Noise Page 15 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

 Check vibrations of the stage 4 suction and discharge bottles after recommendations in section 4.3 and
4.10 have been implemented. Implement the following if required:
o Ensure all recommended orifice plates are installed as recommended by BETA Report Ref. #
208642, in particular stage 4 discharge bottle outlet orifice not visible during site visit
o Install missing stage 4 suction bottle inlet riser brace as recommended in BETA Report Ref. #
 4.11
208642, ensure skid beam below brace foot is appropriately gusseted
o Move existing support brace to the location recommended in BETA Report Ref. # 208642, ensure
skid outrigger below brace foot is appropriately gusseted
o Install suction bottle knee brace for the stage 4 suction bottle
o Install a support post and appropriate brace at the stage 4 discharge bottle outlet elbow
 Check vibrations of the stage 3 suction bottle, suction inlet riser, and discharge bottle outlet spool after
recommendations in section 4.3 and 4.10 have been implemented. Implement the following if
required:
 4.12
o Install outrigger beam gussets and support post knee braces as recommended
o Install a support post and appropriate brace at the stage 3 discharge bottle outlet elbow
o Install an additional brace in the horizontal-axial direction on stage 3 suction inlet riser
 4.13  Install a brace in the axial direction for the stage 1 bypass spool
 Install second wedge support as recommended in BETA Report Ref. # 208642 to ensure adequate
support is provided for stage 3 and stage 4 secondary suction bottles
 Replace existing bottle band clamp with a double bolt band clamp design connected directly to beam
 4.14 sleeper below secondary suction bottles
 Install additional gussets in the beam sleepers installed below the secondary suction bottle
 Adjust the band clamp installed on stage 3 secondary suction bottle to ensure it is installed in vertical
direction
 Install the missing stage 1 and stage 2 discharge bottle overhung end band clamps
 4.15  Monitor vibrations at locations where supports were not installed as recommended in BETA Report Ref.
# 208642

Vibration, Dynamics & Noise Page 16 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.1 Speeds to Avoid

Recommendation
Vibrations exceeding guideline by over 100% were observed throughout the unit operating speed range of 800 –
1000 rpm at various test points as shown in the speed to avoid charts in Figure 4.1.1 to Figure 4.1.4. Due to high
vibrations observed, it is recommended the unit is not operated until recommendations are implemented and
vibrations have been checked throughout the operating speed range. In order to allow for unit operation, the
recommendations made in report sections 4.2 and 4.3 will allow for operation at the lower speed range of 800 –
820 rpm. Additional speed range may be introduced as additional recommendations are implemented. Check
vibrations throughout the speed range to confirm acceptable levels after modifications have been completed.

Analysis
The Vibration vs Speed chart below displays the test points where the “as-found” vibration levels were
significantly over guideline and the speeds at which they exceeded 100%, 150%, and 200% of guideline. For any
desired operating speed, vibrations that are over 150% (orange or red) should be reduced to an acceptable level
for all appropriate test points before operating continuously at that speed. Vibrations are displayed in
descending order of severity from left to right. Green zones are considered safe for continuous operation.

Vibration, Dynamics & Noise Page 17 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Vibration vs Speed

Operation in the highlighted speed range may be allowed


once the highlighted problem areas have been addressed
through implementation of recommendations.

Grey vib > 100% guideline, Orange vib > 150% guideline, Red vib > 200% guideline
Figure 4.1.1 – Summary of Speeds to Avoid (Day Test without Side Stream)

Vibration, Dynamics & Noise Page 18 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Operation in the highlighted speed range may be allowed


once the highlighted problem areas have been addressed
through implementation of recommendations.

Grey vib > 100% guideline, Orange vib > 150% guideline, Red vib > 200% guideline
Figure 4.1.2 – Summary of Speeds to Avoid (Day Test with Side Stream)

Vibration, Dynamics & Noise Page 19 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Operation in the highlighted speed range may be allowed


once the highlighted problem areas have been addressed
through implementation of recommendations.

Grey vib > 100% guideline, Orange vib > 150% guideline, Red vib > 200% guideline
Figure 4.1.3 – Summary of Speeds to Avoid (Night Test without Side Stream)

Vibration, Dynamics & Noise Page 20 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Operation in the highlighted speed range may be allowed


once the highlighted problem areas have been addressed
through implementation of recommendations.

Grey vib > 100% guideline, Orange vib > 150% guideline, Red vib > 200% guideline
Figure 4.1.4 – Summary of Speeds to Avoid (Night Test with Side Stream)

Vibration, Dynamics & Noise Page 21 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.2 Correct Cooler Area Pipe Supports

Recommendation
Implement the following recommendations for the cooler inlet and outlet pipe spools.
1. Install new horizontal support structure extending from existing cooler legs. Use a minimum 6” wide
flange beam and install braces in the horizontal direction as shown in Figure 4.2.1. Optional vertical
braces may be installed to support the newly installed horizontal beam. Ensure gussets are installed at
all pipe spool center lines (see Figure 4.2.8 for typical gusset placement for pipe sleepers). Do not use
short support legs/posts to attach pipes to support beam, attach pipes directly support beam. Ensure
pipe spools are adequately shimmed and CL-1 type flat bar clamps are used for all pipe spools. If
required, tack-weld thick, solid steel plate (packer) to shim gaps larger than 1/4".
2. Install a support post in the axial direction for stage 2 and stage 3 cooler inlet spool from support
structure recommended in #1 above. Install a brace in the horizontal direction to maximize support
stiffness. Ensure pipe spools are adequately shimmed and CL-1 type flat bar clamps are used for all pipe
spools. If required, tack-weld thick, solid steel plate (packer) to shim gaps larger than 1/4".
3. Install a concrete pile directly below existing stage 1 discharge cooler outlet pipe spool. Install a wide
flange beam support sleeper with appropriate gussets. Support pipe as close to elbow as possible and
ensure pipe is properly shimmed and attached using a CL-1 type flat bar clamp as shown in Figure 4.2.8.
See Figure 4.2.3 for support location and additional details.
4. Install minimum four (minimum 1/2" diameter) anchor bolts into existing concrete pile to ensure proper
connection at the existing support location. Use a bed of epoxy grout to ensure proper bond between
steel plate and support sleeper. Additionally, install a minimum of two gussets in each wide flange beam
sleeper directly below pipe spool. Ensure gusset thickness is minimum 1/4" or equal to thickness of the
beam web, whichever is greater. See Figure 4.2.4 for gusset placement additional information.
5. Replace all existing supports (some of which are shown in Figure 4.2.5) at the cooler inlet and outlet
risers with support posts of adequate support stiffness. Use a bed of epoxy grout with adequate number
of 1/2” adhesive anchor bolts to ensure adequate bond between wide flange beam sleeper the
foundation. If support posts are welded to an existing wide flange beam as shown in Figure 4.2.5, ensure
gussets are installed at each support post. Ensure gusset thickness is greater of the beam web thickness
or 1/4” thick. Refer to BETA Standard PS-1 (shown in Figure 4.2.7) for typical support post design.
Alternative to individual support posts: Install a new concrete support pile directly in place of existing
flexible beam. Ensure new pile is properly attached to existing foundation. Install a wide flange beam on
a full bed of epoxy grout and adhesive anchor bolts are used to ensure all gaps are filled and beam is
properly bonded to concrete pile. Install gussets (minimum thickness equal or greater of the beam web
thickness or 1/4") below all pipes being supported (as recommended in BETA Standard CL-1 shown in
Figure 4.2.8). Use CL-1 type clamps as shown in Figure 4.2.8 to attach pipe spool to gusseted beam
sleeper. See Figure 4.2.6 for additional details.
6. Replace existing process pipe clamps and U-bolts with a CL-1 type flat bar clamp as shown in Figure
4.2.8. The use of U-bolts is not recommended in vibratory service due to their limited stiffness and their
tendency to come loose and/or wear into the pipe.
Check vibrations throughout the speed range after these recommendations have been implemented to ensure
vibrations have been reduced to acceptable levels.

Vibration, Dynamics & Noise Page 22 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Do NOT use short horizontal support posts to


attach pipes to the wide flange beam. Install Install a minimum 6” wide flange beam
gussets in the wide flange beam at the pipe support structure in the horizontal direction
centerline and attach pipes to support beam and attach back to cooler legs.
using CL-1 type flat bat clamps. Existing
clamps and U-bolts used are not adequate.

Install two braces in the horizontal direction


from existing support legs to newly installed
horizontal support beam.

Optional vertical braces may be installed to


provide additional stiffness in the vertical
direction and help support the added beam.

Figure 4.2.1 – Cooler Inlet and Outlet Pipe Spool Support Structure

Install two support posts in the axial direction


and install braces in the horizontal direction to
maximize support stiffness. See Plan View.

Plan View

Figure 4.2.2 – Stage 2 and Stage 3 Cooler Inlet Pipe Spool Support Posts

Vibration, Dynamics & Noise Page 23 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Support pipe as close to elbow as possible and


ensure pipe is properly shimmed and attached
using a CL-1 type flat bar clamp.

Install a concrete pile directly below existing


stage 1 discharge outlet pipe spool. Install a wide
flange beam support sleeper with appropriate
gussets.

Figure 4.2.3 – Stage 1 Discharge Cooler Outlet Pipe Spool Missing Support

Replace existing pipe clamps and U-bolts with a CL-1


type flat bar clamp as shown in Figure 4.2.8. The use of
U-bolts is not recommended in vibratory service due to
their limited stiffness and their tendency to come loose
and/or wear into the pipe.

Install minimum four (minimum 1/2" diameter) anchor


bolts into existing concrete pile to ensure proper
connection. Use a bed of epoxy grout to ensure proper
bond between steel plate and support sleeper.

Install a minimum of two gussets in each


horizontal wide flange beam sleeper directly
below pipe spool. Ensure gusset thickness is
minimum 1/4" or thickness of the beam web,
whichever is greater.

Figure 4.2.4 – Stage 1 Discharge Cooler Outlet Spool (Near TP# 200)

Vibration, Dynamics & Noise Page 24 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Replace all U-bolts with CL-1 type flat bar clamps


installed on properly gusseted wide flange beam
sleeper. Typical for all U-bolts on process piping.

Use epoxy grout and anchor beams


with minimum 1/2" adhesive anchor
bolts to ensure all gaps between beam
and concrete are filled and an adequate
bond is achieved.

If wide flange beam sleeper is used, all support post


Replace all existing support posts built from thin
locations must be properly gusseted to maximize
and flexible beams and channels with stiff
support post stiffness. Ensure gusset thickness is
support posts, or concrete sleeper and short,
greater of beam web thickness or 1/4” thick plate.
properly gusseted wide flange beam.

Figure 4.2.5 – Cooler Inlet and Outlet Pipe Spool Support Recommendations

Use CL-1 type flat bar clamp (as shown in Figure 4.2.8) for all
process piping support locations. U-bolts are not recommended
for use in vibratory service due to their limited dynamic stiffness,
and their tendency to come loose and wear into the pipe.

Existing pipe

Install gussets minimum at every pipe spool centerline, or


directly at the pipe clamp bolt locations. See Figure 4.2.8 (BETA
Standard CL-1) for gusset locations. Minimum gusset thickness
equal to beam web thickness or 1/4" whichever is greater.

A bed of epoxy grout between


concrete pile and wide flange beam to
ensure no gaps and proper bond
between pile and beam.

Install concrete sleeper / pile. Ensure


properly attached to existing
foundation.

Figure 4.2.6 – Alternative Cooler Pipe Spool Concrete Pile Support Recommendations

Vibration, Dynamics & Noise Page 25 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.2.7 – BETA Standard PS-1 – Pipe Support Post Design

Vibration, Dynamics & Noise Page 26 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.2.8 – BETA Standard CL-1 – Flat Bar Clamp

Vibration, Dynamics & Noise Page 27 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Analysis
High cooler inlet and outlet spool vibrations were measured as summarized in Table 4.2.1 below. High vibrations
were observed primarily at low frequencies, coincident with the 1x and 2x compressor run speed. Vibrations at
low frequencies are typical of inadequate support stiffness at existing support locations, or insufficient number
of supports installed. Some details of visual inspection of supports near the cooler and samples of deficiencies
are shown in Figure 4.2.9 to Figure 4.2.12.

Table 4.2.1 – Vibration Observation Summary (Cooler Inlet and Outlet Spool Vibrations)
Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 200 a 1.73 13.4 800 1 409 -
Day: 200 h 1.22 13.4 820 1 288 -
Day: 270 h 1.86 30.6 920 2 193 32.8
Day: 360 h 1.95 26.6 800 2 233 26.3
Day: 390 a 4.10 41.9 840 3 410 42.8
Day: 470 a 1.49 16.9 1000 1 281 17.5
Day: 470 a 1.71 33.4 1000 2 171 -
Day: 490 h 3.70 31.9 960 2 370 32.2

U-bolts provide very limited dynamic


support stiffness and have the tendency
to come loose or wear into the pipe.

Support very flexible in the direction of


pulsation induced shaking forces due to
lack of gussets on the sleeper.

Loose anchor bolts were found on


numerous support posts on the stage 1
cooler outlet spool.

Large gaps were observed between


bottom plate and concrete foundation
proving limited support stiffness.

Figure 4.2.9 – Existing Stage 1 Cooler Outlet Pipe Support Post

Vibration, Dynamics & Noise Page 28 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

U-bolts provide very limited dynamic


support stiffness and have the tendency to
come loose or wear into the pipe.

Flexible channel used for support post


material in vertical and horizontal
directions.

Figure 4.2.10 – Cooler Inlet Spool Riser

Flexible channel used for support post


material in vertical and horizontal
directions.

Support very flexible in the direction of


pulsation induced shaking forces due to
lack of gussets on the sleeper.

Figure 4.2.11 – Cooler Inlet and Outlet Spool Support Posts

Vibration, Dynamics & Noise Page 29 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Existing posts installed from the


channel are flexible and of inadequate
Existing posts installed from the size for the pipe spool supported.
channel are flexible and of inadequate
size for the pipe spool supported.

Existing support beam is not attached


to any support structure and does not
provide any support stiffness in the
axial direction. Support does not provide adequate bolt
stretch for preload and to prevent vibratory
loosening.

Figure 4.2.12 – Existing Cooler Inlet and Outlet Pipe Spool Brace Beam

Vibration, Dynamics & Noise Page 30 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.3 Replace Existing Grout and Repair the Foundation Connection

Recommendation
Implement the following recommendations for the skid foundation and the skid outriggers:
1. Check and repair existing grout and concrete foundation to ensure proper bond between the concrete,
grout pad, and the skid and beam outriggers is achieved. This is in particular important for the
foundation below the scrubbers, engine, and skid outriggers where high vertical skid vibrations were
measured. See report section 4.4 for additional details related to recommendations made for scrubbers.
2. Ensure all outriggers on stage 3 and stage 4 side of the compressor (shown in Figure 4.3.3) have been
properly shimmed against the skid and all bolts have been properly tightened to eliminate all gaps.
3. Ensure epoxy grout is used to provide adequate bond between the skid and the existing concrete
foundation. Ensure thermal expansion joints are used during grout installation to ensure the difference
in thermal expansion between skid and concrete is appropriately handled and to ensure skid and grout
do not become detached due to the ambient temperature changes at the site.

Analysis
High vibrations were measured on the compressor skid near the engine pedestal, at the skid outriggers, and on
the secondary skid at the suction scrubbers as summarized in Table 4.3.1. Particular areas of concern are the
stage 3 and stage 4 skid outriggers with pipe spools installed where the concrete and grout condition is visibly a
concern. Visual inspection and hand checks of stage 4 outriggers indicate relative vibration between existing
wide flange beam outrigger and the grout, as well as relative vibration between the concrete foundation and
grout pad. Detailed measurements of the grout and foundation vibrations could not be collected due to lack of
ability to attach transducers to concrete/grout as no epoxy was available at site to affix transducers to concrete.
Similar trend appears to be present on other outriggers on stage 3 and stage 4 side of this and the other
compressor installed at this site. Some examples of the detached grout are shown in Figure 4.3.1 and Figure
4.3.2. Visual inspection of the grout also indicates that no thermal expansion joints were used during the original
grout installation. Thermal expansion joints are typically installed in attempt to control and minimize the
potential of skid detachment from concrete foundation due to differential in thermal growth of the concrete,
grout, and the skid beams.
Additional skid vibration measurements were collected on the secondary skid at the suction scrubbers as a part
of troubleshooting. These measurements indicate vibrations at the scrubbers exceed the BETA skid guideline by
up to 120%. These measurements are graphically represented in the scrubber vibration analysis section of this
report and shown in Figure 4.4.6. While no measurements could be collected inside the compressor or
secondary scrubber skid to confirm proper bond between skid beams and foundation, vibrations exceeding
guideline around the engine pedestal, wedge supports, and vertical vibrations of the skid around the scrubbers
indicate lack of contact or proper bond between the skid and the foundation.
Finally, a few of the outriggers installed were observed to have a gap (missing shims) between the skid beam
bracket and the outrigger bolt bracket as shown in Figure 4.3.3. The observed gap in addition to flexible skid
bracket attachment and poor foundation support provide inadequate stiffness at the skid outriggers and any
supports attached.

Vibration, Dynamics & Noise Page 31 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Table 4.3.1 – Vibration Observation Summary (Compressor and Secondary Skid Vibration)
Test Point Dir’n Amplitude Frequency Speed Order % of
(in/s pk) (Hz) (rpm) Guideline
414 Outrigger v 0.98 182.8 1000 11 975
414 Outrigger -a 0.77 70.3 840 5 766
414 Outrigger -a 0.51 133.4 1000 8 510
Skid Edge Back Right Frame -a 0.19 175.9 800 13 192
Skid at Engine Ped. Front Left v 0.16 31.9 940 2 160
Skid at Engine Ped. Front Right v 0.16 30.9 920 2 158
4D Right Wedge Skid L v 0.23 81.6 980 5 234
4D Left Wedge Skid R v 0.20 61.3 920 4 199
4D Right Wedge Skid R v 0.16 61.3 920 4 162
4D Right Wedge Skid R v 0.16 33.4 1000 2 157
Stage 3 Scr. Skid Back v 0.22 31.6 940 2 220
Stage 3 Scr. Skid Front v 0.22 31.6 940 2 220
Stage 3 Scr. Skid Back Right v 0.16 31.6 940 2 160
Stage 3 Scr. Skid Back Right 2 v 0.12 31.6 940 2 117
Stage 3 Scr. Skid Back Left v 0.12 31.6 940 2 117
Stage 3 Scr. Skid Front Left v 0.20 31.6 940 2 197
Stage 3 Scr. Skid Front Right v 0.19 31.6 940 2 193
Stage 3 Scr. Skid Front Right 2 v 0.17 31.6 940 2 170
Stage 4 Scr. Skid Back v 0.18 28.1 840 2 184
Stage 4 Scr. Skid Back Right v 0.12 28.1 840 2 121

Visible gap between grout and concrete pad of


up to 10” confirmed using 12” long feeler
gauge at various locations.

Visible gap between grout and concrete pad of


up to 10” confirmed using 12” long feeler
gauge at various locations.

Figure 4.3.1 – Stage 4 Outrigger Grout Pad Concerns

Vibration, Dynamics & Noise Page 32 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Visible gap between grout and concrete pad of


up to 10” confirmed using 12” long feeler
gauge at various locations.

Figure 4.3.2 – Stage 3 Outrigger Grout Pad Concerns

Gap present between skid support plate and


the existing outrigger bolt plate.

Gap present between skid support plate and


the existing outrigger bolt plate.

Figure 4.3.3 – Stage 3 and 4 Skid Outrigger Attachment Concerns

Vibration, Dynamics & Noise Page 33 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Vibration measurements close to or exceeding the BETA skid vibration guideline for test points located on the
main skid are displayed in Figure 4.3.4.

0.10
0.16
0.09

0.16 – 0.23

0.16
0.20
0.11

Figure 4.3.4 – Skid Vibrations Measured Near Engine and Compressor Pedestal

A fine crack was observed on the concrete on the back side of the secondary (scrubber) skid at the skid beam
flange connection as shown in Figure 4.3.5. Additionally, concrete condition appears to be atypical of proper,
homogeneous mix typically visible.

Visible crack at the edge of the


skid beam flange.

Figure 4.3.5 – Secondary Skid Concrete/Grout Condition – Back Side

Vibration, Dynamics & Noise Page 34 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.4 Stage 2, 3, and 4 Suction Scrubber Recommendations (TP# 210, 300, and 400)

Recommendation
Check and repair existing foundation and grout installation below secondary scrubber skid to ensure all skid
beams are properly bonded to foundation using epoxy grout. Additional areas of concern were identified and
recommendations were made in report section 4.3 due to visible grout/concrete foundation separation near the
skid outriggers.
Check scrubber vibrations throughout the operating speed range and implement the following
recommendations for the suction scrubbers if the foundation and grout repair was not effective in reducing
vibrations to acceptable levels.
1. Stage 2 suction scrubber:
a. Install a 6” x 6” x 1/2” (or equivalent metric size) HSS (hollow square section) brace between
stage 2 and stage 1 suction scrubbers as shown in Figure 4.4.1 to increase the scrubber
mechanical natural frequency above 2.4x compressor run speed. Install brace to scrubbers using
a band clamp type of connection on each scrubber. Install the scrubber-to-scrubber brace
directly below the top head seam and ensure it is positioned horizontally for maximum
effectiveness. A typical scrubber-to-scrubber brace design is presented in BETA Standard SC-6 as
shown in Figure 4.4.4.
2. Stage 3 suction scrubber:
a. Install scrubber skirt gussets in the axial direction as originally recommended in BETA Pulsation
Report Ref. # 208642. Ensure skirt gussets are of full height, minimum 1/2” thick, and extend to
the edge of the scrubber skid beam below. Ensure gussets extend to the bottom of skid beams
to ensure adequate stiffness is added in the axial direction.
3. Stage 4 suction scrubber:
a. Install scrubber skirt gussets in the axial and horizontal direction as originally recommended in
BETA Pulsation Report Ref. # 208642. Ensure skirt gussets are of full height, minimum 3/4” thick,
and extend to the edge of the scrubber skid beams below. Ensure gussets extend to the bottom
of skid beams to ensure adequate stiffness is added in the axial direction.
Check vibrations on all suction scrubbers in both (horizontal and axial) directions after recommendations are
implemented to confirm the resulting scrubber vibrations are reduced to acceptable levels. Additional
recommendations to increase the scrubber mechanical natural frequencies can be provided if found to be
required after the above recommendations have been properly implemented.

Vibration, Dynamics & Noise Page 35 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Install a 6” x 6” x 1/2” HSS brace between


stage 4 and stage 1 suction scrubbers.
Install brace as high as possible,
preferably at the top head seam.

Install brace to scrubbers using


a band clamp type of
connection on each scrubber.

Figure 4.4.1 – Stage 2 Suction Scrubber Recommendations (TP# 210)

Figure 4.4.2 – Stage 3 Suction Scrubber Recommendations (TP# 300)

Vibration, Dynamics & Noise Page 36 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.4.3 – Stage 4 Suction Scrubber Recommendations (TP# 400)

Vibration, Dynamics & Noise Page 37 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.4.4 – BETA Standard SC-6 – Scrubber Brace with Band Connection

Vibration, Dynamics & Noise Page 38 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Analysis
Visual inspection of the suction scrubbers shows that the following gussets were missed during compressor
package construction and are a contributing factor to high stage 3 and stage 4 scrubber vibrations due to
scrubber mechanical natural frequency (MNF) coincidence with 2x compressor run speed:
 Stage 1 Scrubber: Two gussets were not installed in the horizontal direction. Scrubber vibrations were
found to be approximately 60% of guideline.
 Stage 3 Scrubber: Two gussets were not installed in the axial direction, matching the high scrubber
vibration direction.
 Stage 4 Scrubber: Four gussets were not installed during construction, two in the horizontal and two in
the axial direction. Missing gussets in the axial direction match the high scrubber vibration direction.
Stage 2 suction scrubber vibrations were found to exceed guideline in the horizontal direction as summarized in
Table 4.4.1. Additional measurements were collected on the scrubber and several test points on the skid beams
around the suction scrubber. The measurements collected were found to exceed the BETA skid vibration
guideline of 0.1 in/s pk in a few areas as shown in green color in Figure 4.4.6.

Table 4.4.1 – Vibration Observation Summary (Stage 2 Suction Scrubber)


Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 210 h 1.71 30.6 920 2 177 35.0
Night: 210 h 1.76 33.4 1000 2 176 35.0
Night SS: 210 h 1.86 33.4 1000 2 186 35.0

Stage 3 suction scrubber vibrations were found to exceed guideline in the axial direction as summarized in Table
4.4.2. Additional measurements were collected on the scrubber and several test points on the skid beams
around the suction scrubber. Scrubber ODS vibration data for the stage 3 suction scrubber is shown in Figure
4.4.5 for test points along the scrubber height and directly next to the scrubber skirt on the skid. The
measurements collected were found to exceed the BETA skid vibration guideline of 0.1 in/s pk in a few areas as
shown in red color in Figure 4.4.6.

Table 4.4.2 – Vibration Observation Summary (Stage 3 Suction Scrubber)


Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 300 -a 2.35 31.3 940 2 239 31.6
Night: 300 a 3.90 31.9 950 2 390 31.6
Night SS: 300 a 2.71 31.9 960 2 271 31.6

Vibration, Dynamics & Noise Page 39 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.4.5 – Stage 3 Suction Scrubber ODS Plot of Scrubber and Skid Vibration at Skirt

Stage 4 suction scrubber vibrations were found to exceed guideline in the axial direction as summarized in Table
4.4.3. Additional measurements were collected on the scrubber and several test points on the skid beams
around the suction scrubber. The measurements collected were found to exceed the BETA skid vibration
guideline of 0.1 in/s pk in a few areas as shown in blue color in Figure 4.4.6.

Table 4.4.3 – Vibration Observation Summary (Stage 4 Suction Scrubber)


Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 400 a 3.12 28.1 840 2 353 29.7
Night: 400 a 2.66 29.1 860 2 291 29.7
Night SS: 400 a 3.55 28.8 860 2 392 29.7

The vertical vibrations of the skid as measured at the top of the skid beams were found to exceed the BETA skid
guideline by up to 120% in some areas. This is a strong indication of a poor bond and/or gaps between the
scrubber skid beams and the concrete foundation below. A deck plate installed on the skid prevented additional
measurements to be collected and could not be removed at the time of the site visit to collect additional
measurements at the bottom flange of the skid beams.

Vibration, Dynamics & Noise Page 40 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

0.05 0.03

0.12 0.09
0.08
0.16 0.22 0.18

0.12
0.12

0.20

0.19
0.22 0.07

0.17 0.07

0.07
0.07

0.03

Figure 4.4.6 – Scrubber Skid Vibrations (Values shown in/s pk during ODS Measurement at Fixed Speed)

Vibration, Dynamics & Noise Page 41 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.5 Stage 2 Scrubber Liquid Level Gauge Support Design (TP# 210 Sight Glass)

Recommendation
Implement the following recommendations in the order they are presented below. Check scrubber liquid level
gauge vibrations throughout the operating speed range after completing each step to determine if the
remaining recommendations are required.
1. Check the scrubber liquid gauge for misaligned fitment during installation to ensure no pipe strain is
introduced due to improper installation. See report section D.2 for additional information related to
pipe strain due to misalignment.
2. Install existing level gauge on support post placed next to the scrubber as shown in Figure 4.5.1 Option 3
and use flexible braided hose to connect the level gauge to scrubber. Ensure support post is a minimum
4” x 4” wide flange beam, or equivalent HSS (hollow structural section) tubing welded directly to a skid
beam. Do not weld support post to skid deck plate.

Figure 4.5.1 – BETA Standard SA-8 – Small Bore Level Gauge Support Design

Vibration, Dynamics & Noise Page 42 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Analysis
Stage 2 suction scrubber liquid level gauge vibrations were found to exceed guideline as summarized in Table
4.5.1. An impact test was completed and level gauge mechanical natural frequency (MNF) was found to be
coincident with 6x compressor run speed. Additional vibration amplification due to pipe strain introduced by
misalignment of connections at the time of installation may be present.

Table 4.5.1 – Vibration Observation Summary (TP# 210 Sight Glass – Stage 2 Scrubber Liquid Level Gauge)
Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 210 Sight Glass tan 3.30 96.9 960 6 330 97.8
Night: 210 Sight Glass tan 1.79 96.9 820 7 179 97.8
Night SS: 210 Sight Glass tan 1.78 97.5 840 7 178 97.8

Vibration, Dynamics & Noise Page 43 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.6 Modify Existing Support Clamp and Post Design

Recommendation
Implement the following recommendations for existing support posts and pipe clamp locations after the
concrete and grout foundation has been repaired as recommended in report section 4.3 above:
1. Install gussets at the six existing support post locations shown in Figure 4.6.1 (shown in green) to
increase the support sleeper stiffness in the axial direction. Ensure gusset thickness is greater of the
outrigger beam web thickness or 1/4”. See Figure 4.2.7 for additional best practice recommendations
related to support post design.
2. Install four support post braces in the horizontal direction for the support posts shown in Figure 4.6.1
and Figure 4.6.2 to provide adequate support stiffness in the horizontal direction.
3. Install a minimum 3” HSS (hollow square section) (or equivalent) support post as close to elbow as
possible and install a brace in the horizontal direction. Use a bed of epoxy grout and adhesive anchor
bolts to ensure proper bond between support post, brace and the concrete foundation. Use four,
minimum 1/2” anchor bolts for the support foot and brace. Use CL-1 type flat bar clamp at the support
post. See Figure 4.2.7 and Figure 4.2.8 for typical support post and additional details on the CL-1 type
flat bar clamp.
4. Ensure all existing pipe support clamps are checked for proper alignment while the compressor is at
operating temperature. Ensure pipe clamps are loosened, properly shimmed, and retightened at normal
operating temperature to ensure no pipe strain is introduced into the system during operation.
Note: The compressor package is installed in a location where ambient and operating temperatures vary
significantly. The resulting temperature difference may result in significant thermal expansion, in
particular for long spans between the discharge bottles and the coolers and result in high nozzle loads at
the bottles and coolers. A thermal (pipe stress) analysis may be beneficial to ensure vessel and cooler
nozzle stresses are acceptable.

Add gussets at all support post centerline.


Gusset thickness to be greater of the beam web
thickness or 1/4”. Typical for all posts.

Figure 4.6.1 – Stage 2 and Stage 4 Support Post Gusset Recommendations

Vibration, Dynamics & Noise Page 44 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Brace in either horizontal direction


depending on room available on skid beam.

Add gussets at all support post centerline.


Gusset thickness to be greater of the beam
web thickness or 1/4”. Typical for all posts.

Brace existing support posts in the horizontal direction


and ensure gussets are installed at the centerline of
each support post. Ensure gusset thickness is greater
of the beam web thickness or 1/4”.

Install a support post 3” HSS or equivalent directly to concrete foundation. Use a bed
of epoxy grout and attach to concrete using four, minimum 1/2” anchor bolts to
ensure proper bond. Install a brace to concrete in the horizontal direction.

Figure 4.6.2 – Stage 2 and Stage 4 Support Post Brace Recommendation


Analysis
High frequency vibrations were observed as summarized in Table 4.6.1 indicating potential pipe strain.
Loosening of the stage 4 discharge spool showed many of the supports installed on the stage 4 discharge spool,
downstream of the discharge bottle were found to be improperly shimmed and tightened to support posts as
shown in Figure 4.6.3. Vibrations of the support sleeper and grout below the skid outriggers were also observed
as discussed in report section 4.3 above.
Additionally, high vertical vibrations were measured on the stage 2 discharge spool, TP# 237 and were found to
be coincident with the pipe spool mechanical natural frequency. Additional troubleshooting showed high
vertical vibrations were also present on the skid outrigger in the vertical direction at a nearby support as shown
in Figure 4.6.4 typical of poor bond between skid outrigger and the concrete foundation.

Vibration, Dynamics & Noise Page 45 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Table 4.6.1 – Vibration Observation Summary (Stage 4 Discharge Spool Downstream of Discharge Bottle)
Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 408 h 1.52 85.3 860 6 152 86.56
Day: 436 (Braced) h 2.31 133.4 1000 8 231 125.9
Day: 436 (Braced) v 2.15 115.0 860 8 215 -
Day: 436 (Braced) h 1.72 152.2 840 11 172 156.6
Day: 436 (Braced) h 1.55 165.3 900 11 155 156.6
Night: 436 h 3.30 132.5 1000 8 330 125.9
Night: 436 h 2.06 170.0 940 11 206 -
Night: 436 h 1.76 133.4 800 10 176 125.9
Night SS: 436 h 3.43 174.1 940 11 343 -
Night SS: 436 h 2.90 132.5 980 8 290 125.9
Night SS: 436 a 2.33 66.9 1000 4 233 -
Night SS: 436 v 1.96 118.4 880 8 196 -
Night SS: 436 a 1.54 118.4 880 8 154 -
Day: 437 h 4.51 46.9 920 3 451 51.6
Day: 438 h 2.28 75.9 920 5 228 73.8
Day: 237 v 2.62 76.9 920 5 262 78.1

1/4” gap found after support clamp was


loosened and existing pipe spool and wedge
support lifted up.

Figure 4.6.3 – Support Post and Inadequate Shimming (First Support Downstream of TP# 436)

Vibration, Dynamics & Noise Page 46 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

High vertical vibration measured in


the vertical direction at TP# 237.

Vibration measurements at the bottom


flange of skid outrigger indicated
vibrations exceeding 0.11 in/s pk.

Figure 4.6.4 – Stage2 Support Post and Skid Outrigger (First Support Downstream of TP# 237)

Stage 4 discharge bottle outlet flanges were separated during one of the shutdowns and a flange misalignment
was confirmed at the bottle outlet flange sets in parallel, horizontal and vertical directions. Photos of the
horizontal and parallel misalignments are shown in Figure 4.6.5.

Horizontal Misalignment Parallel Misalignment


Figure 4.6.5 – Stage 4 Discharge Bottle Outlet Flange Misalignments

Vibration, Dynamics & Noise Page 47 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.7 Correct Stage 1 and Stage 2 Scrubber Outlet Spool Flange Misalignment

Recommendation
Check and correct existing flange misalignment at all flanged connections between the stage 1 and stage 2
suction scrubbers and suction bottles. While the flange misalignment was most noticeable on pipe spools
between the scrubbers and suction bottles, it is recommended all flanged connections are checked for
misalignment. Check vibrations of the stage 2 scrubber outlet spool after all flange alignment has been
corrected to ensure vibrations are reduced to acceptable levels. Additional recommendations may be provided if
the above was not effective in reducing vibrations to acceptable levels.

Analysis
Vibrations of the stage 2 scrubber outlet spool were found to exceed guideline as summarized in Table 4.7.1. An
impact test was completed and found the measured vibration is coincident with the pipe spool’s mechanical
natural frequency (MNF). Flange misalignment was also observed on at least three flanged connections between
the stage 1 and stage 2 suction scrubbers and suction bottles. Flange misalignment typically results in
introduction of pipe strain and therefore in amplifications of vibrations. See appendix D.2 and D.3 for additional
details on pipe strain and allowable misalignments at the flanged connections.

Table 4.7.1 – Vibration Observation Summary (Stage 2 Scrubber Outlet Pipe Spool)
Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 212 h 2.42 89.7 900 6 242 91. 6
Night: 212 h 2.84 90.3 900 6 284 91. 6

Stage 1 Scrubber Outlet Example Stage 2 Scrubber Outlet Example


Figure 4.7.1 – Stage 1 and Stage 2 Scrubber Outlet Pipe Spool Misalignments

Vibration, Dynamics & Noise Page 48 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.8 Stage 4 Scrubber Outlet Spool (TP# 399)

Recommendation
Implement recommendations in report section 4.4 and check resulting vibrations at the stage 4 scrubber outlet
spool throughout the operating speed range.
The following recommendations may be implemented in the order in which they are presented if the above
recommendation was not effective at reducing vibrations to acceptable levels:
1. Check for proper support installation at the brace installed back to the scrubber (shown in Figure 4.8.1).
Ensure pipe clamp is installed while pipe is in its neutral position and no pipe strain is introduced. Ensure
the pipe is properly shimmed and clamped while compressor is at its operating temperature.
2. Install a double band clamp support of the elevated scrubber outlet spool mid-way between the existing
post and the top of the scrubber outlet spool (near TP# 399 as shown in Figure 4.8.3). See Figure 4.8.2
for a sketch of a typical double band clamp pipe support.

Check the support clamp to ensure no pipe strain


is introduced while the unit is at its operating
temperature. Ensure pipe and clamp are
properly shimmed and tightened.

Figure 4.8.1 – Stage 4 Suction Scrubber Outlet Spool Recommendations

Vibration, Dynamics & Noise Page 49 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.8.2 – Double Band Clamp Support Sketch

Analysis
Vibrations exceeding guideline were measured in the axial direction on the stage 4 suction scrubber outlet pipe
spool. Vibrations exceeding guideline were measured at three separate frequencies. The vibrations at 29 Hz (2x
compressor run speed) are due to scrubber axial vibration, while vibrations measured at 80 – 86 Hz are
coincident with the pipe spool mechanical natural frequency as determined using the impact test. A summary of
vibrations measured is provided in Table 4.8.1.

Vibration, Dynamics & Noise Page 50 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

TP# 400

TP# 399

Figure 4.8.3 – Stage 4 Suction Scrubber Outlet Spool (TP# 399)

Table 4.8.1 – Vibration Observation Summary (Stage 4 Scrubber Outlet Spool)


Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 399 a 2.67 28.1 840 2 302 29.7
Day: 399 a 2.21 82.2 980 5 221 79.4 & 86. 6
Night: 399 a 2.07 86.3 860 6 207 86. 6
Night: 399 a 1.82 29.1 860 2 199 29.4
Night SS: 399 a 2.75 79.1 940 5 275 79.4
Night SS: 399 a 2.34 28.8 860 2 259 29.4
Night SS: 399 a 2.02 82.2 820 6 202 79.4 & 86.6

Vibration, Dynamics & Noise Page 51 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.9 Stage 2, 3, and 4 Discharge PSV (TP# 250, 350, and 450)

Recommendation
Check all PSV connections (upstream and downstream) for proper alignment at the flanged and threaded
connections to ensure no pipe strain is introduced during installation. See report section D.2 for additional
information related to pipe strain.
Implement the following recommendations for the stage 2 and stage 4 PSVs to reduce the source of high
vibrations due to base excitation and therefore the high relative vibration between the main pipe spool and the
top of the PSV:
1. Install a support post at the stage 2 and stage 4 PSV to minimize the PSV base excitation and increase
the pipe spool and PSV mechanical natural frequency. Ensure the newly installed support post provides
adequate dynamic stiffness in the horizontal direction by installing gussets or short knee-brace in the
horizontal direction as shown in Figure 4.9.1. Use CL-1 and FS-1 type clamps or flanged support
connections. Ensure pipe spool is properly shimmed when clamp is installed. The support posts
recommended will also be effective to control motion in the axial direction, reducing the potential for
internal component failure due to high acceleration measured.
Implement the following recommendation for stage 3 PSV to minimize the chance of failure of the PSV internal
components due to high acceleration. This recommendation is provided as best practice in attempt to reduce
the potential of internal failure and therefore does not have to be implemented if the PSV manufacturer deems
the acceleration to be acceptable.
1. Install a post support as close to PSV as possible and ensure the support post provides adequate support
stiffness in the horizontal and axial direction. Support posts similar to those shown for stage 2 and stage
4 PSV may also be used to control vibrations in the axial direction.

Support PSV outlet spool using a


FS-1 type flange support

See Figure 4.9.2 stacked support


post design details

Support main spool using a


CL-1 type flat bar clamp

Support main spool using a See Figure 4.9.2 stacked


CL-1 type flat bar clamps support post design details

Figure 4.9.1 – Stage 2 and Stage 4 Discharge PSV Recommended Support Post

Vibration, Dynamics & Noise Page 52 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

An FS-1 type connection may be


used to support the outlet flange
of the PSV. See Figure 4.9.3 for
additional details.

Figure 4.9.2 – BETA Standard PS-2 – Multiple Stacked Pipe Support Post Design

Vibration, Dynamics & Noise Page 53 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.9.3 – BETA Standard FS-1 – Flange Support Details

Vibration, Dynamics & Noise Page 54 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Analysis
High PSV vibrations were measured for stage 2, stage 3, and stage 4 PSVs as summarized in Table 4.9.1.

Table 4.9.1 – Vibration Observation Summary (Stage 2, 3, and 4 PSVs – Velocity Guideline)
Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 250 PSV h 3.25 59.7 900 4 325 60.0
Day: 250 PSV a 2.33 59.7 880 4 233 -
Day: 350 PSV h 1.59 176.6 820 13 159 179.4
Day: 350 PSV h 2.94 180.0 980 11 294 179.4
Day: 350 PSV -a 1.70 176.3 960 11 170 175.3
Day: 450 PSV h 2.11 75.0 900 5 211 75.0
Day: 450 PSV a 1.71 71.6 860 5 171 74.1

The ODS data collected indicates only stage 2 and stage 4 PSVs have relative vibrations exceeding 1 in/s pk in the
horizontal direction that may potentially lead to failure due to bending. Internal components of the PSV are
more likely to fail when vibrations exceed an absolute value of 2 g’s pk. The vibration data was converted and is
reported in g’s pk in Table 4.9.2 for all PSVs exceeding the allowable acceleration guideline.

Table 4.9.2 – Vibration Observation Summary (Stage 2, 3, and 4 PSVs – Acceleration Guideline)
Test Point Dir’n Amplitude Frequency Speed Order % of
(g pk) (Hz) (rpm) Guideline
Day: 250 PSV h 3.15 59.7 900 4 158
Day: 250 PSV a 2.26 59.7 880 4 113
Day: 350 PSV h 5.66 176.6 820 13 283
Day: 350 PSV h 8.60 180.0 980 11 430
Day: 350 PSV -a 4.87 176.3 960 11 244
Day: 450 PSV h 2.58 75.0 900 5 129

Operating deflection shape (ODS) vibration data was collected for the stage 2 PSV in the axial and horizontal
direction (TP# 250) at the problem speeds/frequencies and the respective ODS plots are shown in Figure 4.9.4. A
relative vibration between the PSV base and the top of the PSV is estimated to be less than 1 in/s pk in the axial
direction. Relative vibrations in the horizontal direction as well as the acceleration in the horizontal and axial
direction measured for stage 2 PSV were found to exceed the recommended guideline.

Vibration, Dynamics & Noise Page 55 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.9.4 – Stage 2 Discharge PSV ODS Vibration (TP# 250)

Operating deflection shape (ODS) vibration data was collected for the stage 3 PSV in the axial and horizontal
direction (TP# 350) at the problem speeds/frequencies and the respective ODS plots are shown in Figure 4.9.5. A
relative vibration between the PSV base and the top of the PSV is estimated to be less than 1 in/s pk in the
horizontal and the axial direction. The acceleration in the horizontal and axial direction measured for stage 3
PSV were found to exceed the recommended guideline.

Figure 4.9.5 – Stage 3 Discharge PSV ODS Vibration (TP# 350)

Operating deflection shape (ODS) vibration data was collected for the stage 4 PSV in the axial and horizontal
direction (TP# 450) at the problem speeds/frequencies and the respective ODS plots are shown in Figure 4.9.6. A
relative vibration between the PSV base and the top of the PSV is estimated to be less than 1 in/s pk in the axial

Vibration, Dynamics & Noise Page 56 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

direction. Relative vibrations in the horizontal direction as well as the acceleration in the horizontal and axial
direction measured for stage 4 PSV were found to exceed the recommended guideline.

Figure 4.9.6 – Stage 4 Discharge PSV ODS Vibration (TP# 450)

Vibration, Dynamics & Noise Page 57 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.10 Stage 3 and 4 Bottle Wedge and Inboard Support Recommendations

Recommendation
Implement the following recommendations for stage 3 and stage 4 discharge bottle wedge supports and the
cylinder inboard support after the grout and foundation has been repaired as recommended in report section
4.3 above. The following recommendations may be implemented in the order in which they are presented.
Check vibrations throughout the operating speed range after each step is completed to determine if the
remaining recommendations are required.
1. Improve the skid and wedge support design:
a. Install full depth skid beam gussets directly below each wedge support post. Ensure gusset is
minimum 1/2” thick and extends to at least edge of existing skid beam. Triangular extension of
gusset to the edge of wedge support gussets is strongly recommended to increase stiffness at
the wedge support gusset edge. See gussets shown in red in Figure 4.10.1.
b. Install wedge support gussets as shown green in Figure 4.10.1. Gussets can be built using a T-
section beam, cutaway I beam, or two solid plates welded together perpendicularly as shown.
Ensure minimum gusset thickness of 1/2”. Wedge support gussets should be fully welded to
existing wedge support post, top plate of wedge support, and the existing skid beam and deck
plate. It is strongly recommended the skid gussets recommended in part a) extend to edge of
wedge support gussets.
2. Ensure all wedge supports are properly adjusted when the compressor package is at its operating
temperature. Proper adjustment technique as well as best practices are discussed in Figure 4.14.2.
Check vibrations on all cylinders after proper cylinder wedge support adjustment to determine if
additional action is required.
3. Increase vertical inboard support stiffness, in particular at the front where high relative vibrations of the
inboard support were measured. Increase in stiffness can be achieved by installation of additional
gussets at the front of the inboard support, area indicated by green arrow in Figure 4.10.2. An alternate
inboard support design may have to be considered to allow for access to cylinder bolts and jack screws
installed in on the inside of the support. While cylinder 1, 2, and 4 were the only cylinders with
vibrations exceeding guideline by more than 50%, it is recommended the updated, stiffer cylinder
inboard support be installed for all cylinders.

Vibration, Dynamics & Noise Page 58 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Plan View

Two minimum 1/2” thick plates perpendicular


gussets installed between wedge support ‘ear’ Top of Wedge Support
Install gussets in perpendicular direction and skid beam/deck plate.
below each of the four wedge support
‘ears’. Use minimum 1/2” thick plate.

Deck Plate

Strongly recommended
triangular gusset extension to
wedge support gusset edges Skid Beam
Install full height rectangular skid beam gussets Rectangular, full depth skid
directly below both wedge support posts. If beam gussets.
possible, include a triangular wedge to edge of
wedge support to provide adequate stiffness. Side View

Figure 4.10.1 – Stage 3 and Stage 4 Wedge Support Design Recommendations

Increase vertical inboard support stiffness, in particular


at the front where high relative vibrations of the
inboard support were measured. Install additional Increase stiffness vertically.
gussets or redesign existing inboard support.

Figure 4.10.2 – Inboard Support Design Recommendations

Vibration, Dynamics & Noise Page 59 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Analysis
High cylinder and discharge bottle vertical and axial vibrations were measured on stage 4 cylinder and discharge
bottle as summarized in Table 4.10.1. While the cylinder axial and vertical vibrations are not coincident with the
cylinder measured mechanical natural frequencies, the vibrations do occur close and may result in some
vibration amplification near the natural frequencies as shown in Figure 4.10.3. Additional measurements
indicated the wedge support ‘ears’ on existing wedge posts were flexible in the vertical direction, and the wedge
support posts were flexible in the axial direction.

Table 4.10.1 – Vibration Observation Summary (Cylinder 2 and Discharge Bottle)


Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: Cylinder 2 (436 Braced) v 1.60 64.4 960 4 228 55.0 & 76.8
Day: Cylinder 2 (Braced Wedge) v 1.19 62.5 940 4 170 55.0 & 76.8
Night: Cylinder 2 v 1.48 61.3 920 4 211 55.0 & 76.8
Night: Cylinder 2 -a 1.14 31.6 940 2 164 35.3
*1
Night SS: Cylinder 2 v 1.99 65.3 980 4 199 55.0 & 76.8
Day: 430 (Braced Wedge) v 2.20 83.4 1000 5 220 -
Day SS: 430 (SS) v 1.73 83.1 940 5 173 -
Day SS: 430 (Vary SS, 1000rpm) v 1.96 83.1 1000 5 196 -
*1
Night SS: 430 -a 1.61 47.5 960 3 161 -
*1
Night SS: 435 -a 1.58 47.5 960 3 158 -
*1
– Wedge supports were found to be loose after compressor maintenance was completed
earlier in the day, and wedge supported were not properly retightened.

Figure 4.10.3 – Cylinder 2 Vertical and Axial Vibrations and Impact Test Overlay Plots

Vibration, Dynamics & Noise Page 60 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Cylinder 4 vertical vibrations were found to exceed guideline as shown in Table 4.10.2. Vibrations were also
found to exceed guideline marginally on the stage 2 discharge bottle in the horizontal direction due to flexible
wedge support design or improperly adjusted wedge supports at the time of testing. Detailed vibration
measurements at the compressor skid, directly below the wedge supports were not collected during the site
visit due to lack of time, however based on other areas of concern identified, a poor bond between skid beams
and the foundation is possible.

Table 4.10.2 – Vibration Observation Summary (Cylinder 4 Vertical Vibration)


Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: Cylinder 4 v 1.32 64.7 960 4 189 60.0 & 67.2

Detailed testing and troubleshooting of the stage 4 cylinder (cylinder 2) showed the existing cylinder inboard
support has high flexibility and results in high relative vibration across the inboard support as shown in Figure
4.10.4. A relative vibration of 0.239 in/s pk was measured across the top and bottom of the inboard support at
the problem frequency of 62.8 Hz, coincident with 4x compressor run speed at 940 rpm. The flexibility observed
is a contributing factor for high cylinder 1 and cylinder 4 vibrations as discussed in the individual report sections.

0.352 in/s pk

Relative = -0.039 in/s pk

0.391 in/s pk

Relative = 0.239 in/s pk

0.152 in/s pk

Figure 4.10.4 – Cylinder 2 Inboard Support High Relative Vibrations

Vibrations exceeding BETA skid vibration guideline were measured directly below/at the wedge support skid
beams. This is indicative of poor skid beam stiffness or lack of connection between skid beam and the concrete
foundation below. A summary of vibration measurements is included in Table 4.10.3.

Vibration, Dynamics & Noise Page 61 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Table 4.10.3 – Vibration Observation Summary (Skid Vibration at Stage 4 Wedge Supports)
Test Point Dir’n Amplitude Frequency Speed Order % of
(in/s pk) (Hz) (rpm) Guideline
4D Right Wedge Skid L v 0.23 81.6 980 5 234
4D Left Wedge Skid R v 0.20 61.3 920 4 199
4D Right Wedge Skid R v 0.16 61.3 920 4 162
4D Right Wedge Skid R v 0.16 33.4 1000 2 157

Vibration, Dynamics & Noise Page 62 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.11 Cylinder 2, Stage 4 Suction and Discharge Bottles

Recommendation
Implement the following recommendations for cylinder 2 and the stage 4 system after the grout and foundation
has been repaired as recommended in report section 4.3 above:
1. Check the following stage 4 discharge locations to ensure appropriate orifice plates are installed and in
good condition:
a. Check the stage 4 discharge cylinder outlet orifice to ensure it is in good shape and the hole
matches the recommended ID of 1.875” as shown in Figure 4.11.1. Refer to pulsation analysis
recommendations and see report appendix D.1 for additional details on recommended orifice
plate thickness.
b. Install the stage 4 discharge bottle outlet orifice as recommended (but not visible at the time of
site visit) in the pulsation analysis under BETA Ref. 208462. Recommended orifice plate location
and size is shown in Figure 4.11.1. Refer to pulsation analysis recommendations and see report
appendix D.1 for additional details on recommended orifice plate thickness.
2. Install the missing suction riser brace back to skid in the horizontal direction as originally recommended
by BETA Report Ref. 208462. Ensure brace is properly gusseted at the skid beam if installed overhanging
the beam centerline. Ensure gusset thickness is greater of the beam web thickness or 1/4”. New
(previously recommended) brace to be installed is shown in Figure 4.11.2.
3. Move the originally recommended stage 4 bottle inlet riser brace to the originally recommended
location according to BETA Report Ref. 208462. Ensure support outrigger beam gussets are installed
directly below brace foot to minimize beam flexibility at the connection. Ensure gusset thickness is
greater of the beam web thickness or 1/4”. See Figure 4.11.2 for recommended brace location.
4. Install suction bottle knee brace for the stage 4 suction bottle as shown in Figure 4.11.3. Use BETA
Standard SB-4 type connection (shown in Figure 4.11.4) on the suction bottle and attach opposite end to
existing distance piece lifting lug connection.
Check vibrations throughout the operating speed range on the associated components after the
recommendations have been implemented to ensure vibrations have been reduced to acceptable levels.

Figure reference within BETA


Report Ref. # 208462

Figure 4.11.1 – Stage 4 Discharge System Pulsation Analysis Recommendations

Vibration, Dynamics & Noise Page 63 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Ensure gusset installed on skid beam if


brace is installed at the edge of the skid.

Install second brace from spool to skid in


the horizontal direction as
recommended.

Move existing brace to proper location


as recommended. Install gussets inside
the beam at the brace foot.

Figure 4.11.2 – Stage 4 Suction Inlet Riser Brace Recommendations

Install a suction bottle knee-brace back


to cylinder distance piece. See BETA
Standard SB-4 (shown in Figure 4.11.5)
for additional details.

Figure 4.11.3 – Stage 4 Suction Bottle Recommended Bottle Knee-Brace

Vibration, Dynamics & Noise Page 64 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.11.4 – BETA Standard SB-4 – Suction Bottle Head Knee-Brace

Vibration, Dynamics & Noise Page 65 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Analysis
A visual inspection showed the recommended support braces for the stage 4 suction bottle inlet riser was not
braced as recommended in BETA Report Ref. 208462. The foot of the upper brace was not installed at the
proper location of the outrigger beam and the recommended gussets at the foot of the brace were not installed
resulting in a flexible connection. Finally, the existing skid outrigger beam is not properly bonded to the grout or
concrete foundation as discussed in report section 4.3 resulting in additional flexibility, and significantly reducing
the effectiveness of the brace installed. In addition to the improperly installed brace, a second brace between
the suction spool and the skid beam recommended by BETA Report Ref. # 208462 was not installed at the time
of site visit.
High vibrations were measured in the horizontal and axial directions at the elevated elbow at TP# 414. Impact
tests completed indicate the vibration is coincident with a number of mechanical natural frequencies of the pipe
spool. A summary of the vibration measurements collected and the results of the impact test are summarized in
Table 4.11.1.

Table 4.11.1 – Vibration Observation Summary (Elevated Stage 4 Suction Elbow TP# 414)
Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 414 h 2.41 43.8 880 3 241 45.0
Day: 414 (Braced Wedge) -a 3.82 60.3 900 4 382 59.7
Night: 414 -a 3.67 58.1 860 4 367 59.7
Night: 414 h 2.07 66.6 1000 4 207 -
Night: 414 h 1.66 44.1 880 3 166 45.0
*1
Night SS: 414 -a 5.00 57.8 880 4 500 59.7
*1
Night SS: 414 h 2.53 66.3 1000 4 253 -
*1
Night SS: 414 h 1.79 47.8 960 3 179 45.0
*1
Night SS: 414 h 1.65 120.6 920 8 165 120.6
*1
– Wedge supports were found to be loose after compressor maintenance was completed
earlier in the day, and wedge supported were not properly retightened.

TP# 414

Brace to skid in the horizontal direction


not installed.

Existing brace installed in the incorrect


position. No gussets installed at the foot
of the brace.

Figure 4.11.5 – Stage 4 Suction Inlet Riser (TP# 414)

Vibration, Dynamics & Noise Page 66 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

High vibrations of the stage 4 suction were found to be coincident with the bottle rocking mode at 5x
compressor run speed. Suction bottles installed in the axial direction have an increased chance of the rocking
motion due to cylinder piston motion. Additionally, high cylinder vertical vibrations as discussed in report
section 4.10 above were found to be the source or vertical bottle vibrations at 4x compressor run speed. A
summary of vibration measurements and the stage 4 suction bottle mechanical natural frequencies is included
in Table 4.11.2.

Table 4.11.2 – Vibration Observation Summary (Suction Bottle)


Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 415 (436 Braced) v 1.81 57.8 860 4 181 -
*1
Night SS: 415 v 2.04 65.6 980 4 204 -
*1
Night SS: 415 v 1.88 73.8 880 5 188 74.7
Day: 420 (436 Braced) v 1.58 72.8 860 5 158 74.7
Day: 420 (Braced Wedge) h 1.62 83.1 1000 5 162 -
Day SS: 420 (Vary SS, 1000rpm) v 1.53 83.1 1000 5 153 -
*1
Night SS: 420 v 3.01 74.4 900 5 301 74.7
*1
Night SS: 420 -h 2.31 73.4 880 5 231 74.7
*1
Night SS: 420 -h 1.81 65.6 980 4 181 -
*1
– Wedge supports were found to be loose after compressor maintenance was completed
earlier in the day, and wedge supported were not properly retightened.

Pulsation measurements were collected on the stage 4 discharge system at TP# 460 near the cooler inlet risers.
Pulsations were found to exceed guideline by up to 180% and are twice the pulsations that were predicted in
the pulsation analysis completed under BETA Ref. # 208642. Orifice plates were recommended to be installed at
the cylinder 2 outlet and the stage 4 discharge bottle outlet flanges. A visual inspection indicated a 1.88” ID
orifice was installed at the cylinder 2 outlet flange, however an orifice plate tag/handle was not visible at the
bottle outlet flange at the time of site visit for the recommended 1.625” ID stage 4 discharge bottle outlet orifice
plate. Sensitivity checks performed by BETA on stage 4 discharge acoustical model indicate that an increase in
pulsation levels associated with missing orifice plates are similar to those measured at the cooler inlet risers.

Table 4.11.3 – Pulsation Observation Summary (Stage 4 Discharge TP# 460)


Test Point Amplitude Frequency Speed Order % of
(psi pk-pk) (Hz) (rpm) Guideline
460 4D Day no SS (Valve Open) 24.8 64.4 960 4 222
460 4D Night no SS (Valve Open) 27.2 64.4 960 4 243
460 4D Night w/ SS (Valve Open) 31.3 64.1 960 4 280

Vibration, Dynamics & Noise Page 67 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.12 Cylinder 1, Stage 3 Suction Bottle and Suction Inlet Spool

Recommendation
Implement the recommendations to repair grout and improve the existing wedge support and inboard support
design as discussed in report sections 4.3 and 4.10 respectively. Check vibrations of the cylinder, suction bottle,
suction inlet riser and the discharge spool. Implement the following recommendations if the above were not
effective to reduce vibrations to acceptable levels. Recommendations below may be implemented one step at a
time with a check of resulting vibrations and only installing following recommendations if vibrations have not
been reduced to acceptable levels.
1. Modify existing support locations:
a. Install gussets below existing support posts as shown in Figure 4.12.1 to increase the support
post and outrigger stiffness in the axial direction. Ensure gusset thickness is greater of 1/4” or
outrigger web thickness.
b. Install two support post knee-braces in the horizontal direction to increase the support post
stiffness in the horizontal direction. Alternative to a brace in the horizontal direction, a single
minimum 3/4” thick gusset may be installed to the top of the support post. Ensure gusset is
installed at the support post and outrigger beam centerline.
2. Install a support post and adequate brace as close to the elbow as possible. See BETA Standard support
post design as shown in Figure 4.2.7 and Figure 4.12.2 for recommended support post layout. Attach
foot of the support post and the brace using a bed of epoxy grout and four minimum 1/2” adhesive
anchor bolts to ensure proper bond.
3. Install a brace (4” x 4” x 1/4” HSS beam) on the stage 3 suction inlet riser in the horizontal-axial direction
to raise the pipe spool mechanical natural frequency in both directions. Use a CL-1 type connection at
the pipe and connect the brace foot directly to the top of the skid beam.
Note: This recommendation is made if the modifications to grout and outrigger beams are not effective
in increasing the existing brace dynamic support stiffness.

Add gussets at all support post centerline.


Gusset thickness to be greater of the beam web
thickness or 1/4”. Typical for all posts.

Install a knee-brace for existing support posts to


increase the support stiffness in the horizontal
direction. A single minimum 3/4” thick gusset
installed at the beam centerline may also be used.

Figure 4.12.1 – Stage 3 Suction and Discharge Spool Recommendations

Vibration, Dynamics & Noise Page 68 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Install a support post as close to elbow as possible


and attach pipe using a CL-1 type flat bar clamp.
Install a support post brace as shown in maximize
support stiffness in the horizontal direction.

Attach foot of the support and the brace using a bed


of epoxy grout and four minimum 1/2” adhesive
anchor bolts to ensure proper bond.

Figure 4.12.2 – Stage 3 Discharge Outlet Spool Recommendations

Install a support brace in the horizontal-axial


direction directly to the skid beam. Use minimum 4”
4” x 1/4” or equivalent HSS beam.

Figure 4.12.3 – Stage 3 Suction Bottle Inlet Riser (TP# 314)

Vibration, Dynamics & Noise Page 69 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Analysis
High cylinder 1 and stage 3 suction bottle axial vibrations were measured as summarized in Table 4.12.1. An
impact test was completed and found cylinder 1 and the suction bottle mechanical natural frequencies are
coincident with the vibration and compressor run speed. Additionally, vibrations on the stage 3 discharge spool
at TP# 336 were found to exceed guideline in horizontal and vertical direction. Vibrations were measured at a
number of frequencies including a high frequency of 181 Hz typical of vibration due to pipe strain due to
improper fit-up during installation.

Table 4.12.1 – Vibration Observation Summary (Cylinder 1 and Stage 3 Suction Bottle)
Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: Cylinder 1 (After Align) a 1.05 30.9 920 2 155 32.8
Night: Cylinder 1 a 1.08 31.9 960 2 154 32.8
Day: 315 (After Align) a 1.58 30.6 920 2 164 30.9
Day: 336 v 1.84 83.4 1000 5 184 -
Day: 336 (After Align) -h 1.57 180.9 985 11 157 -
Night: 336 v 1.83 81.6 980 5 183 -
Night SS: 336 v 3.41 83.4 1000 5 341 -
Night SS: 336 h 1.88 161.3 880 11 188 -
Night SS: 336 h 1.54 83.4 1000 5 154 -

Vibrations of the stage 3 suction inlet riser were found to exceed guideline as shown in Table 4.12.2. An impact
test completed indicates vibration is due to a coincidence with mechanical natural frequency. Support brace
installed to existing skid outrigger was not properly gusseted at the brace foot and existing support posts.

Table 4.12.2 – Vibration Observation Summary (Stage 3 Suction Inlet Spool TP# 314)
Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day SS: 314 -h 1.92 60.0 900 4 192 61.6
Day: 314 (After Align) -h 2.04 62.5 920 4 204 61.6
Day: 314 (After Align) a 1.87 30.9 920 2 192 31.9
Night: 314 -h 2.73 61.9 920 4 273 61.6
Night: 314 -a 1.88 31.6 940 2 189 31.9
Night: 314 -a 1.63 61.9 920 4 163 55.9
Night SS: 314 -h 2.03 62.8 940 4 203 61.6
Night SS: 314 -a 1.90 62.8 940 4 190 55.9
Night SS: 314 -a 1.79 31.3 940 2 182 31.9

Visual inspection of the stage 3 discharge bottle indicated the threaded rod was bowed upwards, typical of
wedge support that has been overtightened. Additionally, wedge support ‘ear’ appears to be bent downwards,
potentially due to overtightening or repeated discharge bottle impact while wedge supports were loose.

Vibration, Dynamics & Noise Page 70 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Threaded rod bowed upwards typical of wedge


support that has been overtightened.

Wedge support ‘ear’ appears to be bent


downwards, potentially due to overtightening or
repeated discharge bottle impact while wedge
supports were loose.

Figure 4.12.4 – Stage 3 Discharge Bottle Wedge Support

Vibration, Dynamics & Noise Page 71 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.13 Stage 1 Bypass – Scrubber Inlet Spool (TP# 105)

Recommendation
Check vibrations after the grout and foundation recommendations presented in report section 4.3 above have
been implemented. Install a brace in the axial direction as shown if vibrations exceed guideline after the grout
has been repaired. Ensure brace is a minimum 4” x 4” x 1/4” HSS (hollow square section) beam or equivalent.
Use a CL-1 type flat bar clamp (shown in Figure 4.2.8) at the pipe connection and attach the brace foot directly
to the web of an existing skid beam to ensure maximum stiffness is achieved.

Install a brace in the axial direction. Use


minimum 4” x 4” x 1/4” HSS beam. Use a
CL-1 type clamp at the pipe and attach
foot directly to skid beam.

Figure 4.13.1 – Stage 1 Scrubber Bypass inlet Spool Recommendation

Analysis
Vibrations were found to exceed guideline on the stage 1 suction bypass spool (TP# 105) as summarized in Table
4.13.1. Vibration measured was found to be coincident with the pipe spool mechanical natural frequency.

Table 4.13.1 – Vibration Observation Summary (Stage 1 Suction Bypass Spool)


Test Point Dir’n Amplitude Frequency Speed Order % of MNF
(in/s pk) (Hz) (rpm) Guideline (Hz)
Day: 105 -a 2.19 76.9 920 5 219 77.5

Vibration, Dynamics & Noise Page 72 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.14 Secondary Suction Bottle and Stage 1 and 2 Discharge Bottle Recommendations

Recommendation
Implement the following recommendations (previously made in the pulsation analysis report BETA Ref. #
208642) for both secondary suction bottles to improve the existing bottle supports.
1. Stage 3 and 4 Secondary Suction Bottle: Install minimum two gussets for each of the bottle support
sleepers (total of 4 gussets per secondary suction bottle). Ensure gusset thickness is greater of 1/4” or
the beam web thickness. Place gussets directly below wedge support. See Figure 4.14.2 (circled in red)
for recommended gusset locations for each of the two sleepers.
2. Stage 3 and 4 Secondary Suction Bottle: Install second wedge support at the existing band clamp
location to ensure bottle can be installed in its neutral position. A low profile wedge support similar to
one shown in Figure 4.14.3 may be used if limited room is available due to band clamp installation.
3. Stage 3 and 4 Secondary Suction Bottle: Install second band clamp at the existing wedge support
location to ensure bottle can be installed in its neutral position. Use a dual bolt design band clamp as
shown in Figure 4.14.2 (circled in green) to provide adequate stiffness and eliminate the need for the
flexible bracket currently welded to the beam.
4. Stage 3 Secondary Suction Bottle: Ensure stage 3 secondary suction bottle band clamp is checked and
adjusted such that the band clamp is installed in the vertical direction.

Install second wedge support to ensure Install second band clamp to ensure
bottle can the properly supported in its bottle can the properly supported in
neutral position. its neutral position.

Eliminate flexible bracket and install a band


clamp with two bolts directly to beam flange.
Install one bolt on each side of the beam web
as shown in green in Figure 4.14.2.

Install gussets on the outside of


beams to provide working room
below secondary suction bottle.

Install minimum two gussets for each of the bottle support


sleepers. Ensure gusset thickness is equal to or greater than beam
web thickness. Place gussets directly below wedge support.

Figure 4.14.1 – Secondary Suction Bottle Recommendations (Typical for Stage 3 and Stage 4)

Vibration, Dynamics & Noise Page 73 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.14.2 – BETA Standard WS-7 – Discharge Bottle Restraint

Vibration, Dynamics & Noise Page 74 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure 4.14.3 – Low Profile Wedge Support Sketch

Analysis
While the vibrations on the stage 3 and stage 4 secondary suction bottles were found within guideline, the
existing wedge support and band clamp is not recommended. A single band clamp with significant offset from
wedge support may introduce bottle twisting and pipe strain if overtightened. Additionally, ensure band clamp
bracket installed on the support sleeper provides adequate clamping stiffness, or the band clamp is attached
directly to the beam sleeper below.
Stage 3 secondary suction bottle band clamp was observed to be installed at an angle, or has moved over time
due to potential thermal expansions.

Existing sleeper visibly bent towards the back of the


compressor package. Band clamp also no longer
installed vertically, moved towards back.

Figure 4.14.4 – Stage 3 Secondary Suction Bottle (TP# 309 & 310)

Vibration, Dynamics & Noise Page 75 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.15 Coupling

Recommendation
Ensure that the engine is supplied clean, dry gas. For startups unload the compressor as much as possible to
limit the load as the speed passes through the resonances.
Install the revised coupling (stiffer, higher rated springs plus extra inertia) as soon as possible. BETA Machinery
Analysis is currently working with the coupling manufacturer to size springs with greater stiffness and a higher
torque rating.

Analysis
The torsional measurements show that the model is a reasonable approximation of the actual system. The
torsional natural frequencies are close to the ranges predicted, and the measured response is also close to
predicted. Based on the measurements, the coupling torques are near the coupling limit, but should not be
exceeded during normal running. However, the response measured during cold starts was much higher (5 – 6X)
than under normal operation during the resonance below the run speed range. That is, when the 1X torque
excitation is resonant with the first torsional natural frequency between 600 and 650 rpm. The response was
high for 40-60 seconds. Simulation of that event shows high coupling torques due to the load on the
compressor.
During normal warm starts, the run speed passed through the resonance in less than 5 seconds, and the
response was reasonable.
However, to reduce the possibility of damage occurring during cold starts and, or emergency shutdowns, Beta is
working with the coupling vendor on an uprated version of the coupling design. The result of that design study
will be presented in a separate report.

Vibration, Dynamics & Noise Page 76 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.16 Additional Site Visit Details and Observations

Visual Inspection and General Site Visit Notes and Recommendations


The following additional observations were made while at the site:
 Stage 1 and stage 2 discharge bottle overhung end band clamps were not installed as recommended in
BETA Report Ref. # 208642. The missing band clamp on stage 2 discharge bottle (TP# 235) resulted in
vibrations exceeding guideline marginally by 34%. It is recommended bottle band clamps are installed as
originally recommended.
 Some supports were not installed on the secondary (scrubber) skid as originally recommended in BETA
Report Ref. # 208642. These support locations where supports were missed did not appear to have
vibration concerns during a compressor walk through and hand checks for vibrations. Monitor vibrations
in these areas and install missing supports if required.
 Engine was noted to have very slow startup, in particular when the compressor was not running for an
extended period of time or in the morning when ambient temperatures are low. A noisy coupling
operation was heard during slow startup and speed ramp up to reach the compressor idle speed of 750
rpm. The slow startup will have a significant impact on the coupling, in particular while slowly passing
through the system torsional natural frequency.
 Engine and compressor frame were noted to be misaligned on at least two occasions and adjustments
were made while at site and as such, not all measurements were collected while the compressor was at
identical conditions. Additional measurements were obtained to compare the as-found vs. after
alignment measurements.
 Some vibrations measurements were collected on stage 3 and stage 4 test points, as well as other test
points where vibrations exceeded guideline during normal operation. The side stream operation is
intermittent and cannot be controlled or held steady for the duration of the vibration collection speed
sweep. Some variation in vibration is expected due to the transient nature of side stream.

Vibration, Dynamics & Noise Page 77 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

4.17 General

Modifications
Typically, recommendations in this report are provided with the goal of reducing vibrations. It is the
responsibility of our clients to ensure implementing these recommendations, especially pipe layout changes, will
not interfere with the safe operation of the unit.
Changing Operation
All the measurements are taken at the specific load step and operating conditions listed in Appendix A. Changes
in load steps or operating conditions can lead to an increase in forces on components resulting in higher
vibrations.
Assumptions
Some Finite Element Analysis (FEA) may be performed to assess the stress levels due to high vibrations on
specific components. Carefully review the assumptions made for FEA if applicable. Inform BETA if the
assumptions (dimensions, material, etc.) are not accurate. This could significantly change the results of FEA.
Follow-up Analysis
After modifications have been completed, confirm that vibration levels are acceptable before operating at
speeds or conditions where vibrations have been identified as problems.
Solution Options
In some cases, adding supports lowers vibration levels simply by masking the effects of high forces. BETA strives
to apply practical, cost-effective solutions that deal with the source of the problem, not just the symptoms.
Measuring vibration is a useful method of identifying problems. However, it can be impractical to test the
system under all possible operating conditions. Computer modelling can be applied to simulate many different
operating conditions, identify weak points in the system and optimize solutions. The use of advanced methods
including acoustical and mechanical modelling, stress measurements, and finite element analysis can improve
machine reliability while minimizing time spent on trial-and-error approaches. BETA can provide assistance in
this regard.
BETA also offers a monitoring, analysis, and optimization (MAO) service which can increase equipment reliability
and efficiency and reduce maintenance costs. Monitoring can be provided by on-site personnel and equipment,
or by BETA. Measurement data is then sent to BETA for analysis. A comprehensive report is provided which
presents machine status and includes recommendations for corrections to any faults or inefficiencies. The MAO
service includes performance and condition monitoring of many types of rotating and reciprocating machines.
More details can be provided upon request.
More Information
BETA has published many technical papers and offers technical presentations and seminars. For additional
information, please refer to our website at www.BETAMachinery.com, or contact the author of this report.

Vibration, Dynamics & Noise Page 78 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

APPENDIX A Machine Details | Operating Conditions | Test Equipment

A.1 Machine and Operating Details

Details for Compressor Unit U-150.2.5

Job US00365-01-1 GE Oil & Gas (Egypt) Date May 28 – June 5, 2016

Packager / EPC GE Oil & Gas / GE Oil & Gas

Driver make/model/ser. # WAUKESHA / 16V275GL / 5283703956

Driven make/model/ser. # CAMERON / WG76 / 14G1286

Stroke ( in ) 7.00 Piston rod diam ( in )

Rod load allowance ( lbf ) Compression 70000 Tension Total

Design speed range (rpm) 800 – 1000 Test speed range (rpm) 800 – 1000

Stage # 1 1 2 2 3 4

Cylinder/throw # 3 5 4 6 1 2

Cylinder serial # 14D1287 14D1288 14D1290 14D1289 14D1291 14D1292

Cylinder model 759CG 759CG 641CG 641CG 702KG 683JG

Cylinder bore ( in ) 25.5 25.5 14.0 14.0 11.5 7.0

Fixed clearance – HE (%) 15.8 15.8 14.3 14.3 15.7 17.6

Fixed clearance – CE (%) 22.0 22.0 14.5 14.5 15.8 21.8

Variable or fixed volume V V V V V V

Pocket distance open ( in ) 6.25 6.25 7.00 7.00 6.75 6.875

Unloaded (HE/CE) n/a n/a n/a n/a n/a n/a

# of distance pieces 1 1 1 1 1 1

# of valves per cylinder 6/6 6/6 6/6 6/6 4/4 2/2

Specific gravity Sweet Gas

# of side streams - - - - 1 -

Operating Conditions

Suction press. ( psig ) 25.1 – 25.7 91.8 – 95.0 261.0 – 270.6 682.0 – 695.6

Discharge press. ( psig ) 93.6 – 97.1 265.8 – 270.5 684.0 – 700.5 2000 – 2024

Suction temp. ( °F ) 98.9 - 143.0 -

Discharge temp. ( °F ) 232.6 – 293.8 233.5 – 301.0 279.3 – 296.5 281.3 – 306.4 267.0 – 238.9 239.7 -289.0

Recycle ( % ) 0 0 0 0 0 0

Vibration, Dynamics & Noise Page 79 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

A.2 Test Equipment


A.2.1 Instrumentation
Type Make Model Ser. No.
Dynamic Signal Analyzer Data Physics Quattro 3 (DP240) 21046

A.2.2 Sensors
Sensitivity Engineering
Ch # Make Model Ser. No.
(mV/EU) Units (EU)
1 CTC VE102-1D 1114 95.49 ips
2 V0622A01 3672 105.86 ips
3 CTC VE101-1D 1710 96.70 ips
4 CTC VE101-1D 1850 91.22 ips
1 PCB 086D20 25810 1.041 lbf
S111A24 16063 5.110 psi
S111A24 16065 5.050 psi
1 Encoder Products Co. 25T42SJ-0360NV1RP5-SMW 1969557 0.247m deg/s

A.2.3 Data Acquisition Setups

Figure A.2.1 – Pulsation, Vibration and Torsional Data Acquisition Setup

Figure A.2.2 – Transient Torsional Data Acquisition Setup

Vibration, Dynamics & Noise Page 80 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure A.2.3 – Impact Test Data Acquisition Setup

Vibration, Dynamics & Noise Page 81 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

APPENDIX B Data Summary | Vibration | Pulsation |Impact Response Data

B.1 Data Plot Example


For fixed speed machines, the default plot is a frequency spectrum which represents the steady state vibration
or pulsation of the machine.
In contrast, for variable speed machines, the default plot (example shown below) is a frequency spectrum where
the highest vibration or pulsation magnitude occurring at each discrete frequency is stored during the sweep
through the operating speed range. The resulting plot represents the highest vibration measured at each
frequency during the test.
Note that a spectral plot will generally not identify the highest overall vibration level. For this, analysis of the
time waveform is required.

test point

guideline

Figure B.1.1 – Example of a Spectrum Plot for a Variable Speed Machine

Vibration, Dynamics & Noise Page 82 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.2 Vibration Data Summary

Table B.2.1 – Vibration Data Summary (Anomaly Report: As-Found Vibration)


Beta Reference#: US00365-01-01 Test Date: May 29, 2016 Analyst: MG2
Company: GE Oil & Gas Location: Agiba Gas Plant, Egypt Unit: U-150.2.5 (As-Found)
Driver Make/Model: Cameron WG76 Driven Make/Model: Waukesha 16V275GL RPM min/max: 800-1000

Legend Below GL Marginal Alert Alarm


Abbreviations GL=Guideline, Dir'n=Direction, Amp.=Amplitude, Freq.=Frequency
General Piping and Vessel Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
220 h 128 P 1.28 ips Pk 89.7 B.6.1
215 -v 141 P 1.41 ips Pk 48.8 B.6.1
220 h 124 P 1.24 ips Pk 64.7 B.6.1
215 -v 88 P 0.883 ips Pk 60.9 B.6.1
220 a 68 P 0.68 ips Pk 33.4 B.6.2
217 h 127 P 1.27 ips Pk 48.4 B.6.3
217 -v 38 P 0.376 ips Pk 196.3 B.6.4
230 h 116 P 1.16 ips Pk 75.9 B.6.4
230 v 95 P 0.946 ips Pk 64.4 B.6.4
230 a 47 P 0.467 ips Pk 64.1 B.6.4
420 -a 104 P 1.04 ips Pk 63.8 B.6.5
415 -a 151 P 1.51 ips Pk 75.9 B.6.5
420 v 212 P 2.12 ips Pk 75.6 B.6.5
415 v 142 P 1.42 ips Pk 64.4 B.6.5
420 -h 106 P 1.06 ips Pk 72.2 B.6.6
414 h 173 P 1.73 ips Pk 45.6 B.6.7
414 -a 441 P 4.41 ips Pk 59.1 B.6.7
410 h 63 P 0.632 ips Pk 66.6 B.6.7
410 v 115 P 1.15 ips Pk 82.5 B.6.7
430 -a 169 P 1.69 ips Pk 74.4 B.6.8
435 -a 176 P 1.76 ips Pk 44.4 B.6.8
430 v 172 P 1.71 ips Pk 74.1 B.6.8
435 v 123 P 1.23 ips Pk 63.8 B.6.8
409 h 68 P 0.68 ips Pk 44.7 B.6.9
409 v 121 P 1.2 ips Pk 82.2 B.6.9
436 h 595 P 5.94 ips Pk 122.8 B.6.9
435 h 116 P 1.16 ips Pk 122.8 B.6.9
210 h 179 P 1.71 ips Pk 30.6 B.6.10
210 a 113 P 1.13 ips Pk 71.3 B.6.10
212 h 242 P 2.42 ips Pk 89.7 B.6.10
212 -v 134 P 1.34 ips Pk 60.6 B.6.10
235 h 128 P 1.28 ips Pk 77.8 B.6.11
232 h 70 P 0.7 ips Pk 43.8 B.6.11
235 v 134 P 1.34 ips Pk 58.8 B.6.11
232 v 45 P 0.447 ips Pk 58.8 B.6.11
209 h 72 P 0.687 ips Pk 30.6 B.6.12
209 -a 144 P 1.44 ips Pk 50.3 B.6.12
209 v 54 P 0.54 ips Pk 50.3 B.6.12
210 Sight Glass tan 330 P 3.3 ips Pk 96.9 B.6.12
436 v 491 P 4.91 ips Pk 77.2 B.6.13
436 -a 150 P 1.5 ips Pk 73.1 B.6.13
237 h 102 P 1.02 ips Pk 76.9 B.6.16
237 v 262 P 2.62 ips Pk 76.9 B.6.16
237 a 103 P 1.03 ips Pk 76.9 B.6.16
437 h 426 P 4.26 ips Pk 48.8 B.6.16
400 h 32 P 0.307 ips Pk 30.9 B.6.17
400 a 353 P 3.12 ips Pk 28.1 B.6.17
400 Sight Glass tan 87 P 0.771 ips Pk 28.1 B.6.17
250 PSV h 325 P 3.25 ips Pk 59.7 B.6.17
399 h 62 P 0.616 ips Pk 223.8 B.6.18
399 a 302 P 2.67 ips Pk 28.1 B.6.18

Vibration, Dynamics & Noise Page 83 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Max. Freq. Plot


Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
250 PSV a 233 P 2.32 ips Pk 59.7 B.6.18
450 PSV h 211 P 2.11 ips Pk 75 B.6.18
300 h 71 P 0.696 ips Pk 32.5 B.6.19
300 -a 244 P 2.35 ips Pk 31.3 B.6.19
300 Sight Glass tan 54 P 0.523 ips Pk 31.3 B.6.19
450 PSV a 79 P 0.788 ips Pk 70.6 B.6.19
110 h 79 P 0.788 ips Pk 46.6 B.6.20
110 -a 90 P 0.895 ips Pk 62.5 B.6.20
110 Sight Glass tan 80 P 0.8 ips Pk 92.8 B.6.20
350 PSV h 294 P 2.94 ips Pk 180 B.6.20
150 PSV h 33 P 0.332 ips Pk 60 B.6.21
150 PSV -a 44 P 0.439 ips Pk 63.1 B.6.21
109 h 46 P 0.456 ips Pk 62.8 B.6.21
350 PSV -a 170 P 1.7 ips Pk 176.3 B.6.21
100 PSV h 40 P 0.402 ips Pk 41.9 B.6.22
100 PSV -a 38 P 0.379 ips Pk 75.3 B.6.22
109 a 111 P 1.11 ips Pk 76.3 B.6.22
109 v 61 P 0.609 ips Pk 75 B.6.22
136 v 54 P 0.544 ips Pk 100 B.6.23
136 -a 28 P 0.279 ips Pk 235 B.6.23
135 h 99 P 0.991 ips Pk 73.1 B.6.23
135 v 54 P 0.539 ips Pk 126.3 B.6.23
112 h 60 P 0.499 ips Pk 26.6 B.6.24
112 -v 112 P 1.12 ips Pk 58.1 B.6.24
115 h 103 P 1.03 ips Pk 46.6 B.6.24
115 -v 52 P 0.522 ips Pk 58.1 B.6.24
117 -h 81 P 0.81 ips Pk 46.9 B.6.25
117 -v 38 P 0.383 ips Pk 163.1 B.6.25
132 -h 45 P 0.447 ips Pk 73.1 B.6.25
132 v 21 P 0.214 ips Pk 97.8 B.6.25
120 -h 101 P 1.01 ips Pk 46.6 B.6.26
120 -v 73 P 0.727 ips Pk 181.3 B.6.26
130 -h 57 P 0.571 ips Pk 129.7 B.6.26
130 v 28 P 0.276 ips Pk 229.7 B.6.26
310 -h 32 P 0.318 ips Pk 94.7 B.6.27
310 v 47 P 0.468 ips Pk 76.9 B.6.27
309 h 58 P 0.579 ips Pk 53.4 B.6.27
309 v 21 P 0.214 ips Pk 216.9 B.6.27
120 a 48 P 0.479 ips Pk 181.9 B.6.29
130 a 25 P 0.247 ips Pk 58.4 B.6.29
314 h 202 P 2.02 ips Pk 60.6 B.6.30
314 a 229 P 2.18 ips Pk 30.6 B.6.30
320 a 107 P 1.01 ips Pk 30.3 B.6.30
315 a 190 P 1.8 ips Pk 30.3 B.6.30
320 h 59 P 0.306 ips Pk 16.6 B.6.31
320 -v 56 P 0.558 ips Pk 106.6 B.6.31
315 -v 33 P 0.328 ips Pk 106.6 B.6.31
335 -h 82 P 0.815 ips Pk 115.3 B.6.32
330 v 45 P 0.446 ips Pk 83.4 B.6.32
335 v 41 P 0.409 ips Pk 179.7 B.6.32
336 h 142 P 1.42 ips Pk 200.3 B.6.33
330 a 66 P 0.655 ips Pk 122.5 B.6.33
335 a 93 P 0.931 ips Pk 60 B.6.33
336 -a 74 P 0.736 ips Pk 69.7 B.6.34
336 v 194 P 1.94 ips Pk 83.8 B.6.34
337 -h 87 P 0.871 ips Pk 201.6 B.6.38
337 -v 93 P 0.929 ips Pk 168.8 B.6.38
308 -h 83 P 0.83 ips Pk 108.1 B.6.39
308 v 49 P 0.487 ips Pk 137.8 B.6.39
438 h 228 P 2.28 ips Pk 75.9 B.6.39
438 v 124 P 1.24 ips Pk 72.5 B.6.39
408 h 152 P 1.52 ips Pk 85.3 B.6.40
408 v 136 P 1.36 ips Pk 77.8 B.6.40
470 a 281 P 1.49 ips Pk 16.9 B.6.40

Vibration, Dynamics & Noise Page 84 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Max. Freq. Plot


Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
360 a 146 P 1.41 ips Pk 31.6 B.6.40
160 a 27 P 0.138 ips Pk 16.3 B.6.41
470 h 72 P 0.716 ips Pk 43.4 B.6.41
360 h 231 P 1.95 ips Pk 26.9 B.6.41
160 h 21 P 0.208 ips Pk 32.8 B.6.41
490 a 70 P 0.69 ips Pk 32.2 B.6.42
270 a 60 P 0.306 ips Pk 16.3 B.6.42
290 a 45 P 0.451 ips Pk 55.3 B.6.42
390 a 410 P 4.1 ips Pk 41.9 B.6.42
490 h 380 P 3.7 ips Pk 31.9 B.6.43
270 h 199 P 1.66 ips Pk 26.6 B.6.43
290 -h 68 P 0.684 ips Pk 59.7 B.6.43
390 h 133 P 1.33 ips Pk 64.1 B.6.43
492 -v 106 P 1.06 ips Pk 86.6 B.6.44
398 -h 149 P 1.49 ips Pk 56.6 B.6.44
291 h 14 P 0.137 ips Pk 135.6 B.6.44
295 v 15 P 0.149 ips Pk 147.8 B.6.44
492 a 134 P 1.34 ips Pk 64.1 B.6.45
398 a 60 P 0.602 ips Pk 42.2 B.6.45
291 a 107 P 1.07 ips Pk 53.1 B.6.45
295 a 26 P 0.122 ips Pk 15 B.6.45
499 v 115 P 1.15 ips Pk 77.2 B.6.46
398 v 38 P 0.375 ips Pk 77.2 B.6.46
105 -a 219 P 2.19 ips Pk 76.9 B.6.46
499 h 143 P 1.43 ips Pk 63.4 B.6.46
205 v 89 P 0.857 ips Pk 30.9 B.6.47
105 h 98 P 0.984 ips Pk 100 B.6.47
207 v 58 P 0.578 ips Pk 55.6 B.6.47
499 a 82 P 0.795 ips Pk 31.6 B.6.47
205 h 95 P 0.4 ips Pk 13.4 B.6.48
205 h 33 P 0.327 ips Pk 72.2 B.6.48
207 a 34 P 0.341 ips Pk 45 B.6.48
200 h 112 P 1.07 ips Pk 30.9 B.6.48
200 a 158 P 1.58 ips Pk 64.1 B.6.49
200 v 60 P 0.311 ips Pk 16.6 B.6.49
Driver and Component Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Engine Front h 80 EW 0.400 ips Pk 16.9 B.6.14
Engine Front v 38 EW 0.189 ips Pk 16.9 B.6.14
Engine Back h 152 EW 0.757 ips Pk 16.9 B.6.14
Engine Back -v 66 EW 0.331 ips Pk 30.6 B.6.14
Engine Front a 16 EW 0.078 ips Pk 32.2 B.6.15
Compressor Frame and Component Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Cylinder 4 h 73 C 0.267 ips Pk 16.6 B.6.2
Cylinder 4 v 189 C 1.320 ips Pk 64.7 B.6.2
Cylinder 4 -a 102 C 0.711 ips Pk 33.4 B.6.2
Cylinder 6 h 72 C 0.268 ips Pk 16.9 B.6.3
Cylinder 6 v 89 C 0.625 ips Pk 61.3 B.6.3
Cylinder 6 -a 88 C 0.325 ips Pk 16.9 B.6.3
Cylinder 2 h 84 C 0.311 ips Pk 16.9 B.6.6
Cylinder 2 v 211 C 1.470 ips Pk 64.1 B.6.6
Cylinder 2 -a 153 C 1.070 ips Pk 33.4 B.6.6
Frame Front h 85 F 0.226 ips Pk 16.9 B.6.13
Frame Front -v 38 F 0.189 ips Pk 33.4 B.6.13
Frame Back h 26 F 0.067 ips Pk 16.6 B.6.15
Frame Back -a 89 F 0.236 ips Pk 16.9 B.6.15
Frame Back -v 34 F 0.171 ips Pk 72.8 B.6.15
Cylinder 5 -h 70 C 0.249 ips Pk 16.3 B.6.28
Cylinder 5 v 63 C 0.441 ips Pk 97.2 B.6.28
Cylinder 5 a 125 C 0.871 ips Pk 125.6 B.6.28
Cylinder 3 -h 79 C 0.286 ips Pk 16.6 B.6.28
Cylinder 3 v 52 C 0.366 ips Pk 71.9 B.6.29
Cylinder 3 a 85 C 0.595 ips Pk 125.6 B.6.29

Vibration, Dynamics & Noise Page 85 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Max. Freq. Plot


Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Cylinder 1 a 180 C 1.190 ips Pk 30.3 B.6.31
Cylinder 1 v 50 C 0.353 ips Pk 62.2 B.6.32
Cylinder 1 -h 84 C 0.313 ips Pk 16.9 B.6.33
Skid and Structural Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Skid Edge Front Left Engine h 15 S 0.015 ips Pk 56.6 B.6.34
Skid Edge Front Left Engine v 47 S 0.047 ips Pk 31.9 B.6.34
Skid Edge Back Left Engine h 24 S 0.024 ips Pk 175.6 B.6.35
Skid Edge Back Left Engine v 51 S 0.051 ips Pk 31.9 B.6.35
Skid at Engine Ped. Front Left v 160 S 0.160 ips Pk 31.9 B.6.35
Skid at Engine Ped. Back Left v 110 S 0.110 ips Pk 31.9 B.6.35
Skid Edge Back Left Frame h 40 S 0.040 ips Pk 542.8 B.6.36
Skid Edge Back Left Frame v 44 S 0.044 ips Pk 381.6 B.6.36
Skid Edge Back Left Frame -a 96 S 0.096 ips Pk 185 B.6.36
Skid Edge Back Right Frame -a 200 S 0.200 ips Pk 176.3 B.6.36
Skid at Frame Ped. Back Left v 76 S 0.076 ips Pk 163.4 B.6.37
Skid at Frame Ped. Back Right v 85 S 0.085 ips Pk 72.2 B.6.37
Skid at Engine Ped. Front Right v 158 S 0.158 ips Pk 30.9 B.6.37
Skid Edge Front Right Engine v 44 S 0.044 ips Pk 31.9 B.6.37
Skid at Enigne Ped. Back Right v 98 S 0.098 ips Pk 31.6 B.6.38
Skid Edge Engine Back Right v 48 S 0.048 ips Pk 31.9 B.6.38
Marginal Alert Alarm
GL Type GL Description Lower Cutoff Lower Cutoff Lower Cutoff
(%GL) (%GL) (%GL)
C VIBRATION C:BMA-Cylinder 100 150 200
EW VIBRATION EW:BMA-Waukesha Engine 100 150 200
F VIBRATION F:BMA-Frame 100 150 200
P VIBRATION P:BMA-Pipe 100 150 200
S VIBRATION S:BMA-Skid/Foundation 100 150 200

Vibration, Dynamics & Noise Page 86 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Table B.2.2 – Vibration Data Summary (Anomaly Report: After Alignment Done)
Beta Reference#: US00365-01-01 Test Date: Jun 03, 2016 Analyst: MG2
Company: GE Oil & Gas Location: Agiba Gas Plant, Egypt Unit: U-150.2.5 (After Alignment)
Driver Make/Model: Cameron WG76 Driven Make/Model: Waukesha 16V275GL RPM min/max: 800-1000

Legend Below GL Marginal Alert Alarm


Abbreviations GL=Guideline, Dir'n=Direction, Amp.=Amplitude, Freq.=Frequency
General Piping and Vessel Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
420 -a 80 P 0.802 ips Pk 82.8 B.6.50
415 -a 120 P 1.16 ips Pk 31.6 B.6.51
420 -h 136 P 1.36 ips Pk 58.1 B.6.51
436 h 574 P 5.74 ips Pk 118.1 B.6.51
436 v 760 P 7.6 ips Pk 73.4 B.6.52
436 a 250 P 2.5 ips Pk 73.4 B.6.52
414 -a 483 P 4.83 ips Pk 57.8 B.6.52
437 h 451 P 4.51 ips Pk 46.9 B.6.53
430 -a 118 P 1.18 ips Pk 43.1 B.6.53
420 v 190 P 1.9 ips Pk 74.1 B.6.53
320 a 100 P 0.956 ips Pk 30.6 B.6.53
315 a 165 P 1.58 ips Pk 30.9 B.6.54
320 -v 52 P 0.521 ips Pk 106.6 B.6.54
315 -v 43 P 0.429 ips Pk 114.4 B.6.54
320 h 69 P 0.359 ips Pk 16.6 B.6.54
330 v 60 P 0.604 ips Pk 73.1 B.6.55
335 v 49 P 0.486 ips Pk 177.5 B.6.56
330 a 77 P 0.773 ips Pk 83.8 B.6.56
335 a 83 P 0.828 ips Pk 59.1 B.6.56
335 h 68 P 0.676 ips Pk 115.6 B.6.56
314 -h 204 P 2.04 ips Pk 62.5 B.6.57
314 a 195 P 1.87 ips Pk 30.9 B.6.57
336 -h 157 P 1.57 ips Pk 180.9 B.6.57
Driver and Component Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Engine Front h 76 EW 0.377 ips Pk 47.8 B.6.50
Engine Back h 40 EW 0.202 ips Pk 47.8 B.6.50
Compressor Frame and Component Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Frame Front h 39 F 0.085 ips Pk 13.8 B.6.50
Cylinder 2 -a 183 C 1.24 ips Pk 31.6 B.6.51
Cylinder 2 v 175 C 1.22 ips Pk 57.8 B.6.52
Cylinder 1 -h 92 C 0.336 ips Pk 16.6 B.6.55
Cylinder 1 v 60 C 0.419 ips Pk 62.5 B.6.55
Cylinder 1 a 157 C 1.05 ips Pk 30.9 B.6.55
Marginal Alert Alarm
GL Type GL Description Lower Cutoff Lower Cutoff Lower Cutoff
(%GL) (%GL) (%GL)
C VIBRATION C:BMA-Cylinder 100 150 200
EW VIBRATION EW:BMA-Waukesha Engine 100 150 200
F VIBRATION F:BMA-Frame 100 150 200
P VIBRATION P:BMA-Pipe 100 150 200

Vibration, Dynamics & Noise Page 87 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Table B.2.3 – Vibration Data Summary (Anomaly Report: After Pipe at TP# 436 Braced)
Beta Reference#: US00365-01-01 Test Date: Jun 02, 2016 Analyst: MG2
Company: GE Oil & Gas Location: Agiba Gas Plant, Egypt Unit: U-150.2.5 (436 Braced)
Driver Make/Model: Cameron WG76 Driven Make/Model: Waukesha 16V275GL RPM min/max: 800-1000

Legend Below GL Marginal Alert Alarm


Abbreviations GL=Guideline, Dir'n=Direction, Amp.=Amplitude, Freq.=Frequency
General Piping and Vessel Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
436 h 231 P 2.31 ips Pk 133.4 B.6.58
436 v 215 P 2.15 ips Pk 115 B.6.58
436 a 131 P 1.3 ips Pk 133.4 B.6.58
420 v 158 P 1.58 ips Pk 72.8 B.6.59
415 v 181 P 1.81 ips Pk 57.8 B.6.59
420 -h 134 P 1.34 ips Pk 72.8 B.6.59
420 -a 106 P 1.06 ips Pk 64.1 B.6.59
415 -a 109 P 1.05 ips Pk 31.3 B.6.60
430 -a 137 P 1.37 ips Pk 43.8 B.6.60
435 -a 147 P 1.47 ips Pk 43.8 B.6.61
430 v 157 P 1.57 ips Pk 79.4 B.6.61
435 v 129 P 1.29 ips Pk 63.4 B.6.61
435 h 72 P 0.722 ips Pk 135.3 B.6.61
414 h 241 P 2.41 ips Pk 43.8 B.6.62
414 -a 245 P 2.45 ips Pk 59.4 B.6.62
Compressor Frame and Component Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Cylinder 2 v 229 C 1.6 ips Pk 64.4 B.6.58
Cylinder 2 h 85 C 0.311 ips Pk 16.6 B.6.60
Cylinder 2 -a 166 C 1.12 ips Pk 31.3 B.6.60
Frame Front h 66 F 0.175 ips Pk 16.9 B.6.63
Skid and Structural Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
414 Outrigger -a 766 S 0.766 ips Pk 70.3 B.6.62
414 Outrigger v 975 S 0.975 ips Pk 182.8 B.6.62
Marginal Alert Alarm
GL Type GL Description Lower Cutoff Lower Cutoff Lower Cutoff
(%GL) (%GL) (%GL)
C VIBRATION C:BMA-Cylinder 100 150 200
F VIBRATION F:BMA-Frame 100 150 200
P VIBRATION P:BMA-Pipe 100 150 200
S VIBRATION S:BMA-Skid/Foundation 100 150 200

Vibration, Dynamics & Noise Page 88 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Table B.2.4 – Vibration Data Summary (Anomaly Report: Stage 4 Discharge Bottle Wedges Braced)
Beta Reference#: US00365-01-01 Test Date: Jun 03, 2016 Analyst: MG2
Company: GE Oil & Gas Location: Agiba Gas Plant, Egypt Unit: U-150.2.5 (Brace Wedge)
Driver Make/Model: Cameron WG76 Driven Make/Model: Waukesha 16V275GL RPM min/max: 800-1000

Legend Below GL Marginal Alert Alarm


Abbreviations GL=Guideline, Dir'n=Direction, Amp.=Amplitude, Freq.=Frequency
General Piping and Vessel Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
420 v 116 P 1.16 ips Pk 83.8 B.6.64
415 v 107 P 1.07 ips Pk 60.9 B.6.64
420 -a 93 P 0.931 ips Pk 62.5 B.6.64
415 -a 113 P 1.13 ips Pk 83.8 B.6.65
420 h 162 P 1.62 ips Pk 83.1 B.6.65
430 -a 91 P 0.909 ips Pk 83.1 B.6.65
435 -a 95 P 0.948 ips Pk 42.8 B.6.66
430 h 108 P 1.08 ips Pk 61.6 B.6.66
430 v 220 P 2.2 ips Pk 83.4 B.6.66
435 v 146 P 1.46 ips Pk 61.3 B.6.66
414 -a 382 P 3.82 ips Pk 60.3 B.6.67
Compressor Frame and Component Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Cylinder 2 v 170 C 1.19 ips Pk 62.5 B.6.64
Cylinder 2 -a 117 C 0.789 ips Pk 31.3 B.6.65
Marginal Alert Alarm
GL Type GL Description Lower Cutoff Lower Cutoff Lower Cutoff
(%GL) (%GL) (%GL)
C VIBRATION C:BMA-Cylinder 100 150 200
P VIBRATION P:BMA-Pipe 100 150 200

Vibration, Dynamics & Noise Page 89 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Table B.2.5 – Vibration Data Summary (Anomaly Report: Night Operation, no Side Stream)
Beta Reference#: US00365-01-01 Test Date: Jun 04, 2016 Analyst: MG2
Company: GE Oil & Gas Location: Agiba Gas Plant, Egypt Unit: U-150.2.5 (Night Oper'n)
Driver Make/Model: Cameron WG76 Driven Make/Model: Waukesha 16V275GL RPM min/max: 800-1000

Legend Below GL Marginal Alert Alarm


Abbreviations GL=Guideline, Dir'n=Direction, Amp.=Amplitude, Freq.=Frequency
General Piping and Vessel Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
420 v 125 P 1.25 ips Pk 71.9 B.6.68
415 v 140 P 1.4 ips Pk 61.3 B.6.68
420 -a 111 P 1.1 ips Pk 60.9 B.6.68
415 -a 112 P 1.08 ips Pk 31.6 B.6.68
420 -h 138 P 1.38 ips Pk 71.6 B.6.69
430 v 146 P 1.46 ips Pk 79.4 B.6.70
435 v 148 P 1.48 ips Pk 60.9 B.6.70
430 -a 104 P 1.04 ips Pk 79.7 B.6.70
435 -a 98 P 0.975 ips Pk 44.1 B.6.70
435 -h 99 P 0.99 ips Pk 61.3 B.6.72
436 h 330 P 3.3 ips Pk 132.5 B.6.72
436 v 148 P 1.48 ips Pk 117.5 B.6.72
436 a 146 P 1.46 ips Pk 132.5 B.6.72
414 h 207 P 2.07 ips Pk 66.6 B.6.75
414 -a 367 P 3.67 ips Pk 58.1 B.6.75
212 h 284 P 2.84 ips Pk 90.3 B.6.75
408 h 114 P 1.14 ips Pk 176.9 B.6.76
438 h 134 P 1.34 ips Pk 155.6 B.6.76
320 a 91 P 0.872 ips Pk 30.9 B.6.77
315 a 153 P 1.48 ips Pk 31.6 B.6.77
320 -v 60 P 0.598 ips Pk 61.9 B.6.77
315 -v 70 P 0.703 ips Pk 63.4 B.6.77
320 h 69 P 0.358 ips Pk 16.6 B.6.78
330 v 58 P 0.582 ips Pk 83.4 B.6.79
335 v 75 P 0.749 ips Pk 61.9 B.6.79
330 a 64 P 0.64 ips Pk 83.4 B.6.79
335 a 70 P 0.696 ips Pk 61.6 B.6.79
335 -h 56 P 0.56 ips Pk 135.9 B.6.80
336 h 148 P 1.48 ips Pk 180.9 B.6.80
336 v 183 P 1.83 ips Pk 81.6 B.6.80
336 a 78 P 0.784 ips Pk 61.3 B.6.80
314 -h 273 P 2.73 ips Pk 61.9 B.6.81
314 -a 194 P 1.88 ips Pk 31.6 B.6.81
400 a 291 P 2.66 ips Pk 29.1 B.6.81
399 a 207 P 2.07 ips Pk 86.3 B.6.81
210 h 176 P 1.76 ips Pk 33.4 B.6.82
300 a 400 P 3.9 ips Pk 31.9 B.6.82
210 Sight Glass tan 179 P 1.79 ips Pk 96.9 B.6.82
237 v 138 P 1.38 ips Pk 111.9 B.6.82
Driver and Component Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Engine Front h 77 EW 0.386 ips Pk 48.1 B.6.73
Engine Front v 20 EW 0.102 ips Pk 25 B.6.73
Engine Back h 111 EW 0.554 ips Pk 25 B.6.73
Engine Back v 47 EW 0.232 ips Pk 33.1 B.6.73
Engine Back -a 12 EW 0.059 ips Pk 33.4 B.6.74

Vibration, Dynamics & Noise Page 90 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Compressor Frame and Component Vibration


Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Cylinder 2 h 81 C 0.296 ips Pk 16.6 B.6.69
Cylinder 2 v 211 C 1.48 ips Pk 61.3 B.6.69
Cylinder 2 -a 168 C 1.14 ips Pk 31.6 B.6.69
Frame Front h 61 F 0.159 ips Pk 16.6 B.6.74
Frame Front v 36 F 0.18 ips Pk 33.4 B.6.74
Frame Front a 26 F 0.126 ips Pk 31.6 B.6.74
Cylinder 4 v 131 C 0.919 ips Pk 64.1 B.6.75
Frame Back h 106 F 0.281 ips Pk 16.9 B.6.76
Frame Back -v 38 F 0.191 ips Pk 83.4 B.6.76
Cylinder 1 -h 83 C 0.303 ips Pk 16.6 B.6.78
Cylinder 1 v 128 C 0.895 ips Pk 63.8 B.6.78
Cylinder 1 a 157 C 1.07 ips Pk 31.9 B.6.78
Skid and Structural Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
4D Right Wedge Skid R v 162 S 0.162 ips Pk 61.3 B.6.71
4D Right Wedge Skid L v 234 S 0.234 ips Pk 81.6 B.6.71
4D Left Wedge Skid R v 199 S 0.199 ips Pk 61.3 B.6.71
4D Left Wedge Skid L v 136 S 0.136 ips Pk 81.6 B.6.71
Marginal Alert Alarm
GL Type GL Description Lower Cutoff Lower Cutoff Lower Cutoff
(%GL) (%GL) (%GL)
C VIBRATION C:BMA-Cylinder 100 150 200
EW VIBRATION EW:BMA-Waukesha Engine 100 150 200
F VIBRATION F:BMA-Frame 100 150 200
P VIBRATION P:BMA-Pipe 100 150 200
S VIBRATION S:BMA-Skid/Foundation 100 150 200

Vibration, Dynamics & Noise Page 91 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Table B.2.6 – Vibration Data Summary (Anomaly Report: Night Operation, with Side Stream)
Beta Reference#: US00365-01-01 Test Date: Jun 05, 2016 Analyst: MG2
Company: GE Oil & Gas Location: Agiba Gas Plant, Egypt Unit: U-150.2.5 (Night w/ SS)
Driver Make/Model: Cameron WG76 Driven Make/Model: Waukesha 16V275GL RPM min/max: 800-1000

Legend Below GL Marginal Alert Alarm


Abbreviations GL=Guideline, Dir'n=Direction, Amp.=Amplitude, Freq.=Frequency
General Piping and Vessel Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
420 -a 126 P 1.26 ips Pk 65 B.6.83 Vibration higher due to wedge support left loose after web deflection checks by GE
415 -a 140 P 1.4 ips Pk 73.8 B.6.83 Vibration higher due to wedge support left loose after web deflection checks by GE

420 v 301 P 3.01 ips Pk 74.4 B.6.83 Vibration higher due to wedge support left loose after web deflection checks by GE

415 v 204 P 2.04 ips Pk 65.6 B.6.83 Vibration higher due to wedge support left loose after web deflection checks by GE

420 -h 231 P 2.31 ips Pk 73.4 B.6.84 Vibration higher due to wedge support left loose after web deflection checks by GE

430 v 123 P 1.23 ips Pk 83.8 B.6.85 Vibration higher due to wedge support left loose after web deflection checks by GE
435 v 142 P 1.42 ips Pk 65.3 B.6.85 Vibration higher due to wedge support left loose after web deflection checks by GE

430 -a 161 P 1.61 ips Pk 47.5 B.6.85 Vibration higher due to wedge support left loose after web deflection checks by GE
435 -a 158 P 1.58 ips Pk 47.5 B.6.85 Vibration higher due to wedge support left loose after web deflection checks by GE

435 -h 98 P 0.984 ips Pk 65 B.6.86 Vibration higher due to wedge support left loose after web deflection checks by GE

436 h 343 P 3.43 ips Pk 174.1 B.6.86 Vibration higher due to wedge support left loose after web deflection checks by GE

436 v 196 P 1.96 ips Pk 118.4 B.6.86 Vibration higher due to wedge support left loose after web deflection checks by GE

436 a 233 P 2.33 ips Pk 66.9 B.6.86 Vibration higher due to wedge support left loose after web deflection checks by GE

414 h 253 P 2.53 ips Pk 66.3 B.6.87 Vibration higher due to wedge support left loose after web deflection checks by GE

414 -a 500 P 5 ips Pk 57.8 B.6.87 Vibration higher due to wedge support left loose after web deflection checks by GE

212 h 115 P 1.15 ips Pk 90.3 B.6.87


320 a 88 P 0.849 ips Pk 31.6 B.6.88
315 a 143 P 1.38 ips Pk 31.6 B.6.88
320 -v 60 P 0.596 ips Pk 62.8 B.6.88
315 -v 82 P 0.818 ips Pk 64.1 B.6.88
320 -h 59 P 0.59 ips Pk 64.7 B.6.89
330 v 45 P 0.446 ips Pk 83.4 B.6.90
335 v 85 P 0.848 ips Pk 64.4 B.6.90
330 a 46 P 0.457 ips Pk 128.8 B.6.90
335 a 55 P 0.552 ips Pk 62.2 B.6.90
335 -h 56 P 0.558 ips Pk 140.6 B.6.91
336 h 188 P 1.88 ips Pk 161.3 B.6.91
336 v 341 P 3.41 ips Pk 83.4 B.6.91
336 a 142 P 1.42 ips Pk 83.4 B.6.91
314 -h 203 P 2.03 ips Pk 62.8 B.6.92
314 -a 190 P 1.9 ips Pk 62.8 B.6.92
400 a 393 P 3.54 ips Pk 28.8 B.6.92
399 a 328 P 3.28 ips Pk 82.2 B.6.92
210 h 186 P 1.86 ips Pk 33.4 B.6.93
300 a 278 P 2.71 ips Pk 31.9 B.6.93
210 Sight Glass tan 178 P 1.78 ips Pk 97.5 B.6.93
237 v 114 P 1.14 ips Pk 111.9 B.6.93
Compressor Frame and Component Vibration
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
Cylinder 2 h 78 C 0.285 ips Pk 16.6 B.6.84 Vibration higher due to wedge support left loose after web deflection checks by GE

Cylinder 2 v 284 C 1.99 ips Pk 65.3 B.6.84 Vibration higher due to wedge support left loose after web deflection checks by GE

Cylinder 2 -a 144 C 1.01 ips Pk 33.4 B.6.84 Vibration higher due to wedge support left loose after web deflection checks by GE

Cylinder 4 v 201 C 1.41 ips Pk 64.7 B.6.87


Cylinder 1 -h 88 C 0.328 ips Pk 16.9 B.6.89
Cylinder 1 v 134 C 0.941 ips Pk 64.4 B.6.89
Cylinder 1 a 137 C 0.931 ips Pk 31.6 B.6.89
Marginal Alert Alarm
GL Type GL Description Lower Cutoff Lower Cutoff Lower Cutoff
(%GL) (%GL) (%GL)
C VIBRATION C:BMA-Cylinder 100 150 200
P VIBRATION P:BMA-Pipe 100 150 200

Vibration, Dynamics & Noise Page 92 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.3 Pulsation Plot Index

Beta Reference#: US00365-01-01 Test Date: Jun 05, 2016 Analyst: MG2
Company: GE Oil & Gas Location: Agiba Gas Plant, Egypt Unit: U-150.2.5 (Pulsations)
Driver Make/Model: Cameron WG76 Driven Make/Model: Waukesha 16V275GL RPM min/max: 800-1000

Legend Below GL Marginal Alert Alarm


Abbreviations GL=Guideline, Dir'n=Direction, Amp.=Amplitude, Freq.=Frequency
Pressure Pulsation
Max. Freq. Plot
Location Dir'n GL ID Amp. Units Comments
% GL (Hz) Fig. #
460 4D Day no SS (Valve Closed) psi Pk-Pk B.7.1
460 4D Day no SS (Valve Open) 222 H 24.8 psi Pk-Pk 64.4 B.7.1
299 3S Day no SS (Valve Closed) psi Pk-Pk B.7.1
299 3S Day no SS (Valve Open) 26 H 1.17 psi Pk-Pk 16.9 B.7.1
299 3S Day w/ SS 1000 rpm (Valv e Open) 37 H 1.67 psi Pk-Pk 16.6 B.7.2
460 4D Day w/ SS 1000 rpm (Valv e Open) 73 H 8.07 psi Pk-Pk 66.6 B.7.2
299 3S Day w/ SS 900 rpm (Valv e Open) 23 H 1.09 psi Pk-Pk 15 B.7.2
460 4D Day w/ SS 900 rpm (Valv e Open) 84 H 9.63 psi Pk-Pk 60.9 B.7.2
299 3S Day w/ SS 800 rpm (Valv e Open) 61 H 1.36 psi Pk-Pk 66.6 B.7.3
460 4D Day w/ SS 800 rpm (Valv e Open) 97 H 11.9 psi Pk-Pk 53.4 B.7.3
299 3S Night no SS (Valve Closed) psi Pk-Pk B.7.3
460 4D Night no SS (Valve Closed) psi Pk-Pk B.7.3
299 3S Night no SS (Valve Open) 28 H 1.24 psi Pk-Pk 16.6 B.7.4
460 4D Night no SS (Valve Open) 243 H 27.2 psi Pk-Pk 64.4 B.7.4
299 3S Night w / SS (Valve Closed) psi Pk-Pk B.7.4
460 4D Night w / SS (Valve Closed) psi Pk-Pk B.7.4
299 3S Night w/ SS (Valve Open) 88 H 1.95 psi Pk-Pk 68.4 B.7.5
460 4D Night w/ SS (Valve Open) 280 H 31.3 psi Pk-Pk 64.1 B.7.5
Marginal Alert Alarm
GL Type GL Description Lower Cutoff Lower Cutoff Lower Cutoff
(%GL) (%GL) (%GL)
H PULSE H:DPL-API 618 5th Ed 100 150 200

Vibration, Dynamics & Noise Page 93 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.4 Torsional Data Summary

Table B.4.1 – Torsional Data Summary (Anomaly Report)


Torsional Measurements
Run # Location Amp. Units Freq (Hz) Plot Fig. # Comments
58 Compressor Aux End, Lube Oil Pump 314 deg/s 0-pk 10.9 B.8.1 Cold Start, Approximately 40 Secs Through 1X Resonance
60 Compressor Aux End, Lube Oil Pump 312 deg/s 0-pk 11.5 B.8.2 Controlled Shutdown, a few seconds at 1X Resonance
61 Compressor Aux End, Lube Oil Pump 211 deg/s 0-pk 10.5 B.8.2 Warm Start, <10 secs through 1X Resonance
62 Compressor Aux End, Lube Oil Pump 59 deg/s 0-pk 98.0 B.8.3 Unloaded Speed Sweep, Largest response when 6X resonant at 980 rpm
63 Compressor Aux End, Lube Oil Pump 35 deg/s 0-pk 90.0 B.8.4 Loading of Compressor at 900 rpm
64 Compressor Aux End, Lube Oil Pump 45 deg/s 0-pk 98.0 B.8.5 Loaded Speed Sweep, Largest response when 6X resonant at 980 rpm
177 Compressor Aux End, Lube Oil Pump 307 deg/s 0-pk 11.0 B.8.6 Cold Start, Approximately 5-10 Secs Through 1X Resonance
196 Compressor Aux End, Lube Oil Pump 1190 deg/s 0-pk 0.5-1.0 B.8.7 ESD, Large response, but very short duration (<5 sec) and low frequency

Vibration, Dynamics & Noise Page 94 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.5 Impact Response Plot Index

Table B.5.1 – Impact Response Plot Index


Plot Figure
Test Point Location Dir’n
#
415 (a) [Hit 415] a B.9.1
420 (a) [Hit 415] a B.9.2
415 Flange (a) [Hit 415] a B.9.3
415 (v) [Hit 415] v B.9.4
420 (v) [Hit 415] v B.9.5
415 Flange (v) [Hit 415] v B.9.6
420 (h) [Hit 420] h B.9.7
415 (h) [Hit 420] h B.9.8
414 (h) [Hit 420] h B.9.9
320 (a) [Hit 320] a B.9.10
315 (a) [Hit 320] a B.9.11
315 Flange (a) [Hit 320] a B.9.12
320 (v) [Hit 320] v B.9.13
315 (v) [Hit 320] v B.9.14
315 Flange (v) [Hit 320] v B.9.15
320 (h) [Hit 320] h B.9.16
Cylinder 2 (v) [Hit Cylinder 2] v B.9.17
414 (h) [Hit 414] h B.9.18
412 (h) [Hit 414] h B.9.19
414B (h) [Hit 414] h B.9.20
414 (a) [Hit 414] a B.9.21
412 (a) [Hit 414] a B.9.22
414B (a) [Hit 414] a B.9.23
210 (h) [Hit 210] h B.9.24
210 (a) [Hit 210] a B.9.25
210 Sight Glass (tan) [Hit 210 Sight Glass] tan B.9.26
450 psv (h) [Hit 450 psv] h B.9.27
450 mp (h) [Hit 450 psv] h B.9.28
250 psv (h) [Hit 250 psv] h B.9.29
250 mid (h) [Hit 250 psv] h B.9.30
250 mp (h) [Hit 250 psv] h B.9.31
250 psv (a) [Hit 250 psv] a B.9.32
250 mid (a) [Hit 250 psv] a B.9.33
250 mp (a) [Hit 250 psv] a B.9.34
400 (a) [Hit 400] a B.9.35
300 (a) [Hit 300] a B.9.36
350 psv (h) [Hit 350 psv] h B.9.37
350 mid (h) [Hit 350 psv] h B.9.38
350 mp (h) [Hit 350 psv] h B.9.39
350 psv (a) [Hit 350 psv] a B.9.40
350 mid (a) [Hit 350 psv] a B.9.41
350 mp (a) [Hit 350 psv] a B.9.42
314 (a) [Hit 314] a B.9.43
314 (h) [Hit 314] h B.9.44
336 (v) [Hit 336] v B.9.45
399 (h) [Hit 399] h B.9.46

Vibration, Dynamics & Noise Page 95 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

399 (a) [Hit 399] a B.9.47


437 (h) [Hit 437] h B.9.48
237 (v) [Hit 237] v B.9.49
212 (h) [Hit 212] h B.9.50
436 (h) [Hit 436] h B.9.51
435 (a) [Hit 435] a B.9.52
430 (v) [Hit 430] v B.9.53
436 (v) [Hit 436] v B.9.54
Cylinder 4 (v) [Hit Cylinder 4] v B.9.55
436 (a) [Hit 436] a B.9.56
Cylinder 1 (a) [Hit Cylinder 1] a B.9.57
450 psv (a) [Hit 450 psv] a B.9.58
450 mid (a) [Hit 450 psv] a B.9.59
450 mp (a) [Hit 450 psv] a B.9.60
Cylinder 2 (a) [Hit Cylinder 2] a B.9.61
430 (a) [Hit 430] a B.9.62
435 (a) [Hit 430] a B.9.63
435 Flange (a) [Hit 430] a B.9.64
105 (h) [Hit 105] h B.9.65
105 (a) [Hit 105] a B.9.66
490 (h) [Hit 490] h B.9.67
390 (a) [Hit 390] a B.9.68
270 (h) [Hit 270] h B.9.69
360 (h) [Hit 360] h B.9.70
470 (a) [Hit 470] a B.9.71
408 (h) [Hit 408] h B.9.72
438 (h) [Hit 438] h B.9.73

Vibration, Dynamics & Noise Page 96 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.6 Vibration Data


B.6.1 Vibration Data – As Found Vibration
Fig: B.6.1
Spectrum TP: 220 (h)
1.5 Channel: 1 P:BMA-Pipe

1.4 Date: May 30, 2016 02:23


Setup:
1.3 1 Note:

1.2 Freq. Magnitude


2 # Hz ips Pk
1.1 1 89.7 1.28E+00
3
2 48.8 1.13E+00
1.0 3 64.7 1.04E+00
4 60.9 8.63E-01
0.9 5 161.6 7.99E-01
Magnitude (ips Pk)

4
5 6 162.2 7.79E-01
0.8 6 7 162.8 7.17E-01
7 8 163.4 6.62E-01
0.7 8 9 57.5 6.14E-01
9 10 45.3 5.63E-01
0.6 10 11 158.8 5.35E-01
11
12 16.9 3.81E-01
0.5 13 166.9 3.76E-01
14 155.9 3.72E-01
0.4 12
16
14 13
1517 15 165.9 3.51E-01
19 18 16 76.6 3.47E-01
0.3 20 17 173.4 3.33E-01
0.2 18 179.4 2.91E-01
19 85.3 2.90E-01
0.1 20 181.3 2.50E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00022\G1, 1_P1sv00000 - 220 215.csv

Spectrum TP: 215 (-v)


1.6 Channel: 2 P:BMA-Pipe
Date: May 30, 2016 02:23
1 Setup:
1.4 Note:

Freq. Magnitude
# Hz ips Pk
1.2 1 48.8 1.41E+00
2 45.3 6.25E-01
3 161.6 5.97E-01
1.0 4 162.2 5.75E-01
5 162.8 5.17E-01
Magnitude (ips Pk)

6 163.4 4.78E-01
7 31.9 4.13E-01
0.8 8 158.8 4.13E-01
9 64.7 3.71E-01
2
10 57.5 3.49E-01
0.6 3
4 11 16.6 3.21E-01
5
12 56.3 3.07E-01
6 13 166.9 2.94E-01
7 8 14 173.4 2.87E-01
0.4 10
9 15 76.9 2.64E-01
11 12 16 171.9 2.16E-01
1314
15 17 171.3 2.14E-01
1920 17
16
18 18 174.7 2.06E-01
0.2 19 66.6 2.04E-01
20 73.4 1.91E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00022\G2, 2_P1sv00000 - 220 215.csv

Spectrum TP: 220 (h)


1.4 Channel: 3 P:BMA-Pipe
Date: May 30, 2016 02:23
1 Setup:
1.2 Note:

Freq. Magnitude
# Hz ips Pk
1 64.7 1.24E+00
1.0 2 196.3 5.43E-01
3 68.4 4.18E-01
4 197.5 3.98E-01
5 89.7 3.06E-01
Magnitude (ips Pk)

0.8 6 161.6 2.90E-01


7 76.9 2.90E-01
8 162.2 2.64E-01
9 200.3 2.60E-01
0.6 10 179.1 2.58E-01
2
11 178.4 2.58E-01
12 162.8 2.43E-01
3 13 163.4 2.40E-01
4
0.4 14 56.3 2.28E-01
15 159.1 2.01E-01
7 5 6 16 110.3 1.92E-01
8 10 9
14 13 11
12 17 217.2 1.86E-01
16 15
0.2 19 20 18 17 18 111.9 1.84E-01
19 33.4 1.73E-01
20 50.3 1.65E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00022\G3, 3_P1sv00000 - 220 215.csv

Spectrum TP: 215 (-v)


1.00
Channel: 4 P:BMA-Pipe

Date: May 30, 2016 02:23


0.90 12 Setup:
Note:

0.80 Freq. Magnitude


# Hz ips Pk
1 60.9 8.83E-01
0.70 2 63.4 8.81E-01
3 57.8 5.23E-01
4 73.4 4.47E-01
0.60 5 161.6 3.09E-01
Magnitude (ips Pk)

6 170.9 2.92E-01
3
7 162.2 2.91E-01
0.50 8 162.8 2.76E-01
4 9 76.9 2.62E-01
10 163.4 2.62E-01
0.40 11 69.1 2.51E-01
12 159.1 2.17E-01
5 13 45.3 2.06E-01
0.30 7 6
8 14 67.5 2.03E-01
11 9 10
12
15 80.6 1.88E-01
13 14 16 164.7 1.87E-01
0.20 15 16
17 19 18 20 17 48.1 1.62E-01
18 166.6 1.61E-01
0.10 19 112.8 1.54E-01
20 175.3 1.53E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00022\G4, 4_P1sv00000 - 220 215.csv

Vibration, Dynamics & Noise Page 97 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.2
Spectrum TP: 220 (a)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 02:35
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 33.4 6.80E-01
2 64.7 6.51E-01
3 90.0 5.87E-01
0.7 1 4 159.4 5.32E-01
2
5 157.8 4.72E-01
Magnitude (ips Pk)

0.6 3 6 161.9 4.21E-01


7 156.3 3.52E-01
4 8 173.8 3.11E-01
0.5 5 9 132.2 2.76E-01
10 175.6 2.68E-01
6 11 16.9 2.44E-01
0.4 12 145.3 2.41E-01
7
13 113.4 2.40E-01
8
0.3 14 112.8 2.40E-01
9 10
11 12
15 176.9 2.36E-01
1316
14 18 17 15
20 19 16 119.1 2.34E-01
0.2 17 145.9 2.33E-01
18 120.9 2.30E-01
19 144.4 2.23E-01
0.1 20 117.5 2.22E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00023\G1, 1_P1sv00000 - 220 C4.csv

Spectrum TP: Cylinder 4 (h)


0.77
Channel: 2 C:BMA-Cylinder

Date: May 30, 2016 02:35


Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 177.5 3.83E-01
0.55 2 178.1 3.69E-01
3 179.4 3.41E-01
4 181.6 3.23E-01
5 182.2 3.22E-01
Magnitude (ips Pk)

0.44 6 180.3 3.20E-01


1 7 65.0 3.06E-01
2 8 16.6 2.67E-01
3 9 173.4 2.01E-01
0.33 7
645 10 200.3 1.89E-01
11 195.0 1.43E-01
8 12 89.4 1.42E-01
13 68.1 1.40E-01
0.22 9 14 194.1 1.36E-01
10 15 32.5 1.30E-01
12 11 16 161.9 1.26E-01
13 14
15 16
17
18
17 162.8 1.20E-01
19
0.11 20 18 163.8 1.16E-01
19 193.1 1.14E-01
20 77.8 1.01E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00023\G2, 2_P1sv00000 - 220 C4.csv

Spectrum TP: Cylinder 4 (v)


1.5 Channel: 3 C:BMA-Cylinder

1.4 Date: May 30, 2016 02:35


1 Setup:
1.3 Note:

1.2 Freq. Magnitude


# Hz ips Pk
1.1 1 64.7 1.32E+00
2 76.6 5.21E-01
1.0 3 68.1 4.96E-01
4 55.9 3.46E-01
0.9 5 73.4 2.75E-01
Magnitude (ips Pk)

6 178.8 2.74E-01
0.8 7 178.1 2.71E-01
8 180.3 2.52E-01
0.7 9 181.6 2.51E-01
10 182.5 2.45E-01
0.6 11 45.0 2.40E-01
2 12 110.0 2.39E-01
3
0.5 13 183.8 2.37E-01
14 184.4 2.36E-01
0.4 15 185.0 2.29E-01
4
16 110.9 2.28E-01
0.3 5 76
11 12
16
813
914
1015 17 82.5 2.08E-01
17
18
19
20 18 85.3 2.07E-01
0.2
19 81.3 2.01E-01
0.1 20 84.1 1.93E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00023\G3, 3_P1sv00000 - 220 C4.csv

Spectrum TP: Cylinder 4 (-a)


0.80 Channel: 4 C:BMA-Cylinder
Date: May 30, 2016 02:35
1 Setup:
0.70 Note:

Freq. Magnitude
# Hz ips Pk
0.60
1 33.4 7.11E-01
2 76.3 3.47E-01
3 16.9 2.84E-01
0.50 4 140.9 2.20E-01
5 40.0 1.93E-01
Magnitude (ips Pk)

6 45.6 1.92E-01
7 245.9 1.86E-01
0.40 8 46.3 1.81E-01
2 9 61.3 1.78E-01
10 63.1 1.77E-01
0.30 11 244.1 1.66E-01
3
12 247.5 1.62E-01
13 243.4 1.60E-01
4 14 41.6 1.48E-01
0.20 56 7 15 64.4 1.47E-01
8 910
1112
13 16 242.8 1.45E-01
14 15 16
18 17
20 19 17 70.9 1.34E-01
18 49.1 1.26E-01
0.10 19 145.3 1.25E-01
20 89.7 1.20E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00023\G4, 4_P1sv00000 - 220 C4.csv

Vibration, Dynamics & Noise Page 98 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.3
Spectrum TP: 217 (h)
1.5 Channel: 1 P:BMA-Pipe

1.4 Date: May 30, 2016 02:43


Setup:
1.3 1 Note:

1.2 Freq. Magnitude


# Hz ips Pk
1.1 1 48.4 1.27E+00
2 45.0 6.04E-01
1.0 3 89.4 5.65E-01
4 55.9 5.28E-01
0.9 5 57.2 5.17E-01
Magnitude (ips Pk)

6 64.4 4.03E-01
0.8 7 60.9 3.82E-01
8 62.8 3.64E-01
0.7 9 200.3 2.29E-01
2 10 183.4 2.05E-01
0.6 3 11 182.5 2.02E-01
45
12 196.9 2.02E-01
0.5 13 30.9 1.91E-01
6 14 163.4 1.70E-01
0.4 78
15 198.4 1.69E-01
16 73.1 1.62E-01
0.3 17 109.4 1.62E-01
9
13 10 12
11 18 173.4 1.46E-01
0.2 16 17 14 15
2019 18 19 25.0 1.42E-01
0.1 20 16.9 1.42E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00024\G1, 1_P1sv00000 - 217 C6.csv

Spectrum TP: Cylinder 6 (h)


0.77
Channel: 2 C:BMA-Cylinder

Date: May 30, 2016 02:43


Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 16.9 2.68E-01
0.55 2 76.3 2.49E-01
3 64.4 2.48E-01
4 61.3 2.43E-01
5 176.6 2.11E-01
Magnitude (ips Pk)

0.44 6 177.2 2.11E-01


7 33.4 2.00E-01
8 57.2 1.95E-01
9 175.3 1.92E-01
0.33 10 179.7 1.61E-01
11 109.4 1.59E-01
1 12 159.4 1.47E-01
43 2
13 89.4 1.44E-01
0.22 7 8
56 14 160.0 1.38E-01
9
15 157.5 1.37E-01
11 10 16 156.6 1.31E-01
13 12
15
14
17 16 17 114.1 1.26E-01
20 18 19
0.11 18 115.0 1.21E-01
19 146.9 1.19E-01
20 30.6 1.18E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00024\G2, 2_P1sv00000 - 217 C6.csv

Spectrum TP: Cylinder 6 (v)


0.70 Channel: 3 C:BMA-Cylinder

Date: May 30, 2016 02:43


1 Setup:
0.60 Note:

Freq. Magnitude
# Hz ips Pk
1 61.3 6.25E-01
0.50 2 57.2 4.75E-01
2
3 73.4 4.07E-01
4 89.4 3.79E-01
3 5 76.6 3.30E-01
Magnitude (ips Pk)

0.40 4 6 48.1 3.08E-01


7 109.4 2.93E-01
5 8 45.0 2.82E-01
6 9 68.8 2.10E-01
0.30 8
7
10 169.1 1.87E-01
11 170.9 1.86E-01
12 66.6 1.53E-01
9 13 163.4 1.52E-01
0.20 10
11 14 15.9 1.52E-01
12
15 113.8 1.44E-01
14 15 13
17 16 16 172.5 1.42E-01
18
19 17 80.6 1.38E-01
20
0.10 18 128.8 1.19E-01
19 129.7 1.16E-01
20 160.9 1.08E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00024\G3, 3_P1sv00000 - 217 C6.csv

Spectrum TP: Cylinder 6 (-a)


0.70 Channel: 4 C:BMA-Cylinder
Date: May 30, 2016 02:43
1
Setup:
0.60 Note:

Freq. Magnitude
# Hz ips Pk
1 33.4 6.10E-01
0.50 2 76.3 3.34E-01
3 16.9 3.25E-01
4 45.0 2.15E-01
5 46.3 2.08E-01
Magnitude (ips Pk)

0.40 6 40.0 1.83E-01


7 70.9 1.74E-01
3 2 8 49.7 1.72E-01
9 61.9 1.60E-01
0.30 10 140.9 1.55E-01
11 61.3 1.53E-01
12 41.6 1.50E-01
45 13 89.4 1.49E-01
0.20 6 14 181.3 1.35E-01
8 7
9
11 10 15 181.9 1.33E-01
12 13
14
15
16 16 179.7 1.33E-01
18 17
19
20 17 242.8 1.23E-01
0.10 18 68.4 1.22E-01
19 244.4 1.22E-01
20 243.4 1.21E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00024\G4, 4_P1sv00000 - 217 C6.csv

Vibration, Dynamics & Noise Page 99 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.4
Spectrum TP: 217 (-v)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 02:52
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 196.3 3.76E-01
2 55.9 3.02E-01
3 56.9 2.86E-01
0.7 4 76.3 2.83E-01
5 60.6 2.59E-01
Magnitude (ips Pk)

0.6 6 73.1 2.35E-01


7 215.6 1.85E-01
8 66.6 1.82E-01
0.5 9 216.3 1.79E-01
10 64.4 1.69E-01
11 44.7 1.63E-01
0.4 1 12 80.3 1.47E-01
13 89.7 1.33E-01
2 14 179.1 1.32E-01
0.3 3 4
5 15 200.0 1.26E-01
6
16 191.9 1.25E-01
0.2 11 10
8 79 17 50.3 1.24E-01
12 13
14 1615 18 866.6 1.09E-01
17
19 20 18 19 168.8 1.07E-01
0.1 20 221.6 1.06E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00025\G1, 1_P1sv00000 - 217 230.csv

Spectrum TP: 230 (h)


1.3
Channel: 2 P:BMA-Pipe

1.2 Date: May 30, 2016 02:52


1 Setup:
2 Note:
1.1 34
5
6 Freq. Magnitude
1.0 # Hz ips Pk
1 75.9 1.16E+00
0.9 2 182.2 1.11E+00
7 3 183.4 1.08E+00
0.8 8 4 184.1 1.08E+00
9 5 178.4 1.02E+00
Magnitude (ips Pk)

6 179.4 1.00E+00
0.7 7 64.1 8.26E-01
8 186.3 7.79E-01
0.6 10
9 68.4 7.54E-01
11
12
10 55.9 5.89E-01
0.5 11 71.6 5.46E-01
13
14 12 78.8 5.06E-01
16 18 15 1719
0.4 20 13 233.1 4.44E-01
14 233.8 4.43E-01
15 204.4 4.18E-01
0.3 16 48.1 4.18E-01
17 227.8 4.12E-01
0.2 18 173.1 4.12E-01
19 231.9 4.00E-01
0.1 20 226.9 3.98E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00025\G2, 2_P1sv00000 - 217 230.csv

Spectrum TP: 230 (v)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 02:52


1.0 Setup:
1 Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 64.4 9.46E-01
2 195.3 6.81E-01
3 193.4 4.42E-01
0.7 2 4 184.1 3.95E-01
5 183.1 3.95E-01
Magnitude (ips Pk)

0.6 6 182.5 3.77E-01


7 66.6 3.72E-01
8 217.2 3.67E-01
0.5 9 215.6 3.61E-01
3 10 215.0 3.51E-01
54 11 186.3 3.38E-01
0.4 7 6 12 68.1 3.34E-01
98
10
12 11 13 179.7 3.21E-01
13
0.3 14 76.3 2.53E-01
14 15 15 218.4 2.52E-01
17 16 16 219.7 2.27E-01
20 18 19
0.2 17 190.3 2.23E-01
18 189.7 2.18E-01
19 222.8 2.11E-01
0.1 20 177.5 2.09E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00025\G3, 3_P1sv00000 - 217 230.csv

Spectrum TP: 230 (a)


1.1 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 02:52
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 64.1 4.67E-01
2 62.8 4.29E-01
3 33.4 4.25E-01
0.7 4 75.9 3.51E-01
5 109.7 2.31E-01
Magnitude (ips Pk)

0.6 6 16.6 2.16E-01


7 66.6 1.80E-01
8 89.4 1.68E-01
0.5 1
9 57.2 1.68E-01
2
10 70.6 1.64E-01
3
11 45.0 1.53E-01
0.4 12 46.6 1.35E-01
4
13 40.0 1.34E-01
0.3 14 72.8 1.11E-01
15 335.9 1.11E-01
5 16 78.8 1.09E-01
6
0.2 9 710 8 17 335.0 1.07E-01
11 18 637.2 1.02E-01
1312
1416 15
17 18
19 19 636.6 9.86E-02
20
0.1 20 168.4 9.44E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00025\G4, 4_P1sv00000 - 217 230.csv

Vibration, Dynamics & Noise Page 100 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.5
Spectrum TP: 420 (-a)
1.2 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 03:02
Setup:
1
Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 63.8 1.04E+00
2 2 75.9 8.30E-01
0.8 3 59.7 6.95E-01
4 83.8 6.81E-01
3 5 102.2 6.60E-01
Magnitude (ips Pk)

4
5 6 32.2 5.35E-01
7 33.4 5.17E-01
0.6 8 93.4 4.75E-01
6 9 87.8 4.54E-01
7
8 10 109.4 3.59E-01
9 11 72.5 3.57E-01
12 91.6 3.57E-01
0.4 13 11 12 10 13 57.2 3.57E-01
15 14
16
14 217.2 3.56E-01
1817 15 56.3 3.49E-01
19
20 16 178.4 3.37E-01
17 95.9 2.95E-01
0.2
18 90.0 2.88E-01
19 80.3 2.62E-01
20 70.0 2.47E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00026\G1, 1_P1sv00000 - 420 415.csv

Spectrum TP: 415 (-a)


1.8
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 03:02


Setup:
1 Note:
1.5
Freq. Magnitude
# Hz ips Pk
1 75.9 1.51E+00
2 32.2 1.07E+00
1.2 3 33.4 1.01E+00
4 30.9 9.72E-01
2
5 72.5 8.72E-01
Magnitude (ips Pk)

3
4 6 60.3 8.36E-01
7 83.8 8.15E-01
0.9 6
5 8 45.0 6.30E-01
7
9 80.0 5.53E-01
10 81.9 4.58E-01
11 28.4 4.40E-01
8
12 68.1 3.86E-01
0.6 9 13 90.6 3.24E-01
10 14 214.7 3.20E-01
11 15 213.8 3.12E-01
12
16 212.8 2.97E-01
13 14
15
17 19 18 16 17 39.1 2.96E-01
0.3 20
18 65.0 2.88E-01
19 56.6 2.80E-01
20 182.2 2.78E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00026\G2, 2_P1sv00000 - 420 415.csv

Spectrum TP: 420 (v)


2.4 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 03:02


1 Setup:
Note:
2.0
2 Freq. Magnitude
# Hz ips Pk
1 75.6 2.12E+00
2 72.5 1.87E+00
1.6 3 63.8 7.87E-01
4 84.1 6.51E-01
5 59.7 6.34E-01
Magnitude (ips Pk)

6 213.8 5.73E-01
7 214.4 5.71E-01
1.2 8 212.8 5.70E-01
9 217.2 5.56E-01
10 210.0 5.39E-01
11 211.3 5.30E-01
3 12 208.8 4.87E-01
0.8 13 82.2 4.84E-01
5 4 14 206.6 4.28E-01
867 15 204.7 4.01E-01
119
10
13 12 16 205.3 3.97E-01
14
0.4 15
16
17 17 203.8 3.70E-01
19
20 18
18 315.6 3.47E-01
19 200.6 3.45E-01
20 201.3 3.45E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00026\G3, 3_P1sv00000 - 420 415.csv

Spectrum TP: 415 (v)


1.6 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 03:02
1 Setup:
1.4 Note:
2
Freq. Magnitude
# Hz ips Pk
1.2
1 64.4 1.42E+00
2 56.9 1.31E+00
3 3 72.2 1.03E+00
1.0 4 59.4 9.39E-01
4 5 60.6 8.44E-01
Magnitude (ips Pk)

5
6 68.1 7.93E-01
6 7 75.6 3.65E-01
0.8 8 53.8 3.64E-01
9 315.6 3.57E-01
10 79.4 3.56E-01
0.6 11 316.6 3.14E-01
12 182.2 3.09E-01
13 317.5 2.58E-01
14 84.1 2.52E-01
0.4 8 710 9 15 32.5 2.36E-01
12 11 16 318.4 2.30E-01
14 13 17 33.4 2.28E-01
15
19
17 18
20 16
18 176.6 2.27E-01
0.2 19 31.9 2.26E-01
20 175.9 2.23E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00026\G4, 4_P1sv00000 - 420 415.csv

Vibration, Dynamics & Noise Page 101 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.6
Spectrum TP: 420 (-h)
1.2 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 03:12
1 Setup:
Note:
1.0
Freq. Magnitude
2 # Hz ips Pk
3 1 72.2 1.06E+00
4 2 70.6 8.87E-01
0.8 5 3 55.9 8.59E-01
7 6 4 59.1 8.20E-01
5 64.4 7.63E-01
Magnitude (ips Pk)

8
6 75.3 7.30E-01
7 66.6 7.30E-01
0.6 8 68.4 6.80E-01
9 182.5 5.01E-01
9
10 10 61.6 4.77E-01
11 82.8 3.95E-01
11 12 16.9 3.55E-01
0.4 13 14.7 3.23E-01
12
13 14 15 14 33.4 3.17E-01
15 180.6 3.07E-01
18 17
16 16 176.9 2.24E-01
20 19 17 176.3 2.24E-01
0.2
18 44.4 2.23E-01
19 216.6 2.10E-01
20 152.8 2.10E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00027\G1, 1_P1sv00000 - 420 c2.csv

Spectrum TP: Cylinder 2 (h)


0.77
Channel: 2 C:BMA-Cylinder

Date: May 30, 2016 03:12


Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 210.9 3.47E-01
0.55 2 210.3 3.20E-01
3 16.9 3.11E-01
4 214.4 3.01E-01
5 208.4 2.98E-01
Magnitude (ips Pk)

0.44 6 209.7 2.91E-01


7 212.8 2.87E-01
8 33.4 2.82E-01
1 9 182.2 2.81E-01
0.33 3 2 10 206.6 2.60E-01
564
8 9 7 11 217.2 2.47E-01
10
11
12 205.3 2.22E-01
12
13 180.3 1.91E-01
0.22 14 153.1 1.75E-01
13
14 15
16
15 176.3 1.69E-01
117
18 920 16 175.6 1.69E-01
17 60.0 1.60E-01
0.11 18 55.9 1.57E-01
19 59.1 1.56E-01
20 66.6 1.51E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00027\G2, 2_P1sv00000 - 420 c2.csv

Spectrum TP: Cylinder 2 (v)


1.8 Channel: 3 C:BMA-Cylinder

Date: May 30, 2016 03:12


Setup:
Note:
1.5 1 2
Freq. Magnitude
# Hz ips Pk
1 64.1 1.47E+00
2 75.6 1.46E+00
1.2 3 56.3 9.67E-01
4 60.3 6.73E-01
5 61.3 6.70E-01
Magnitude (ips Pk)

3 6 59.1 6.59E-01
7 82.5 3.28E-01
0.9 8 33.4 2.63E-01
9 44.7 2.04E-01
10 49.1 2.04E-01
645 11 31.3 2.01E-01
12 48.1 1.96E-01
0.6 13 91.3 1.92E-01
14 93.4 1.92E-01
15 16.6 1.61E-01
16 217.2 1.52E-01
7
0.3 17 15.0 1.33E-01
8
18 86.3 1.31E-01
11 912
10 13
14
15 16 19 96.3 1.25E-01
20 17 18 19 20 5.3 1.17E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00027\G3, 3_P1sv00000 - 420 c2.csv

Spectrum TP: Cylinder 2 (-a)


1.2 Channel: 4 C:BMA-Cylinder
Date: May 30, 2016 03:12
1 Setup:
2
3
Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 33.4 1.07E+00
2 32.2 1.04E+00
0.8 3 30.9 1.00E+00
4 44.7 5.31E-01
5 75.6 4.55E-01
Magnitude (ips Pk)

6 47.8 3.73E-01
7 28.4 3.69E-01
0.6 8 16.6 3.40E-01
4 9 60.0 3.19E-01
10 38.8 3.14E-01
5 11 27.5 3.10E-01
12 59.4 3.09E-01
0.4 7 6 13 63.4 2.98E-01
8
11 10 9
12 14 82.8 2.62E-01
13
15 87.2 1.83E-01
14
16 229.4 1.69E-01
0.2 15 17 228.8 1.68E-01
18 17
16
19
20 18 56.3 1.66E-01
19 227.5 1.59E-01
20 230.6 1.58E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00027\G4, 4_P1sv00000 - 420 c2.csv

Vibration, Dynamics & Noise Page 102 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.7
Spectrum TP: 414 (h)
2.0 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 03:23
1.8 Setup:
1 Note:

1.6 Freq. Magnitude


# Hz ips Pk
1 45.6 1.73E+00
1.4 2 2 44.1 1.36E+00
3 87.2 8.49E-01
4 58.8 7.33E-01
1.2 5 56.3 6.30E-01
Magnitude (ips Pk)

6 182.5 5.63E-01
7 60.0 5.39E-01
1.0 8 82.5 5.28E-01
3
9 120.0 4.49E-01
10 244.4 4.34E-01
0.8 4 11 246.6 4.29E-01
12 33.1 4.26E-01
5
13 243.8 4.26E-01
0.6 7 8
6
14 245.3 4.13E-01
9 15 31.9 4.02E-01
12 10
11
13
14
15 16 17 16 119.1 3.92E-01
0.4 19 18 20
17 247.8 3.90E-01
18 89.1 3.82E-01
0.2 19 66.3 3.81E-01
20 153.4 3.73E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00028\G1, 1_P1sv00000 - 414 410.csv

Spectrum TP: 414 (-a)


5.0
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 03:23


4.5 1 Setup:
Note:

4.0 Freq. Magnitude


# Hz ips Pk
1 59.1 4.41E+00
3.5 2 56.3 2.73E+00
3 63.4 1.70E+00
4 182.5 1.64E+00
3.0 5 45.0 1.56E+00
Magnitude (ips Pk)

2 6 33.4 1.39E+00
7 82.5 1.36E+00
2.5 8 75.0 1.31E+00
9 31.9 1.31E+00
10 177.5 9.84E-01
2.0 11 86.9 9.22E-01
3 4 12 176.3 9.05E-01
5 13 53.8 8.77E-01
1.5 6
9 87 14 185.0 8.33E-01
15 180.0 8.23E-01
10 16 192.5 7.34E-01
1.0 13 11 12
1514 17 191.9 7.26E-01
16
17
1819
20 18 193.8 7.15E-01
0.5 19 201.6 7.15E-01
20 38.1 6.49E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00028\G2, 2_P1sv00000 - 414 410.csv

Spectrum TP: 410 (h)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 03:23


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 66.6 6.32E-01
2 44.4 5.76E-01
3 60.0 3.02E-01
0.7 4 75.3 2.32E-01
5 58.1 2.11E-01
Magnitude (ips Pk)

1
0.6 6 73.1 1.92E-01
2
7 89.7 1.81E-01
8 87.2 1.76E-01
0.5 9 48.4 1.72E-01
10 82.8 1.72E-01
11 74.1 1.71E-01
0.4 12 64.1 1.52E-01
13 71.3 1.48E-01
3 14 55.9 1.45E-01
0.3
15 56.9 1.36E-01
4
5 16 182.8 9.61E-02
0.2 6 17 260.3 9.59E-02
9 11 1087
14 1213 18 217.2 9.31E-02
15
19 16 20 18 17 19 92.8 9.29E-02
0.1 20 192.5 8.68E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00028\G3, 3_P1sv00000 - 414 410.csv

Spectrum TP: 410 (v)


1.3 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 03:23
1.2 1 Setup:
Note:
1.1
Freq. Magnitude
1.0 2
# Hz ips Pk
1 82.5 1.15E+00
0.9 2 75.9 9.91E-01
3 78.4 7.47E-01
0.8 4 74.1 5.12E-01
5 80.0 4.77E-01
Magnitude (ips Pk)

3
6 70.6 2.41E-01
0.7 7 87.8 2.14E-01
8 88.4 2.09E-01
0.6 9 59.1 1.96E-01
4 10 208.4 1.48E-01
0.5 5 11 209.4 1.46E-01
12 210.0 1.45E-01
0.4 13 63.4 1.19E-01
14 211.9 1.05E-01
15 212.5 1.04E-01
0.3 16 107.8 9.50E-02
6
9
78 17 153.8 8.81E-02
0.2 18 105.0 8.36E-02
10
11
12
13 14
15
19 90.6 8.20E-02
16
0.1 20 19 18 17 20 56.6 7.67E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00028\G4, 4_P1sv00000 - 414 410.csv

Vibration, Dynamics & Noise Page 103 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.8
Spectrum TP: 430 (-a)
2.0 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 03:32
1.8 Setup:
1 Note:

1.6 Freq. Magnitude


# Hz ips Pk
2 1 74.4 1.69E+00
1.4 2 44.4 1.44E+00
3 81.6 9.94E-01
4 80.0 7.84E-01
1.2 5 55.9 4.25E-01
Magnitude (ips Pk)

6 47.5 4.05E-01
3 7 59.4 3.68E-01
1.0 8 30.9 3.11E-01
9 86.9 2.99E-01
4 10 90.9 2.32E-01
0.8 11 64.1 1.79E-01
12 92.2 1.75E-01
13 53.8 1.69E-01
0.6 14 16.6 1.68E-01
15 150.6 1.58E-01
6 5 16 49.4 1.47E-01
0.4 7
17 101.6 1.37E-01
8 9
10
18 148.1 1.33E-01
0.2 14 11 12 19 27.5 1.11E-01
1613 17 15
18 20 153.1 1.04E-01
19 20

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00029\G1, 1_P1sv00000 - 430 435.csv

Spectrum TP: 435 (-a)


2.0
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 03:32


1.8 1 Setup:
Note:
2
1.6 Freq. Magnitude
# Hz ips Pk
3
1 44.4 1.76E+00
1.4 2 74.1 1.63E+00
3 75.3 1.46E+00
4 58.1 8.71E-01
1.2 5 30.9 7.76E-01
Magnitude (ips Pk)

6 33.1 6.60E-01
7 81.6 5.07E-01
1.0 8 39.1 3.90E-01
4 9 40.0 3.71E-01
10 28.4 2.61E-01
0.8 5
11 161.6 2.47E-01
6 12 83.8 2.36E-01
13 90.9 2.35E-01
0.6 14 16.9 2.22E-01
7
15 27.5 2.18E-01
89 16 150.6 2.07E-01
0.4 17 85.3 1.95E-01
10
1213 11 18 66.9 1.64E-01
14 15 16
0.2 18
17 19 49.1 1.42E-01
20 19 20 35.3 1.38E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00029\G2, 2_P1sv00000 - 430 435.csv

Spectrum TP: 430 (v)


2.0 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 03:32


1.8 Setup:
1 Note:

1.6 Freq. Magnitude


# Hz ips Pk
1 74.1 1.71E+00
1.4 2 58.4 7.07E-01
3 90.9 5.14E-01
4 153.8 4.98E-01
1.2 5 155.3 4.25E-01
Magnitude (ips Pk)

6 63.4 4.03E-01
7 122.8 3.66E-01
1.0 8 61.3 2.94E-01
9 86.9 2.79E-01
10 117.5 2.25E-01
0.8 11 150.3 2.16E-01
2
12 93.4 2.09E-01
13 96.3 2.03E-01
0.6 14 160.3 1.98E-01
3 4
15 95.0 1.94E-01
5
6 16 254.4 1.88E-01
0.4 7
17 160.9 1.88E-01
8 9 18 215.0 1.84E-01
12
13 10 11 14
0.2 15 17 18
20
19 16 19 217.2 1.84E-01
20 215.6 1.84E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00029\G3, 3_P1sv00000 - 430 435.csv

Spectrum TP: 435 (v)


1.4 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 03:32
1 Setup:
1.2 Note:

2 Freq. Magnitude
# Hz ips Pk
1 63.8 1.23E+00
1.0 2 55.9 1.08E+00
3 70.9 7.12E-01
4 123.1 6.85E-01
5 153.8 6.39E-01
Magnitude (ips Pk)

0.8 6 154.7 6.13E-01


3 7 155.3 5.78E-01
4
8 60.0 3.98E-01
5
6 9 82.5 3.51E-01
0.6 7 10 160.3 3.30E-01
11 117.5 3.16E-01
12 160.9 3.11E-01
13 159.1 3.04E-01
8
0.4 9
14 150.3 2.94E-01
11 10
12 15 33.4 2.68E-01
14 13 16 91.3 2.65E-01
15 1716
18 17 86.9 2.64E-01
20 19
0.2 18 44.4 2.39E-01
19 181.9 2.14E-01
20 162.8 2.14E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00029\G4, 4_P1sv00000 - 430 435.csv

Vibration, Dynamics & Noise Page 104 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.9
Spectrum TP: 409 (h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 03:49
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 44.7 6.80E-01
2 66.3 3.51E-01
3 58.4 3.32E-01
0.7 1 4 55.9 3.29E-01
5 82.2 3.11E-01
Magnitude (ips Pk)

0.6 6 49.7 2.90E-01


7 48.4 2.79E-01
8 55.0 2.54E-01
0.5 9 60.9 1.89E-01
10 53.8 1.85E-01
11 78.1 1.71E-01
0.4 12 76.6 1.36E-01
2
43 13 80.0 1.10E-01
5
0.3 76
14 176.6 9.58E-02
8 15 259.1 8.18E-02
16 63.4 7.88E-02
0.2 10 9
11 17 150.6 7.52E-02
12 18 150.0 7.28E-02
13 19 72.5 7.21E-02
14
0.1 16 19 17
18 15
20 20 257.2 6.81E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00030\G1, 1_P1sv00000 - 435 436 409.csv

Spectrum TP: 409 (v)


1.4
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 03:49


Setup:
1 Note:
1.2
Freq. Magnitude
# Hz ips Pk
1 82.2 1.20E+00
1.0 2 78.1 6.46E-01
3 76.6 6.08E-01
4 75.3 5.58E-01
5 210.0 4.30E-01
Magnitude (ips Pk)

0.8 6 209.1 4.19E-01


7 72.5 4.14E-01
2 8 80.0 4.01E-01
3 9 210.9 3.60E-01
0.6 4 10 44.4 2.80E-01
11 206.6 2.63E-01
12 205.9 2.39E-01
7 8 65 13 212.5 2.30E-01
0.4 9 14 70.6 2.21E-01
15 213.4 1.97E-01
10 11 16 86.3 1.94E-01
14 1213 17 87.8 1.78E-01
16 15 18 203.1 1.56E-01
0.2 19
17
18
20 19 58.4 1.50E-01
20 219.4 1.31E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00030\G2, 2_P1sv00000 - 435 436 409.csv

Spectrum TP: 436 (h)


7.0 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 03:49


Setup:
6.0 1 Note:

Freq. Magnitude
# Hz ips Pk
1 122.8 5.94E+00
5.0 2 153.4 4.25E+00
3 154.4 3.37E+00
2 4 149.4 3.17E+00
5 148.1 3.15E+00
Magnitude (ips Pk)

4.0 6 58.1 3.10E+00


7 80.9 2.57E+00
3 8 55.9 2.43E+00
6 54 9 155.6 2.40E+00
3.0 10 71.6 2.39E+00
7 11 72.5 2.34E+00
8 10 9 12 78.4 2.29E+00
1112
13 76.9 1.99E+00
13
2.0 15 14 14 117.2 1.94E+00
15 73.8 1.94E+00
16 128.4 1.22E+00
16
19 18 17
20 17 159.7 1.20E+00
1.0 18 145.0 1.20E+00
19 132.5 1.19E+00
20 129.7 1.14E+00

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00030\G3, 3_P1sv00000 - 435 436 409.csv

Spectrum TP: 435 (h)


1.3 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 03:49
1.2 1
2 Setup:
Note:
1.1 3
4
Freq. Magnitude
1.0 # Hz ips Pk
1 122.8 1.16E+00
0.9 2 63.4 1.14E+00
5
3 80.9 1.08E+00
0.8 4 81.6 1.06E+00
5 78.1 8.62E-01
Magnitude (ips Pk)

6 6 61.3 6.91E-01
0.7 7 66.6 6.05E-01
7 8 72.8 4.74E-01
0.6 9 55.6 4.62E-01
10 58.1 4.14E-01
0.5 8 11 59.1 4.02E-01
9
12 117.2 4.00E-01
10
11 12
0.4 13 70.0 3.66E-01
13
14 74.1 3.20E-01
14
15 16 15 71.3 3.15E-01
0.3 17 16 210.9 3.07E-01
18 19
20
17 327.5 2.60E-01
0.2 18 88.4 2.51E-01
19 328.1 2.45E-01
0.1 20 326.9 2.40E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00030\G4, 4_P1sv00000 - 435 436 409.csv

Vibration, Dynamics & Noise Page 105 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.10
Spectrum TP: 210 (h)
2.0 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 04:03
1.8 Setup:
1 Note:

1.6 Freq. Magnitude


# Hz ips Pk
1 30.6 1.71E+00
1.4 2 33.4 7.41E-01
3 28.1 5.78E-01
4 89.7 4.22E-01
1.2 5 43.8 2.78E-01
Magnitude (ips Pk)

6 48.4 2.09E-01
7 49.1 2.08E-01
1.0 8 456.6 1.82E-01
9 16.3 1.61E-01
10 222.2 1.49E-01
0.8 2 11 161.3 1.38E-01
12 160.6 1.37E-01
13 338.1 1.36E-01
0.6 3
14 338.8 1.34E-01
15 457.8 1.34E-01
4
16 336.3 1.31E-01
0.4 17 78.1 1.30E-01
5 18 337.5 1.26E-01
67 19 315.9 1.24E-01
0.2 9 12
11 10 13
14
8
15
17 19 2016
18 20 329.1 1.24E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00031\G1, 1_P1sv00000 - 210 212.csv

Spectrum TP: 210 (a)


1.3
Channel: 2 P:BMA-Pipe

1.2 Date: May 30, 2016 04:03


Setup:
1
Note:
1.1
Freq. Magnitude
1.0 # Hz ips Pk
1 71.3 1.13E+00
0.9 2 63.1 8.34E-01
2 3 33.4 7.08E-01
0.8 4 61.3 5.70E-01
5 66.9 4.81E-01
Magnitude (ips Pk)

3 6 73.1 4.66E-01
0.7 7 75.0 3.34E-01
8 50.0 3.16E-01
0.6 4 9 77.8 3.15E-01
10 40.0 2.90E-01
0.5 56 11 16.6 2.71E-01
12 46.3 2.47E-01
0.4 13 27.5 2.40E-01
7 14 44.7 2.39E-01
8 9 15 68.4 2.11E-01
0.3 10
11 16 191.9 1.54E-01
13 12
14
15 17 191.3 1.53E-01
0.2 16 18 195.0 1.48E-01
17
18
20
19
19 193.1 1.44E-01
0.1 20 192.5 1.42E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00031\G2, 2_P1sv00000 - 210 212.csv

Spectrum TP: 212 (h)


3.0 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 04:03


2.7 Setup:
Note:
1
2.4 Freq. Magnitude
# Hz ips Pk
1 89.7 2.42E+00
2.1 2 30.6 7.31E-01
3 49.4 7.10E-01
4 60.6 6.77E-01
1.8 5 48.4 6.38E-01
Magnitude (ips Pk)

6 43.8 6.07E-01
7 78.1 5.92E-01
1.5 8 108.8 5.84E-01
9 62.2 5.21E-01
10 16.9 5.15E-01
1.2 11 161.6 3.46E-01
12 112.8 3.42E-01
13 425.9 3.17E-01
0.9 14 97.5 2.75E-01
2 3 4 15 163.1 2.72E-01
65 7 8 16 96.9 2.70E-01
0.6 10 9 17 99.7 2.69E-01
11
18 102.2 2.57E-01
12 13
0.3 19 14
16
120
7
18 15 19 41.6 2.55E-01
20 100.6 2.53E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00031\G3, 3_P1sv00000 - 210 212.csv

Spectrum TP: 212 (-v)


1.5 Channel: 4 P:BMA-Pipe

1.4 Date: May 30, 2016 04:03


1 Setup:
2
1.3 Note:

1.2 Freq. Magnitude


# Hz ips Pk
1.1 1 60.6 1.34E+00
2 71.3 1.31E+00
1.0 3 76.6 5.69E-01
4 83.4 5.66E-01
0.9 5 112.8 5.61E-01
Magnitude (ips Pk)

6 85.0 5.45E-01
0.8 7 55.6 5.22E-01
8 88.8 5.18E-01
0.7 9 80.0 5.00E-01
10 68.4 4.85E-01
0.6 34 5 11 78.4 4.69E-01
6
7 8
10 119 12 115.0 4.61E-01
0.5 12 13 116.9 4.15E-01
13 14 86.6 3.68E-01
0.4 14 15
16 15 98.8 3.50E-01
17 18 19 20 16 309.4 3.46E-01
0.3
17 54.1 3.41E-01
0.2 18 81.3 3.26E-01
19 310.0 3.24E-01
0.1 20 425.9 3.16E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00031\G4, 4_P1sv00000 - 210 212.csv

Vibration, Dynamics & Noise Page 106 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.11
Spectrum TP: 235 (h)
1.5 Channel: 1 P:BMA-Pipe

1.4 Date: May 30, 2016 04:12


Setup:
1.3 1 Note:

1.2 Freq. Magnitude


# Hz ips Pk
1.1 1 77.8 1.28E+00
2 69.7 9.91E-01
1.0 2
3 33.4 8.77E-01
4 43.8 8.56E-01
0.9 3 5 62.8 8.01E-01
Magnitude (ips Pk)

4
5 6 60.6 7.77E-01
0.8 6 7 47.8 7.15E-01
7 8 59.4 6.60E-01
0.7 98 10 9 58.8 6.57E-01
11 12 10 70.9 6.44E-01
0.6 11 16.6 6.15E-01
13 12 72.5 5.96E-01
0.5 14 13 90.0 5.06E-01
15
16 14 66.9 4.51E-01
0.4 15 57.2 4.28E-01
17 18
19 20 16 75.0 3.87E-01
0.3 17 81.9 3.34E-01
0.2 18 112.2 3.29E-01
19 113.4 3.11E-01
0.1 20 182.8 3.03E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00032\G1, 1_P1sv00000 - 235 232.csv

Spectrum TP: 232 (h)


1.1
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 04:12


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 43.8 7.00E-01
2 47.8 5.55E-01
1 3 810.6 5.52E-01
0.7 4 810.0 5.10E-01
5 33.4 4.75E-01
Magnitude (ips Pk)

0.6 6 809.1 4.27E-01


2 3 7 806.3 4.02E-01
4 8 699.4 3.85E-01
0.5 5 9 808.1 3.72E-01
10 806.9 3.66E-01
6
7 11 805.3 3.61E-01
0.4 8
109 12 379.4 3.09E-01
11
13 380.3 3.06E-01
12
13 14
0.3 15
14 804.4 3.04E-01
16 15 16.9 2.78E-01
19
20 17 18 16 819.4 2.63E-01
0.2 17 683.1 2.25E-01
18 812.5 2.21E-01
19 219.1 2.20E-01
0.1 20 219.7 2.19E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00032\G2, 2_P1sv00000 - 235 232.csv

Spectrum TP: 235 (v)


1.5 Channel: 3 P:BMA-Pipe

1.4 Date: May 30, 2016 04:12


1 Setup:
1.3 Note:
2
1.2 Freq. Magnitude
# Hz ips Pk
1.1 1 58.8 1.34E+00
2 60.6 1.21E+00
1.0 3 3 112.8 9.61E-01
4 77.8 7.80E-01
0.9 5 72.5 7.80E-01
Magnitude (ips Pk)

6 78.4 7.72E-01
0.8 54
7 6 7 69.7 7.55E-01
8
8 76.6 6.88E-01
0.7 10 9 9 84.4 6.56E-01
11 10 56.3 6.48E-01
0.6 11 71.3 6.19E-01
12 54.1 4.14E-01
0.5 13 122.2 4.02E-01
12 1715 1416
13 14 117.2 4.02E-01
0.4 18 15 89.4 4.00E-01
20 19 16 121.3 3.99E-01
0.3
17 81.9 3.96E-01
0.2 18 82.8 3.48E-01
19 108.4 3.06E-01
0.1 20 48.8 3.05E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00032\G3, 3_P1sv00000 - 235 232.csv

Spectrum TP: 232 (v)


1.1 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 04:12
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 58.8 4.47E-01
2 70.0 3.85E-01
3 70.9 3.29E-01
0.7 4 60.0 3.20E-01
5 72.5 2.80E-01
Magnitude (ips Pk)

0.6 6 43.8 2.54E-01


7 55.9 2.01E-01
8 54.1 1.79E-01
0.5 9 77.5 1.74E-01
1 10 76.3 1.69E-01
11 41.9 1.67E-01
0.4 2
12 810.6 1.57E-01
4 3 13 810.0 1.49E-01
0.3 5 14 809.4 1.43E-01
6 15 46.6 1.38E-01
16 112.8 1.31E-01
7
0.2 11 8 9
10 17 47.8 1.26E-01
12
13
15 1620 14 18 66.9 1.23E-01
17 18 19
19 807.8 1.22E-01
0.1 20 116.9 1.21E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00032\G4, 4_P1sv00000 - 235 232.csv

Vibration, Dynamics & Noise Page 107 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.12
Spectrum TP: 209 (h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 04:22
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 30.6 6.87E-01
2 117.2 5.26E-01
3 89.7 5.17E-01
0.7 1
4 32.8 3.78E-01
5 33.4 3.77E-01
Magnitude (ips Pk)

0.6 6 112.5 3.60E-01


7 71.6 3.37E-01
3 2 8 119.4 3.28E-01
0.5 9 115.3 2.82E-01
10 28.1 2.46E-01
11 125.6 2.32E-01
0.4 45 12 130.0 1.54E-01
6
7 8 13 99.7 1.48E-01
0.3 9 14 129.1 1.43E-01
10 15 48.4 1.41E-01
11 16 43.8 1.40E-01
0.2 17 62.5 1.30E-01
1615 17 18 13 12
14 18 78.1 1.29E-01
20 19 19 86.6 1.10E-01
0.1 20 60.9 1.01E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00033\G1, 1_P1sv00000 - 209 210sg.csv

Spectrum TP: 209 (-a)


1.6
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 04:22


1
Setup:
1.4 Note:

Freq. Magnitude
# Hz ips Pk
1.2
1 50.3 1.44E+00
2 42.5 9.19E-01
3 63.1 8.16E-01
1.0 4 62.5 8.07E-01
5 71.6 7.89E-01
Magnitude (ips Pk)

2
6 59.1 6.05E-01
43 5 7 46.3 6.01E-01
0.8 8 43.4 5.91E-01
9 66.9 4.99E-01
10 51.6 3.61E-01
87 6 11 33.4 3.54E-01
0.6
12 55.3 3.51E-01
9 13 40.0 3.45E-01
14 53.8 3.15E-01
0.4 1113 1012 15 73.4 2.84E-01
14 16 204.7 2.43E-01
15 17 78.8 2.17E-01
16
17 18 18 195.0 2.10E-01
0.2 19
20
19 194.4 1.92E-01
20 193.8 1.84E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00033\G2, 2_P1sv00000 - 209 210sg.csv

Spectrum TP: 209 (v)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 04:22


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 50.3 5.40E-01
2 89.4 3.78E-01
3 70.3 3.27E-01
0.7 4 42.2 2.72E-01
5 78.1 2.59E-01
Magnitude (ips Pk)

0.6 6 30.6 2.52E-01


7 85.9 2.12E-01
1
8 62.5 2.10E-01
0.5 9 85.3 2.00E-01
10 46.3 1.95E-01
11 91.6 1.94E-01
0.4 2 12 28.1 1.87E-01
3 13 60.9 1.76E-01
0.3 14 83.4 1.60E-01
4
6 5 15 75.3 1.52E-01
16 43.4 1.52E-01
10
8 9711
0.2 12 13 17 58.4 1.40E-01
16 17 1514 18 32.8 1.33E-01
18 19
20 19 51.6 1.24E-01
0.1 20 53.8 1.14E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00033\G3, 3_P1sv00000 - 209 210sg.csv

Spectrum TP: 210 Sight Glass (tan)


4.0 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 04:22
3.6 Setup:
Note:
1
3.2 Freq. Magnitude
# Hz ips Pk
1 96.9 3.30E+00
2.8 2 71.6 6.60E-01
3 90.0 6.51E-01
4 63.1 3.68E-01
2.4 5 62.5 3.58E-01
Magnitude (ips Pk)

6 78.1 3.17E-01
7 33.4 3.15E-01
2.0 8 73.4 2.91E-01
9 66.9 2.85E-01
10 181.3 2.73E-01
1.6 11 60.9 2.47E-01
12 190.9 2.40E-01
13 195.0 2.37E-01
1.2 14 195.6 2.25E-01
15 193.1 2.19E-01
16 193.8 2.12E-01
0.8 2 3 17 112.5 2.05E-01
18 75.0 2.04E-01
0.4 54 6 19 117.2 1.89E-01
7 8
119 18 1719
10 1213
15
14
16 20 50.0 1.85E-01
20

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00033\G4, 4_P1sv00000 - 209 210sg.csv

Vibration, Dynamics & Noise Page 108 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.13
Spectrum TP: 436 (v)
6.0 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 04:39
Setup:
Note:
5.0 21
3 4 Freq. Magnitude
5 # Hz ips Pk
6
1 77.2 4.91E+00
9 87 2 76.6 4.89E+00
4.0 3 57.8 4.70E+00
4 75.9 4.68E+00
5 83.4 4.45E+00
Magnitude (ips Pk)

10
11 6 82.5 4.19E+00
12
7 81.3 4.06E+00
3.0 14 13 8 80.6 4.06E+00
15 9 60.3 4.03E+00
10 55.6 3.32E+00
11 55.0 3.31E+00
12 56.6 3.18E+00
2.0 13 153.8 2.84E+00
16 17 14 62.5 2.84E+00
19 18 15 123.1 2.68E+00
20
16 85.6 1.71E+00
17 152.2 1.63E+00
1.0
18 150.6 1.35E+00
19 43.1 1.33E+00
20 150.0 1.29E+00

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00034\G1, 1_P1sv00000 - 436 fr front.csv

Spectrum TP: 436 (-a)


1.8
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 04:39


Setup:
Note:
1
1.5 2
Freq. Magnitude
# Hz ips Pk
3
45 1 73.1 1.50E+00
6 2 81.6 1.46E+00
1.2 3 78.1 1.32E+00
4 75.9 1.28E+00
7 8 5 79.7 1.27E+00
Magnitude (ips Pk)

6 71.9 1.24E+00
9 10 7 57.8 1.05E+00
0.9 11 8 83.4 1.05E+00
9 43.1 9.25E-01
10 150.0 9.22E-01
12 11 151.3 8.37E-01
14 13
12 66.9 6.83E-01
0.6 13 159.4 6.59E-01
15
16
14 65.9 6.38E-01
19 1718
20 15 64.4 5.34E-01
16 85.6 5.06E-01
17 146.9 4.28E-01
0.3
18 153.1 4.21E-01
19 45.6 4.19E-01
20 147.5 4.17E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00034\G2, 2_P1sv00000 - 436 fr front.csv

Spectrum TP: Frame Front (h)


0.55 Channel: 3 F:BMA-Frame

Date: May 30, 2016 04:39


0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 73.1 3.10E-01
2 75.3 2.72E-01
3 16.9 2.26E-01
0.35 4 30.6 2.18E-01
5 33.4 1.63E-01
Magnitude (ips Pk)

1
0.30 6 45.6 1.59E-01
2
7 90.0 1.45E-01
8 122.5 1.28E-01
0.25 9 123.1 1.28E-01
3 10 62.2 1.22E-01
4
11 121.6 1.14E-01
0.20 12 67.8 1.14E-01
5 6 13 180.9 1.04E-01
0.15 7 14 181.6 1.03E-01
10 89 15 85.9 9.63E-02
12 11 16 43.1 9.60E-02
13
14
0.10 1617 15 17 48.8 9.56E-02
18 19
20
18 116.9 8.90E-02
19 203.4 8.81E-02
0.05 20 205.0 8.66E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00034\G3, 3_P1sv00000 - 436 fr front.csv

Spectrum TP: Frame Front (-v)


0.55 Channel: 4 F:BMA-Frame
Date: May 30, 2016 04:39
0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 33.4 1.89E-01
2 70.9 1.80E-01
3 73.1 1.54E-01
0.35 4 74.4 1.34E-01
5 16.9 9.95E-02
Magnitude (ips Pk)

0.30 6 57.5 9.85E-02


7 65.3 9.19E-02
8 219.7 8.91E-02
0.25 9 53.4 8.58E-02
10 221.6 8.43E-02
11 64.7 8.32E-02
0.20 1 12 48.1 8.28E-02
2
13 87.5 7.97E-02
3
0.15 14 215.6 7.82E-02
4 15 216.9 7.65E-02
16 83.4 7.54E-02
5 6 7
0.10 129 11 8
10 17 225.9 7.51E-02
1613
1820 19 14
15 17 18 54.7 7.46E-02
19 80.3 7.35E-02
0.05 20 62.8 7.15E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00034\G4, 4_P1sv00000 - 436 fr front.csv

Vibration, Dynamics & Noise Page 109 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.14
Spectrum TP: Engine Front (h)
0.55 Channel: 1 EW:BMA-Waukesha Engine
Date: May 30, 2016 04:51
0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
1
0.40 1 16.9 4.00E-01
2 48.8 3.15E-01
3 47.2 3.08E-01
0.35 4 23.8 2.60E-01
5 31.6 1.33E-01
Magnitude (ips Pk)

32
0.30 6 57.2 1.21E-01
7 56.3 1.19E-01
4 8 26.6 1.18E-01
0.25 9 29.1 1.09E-01
10 66.3 1.05E-01
11 65.3 1.01E-01
0.20 12 91.9 9.70E-02
13 53.8 9.61E-02
0.15 14 90.3 9.14E-02
5 15 89.4 8.90E-02
8 76
9 10 16 40.9 8.87E-02
0.10 13 11 12
14
15 17 107.8 7.92E-02
16
17
19
120
8
18 110.9 7.88E-02
19 109.4 7.86E-02
0.05 20 111.9 7.46E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00035\G1, 1_P1sv00000 - engine hv.csv

Spectrum TP: Engine Front (v)


0.55
Channel: 2 EW:BMA-Waukesha Engine

Date: May 30, 2016 04:51


0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 16.9 1.89E-01
2 31.6 1.30E-01
3 25.0 8.63E-02
0.35 4 23.8 8.21E-02
5 48.4 6.36E-02
Magnitude (ips Pk)

0.30 6 38.4 5.83E-02


7 28.1 5.06E-02
8 46.9 5.03E-02
0.25 9 41.3 4.63E-02
10 182.8 4.26E-02
11 182.2 4.25E-02
0.20 1 12 43.4 4.18E-02
13 70.3 4.10E-02
0.15 14 65.9 4.08E-02
2 15 108.8 3.52E-02
16 179.7 3.34E-02
0.10 43
17 69.1 3.33E-02
18 213.1 3.29E-02
6 5 19 53.1 3.28E-02
7 9 8 1413
0.05 12
19 17 20 15
11
10
16 18 20 97.5 3.23E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00035\G2, 2_P1sv00000 - engine hv.csv

Spectrum TP: Engine Back (h)


0.90 Channel: 3 EW:BMA-Waukesha Engine

Date: May 30, 2016 04:51


0.80 Setup:
1 Note:

Freq. Magnitude
0.70 # Hz ips Pk
1 16.9 7.57E-01
2 23.8 4.40E-01
0.60 3 33.4 2.14E-01
4 80.3 1.87E-01
5 79.7 1.84E-01
Magnitude (ips Pk)

0.50 6 80.9 1.83E-01


7 47.2 1.75E-01
2
8 48.8 1.73E-01
0.40 9 53.8 1.72E-01
10 125.3 1.28E-01
11 82.8 1.18E-01
12 83.4 1.18E-01
0.30 13 123.1 1.07E-01
14 132.5 1.04E-01
3 15 28.1 1.04E-01
0.20 78 9 546 16 122.5 1.03E-01
17 131.3 9.93E-02
11
12 10 18 75.0 9.80E-02
15 18 13 14
1617
20 19
0.10 19 133.8 9.79E-02
20 121.9 9.59E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00035\G3, 3_P1sv00000 - engine hv.csv

Spectrum TP: Engine Back (-v)


0.55 Channel: 4 EW:BMA-Waukesha Engine
Date: May 30, 2016 04:51
0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 30.6 3.31E-01
2 16.9 3.05E-01
3 28.8 1.73E-01
0.35 1 4 27.5 1.48E-01
5 41.9 1.36E-01
Magnitude (ips Pk)

2
0.30 6 43.4 1.29E-01
7 65.9 1.10E-01
8 24.1 1.06E-01
0.25 9 38.4 1.05E-01
10 66.9 1.05E-01
11 25.0 1.02E-01
0.20 12 71.9 1.02E-01
3 13 72.8 9.29E-02
0.15 4 14 47.8 8.68E-02
56
15 83.4 8.65E-02
8 9
11
7
10
12
16 94.1 8.28E-02
0.10 14 13 15
16
18 1920
17
17 74.7 8.25E-02
18 74.1 8.23E-02
19 93.1 8.13E-02
0.05 20 100.3 7.86E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00035\G4, 4_P1sv00000 - engine hv.csv

Vibration, Dynamics & Noise Page 110 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.15
Spectrum TP: Engine Front (a)
0.55 Channel: 1 EW:BMA-Waukesha Engine
Date: May 30, 2016 06:02
0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 32.2 7.84E-02
2 24.1 5.04E-02
3 230.6 4.93E-02
0.35 4 228.4 4.92E-02
5 229.1 4.89E-02
Magnitude (ips Pk)

0.30 6 226.9 4.80E-02


7 240.3 4.74E-02
8 238.1 4.69E-02
0.25 9 231.9 4.68E-02
10 224.1 4.68E-02
11 225.6 4.65E-02
0.20 12 233.1 4.65E-02
13 223.4 4.59E-02
0.15 14 242.2 4.57E-02
15 244.7 4.55E-02
16 221.9 4.55E-02
0.10 17 243.8 4.53E-02
1
18 239.1 4.50E-02
2 645319
10
1112
16
13 717
9 18
814
15 19 233.8 4.46E-02
0.05 20
20 182.2 4.41E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00036\G1, 1_P1sv00000 - engine frame.csv

Spectrum TP: Frame Back (h)


0.55
Channel: 2 F:BMA-Frame

Date: May 30, 2016 06:02


0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 31.9 1.18E-01
2 31.3 1.16E-01
3 75.3 1.12E-01
0.35 4 181.3 1.04E-01
5 180.0 1.01E-01
Magnitude (ips Pk)

0.30 6 178.1 9.10E-02


7 83.4 6.82E-02
8 16.6 6.69E-02
0.25 9 175.9 6.61E-02
10 29.1 6.60E-02
11 176.6 6.52E-02
0.20 12 100.3 5.65E-02
13 161.9 5.61E-02
0.15 14 27.5 5.49E-02
15 116.9 5.38E-02
21 3
54
16 65.9 5.28E-02
0.10 6 17 99.4 4.98E-02
8 10 7 9
11 18 62.8 4.97E-02
14 16 19
18 12 15
17 13 19 81.6 4.70E-02
0.05 20
20 80.9 4.42E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00036\G2, 2_P1sv00000 - engine frame.csv

Spectrum TP: Frame Back (-a)


0.55 Channel: 3 F:BMA-Frame

Date: May 30, 2016 06:02


0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 175.6 2.50E-01
2 75.6 2.45E-01
3 33.1 2.37E-01
0.35 4 16.9 2.36E-01
5 176.6 2.32E-01
Magnitude (ips Pk)

0.30 6 179.7 2.32E-01


7 181.3 2.25E-01
8 177.2 2.25E-01
2 1
0.25 4 3 56
9 180.6 2.24E-01
10 897 10 73.8 2.20E-01
11
11 178.1 2.11E-01
0.20 12 12 161.9 1.84E-01
13 60.9 1.53E-01
13 14 15 14 70.3 1.50E-01
0.15 16
17
18
19 20 15 168.8 1.47E-01
16 169.7 1.45E-01
0.10 17 171.6 1.45E-01
18 170.9 1.43E-01
19 112.8 1.35E-01
0.05 20 166.6 1.29E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00036\G3, 3_P1sv00000 - engine frame.csv

Spectrum TP: Frame Back (-v)


0.55 Channel: 4 F:BMA-Frame
Date: May 30, 2016 06:02
0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 72.8 1.71E-01
2 71.6 1.47E-01
3 83.4 1.43E-01
0.35 4 62.5 1.18E-01
5 242.8 1.03E-01
Magnitude (ips Pk)

0.30 6 82.2 1.00E-01


7 242.2 9.95E-02
8 243.4 9.84E-02
0.25 9 241.6 9.71E-02
10 87.2 9.35E-02
11 85.6 9.19E-02
0.20 12 85.0 9.19E-02
1 13 181.9 8.84E-02
0.15 2 3 14 90.6 8.36E-02
15 163.1 7.82E-02
4
16 235.9 7.63E-02
0.10 610 9785
12
11
14 13 17 162.5 7.52E-02
19 15
17 18 16 20 18 183.4 7.37E-02
19 45.9 7.33E-02
0.05 20 250.0 7.26E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00036\G4, 4_P1sv00000 - engine frame.csv

Vibration, Dynamics & Noise Page 111 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.16
Spectrum TP: 237 (h)
1.2 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 06:13
Setup:
1 Note:
1.0
Freq. Magnitude
2 # Hz ips Pk
3
4
1 76.9 1.02E+00
5
67 2 180.3 8.85E-01
0.8 89
10 3 43.1 8.79E-01
4 43.8 8.38E-01
5 180.9 8.31E-01
Magnitude (ips Pk)

11 6 179.7 8.21E-01
7 183.1 8.21E-01
0.6 12
8 177.5 7.89E-01
13 9 181.6 7.89E-01
14
1615 10 178.4 7.72E-01
11 70.0 6.53E-01
17 18
19
20 12 48.1 5.86E-01
0.4 13 33.4 5.29E-01
14 212.5 4.99E-01
15 210.6 4.88E-01
16 205.9 4.88E-01
17 16.9 4.22E-01
0.2
18 218.4 4.16E-01
19 217.5 4.11E-01
20 199.7 4.03E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00037\G1, 1_P1sv00000 - 237 437.csv

Spectrum TP: 237 (v)


3.0
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 06:13


2.7 1 Setup:
Note:

2.4 Freq. Magnitude


# Hz ips Pk
1 76.9 2.62E+00
2.1 2 70.0 1.15E+00
3 108.1 1.05E+00
4 110.6 7.37E-01
1.8 5 80.0 5.98E-01
Magnitude (ips Pk)

6 43.1 5.71E-01
7 53.1 4.12E-01
1.5 8 215.3 3.81E-01
9 214.7 3.69E-01
10 213.1 3.61E-01
1.2 2
11 213.8 3.54E-01
3
12 218.4 3.41E-01
13 210.9 3.29E-01
0.9 14 116.9 3.22E-01
4 15 222.8 3.10E-01
5 16 225.0 3.04E-01
0.6 6
17 57.5 3.04E-01
7 18 225.9 2.90E-01
9812
10
11
17 14 13 15
16
0.3 19 18
20 19 83.4 2.80E-01
20 228.1 2.79E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00037\G2, 2_P1sv00000 - 237 437.csv

Spectrum TP: 237 (a)


1.2 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 06:13


Setup:
1 Note:
23
1.0 6547
8 Freq. Magnitude
190 # Hz ips Pk
1 76.9 1.03E+00
2 222.8 1.00E+00
0.8 3 225.0 9.96E-01
4 224.1 9.83E-01
5 220.0 9.78E-01
Magnitude (ips Pk)

6 219.4 9.71E-01
7 225.9 9.60E-01
0.6 8 220.6 9.38E-01
9 227.2 9.11E-01
11
12 10 227.8 9.10E-01
13 11 70.0 5.09E-01
12 231.9 4.78E-01
0.4 14 13 232.8 4.45E-01
15
16 14 213.8 3.60E-01
1718 15 213.1 3.38E-01
20 19 16 210.9 3.31E-01
0.2 17 205.6 2.80E-01
18 209.7 2.72E-01
19 249.1 2.48E-01
20 209.1 2.48E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00037\G3, 3_P1sv00000 - 237 437.csv

Spectrum TP: 437 (h)


5.0 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 06:13
4.5 Setup:
1 Note:

4.0 Freq. Magnitude


# Hz ips Pk
1 48.8 4.26E+00
3.5 2 55.0 1.22E+00
3 57.8 9.48E-01
4 76.6 9.01E-01
3.0 5 56.9 8.53E-01
Magnitude (ips Pk)

6 73.1 7.81E-01
7 53.1 7.77E-01
2.5 8 70.0 6.92E-01
9 80.9 6.77E-01
10 43.4 6.37E-01
2.0 11 83.8 6.14E-01
12 45.0 4.84E-01
13 66.9 4.26E-01
1.5 14 169.7 3.92E-01
2 15 65.9 3.89E-01
16 59.7 3.56E-01
1.0 5
3 4
7 6 17 122.5 3.16E-01
10 8 9 18 85.6 2.15E-01
11
0.5 12 13 19 173.4 1.73E-01
1615 14
17 20 208.4 1.73E-01
18 19 20

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00037\G4, 4_P1sv00000 - 237 437.csv

Vibration, Dynamics & Noise Page 112 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.17
Spectrum TP: 400 (h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 06:29
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 30.9 3.07E-01
2 24.4 2.35E-01
3 32.8 2.13E-01
0.7 4 27.2 1.26E-01
5 55.6 8.94E-02
Magnitude (ips Pk)

0.6 6 215.0 6.69E-02


7 215.6 6.58E-02
8 16.6 5.64E-02
0.5 9 309.7 5.62E-02
10 315.3 5.38E-02
11 41.9 5.30E-02
0.4
1
0.3
2
3
0.2
4
0.1 5
67
8 11 910

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00038\G1, 1_P1sv00000 - 400 250.csv

Spectrum TP: 400 (a)


3.5
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 06:29


1 Setup:
3.0 Note:

Freq. Magnitude
# Hz ips Pk
1 28.1 3.12E+00
2.5 2 31.3 5.04E-01
3 32.8 3.62E-01
4 82.5 1.17E-01
5 40.3 7.79E-02
Magnitude (ips Pk)

2.0 6 75.9 7.78E-02


7 78.4 6.92E-02
8 45.0 6.09E-02
9 202.8 6.00E-02
1.5 10 203.4 5.95E-02
11 204.4 5.53E-02
12 175.9 5.31E-02

1.0

2
0.5
3

58 674 12 10
9
11
0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00038\G2, 2_P1sv00000 - 400 250.csv

Spectrum TP: 400 Sight Glass (tan)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 06:29


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 1 28.1 7.71E-01
2 201.6 6.52E-01
3 105.3 2.61E-01
0.7 4 30.9 2.01E-01
2
5 32.8 1.47E-01
Magnitude (ips Pk)

0.6 6 165.0 9.99E-02


7 393.1 7.69E-02
8 206.6 7.67E-02
0.5 9 394.4 6.84E-02
10 385.9 6.74E-02
11 396.6 6.52E-02
0.4 12 395.3 6.32E-02
13 386.9 6.13E-02
0.3 14 397.2 6.07E-02
3 15 207.8 5.54E-02
16 159.1 5.43E-02
4
0.2 17 385.0 5.35E-02
5 18 24.4 5.15E-02
6 19 397.8 5.10E-02
0.1 8 10 7911
13 1214 20 214.4 5.07E-02
18 16 1520 17 19

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00038\G3, 3_P1sv00000 - 400 250.csv

Spectrum TP: 250 psv (h)


4.0 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 06:29
3.6 Setup:
Note:
1
3.2 Freq. Magnitude
# Hz ips Pk
1 59.7 3.25E+00
2.8 2 62.2 8.07E-01
3 116.9 4.91E-01
4 199.7 4.75E-01
2.4 5 200.3 4.40E-01
Magnitude (ips Pk)

6 72.2 4.30E-01
7 65.6 4.01E-01
2.0 8 201.6 3.88E-01
9 212.2 3.84E-01
10 90.0 3.74E-01
1.6 11 210.6 3.70E-01
12 195.6 3.37E-01
13 204.4 3.35E-01
1.2 14 196.9 3.31E-01
15 88.1 3.28E-01
2 16 214.1 3.06E-01
0.8
17 118.4 2.94E-01
3 45 18 168.4 2.82E-01
76 10 8 9 19 167.2 2.75E-01
0.4 15 17 18 14 11
1213 16
19 20 20 215.0 2.71E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00038\G4, 4_P1sv00000 - 400 250.csv

Vibration, Dynamics & Noise Page 113 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.18
Spectrum TP: 399 (h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 06:40
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 223.8 6.16E-01
2 217.2 4.93E-01
3 255.0 3.80E-01
0.7 4 254.4 3.76E-01
5 255.9 3.49E-01
Magnitude (ips Pk)

1
0.6 6 220.0 3.38E-01
7 221.6 3.30E-01
8 28.1 3.10E-01
0.5 2 9 30.6 3.09E-01
10 258.4 2.59E-01
11 210.9 2.53E-01
0.4 43 12 215.3 2.48E-01
67 5
13 159.7 2.39E-01
89
0.3 14 204.7 2.31E-01
1112 10 15 78.4 2.30E-01
15 13 14
16
17
16 205.3 2.16E-01
0.2 20 18
19
17 209.4 2.02E-01
18 176.3 1.67E-01
19 179.7 1.66E-01
0.1 20 155.0 1.63E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00039\G1, 1_P1sv00000 - 399 450 250.csv

Spectrum TP: 399 (a)


3.0
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 06:40


2.7 1 Setup:
Note:

2.4 Freq. Magnitude


2 # Hz ips Pk
1 28.1 2.67E+00
2.1 2 82.2 2.21E+00
3 78.4 1.76E+00
4 86.6 8.13E-01
1.8 3 5 80.0 7.90E-01
Magnitude (ips Pk)

6 87.5 7.06E-01
7 65.9 5.57E-01
1.5 8 75.9 4.08E-01
9 30.6 3.69E-01
10 33.4 2.34E-01
1.2 11 134.1 2.24E-01
12 90.0 1.59E-01
13 255.0 1.36E-01
0.9 14 254.4 1.36E-01
54
6 15 137.5 1.35E-01
16 190.6 1.35E-01
0.6 7
17 255.9 1.35E-01
9 8 18 63.4 1.20E-01
0.3 19 70.3 1.17E-01
10 11
12 20 284.4 1.17E-01
1819 15 16 14
13
17 20

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00039\G2, 2_P1sv00000 - 399 450 250.csv

Spectrum TP: 250 psv (a)


3.0 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 06:40


2.7 Setup:
Note:

2.4 1 Freq. Magnitude


# Hz ips Pk
1 59.7 2.32E+00
2.1 2 71.6 1.71E+00
3 88.1 1.40E+00
4 75.3 1.12E+00
1.8 5 243.4 1.04E+00
Magnitude (ips Pk)

2
6 244.1 1.04E+00
7 90.0 9.01E-01
1.5 3 8 86.9 8.82E-01
9 208.1 7.53E-01
10 208.8 7.38E-01
1.2 4 11 82.5 6.88E-01
56 12 62.5 6.34E-01
87 13 273.1 5.98E-01
0.9 14 272.5 5.93E-01
9
10
11 15 271.9 5.85E-01
12
14
13
15 16 65.9 5.05E-01
0.6 16 17 19
20 18 17 210.0 4.76E-01
18 298.8 4.74E-01
0.3 19 275.0 4.69E-01
20 275.6 4.55E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00039\G3, 3_P1sv00000 - 399 450 250.csv

Spectrum TP: 450 psv (h)


2.4 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 06:40
1 Setup:
Note:
2.0
Freq. Magnitude
# Hz ips Pk
1 75.0 2.11E+00
2 70.6 1.10E+00
1.6 3 72.2 1.01E+00
4 59.7 9.23E-01
5 81.9 5.41E-01
Magnitude (ips Pk)

6 78.4 5.24E-01
7 79.4 5.21E-01
1.2 8 65.9 5.20E-01
2
9 62.2 4.67E-01
3
10 83.4 4.52E-01
4
11 68.1 4.06E-01
12 109.1 3.47E-01
0.8 13 89.7 3.29E-01
14 110.3 3.13E-01
15 112.2 3.01E-01
8 675
9 10 16 88.1 3.00E-01
11 17 113.1 2.81E-01
0.4 13 12
16 14
15
17
18 86.3 2.63E-01
18
19 19 116.9 1.97E-01
20
20 115.9 1.87E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00039\G4, 4_P1sv00000 - 399 450 250.csv

Vibration, Dynamics & Noise Page 114 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.19
Spectrum TP: 300 (h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 06:51
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 32.5 6.96E-01
2 30.3 5.62E-01
1 3 26.6 2.06E-01
0.7 4 41.9 1.72E-01
5 43.4 1.26E-01
Magnitude (ips Pk)

0.6 6 42.8 1.20E-01


2 7 44.7 1.14E-01
8 45.9 1.10E-01
0.5 9 63.1 9.20E-02
10 201.3 6.41E-02
11 196.3 6.29E-02
0.4 12 200.3 6.25E-02
13 197.2 5.97E-02
0.3 14 131.3 5.80E-02
15 198.4 5.76E-02
3 16 342.2 5.34E-02
0.2 4 17 25.0 5.08E-02
6578
0.1 9
17 14 11
13110
15 2 16

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00040\G1, 1_P1sv00000 - 300 450.csv

Spectrum TP: 300 (-a)


3.0
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 06:51


2.7 Setup:
Note:

2.4 1 Freq. Magnitude


# Hz ips Pk
1 31.3 2.35E+00
2.1 2 33.1 7.83E-01
3 69.1 4.17E-01
4 53.4 2.35E-01
1.8 5 200.3 1.93E-01
Magnitude (ips Pk)

6 73.4 1.77E-01
7 27.2 1.62E-01
1.5 8 195.3 1.19E-01
9 55.9 1.10E-01
10 76.6 1.07E-01
1.2 11 71.9 1.07E-01
12 56.9 1.06E-01
13 65.0 1.04E-01
0.9 14 115.9 9.89E-02
2
15 193.8 9.01E-02
16 193.1 8.98E-02
0.6 17 60.0 8.77E-02
3 18 59.4 8.60E-02
0.3 19 58.8 8.35E-02
4
7 6 5 20 63.1 8.14E-02
919
1213
201110
18
17 14 8
16
15
0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00040\G2, 2_P1sv00000 - 300 450.csv

Spectrum TP: 300 Sight Glass (tan)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 06:51


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 31.3 5.23E-01
2 95.0 4.17E-01
3 33.1 3.01E-01
0.7 4 98.1 2.11E-01
5 69.1 1.24E-01
Magnitude (ips Pk)

0.6 6 190.3 1.17E-01


7 371.6 9.03E-02
1 8 370.0 7.48E-02
0.5 9 26.9 6.29E-02
10 73.4 6.22E-02
2 11 53.8 6.05E-02
0.4 12 287.5 5.97E-02
13 286.9 5.83E-02
3 14 358.4 5.33E-02
0.3
15 288.1 5.33E-02
4 16 286.3 5.29E-02
0.2 17 391.6 5.17E-02
18 333.8 5.09E-02
5 6
0.1 7
9 11 10 8
13
12
16
15 18 14 17

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00040\G3, 3_P1sv00000 - 300 450.csv

Spectrum TP: 450 psv (a)


1.1 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 06:51
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 1 70.6 7.88E-01
2 72.2 5.10E-01
3 82.8 3.31E-01
0.7 4 59.7 2.98E-01
5 75.6 2.71E-01
Magnitude (ips Pk)

0.6 6 228.1 2.59E-01


7 227.5 2.52E-01
2 8 225.9 2.41E-01
0.5 9 226.6 2.40E-01
10 65.9 2.38E-01
11 228.8 2.28E-01
0.4 12 230.0 2.26E-01
3 13 64.1 2.24E-01
0.3 4 14 224.7 2.22E-01
5 15 225.3 2.22E-01
76
8911
10
13 12
14
15
2016 18
17 19 16 229.4 2.17E-01
0.2 17 440.3 2.10E-01
18 439.7 2.09E-01
19 455.0 2.07E-01
0.1 20 222.8 2.07E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00040\G4, 4_P1sv00000 - 300 450.csv

Vibration, Dynamics & Noise Page 115 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.20
Spectrum TP: 110 (h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 08:28
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 2
1 1 46.6 7.88E-01
2 32.2 7.68E-01
3 33.1 5.94E-01
0.7 4 29.4 5.39E-01
5 26.9 4.80E-01
Magnitude (ips Pk)

0.6 3 6 153.8 3.38E-01


7 50.3 2.94E-01
4
8 73.1 2.81E-01
0.5 5 9 71.6 2.48E-01
10 57.8 2.42E-01
11 155.9 2.15E-01
0.4 12 53.4 2.13E-01
6 13 162.2 2.04E-01
0.3 7
8 14 70.3 2.03E-01
10 9
15 97.8 2.03E-01
12 14 15 1113 16 156.9 1.93E-01
0.2 18 20 19 1617 17 161.6 1.87E-01
18 61.3 1.82E-01
19 145.3 1.82E-01
0.1 20 116.9 1.78E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00041\G1, 1_P1sv00000 - 110 350.csv

Spectrum TP: 110 (-a)


1.00
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 08:28


1 Setup:
0.90
Note:

0.80 2 Freq. Magnitude


# Hz ips Pk
3 1 62.5 8.95E-01
0.70 2 33.4 7.82E-01
3 60.9 7.04E-01
4 30.6 4.70E-01
0.60 5 28.4 4.25E-01
Magnitude (ips Pk)

6 80.9 3.05E-01
7 27.2 2.73E-01
0.50 4 8 56.9 2.72E-01
5
9 69.4 2.32E-01
10 70.9 2.19E-01
0.40 11 53.4 2.16E-01
12 180.0 2.06E-01
6 13 48.1 1.94E-01
0.30 7 8 14 50.0 1.91E-01
9 15 72.8 1.78E-01
11 10 12
13
14 16 54.7 1.75E-01
0.20 16 15 17 40.0 1.33E-01
17
19 20 18 18 181.9 1.29E-01
0.10 19 41.6 1.26E-01
20 117.2 1.22E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00041\G2, 2_P1sv00000 - 110 350.csv

Spectrum TP: 110 Sight Glass (tan)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 08:28


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
1
0.8 1 92.8 8.00E-01
2 62.2 6.18E-01
3 60.6 4.49E-01
0.7 4 33.4 2.77E-01
5 73.1 2.60E-01
Magnitude (ips Pk)

2
0.6 6 71.6 2.53E-01
7 70.3 2.49E-01
8 97.8 2.42E-01
0.5 9 76.6 2.23E-01
3 10 137.2 2.05E-01
11 163.1 1.86E-01
0.4 12 77.8 1.78E-01
13 30.6 1.65E-01
0.3 14 138.4 1.63E-01
4
765 8 15 115.3 1.61E-01
9
10 16 116.9 1.58E-01
0.2 13 12
15 14
11 17 95.3 1.52E-01
17 16
18 19
20 18 28.4 1.48E-01
19 289.1 1.46E-01
0.1 20 289.7 1.45E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00041\G3, 3_P1sv00000 - 110 350.csv

Spectrum TP: 350 psv (h)


3.5 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 08:28
Setup:
3.0 1 Note:

Freq. Magnitude
# Hz ips Pk
1 180.0 2.94E+00
2.5 2 177.8 2.14E+00
3 177.2 2.14E+00
32 4 176.3 1.97E+00
5 182.2 1.51E+00
Magnitude (ips Pk)

2.0 4
6 197.8 1.44E+00
7 198.8 1.44E+00
8 196.6 1.34E+00
5 9 149.4 1.29E+00
1.5 67 10 150.6 1.22E+00
8 11 136.9 1.14E+00
9
10 12 189.1 1.13E+00
11 14 12
13
15 1617 13 189.7 1.12E+00
18
1.0 14 151.6 1.12E+00
2019 15 152.5 1.08E+00
16 190.3 1.04E+00
17 194.1 1.02E+00
0.5 18 71.9 9.91E-01
19 138.4 8.45E-01
20 133.4 8.27E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00041\G4, 4_P1sv00000 - 110 350.csv

Vibration, Dynamics & Noise Page 116 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.21
Spectrum TP: 150 psv (h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 08:51
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 60.0 3.32E-01
2 175.6 2.63E-01
3 62.5 2.58E-01
0.7 4 41.9 2.40E-01
5 69.1 2.27E-01
Magnitude (ips Pk)

0.6 6 48.4 2.05E-01


7 208.8 2.03E-01
8 71.9 1.96E-01
0.5 9 362.2 1.71E-01
10 361.3 1.66E-01
11 75.0 1.57E-01
0.4 12 31.9 1.56E-01
1 13 181.9 1.49E-01
0.3 14 110.3 1.35E-01
3 2 15 109.7 1.35E-01
4 5
6 7
16 219.1 1.35E-01
8
0.2 9
10
17 162.8 1.27E-01
12 11 13
14
15 16 18 108.4 1.26E-01
18 20 17 19
19 270.3 1.25E-01
0.1 20 152.8 1.24E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00042\G1, 1_P1sv00000 - 150 109 350.csv

Spectrum TP: 150 psv (-a)


1.1
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 08:51


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 63.1 4.39E-01
2 64.1 3.97E-01
3 41.9 3.96E-01
0.7 4 68.1 3.32E-01
5 70.0 3.14E-01
Magnitude (ips Pk)

0.6 6 69.1 3.12E-01


7 75.9 2.96E-01
8 121.6 2.87E-01
0.5 9 186.6 2.81E-01
1 10 185.9 2.64E-01
3 2 11 175.9 2.36E-01
0.4 12 127.5 2.11E-01
4 13 120.0 2.09E-01
65
0.3 7 8 9 14 116.3 2.05E-01
10 15 128.8 1.85E-01
11
141312 16 73.1 1.72E-01
0.2 16 17
15
18
17 125.3 1.67E-01
20 19
18 129.7 1.65E-01
19 126.3 1.60E-01
0.1 20 66.6 1.53E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00042\G2, 2_P1sv00000 - 150 109 350.csv

Spectrum TP: 109 (h)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 08:51


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 62.8 4.56E-01
2 46.6 3.21E-01
3 47.2 3.18E-01
0.7 4 31.9 3.09E-01
5 115.3 2.77E-01
Magnitude (ips Pk)

0.6 6 116.6 2.76E-01


7 70.3 2.76E-01
8 138.1 2.15E-01
0.5 9 29.4 2.07E-01
1 10 140.0 1.85E-01
11 59.4 1.84E-01
0.4 12 72.2 1.82E-01
23 13 153.4 1.82E-01
4
0.3 14 57.8 1.80E-01
7 56
15 75.0 1.76E-01
9 8 16 83.4 1.67E-01
0.2 11 12
14 1516 10 13 17 77.8 1.59E-01
18 1719 20 18 26.6 1.59E-01
19 82.2 1.59E-01
0.1 20 145.9 1.47E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00042\G3, 3_P1sv00000 - 150 109 350.csv

Spectrum TP: 350 psv (-a)


2.0 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 08:51
1.8 Setup:
1 Note:

1.6 Freq. Magnitude


# Hz ips Pk
1 176.3 1.70E+00
1.4 2 179.7 1.22E+00
3 182.5 1.05E+00
2 4 76.9 4.89E-01
1.2 5 128.1 4.89E-01
Magnitude (ips Pk)

6 62.8 4.88E-01
3
7 199.7 4.48E-01
1.0 8 129.7 4.45E-01
9 190.9 4.40E-01
10 148.8 4.27E-01
0.8 11 64.1 4.26E-01
12 139.7 4.21E-01
13 186.9 4.15E-01
0.6 14 148.1 4.14E-01
6 4 5 15 142.2 3.94E-01
11 8 12 10 9 7
1514 1716 13 16 171.6 3.74E-01
0.4 19 20 18
17 164.4 3.68E-01
18 163.8 3.63E-01
0.2 19 60.6 3.62E-01
20 142.8 3.59E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00042\G4, 4_P1sv00000 - 150 109 350.csv

Vibration, Dynamics & Noise Page 117 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.22
Spectrum TP: 100 psv (h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 09:00
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 41.9 4.02E-01
2 61.9 3.64E-01
3 60.0 2.92E-01
0.7 4 69.4 2.79E-01
5 62.8 2.69E-01
Magnitude (ips Pk)

0.6 6 121.6 2.46E-01


7 122.8 2.13E-01
8 175.9 2.12E-01
0.5 9 180.9 1.94E-01
10 181.9 1.87E-01
1 11 76.3 1.72E-01
0.4 2 12 48.4 1.48E-01
13 153.1 1.48E-01
0.3 3 14 32.2 1.42E-01
54 15 147.8 1.39E-01
6
7 8 16 115.3 1.31E-01
0.2 9
10 17 127.8 1.22E-01
11
14 12 16 1513 18 149.7 1.21E-01
19 17 18 20 19 117.2 1.19E-01
0.1 20 261.6 1.14E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00043\G1, 1_P1sv00000 - 100 109.csv

Spectrum TP: 100 psv (-a)


1.1
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 09:00


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 75.3 3.79E-01
2 28.4 2.15E-01
3 90.0 2.02E-01
0.7 4 53.4 1.93E-01
5 48.4 1.85E-01
Magnitude (ips Pk)

0.6 6 69.1 1.83E-01


7 97.5 1.82E-01
8 46.9 1.75E-01
0.5 9 55.3 1.61E-01
10 86.3 1.23E-01
11 77.5 1.16E-01
0.4 1 12 115.6 1.15E-01
13 132.2 1.12E-01
0.3 14 129.7 1.11E-01
15 130.9 1.10E-01
2 3
16 72.5 1.07E-01
0.2 4 17 71.6 1.07E-01
85 6 7
9
18 181.9 1.05E-01
10
1611
17 12 14
1320
15 1918 19 175.9 1.04E-01
0.1 20 136.3 1.04E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00043\G2, 2_P1sv00000 - 100 109.csv

Spectrum TP: 109 (a)


1.3 Channel: 3 P:BMA-Pipe

1.2 Date: May 30, 2016 09:00


Setup:
1 Note:
1.1
Freq. Magnitude
1.0 # Hz ips Pk
3 2 1 76.3 1.11E+00
0.9 2 77.8 9.42E-01
4
3 62.5 9.38E-01
0.8 4 80.9 8.20E-01
5 64.4 7.40E-01
Magnitude (ips Pk)

5
6 70.0 5.71E-01
0.7 7 69.4 5.59E-01
8 74.1 4.68E-01
0.6 76 9 97.8 3.42E-01
10 117.2 2.86E-01
0.5 8 11 87.8 2.53E-01
12 115.3 2.52E-01
0.4 13 86.3 2.18E-01
9 14 58.8 2.01E-01
15 100.0 1.85E-01
0.3 10
16 33.4 1.67E-01
11 12
14 13 17 30.0 1.66E-01
0.2 17
16
19 18
20
15 18 90.6 1.64E-01
19 30.6 1.63E-01
0.1 20 93.4 1.62E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00043\G3, 3_P1sv00000 - 100 109.csv

Spectrum TP: 109 (v)


1.1 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 09:00
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 75.0 6.09E-01
2 71.3 5.99E-01
3 69.1 4.61E-01
0.7 4 77.5 4.05E-01
5 47.2 3.02E-01
Magnitude (ips Pk)

21 6 83.8 2.86E-01
0.6
7 93.4 2.79E-01
8 94.1 2.71E-01
0.5 3
9 97.5 2.70E-01
10 62.5 2.69E-01
4 11 61.9 2.61E-01
0.4 12 60.3 2.56E-01
13 96.6 2.42E-01
5 14 80.6 2.41E-01
0.3 10
6 789
11
12 14 13
15 31.6 2.40E-01
15
18 17 16 16 90.3 2.37E-01
19
20
0.2 17 79.7 2.28E-01
18 64.4 2.24E-01
19 137.5 2.05E-01
0.1 20 138.1 1.98E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00043\G4, 4_P1sv00000 - 100 109.csv

Vibration, Dynamics & Noise Page 118 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.23
Spectrum TP: 136 (v)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 09:10
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 100.0 5.44E-01
2 129.7 4.82E-01
3 98.1 4.76E-01
0.7 4 126.3 3.74E-01
5 126.9 3.56E-01
Magnitude (ips Pk)

0.6 6 127.5 3.54E-01


1 7 123.8 3.13E-01
8 108.1 2.69E-01
0.5 3 2 9 116.9 2.45E-01
10 96.3 2.42E-01
11 115.6 2.35E-01
0.4 4 12 102.8 2.28E-01
56
13 133.8 2.11E-01
7
0.3 14 73.4 2.08E-01
8 15 105.6 1.84E-01
9
1012 11
14 13 16 118.8 1.62E-01
0.2 15
16
17 161.6 1.58E-01
20 19 18 17 18 148.8 1.47E-01
19 83.1 1.46E-01
0.1 20 71.3 1.46E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00044\G1, 1_P1sv00000 - 136 135.csv

Spectrum TP: 136 (-a)


1.1
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 09:10


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 235.0 2.79E-01
2 71.3 2.77E-01
3 235.9 2.75E-01
0.7 4 236.6 2.63E-01
5 73.4 2.46E-01
Magnitude (ips Pk)

0.6 6 226.3 2.33E-01


7 225.0 2.32E-01
8 237.5 2.30E-01
0.5 9 81.9 2.28E-01
10 176.6 2.25E-01
11 179.4 2.23E-01
0.4 12 80.9 2.20E-01
13 230.9 2.17E-01
0.3 13
14 223.4 2.17E-01
2 4
5 15 233.8 2.16E-01
9
12 10
11 7613 8 16 224.1 2.14E-01
20 1914
161715
18
0.2 17 232.5 2.11E-01
18 231.9 2.06E-01
19 217.8 2.06E-01
0.1 20 121.9 2.03E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00044\G2, 2_P1sv00000 - 136 135.csv

Spectrum TP: 135 (h)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 09:10


1.0 1
Setup:
Note:
0.9 2 Freq. Magnitude
# Hz ips Pk
0.8 1 73.1 9.91E-01
2 71.3 8.63E-01
3 76.3 6.85E-01
0.7 3 4 62.2 6.13E-01
5 83.8 4.56E-01
Magnitude (ips Pk)

4
0.6 6 83.1 4.53E-01
7 81.9 3.83E-01
8 97.2 3.50E-01
0.5 9 66.6 3.46E-01
65 10 98.1 3.26E-01
11 96.3 3.25E-01
0.4 7
12 176.9 3.20E-01
9 8
11
10 12 13 362.2 3.04E-01
16 15 13
14 14 362.8 3.02E-01
0.3 19 18 17
20 15 175.9 3.01E-01
16 33.4 2.95E-01
0.2 17 361.3 2.81E-01
18 208.4 2.69E-01
19 57.5 2.68E-01
0.1 20 86.3 2.54E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00044\G3, 3_P1sv00000 - 136 135.csv

Spectrum TP: 135 (v)


1.1 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 09:10
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 126.3 5.39E-01
2 130.6 5.16E-01
3 126.9 5.12E-01
0.7 4 123.8 4.59E-01
5 153.8 4.36E-01
Magnitude (ips Pk)

0.6 6 269.1 4.32E-01


7 268.4 4.26E-01
1
32 8 128.4 3.85E-01
0.5 9 200.3 3.68E-01
4
5 10 116.9 3.53E-01
76
11 98.1 3.33E-01
0.4 8
9 12 266.9 3.28E-01
10
11
13 12 13 115.6 3.20E-01
14
0.3 15
14 97.2 3.16E-01
18 16 17
20 19 15 134.7 2.78E-01
16 136.6 2.77E-01
0.2 17 150.3 2.77E-01
18 96.3 2.67E-01
19 149.7 2.64E-01
0.1 20 133.1 2.59E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00044\G4, 4_P1sv00000 - 136 135.csv

Vibration, Dynamics & Noise Page 119 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.24
Spectrum TP: 112 (h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 09:19
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 46.6 5.96E-01
2 73.1 5.29E-01
3 26.6 4.99E-01
0.7 4 31.6 4.48E-01
5 83.1 4.21E-01
Magnitude (ips Pk)

0.6 1 6 29.4 4.01E-01


7 80.3 3.84E-01
2 8 58.1 3.40E-01
3
0.5 9 50.0 3.15E-01
4 10 16.3 3.03E-01
5 11 75.3 2.75E-01
6
0.4 7
12 70.3 2.58E-01
8 13 60.9 2.48E-01
10 9
0.3 14 76.6 2.37E-01
11
13 1214 15 33.4 2.33E-01
15
16 17
16 66.9 2.11E-01
0.2 18
19
17 97.8 2.02E-01
20
18 96.9 1.80E-01
19 102.8 1.65E-01
0.1 20 105.0 1.59E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00045\G1, 1_P1sv00000 - 112 115.csv

Spectrum TP: 112 (-v)


1.3
Channel: 2 P:BMA-Pipe

1.2 Date: May 30, 2016 09:19


Setup:
1
Note:
1.1 2
Freq. Magnitude
1.0 # Hz ips Pk
1 58.1 1.12E+00
0.9 2 61.3 1.08E+00
3 54.7 7.93E-01
0.8 3 4 73.4 5.42E-01
5 83.4 3.19E-01
Magnitude (ips Pk)

6 76.3 2.98E-01
0.7 7 68.4 2.42E-01
8 45.9 2.35E-01
0.6 9 66.9 2.26E-01
4
10 70.3 2.15E-01
0.5 11 50.0 1.49E-01
12 97.2 1.49E-01
0.4 13 80.3 1.43E-01
14 26.9 1.33E-01
5 15 33.4 1.31E-01
6
0.3 16 97.8 1.30E-01
8 9710 17 89.1 1.30E-01
0.2 18 288.4 1.29E-01
11 1319 12
1415 2017 16 18 19 88.1 1.28E-01
0.1 20 84.7 1.26E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00045\G2, 2_P1sv00000 - 112 115.csv

Spectrum TP: 115 (h)


1.2 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 09:19


Setup:
1 Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 46.6 1.03E+00
2 50.0 4.65E-01
0.8 3 26.6 4.35E-01
4 154.4 3.65E-01
5 153.8 3.60E-01
Magnitude (ips Pk)

6 54.4 3.20E-01
7 162.2 3.06E-01
0.6 8 155.9 2.97E-01
9 137.2 2.89E-01
10 57.8 2.80E-01
2
3 11 29.4 2.79E-01
12 160.6 2.50E-01
0.4 54 13 15.9 2.28E-01
6 14 31.9 2.18E-01
9 87
11 10 15 60.6 2.07E-01
12 16 72.8 2.00E-01
13 14
15 17
16 17 71.9 1.93E-01
0.2 20 18 19
18 150.3 1.85E-01
19 332.5 1.83E-01
20 70.3 1.82E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00045\G3, 3_P1sv00000 - 112 115.csv

Spectrum TP: 115 (-v)


1.1 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 09:19
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 58.1 5.22E-01
2 57.5 5.07E-01
3 54.7 4.68E-01
0.7 4 60.6 3.80E-01
5 163.1 2.98E-01
Magnitude (ips Pk)

0.6 6 164.4 2.67E-01


7 45.9 2.27E-01
1
2 8 180.3 2.19E-01
0.5 3
9 165.0 2.16E-01
10 162.2 2.14E-01
11 33.4 1.72E-01
0.4 4 12 71.9 1.63E-01
13 166.6 1.62E-01
0.3 5 14 26.9 1.58E-01
6 15 177.5 1.57E-01
7 109 8 16 72.8 1.51E-01
0.2 17 160.0 1.43E-01
1411 12
16 13 15
17 19
18
20 18 183.8 1.41E-01
19 182.2 1.41E-01
0.1 20 182.8 1.38E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00045\G4, 4_P1sv00000 - 112 115.csv

Vibration, Dynamics & Noise Page 120 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.25
Spectrum TP: 117 (-h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 09:28
1.0 Setup:
Note:
0.9
Freq. Magnitude
1 # Hz ips Pk
0.8 2 1 46.9 8.10E-01
2 45.9 7.84E-01
3 54.1 4.78E-01
0.7 4 26.9 4.45E-01
5 50.3 3.78E-01
Magnitude (ips Pk)

0.6 6 56.9 3.06E-01


7 74.4 2.88E-01
8 29.1 2.79E-01
0.5 3 9 33.4 2.76E-01
4 10 83.1 2.73E-01
11 82.2 2.60E-01
0.4 5 12 177.2 2.26E-01
13 177.8 2.15E-01
6 14 31.3 1.91E-01
0.3 89 7
10
11 15 42.5 1.87E-01
12
13 16 179.7 1.85E-01
0.2 17 14 15 16
18
17 15.9 1.81E-01
19
20
18 332.2 1.64E-01
19 62.8 1.59E-01
0.1 20 64.4 1.58E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00046\G1, 1_P1sv00000 - 117 132.csv

Spectrum TP: 117 (-v)


1.1
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 09:28


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 163.1 3.83E-01
2 161.6 3.05E-01
3 160.9 2.80E-01
0.7 4 159.7 2.71E-01
5 159.1 2.71E-01
Magnitude (ips Pk)

0.6 6 158.1 2.59E-01


7 156.6 2.51E-01
8 148.1 2.43E-01
0.5 9 147.5 2.38E-01
10 153.4 2.21E-01
11 180.0 2.16E-01
0.4 1
12 165.3 2.14E-01
13 154.7 2.11E-01
2 14 155.6 2.03E-01
0.3 3
654 15 152.5 1.91E-01
89 7
10 11
14 12 16
13 16 177.8 1.89E-01
0.2 19
15
17
20 18 17 151.6 1.71E-01
18 183.4 1.70E-01
19 55.0 1.69E-01
0.1 20 150.9 1.68E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00046\G2, 2_P1sv00000 - 117 132.csv

Spectrum TP: 132 (-h)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 09:28


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 73.1 4.47E-01
2 70.9 4.05E-01
3 177.2 3.16E-01
0.7 4 176.3 3.08E-01
5 733.8 3.06E-01
Magnitude (ips Pk)

0.6 6 62.2 2.98E-01


7 178.1 2.90E-01
8 61.3 2.82E-01
0.5 9 734.4 2.67E-01
1 10 75.6 2.65E-01
2 11 732.2 2.54E-01
0.4 12 731.6 2.41E-01
13 175.0 2.41E-01
6 43 5 14 748.1 2.11E-01
0.3 8
10
7
13 119
12 15 747.5 1.95E-01
14 16 748.8 1.95E-01
0.2 19 18 20 15
16 17 17 765.9 1.90E-01
18 185.6 1.86E-01
19 66.6 1.86E-01
0.1 20 671.9 1.86E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00046\G3, 3_P1sv00000 - 117 132.csv

Spectrum TP: 132 (v)


1.1 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 09:28
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 97.8 2.14E-01
2 125.9 1.87E-01
3 200.3 1.80E-01
0.7 4 55.0 1.80E-01
5 56.9 1.77E-01
Magnitude (ips Pk)

0.6 6 199.1 1.67E-01


7 33.4 1.35E-01
8 198.1 1.27E-01
0.5 9 96.3 1.24E-01
10 124.4 1.22E-01
11 130.3 1.18E-01
0.4 12 105.9 1.17E-01
13 117.2 1.17E-01
0.3 14 95.3 1.15E-01
15 26.9 1.12E-01
1 16 115.6 1.11E-01
0.2 45 2
6
3 17 45.0 1.10E-01
7 8
18 94.1 1.06E-01
15 17 9 12 16
14 131011
18
19 20 19 92.2 9.90E-02
0.1 20 105.0 9.87E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00046\G4, 4_P1sv00000 - 117 132.csv

Vibration, Dynamics & Noise Page 121 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.26
Spectrum TP: 120 (-h)
1.2 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 09:38
Setup:
1 Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 46.6 1.01E+00
2 73.1 7.05E-01
0.8 3 54.4 6.38E-01
4 58.1 6.37E-01
2 5 82.8 6.02E-01
Magnitude (ips Pk)

34 6 153.8 5.47E-01
5 7 81.9 5.46E-01
0.6 8 180.0 5.39E-01
7 6 8
10 9 9 181.3 5.16E-01
11 12 10 33.4 5.12E-01
13
14
11 56.6 4.95E-01
16 15
17 12 176.6 4.84E-01
0.4 19 20 18 13 177.2 4.64E-01
14 175.9 4.62E-01
15 177.8 4.26E-01
16 26.9 4.24E-01
17 80.0 4.03E-01
0.2
18 76.3 3.76E-01
19 16.9 3.68E-01
20 66.9 3.65E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00047\G1, 1_P1sv00000 - 120 130.csv

Spectrum TP: 120 (-v)


1.1
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 09:38


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 181.3 7.27E-01
2 181.9 7.18E-01
12
3 180.0 6.21E-01
0.7 4 182.8 5.52E-01
5 154.7 5.44E-01
Magnitude (ips Pk)

3
0.6 6 155.9 5.27E-01
5 4 7 58.1 5.18E-01
7 6 8 147.8 4.97E-01
8
0.5 9
9 147.2 4.63E-01
10 10 162.2 4.31E-01
11 11 163.4 4.05E-01
0.4 13 12
14
15 12 176.6 3.91E-01
17 16
18 13 61.3 3.90E-01
19
0.3 20 14 177.2 3.79E-01
15 175.9 3.74E-01
16 177.8 3.49E-01
0.2 17 160.9 3.40E-01
18 160.3 3.25E-01
19 159.1 3.16E-01
0.1 20 149.1 2.93E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00047\G2, 2_P1sv00000 - 120 130.csv

Spectrum TP: 130 (-h)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 09:38


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 129.7 5.71E-01
2 134.1 4.35E-01
3 133.4 4.25E-01
0.7 4 135.9 3.90E-01
5 135.0 3.86E-01
Magnitude (ips Pk)

0.6 6 183.8 3.66E-01


1 7 184.7 3.56E-01
8 115.3 3.47E-01
0.5 9 162.5 3.31E-01
23 10 122.8 3.26E-01
11 71.6 3.23E-01
0.4 54
67 12 117.2 3.19E-01
8
11 10
1213 9 13 125.3 3.17E-01
14
16 15 14 182.5 3.16E-01
0.3 17 18
19 20 15 181.9 3.01E-01
16 120.6 2.94E-01
0.2 17 73.4 2.69E-01
18 178.8 2.61E-01
19 74.1 2.55E-01
0.1 20 390.9 2.44E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00047\G3, 3_P1sv00000 - 120 130.csv

Spectrum TP: 130 (v)


1.1 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 09:38
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 229.7 2.76E-01
2 229.1 2.68E-01
3 233.1 2.67E-01
0.7 4 234.1 2.66E-01
5 58.1 2.59E-01
Magnitude (ips Pk)

0.6 6 97.5 2.47E-01


7 61.3 2.36E-01
8 181.9 2.35E-01
0.5 9 163.4 2.31E-01
10 162.5 2.23E-01
11 235.0 2.23E-01
0.4 12 100.0 1.90E-01
13 100.6 1.89E-01
0.3 14 183.8 1.81E-01
14
23
5 6 15 370.3 1.80E-01
7 9
10 8 11 16 236.6 1.73E-01
0.2 12
13
19 14 16
20 15
17
18 17 371.6 1.72E-01
18 372.2 1.72E-01
19 165.0 1.68E-01
0.1 20 237.8 1.67E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00047\G4, 4_P1sv00000 - 120 130.csv

Vibration, Dynamics & Noise Page 122 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.27
Spectrum TP: 310 (-h)
1.1 Channel: 1 P:BMA-Pipe
Date: May 30, 2016 09:48
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 94.7 3.18E-01
2 53.4 2.59E-01
3 30.6 2.41E-01
0.7 4 45.0 1.90E-01
5 97.8 1.88E-01
Magnitude (ips Pk)

0.6 6 50.0 1.49E-01


7 49.4 1.42E-01
8 75.6 1.22E-01
0.5 9 99.7 1.19E-01
10 100.3 1.15E-01
11 43.8 1.15E-01
0.4 12 106.6 9.96E-02
1
13 60.9 8.91E-02
0.3 14 107.8 8.29E-02
3
2 15 117.2 8.06E-02
16 110.0 7.74E-02
0.2 4 5 17 71.3 6.91E-02
76 18 83.8 6.43E-02
11 8 9
10
12 19 72.8 6.17E-02
0.1 13
17
19 1820
14
1615 20 90.6 5.89E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00048\G1, 1_P1sv00000 - 310 309.csv

Spectrum TP: 310 (v)


1.1
Channel: 2 P:BMA-Pipe

Date: May 30, 2016 09:48


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 76.9 4.68E-01
2 124.1 4.05E-01
3 135.6 3.94E-01
0.7 4 106.6 3.18E-01
5 117.2 3.08E-01
Magnitude (ips Pk)

0.6 6 74.1 2.51E-01


7 109.7 2.44E-01
8 60.6 2.10E-01
0.5 1
9 150.3 1.82E-01
10 110.9 1.73E-01
2 3 11 142.5 1.44E-01
0.4 12 53.4 1.35E-01
4 5
13 30.9 1.32E-01
0.3 14 81.6 1.25E-01
6 7 15 105.0 1.19E-01
8 16 104.4 1.16E-01
0.2 10 9 17 156.3 9.92E-02
13 12 11 18 102.5 9.70E-02
14 15
16
18 17
19 19 154.7 9.60E-02
0.1 20 20 100.3 8.08E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00048\G2, 2_P1sv00000 - 310 309.csv

Spectrum TP: 309 (h)


1.1 Channel: 3 P:BMA-Pipe

Date: May 30, 2016 09:48


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 53.4 5.79E-01
2 60.9 4.64E-01
3 45.0 2.83E-01
0.7 4 30.6 2.52E-01
5 50.0 2.01E-01
Magnitude (ips Pk)

0.6 6 49.4 1.96E-01


1
7 43.8 1.46E-01
8 94.7 1.06E-01
0.5 2
9 70.6 1.03E-01
10 51.9 9.51E-02
11 176.9 8.99E-02
0.4 12 46.9 8.83E-02
13 58.1 8.82E-02
0.3 3 14 177.5 8.11E-02
4 15 98.1 7.55E-02
16 158.4 7.40E-02
65
0.2 17 41.3 7.19E-02
7 18 160.0 6.86E-02
121013
9 8 19 72.8 6.81E-02
0.1 17
20 19 15 16
18
11
14 20 40.0 6.57E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00048\G3, 3_P1sv00000 - 310 309.csv

Spectrum TP: 309 (v)


1.1 Channel: 4 P:BMA-Pipe
Date: May 30, 2016 09:48
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 216.9 2.14E-01
2 76.9 1.60E-01
3 89.4 1.44E-01
0.7 4 221.3 1.35E-01
5 233.4 1.33E-01
Magnitude (ips Pk)

0.6 6 232.8 1.32E-01


7 234.1 1.28E-01
8 219.4 1.14E-01
0.5 9 235.0 9.64E-02
10 230.3 9.60E-02
11 235.6 9.45E-02
0.4 12 229.4 8.82E-02
13 224.4 8.66E-02
0.3 14 117.2 8.63E-02
15 249.1 8.36E-02
1 16 124.1 8.32E-02
0.2 17 248.4 8.07E-02
2
3 4 65 18 100.3 8.06E-02
8 7 19 129.1 8.05E-02
1011
9 15
0.1 18 141619 2012 17
13
20 225.9 8.02E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00048\G4, 4_P1sv00000 - 310 309.csv

Vibration, Dynamics & Noise Page 123 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.28
Spectrum TP: Cylinder 5 (-h)
0.77 Channel: 1 C:BMA-Cylinder
Date: May 30, 2016 09:59
Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 176.9 4.11E-01
0.55 2 177.5 3.87E-01
3 180.6 2.76E-01
4 16.3 2.49E-01
5 182.2 2.45E-01
Magnitude (ips Pk)

0.44 6 26.6 2.37E-01


1
2 7 183.4 2.32E-01
8 174.1 2.26E-01
9 73.4 1.84E-01
0.33 10 199.7 1.76E-01
3 11 82.8 1.58E-01
4 12 171.6 1.40E-01
6 5
8 7 13 45.9 1.35E-01
0.22 14 197.5 1.34E-01
9 10 15 90.3 1.31E-01
11 16 196.9 1.29E-01
13 15 12 14
19 18
20
17 16 17 170.6 1.29E-01
0.11 18 85.0 1.26E-01
19 70.0 1.16E-01
20 69.1 1.16E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00049\G1, 1_P1sv00000 - C5 460.csv

Spectrum TP: Cylinder 5 (v)


0.77
Channel: 2 C:BMA-Cylinder

Date: May 30, 2016 09:59


Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 97.2 4.41E-01
0.55 2 57.5 3.84E-01
3 58.4 3.70E-01
4 45.9 3.47E-01
5 55.0 2.99E-01
Magnitude (ips Pk)

1
0.44 6 59.7 2.65E-01
2 7 32.8 2.17E-01
3 8 26.6 2.10E-01
4 9 80.9 2.00E-01
0.33 10 100.0 1.96E-01
5
11 94.4 1.86E-01
6 12 70.0 1.74E-01
13 71.3 1.71E-01
0.22 87 9 14 103.8 1.59E-01
10
11 15 105.0 1.55E-01
12
13
14
15 16 111.3 1.47E-01
20 17
16
1918
17 107.8 1.47E-01
0.11 18 111.9 1.45E-01
19 107.2 1.45E-01
20 75.0 1.39E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00049\G2, 2_P1sv00000 - C5 460.csv

Spectrum TP: Cylinder 5 (a)


1.00 Channel: 3 C:BMA-Cylinder

Date: May 30, 2016 09:59


0.90 1
Setup:
Note:
2
0.80 Freq. Magnitude
# Hz ips Pk
1 125.6 8.71E-01
0.70 2 126.3 8.24E-01
3 128.1 5.14E-01
4 129.4 5.14E-01
0.60 5 123.4 5.08E-01
Magnitude (ips Pk)

6 130.3 4.83E-01
5 34 7 132.2 4.50E-01
0.50 6 8 131.3 4.32E-01
7 9 30.9 3.66E-01
8
10 33.4 3.48E-01
0.40 9 11 69.7 3.21E-01
10 12 71.6 3.05E-01
11
13 12 13 58.1 3.01E-01
0.30 17 16
18
14
15 14 121.3 2.90E-01
19
20
15 120.6 2.78E-01
16 64.4 2.74E-01
0.20
17 28.4 2.73E-01
18 62.5 2.70E-01
0.10 19 114.4 2.60E-01
20 116.9 2.54E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00049\G3, 3_P1sv00000 - C5 460.csv

Spectrum TP: Cylinder 3 (-h)


0.77 Channel: 1 C:BMA-Cylinder
Date: May 30, 2016 10:10
Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 175.9 3.05E-01
0.55 2 175.0 2.93E-01
3 16.6 2.86E-01
4 174.4 2.83E-01
5 173.8 2.68E-01
Magnitude (ips Pk)

0.44 6 173.1 2.64E-01


7 172.5 2.57E-01
8 171.9 2.49E-01
9 32.5 2.46E-01
0.33 1 10 171.3 2.39E-01
3 42 11 177.8 2.39E-01
65 12 179.4 2.07E-01
9 87
1011 13 163.1 2.02E-01
0.22 14 16 13 12
15 14 26.9 2.00E-01
20 17
18
19 15 162.5 1.96E-01
16 58.1 1.96E-01
17 168.4 1.86E-01
0.11 18 166.9 1.83E-01
19 164.7 1.79E-01
20 147.2 1.77E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00050\G1, 1_P1sv00000 - C3 460 open.csv

Vibration, Dynamics & Noise Page 124 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.29
Spectrum TP: Cylinder 3 (v)
0.77 Channel: 2 C:BMA-Cylinder
Date: May 30, 2016 10:10
Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 71.9 3.66E-01
0.55 2 72.5 3.54E-01
3 58.1 3.52E-01
4 70.3 3.42E-01
5 58.8 3.42E-01
Magnitude (ips Pk)

0.44 6 60.9 2.98E-01


7 45.9 2.65E-01
1 8 100.0 2.28E-01
3 2
5 4 9 97.8 2.26E-01
0.33 10 32.5 1.98E-01
6
11 82.2 1.84E-01
7 12 148.1 1.84E-01
98 13 26.6 1.82E-01
0.22 10 14 148.8 1.79E-01
13 11 12
14 15 56.3 1.73E-01
15 16
20 17 18 19 16 81.6 1.73E-01
17 55.6 1.57E-01
0.11 18 102.2 1.54E-01
19 147.5 1.51E-01
20 41.9 1.49E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00050\G2, 2_P1sv00000 - C3 460 open.csv

Spectrum TP: Cylinder 3 (a)


0.70
Channel: 3 C:BMA-Cylinder

Date: May 30, 2016 10:10


Setup:
0.60 1 Note:

Freq. Magnitude
# Hz ips Pk
1 125.6 5.95E-01
0.50 2
2 127.5 4.93E-01
3 3 130.3 4.46E-01
4 4 130.9 4.29E-01
5 133.4 3.80E-01
Magnitude (ips Pk)

0.40 5 6 33.4 3.51E-01


6 7 69.7 3.08E-01
8 71.3 2.96E-01
7 9 63.1 2.73E-01
0.30 8
10 9
10 28.4 2.72E-01
11
12
11 30.6 2.71E-01
1413 15 12 31.3 2.70E-01
16
17
18 13 65.0 2.50E-01
0.20 20 19
14 58.1 2.45E-01
15 122.5 2.38E-01
16 120.3 2.23E-01
17 211.3 2.12E-01
0.10 18 210.6 2.04E-01
19 210.0 1.96E-01
20 114.7 1.95E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00050\G3, 3_P1sv00000 - C3 460 open.csv

Spectrum TP: 120 (a)


1.1 Channel: 1 P:BMA-Pipe

Date: May 30, 2016 10:22


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 181.9 4.79E-01
2 30.9 4.59E-01
3 33.1 3.81E-01
0.7 4 183.4 3.58E-01
5 28.4 3.54E-01
Magnitude (ips Pk)

0.6 6 270.0 3.07E-01


7 268.4 3.03E-01
8 178.4 2.88E-01
0.5 1 9 286.3 2.65E-01
2
10 285.6 2.55E-01
11 176.9 2.50E-01
0.4 3 12 175.9 2.49E-01
5 4
13 177.5 2.41E-01
76 14 277.2 2.34E-01
0.3 8
9
11
12
13 10 15 284.1 2.30E-01
1415
16
17
18
19 20 16 276.6 2.28E-01
0.2 17 275.9 2.27E-01
18 271.3 2.16E-01
19 275.0 2.12E-01
0.1 20 287.5 2.11E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00051\G1, 1_P1sv00000 - 120 130 314.csv

Spectrum TP: 130 (a)


1.1 Channel: 2 P:BMA-Pipe
Date: May 30, 2016 10:22
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 58.4 2.47E-01
2 83.4 2.33E-01
3 69.4 1.75E-01
0.7 4 154.1 1.63E-01
5 156.9 1.54E-01
Magnitude (ips Pk)

0.6 6 54.1 1.54E-01


7 81.9 1.53E-01
8 71.6 1.50E-01
0.5 9 63.1 1.45E-01
10 67.8 1.44E-01
11 90.3 1.42E-01
0.4 12 64.4 1.35E-01
13 33.1 1.34E-01
0.3 14 65.3 1.28E-01
1 15 30.9 1.18E-01
2
16 366.9 1.14E-01
0.2 3 45
17 182.2 1.14E-01
6 9108 7 11 18 181.6 1.08E-01
13 12
14
15 17 16
20 18 19 19 365.6 1.05E-01
0.1 20 28.4 9.93E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00051\G2, 2_P1sv00000 - 120 130 314.csv

Vibration, Dynamics & Noise Page 125 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.30
Spectrum TP: 314 (h)
2.4 Channel: 3 P:BMA-Pipe
Date: May 30, 2016 10:22
Setup:
1 Note:
2.0
Freq. Magnitude
# Hz ips Pk
1 60.6 2.02E+00
2 110.9 5.68E-01
1.6 3 110.0 5.16E-01
4 158.1 5.14E-01
5 114.1 5.10E-01
Magnitude (ips Pk)

6 116.6 4.69E-01
7 182.2 4.62E-01
1.2 8 175.9 4.50E-01
9 164.1 4.47E-01
10 45.9 4.39E-01
11 45.0 4.16E-01
12 165.0 4.16E-01
0.8 13 161.9 4.07E-01
14 166.6 3.86E-01
2 15 161.3 3.81E-01
35 4
6 9 87 16 54.7 3.77E-01
10
11 12
13
14
15 17 55.9 3.71E-01
0.4 18 19 16
20
17
18 30.6 3.49E-01
19 42.8 3.33E-01
20 30.0 3.28E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00051\G3, 3_P1sv00000 - 120 130 314.csv

Spectrum TP: 314 (a)


2.4
Channel: 4 P:BMA-Pipe

1 Date: May 30, 2016 10:22


Setup:
Note:
2.0
Freq. Magnitude
# Hz ips Pk
1 30.6 2.18E+00
2 76.6 1.52E+00
1.6 2 3 73.1 9.14E-01
4 53.4 6.62E-01
5 16.9 6.31E-01
Magnitude (ips Pk)

6 58.8 5.97E-01
7 71.6 5.63E-01
1.2 8 106.6 4.48E-01
9 115.0 4.04E-01
10 116.6 3.55E-01
3 11 43.1 3.54E-01
12 105.3 3.25E-01
0.8 13 26.6 3.07E-01
4 14 83.1 2.89E-01
5
6
7 15 321.3 2.75E-01
8 16 322.2 2.66E-01
9 17 322.8 2.65E-01
0.4 11 12 10
13 14 18 195.0 2.61E-01
18 15
16
17
19 20 19 66.9 2.09E-01
20 319.4 2.05E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00051\G4, 4_P1sv00000 - 120 130 314.csv

Spectrum TP: 320 (a)


1.2 Channel: 1 P:BMA-Pipe

Date: May 30, 2016 10:36


Setup:
1 Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 30.3 1.01E+00
2 73.8 6.94E-01
0.8 3 60.3 5.88E-01
4 59.4 5.65E-01
2 5 156.6 5.36E-01
Magnitude (ips Pk)

6 158.1 5.25E-01
7 75.3 5.16E-01
0.6 3
4 8 16.6 4.87E-01
56 9 62.8 4.24E-01
7
8 10 162.8 3.31E-01
11 163.4 3.20E-01
9
12 164.4 3.15E-01
0.4 13 69.4 2.99E-01
10
11 14 160.6 2.99E-01
12
13
15 14
18
16
17 15 71.9 2.96E-01
19
20 16 151.9 2.82E-01
0.2 17 150.6 2.81E-01
18 81.9 2.64E-01
19 80.0 2.52E-01
20 80.6 2.49E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00052\G1, 1_P1sv00000 - 330 335 c1.csv

Spectrum TP: 315 (a)


2.0 Channel: 2 P:BMA-Pipe
Date: May 30, 2016 10:36
1
1.8 Setup:
Note:

1.6 Freq. Magnitude


# Hz ips Pk
1 30.3 1.80E+00
1.4 2 59.1 7.11E-01
3 60.3 6.75E-01
4 16.9 6.41E-01
1.2 5 73.4 4.07E-01
Magnitude (ips Pk)

6 62.8 3.84E-01
7 26.9 2.89E-01
1.0 8 69.4 2.68E-01
9 43.1 2.24E-01
10 83.4 2.04E-01
0.8 11 81.9 2.01E-01
2
4
3 12 82.8 1.97E-01
13 78.1 1.95E-01
0.6 14 80.0 1.86E-01
15 45.3 1.82E-01
0.4 6 5 16 80.6 1.80E-01
17 158.4 1.77E-01
7 8 18 37.2 1.72E-01
9 10
11
0.2 1815 1312
14
16 17
19 20
19 156.9 1.71E-01
20 254.7 1.61E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00052\G2, 2_P1sv00000 - 330 335 c1.csv

Vibration, Dynamics & Noise Page 126 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.31
Spectrum TP: Cylinder 1 (a)
1.4 Channel: 3 C:BMA-Cylinder
Date: May 30, 2016 10:36
Setup:
1.2 1 Note:

Freq. Magnitude
# Hz ips Pk
1 30.3 1.19E+00
1.0 2 16.9 5.09E-01
3 60.3 3.47E-01
4 76.9 2.43E-01
5 203.4 2.34E-01
Magnitude (ips Pk)

0.8 6 204.1 2.33E-01


7 205.6 2.06E-01
8 26.9 2.05E-01
9 206.6 2.02E-01
0.6 10 211.6 1.95E-01
2 11 207.2 1.89E-01
12 208.8 1.87E-01
13 63.1 1.79E-01
0.4 14 209.4 1.76E-01
3
15 210.3 1.75E-01
16 54.4 1.74E-01
4 56 17 64.1 1.72E-01
8 7910
11
0.2 16 13
17 12
14
1519 18 215.0 1.60E-01
18
20 19 214.4 1.59E-01
20 181.9 1.41E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00052\G3, 3_P1sv00000 - 330 335 c1.csv

Spectrum TP: 320 (h)


1.1
Channel: 4 P:BMA-Pipe

Date: May 30, 2016 10:36


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 181.9 5.23E-01
2 83.4 4.42E-01
3 72.8 3.81E-01
0.7 4 70.6 3.61E-01
5 175.9 3.38E-01
Magnitude (ips Pk)

0.6 6 175.3 3.30E-01


7 176.6 3.28E-01
1 8 106.6 3.08E-01
0.5 9 82.2 3.06E-01
2 10 16.6 3.06E-01
11 75.3 2.90E-01
0.4 3 12 105.0 2.84E-01
4
657 13 46.3 2.81E-01
10 9 8
0.3 13 11 12 14 14 115.6 2.76E-01
16 15
18 17
19 15 102.5 2.76E-01
20
16 33.4 2.62E-01
0.2 17 114.4 2.57E-01
18 104.4 2.54E-01
19 103.8 2.52E-01
0.1 20 178.1 2.40E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00052\G4, 4_P1sv00000 - 330 335 c1.csv

Spectrum TP: 320 (-v)


1.1 Channel: 1 P:BMA-Pipe

Date: May 30, 2016 10:47


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 106.6 5.58E-01
2 30.9 3.87E-01
3 59.1 3.43E-01
0.7 4 69.1 2.80E-01
5 183.1 2.71E-01
Magnitude (ips Pk)

0.6 6 116.3 2.46E-01


1 7 182.5 2.45E-01
8 221.6 2.39E-01
0.5 9 116.9 2.37E-01
10 181.6 2.36E-01
11 202.8 2.25E-01
0.4 2
12 220.6 2.24E-01
3 13 199.7 2.22E-01
0.3 4 14 200.3 2.19E-01
5
69 7 8
15 217.2 2.10E-01
10 11 12
16
13
14 15 16 76.6 2.07E-01
0.2 20 17 19 18
17 73.4 2.06E-01
18 218.8 1.97E-01
19 192.5 1.94E-01
0.1 20 61.3 1.91E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00053\G1, 1_P1sv00000 - 320 315 c1 335.csv

Spectrum TP: 315 (-v)


1.1 Channel: 2 P:BMA-Pipe
Date: May 30, 2016 10:47
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 106.6 3.28E-01
2 115.9 3.18E-01
3 116.6 3.18E-01
0.7 4 53.1 3.07E-01
5 46.6 2.98E-01
Magnitude (ips Pk)

0.6 6 83.8 2.86E-01


7 62.2 2.61E-01
8 45.0 2.29E-01
0.5 9 76.6 1.83E-01
10 81.9 1.82E-01
11 81.3 1.82E-01
0.4 12 175.3 1.75E-01
1 23 13 122.8 1.62E-01
54 14 60.3 1.59E-01
0.3 6
7 15 163.4 1.58E-01
8 16 250.9 1.58E-01
0.2 910
11
13 12 17 151.3 1.57E-01
2014 17 19
15
18 16
18 165.6 1.56E-01
19 162.8 1.51E-01
0.1 20 56.3 1.47E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00053\G2, 2_P1sv00000 - 320 315 c1 335.csv

Vibration, Dynamics & Noise Page 127 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.32
Spectrum TP: Cylinder 1 (v)
0.77 Channel: 3 C:BMA-Cylinder
Date: May 30, 2016 10:47
Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 62.2 3.53E-01
0.55 2 46.6 3.45E-01
3 53.1 2.87E-01
4 83.4 2.87E-01
5 76.6 2.83E-01
Magnitude (ips Pk)

0.44 6 45.0 2.65E-01


7 56.6 2.35E-01
8 57.2 2.17E-01
2 1
9 31.3 2.11E-01
0.33 10 81.3 2.01E-01
3 54 11 81.9 1.97E-01
6 12 59.1 1.81E-01
7 13 16.9 1.69E-01
8
0.22 9
10
11 14 66.6 1.52E-01
13
12 15 42.2 1.43E-01
15 14 16 65.9 1.41E-01
16
17 18
20 19 17 40.9 1.29E-01
0.11 18 69.7 1.27E-01
19 106.6 1.21E-01
20 71.3 1.17E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00053\G3, 3_P1sv00000 - 320 315 c1 335.csv

Spectrum TP: 335 (-h)


1.1
Channel: 4 P:BMA-Pipe

Date: May 30, 2016 10:47


1.0 Setup:
Note:
0.9
Freq. Magnitude
1 # Hz ips Pk
0.8 1 115.3 8.15E-01
2 124.7 5.78E-01
3 200.3 5.28E-01
0.7 4 199.7 5.28E-01
5 83.8 4.80E-01
Magnitude (ips Pk)

0.6 6 70.3 4.02E-01


2
7 71.3 3.90E-01
43 8 193.8 3.61E-01
0.5 5 9 214.4 3.60E-01
10 194.4 3.57E-01
67 11 195.6 3.53E-01
0.4 12 203.1 3.44E-01
8
10
11 9
14 12 13
15 13 215.3 3.43E-01
17 16 19 18
20
0.3 14 195.0 3.40E-01
15 203.8 3.34E-01
16 176.6 3.29E-01
0.2 17 151.3 3.27E-01
18 210.0 3.27E-01
19 192.5 3.18E-01
0.1 20 191.9 3.12E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00053\G4, 4_P1sv00000 - 320 315 c1 335.csv

Spectrum TP: 330 (v)


1.1 Channel: 1 P:BMA-Pipe

Date: May 30, 2016 10:55


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 83.4 4.46E-01
2 213.4 3.72E-01
3 214.7 3.69E-01
0.7 4 214.1 3.67E-01
5 200.3 3.46E-01
Magnitude (ips Pk)

0.6 6 201.3 3.38E-01


7 210.9 3.26E-01
8 76.6 3.24E-01
0.5 9 176.9 3.16E-01
1 10 177.5 3.14E-01
11 178.8 3.14E-01
0.4 243 12 82.2 3.11E-01
56 13 179.7 3.04E-01
812 10
911 7
13 1415 14 202.2 3.02E-01
0.3 16 17
20 1819 15 209.7 2.90E-01
16 203.1 2.80E-01
0.2 17 216.9 2.75E-01
18 197.8 2.57E-01
19 207.2 2.54E-01
0.1 20 116.9 2.52E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00054\G1, 1_P1sv00000 - 330 335 c1 336.csv

Spectrum TP: 335 (v)


1.1 Channel: 2 P:BMA-Pipe
Date: May 30, 2016 10:55
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 179.7 4.09E-01
2 178.8 3.88E-01
3 214.7 3.74E-01
0.7 4 214.1 3.71E-01
5 213.4 3.65E-01
Magnitude (ips Pk)

0.6 6 61.9 3.59E-01


7 60.0 3.56E-01
8 60.6 3.55E-01
0.5 9 176.9 3.45E-01
10 216.9 2.81E-01
1 11 210.9 2.62E-01
0.4 2
543 12 83.8 2.62E-01
876 9 13 76.3 2.61E-01
0.3 10 14 57.5 2.49E-01
14
16
1312 11
15 15 209.7 2.46E-01
18 17 19
20 16 56.3 2.43E-01
0.2 17 150.0 2.31E-01
18 81.6 2.28E-01
19 181.6 2.23E-01
0.1 20 182.5 2.20E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00054\G2, 2_P1sv00000 - 330 335 c1 336.csv

Vibration, Dynamics & Noise Page 128 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.33
Spectrum TP: Cylinder 1 (-h)
0.77 Channel: 3 C:BMA-Cylinder
Date: May 30, 2016 10:55
Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 16.9 3.13E-01
0.55 2 70.6 2.89E-01
3 73.1 2.67E-01
4 181.6 1.88E-01
5 180.9 1.85E-01
Magnitude (ips Pk)

0.44 6 33.4 1.65E-01


7 90.3 1.47E-01
8 200.3 1.47E-01
9 60.3 1.45E-01
0.33 1 10 164.1 1.43E-01
2 11 210.9 1.42E-01
3 12 163.4 1.38E-01
13 164.7 1.38E-01
0.22 14 45.9 1.37E-01
54 15 83.4 1.37E-01
6
16 175.6 1.36E-01
14 9 15 7 10
12
13
17 16
8 11
19 1820 17 165.9 1.32E-01
0.11 18 166.9 1.26E-01
19 82.2 1.25E-01
20 174.4 1.23E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00054\G3, 3_P1sv00000 - 330 335 c1 336.csv

Spectrum TP: 336 (h)


1.6
Channel: 4 P:BMA-Pipe

Date: May 30, 2016 10:55


1 Setup:
1.4 Note:
2
3 Freq. Magnitude
4 # Hz ips Pk
1.2 5
1 200.3 1.42E+00
2 198.8 1.31E+00
6 3 179.7 1.25E+00
1.0 4 197.8 1.19E+00
5 150.0 1.18E+00
Magnitude (ips Pk)

78
9 6 182.5 1.04E+00
1210
11 7 212.5 9.02E-01
0.8 15 13
14
16 17 8 213.4 9.00E-01
1819
20 9 83.8 8.54E-01
10 214.1 8.46E-01
0.6 11 209.7 8.31E-01
12 210.3 8.27E-01
13 209.1 7.91E-01
14 206.9 7.86E-01
0.4 15 81.6 7.77E-01
16 190.3 7.66E-01
17 207.8 7.49E-01
18 76.6 7.33E-01
0.2 19 80.6 7.15E-01
20 188.4 7.09E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00054\G4, 4_P1sv00000 - 330 335 c1 336.csv

Spectrum TP: 330 (a)


1.1 Channel: 1 P:BMA-Pipe

Date: May 30, 2016 11:04


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 122.5 6.55E-01
2 60.0 5.06E-01
3 83.4 3.77E-01
0.7 4 115.6 3.75E-01
1
5 82.2 3.26E-01
Magnitude (ips Pk)

0.6 6 94.1 3.01E-01


7 63.1 2.76E-01
2 8 30.3 2.70E-01
0.5 9 118.4 2.40E-01
10 92.2 2.35E-01
11 96.3 2.33E-01
0.4 3 4 12 16.6 2.01E-01
5 13 76.9 1.97E-01
6 14 69.1 1.89E-01
0.3 8 7
9
15 131.6 1.69E-01
1011
16 65.3 1.60E-01
12 1413
0.2 15 17 132.8 1.57E-01
1619 17
18
20 18 129.1 1.49E-01
19 71.9 1.48E-01
0.1 20 130.0 1.47E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00055\G1, 1_P1sv00000 - 330 335 336.csv

Spectrum TP: 335 (a)


1.1 Channel: 2 P:BMA-Pipe
Date: May 30, 2016 11:04
1.0 Setup:
1 Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 60.0 9.31E-01
2 30.6 7.10E-01
2 3 122.5 4.01E-01
0.7 4 75.6 3.99E-01
5 63.4 3.19E-01
Magnitude (ips Pk)

0.6 6 65.3 2.92E-01


7 64.7 2.83E-01
8 16.9 2.74E-01
0.5 9 83.4 2.62E-01
10 94.1 2.59E-01
4 3 11 95.6 2.49E-01
0.4 12 96.3 2.45E-01
5 13 72.2 2.37E-01
0.3 76 14 55.9 2.06E-01
8 9 10
11
12 15 92.2 1.91E-01
13
14 16 118.4 1.84E-01
0.2 1715 16 18 17 85.0 1.79E-01
19
20 18 132.8 1.70E-01
19 131.6 1.60E-01
0.1 20 134.4 1.46E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00055\G2, 2_P1sv00000 - 330 335 336.csv

Vibration, Dynamics & Noise Page 129 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.34
Spectrum TP: 336 (-a)
1.1 Channel: 3 P:BMA-Pipe
Date: May 30, 2016 11:04
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 69.7 7.36E-01
1 2 70.9 6.47E-01
3 60.0 6.16E-01
0.7 4 81.9 4.49E-01
2 5 76.9 4.37E-01
Magnitude (ips Pk)

3
0.6 6 73.8 3.48E-01
7 199.7 3.27E-01
8 198.1 3.00E-01
0.5 9 175.6 2.65E-01
54 10 65.6 2.61E-01
11 192.2 2.29E-01
0.4 12 201.6 2.28E-01
6
7 13 182.2 2.08E-01
8 14 177.2 2.07E-01
0.3 9
10 15 57.2 2.07E-01
11 12 16 185.9 2.05E-01
15 14131619
17
20 18
0.2 17 174.4 2.01E-01
18 193.4 2.00E-01
19 190.9 1.99E-01
0.1 20 173.1 1.98E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00055\G3, 3_P1sv00000 - 330 335 336.csv

Spectrum TP: 336 (v)


2.2
Channel: 4 P:BMA-Pipe

Date: May 30, 2016 11:04


2.0 1 Setup:
Note:
1.8
Freq. Magnitude
2
# Hz ips Pk
3 1 83.8 1.94E+00
1.6
2 76.6 1.69E+00
3 81.9 1.59E+00
1.4 4 80.0 1.01E+00
5 215.0 7.38E-01
Magnitude (ips Pk)

1.2 6 125.0 7.36E-01


7 214.4 7.30E-01
8 210.9 6.85E-01
4
1.0 9 213.1 6.81E-01
10 123.1 6.76E-01
11 178.8 6.74E-01
0.8 6 75 12 177.2 6.61E-01
10 11
12 89 13 177.8 6.47E-01
13
0.6 15
14 14 209.4 5.92E-01
16 17
18 19 15 200.0 5.59E-01
20
16 132.5 5.53E-01
0.4 17 200.6 5.42E-01
18 59.7 5.12E-01
19 175.3 4.93E-01
0.2 20 202.5 4.77E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00055\G4, 4_P1sv00000 - 330 335 336.csv

Spectrum TP: Skid Edge Front Left Engine (h)


0.11 Channel: 1 S:BMA-Skid/Foundation

Date: Jun 02, 2016 07:19


0.10 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 1 56.6 1.54E-02
2 46.9 1.42E-02
3 16.6 1.36E-02
0.07 4 47.8 1.25E-02
5 49.1 1.10E-02
Magnitude (ips Pk)

0.06 6 53.4 1.08E-02


7 50.0 1.07E-02
8 31.9 9.82E-03
0.05 9 241.6 8.58E-03
10 183.8 8.38E-03
11 910.9 8.35E-03
0.04 12 221.9 8.30E-03
13 240.0 8.12E-03
0.03 14 223.4 7.96E-03
15 242.8 7.40E-03
16 236.9 7.39E-03
0.02 17 245.9 7.31E-03
3 2 1 18 238.1 7.28E-03
4
8 56
7 19 45.0 7.28E-03
0.01 19 10 12 18
9
14 1617
13
15 11
20 20 910.0 7.24E-03

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00095\G1, 1_P1sv00000 - Skid Left.csv

Spectrum TP: Skid Edge Front Left Engine (v)


0.11 Channel: 2 S:BMA-Skid/Foundation
Date: Jun 02, 2016 07:19
0.10 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 1 31.9 4.66E-02
2 31.3 4.65E-02
3 27.8 1.98E-02
0.07 4 48.1 1.37E-02
5 42.8 1.36E-02
Magnitude (ips Pk)

0.06 6 41.9 1.16E-02


7 16.9 1.13E-02
8 75.0 9.16E-03
0.05 21
9 40.0 7.96E-03
10 38.8 6.89E-03
11 56.6 6.83E-03
0.04 12 71.6 6.79E-03
13 63.4 6.09E-03
0.03 14 36.3 6.05E-03
15 227.8 5.85E-03
16 219.4 5.24E-03
3
0.02 17 224.1 5.20E-03
54 18 25.0 5.12E-03
7 6 19 222.2 5.10E-03
0.01 9 11 128
10 20 229.4 5.03E-03
18 14 13 1715
16
1920

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00095\G2, 2_P1sv00000 - Skid Left.csv

Vibration, Dynamics & Noise Page 130 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.35
Spectrum TP: Skid Edge Back Left Engine (h)
0.11 Channel: 3 S:BMA-Skid/Foundation
Date: Jun 02, 2016 07:19
0.10 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 1 175.6 2.38E-02
2 173.4 2.35E-02
3 177.5 2.10E-02
0.07 4 178.4 2.10E-02
5 215.6 1.80E-02
Magnitude (ips Pk)

0.06 6 215.0 1.74E-02


7 216.3 1.72E-02
8 31.9 1.69E-02
0.05 9 171.3 1.67E-02
10 164.1 1.62E-02
11 181.3 1.59E-02
0.04 12 183.8 1.54E-02
13 165.3 1.54E-02
0.03 14 211.9 1.46E-02
15 16.9 1.44E-02
21
34 16 170.3 1.44E-02
0.02 8 10 9 11 657 17 179.7 1.41E-02
15 13161712 14 18 18 221.9 1.41E-02
20 19
19 223.4 1.34E-02
0.01 20 49.1 1.22E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00095\G3, 3_P1sv00000 - Skid Left.csv

Spectrum TP: Skid Edge Back Left Engine (v)


0.11
Channel: 4 S:BMA-Skid/Foundation

Date: Jun 02, 2016 07:19


0.10 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 1 31.9 5.11E-02
2 31.3 5.09E-02
3 33.4 4.57E-02
0.07 4 177.2 3.21E-02
5 27.5 2.86E-02
Magnitude (ips Pk)

0.06 6 178.4 2.60E-02


7 217.2 2.27E-02
21 8 25.3 1.92E-02
0.05 9 224.4 1.68E-02
3 10 16.9 1.64E-02
11 43.4 1.60E-02
0.04 12 42.8 1.55E-02
4 13 35.9 1.53E-02
0.03 5 14 265.0 1.39E-02
6 15 41.9 1.36E-02
7 16 183.4 1.35E-02
0.02 8 17 261.3 1.32E-02
10 11 9
1312 18 260.6 1.31E-02
15 16 14
18
17
19
20
19 262.2 1.25E-02
0.01 20 219.4 1.23E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00095\G4, 4_P1sv00000 - Skid Left.csv

Spectrum TP: Skid at Engine Ped. Front Left (v)


0.18 Channel: 1 S:BMA-Skid/Foundation

Date: Jun 02, 2016 07:38


21 Setup:
Note:
0.15
Freq. Magnitude
# Hz ips Pk
1 31.9 1.60E-01
2 31.3 1.59E-01
0.12 3 16.9 7.25E-02
4 27.8 7.06E-02
5 180.9 6.10E-02
Magnitude (ips Pk)

6 182.2 5.84E-02
7 41.6 5.07E-02
0.09 8 223.1 4.95E-02
9 216.6 4.93E-02
3 4 10 43.1 4.71E-02
11 221.9 4.65E-02
5 12 214.7 4.51E-02
0.06 6
13 224.1 4.38E-02
7 98
10 14 38.1 4.25E-02
1211
13
14 16
18
19
20
15 17 15 160.3 4.23E-02
16 48.8 4.10E-02
0.03 17 220.0 4.08E-02
18 47.8 3.94E-02
19 45.6 3.91E-02
20 47.2 3.91E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00096\G1, 1_P1sv00000 - eng ped Skid Left.csv

Spectrum TP: Skid at Engine Ped. Back Left (v)


0.13 Channel: 2 S:BMA-Skid/Foundation
Date: Jun 02, 2016 07:38
0.12
Setup:
1 Note:
0.11 2
Freq. Magnitude
0.10 3 # Hz ips Pk
1 31.9 1.10E-01
0.09 2 31.3 1.08E-01
3 16.9 9.82E-02
0.08 5
4 4 29.1 7.99E-02
5 24.7 7.77E-02
Magnitude (ips Pk)

6
7 6 43.1 7.40E-02
0.07 7 27.5 7.03E-02
8 9 8 41.6 6.30E-02
0.06 10 11 9 133.4 6.19E-02
12 10 45.6 5.70E-02
13
0.05 14 15 11 71.3 5.67E-02
17 16
18
20
19 12 222.5 5.34E-02
0.04 13 47.2 4.99E-02
14 50.0 4.87E-02
15 224.1 4.71E-02
0.03 16 131.3 4.54E-02
17 120.3 4.46E-02
0.02 18 121.9 4.37E-02
19 123.1 4.23E-02
0.01 20 122.5 4.23E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00096\G2, 2_P1sv00000 - eng ped Skid Left.csv

Vibration, Dynamics & Noise Page 131 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.36
Spectrum TP: Skid Edge Back Left Frame (h)
0.11 Channel: 3 S:BMA-Skid/Foundation
Date: Jun 02, 2016 07:38
0.10 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 1 542.8 3.98E-02
2 542.2 3.76E-02
3 547.5 3.50E-02
0.07 4 544.1 3.44E-02
5 544.7 3.36E-02
Magnitude (ips Pk)

0.06 6 546.9 3.32E-02


7 545.9 3.15E-02
8 540.9 3.12E-02
0.05 9 540.3 3.03E-02
10 548.1 3.02E-02
1 11 577.5 3.00E-02
0.04 2 12 549.1 2.93E-02
4563 13 539.7 2.80E-02
98 710 11 14 503.1 2.73E-02
0.03 14 13 12 1516
17 15 572.2 2.67E-02
18
19
20 16 576.3 2.66E-02
0.02 17 575.3 2.57E-02
18 574.4 2.46E-02
19 571.6 2.32E-02
0.01 20 573.8 2.30E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00096\G3, 3_P1sv00000 - eng ped Skid Left.csv

Spectrum TP: Skid Edge Back Left Frame (v)


0.11
Channel: 4 S:BMA-Skid/Foundation

Date: Jun 02, 2016 07:38


0.10 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 1 381.6 4.37E-02
2 380.9 4.31E-02
3 380.3 4.19E-02
0.07 4 679.7 4.04E-02
5 382.5 3.73E-02
Magnitude (ips Pk)

0.06 6 383.1 3.49E-02


7 384.4 3.43E-02
8 33.4 2.99E-02
0.05 9 30.6 2.85E-02
1 10 342.2 2.82E-02
32 11 343.1 2.70E-02
4
0.04 5 12 400.0 2.55E-02
67
13 28.8 2.55E-02
8 14 400.6 2.54E-02
0.03 9 10
11
13 15 12
14 15 43.8 2.43E-02
16 17
19 18 20 16 341.6 2.37E-02
0.02 17 387.8 2.36E-02
18 387.2 2.30E-02
19 371.9 2.30E-02
0.01 20 411.6 2.26E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00096\G4, 4_P1sv00000 - eng ped Skid Left.csv

Spectrum TP: Skid Edge Back Left Frame (-a)


0.11 Channel: 1 S:BMA-Skid/Foundation

Date: Jun 02, 2016 07:51


0.10 1 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 1 185.0 9.62E-02
2
2 358.1 7.33E-02
3 3 359.4 7.01E-02
0.07 4 4 357.5 6.74E-02
5
5 352.8 6.51E-02
Magnitude (ips Pk)

0.06 6 6 353.8 5.88E-02


8 7 7 380.0 5.70E-02
9
10 8 366.6 5.57E-02
0.05 11
15 12
1613 14
17
9 367.2 5.37E-02
1819 10 310.6 5.07E-02
20 11 311.6 4.86E-02
0.04 12 373.4 4.84E-02
13 361.9 4.73E-02
0.03 14 374.1 4.71E-02
15 316.9 4.71E-02
16 355.6 4.63E-02
0.02 17 374.7 4.63E-02
18 375.3 4.49E-02
19 380.9 4.46E-02
0.01 20 318.4 4.21E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00097\G1, 1_P1sv00000 - skid back.csv

Spectrum TP: Skid Edge Back Right Frame (-a)


0.22 Channel: 2 S:BMA-Skid/Foundation

1 Date: Jun 02, 2016 07:51


0.20 Setup:
Note:
0.18
Freq. Magnitude
# Hz ips Pk
0.16 1 176.3 2.00E-01
2 371.3 1.08E-01
3 373.1 7.35E-02
0.14 4 367.8 6.84E-02
5 368.8 6.56E-02
Magnitude (ips Pk)

0.12 6 374.7 6.47E-02


7 359.7 5.98E-02
2
8 375.3 5.85E-02
0.10 9 359.1 5.57E-02
10 369.7 5.46E-02
11 352.8 5.16E-02
0.08 3 12 450.9 4.35E-02
4 13 361.6 4.18E-02
56
7 8 14 350.3 3.93E-02
0.06 9 10
11 15 326.9 3.76E-02
12 16 325.9 3.69E-02
14 13
0.04 15
16
20 18 1719 17 409.1 3.64E-02
18 355.3 3.56E-02
19 416.9 3.56E-02
0.02 20 325.3 3.56E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00097\G2, 2_P1sv00000 - skid back.csv

Vibration, Dynamics & Noise Page 132 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.37
Spectrum TP: Skid at Frame Ped. Back Left (v)
0.11 Channel: 3 S:BMA-Skid/Foundation
Date: Jun 02, 2016 07:51
0.10 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 1 163.4 7.59E-02
1 2 383.1 6.51E-02
3 83.1 6.18E-02
0.07 4 383.8 6.03E-02
2
5 80.0 6.03E-02
Magnitude (ips Pk)

3
6 5 7 4 6 41.3 6.03E-02
0.06 12 9 810 11
13
15 14 18 17 16 7 200.0 5.98E-02
20 19
8 367.8 5.79E-02
0.05 9 161.3 5.73E-02
10 370.9 5.71E-02
11 382.5 5.71E-02
0.04 12 84.7 5.69E-02
13 369.1 5.66E-02
0.03 14 53.1 5.60E-02
15 30.9 5.53E-02
16 369.7 5.52E-02
0.02 17 166.3 5.50E-02
18 81.6 5.50E-02
19 361.3 5.36E-02
0.01 20 44.1 5.34E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00097\G3, 3_P1sv00000 - skid back.csv

Spectrum TP: Skid at Frame Ped. Back Right (v)


0.10
Channel: 4 S:BMA-Skid/Foundation

Date: Jun 02, 2016 07:51


0.09 Setup:
1 32 Note:
4
0.08 Freq. Magnitude
# Hz ips Pk
5 1 72.2 8.48E-02
0.07 2 82.2 8.41E-02
6 3 81.6 8.39E-02
7 4 80.0 7.96E-02
98 10
0.06 11 5 70.6 7.17E-02
Magnitude (ips Pk)

12
1413
1615 6 73.4 6.43E-02
20 17
18
19 7 200.3 6.13E-02
0.05 8 30.9 6.02E-02
9 28.4 5.95E-02
10 216.9 5.95E-02
0.04 11 181.3 5.80E-02
12 224.4 5.74E-02
13 222.8 5.71E-02
0.03 14 219.4 5.66E-02
15 221.9 5.49E-02
16 218.4 5.38E-02
0.02 17 179.1 5.16E-02
18 179.7 5.15E-02
0.01 19 183.1 5.13E-02
20 83.8 5.07E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00097\G4, 4_P1sv00000 - skid back.csv

Spectrum TP: Skid at Engine Ped. Front Right (v)


0.18 Channel: 1 S:BMA-Skid/Foundation

Date: Jun 02, 2016 08:11


1 Setup:
2 Note:
0.15
Freq. Magnitude
# Hz ips Pk
1 30.9 1.58E-01
2 31.9 1.53E-01
0.12 3 182.2 7.46E-02
4 181.3 7.41E-02
5 27.5 6.45E-02
Magnitude (ips Pk)

6 16.6 5.89E-02
7 179.7 5.68E-02
0.09 8 25.0 5.35E-02
9 41.3 4.65E-02
43 10 176.9 4.57E-02
5 11 160.3 4.39E-02
6 12 161.9 4.15E-02
0.06 7
13 45.3 3.86E-02
8
9 14 47.5 3.84E-02
11 10 15 37.5 3.82E-02
12
1613
15 14
20 19 18 17 16 38.1 3.78E-02
0.03 17 213.4 3.67E-02
18 204.1 3.51E-02
19 156.3 3.49E-02
20 138.1 3.46E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00098\G1, 1_P1sv00000 - skid right.csv

Spectrum TP: Skid Edge Front Right Engine (v)


0.11 Channel: 2 S:BMA-Skid/Foundation
Date: Jun 02, 2016 08:11
0.10 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 1 31.9 4.42E-02
2 27.5 1.72E-02
3 49.1 1.36E-02
0.07 4 43.1 1.32E-02
5 41.9 1.06E-02
Magnitude (ips Pk)

0.06 6 25.0 9.68E-03


7 53.1 9.02E-03
8 16.6 8.75E-03
0.05 9 45.9 8.05E-03
1 10 71.9 7.16E-03
11 56.6 6.80E-03
0.04 12 71.3 6.78E-03
13 157.8 5.48E-03
0.03 14 66.6 5.36E-03
15 154.4 5.34E-03

0.02 2
43
5
0.01 8 6 9 711 10
1412 15
13

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00098\G2, 2_P1sv00000 - skid right.csv

Vibration, Dynamics & Noise Page 133 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.38
Spectrum TP: Skid at Enigne Ped. Back Right (v)
0.11 Channel: 3 S:BMA-Skid/Foundation
Date: Jun 02, 2016 08:11
0.10 1 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 2 1 31.6 9.84E-02
2 33.4 7.86E-02
3 43.1 6.12E-02
0.07 4 28.8 6.09E-02
5 27.5 5.74E-02
Magnitude (ips Pk)

4 3
0.06 6 133.8 5.60E-02
5 6 7 44.7 5.35E-02
78 8 45.3 5.31E-02
0.05 9 10 11 9 16.9 4.85E-02
12 13 10 50.0 4.83E-02
14
15
16 11 181.3 4.80E-02
0.04 19 20
18 17
12 25.0 4.45E-02
13 71.3 4.41E-02
0.03 14 217.2 4.22E-02
15 216.6 4.20E-02
16 69.7 4.10E-02
0.02 17 215.3 3.91E-02
18 131.3 3.87E-02
19 47.5 3.85E-02
0.01 20 66.9 3.73E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00098\G3, 3_P1sv00000 - skid right.csv

Spectrum TP: Skid Edge Engine Back Right (v)


0.11
Channel: 4 S:BMA-Skid/Foundation

Date: Jun 02, 2016 08:11


0.10 Setup:
Note:
0.09
Freq. Magnitude
# Hz ips Pk
0.08 1 31.9 4.77E-02
2 33.4 3.83E-02
3 28.8 2.54E-02
0.07 4 43.4 1.83E-02
5 49.1 1.77E-02
Magnitude (ips Pk)

0.06 6 36.6 1.26E-02


7 35.0 1.18E-02
8 77.2 1.09E-02
0.05 1 9 223.1 1.08E-02
10 16.9 1.04E-02
11 25.0 1.04E-02
0.04 2
12 221.6 1.02E-02
13 271.3 1.00E-02
0.03 14 183.8 9.90E-03
3 15 226.6 9.68E-03
16 272.2 9.16E-03
0.02 45 17 56.6 9.09E-03
18 268.4 9.01E-03
76
1011 8 14 129 13 19 270.0 8.97E-03
0.01 17 20 15 18
19
16
20 217.2 8.74E-03

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00098\G4, 4_P1sv00000 - skid right.csv

Spectrum TP: 337 (-h)


1.00 Channel: 1 P:BMA-Pipe

Date: Jun 02, 2016 08:27


0.90 12
Setup:
Note:
3

0.80 Freq. Magnitude


# Hz ips Pk
1 201.6 8.71E-01
0.70 5
4 2 202.2 8.60E-01
6 3 176.9 8.33E-01
7
4 197.8 6.87E-01
0.60 5 178.8 6.66E-01
Magnitude (ips Pk)

8 9
10 6 214.7 6.53E-01
11
12 7 197.2 6.38E-01
0.50 13 14
15 8 64.7 5.64E-01
16 17 9 181.6 5.57E-01
19 18
20 10 116.9 5.48E-01
0.40 11 189.7 5.22E-01
12 190.9 5.02E-01
13 136.3 4.89E-01
0.30 14 211.6 4.86E-01
15 212.2 4.71E-01
16 137.8 4.50E-01
0.20
17 183.8 4.42E-01
18 193.1 4.22E-01
0.10 19 132.5 4.09E-01
20 209.4 4.07E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00099\G1, 1_P1sv00000 - 337 308.csv

Spectrum TP: 337 (-v)


1.1 Channel: 2 P:BMA-Pipe
Date: Jun 02, 2016 08:27
1.0 Setup:
1 Note:
0.9 2
Freq. Magnitude
# Hz ips Pk
0.8 1 168.8 9.29E-01
2 116.9 8.94E-01
3 173.1 5.67E-01
0.7 4 114.7 5.30E-01
5 120.3 3.36E-01
Magnitude (ips Pk)

0.6 6 121.9 3.27E-01


3 7 111.9 2.83E-01
4 8 72.5 2.52E-01
0.5 9 129.4 2.34E-01
10 136.3 2.18E-01
11 130.3 2.12E-01
0.4 12 182.8 2.04E-01
56 13 183.4 1.92E-01
0.3 7 14 131.6 1.89E-01
8 15 149.4 1.65E-01
9
1110 12 16 186.3 1.58E-01
0.2 14 13 17 98.4 1.43E-01
15 16
17
18 19 20 18 99.1 1.41E-01
19 158.1 1.31E-01
0.1 20 180.3 1.30E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00099\G2, 2_P1sv00000 - 337 308.csv

Vibration, Dynamics & Noise Page 134 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.39
Spectrum TP: 308 (-h)
1.00 Channel: 3 P:BMA-Pipe
Date: Jun 02, 2016 08:27
0.90 Setup:
Note:
1
0.80 Freq. Magnitude
# Hz ips Pk
1 108.1 8.30E-01
0.70 2 53.1 3.79E-01
3 72.5 2.11E-01
4 48.1 1.71E-01
0.60 5 114.7 1.71E-01
Magnitude (ips Pk)

6 68.4 1.66E-01
7 410.3 1.64E-01
0.50 8 49.1 1.53E-01
9 158.1 1.48E-01
10 217.2 1.43E-01
0.40 2 11 66.9 1.42E-01
12 71.3 1.40E-01
13 50.0 1.36E-01
0.30 14 113.1 1.30E-01
15 411.9 1.29E-01
3
16 162.8 1.25E-01
0.20 4 6 5 7 17 116.9 1.22E-01
8 9
13 1112 14 16
10
15 18 220.0 1.22E-01
17 18
19
20
0.10 19 219.4 1.20E-01
20 223.1 1.19E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00099\G3, 3_P1sv00000 - 337 308.csv

Spectrum TP: 308 (v)


1.1
Channel: 4 P:BMA-Pipe

Date: Jun 02, 2016 08:27


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 137.8 4.87E-01
2 127.8 4.83E-01
3 129.4 4.78E-01
0.7 4 135.9 4.51E-01
5 128.8 4.35E-01
Magnitude (ips Pk)

0.6 6 130.6 4.03E-01


7 131.9 3.41E-01
8 133.8 3.23E-01
0.5 23 1 9 153.1 1.97E-01
4 10 152.2 1.96E-01
5
6 11 155.0 1.91E-01
0.4 12 150.9 1.91E-01
7 13 156.3 1.78E-01
8
0.3 14 54.7 1.70E-01
15 147.2 1.25E-01
16 250.6 1.13E-01
9
10
11
0.2 14
12
13 17 77.2 1.11E-01
18 148.1 1.06E-01
15
2017 18 16 19 19 263.4 1.04E-01
0.1 20 72.5 1.03E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00099\G4, 4_P1sv00000 - 337 308.csv

Spectrum TP: 438 (h)


3.0 Channel: 1 P:BMA-Pipe

Date: Jun 02, 2016 08:57


2.7 Setup:
Note:

2.4 Freq. Magnitude


1 # Hz ips Pk
1 75.9 2.28E+00
2.1 2 70.0 1.64E+00
3 155.3 7.59E-01
4 72.2 7.11E-01
1.8 5 77.8 4.87E-01
Magnitude (ips Pk)

2 6 63.4 4.22E-01
7 165.0 4.10E-01
1.5 8 66.3 3.64E-01
9 165.9 2.93E-01
10 239.7 2.04E-01
1.2 11 242.8 1.89E-01
12 85.9 1.85E-01
13 182.5 1.82E-01
0.9 14 183.1 1.81E-01
3
4 15 326.6 1.80E-01
16 240.3 1.80E-01
0.6
5 17 325.9 1.77E-01
6 7 18 181.6 1.75E-01
8
0.3 9 19 241.6 1.69E-01
20 12 13
14
18 10
11
16
19 15
17 20 59.4 1.69E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00101\G1, 1_P1sv00000 - 438 408.csv

Spectrum TP: 438 (v)


1.4 Channel: 2 P:BMA-Pipe
Date: Jun 02, 2016 08:57
2 1 Setup:
1.2 Note:

Freq. Magnitude
# Hz ips Pk
1 72.5 1.24E+00
1.0 2 63.4 1.23E+00
3 70.6 7.86E-01
4 66.3 7.33E-01
5 89.7 6.76E-01
Magnitude (ips Pk)

0.8 3
6 81.3 5.34E-01
4
7 77.8 5.15E-01
5 8 137.2 5.00E-01
9 86.6 4.62E-01
0.6 10 76.3 4.02E-01
6 11 88.1 3.94E-01
7 8
9 12 177.2 3.47E-01
10 11
13 181.3 3.46E-01
0.4 14 59.1 3.38E-01
14 16 1213
19 17 15
18 15 175.6 3.33E-01
20
16 68.8 3.23E-01
17 112.5 3.22E-01
0.2 18 179.7 3.11E-01
19 94.7 3.09E-01
20 178.8 3.01E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00101\G2, 2_P1sv00000 - 438 408.csv

Vibration, Dynamics & Noise Page 135 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.40
Spectrum TP: 408 (h)
1.8 Channel: 3 P:BMA-Pipe
Date: Jun 02, 2016 08:57
Setup:
1 Note:
1.5
Freq. Magnitude
# Hz ips Pk
1 85.3 1.52E+00
2 175.6 8.83E-01
1.2 3 178.8 5.08E-01
4 177.5 5.00E-01
5 183.4 4.50E-01
Magnitude (ips Pk)

6 180.0 3.68E-01
7 88.1 3.51E-01
0.9 2
8 181.6 2.94E-01
9 89.7 2.93E-01
10 87.2 2.68E-01
11 190.9 2.54E-01
12 77.8 2.50E-01
0.6 13 81.3 2.43E-01
43 14 65.0 2.31E-01
5
15 224.1 2.17E-01
7 6 16 66.3 1.74E-01
9 8 17 332.8 1.44E-01
0.3 10 11
14 1213 15 18 185.9 1.42E-01
16
17
19 186.6 1.31E-01
18
19
20 20 188.8 1.14E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00101\G3, 3_P1sv00000 - 438 408.csv

Spectrum TP: 408 (v)


1.5
Channel: 4 P:BMA-Pipe

1.4 Date: Jun 02, 2016 08:57


1
Setup:
1.3 Note:

1.2 Freq. Magnitude


# Hz ips Pk
1.1 1 77.8 1.36E+00
2 133.1 9.57E-01
1.0 2 3 81.9 8.37E-01
4 140.0 6.05E-01
0.9 5 208.4 5.60E-01
Magnitude (ips Pk)

3
6 207.8 5.51E-01
0.8 7 137.8 3.53E-01
8 136.9 3.31E-01
0.7 9 86.9 3.22E-01
4 10 112.5 2.91E-01
0.6 65 11 176.3 2.89E-01
12 175.6 2.84E-01
0.5 13 180.6 2.11E-01
14 113.8 2.03E-01
0.4 7 15 85.3 2.03E-01
9 8
10 11 16 114.7 1.98E-01
0.3 12
17 155.9 1.79E-01
15 14
16 13 18 129.4 1.77E-01
0.2 20 18 17 19
19 205.3 1.75E-01
0.1 20 116.9 1.69E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00101\G4, 4_P1sv00000 - 438 408.csv

Spectrum TP: 470 (a)


2.0 Channel: 1 P:BMA-Pipe

Date: Jun 02, 2016 09:18


1.8 Setup:
1
Note:

1.6 Freq. Magnitude


2 # Hz ips Pk
1 33.4 1.73E+00
1.4 2 16.9 1.49E+00
3 31.3 8.74E-01
4 27.8 7.71E-01
1.2 5 80.3 6.41E-01
Magnitude (ips Pk)

6 80.9 5.66E-01
7 55.3 4.39E-01
1.0 8 72.5 4.34E-01
3 9 76.6 3.82E-01
10 53.1 3.19E-01
0.8 4
11 70.3 2.65E-01
12 44.4 2.37E-01
5
13 71.3 2.27E-01
0.6 6
14 41.6 2.18E-01
7 15 120.3 2.12E-01
8
16 40.0 2.09E-01
0.4 9
10 17 40.9 2.01E-01
12
11 18 133.4 1.96E-01
14
16 13 15 19
17 18 19 132.5 1.95E-01
0.2 20
20 14.1 1.74E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00102\G1, 1_P1sv00000 - 470 360 160 299.csv

Spectrum TP: 360 (a)


1.6 Channel: 2 P:BMA-Pipe
Date: Jun 02, 2016 09:18
1 Setup:
1.4 Note:

Freq. Magnitude
# Hz ips Pk
1.2
1 31.6 1.41E+00
2 26.6 7.69E-01
3 44.4 5.14E-01
1.0 4 45.6 4.76E-01
5 46.3 4.73E-01
Magnitude (ips Pk)

6 13.4 4.46E-01
7 41.6 3.96E-01
0.8 2 8 28.8 3.43E-01
9 63.1 3.25E-01
10 54.7 3.00E-01
0.6 11 69.1 2.74E-01
3
12 40.0 2.40E-01
45 13 72.8 2.28E-01
6 14 65.9 2.22E-01
7
0.4 8
15 76.9 2.19E-01
10
9 16 66.6 2.06E-01
11 17 50.0 1.87E-01
12 14 13
16 15 18 16.3 1.83E-01
0.2 18 17 19
19 60.9 1.68E-01
20
20 116.9 1.37E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00102\G2, 2_P1sv00000 - 470 360 160 299.csv

Vibration, Dynamics & Noise Page 136 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.41
Spectrum TP: 160 (a)
1.1 Channel: 3 P:BMA-Pipe
Date: Jun 02, 2016 09:18
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 40.6 1.70E-01
2 41.6 1.64E-01
3 16.3 1.38E-01
0.7 4 269.1 1.29E-01
5 270.0 1.29E-01
Magnitude (ips Pk)

0.6 6 81.3 1.23E-01


7 268.1 1.22E-01
8 31.3 1.14E-01
0.5 9 98.8 1.10E-01
10 98.1 1.09E-01
11 282.8 9.12E-02
0.4 12 281.9 9.07E-02
13 405.9 8.79E-02
0.3 14 110.9 8.41E-02
15 24.7 8.36E-02
16 406.9 8.18E-02
0.2 12 17 405.3 7.51E-02
3 18 362.2 7.10E-02
8 6 9 745
10
12
11 19 407.5 7.02E-02
0.1 15 14
20 18
13
16
17
19 20 112.5 6.77E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00102\G3, 3_P1sv00000 - 470 360 160 299.csv

Spectrum TP: 470 (h)


1.1
Channel: 1 P:BMA-Pipe

Date: Jun 02, 2016 09:26


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 43.4 7.16E-01
2 64.4 5.65E-01
1 3 41.9 5.52E-01
0.7 4 68.8 5.37E-01
5 75.6 4.61E-01
Magnitude (ips Pk)

0.6 6 63.1 4.49E-01


3 2 7 31.3 4.24E-01
4
8 55.6 4.23E-01
0.5 9 176.9 3.77E-01
6 5 10 178.4 3.11E-01
7 8
11 53.1 2.76E-01
0.4 9 12 179.7 2.72E-01
13 40.3 2.52E-01
10
0.3 14 174.4 2.46E-01
11 12
13 14 15 72.8 2.38E-01
15
16 16 71.9 2.08E-01
0.2 20 19 17
18 17 180.9 2.02E-01
18 170.3 1.95E-01
19 170.9 1.94E-01
0.1 20 26.9 1.92E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00103\G1, 1_P1sv00000 - 470 360 160 299 op.csv

Spectrum TP: 360 (h)


2.2 Channel: 2 P:BMA-Pipe

Date: Jun 02, 2016 09:26


2.0 1 Setup:
Note:
1.8
Freq. Magnitude
# Hz ips Pk
1.6 1 26.9 1.95E+00
2 44.1 1.44E+00
2 3 42.2 1.16E+00
1.4 4 30.6 7.24E-01
5 40.0 6.32E-01
Magnitude (ips Pk)

1.2 3 6 33.4 5.03E-01


7 72.5 4.78E-01
8 66.9 4.04E-01
1.0 9 76.6 3.92E-01
10 55.0 3.86E-01
11 150.3 3.75E-01
0.8 4 12 53.8 3.70E-01
13 65.0 3.40E-01
5
0.6 14 152.5 3.32E-01
6 7
15 63.8 2.93E-01
16 70.9 2.81E-01
0.4 10 8 9
12 11 17 154.4 2.62E-01
13 14
1516
17 18 60.9 2.51E-01
18 19 20 19 114.4 2.44E-01
0.2 20 135.6 2.36E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00103\G2, 2_P1sv00000 - 470 360 160 299 op.csv

Spectrum TP: 160 (h)


1.1 Channel: 3 P:BMA-Pipe
Date: Jun 02, 2016 09:26
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 32.8 2.08E-01
2 33.4 2.04E-01
3 30.3 1.97E-01
0.7 4 26.9 1.58E-01
5 40.3 1.54E-01
Magnitude (ips Pk)

0.6 6 76.6 1.48E-01


7 31.3 1.38E-01
8 28.8 1.22E-01
0.5 9 70.3 1.22E-01
10 42.2 1.20E-01
11 54.7 9.30E-02
0.4 12 371.9 9.17E-02
13 370.9 9.15E-02
0.3 14 72.8 9.14E-02
15 352.8 9.13E-02
16 372.8 9.10E-02
312
0.2 17 79.1 8.92E-02
4 5
7 6 18 15.9 8.82E-02
8 10 9
11 1417 15 13
12
16 19 374.7 8.69E-02
0.1 18 20
19
20 373.8 8.67E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00103\G3, 3_P1sv00000 - 470 360 160 299 op.csv

Vibration, Dynamics & Noise Page 137 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.42
Spectrum TP: 490 (a)
1.1 Channel: 1 P:BMA-Pipe
Date: Jun 02, 2016 10:20
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 40.3 6.95E-01
2 32.2 6.90E-01
3 32.8 6.46E-01
0.7 2 1
4 41.6 4.95E-01
3 5 28.4 3.43E-01
Magnitude (ips Pk)

0.6 6 63.4 2.86E-01


7 44.1 2.67E-01
8 68.4 2.20E-01
4
0.5 9 37.8 1.83E-01
10 135.0 1.73E-01
11 178.8 1.62E-01
0.4 12 134.1 1.51E-01
5 13 61.6 1.50E-01
0.3 6 14 55.9 1.46E-01
7 15 176.9 1.27E-01
8 16 76.6 1.25E-01
0.2 9 10 11
17 138.4 1.24E-01
1413 12 18 53.4 1.06E-01
16 17 15
1918 20 19 47.2 1.06E-01
0.1 20 175.3 1.05E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00104\G1, 1_P1sv00000 - 490 270 290 390.csv

Spectrum TP: 270 (a)


1.1
Channel: 2 P:BMA-Pipe

Date: Jun 02, 2016 10:20


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 41.9 4.33E-01
2 45.6 4.05E-01
3 53.1 3.87E-01
0.7 4 70.3 3.53E-01
5 62.8 3.48E-01
Magnitude (ips Pk)

0.6 6 69.4 3.29E-01


7 66.9 3.14E-01
8 16.3 3.06E-01
0.5 9 54.4 2.86E-01
1 10 72.8 2.35E-01
2 11 61.3 2.08E-01
0.4 3
12 33.4 1.50E-01
5 4
6 13 59.1 1.39E-01
8 7
0.3 9 14 109.1 1.27E-01
15 28.1 1.26E-01
10
11 16 310.0 1.24E-01
0.2 17 31.3 1.16E-01
12 13 18 310.9 1.13E-01
15
17 14 16
20 18
19 19 308.8 1.10E-01
0.1 20 110.9 1.08E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00104\G2, 2_P1sv00000 - 490 270 290 390.csv

Spectrum TP: 290 (a)


1.1 Channel: 3 P:BMA-Pipe

Date: Jun 02, 2016 10:20


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 55.3 4.51E-01
2 66.3 3.51E-01
3 69.4 3.20E-01
0.7 4 41.9 2.98E-01
5 64.4 2.70E-01
Magnitude (ips Pk)

0.6 6 76.9 2.33E-01


7 60.6 1.85E-01
8 97.5 1.56E-01
0.5 9 100.0 1.48E-01
1 10 44.4 1.38E-01
11 31.3 1.36E-01
0.4 12 182.8 1.27E-01
2
3 13 80.6 1.27E-01
0.3 4 14 83.4 1.15E-01
5
15 73.4 1.12E-01
6
16 81.9 1.12E-01
0.2 7 17 95.9 9.26E-02
89 18 180.0 8.53E-02
11 10 13 12
14
1516 19 739.4 8.50E-02
0.1 1720 18 19
20 102.2 8.44E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00104\G3, 3_P1sv00000 - 490 270 290 390.csv

Spectrum TP: 390 (a)


5.0 Channel: 4 P:BMA-Pipe
Date: Jun 02, 2016 10:20
4.5 Setup:
Note:
1
4.0 Freq. Magnitude
# Hz ips Pk
1 41.9 4.10E+00
3.5 2 31.3 8.05E-01
3 33.4 6.45E-01
4 28.8 4.48E-01
3.0 5 55.3 4.22E-01
Magnitude (ips Pk)

6 62.5 3.03E-01
7 64.1 2.44E-01
2.5 8 135.6 2.04E-01
9 200.6 1.66E-01
10 201.6 1.62E-01
2.0 11 198.8 1.51E-01
12 197.8 1.48E-01
13 73.8 1.18E-01
1.5 14 66.9 1.12E-01
15 132.2 9.69E-02
16 59.1 9.47E-02
1.0
2 17 76.6 8.69E-02
3 18 129.1 8.69E-02
0.5 4 5 19 176.6 8.62E-02
67 20 181.6 8.39E-02
8 9
10
161413
17 15
18 1920 12
11
0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00104\G4, 4_P1sv00000 - 490 270 290 390.csv

Vibration, Dynamics & Noise Page 138 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.43
Spectrum TP: 490 (h)
4.5 Channel: 1 P:BMA-Pipe
Date: Jun 02, 2016 10:32
4.0 Setup:
Note:
1
Freq. Magnitude
3.5 # Hz ips Pk
1 31.9 3.70E+00
2 77.2 7.16E-01
3.0 3 42.2 6.75E-01
4 40.0 6.17E-01
5 63.8 5.81E-01
Magnitude (ips Pk)

2.5 6 28.4 5.77E-01


7 79.7 4.75E-01
8 82.5 4.74E-01
2.0 9 75.9 4.62E-01
10 86.6 4.10E-01
11 68.4 3.49E-01
12 26.6 3.48E-01
1.5 13 74.1 3.13E-01
14 70.9 2.25E-01
15 135.6 2.17E-01
1.0 16 65.3 1.65E-01
2 17 65.9 1.65E-01
3
6 4 5 18 69.7 1.65E-01
0.5 97810 19 55.0 1.29E-01
12 1113
14 15
20 50.0 1.28E-01
2019 16
17
1 8

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00105\G1, 1_P1sv00000 - 490 270 290 390 h.csv

Spectrum TP: 270 (h)


2.2
Channel: 2 P:BMA-Pipe

Date: Jun 02, 2016 10:32


2.0 Setup:
1 Note:
1.8
Freq. Magnitude
32 # Hz ips Pk
1.6 1 30.6 1.86E+00
2 31.9 1.67E+00
3 26.6 1.66E+00
1.4 4 72.5 4.17E-01
5 71.3 4.01E-01
Magnitude (ips Pk)

1.2 6 54.4 3.87E-01


7 42.2 3.87E-01
8 53.4 3.75E-01
1.0 9 40.0 2.76E-01
10 69.4 2.51E-01
11 82.2 2.46E-01
0.8 12 80.9 2.34E-01
13 77.2 2.18E-01
0.6 14 75.0 1.67E-01
15 60.0 1.64E-01
16 85.3 1.41E-01
7 86 54
0.4 17 311.6 1.11E-01
9 18 310.9 1.09E-01
10 12
11
13 19 312.2 1.05E-01
0.2 15 14 16
20 64.1 1.03E-01
20 17
18
19

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00105\G2, 2_P1sv00000 - 490 270 290 390 h.csv

Spectrum TP: 290 (-h)


1.1 Channel: 3 P:BMA-Pipe

Date: Jun 02, 2016 10:32


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 59.7 6.84E-01
2 62.2 6.52E-01
3 65.3 6.48E-01
0.7 1 4 75.9 6.06E-01
23
5 61.3 5.69E-01
Magnitude (ips Pk)

4 6 72.8 5.49E-01
0.6 5
7 6 7 56.9 5.45E-01
8 42.2 4.43E-01
0.5 9 71.3 3.86E-01
8 10 53.4 3.63E-01
11 50.0 3.27E-01
0.4 10
9
12 66.9 2.51E-01
11 13 68.1 2.47E-01
0.3 14 69.1 2.05E-01
12
13 15 40.0 1.94E-01
14 16 79.4 1.65E-01
0.2 15
16
17 116.9 1.55E-01
18 17 18 78.4 1.45E-01
19 20
19 45.3 1.33E-01
0.1 20 158.4 1.29E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00105\G3, 3_P1sv00000 - 490 270 290 390 h.csv

Spectrum TP: 390 (h)


1.5 Channel: 4 P:BMA-Pipe

1.4 Date: Jun 02, 2016 10:32


1 Setup:
2
1.3 3 Note:

1.2 Freq. Magnitude


# Hz ips Pk
1.1 1 64.1 1.33E+00
2 41.9 1.30E+00
1.0 3 62.5 1.27E+00
4
4 55.3 9.37E-01
0.9 5 69.4 7.91E-01
Magnitude (ips Pk)

5
6 59.7 5.06E-01
0.8 7 66.3 4.37E-01
8 31.6 3.52E-01
0.7 9 33.1 3.17E-01
10 135.6 3.12E-01
0.6 11 135.0 3.11E-01
6 12 75.6 3.11E-01
0.5 13 50.0 3.09E-01
7
14 45.0 2.15E-01
0.4 8 15 131.9 1.50E-01
9 13 12 11
10 16 130.0 1.43E-01
0.3
17 113.8 1.32E-01
14
0.2 18 77.2 1.29E-01
15
17 16 19 183.1 1.28E-01
20 18 19
0.1 20 47.8 1.16E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00105\G4, 4_P1sv00000 - 490 270 290 390 h.csv

Vibration, Dynamics & Noise Page 139 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.44
Spectrum TP: 492 (-v)
1.2 Channel: 1 P:BMA-Pipe
Date: Jun 02, 2016 11:00
1 Setup:
Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 86.6 1.06E+00
2 2 76.6 8.27E-01
0.8 3 44.1 5.81E-01
4 82.8 5.49E-01
5 71.6 4.52E-01
Magnitude (ips Pk)

6 99.7 3.66E-01
7 205.6 3.50E-01
0.6 3 8 181.6 2.17E-01
4
9 162.5 1.63E-01
10 149.1 1.45E-01
5 11 183.8 1.40E-01
12 60.0 1.40E-01
0.4 6 13 79.7 1.33E-01
7
14 155.6 1.31E-01
15 61.3 1.21E-01
16 63.1 1.17E-01
8
17 40.3 1.04E-01
0.2 9
12 13 1014 11
18 90.0 1.03E-01
15
16 19 158.8 9.54E-02
17 18 2019
20 153.4 9.41E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00106\G1, 1_P1sv00000 - 492 398 291 295.csv

Spectrum TP: 398 (-h)


1.8
Channel: 2 P:BMA-Pipe

Date: Jun 02, 2016 11:00


Setup:
Note:
1.5 1
Freq. Magnitude
# Hz ips Pk
1 56.6 1.49E+00
2 59.7 6.16E-01
1.2 3 50.0 4.36E-01
4 44.4 4.00E-01
5 62.2 2.89E-01
Magnitude (ips Pk)

6 64.7 2.43E-01
7 66.9 1.77E-01
0.9 8 76.3 1.32E-01
9 69.1 1.17E-01
10 73.4 9.95E-02
11 40.0 7.29E-02
2 12 83.4 7.13E-02
0.6 13 145.9 6.48E-02
14 182.2 6.11E-02
3 15 28.4 5.51E-02
4
16 183.8 5.49E-02
5 17 135.9 5.23E-02
0.3 6 18 33.1 5.10E-02
7
9108
151811 12 17 13 14
16
0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00106\G2, 2_P1sv00000 - 492 398 291 295.csv

Spectrum TP: 291 (h)


1.1 Channel: 3 P:BMA-Pipe

Date: Jun 02, 2016 11:00


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 135.6 1.37E-01
2 63.1 1.24E-01
3 30.9 1.14E-01
0.7 4 64.7 9.11E-02
5 32.2 8.77E-02
Magnitude (ips Pk)

0.6 6 77.8 7.03E-02


7 68.4 6.14E-02

0.5

0.4

0.3

0.2
2 1
3
0.1 5 4
7 6

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00106\G3, 3_P1sv00000 - 492 398 291 295.csv

Spectrum TP: 295 (v)


1.1 Channel: 4 P:BMA-Pipe
Date: Jun 02, 2016 11:00
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 147.8 1.49E-01
2 149.1 1.33E-01
3 138.4 1.22E-01
0.7 4 160.6 1.00E-01
5 176.9 8.98E-02
Magnitude (ips Pk)

0.6 6 194.7 8.66E-02


7 195.9 8.57E-02
8 162.2 8.37E-02
0.5 9 163.8 8.35E-02
10 173.8 8.05E-02
11 183.8 8.02E-02
0.4 12 175.6 7.94E-02
13 164.4 7.94E-02
0.3 14 165.6 7.80E-02
15 140.9 7.50E-02
16 156.3 7.38E-02
0.2 17 200.3 7.23E-02
1 18 197.5 6.80E-02
3 2
4 5 19 117.5 6.79E-02
0.1 19 15 16813
9 10
14
20
1211 6718
17 20 166.9 6.45E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00106\G4, 4_P1sv00000 - 492 398 291 295.csv

Vibration, Dynamics & Noise Page 140 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.45
Spectrum TP: 492 (a)
1.5 Channel: 1 P:BMA-Pipe

1.4 Date: Jun 02, 2016 11:10


1 Setup:
1.3 Note:

1.2 Freq. Magnitude


# Hz ips Pk
1.1 1 64.1 1.34E+00
2 72.8 6.15E-01
1.0 3 65.6 5.37E-01
4 68.8 4.74E-01
0.9 5 70.9 4.73E-01
Magnitude (ips Pk)

6 42.8 4.44E-01
0.8 7 40.3 3.58E-01
8 77.5 3.43E-01
0.7 9 41.3 2.88E-01
2 10 75.9 2.65E-01
0.6 11 44.1 2.47E-01
3
12 37.8 2.12E-01
0.5 45
13 55.6 1.99E-01
6
14 115.6 1.96E-01
0.4 7 15 50.0 1.90E-01
8
9 16 53.4 1.85E-01
0.3 11 10 17 116.9 1.69E-01
12 13 14 18 28.4 1.69E-01
0.2 15
18 2016 17 19
19 135.3 1.64E-01
0.1 20 46.9 1.62E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00107\G1, 1_P1sv00000 - 492 398 291 295 a.csv

Spectrum TP: 398 (a)


1.1
Channel: 2 P:BMA-Pipe

Date: Jun 02, 2016 11:10


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 42.2 6.02E-01
2 93.1 4.20E-01
3 76.6 3.64E-01
0.7 4 28.8 3.37E-01
5 90.0 3.31E-01
Magnitude (ips Pk)

1 6 73.8 2.63E-01
0.6
7 71.9 2.62E-01
8 182.5 2.55E-01
0.5 9 181.3 2.06E-01
10 100.0 2.00E-01
2 11 69.7 1.78E-01
0.4 3 12 56.3 1.77E-01
4 5 13 83.4 1.64E-01
0.3 14 82.5 1.60E-01
76 8 15 135.6 1.59E-01
9 16 30.6 1.56E-01
10
0.2 12 11 13 17 115.3 1.32E-01
16 14 15
17
1920 18 18 133.4 1.31E-01
19 107.5 1.28E-01
0.1 20 112.2 1.15E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00107\G2, 2_P1sv00000 - 492 398 291 295 a.csv

Spectrum TP: 291 (a)


1.2 Channel: 3 P:BMA-Pipe

Date: Jun 02, 2016 11:10


1 Setup:
Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 53.1 1.07E+00
2 32.2 6.56E-01
0.8 3 55.0 4.09E-01
4 160.6 2.20E-01
5 158.8 1.89E-01
Magnitude (ips Pk)

2 6 68.4 1.73E-01
7 163.4 1.67E-01
0.6 8 71.3 1.23E-01
9 155.6 1.18E-01
10 64.7 1.09E-01
11 59.7 9.78E-02
3 12 149.4 9.64E-02
0.4 13 150.3 9.58E-02
14 148.8 9.52E-02
15 66.9 9.45E-02
16 140.0 8.73E-02
4
0.2 5 17 200.6 8.56E-02
6 7 18 152.8 8.45E-02
8 9 19 138.8 7.94E-02
1110
15 12
1614
13
18 17
19 20 20 175.9 7.78E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00107\G3, 3_P1sv00000 - 492 398 291 295 a.csv

Spectrum TP: 295 (a)


1.1 Channel: 4 P:BMA-Pipe
Date: Jun 02, 2016 11:10
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 140.0 1.71E-01
2 160.6 1.68E-01
3 163.4 1.66E-01
0.7 4 158.8 1.65E-01
5 159.7 1.62E-01
Magnitude (ips Pk)

0.6 6 148.8 1.61E-01


7 138.8 1.61E-01
8 149.4 1.61E-01
0.5 9 150.3 1.47E-01
10 136.3 1.45E-01
11 155.0 1.38E-01
0.4 12 137.5 1.38E-01
13 15.0 1.22E-01
0.3 14 200.3 1.16E-01
15 212.2 1.14E-01
16 213.4 1.12E-01
0.2 71 68 4523
17 210.6 9.68E-02
12 911
10 18 152.8 8.98E-02
13 14 15
16
17 19 151.6 8.35E-02
0.1 20 18
19
20 78.8 8.20E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00107\G4, 4_P1sv00000 - 492 398 291 295 a.csv

Vibration, Dynamics & Noise Page 141 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.46
Spectrum TP: 499 (v)
1.3 Channel: 1 P:BMA-Pipe
Date: Jun 02, 2016 11:46
1.2 1 Setup:
Note:
1.1 2
Freq. Magnitude
1.0 # Hz ips Pk
1 77.2 1.15E+00
0.9 2 33.4 1.06E+00
3 44.1 6.45E-01
0.8 4 50.0 5.50E-01
5 82.5 4.89E-01
Magnitude (ips Pk)

6 28.1 4.26E-01
0.7 7 26.6 4.19E-01
3
8 30.6 3.62E-01
0.6 9 35.9 3.46E-01
4
10 31.9 3.11E-01
0.5 5 11 14.7 1.50E-01
76
12 72.5 1.46E-01
0.4 13 65.6 1.44E-01
89 14 142.8 1.38E-01
10 15 37.8 1.36E-01
0.3 16 100.3 1.35E-01
17 99.4 1.29E-01
0.2 18 46.6 1.27E-01
11 15 18 1312 16 14
17 19 98.1 1.25E-01
20 19
0.1 20 84.7 1.12E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00108\G1, 1_P1sv00000 - 499 398 105 Frame Front.csv

Spectrum TP: 398 (v)


1.1
Channel: 2 P:BMA-Pipe

Date: Jun 02, 2016 11:46


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 77.2 3.75E-01
2 71.6 3.68E-01
3 73.8 2.98E-01
0.7 4 145.9 2.60E-01
5 28.4 2.32E-01
Magnitude (ips Pk)

0.6 6 147.2 2.06E-01


7 142.8 1.55E-01
8 55.9 1.42E-01
0.5 9 144.1 1.39E-01
10 56.9 1.33E-01
11 139.1 1.30E-01
0.4 21 12 67.5 1.22E-01
13 83.1 1.16E-01
0.3 3 14 82.5 1.15E-01
4 15 137.2 1.06E-01
5
6 16 133.1 1.05E-01
0.2 17 136.3 1.00E-01
8 7 18 65.3 9.52E-02
10 12 14
13 119
19 18 20
16
15
17 19 31.3 9.48E-02
0.1 20 90.0 9.07E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00108\G2, 2_P1sv00000 - 499 398 105 Frame Front.csv

Spectrum TP: 105 (-a)


2.6 Channel: 3 P:BMA-Pipe

2.4 Date: Jun 02, 2016 11:46


Setup:
1 Note:
2.2
Freq. Magnitude
2.0 # Hz ips Pk
1 76.9 2.19E+00
1.8 2 80.9 1.70E+00
2 3 74.1 1.05E+00
1.6 4 72.5 9.36E-01
5 66.9 6.43E-01
Magnitude (ips Pk)

6 70.3 5.45E-01
1.4 7 61.9 5.15E-01
8 62.8 4.89E-01
1.2 9 60.0 4.63E-01
3 10 137.8 3.98E-01
1.0 4 11 136.3 3.26E-01
12 90.0 2.77E-01
0.8 13 166.9 2.32E-01
14 354.4 2.18E-01
5
15 141.3 1.91E-01
0.6 7 6 16 30.9 1.84E-01
98
10 17 54.1 1.83E-01
0.4 11 18 127.5 1.64E-01
12 19 355.0 1.61E-01
13 14
0.2 16 17
20 18 15 19 20 56.3 1.60E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00108\G3, 3_P1sv00000 - 499 398 105 Frame Front.csv

Spectrum TP: 499 (h)


1.6 Channel: 1 P:BMA-Pipe
Date: Jun 03, 2016 03:44
12 Setup:
1.4 3
Note:

Freq. Magnitude
# Hz ips Pk
1.2
1 63.4 1.43E+00
2 65.0 1.43E+00
3 61.6 1.38E+00
1.0 4 4 77.2 9.80E-01
5 5 68.1 9.36E-01
Magnitude (ips Pk)

6 26.6 5.04E-01
7 116.6 3.98E-01
0.8 8 33.1 3.71E-01
9 27.8 3.38E-01
10 100.3 3.12E-01
0.6 11 82.5 2.90E-01
12 49.4 2.66E-01
6
13 89.1 2.47E-01
14 115.3 2.17E-01
7
0.4 8 15 112.8 2.06E-01
9
10 16 86.3 1.75E-01
11
12 13 17 47.2 1.75E-01
14
15 18 110.6 1.67E-01
0.2 17 16 18 19 19 127.8 1.55E-01
20
20 95.9 1.29E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00109\G1, 1_P1sv00000 - 499 205 105 207.csv

Vibration, Dynamics & Noise Page 142 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.47
Spectrum TP: 205 (v)
1.00 Channel: 2 P:BMA-Pipe
Date: Jun 03, 2016 03:44
0.90 Setup:
1 Note:

0.80 Freq. Magnitude


# Hz ips Pk
1 30.9 8.57E-01
0.70 2 50.0 3.90E-01
3 43.8 2.50E-01
4 177.8 2.32E-01
0.60 5 45.9 1.64E-01
Magnitude (ips Pk)

6 70.3 1.28E-01
7 181.6 1.09E-01
0.50 8 173.8 9.07E-02
9 172.8 8.67E-02
10 27.2 7.43E-02
0.40 2
11 55.6 7.05E-02
12 64.1 7.04E-02
13 41.9 6.12E-02
0.30 14 66.9 6.03E-02
3
4 15 189.1 5.49E-02
0.20 5
6
7
0.10 10 98
13 1112
14 15

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00109\G2, 2_P1sv00000 - 499 205 105 207.csv

Spectrum TP: 105 (h)


1.1
Channel: 3 P:BMA-Pipe

Date: Jun 03, 2016 03:44


1.0 1 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 2 1 100.0 9.84E-01
2 97.8 7.93E-01
3 3 99.1 7.18E-01
0.7 4 4 64.4 6.85E-01
5 104.1 5.24E-01
Magnitude (ips Pk)

0.6 6 96.3 4.28E-01


7 101.9 3.85E-01
5 8 166.6 2.60E-01
0.5 9 181.9 2.54E-01
6
10 31.9 2.53E-01
11 58.8 2.49E-01
0.4 7
12 180.9 2.48E-01
13 90.6 2.41E-01
0.3 14 30.9 2.35E-01
10 11 13
8 12
9 15 93.4 2.34E-01
14
20 18 16 15
17 19 16 69.1 2.33E-01
0.2 17 94.4 2.30E-01
18 60.3 2.27E-01
19 116.9 2.26E-01
0.1 20 45.9 2.20E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00109\G3, 3_P1sv00000 - 499 205 105 207.csv

Spectrum TP: 207 (v)


1.1 Channel: 4 P:BMA-Pipe

Date: Jun 03, 2016 03:44


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 55.6 5.78E-01
2 50.0 3.09E-01
3 177.8 1.16E-01
0.7 4 109.4 1.14E-01
5 43.8 1.08E-01
Magnitude (ips Pk)

0.6 6 45.9 8.99E-02


1
7 108.4 8.91E-02
8 111.3 8.11E-02
0.5 9 112.5 7.91E-02

0.4
2
0.3

0.2
5 4 3
0.1 6 789

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00109\G4, 4_P1sv00000 - 499 205 105 207.csv

Spectrum TP: 499 (a)


1.1 Channel: 1 P:BMA-Pipe
Date: Jun 03, 2016 03:59
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
1 1 31.6 7.95E-01
0.8
2 33.1 7.16E-01
2 3 77.2 6.07E-01
0.7 4 64.1 5.48E-01
5 61.3 4.77E-01
Magnitude (ips Pk)

3 6 28.1 3.96E-01
0.6
4 7 71.3 2.95E-01
8 69.4 2.34E-01
0.5 5 9 116.3 2.13E-01
10 26.6 2.11E-01
6 11 14.4 2.04E-01
0.4 12 72.8 1.99E-01
13 40.0 1.93E-01
0.3 7 14 42.2 1.88E-01
15 43.4 1.83E-01
8
11 10 13 9 16 47.5 1.79E-01
12
0.2 14
156
17 119 18 17 38.1 1.69E-01
20 18 83.1 1.67E-01
19 49.1 1.63E-01
0.1 20 89.4 1.44E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00110\G1, 1_P1sv00000 - 499 205 207.csv

Vibration, Dynamics & Noise Page 143 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.48
Spectrum TP: 205 (h)
1.1 Channel: 2 P:BMA-Pipe
Date: Jun 03, 2016 03:59
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 13.4 4.00E-01
2 130.3 2.95E-01
3 129.4 2.65E-01
0.7 4 72.2 2.16E-01
5 54.1 1.85E-01
Magnitude (ips Pk)

0.6 6 156.9 1.20E-01


7 42.5 1.09E-01
8 117.5 8.29E-02
0.5 9 26.9 7.82E-02
10 43.4 7.24E-02
1 11 420.0 6.54E-02
0.4 12 115.3 5.99E-02
13 357.5 5.88E-02
0.3 2 14 159.1 5.74E-02
3 15 45.0 5.47E-02
4 16 267.5 5.26E-02
0.2 5 17 125.0 5.07E-02
18 262.5 5.04E-02
7 6
19 55.9 5.04E-02
0.1 9 10 8
12 17 11
15 19 14 1816 13

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00110\G2, 2_P1sv00000 - 499 205 207.csv

Spectrum TP: 205 (h)


1.1
Channel: 3 P:BMA-Pipe

Date: Jun 03, 2016 03:59


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 72.2 3.27E-01
2 26.9 2.35E-01
3 45.0 1.92E-01
0.7 4 31.3 1.87E-01
5 28.1 1.79E-01
Magnitude (ips Pk)

0.6 6 42.5 1.75E-01


7 33.4 1.35E-01
8 43.4 1.16E-01
0.5 9 156.9 1.11E-01
10 100.6 9.92E-02
11 112.5 8.64E-02
0.4 12 115.3 7.17E-02
1 13 117.5 7.09E-02
0.3 14 13.4 6.69E-02
15 54.4 6.66E-02
2
16 400.6 5.87E-02
0.2 54 63 17 401.3 5.81E-02
7 18 113.8 5.64E-02
8 9 19 401.9 5.53E-02
10 11
0.1 14 15 12
13 20 159.1 5.19E-02
18 20 16
17
19

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00110\G3, 3_P1sv00000 - 499 205 207.csv

Spectrum TP: 207 (a)


1.1 Channel: 4 P:BMA-Pipe

Date: Jun 03, 2016 03:59


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 45.0 3.41E-01
2 50.3 1.76E-01
3 129.4 1.14E-01
0.7 4 130.6 9.60E-02
5 53.1 8.99E-02
Magnitude (ips Pk)

0.6 6 55.0 7.80E-02


7 225.6 6.58E-02
8 42.5 6.36E-02
0.5 9 56.3 6.26E-02
10 225.0 5.99E-02
11 226.3 5.97E-02
0.4 12 56.9 5.53E-02
1 13 57.5 5.47E-02
0.3 14 63.1 5.30E-02

0.2 2

3
4
0.1 56
8 12
9 14 7
13 10
11

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00110\G4, 4_P1sv00000 - 499 205 207.csv

Spectrum TP: 200 (h)


1.2 Channel: 4 P:BMA-Pipe
Date: May 29, 2016 04:49
1 Setup:
Note:
1.0
Freq. Magnitude
2
3 # Hz ips Pk
1 30.9 1.07E+00
2 32.8 9.20E-01
0.8 3 33.4 8.95E-01
4 28.4 4.25E-01
5 44.7 4.20E-01
Magnitude (ips Pk)

6 45.9 3.49E-01
7 59.1 3.38E-01
0.6 8 16.6 3.34E-01
9 38.8 3.33E-01
10 63.8 3.27E-01
11 76.3 3.20E-01
4 5
12 47.8 3.10E-01
0.4 13 40.0 2.78E-01
8 6 7
9 10 11 14 82.8 2.26E-01
12
13 15 56.3 1.77E-01
14 16 80.9 1.72E-01
0.2 17 34.7 1.70E-01
17 15 16
20 18
19 18 227.2 1.60E-01
19 225.9 1.53E-01
20 69.1 1.53E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00011\G4, 4_P1sv00000 - 415 420 C2 -a.csv

Vibration, Dynamics & Noise Page 144 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.49
Spectrum TP: 200 (a)
1.8 Channel: 4 P:BMA-Pipe
Date: May 29, 2016 05:02
1 Setup:
Note:
1.5 2
Freq. Magnitude
# Hz ips Pk
1 64.1 1.58E+00
2 75.9 1.46E+00
1.2 3 55.9 9.85E-01
4 61.6 9.63E-01
5 58.8 5.83E-01
Magnitude (ips Pk)

34 6 82.5 3.22E-01
7 33.4 2.80E-01
0.9 8 90.3 2.14E-01
9 44.4 2.12E-01
10 49.7 1.72E-01
11 86.3 1.61E-01
12 217.2 1.54E-01
0.6 5
13 45.9 1.51E-01
14 16.6 1.45E-01
15 30.0 1.44E-01
16 15.3 1.36E-01
6
17 14.4 1.30E-01
0.3 7
9 8 18 28.8 1.23E-01
10
15 13
14 18 11 12 19 182.2 1.17E-01
16
17 19 20 20 212.8 1.15E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00012\G4, 4_P1sv00000 - 415 420 C2 v.csv

Spectrum TP: 200 (v)


1.1
Channel: 4 P:BMA-Pipe

Date: May 29, 2016 05:12


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 181.6 3.24E-01
2 16.6 3.11E-01
3 214.7 2.84E-01
0.7 4 33.4 2.63E-01
5 213.1 2.57E-01
Magnitude (ips Pk)

0.6 6 210.3 2.40E-01


7 208.4 2.24E-01
8 206.3 1.89E-01
0.5 9 205.3 1.74E-01
10 204.4 1.68E-01
11 175.9 1.60E-01
0.4 12 177.5 1.55E-01
1 13 153.8 1.55E-01
2
0.3 3 14 202.2 1.48E-01
4 5 15 64.1 1.48E-01
6
7 16 63.1 1.48E-01
0.2 8
9
10 17 174.7 1.47E-01
13 11
12 14
1916
15 17 18
20 18 201.6 1.45E-01
19 55.6 1.40E-01
0.1 20 199.4 1.31E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00013\G4, 4_P1sv00000 - 415 414 C2 h.csv

Vibration, Dynamics & Noise Page 145 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.6.2 Vibration Data – Engine/Compressor Alignment Done


Fig: B.6.50
Spectrum TP: Engine Front (h)
0.55 Channel: 2 EW:BMA-Waukesha Engine
Date: Jun 01, 2016 12:16
0.50 Setup:
Note:
0.45 Freq. Magnitude
# Hz ips Pk
0.40 1 47.8 3.77E-01
1 2 27.2 1.30E-01
3 13.8 8.48E-02
0.35 4 20.0 5.25E-02
5 54.1 4.80E-02
Magnitude (ips Pk)

0.30 6 60.9 4.57E-02


7 94.7 4.39E-02
8 218.4 3.95E-02
0.25 9 41.3 3.90E-02
10 95.9 3.90E-02
11 67.5 3.88E-02
0.20 12 216.6 3.79E-02
13 89.1 3.69E-02
0.15 14 102.8 3.38E-02
2 15 81.3 3.06E-02
16 150.0 2.95E-02
0.10 3 17 87.8 2.80E-02
18 148.8 2.62E-02
4 56 19 115.0 2.52E-02
0.05 9 11 7
131014 128
1517 19 16
18

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00064\G2, 2_P1sv00000 - tors loaded engine frame.csv

Spectrum TP: Engine Back (h)


0.55 Channel: 3 EW:BMA-Waukesha Engine
Date: Jun 01, 2016 12:16
0.50 Setup:
Note:
0.45 Freq. Magnitude
# Hz ips Pk
0.40 1 47.8 2.02E-01
2 27.2 1.72E-01
3 54.1 1.69E-01
0.35 4 13.8 1.60E-01
5 20.3 6.70E-02
Magnitude (ips Pk)

0.30 6 34.1 6.68E-02


7 130.0 6.64E-02
8 128.4 6.60E-02
0.25 9 81.3 5.40E-02
10 67.8 5.26E-02
1 11 68.4 5.02E-02
0.20 12 94.7 4.91E-02
2 3 13 109.4 4.84E-02
4
0.15 14 61.6 4.57E-02
15 108.1 4.57E-02
16 115.0 3.91E-02
0.10 17 95.6 3.83E-02
5 6 87 18 101.6 3.77E-02
11 9 12 15
1410 13 19 116.3 3.48E-02
0.05 1718 16
1920 20 121.9 3.29E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00064\G3, 3_P1sv00000 - tors loaded engine frame.csv

Spectrum TP: Frame Front (h)


0.55 Channel: 4 F:BMA-Frame
Date: Jun 01, 2016 12:16
0.50 Setup:
Note:
0.45 Freq. Magnitude
# Hz ips Pk
0.40 1 68.4 1.12E-01
2 67.5 9.40E-02
3 13.8 8.46E-02
0.35 4 54.7 7.15E-02
5 205.0 5.70E-02
Magnitude (ips Pk)

0.30 6 82.2 5.24E-02


7 203.1 4.12E-02
8 438.1 3.90E-02
0.25 9 436.9 3.84E-02
10 27.2 3.80E-02
11 122.8 3.53E-02
0.20 12 164.4 3.51E-02
13 395.9 3.39E-02
0.15 14 396.9 3.26E-02
15 433.1 3.26E-02
1 16 270.6 3.07E-02
0.10 3
2 17 259.4 2.89E-02
4 18 33.8 2.87E-02
6 5 19 260.0 2.85E-02
0.05 10 11 12 7
13
14 20 1598 20 410.6 2.75E-02
18 19 16
17

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00064\G4, 4_P1sv00000 - tors loaded engine frame.csv

Spectrum TP: 420 (-a)


1.1
Channel: 1 P:BMA-Pipe

Date: Jun 01, 2016 12:50


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
1
0.8 1 82.8 8.02E-01
2 58.1 7.22E-01
23 3 60.9 7.20E-01
0.7 4 4 64.4 6.80E-01
5
5 101.3 6.60E-01
Magnitude (ips Pk)

6
7 6 100.0 6.32E-01
0.6
8 9 7 31.6 6.05E-01
8 32.5 5.57E-01
0.5 9 102.8 5.57E-01
10 10 182.2 4.37E-01
11
13 12 11 76.9 4.24E-01
0.4 15 14
12 109.1 4.13E-01
16 13 90.9 4.06E-01
17 14 99.1 3.95E-01
0.3 18
20 19 15 80.3 3.90E-01
16 87.5 3.26E-01
0.2 17 29.4 3.05E-01
18 217.2 2.89E-01
19 179.4 2.58E-01
0.1 20 73.1 2.43E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00066\G1, 1_P1sv00000 - 420 415 c2.csv

Vibration, Dynamics & Noise Page 146 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.51
Spectrum TP: 415 (-a)
1.3 Channel: 2 P:BMA-Pipe
Date: Jun 01, 2016 12:50
1.2 1 Setup:
Note:
1.1 2
3
Freq. Magnitude
1.0 # Hz ips Pk
4
5 1 31.6 1.16E+00
0.9 2 76.3 1.09E+00
3 32.5 1.05E+00
0.8 4 73.4 9.30E-01
5 74.1 9.10E-01
Magnitude (ips Pk)

6 82.5 6.58E-01
0.7 6 7 44.1 6.00E-01
7 8 60.9 5.67E-01
0.6 8 9 70.6 3.97E-01
10 80.0 3.04E-01
0.5 11 183.4 3.00E-01
12 101.6 2.95E-01
0.4 9 13 201.9 2.86E-01
14 65.6 2.69E-01
10 12 11 15 39.4 2.56E-01
0.3 1519 14 13
16 16 209.4 2.54E-01
17 2018
17 38.1 2.49E-01
0.2 18 215.3 2.46E-01
19 47.5 2.43E-01
0.1 20 211.6 2.42E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00066\G2, 2_P1sv00000 - 420 415 c2.csv

Spectrum TP: Cylinder 2 (-a)


1.4
Channel: 3 C:BMA-Cylinder

Date: Jun 01, 2016 12:50


1 Setup:
1.2 Note:

Freq. Magnitude
# Hz ips Pk
2
1 31.6 1.24E+00
1.0 2 32.8 1.02E+00
3 44.4 5.81E-01
4 45.9 4.44E-01
5 58.1 4.03E-01
Magnitude (ips Pk)

0.8 6 16.6 3.80E-01


7 40.0 3.55E-01
8 47.5 3.37E-01
9 75.9 3.00E-01
0.6 3 10 38.1 2.82E-01
11 82.8 2.68E-01
12 81.9 2.25E-01
4
5
13 63.4 2.08E-01
0.4 6
7 14 80.3 1.91E-01
8 15 230.6 1.89E-01
9
10 11 16 221.6 1.82E-01
12 17 229.7 1.82E-01
13
0.2 14 18 15
1617 18 222.2 1.80E-01
20 19
19 220.6 1.74E-01
20 210.0 1.71E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00066\G3, 3_P1sv00000 - 420 415 c2.csv

Spectrum TP: 420 (-h)


1.5 Channel: 4 P:BMA-Pipe

1.4 1 Date: Jun 01, 2016 12:50


2 Setup:
1.3 Note:

1.2 Freq. Magnitude


# Hz ips Pk
1.1 1 58.1 1.36E+00
2 73.8 1.33E+00
1.0 3 64.7 8.34E-01
4 65.9 8.03E-01
0.9 5 66.9 7.72E-01
Magnitude (ips Pk)

3
4 6 61.6 6.05E-01
0.8 5 7 68.4 5.68E-01
8 183.1 5.32E-01
0.7 9 81.9 4.52E-01
6 10 54.1 3.83E-01
0.6 7 11 33.4 3.36E-01
8
12 80.3 3.17E-01
0.5 9 13 16.6 3.12E-01
14 175.6 2.65E-01
0.4 10
15 176.6 2.60E-01
11 12
13 16 190.9 2.54E-01
0.3 14
15 16
1920
18 17 17 216.9 2.47E-01
0.2 18 185.9 2.40E-01
19 185.3 2.40E-01
0.1 20 192.5 2.33E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00066\G4, 4_P1sv00000 - 420 415 c2.csv

Spectrum TP: 436 (h)


7.0 Channel: 1 P:BMA-Pipe
Date: Jun 01, 2016 13:24
Setup:
6.0 Note:
1
Freq. Magnitude
# Hz ips Pk
1 118.1 5.74E+00
5.0 2 147.2 3.89E+00
3 73.4 3.61E+00
4 76.6 2.86E+00
5 122.2 2.76E+00
Magnitude (ips Pk)

4.0 2
6 75.0 2.62E+00
3 7 80.0 2.54E+00
8 83.4 2.22E+00
9 115.3 2.02E+00
3.0 4
5 10 70.6 1.90E+00
67 11 54.4 1.76E+00
12 43.4 1.66E+00
8
9
13 183.8 1.50E+00
2.0 11
10 14 56.3 1.49E+00
12 15 57.5 1.48E+00
16 14
15 13
16 46.9 1.43E+00
17
18 17 33.1 1.26E+00
1.0 19 18 143.8 1.15E+00
20
19 5.6 9.48E-01
20 66.9 8.23E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00067\G1, 1_P1sv00000 - c2 436.csv

Vibration, Dynamics & Noise Page 147 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.52
Spectrum TP: 436 (v)
9.0 Channel: 2 P:BMA-Pipe
Date: Jun 01, 2016 13:24
8.0 Setup:
1 Note:

Freq. Magnitude
7.0 # Hz ips Pk
2 1 73.4 7.60E+00
2 76.6 6.35E+00
6.0 3 3 75.0 5.83E+00
4 80.0 5.18E+00
5 79.4 5.16E+00
Magnitude (ips Pk)

54
5.0 6 54.4 4.58E+00
6 7 70.6 4.24E+00
7 8 57.5 4.07E+00
98 9 56.3 3.97E+00
4.0 10
10 83.4 3.82E+00
11 43.4 2.98E+00
11 12 149.4 2.44E+00
3.0 13 150.9 1.89E+00
12 14 66.9 1.66E+00
15 152.8 1.49E+00
2.0 13 16 60.6 1.15E+00
14
15 17 46.6 1.14E+00
17 16
18 18 45.9 1.12E+00
19
1.0 20 19 87.2 9.73E-01
20 5.3 8.83E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00067\G2, 2_P1sv00000 - c2 436.csv

Spectrum TP: 436 (a)


3.0
Channel: 3 P:BMA-Pipe

Date: Jun 01, 2016 13:24


2.7 Setup:
Note:
1

2.4 Freq. Magnitude


2 # Hz ips Pk
3 1 73.4 2.50E+00
2.1 2 72.2 2.22E+00
4 3 75.0 2.17E+00
4 76.6 1.93E+00
1.8 5 78.8 1.71E+00
Magnitude (ips Pk)

5
7 6 6 79.7 1.66E+00
8 7 43.4 1.65E+00
1.5 8 147.2 1.54E+00
9 9 69.7 1.30E+00
10 66.3 1.15E+00
1.2 10
11 83.4 1.04E+00
11 12 64.7 9.41E-01
12 13 57.8 8.66E-01
0.9 13
14 14 150.9 8.22E-01
16
15 15 56.3 6.76E-01
17 16 54.4 6.74E-01
0.6 18 19 17 152.5 5.86E-01
20
18 117.8 5.23E-01
0.3 19 160.3 4.93E-01
20 45.9 4.46E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00067\G3, 3_P1sv00000 - c2 436.csv

Spectrum TP: Cylinder 2 (v)


1.4 Channel: 4 C:BMA-Cylinder

Date: Jun 01, 2016 13:24


1 Setup:
1.2 Note:

2 Freq. Magnitude
# Hz ips Pk
1 57.8 1.22E+00
1.0 3
2 73.4 1.09E+00
3 60.6 9.75E-01
4 75.0 7.94E-01
5 76.3 7.81E-01
Magnitude (ips Pk)

0.8 45
6 63.4 6.79E-01
7 53.8 4.61E-01
6
8 5.6 4.10E-01
9 5.0 3.70E-01
0.6 10 83.4 3.42E-01
11 33.4 3.37E-01
7 12 81.6 2.99E-01
8 13 31.3 2.58E-01
0.4 9 14 7.8 2.51E-01
11 10 15 29.4 1.95E-01
12
13
16 16.6 1.83E-01
14
17 50.0 1.81E-01
0.2 16 15
19 17 18 18 217.2 1.80E-01
20
19 15.3 1.71E-01
20 27.2 1.52E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00067\G4, 4_P1sv00000 - c2 436.csv

Spectrum TP: 414 (-a)


6.0 Channel: 1 P:BMA-Pipe
Date: Jun 01, 2016 13:35
Setup:
Note:
5.0 1
Freq. Magnitude
# Hz ips Pk
1 57.8 4.83E+00
2 60.0 3.31E+00
4.0 3 31.9 1.58E+00
4 181.6 1.54E+00
5 183.4 1.50E+00
Magnitude (ips Pk)

2 6 32.5 1.49E+00
7 44.1 1.16E+00
3.0 8 82.5 1.07E+00
9 178.4 1.04E+00
10 45.6 9.82E-01
11 201.9 9.38E-01
12 175.9 8.88E-01
2.0 13 63.1 8.77E-01
3 45 14 71.6 8.24E-01
6
15 28.1 6.82E-01
7 16 38.1 6.24E-01
8 9
1.0 10 11 17 75.3 6.01E-01
1314 12
18 74.1 5.67E-01
15 16
17
18 19
20 19 193.1 5.40E-01
20 192.2 5.27E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00068\G1, 1_P1sv00000 - 414 437 400 420.csv

Vibration, Dynamics & Noise Page 148 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.53
Spectrum TP: 437 (h)
5.0 Channel: 2 P:BMA-Pipe
Date: Jun 01, 2016 13:35
1
4.5 Setup:
Note:

4.0 Freq. Magnitude


# Hz ips Pk
1 46.9 4.51E+00
3.5 2 53.4 1.79E+00
3 43.8 1.75E+00
4 76.6 1.11E+00
3.0 5 75.0 1.09E+00
Magnitude (ips Pk)

6 55.9 1.01E+00
7 72.2 9.95E-01
2.5 8 57.2 9.86E-01
9 70.3 8.46E-01
10 79.1 8.25E-01
2.0 11 81.3 7.21E-01
3 2
12 66.9 5.29E-01
13 86.6 3.99E-01
1.5 14 121.3 3.54E-01
54
15 50.0 3.38E-01
68 7 16 40.0 1.98E-01
1.0 9 10 17 235.9 1.88E-01
11
18 84.7 1.67E-01
12 19 39.1 1.51E-01
0.5 15
13 14 20 90.6 1.36E-01
16
19 1820 17

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00068\G2, 2_P1sv00000 - 414 437 400 420.csv

Spectrum TP: 430 (-a)


1.3
Channel: 3 P:BMA-Pipe

1.2 12
Date: Jun 01, 2016 13:35
Setup:
Note:
1.1
Freq. Magnitude
1.0 # Hz ips Pk
1 43.1 1.18E+00
0.9 2 43.8 1.17E+00
3
3 68.8 8.55E-01
4
0.8 4 76.6 8.12E-01
5 72.8 7.18E-01
Magnitude (ips Pk)

5 6 71.9 7.01E-01
6
0.7 7 70.6 6.50E-01
7
8 8 75.0 6.30E-01
9
0.6 9 79.1 6.00E-01
10 58.4 4.94E-01
10 11 46.9 4.54E-01
0.5 11
12 12 60.6 4.20E-01
0.4 13 13 31.6 3.84E-01
14 14 45.6 3.60E-01
16 15 15 63.1 3.20E-01
0.3 16 49.1 3.06E-01
17 18 17 83.4 2.19E-01
0.2 19 18 149.4 2.18E-01
20
19 53.1 1.81E-01
0.1 20 65.6 1.48E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00068\G3, 3_P1sv00000 - 414 437 400 420.csv

Spectrum TP: 420 (v)


2.2 Channel: 4 P:BMA-Pipe

Date: Jun 01, 2016 13:35


2.0 Setup:
1 Note:
1.8 2 Freq. Magnitude
# Hz ips Pk
1.6 1 74.1 1.90E+00
2 76.3 1.74E+00
3 78.8 9.93E-01
1.4 4 71.3 8.13E-01
5 80.0 7.93E-01
Magnitude (ips Pk)

1.2 6 81.6 7.53E-01


7 60.6 6.85E-01
8 84.1 6.05E-01
3
1.0 9 215.6 5.93E-01
10 214.7 5.92E-01
4 5 11 69.4 5.51E-01
0.8 6 12 68.8 5.50E-01
7 13 213.1 5.22E-01
8 10
9 14 202.2 4.14E-01
0.6 11
12 13 15 211.6 3.83E-01
14 16 315.6 3.80E-01
0.4 15
17
19
20 16
18 17 209.1 3.76E-01
18 317.2 3.68E-01
19 208.4 3.67E-01
0.2 20 209.7 3.65E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00068\G4, 4_P1sv00000 - 414 437 400 420.csv

Spectrum TP: 320 (a)


1.1 Channel: 1 P:BMA-Pipe
Date: Jun 03, 2016 09:04
1.0 Setup:
1
Note:
0.9
2 Freq. Magnitude
# Hz ips Pk
0.8 1 30.6 9.56E-01
2 31.9 8.47E-01
3 3 77.8 7.09E-01
0.7 4 73.1 6.44E-01
4 5 157.2 5.85E-01
Magnitude (ips Pk)

0.6 5 6 83.4 4.59E-01


7 154.4 4.54E-01
8 16.9 4.35E-01
0.5 9 111.6 4.28E-01
6 7
8 10 58.4 4.25E-01
1012 9 11
13
11 161.3 4.18E-01
0.4 12 62.5 4.11E-01
13 160.0 3.92E-01
14
15 16 14 114.1 3.03E-01
0.3 17
19 18
20 15 113.4 2.97E-01
16 175.3 2.92E-01
0.2 17 258.4 2.90E-01
18 165.6 2.62E-01
19 26.9 2.60E-01
0.1 20 166.9 2.48E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00117\G1, 1_P1sv00000 - 320 315.csv

Vibration, Dynamics & Noise Page 149 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.54
Spectrum TP: 315 (a)
1.8 Channel: 2 P:BMA-Pipe
Date: Jun 03, 2016 09:04
1 Setup:
2 Note:
1.5
Freq. Magnitude
# Hz ips Pk
1 30.9 1.58E+00
2 31.9 1.51E+00
1.2 3 16.9 5.23E-01
4 83.4 5.17E-01
5 58.4 4.87E-01
Magnitude (ips Pk)

6 72.5 4.11E-01
7 73.1 4.11E-01
0.9 8 57.2 4.08E-01
9 26.9 3.86E-01
10 62.2 3.42E-01
11 77.2 2.89E-01
12 28.4 2.65E-01
0.6 13 43.8 2.31E-01
3 4
5 14 75.9 2.22E-01
8 67 15 45.3 2.12E-01
9
10 16 53.8 2.00E-01
11 17 37.8 1.92E-01
0.3 12
13 14 18 253.4 1.75E-01
1715 16 20 18
19 19 256.3 1.70E-01
20 157.5 1.70E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00117\G2, 2_P1sv00000 - 320 315.csv

Spectrum TP: 320 (-v)


1.1
Channel: 3 P:BMA-Pipe

Date: Jun 03, 2016 09:04


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 106.6 5.21E-01
2 83.4 4.49E-01
3 114.1 3.20E-01
0.7 4 217.2 3.10E-01
5 31.9 2.90E-01
Magnitude (ips Pk)

0.6 6 201.9 2.76E-01


7 202.8 2.72E-01
1 8 218.8 2.70E-01
0.5 9 204.4 2.41E-01
2 10 192.5 2.34E-01
11 220.3 2.33E-01
0.4 12 183.1 2.30E-01
3 13 221.9 2.28E-01
4
0.3 5 14 117.8 2.27E-01
67 8
15 46.6 2.24E-01
15 14 12 10 9 11
16 13 16 181.6 2.22E-01
17
19 18
20
0.2 17 224.1 2.13E-01
18 223.4 2.12E-01
19 213.8 2.08E-01
0.1 20 213.1 2.02E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00117\G3, 3_P1sv00000 - 320 315.csv

Spectrum TP: 315 (-v)


1.1 Channel: 4 P:BMA-Pipe

Date: Jun 03, 2016 09:04


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 114.4 4.29E-01
2 46.3 3.63E-01
3 72.5 3.10E-01
0.7 4 106.6 2.90E-01
5 83.8 2.59E-01
Magnitude (ips Pk)

0.6 6 136.3 2.55E-01


7 135.6 2.55E-01
8 118.1 2.42E-01
0.5 9 175.0 2.37E-01
1
10 43.8 2.19E-01
11 133.8 2.17E-01
0.4 2 12 79.7 1.91E-01
13 80.3 1.89E-01
3
0.3 4 14 253.4 1.67E-01
5
8 76 15 254.4 1.64E-01
9
10 11 16 181.3 1.58E-01
0.2 12
13 17 167.2 1.53E-01
14
15
20 17 16 1819 18 250.6 1.47E-01
19 257.2 1.46E-01
0.1 20 153.1 1.45E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00117\G4, 4_P1sv00000 - 320 315.csv

Spectrum TP: 320 (h)


1.1 Channel: 1 P:BMA-Pipe
Date: Jun 03, 2016 09:17
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 83.4 5.49E-01
2 82.5 4.93E-01
3 105.9 4.63E-01
0.7 4 106.6 4.47E-01
5 181.3 4.27E-01
Magnitude (ips Pk)

0.6 6 73.1 4.06E-01


1 7 183.4 3.98E-01
8 46.3 3.77E-01
0.5 2 9 16.6 3.59E-01
3
4 10 175.3 3.50E-01
5
6 7 11 178.1 2.90E-01
0.4 8 12 78.4 2.90E-01
9 10
13 114.7 2.72E-01
0.3 12 11 14 77.2 2.71E-01
1514 13
15 70.6 2.63E-01
16 17
19 1820 16 32.8 2.47E-01
0.2 17 48.4 2.37E-01
18 98.8 2.29E-01
19 62.5 2.29E-01
0.1 20 103.4 2.27E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00118\G1, 1_P1sv00000 - 320 c1.csv

Vibration, Dynamics & Noise Page 150 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.55
Spectrum TP: Cylinder 1 (-h)
0.77 Channel: 2 C:BMA-Cylinder
Date: Jun 03, 2016 09:17
Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 16.6 3.36E-01
0.55 2 82.5 2.48E-01
3 72.8 2.31E-01
4 32.2 2.13E-01
5 180.9 2.09E-01
Magnitude (ips Pk)

0.44 6 133.4 2.02E-01


7 179.7 1.96E-01
8 77.2 1.93E-01
1 9 177.5 1.92E-01
0.33 10 70.6 1.92E-01
11 46.3 1.91E-01
2
12 211.6 1.87E-01
3 13 137.8 1.74E-01
0.22 4
6 5 14 138.4 1.71E-01
11 10 8 97 12
13
14 15 136.6 1.65E-01
15
17 16 18 16 182.8 1.57E-01
19 20 17 174.4 1.51E-01
0.11 18 216.6 1.50E-01
19 78.4 1.40E-01
20 213.8 1.36E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00118\G2, 2_P1sv00000 - 320 c1.csv

Spectrum TP: Cylinder 1 (v)


0.77
Channel: 3 C:BMA-Cylinder

Date: Jun 03, 2016 09:17


Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 62.5 4.19E-01
0.55 2 55.6 4.13E-01
3 46.3 3.35E-01
4 60.6 2.52E-01
5 80.0 2.50E-01
Magnitude (ips Pk)

0.44 21 6 83.4 2.25E-01


7 82.5 2.20E-01
8 76.9 2.06E-01
3 9 58.8 1.99E-01
0.33 10 30.6 1.86E-01
11 43.8 1.50E-01
4 5 12 16.6 1.43E-01
13 66.6 1.24E-01
76
0.22 9 8 14 90.3 1.24E-01
10 15 53.1 1.19E-01
12 11 16 41.3 1.15E-01
15 13 14 17 176.3 1.15E-01
16 18
20 19 17
0.11 18 50.3 1.12E-01
19 68.4 1.11E-01
20 40.0 1.10E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00118\G3, 3_P1sv00000 - 320 c1.csv

Spectrum TP: Cylinder 1 (a)


1.2 Channel: 4 C:BMA-Cylinder

Date: Jun 03, 2016 09:17


1 Setup:
2 Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 30.9 1.05E+00
2 31.9 1.03E+00
0.8 3 16.9 4.31E-01
4 55.6 4.01E-01
5 60.0 3.21E-01
Magnitude (ips Pk)

6 28.4 2.25E-01
7 63.1 2.24E-01
0.6 8 27.2 2.17E-01
9 77.8 1.50E-01
10 202.8 1.43E-01
3 11 211.6 1.33E-01
4 12 181.3 1.24E-01
0.4 13 73.8 1.22E-01
5 14 214.7 1.22E-01
15 214.1 1.21E-01
16 182.8 1.19E-01
86 7
0.2 17 177.8 1.19E-01
9 1011 18 90.0 1.16E-01
13 18 12
17
16
20 14
19 15 19 205.3 1.11E-01
20 179.7 1.10E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00118\G4, 4_P1sv00000 - 320 c1.csv

Spectrum TP: 330 (v)


1.1 Channel: 1 P:BMA-Pipe
Date: Jun 03, 2016 09:26
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 73.1 6.04E-01
2 83.1 4.64E-01
3 177.2 4.51E-01
0.7 4 115.0 4.03E-01
5 81.6 3.39E-01
Magnitude (ips Pk)

1 6 214.4 3.35E-01
0.6
7 180.9 3.34E-01
8 200.6 3.30E-01
0.5 2
9 213.8 3.29E-01
3 10 116.9 3.19E-01
4 11 179.4 3.14E-01
0.4 12 205.0 2.88E-01
5 7 8 96 13 216.6 2.81E-01
10 11
0.3 12 13 14 133.1 2.71E-01
14
15
16 15 135.9 2.64E-01
17
18 19 16 136.6 2.63E-01
20
0.2 17 203.8 2.37E-01
18 138.1 2.18E-01
19 211.3 2.08E-01
0.1 20 209.4 2.01E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00119\G1, 1_P1sv00000 - 330 335.csv

Vibration, Dynamics & Noise Page 151 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.56
Spectrum TP: 335 (v)
1.1 Channel: 2 P:BMA-Pipe
Date: Jun 03, 2016 09:26
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 177.5 4.86E-01
2 73.1 4.80E-01
3 180.9 4.46E-01
0.7 4 46.9 3.65E-01
5 55.6 3.50E-01
Magnitude (ips Pk)

0.6 6 214.4 3.15E-01


7 115.3 3.13E-01
8 213.8 3.07E-01
0.5 2 1 9 215.3 3.05E-01
3 10 62.5 2.95E-01
11 83.1 2.68E-01
0.4 4 12 116.9 2.67E-01
5
13 80.9 2.52E-01
7 869
0.3 10 14 58.8 2.49E-01
11 12 15 152.2 2.39E-01
14 13 15
16 17
20 19 18 16 57.8 2.35E-01
0.2 17 133.1 2.30E-01
18 150.3 2.16E-01
19 69.1 2.15E-01
0.1 20 60.3 2.06E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00119\G2, 2_P1sv00000 - 330 335.csv

Spectrum TP: 330 (a)


1.1
Channel: 3 P:BMA-Pipe

Date: Jun 03, 2016 09:26


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 1 83.8 7.73E-01
2 81.9 7.29E-01
2
3 3 115.3 6.97E-01
0.7 4 59.1 6.25E-01
5 117.8 3.96E-01
Magnitude (ips Pk)

4
0.6 6 91.9 3.64E-01
7 73.8 3.47E-01
8 76.3 3.34E-01
0.5 9 120.6 3.18E-01
10 77.8 3.10E-01
5 11 62.5 2.98E-01
0.4 6 12 63.4 2.81E-01
78
9 13 134.4 2.76E-01
11 10 14 55.6 2.76E-01
0.3 1412 13
15
16
17 15 131.6 2.56E-01
20 18 19
16 130.9 2.51E-01
0.2 17 130.3 2.45E-01
18 69.7 2.41E-01
19 94.4 2.37E-01
0.1 20 54.1 2.37E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00119\G3, 3_P1sv00000 - 330 335.csv

Spectrum TP: 335 (a)


1.00 Channel: 4 P:BMA-Pipe

Date: Jun 03, 2016 09:26


0.90 Setup:
Note:
1
0.80 Freq. Magnitude
# Hz ips Pk
1 59.1 8.28E-01
0.70 2 30.9 6.10E-01
3 81.9 4.35E-01
2 4 115.3 3.95E-01
0.60 5 77.5 3.84E-01
Magnitude (ips Pk)

6 83.4 3.54E-01
7 55.3 3.45E-01
0.50 8 63.4 2.76E-01
3 9 62.5 2.68E-01
4 10 91.9 2.37E-01
0.40 5
11 73.8 2.31E-01
7 6
12 135.3 2.30E-01
13 135.9 2.27E-01
0.30 98 14 118.1 2.25E-01
11 10 14 12
13
15 15 136.6 2.25E-01
18 16 17
20 19 16 75.0 2.21E-01
0.20
17 90.0 2.16E-01
18 16.6 2.15E-01
0.10 19 138.4 2.03E-01
20 66.6 1.98E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00119\G4, 4_P1sv00000 - 330 335.csv

Spectrum TP: 335 (h)


1.1 Channel: 1 P:BMA-Pipe
Date: Jun 03, 2016 09:41
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 115.6 6.76E-01
2 83.4 6.51E-01
3 116.9 5.70E-01
0.7 1 4 132.5 5.16E-01
2
5 136.3 4.84E-01
Magnitude (ips Pk)

0.6 6 201.3 4.57E-01


3 7 200.0 4.56E-01
4 8 129.1 3.69E-01
0.5 5 9 118.1 3.59E-01
76 10 176.9 3.40E-01
11 62.8 3.16E-01
0.4 12 213.4 3.15E-01
9 8
10 13 122.5 2.95E-01
11 12
0.3 13
15
14 14 215.0 2.94E-01
18 16
17
19 20 15 193.4 2.78E-01
16 192.8 2.77E-01
0.2 17 195.0 2.70E-01
18 160.0 2.68E-01
19 195.6 2.67E-01
0.1 20 210.9 2.67E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00120\G1, 1_P1sv00000 - 335 314 336.csv

Vibration, Dynamics & Noise Page 152 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.57
Spectrum TP: 314 (-h)
2.4 Channel: 2 P:BMA-Pipe
Date: Jun 03, 2016 09:41
Setup:
1 Note:
2.0
Freq. Magnitude
# Hz ips Pk
1 62.5 2.04E+00
2
2 60.0 1.67E+00
1.6 3 55.9 1.42E+00
4 175.6 6.37E-01
3
5 112.8 6.21E-01
Magnitude (ips Pk)

6 30.9 6.08E-01
7 112.2 5.84E-01
1.2 8 162.5 5.16E-01
9 114.4 5.06E-01
10 181.3 4.96E-01
11 161.3 4.77E-01
12 46.9 4.73E-01
0.8 13 160.0 4.59E-01
6 5 4 14 159.1 4.40E-01
7 15 110.6 4.35E-01
9 8
12 11 10
13 16 166.6 4.18E-01
15 14 16
19 18 17 17 183.4 4.00E-01
0.4 20
18 164.4 3.87E-01
19 116.9 3.83E-01
20 32.8 3.72E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00120\G2, 2_P1sv00000 - 335 314 336.csv

Spectrum TP: 314 (a)


2.2
Channel: 3 P:BMA-Pipe

Date: Jun 03, 2016 09:41


2.0 Setup:
1 Note:
1.8
Freq. Magnitude
2 # Hz ips Pk
1.6 1 30.9 1.87E+00
3 2 32.2 1.66E+00
3 78.1 1.47E+00
1.4 4 60.0 1.07E+00
5 55.3 8.40E-01
Magnitude (ips Pk)

1.2 6 73.8 7.47E-01


7 53.4 7.07E-01
4
8 16.9 5.55E-01
1.0 9 106.9 4.99E-01
10 28.8 4.76E-01
5 11 71.6 3.99E-01
0.8 6 12 323.1 3.58E-01
7
13 27.2 3.57E-01
0.6 8
14 82.2 3.56E-01
9 15 68.1 3.39E-01
10
16 323.8 3.39E-01
11
0.4 13 15 14 12
16 17 325.0 3.12E-01
18 17 18 66.6 2.96E-01
19 20
19 115.6 2.64E-01
0.2 20 175.9 2.55E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00120\G3, 3_P1sv00000 - 335 314 336.csv

Spectrum TP: 336 (-h)


1.8 Channel: 4 P:BMA-Pipe

Date: Jun 03, 2016 09:41


1 Setup:
Note:
1.5 2
3
Freq. Magnitude
# Hz ips Pk
1 180.9 1.57E+00
2 201.3 1.48E+00
1.2 3 200.0 1.44E+00
4 152.8 1.06E+00
4 5 192.8 1.02E+00
Magnitude (ips Pk)

5
9 67 6 191.3 9.67E-01
12 1011 8 7 190.6 9.56E-01
0.9 16 15 13 1714 8 213.4 9.54E-01
18 19
20 9 83.8 9.54E-01
10 189.7 9.30E-01
11 195.0 9.16E-01
12 150.6 9.15E-01
0.6 13 188.1 8.75E-01
14 210.9 8.58E-01
15 177.5 8.56E-01
16 81.3 8.51E-01
0.3 17 205.0 8.40E-01
18 132.5 8.33E-01
19 178.1 8.24E-01
20 155.6 7.92E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00120\G4, 4_P1sv00000 - 335 314 336.csv

Vibration, Dynamics & Noise Page 153 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.6.3 Vibration Data – Elbow at TP# 436 Braced


Fig: B.6.58
Spectrum TP: 436 (h)
3.0 Channel: 1 P:BMA-Pipe
Date: Jun 02, 2016 02:01
2.7 Setup:
Note:

2.4 1 Freq. Magnitude


# Hz ips Pk
2 1 133.4 2.31E+00
2.1 3 2 125.9 2.16E+00
3 122.5 2.03E+00
4
4 128.1 1.88E+00
1.8 5 152.2 1.72E+00
Magnitude (ips Pk)

5
6 8 7
6 150.9 1.59E+00
9 7 179.7 1.59E+00
10
1.5 11
8 159.7 1.58E+00
12
13
9 165.3 1.55E+00
1415 10 150.3 1.50E+00
1.2 11 120.9 1.47E+00
16
12 175.9 1.39E+00
17 13 163.8 1.27E+00
0.9 18
14 161.9 1.20E+00
19 20
15 166.9 1.20E+00
16 154.7 1.07E+00
0.6 17 156.9 9.03E-01
18 115.0 8.40E-01
0.3 19 116.6 7.86E-01
20 170.6 7.85E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00070\G1, 1_P1sv00000 - 436 c2.csv

Spectrum TP: 436 (v)


2.4 Channel: 2 P:BMA-Pipe
Date: Jun 02, 2016 02:01
1 Setup:
Note:
2.0
Freq. Magnitude
# Hz ips Pk
1 115.0 2.15E+00
2 180.6 1.34E+00
1.6 3 111.9 1.14E+00
4 199.7 1.10E+00
5 83.4 9.58E-01
Magnitude (ips Pk)

2
6 64.1 8.26E-01
7 177.8 8.22E-01
1.2 3 8 201.6 8.00E-01
4
9 81.6 7.88E-01
5 10 202.2 7.39E-01
11 175.9 7.34E-01
6 7 8 12 183.4 7.04E-01
0.8 9
1112 10 13 120.3 6.85E-01
13
14 14 133.4 6.33E-01
15 16
19 17 18 15 66.6 5.97E-01
20
16 205.3 5.72E-01
0.4 17 74.1 5.50E-01
18 205.9 5.37E-01
19 45.0 5.31E-01
20 76.9 5.16E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00070\G2, 2_P1sv00000 - 436 c2.csv

Spectrum TP: 436 (a)


1.5 Channel: 3 P:BMA-Pipe

1.4 Date: Jun 02, 2016 02:01


1
Setup:
1.3 2 Note:

1.2 Freq. Magnitude


# Hz ips Pk
1.1 1 133.4 1.30E+00
3
54 2 115.0 1.28E+00
1.0 3 45.0 1.02E+00
4 65.6 1.01E+00
0.9 5 64.4 1.00E+00
Magnitude (ips Pk)

6 6 69.4 7.98E-01
0.8 78 7 66.9 7.46E-01
8 70.6 7.36E-01
0.7 9
9 130.9 6.77E-01
10 11
12 10 111.9 6.41E-01
0.6 13
11 180.6 6.24E-01
14 15 12 81.6 6.05E-01
0.5 16
13 128.4 5.74E-01
17 18
19 14 83.4 5.06E-01
0.4 20 15 125.9 5.06E-01
16 125.3 4.83E-01
0.3
17 60.0 4.08E-01
0.2 18 123.8 4.01E-01
19 123.1 3.90E-01
0.1 20 167.2 3.53E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00070\G3, 3_P1sv00000 - 436 c2.csv

Spectrum TP: Cylinder 2 (v)


1.8
Channel: 4 C:BMA-Cylinder

Date: Jun 02, 2016 02:01


1 Setup:
Note:
1.5
Freq. Magnitude
# Hz ips Pk
1 64.4 1.60E+00
2 58.1 1.07E+00
1.2 3 61.6 6.45E-01
4 60.6 6.40E-01
2
5 73.8 4.69E-01
Magnitude (ips Pk)

6 83.4 4.59E-01
7 70.9 4.45E-01
0.9 8 69.1 4.42E-01
9 75.6 4.13E-01
10 53.4 2.66E-01
11 32.8 2.43E-01
43
12 80.3 2.18E-01
0.6 13 48.1 2.12E-01
5 14 48.8 1.95E-01
87 6
9 15 217.2 1.65E-01
16 16.3 1.56E-01
0.3 17 45.3 1.55E-01
11 10 18 45.9 1.51E-01
13 12
14
16 20 17
19 18 15 19 14.4 1.49E-01
20 30.0 1.42E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00070\G4, 4_P1sv00000 - 436 c2.csv

Vibration, Dynamics & Noise Page 154 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.59
Spectrum TP: 420 (v)
1.8 Channel: 1 P:BMA-Pipe
Date: Jun 02, 2016 02:17
1 Setup:
Note:
1.5
Freq. Magnitude
# Hz ips Pk
1 72.8 1.58E+00
2 64.1 8.95E-01
1.2 3 75.9 7.72E-01
4 66.3 5.62E-01
5 82.5 5.61E-01
Magnitude (ips Pk)

6 60.0 5.10E-01
2 7 212.2 4.77E-01
0.9 8 209.1 4.62E-01
3 9 210.3 4.54E-01
10 214.1 4.40E-01
11 80.0 4.21E-01
12 217.2 4.19E-01
0.6 4 5 13 58.4 3.84E-01
6
89710 14 205.3 3.73E-01
11 12 15 89.4 3.26E-01
13 14 16 203.4 3.07E-01
15 16
18
19 17 17 315.3 3.03E-01
0.3 20
18 201.9 3.02E-01
19 201.3 2.99E-01
20 314.4 2.69E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00071\G1, 1_P1sv00000 - 420 415.csv

Spectrum TP: 415 (v)


2.0
Channel: 2 P:BMA-Pipe

1
Date: Jun 02, 2016 02:17
1.8 Setup:
Note:

1.6 Freq. Magnitude


# Hz ips Pk
1 57.8 1.81E+00
1.4 2 2 64.4 1.38E+00
3 3 72.5 1.30E+00
4 55.9 1.14E+00
1.2 5 81.6 5.56E-01
Magnitude (ips Pk)

4
6 83.8 4.60E-01
7 315.3 3.33E-01
1.0 8 317.2 2.49E-01
9 316.6 2.48E-01
10 177.8 2.42E-01
0.8 11 212.2 2.42E-01
12 182.8 2.35E-01
13 209.4 2.35E-01
0.6 5 14 210.0 2.31E-01
6 15 45.0 2.17E-01
16 214.1 2.15E-01
0.4 7 17 32.5 2.08E-01
1012 11
13
14 98 18 33.4 2.06E-01
18 15
17 19 16
20 19 175.9 2.01E-01
0.2
20 217.2 1.94E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00071\G2, 2_P1sv00000 - 420 415.csv

Spectrum TP: 420 (-h)


1.5 Channel: 3 P:BMA-Pipe

1.4 Date: Jun 02, 2016 02:17


1 Setup:
1.3 Note:
2
1.2 Freq. Magnitude
# Hz ips Pk
1.1 1 72.8 1.34E+00
2 57.8 1.22E+00
1.0 3 64.7 8.45E-01
4 55.9 8.06E-01
0.9 5 182.5 5.02E-01
Magnitude (ips Pk)

3
4 6 61.3 3.74E-01
0.8 7 81.6 3.57E-01
8 16.3 3.06E-01
0.7 9 179.7 2.99E-01
10 32.5 2.72E-01
0.6 11 217.2 2.69E-01
5 12 33.4 2.66E-01
0.5 13 175.0 2.65E-01
14 185.0 2.35E-01
0.4 6 7 15 177.2 2.29E-01
8 9 16 200.6 2.29E-01
0.3 10
12 13 11
17 151418 16 17 83.8 2.28E-01
19 20 18 191.6 2.27E-01
0.2
19 44.7 2.10E-01
0.1 20 171.9 2.06E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00071\G3, 3_P1sv00000 - 420 415.csv

Spectrum TP: 420 (-a)


1.2 Channel: 4 P:BMA-Pipe
Date: Jun 02, 2016 02:17
1 Setup:
Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 64.1 1.06E+00
2 57.8 6.99E-01
0.8 3 93.4 6.83E-01
4 83.4 6.51E-01
2 5 59.7 6.46E-01
Magnitude (ips Pk)

3
5 4 6 72.8 5.87E-01
7 33.4 5.24E-01
0.6 6
8 88.8 5.07E-01
7 9 31.9 5.02E-01
9 8
10 10 109.4 4.77E-01
13 1114 12 11 90.9 4.52E-01
15
16 12 178.1 4.44E-01
0.4 13 80.6 4.41E-01
14 95.3 4.39E-01
18 17 15 103.4 4.20E-01
19 20 16 55.9 3.90E-01
0.2 17 217.2 2.94E-01
18 97.2 2.82E-01
19 29.1 2.54E-01
20 99.7 2.50E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00071\G4, 4_P1sv00000 - 420 415.csv

Vibration, Dynamics & Noise Page 155 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.60
Spectrum TP: 415 (-a)
1.2 Channel: 1 P:BMA-Pipe
Date: Jun 02, 2016 02:37
1 Setup:
23
Note:
1.0
Freq. Magnitude
4 # Hz ips Pk
5 1 33.4 1.07E+00
2 31.3 1.05E+00
0.8 3 31.9 1.05E+00
6 4 78.1 8.86E-01
5 81.6 8.69E-01
Magnitude (ips Pk)

7
6 73.4 7.30E-01
8
9 7 79.4 6.69E-01
0.6 10
11 8 72.2 6.13E-01
12 9 83.4 5.97E-01
10 44.4 5.86E-01
13 11 43.8 5.81E-01
14
12 60.0 5.16E-01
0.4 13 61.6 4.46E-01
15
1617
14 28.4 4.18E-01
18 20
19
15 65.3 3.51E-01
16 63.1 3.04E-01
17 68.1 3.00E-01
0.2
18 75.6 2.79E-01
19 210.3 2.64E-01
20 209.7 2.63E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00072\G1, 1_P1sv00000 - 415 c2 430.csv

Spectrum TP: Cylinder 2 (h)


0.77
Channel: 2 C:BMA-Cylinder

Date: Jun 02, 2016 02:37


Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 210.3 3.13E-01
0.55 2 16.6 3.11E-01
3 209.7 3.05E-01
4 182.2 2.74E-01
5 211.9 2.42E-01
Magnitude (ips Pk)

0.44 6 33.4 2.32E-01


7 212.8 2.29E-01
8 179.7 2.11E-01
9 214.1 2.11E-01
0.33 2 31 10 214.7 2.09E-01
11 205.3 2.07E-01
4
12 216.3 2.00E-01
5
6 7 13 217.2 1.98E-01
0.22 8 9
11 10
12
13 14 204.1 1.77E-01
15
16 14 15 174.4 1.74E-01
17
20 18 19 16 175.3 1.71E-01
17 177.5 1.68E-01
0.11 18 171.6 1.56E-01
19 200.3 1.51E-01
20 66.6 1.49E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00072\G2, 2_P1sv00000 - 415 c2 430.csv

Spectrum TP: Cylinder 2 (-a)


1.3 Channel: 3 C:BMA-Cylinder

1.2 Date: Jun 02, 2016 02:37


Setup:
1
Note:
1.1
Freq. Magnitude
1.0 2 # Hz ips Pk
1 31.3 1.12E+00
0.9 2 33.4 9.57E-01
3 44.4 5.48E-01
0.8 4 45.9 4.46E-01
5 28.4 3.88E-01
Magnitude (ips Pk)

6 16.6 3.47E-01
0.7 7 38.1 2.95E-01
8 39.1 2.81E-01
0.6 9 57.8 2.68E-01
3
10 83.4 2.59E-01
0.5 11 79.4 2.42E-01
4 12 55.9 2.34E-01
0.4 5 13 58.8 2.30E-01
6 14 63.1 2.26E-01
78 15 48.4 2.20E-01
0.3 9 10 16 59.4 2.20E-01
1512 314 11
116
17 18
17 81.3 1.94E-01
0.2 19
20
18 210.6 1.93E-01
19 228.8 1.90E-01
0.1 20 230.0 1.88E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00072\G3, 3_P1sv00000 - 415 c2 430.csv

Spectrum TP: 430 (-a)


1.6 Channel: 4 P:BMA-Pipe
Date: Jun 02, 2016 02:37
Setup:
1.4 1 Note:

Freq. Magnitude
2
# Hz ips Pk
1.2
1 43.8 1.37E+00
2 78.4 1.22E+00
3 81.6 1.02E+00
43
1.0 5
4 79.4 9.99E-01
5 83.1 9.56E-01
Magnitude (ips Pk)

6 6 82.5 8.85E-01
7 45.9 5.96E-01
0.8 8 73.4 3.87E-01
9 57.2 3.67E-01
10 57.8 3.57E-01
0.6 7 11 55.9 3.25E-01
12 31.3 2.93E-01
13 75.6 2.89E-01
14 94.1 2.68E-01
0.4 9 8 15 58.8 2.50E-01
10
11 16 48.4 2.47E-01
12 13
16 15
17
14 17 59.4 2.41E-01
18 18 90.3 2.20E-01
20 19
0.2 19 118.8 1.96E-01
20 87.2 1.91E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00072\G4, 4_P1sv00000 - 415 c2 430.csv

Vibration, Dynamics & Noise Page 156 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.61
Spectrum TP: 435 (-a)
1.8 Channel: 1 P:BMA-Pipe
Date: Jun 02, 2016 02:47
Setup:
Note:
1.5 1
Freq. Magnitude
# Hz ips Pk
1 43.8 1.47E+00
2 31.3 8.03E-01
1.2 3 79.4 6.98E-01
4 33.4 6.92E-01
5 81.3 6.26E-01
Magnitude (ips Pk)

6 80.3 6.24E-01
7 83.4 4.60E-01
0.9 8 39.1 4.34E-01
2 9 40.0 4.08E-01
10 38.1 3.89E-01
4 3
11 118.1 3.04E-01
65 12 75.6 2.60E-01
0.6 13 27.8 2.38E-01
7 14 16.6 2.38E-01
8 15 28.4 2.38E-01
109
16 73.8 2.32E-01
11 17 179.1 1.74E-01
0.3 12
14 13
15 16 18 69.4 1.60E-01
20 18
19 17 19 70.3 1.59E-01
20 48.1 1.56E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00073\G1, 1_P1sv00000 - 435 430.csv

Spectrum TP: 430 (v)


1.8
Channel: 2 P:BMA-Pipe

Date: Jun 02, 2016 02:47


1
Setup:
Note:
1.5
Freq. Magnitude
# Hz ips Pk
1 79.4 1.57E+00
2 83.4 8.97E-01
1.2 3 135.3 3.93E-01
4 179.1 3.74E-01
5 179.7 3.72E-01
Magnitude (ips Pk)

6 133.8 3.57E-01
2 7 56.9 3.25E-01
0.9 8 180.6 3.23E-01
9 55.9 3.09E-01
10 90.3 2.65E-01
11 63.1 2.53E-01
12 216.9 2.02E-01
0.6 13 216.3 1.99E-01
14 256.3 1.97E-01
15 214.7 1.97E-01
3 45
6 16 215.3 1.96E-01
97 8
17 259.7 1.95E-01
0.3 11 10
18 87.2 1.95E-01
18 12
15
13
16 1417
1920 19 255.3 1.93E-01
20 260.3 1.92E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00073\G2, 2_P1sv00000 - 435 430.csv

Spectrum TP: 435 (v)


1.5 Channel: 3 P:BMA-Pipe

1.4 Date: Jun 02, 2016 02:47


Setup:
1.3 1 Note:

1.2 Freq. Magnitude


# Hz ips Pk
1.1 1 63.4 1.29E+00
2 3 2 56.9 1.04E+00
1.0 4 3 79.1 1.04E+00
5 4 66.6 9.83E-01
0.9 5 55.9 9.27E-01
Magnitude (ips Pk)

6 61.3 7.65E-01
0.8 6 7 7 76.6 7.47E-01
8 8 60.6 7.27E-01
0.7 119
10 9 74.4 6.60E-01
10 69.4 6.52E-01
0.6 12 11 70.3 6.46E-01
13 12 135.3 5.59E-01
0.5 13 133.8 4.90E-01
14
14 83.4 4.26E-01
0.4 15 15 181.3 3.46E-01
16 16 179.7 2.96E-01
0.3 17
20
18 19 17 179.1 2.79E-01
0.2 18 33.4 2.43E-01
19 117.8 2.42E-01
0.1 20 32.8 2.40E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00073\G3, 3_P1sv00000 - 435 430.csv

Spectrum TP: 435 (h)


1.1 Channel: 4 P:BMA-Pipe
Date: Jun 02, 2016 02:47
1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 135.3 7.22E-01
2 63.4 6.88E-01
1 3 133.8 6.52E-01
0.7 2
4 117.8 6.47E-01
4 3
5 56.9 5.50E-01
Magnitude (ips Pk)

0.6 6 66.6 5.13E-01


5 7 55.9 4.82E-01
6 8 180.9 4.37E-01
0.5 7 9 179.7 4.03E-01
8 10 179.1 3.84E-01
9 11 78.8 3.61E-01
0.4 11
10
12 210.9 3.35E-01
12 13 76.6 2.97E-01
0.3 13 14 71.3 2.61E-01
14
15
16 15 71.9 2.58E-01
19
18 17 20 16 69.4 2.57E-01
0.2 17 216.9 2.29E-01
18 74.4 2.19E-01
19 73.4 2.18E-01
0.1 20 271.3 2.16E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00073\G4, 4_P1sv00000 - 435 430.csv

Vibration, Dynamics & Noise Page 157 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.62
Spectrum TP: 414 (h)
3.0 Channel: 1 P:BMA-Pipe
Date: Jun 02, 2016 08:45
2.7 Setup:
Note:
12
2.4 Freq. Magnitude
# Hz ips Pk
1 43.8 2.41E+00
2.1 2 45.3 2.39E+00
3 120.3 7.62E-01
4 86.9 6.94E-01
1.8 5 32.8 5.07E-01
Magnitude (ips Pk)

6 180.3 4.66E-01
7 66.3 4.63E-01
1.5 8 77.8 4.60E-01
9 31.3 4.60E-01
10 181.9 4.51E-01
1.2 11 243.4 4.19E-01
12 183.8 3.88E-01
13 58.4 3.85E-01
0.9 14 63.4 3.67E-01
3
4 15 118.1 3.66E-01
16 176.9 3.43E-01
0.6 5 17 244.7 3.41E-01
9 7 8 6
10
1314 12 11 18 50.0 3.40E-01
18 15 16 17
20 19
0.3 19 133.8 3.27E-01
20 53.1 3.13E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00100\G1, 1_P1sv00000 - 414.csv

Spectrum TP: 414 (-a)


3.0
Channel: 2 P:BMA-Pipe

Date: Jun 02, 2016 08:45


2.7 Setup:
Note:
1
2.4 Freq. Magnitude
# Hz ips Pk
1 59.4 2.45E+00
2.1 2 33.4 1.54E+00
3 31.6 1.45E+00
4 182.5 1.35E+00
1.8 5 177.2 1.34E+00
Magnitude (ips Pk)

6 183.8 1.33E+00
2 7 81.6 1.33E+00
1.5 3 8 181.9 1.32E+00
7 5 846 9 180.3 1.30E+00
9
10 43.4 1.14E+00
1.2 10 11 44.4 1.01E+00
11
13 12 12 173.8 9.82E-01
1415 13 70.6 9.72E-01
0.9 17 16
18 14 192.2 9.07E-01
19
20 15 195.6 8.74E-01
16 196.3 8.67E-01
0.6 17 86.6 8.54E-01
18 197.2 8.26E-01
0.3 19 185.6 7.76E-01
20 198.1 7.20E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00100\G2, 2_P1sv00000 - 414.csv

Spectrum TP: 414 Outrigger (-a)


0.90 Channel: 3 S:BMA-Skid/Foundation

Date: Jun 02, 2016 08:45


0.80 Setup:
1 Note:

Freq. Magnitude
0.70 # Hz ips Pk
1 70.3 7.66E-01
2 135.0 5.26E-01
0.60 3 133.4 5.10E-01
4 115.9 4.44E-01
2 5 182.8 4.09E-01
Magnitude (ips Pk)

3
0.50 6 210.6 3.81E-01
4
7 183.8 3.76E-01
8 180.0 3.69E-01
5
0.40 9 127.2 3.60E-01
6
9 87 10 208.1 3.28E-01
10 11 213.8 3.10E-01
1211 12 207.2 3.08E-01
0.30 14 13
15
19 16 17
18 13 153.8 2.89E-01
20
14 65.9 2.85E-01
15 154.4 2.84E-01
0.20 16 205.3 2.79E-01
17 215.0 2.79E-01
18 204.7 2.77E-01
0.10 19 178.1 2.69E-01
20 212.2 2.58E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00100\G3, 3_P1sv00000 - 414.csv

Spectrum TP: 414 Outrigger (v)


1.1 Channel: 4 S:BMA-Skid/Foundation
Date: Jun 02, 2016 08:45
1.0 1 Setup:
Note:
0.9 2 Freq. Magnitude
3 # Hz ips Pk
54
0.8 1 182.8 9.75E-01
6 2 210.0 8.73E-01
3 207.8 8.35E-01
0.7 4 207.2 8.22E-01
5 206.6 8.09E-01
Magnitude (ips Pk)

7 8
0.6 9 6 205.3 7.56E-01
7 180.3 6.12E-01
10 8 200.6 6.10E-01
11
0.5 9 200.0 5.82E-01
12
14 13 10 213.8 5.18E-01
15
11 212.2 4.98E-01
0.4 17 16
18
19 12 198.4 4.60E-01
20
13 216.9 4.41E-01
0.3 14 197.5 4.30E-01
15 63.4 4.24E-01
16 185.9 3.88E-01
0.2 17 154.4 3.84E-01
18 185.3 3.76E-01
19 186.6 3.75E-01
0.1 20 177.2 3.59E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00100\G4, 4_P1sv00000 - 414.csv

Vibration, Dynamics & Noise Page 158 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.63
Spectrum TP: Frame Front (h)
0.55 Channel: 4 F:BMA-Frame
Date: Jun 02, 2016 11:46
0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 82.5 2.67E-01
2 83.4 2.44E-01
3 73.1 2.12E-01
0.35 4 32.2 2.12E-01
5 71.9 2.04E-01
Magnitude (ips Pk)

0.30 6 33.4 1.99E-01


7 70.9 1.98E-01
1 8 16.9 1.75E-01
0.25 2 9 76.6 1.68E-01
10 77.8 1.66E-01
4 3
6 75 11 68.1 1.65E-01
0.20 12 46.9 1.64E-01
8
12 11 190 13 66.9 1.42E-01
0.15 13 14 90.0 1.20E-01
15 30.6 1.17E-01
15 14
16 203.4 9.75E-02
0.10 16 17 25.0 8.24E-02
17 18 20 19 18 55.6 7.75E-02
19 122.2 7.30E-02
0.05 20 113.1 7.14E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00108\G4, 4_P1sv00000 - 499 398 105 Frame Front.csv

Vibration, Dynamics & Noise Page 159 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.6.4 Vibration Data – Braced Wedge Supports


Fig: B.6.64
Spectrum TP: 420 (v)
1.3 Channel: 1 P:BMA-Pipe

1.2 Date: Jun 03, 2016 05:38


1 Setup:
Note:
1.1
Freq. Magnitude
1.0 # Hz ips Pk
2 1 83.8 1.16E+00
0.9 2 62.2 9.30E-01
3 76.6 7.84E-01
0.8 3 4 75.3 7.45E-01
5 217.5 7.11E-01
Magnitude (ips Pk)

4
5 6 60.6 6.37E-01
0.7 7 214.4 5.65E-01
6
8 212.5 5.10E-01
0.6 7 9 315.0 4.94E-01
8
10 66.3 4.86E-01
0.5 1011 9 11 71.9 4.71E-01
12 210.9 3.69E-01
0.4 13 317.8 3.51E-01
12
13 14 85.3 3.14E-01
14 15 90.0 2.82E-01
0.3 15 16 16 208.1 2.73E-01
18 17
19
20 17 312.2 2.33E-01
0.2 18 88.1 2.32E-01
19 205.9 2.11E-01
0.1 20 206.6 2.07E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00111\G1, 1_P1sv00000 - 420 415 c2 braced wedge.csv

Spectrum TP: 415 (v)


1.2 Channel: 2 P:BMA-Pipe
Date: Jun 03, 2016 05:38
1 Setup:
Note:
1.0 2
Freq. Magnitude
3 # Hz ips Pk
1 60.9 1.07E+00
2 57.5 9.82E-01
0.8 3 62.5 9.02E-01
5 4 4 65.0 7.37E-01
5 55.9 7.28E-01
Magnitude (ips Pk)

6 6 66.9 6.42E-01
7 83.8 5.28E-01
0.6 8 54.7 5.13E-01
8 7 9 315.3 4.95E-01
9 10 74.7 4.75E-01
10
11
11 75.3 4.71E-01
12 13
12 70.9 4.19E-01
0.4 14
15 16 13 79.7 4.12E-01
17
19 18 14 80.9 3.80E-01
20
15 81.6 3.77E-01
16 177.5 3.75E-01
0.2 17 53.1 3.55E-01
18 317.8 3.28E-01
19 72.8 3.22E-01
20 217.5 3.08E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00111\G2, 2_P1sv00000 - 420 415 c2 braced wedge.csv

Spectrum TP: Cylinder 2 (v)


1.4 Channel: 3 C:BMA-Cylinder
Date: Jun 03, 2016 05:38
Setup:
1.2 21 Note:

Freq. Magnitude
# Hz ips Pk
1 62.5 1.19E+00
1.0 2 60.6 1.18E+00
3 83.8 8.74E-01
3
4 57.5 7.30E-01
5 55.9 6.55E-01
Magnitude (ips Pk)

0.8 6 66.6 6.46E-01


4
7 79.7 4.80E-01
5 6 8 53.1 3.56E-01
9 217.2 2.21E-01
0.6 10 75.6 2.07E-01
11 215.9 1.97E-01
7 12 90.0 1.92E-01
13 33.4 1.91E-01
0.4 8
14 49.1 1.82E-01
15 31.3 1.78E-01
16 50.0 1.75E-01
9 17 31.9 1.73E-01
13 14 10 12 11
0.2 15
17 18 177.8 1.67E-01
2016 18 19
19 315.3 1.66E-01
20 45.6 1.58E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00111\G3, 3_P1sv00000 - 420 415 c2 braced wedge.csv

Spectrum TP: 420 (-a)


1.1
Channel: 1 P:BMA-Pipe

Date: Jun 03, 2016 05:48


1.0 Setup:
1 Note:
0.9 2
Freq. Magnitude
# Hz ips Pk
0.8 1 62.5 9.31E-01
2 60.3 8.86E-01
3 177.8 5.11E-01
0.7 4 33.1 4.83E-01
5 80.0 4.83E-01
Magnitude (ips Pk)

0.6 6 92.2 4.74E-01


7 87.5 4.72E-01
3 8 90.0 4.50E-01
0.5 4 5 76 9 109.4 4.39E-01
8 9 10 31.3 4.17E-01
10 11 216.9 3.99E-01
11
0.4 12 99.7 2.66E-01
13 93.1 2.59E-01
0.3 14 103.8 2.58E-01
131214 15 15 112.8 2.54E-01
16 17
18 16 66.9 2.31E-01
19 20
0.2 17 111.9 2.25E-01
18 111.3 2.23E-01
19 84.1 2.08E-01
0.1 20 107.5 2.08E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00112\G1, 1_P1sv00000 - 420 415 c2 braced wedge a.csv

Vibration, Dynamics & Noise Page 160 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.65
Spectrum TP: 415 (-a)
1.3 Channel: 2 P:BMA-Pipe

1.2 Date: Jun 03, 2016 05:48


1 Setup:
Note:
1.1
Freq. Magnitude
1.0 2 # Hz ips Pk
1 83.8 1.13E+00
0.9 2 80.0 9.66E-01
3 33.1 7.95E-01
0.8 3 4 31.3 7.55E-01
4 5 81.3 6.67E-01
Magnitude (ips Pk)

6 62.5 5.98E-01
0.7 5 7 60.3 4.64E-01
6
8 65.6 4.42E-01
0.6 9 57.5 3.70E-01
10 64.4 3.61E-01
0.5 7
11 71.9 3.58E-01
8 12 45.0 3.26E-01
0.4 13 215.3 2.99E-01
9 1011
14 213.8 2.90E-01
12
13
14 15 27.5 2.80E-01
0.3 15 18 1716 16 217.2 2.80E-01
20 19
17 212.8 2.66E-01
0.2 18 38.1 2.64E-01
19 75.6 2.50E-01
0.1 20 38.8 2.49E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00112\G2, 2_P1sv00000 - 420 415 c2 braced wedge a.csv

Spectrum TP: Cylinder 2 (-a)


0.90 Channel: 3 C:BMA-Cylinder
Date: Jun 03, 2016 05:48
0.80 1 Setup:
Note:

Freq. Magnitude
0.70 2 # Hz ips Pk
3
1 31.3 7.89E-01
2 33.1 6.78E-01
0.60 3 32.2 6.31E-01
4 45.9 4.35E-01
5 57.8 3.94E-01
Magnitude (ips Pk)

0.50 6 62.5 3.12E-01


7 38.8 2.97E-01
4 8 38.1 2.94E-01
0.40 5 9 16.9 2.91E-01
10 40.0 2.90E-01
11 27.8 2.67E-01
6 12 55.9 2.60E-01
0.30 9 87
10
11 1213 13 60.3 2.59E-01
14 47.8 2.25E-01
14
15
16 15 220.6 2.12E-01
0.20 16 221.3 2.09E-01
19 17
18
20
17 228.8 1.69E-01
18 229.4 1.68E-01
0.10 19 216.9 1.67E-01
20 230.0 1.65E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00112\G3, 3_P1sv00000 - 420 415 c2 braced wedge a.csv

Spectrum TP: 420 (h)


1.8 Channel: 1 P:BMA-Pipe
Date: Jun 03, 2016 05:59
1
Setup:
Note:
1.5
Freq. Magnitude
# Hz ips Pk
1 83.1 1.62E+00
2 180.6 7.10E-01
1.2 3 180.0 6.78E-01
4 60.9 6.62E-01
5 182.5 6.10E-01
Magnitude (ips Pk)

6 57.5 6.01E-01
7 74.7 5.39E-01
0.9 8 183.4 5.34E-01
9 65.6 5.30E-01
2 10 72.8 4.97E-01
4 3 11 76.6 4.39E-01
6 5 12 16.6 4.02E-01
0.6 13 215.6 3.87E-01
9 7 8
10 14 56.3 3.85E-01
11 15 55.6 3.84E-01
12 14
15 13
16
19 17
18 16 212.2 3.82E-01
20
0.3 17 214.7 3.68E-01
18 214.1 3.57E-01
19 54.4 3.55E-01
20 33.4 3.34E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00113\G1, 1_P1sv00000 - 420 415 c2 braced wedge v.csv

Spectrum TP: 430 (-a)


1.1
Channel: 2 P:BMA-Pipe

Date: Jun 03, 2016 05:59


1.0 Setup:
Note:
1
0.9
Freq. Magnitude
# Hz ips Pk
0.8 2 1 83.1 9.09E-01
2 44.1 7.77E-01
3 42.8 6.52E-01
0.7 4 79.7 6.49E-01
3 4
5 78.4 6.06E-01
Magnitude (ips Pk)

5 6 81.6 5.67E-01
0.6 6 7 57.5 5.08E-01
7 8 56.3 3.92E-01
0.5 9 72.5 3.70E-01
10 118.1 3.36E-01
8
11 47.8 3.22E-01
0.4 9 12 87.5 3.16E-01
11 12
10 13 117.2 3.16E-01
14 13
0.3 15 14 31.3 3.06E-01
16 15 66.6 2.96E-01
17 18 16 64.1 2.61E-01
0.2 19 17 32.8 2.18E-01
20 18 74.1 2.14E-01
19 69.4 1.67E-01
0.1 20 90.0 1.56E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00113\G2, 2_P1sv00000 - 420 415 c2 braced wedge v.csv

Vibration, Dynamics & Noise Page 161 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.66
Spectrum TP: 435 (-a)
1.1 Channel: 3 P:BMA-Pipe
Date: Jun 03, 2016 05:59
1.0 Setup:
1 Note:
0.9 Freq. Magnitude
2 # Hz ips Pk
0.8 1 42.8 9.48E-01
2 44.1 8.23E-01
3 3 33.4 7.08E-01
0.7 4 4 31.3 6.83E-01
5 40.0 5.51E-01
Magnitude (ips Pk)

0.6 6 83.1 4.95E-01


5 7 78.4 4.78E-01
8 79.7 4.41E-01
6
0.5 7 9 38.8 4.35E-01
9 8 10 118.1 3.71E-01
11 81.3 2.86E-01
0.4 10 12 27.5 1.84E-01
13 47.5 1.77E-01
0.3 11 14 16.9 1.69E-01
15 132.5 1.67E-01
16 180.0 1.58E-01
0.2 14
12 13 15 17 181.6 1.53E-01
16
17
20 18 19 18 87.5 1.48E-01
19 202.5 1.48E-01
0.1 20 75.3 1.42E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00113\G3, 3_P1sv00000 - 420 415 c2 braced wedge v.csv

Spectrum TP: 430 (h)


1.2 Channel: 1 P:BMA-Pipe
Date: Jun 03, 2016 06:13
1 Setup:
Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 61.6 1.08E+00
2 2 78.4 8.02E-01
0.8 3 132.2 6.65E-01
4 66.9 6.53E-01
5 57.5 5.79E-01
Magnitude (ips Pk)

4 3 6 55.9 5.56E-01
7 117.8 5.55E-01
0.6 5 8 72.5 5.50E-01
6 8 7
9 10 9 70.3 5.20E-01
11 10 83.4 5.07E-01
11 81.6 4.75E-01
12 12 180.0 3.98E-01
0.4 13 181.6 3.36E-01
13 14 211.6 2.29E-01
15 212.2 2.11E-01
14 16 139.1 2.07E-01
16
17 15 17 139.7 2.00E-01
0.2 192018
18 176.6 1.88E-01
19 161.3 1.79E-01
20 168.4 1.78E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00114\G1, 1_P1sv00000 - 430 435 414 Wedge braced.csv

Spectrum TP: 430 (v)


2.6 Channel: 2 P:BMA-Pipe

2.4 Date: Jun 03, 2016 06:13


Setup:
1 Note:
2.2
Freq. Magnitude
2.0 # Hz ips Pk
1 83.4 2.20E+00
1.8 2 78.4 1.51E+00
3 79.7 1.26E+00
1.6 4 72.5 6.74E-01
2 5 70.3 4.95E-01
Magnitude (ips Pk)

6 132.2 4.77E-01
1.4 7 180.9 3.21E-01
3 8 181.6 2.93E-01
1.2 9 90.0 2.61E-01
10 254.1 2.18E-01
1.0 11 254.7 2.09E-01
12 217.5 1.99E-01
0.8 13 253.4 1.97E-01
4 14 216.6 1.95E-01
15 215.6 1.92E-01
0.6 16 259.4 1.76E-01
5 6
17 214.4 1.76E-01
0.4 78 18 55.9 1.70E-01
9 19 85.9 1.68E-01
14
12
15 10
1116
13
0.2 18 19 20 17 20 123.8 1.63E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00114\G2, 2_P1sv00000 - 430 435 414 Wedge braced.csv

Spectrum TP: 435 (v)


1.8
Channel: 3 P:BMA-Pipe

Date: Jun 03, 2016 06:13


Setup:
Note:
1.5 1
Freq. Magnitude
# Hz ips Pk
1 61.3 1.46E+00
2 66.3 8.42E-01
1.2 3 83.4 7.90E-01
4 72.5 7.37E-01
5 57.5 7.06E-01
Magnitude (ips Pk)

6 132.2 7.03E-01
7 55.9 6.89E-01
0.9 2 8 78.4 6.85E-01
3 9 70.3 6.65E-01
4 10 55.0 6.03E-01
75 6
9 8 11 75.0 4.13E-01
10 12 181.9 2.81E-01
0.6 13 180.9 2.76E-01
14 213.1 2.35E-01
11 15 214.4 2.31E-01
16 212.5 2.25E-01
0.3 12
13 17 33.4 2.20E-01
17 14
15
16
2018
19 18 215.3 2.19E-01
19 216.6 2.19E-01
20 210.9 2.10E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00114\G3, 3_P1sv00000 - 430 435 414 Wedge braced.csv

Vibration, Dynamics & Noise Page 162 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.67
Spectrum TP: 414 (-a)
4.5 Channel: 4 P:BMA-Pipe
Date: Jun 03, 2016 06:13
4.0 Setup:
1 Note:

Freq. Magnitude
3.5 # Hz ips Pk
2 1 60.3 3.82E+00
2 57.8 3.15E+00
3.0 3 62.5 2.18E+00
4 177.5 1.62E+00
5 176.6 1.40E+00
Magnitude (ips Pk)

2.5 6 182.8 1.32E+00


7 56.3 1.30E+00
3 8 33.4 1.10E+00
2.0 9 31.3 1.08E+00
10 175.0 1.02E+00
4 11 172.8 9.18E-01
12 45.0 8.71E-01
1.5 5 13 54.7 8.70E-01
7 6
14 180.6 8.64E-01
98 15 81.6 8.04E-01
10
1.0 12 13 1114 16 191.9 7.98E-01
15 16
17
18
19
20 17 192.5 7.97E-01
18 196.6 7.83E-01
0.5 19 195.0 7.73E-01
20 185.3 7.06E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00114\G4, 4_P1sv00000 - 430 435 414 Wedge braced.csv

Vibration, Dynamics & Noise Page 163 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.6.5 Vibration Data – Night Operation no Side Stream


Fig: B.6.68
Spectrum TP: 420 (v)
1.4 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 12:59
1 Setup:
1.2 Note:

Freq. Magnitude
2 # Hz ips Pk
1 71.9 1.25E+00
1.0 3
2 82.5 1.03E+00
3 81.9 9.83E-01
4 60.9 7.33E-01
5 217.2 7.14E-01
Magnitude (ips Pk)

0.8 6 79.4 6.92E-01


4
6
5 7 63.4 6.17E-01
8 215.3 5.99E-01
7
8 9 66.3 5.87E-01
0.6 9 11
12 10 10 315.3 5.75E-01
11 214.1 5.69E-01
13 12 213.1 5.62E-01
13 75.3 4.60E-01
0.4 14 14 210.6 3.84E-01
15 15 202.2 3.21E-01
16 18 17
20 19 16 87.2 3.02E-01
17 245.6 3.00E-01
0.2 18 219.4 2.94E-01
19 318.1 2.66E-01
20 33.4 2.57E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00160\G1, 1_P1sv00000 - 420 415.csv

Spectrum TP: 415 (v)


1.6 Channel: 2 P:BMA-Pipe
Date: Jun 04, 2016 12:59
1 Setup:
1.4 Note:
2
Freq. Magnitude
# Hz ips Pk
1.2 1 61.3 1.40E+00
3 2 64.4 1.28E+00
3 71.6 1.07E+00
1.0 4 4 57.5 9.75E-01
5 55.9 8.36E-01
Magnitude (ips Pk)

6 69.4 7.12E-01
5
7 315.3 5.75E-01
0.8 8 80.9 4.57E-01
6 9 53.4 3.83E-01
10 75.3 3.11E-01
0.6 7 11 178.8 2.76E-01
12 217.2 2.68E-01
13 76.6 2.67E-01
8
14 181.3 2.66E-01
0.4 9 15 182.8 2.58E-01
10 16 245.6 2.45E-01
13 11
14
15 12 17 33.4 2.44E-01
17 19 16 18
20 18 317.5 2.41E-01
0.2 19 175.6 2.35E-01
20 85.0 2.19E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00160\G2, 2_P1sv00000 - 420 415.csv

Spectrum TP: 420 (-a)


1.3 Channel: 3 P:BMA-Pipe

1.2 Date: Jun 04, 2016 12:59


Setup:
1 Note:
1.1
Freq. Magnitude
1.0 # Hz ips Pk
1 60.9 1.10E+00
0.9 2 64.1 7.88E-01
3 88.1 5.87E-01
0.8 2 4 109.4 5.68E-01
5 80.3 5.36E-01
Magnitude (ips Pk)

6 31.6 5.32E-01
0.7 7 80.9 5.19E-01
8 33.1 5.05E-01
0.6 3
4 9 83.4 5.00E-01
6 5 10 217.2 4.97E-01
8 7
9 10
0.5 12 11 11 181.3 4.81E-01
13 12 71.6 4.65E-01
0.4 13 178.4 4.21E-01
1514 14 107.2 3.62E-01
1617
15 100.0 3.59E-01
0.3 18
2019 16 93.1 3.21E-01
17 101.6 3.19E-01
0.2 18 97.8 2.83E-01
19 95.9 2.75E-01
0.1 20 90.6 2.69E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00160\G3, 3_P1sv00000 - 420 415.csv

Spectrum TP: 415 (-a)


1.2
Channel: 4 P:BMA-Pipe

Date: Jun 04, 2016 12:59


1
2 Setup:
Note:
3
1.0
Freq. Magnitude
# Hz ips Pk
1 31.6 1.08E+00
2 80.6 1.07E+00
0.8 4 3 33.1 9.99E-01
5
4 60.9 7.72E-01
5 71.3 7.50E-01
Magnitude (ips Pk)

6 65.0 5.36E-01
7 65.6 5.21E-01
0.6 8 84.7 4.62E-01
6 9 83.4 4.10E-01
7
10 69.4 4.08E-01
8
11 215.6 3.22E-01
10 9 12 217.2 3.21E-01
0.4 13 202.2 2.93E-01
11
12 14 39.4 2.77E-01
13
14 15 15 245.6 2.65E-01
18 16 17 19
20 16 86.3 2.60E-01
0.2 17 109.4 2.48E-01
18 46.9 2.46E-01
19 212.8 2.45E-01
20 178.8 2.36E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00160\G4, 4_P1sv00000 - 420 415.csv

Vibration, Dynamics & Noise Page 164 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.69
Spectrum TP: 420 (-h)
1.6 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 13:11
Setup:
1.4 1 Note:

Freq. Magnitude
# Hz ips Pk
1.2
1 71.6 1.38E+00
2 61.3 1.00E+00
3 57.8 9.57E-01
2
1.0 3
4 65.9 9.13E-01
5 56.3 7.74E-01
Magnitude (ips Pk)

4
6 178.4 6.74E-01
7 175.6 6.07E-01
0.8 5 8 182.2 5.89E-01
9 183.1 5.87E-01
6
10 216.3 4.54E-01
78 11 82.8 4.12E-01
0.6 9
12 82.2 4.08E-01
13 16.6 3.90E-01
10
11 14 78.4 3.88E-01
0.4 13 1412 15 33.4 3.57E-01
15
16 185.0 2.60E-01
16 17 315.6 2.38E-01
20 1819 17
18 166.9 2.36E-01
0.2 19 170.9 2.27E-01
20 31.3 2.23E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00161\G1, 1_P1sv00000 - 420 c2.csv

Spectrum TP: Cylinder 2 (h)


0.77 Channel: 2 C:BMA-Cylinder
Date: Jun 04, 2016 13:11
Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 215.0 3.43E-01
0.55 2 215.6 3.37E-01
3 217.2 3.22E-01
4 213.4 3.07E-01
5 16.6 2.96E-01
Magnitude (ips Pk)

0.44 6 33.4 2.86E-01


7 181.9 2.74E-01
8 211.3 2.65E-01
12 9 181.3 2.62E-01
0.33 4
3
10 60.9 2.28E-01
5 6
7
11 175.3 2.20E-01
9 8 12 178.1 1.92E-01
10 13 66.9 1.70E-01
11
0.22 14 31.3 1.69E-01
12
14 13 15 81.3 1.54E-01
16 15 16 49.4 1.51E-01
20 17
18 19 17 69.1 1.38E-01
0.11 18 67.8 1.37E-01
19 200.3 1.32E-01
20 27.5 1.32E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00161\G2, 2_P1sv00000 - 420 c2.csv

Spectrum TP: Cylinder 2 (v)


1.8 Channel: 3 C:BMA-Cylinder
Date: Jun 04, 2016 13:11
Setup:
Note:
1.5 1
Freq. Magnitude
# Hz ips Pk
1 61.3 1.48E+00
2 64.4 1.14E+00
1.2 2 3 66.6 9.46E-01
4 57.8 8.61E-01
5 56.3 7.59E-01
Magnitude (ips Pk)

6 81.9 6.05E-01
3
7 83.4 5.64E-01
0.9 4 8 82.8 5.60E-01
9 68.8 3.97E-01
5
10 84.7 3.79E-01
11 70.3 3.60E-01
6 12 71.3 3.43E-01
0.6 87 13 33.4 2.85E-01
14 75.9 2.05E-01
9 10 15 315.6 1.96E-01
11
12 16 31.3 1.94E-01
0.3 13 17 50.0 1.94E-01
18 217.2 1.82E-01
16 17 14 15
18 19 29.4 1.56E-01
20 19
20 15.9 1.48E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00161\G3, 3_P1sv00000 - 420 c2.csv

Spectrum TP: Cylinder 2 (-a)


1.3
Channel: 4 C:BMA-Cylinder

1.2 Date: Jun 04, 2016 13:11


1 Setup:
Note:
1.1
Freq. Magnitude
1.0 # Hz ips Pk
1 31.6 1.14E+00
0.9 2 57.8 5.15E-01
3 40.0 4.10E-01
0.8 4 49.1 2.93E-01
5 46.3 2.93E-01
Magnitude (ips Pk)

6 16.6 2.90E-01
0.7 7 48.4 2.88E-01
8 46.9 2.85E-01
0.6 9 28.1 2.70E-01
2 10 38.1 2.59E-01
0.5 11 63.8 2.13E-01
12 221.6 1.94E-01
3
0.4 13 88.1 1.89E-01
14 71.9 1.78E-01
6 574 15 84.1 1.76E-01
0.3 9 10 8 16 220.0 1.72E-01
11
12
17 223.1 1.72E-01
0.2 19 14 1513 16
18120
7 18 217.2 1.66E-01
19 42.5 1.66E-01
0.1 20 226.9 1.66E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00161\G4, 4_P1sv00000 - 420 c2.csv

Vibration, Dynamics & Noise Page 165 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.70
Spectrum TP: 430 (v)
1.8 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 13:20
Setup:
Note:
1.5 1
2
Freq. Magnitude
# Hz ips Pk
1 79.4 1.46E+00
2 80.9 1.44E+00
1.2 3 83.4 1.06E+00
4 74.7 6.91E-01
3 5 73.4 6.70E-01
Magnitude (ips Pk)

6 132.8 5.29E-01
7 70.3 3.17E-01
0.9 8 60.9 3.01E-01
9 56.3 2.33E-01
10 217.2 2.02E-01
54 11 255.0 1.99E-01
12 182.2 1.99E-01
0.6 13 64.1 1.94E-01
6
14 255.9 1.91E-01
15 261.6 1.89E-01
16 215.9 1.87E-01
8 7 17 249.1 1.75E-01
0.3
9 18 250.6 1.75E-01
13 12 10 1115
19 16 181420
17 19 180.3 1.64E-01
20 260.0 1.61E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00162\G1, 1_P1sv00000 - 430 435.csv

Spectrum TP: 435 (v)


1.8 Channel: 2 P:BMA-Pipe
Date: Jun 04, 2016 13:20
Setup:
Note:
1.5 1
Freq. Magnitude
# Hz ips Pk
1 60.9 1.48E+00
2 64.4 1.18E+00
1.2 2 3 66.9 1.07E+00
4 132.8 9.71E-01
3
5 71.9 8.18E-01
Magnitude (ips Pk)

4 6 57.5 7.96E-01
7 80.9 7.88E-01
0.9 8 70.0 7.33E-01
5
6 7 9 79.4 7.20E-01
8 9 10 68.8 6.84E-01
10 11 76.3 5.95E-01
11 12 83.4 4.09E-01
0.6 13 213.8 3.25E-01
14 215.3 3.19E-01
12 15 214.7 3.15E-01
16 33.4 3.09E-01
16 13
14
15
0.3 18 17 17 217.2 2.93E-01
18 31.6 2.84E-01
1920
19 117.5 2.07E-01
20 126.9 2.07E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00162\G2, 2_P1sv00000 - 430 435.csv

Spectrum TP: 430 (-a)


1.2 Channel: 3 P:BMA-Pipe
Date: Jun 04, 2016 13:20
Setup:
1
Note:
1.0
2 Freq. Magnitude
# Hz ips Pk
1 79.7 1.04E+00
2 83.4 9.42E-01
0.8 3 44.1 6.33E-01
4 57.5 5.67E-01
5 77.5 4.66E-01
Magnitude (ips Pk)

3
6 46.6 4.64E-01
7 73.4 3.89E-01
0.6 4 8 75.0 3.85E-01
9 31.6 3.67E-01
10 48.4 3.54E-01
6 5
11 88.1 3.38E-01
12 32.8 2.62E-01
0.4 9
78
13 118.8 1.86E-01
10
11
14 117.5 1.76E-01
12
15 66.9 1.72E-01
16 159.1 1.69E-01
0.2 13 17 64.7 1.31E-01
15 14 16 18 62.2 1.27E-01
19 17
18 20 19 16.9 1.23E-01
20 95.9 1.21E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00162\G3, 3_P1sv00000 - 430 435.csv

Spectrum TP: 435 (-a)


1.1
Channel: 4 P:BMA-Pipe

Date: Jun 04, 2016 13:20


1.0 1 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 2 1 44.1 9.75E-01
2 31.6 7.74E-01
3 33.1 6.65E-01
0.7 3 4 80.3 6.34E-01
5 40.0 5.47E-01
Magnitude (ips Pk)

4
0.6 6 83.4 5.40E-01
5 7 118.4 2.19E-01
6
8 117.5 2.16E-01
0.5 9 132.8 2.10E-01
10 64.1 1.92E-01
11 88.1 1.90E-01
0.4 12 65.9 1.72E-01
13 27.5 1.70E-01
0.3 14 60.6 1.61E-01
15 16.9 1.59E-01
87 9 16 122.2 1.58E-01
0.2 10 11 17 182.2 1.29E-01
15 13 1412 16
17 18 159.1 1.24E-01
18
19
20
19 160.0 1.22E-01
0.1 20 160.9 1.20E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00162\G4, 4_P1sv00000 - 430 435.csv

Vibration, Dynamics & Noise Page 166 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.71
Spectrum TP: 4D Right Wedge Skid R (v)
0.18 Channel: 1 S:BMA-Skid/Foundation
Date: Jun 04, 2016 13:30
1
3 2 Setup:
4
Note:
0.15
5 Freq. Magnitude
6 # Hz ips Pk
7 8 1 61.3 1.62E-01
9 10 2 64.1 1.59E-01
0.12 3 33.4 1.57E-01
4 64.7 1.56E-01
5 79.7 1.40E-01
Magnitude (ips Pk)

6 66.6 1.33E-01
11
7 57.8 1.27E-01
0.09 12 8 81.9 1.27E-01
9 31.3 1.25E-01
15 16 13
14
18 17 19 10 56.3 1.23E-01
20 11 217.2 9.46E-02
12 68.4 8.43E-02
0.06 13 364.4 7.54E-02
14 363.4 7.52E-02
15 219.4 7.41E-02
16 232.5 7.41E-02
17 220.6 7.37E-02
0.03
18 75.0 7.27E-02
19 231.6 7.20E-02
20 221.9 6.87E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00163\G1, 1_P1sv00000 - Skid at Wedges.csv

Spectrum TP: 4D Right Wedge Skid L (v)


0.30 Channel: 2 S:BMA-Skid/Foundation
Date: Jun 04, 2016 13:30
0.27 Setup:
Note:

0.24 1 Freq. Magnitude


# Hz ips Pk
1 81.6 2.34E-01
0.21 2 61.3 1.97E-01
2 3 3 79.4 1.95E-01
4 64.1 1.65E-01
0.18 5 64.7 1.65E-01
Magnitude (ips Pk)

45 6 83.8 1.55E-01
6 7 57.8 1.33E-01
0.15 8 33.4 1.30E-01
8 7 9 56.3 1.24E-01
9 10 31.3 1.10E-01
0.12 10 11 217.2 1.01E-01
11 12 215.6 9.15E-02
12
13 13 215.0 8.77E-02
0.09 1514
16 14 549.1 8.03E-02
17
18 19
20 15 545.0 8.01E-02
16 544.4 7.95E-02
0.06
17 542.8 7.93E-02
18 543.4 7.83E-02
0.03 19 549.7 7.60E-02
20 75.0 7.33E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00163\G2, 2_P1sv00000 - Skid at Wedges.csv

Spectrum TP: 4D Left Wedge Skid R (v)


0.22 Channel: 3 S:BMA-Skid/Foundation
Date: Jun 04, 2016 13:30
0.20 1
Setup:
Note:
0.18 Freq. Magnitude
2
# Hz ips Pk
0.16 1 61.3 1.99E-01
2 64.1 1.69E-01
3 81.9 1.37E-01
0.14 3
4 66.6 1.32E-01
4
5 79.4 1.25E-01
Magnitude (ips Pk)

6 5
0.12 7
6 57.8 1.23E-01
8
7 56.3 1.16E-01
8 33.4 1.09E-01
0.10 9 549.1 9.00E-02
11 10 129
14
13
15 10 217.2 8.93E-02
16
17
19 18
20 11 31.3 8.87E-02
0.08 12 545.0 8.81E-02
13 544.4 8.74E-02
0.06 14 542.8 8.73E-02
15 543.4 8.64E-02
16 549.7 8.53E-02
0.04 17 215.6 8.18E-02
18 550.3 7.97E-02
19 215.0 7.94E-02
0.02 20 547.8 7.86E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00163\G3, 3_P1sv00000 - Skid at Wedges.csv

Spectrum TP: 4D Left Wedge Skid L (v)


0.15
Channel: 4 S:BMA-Skid/Foundation

0.14 1
Date: Jun 04, 2016 13:30
Setup:
0.13 Note:
2
0.12 Freq. Magnitude
# Hz ips Pk
0.11 1 81.6 1.36E-01
2 79.4 1.23E-01
0.10 3 61.3 8.18E-02
4 33.4 7.98E-02
0.09 5 64.7 6.55E-02
Magnitude (ips Pk)

4
3 6 31.3 6.34E-02
0.08 7 215.0 5.93E-02
8 545.0 5.66E-02
0.07 5 9 544.4 5.62E-02
6
7 10 217.2 5.50E-02
0.06 10
11 98 11 213.4 5.47E-02
12 13
14
19 17 161815 12 212.8 5.39E-02
0.05 20 13 549.7 5.38E-02
14 549.1 5.35E-02
0.04 15 550.3 4.99E-02
16 543.8 4.92E-02
0.03
17 74.4 4.90E-02
0.02 18 546.9 4.89E-02
19 56.3 4.88E-02
0.01 20 57.8 4.61E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00163\G4, 4_P1sv00000 - Skid at Wedges.csv

Vibration, Dynamics & Noise Page 167 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.72
Spectrum TP: 435 (-h)
1.1 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 13:41
1.0 1
Setup:
Note:
0.9 2 3 Freq. Magnitude
# Hz ips Pk
4
0.8 5 1 61.3 9.90E-01
2 64.1 8.75E-01
6
7 3 132.5 8.72E-01
0.7 4 79.4 8.06E-01
5 80.9 7.83E-01
Magnitude (ips Pk)

8
0.6 6 66.9 7.25E-01
7 72.8 6.95E-01
9
8 57.8 6.19E-01
0.5 9 70.3 5.37E-01
10 117.2 3.54E-01
11 115.6 3.21E-01
0.4 12 211.9 3.16E-01
10
11 12
13 181.6 2.70E-01
0.3 14 175.0 2.40E-01
13 15 175.6 2.30E-01
14
15 16 169.4 1.82E-01
0.2 20 16
19
18 17 17 325.6 1.76E-01
18 151.6 1.75E-01
19 150.9 1.75E-01
0.1 20 153.8 1.70E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00164\G1, 1_P1sv00000 - 435 436.csv

Spectrum TP: 436 (h)


4.0 Channel: 2 P:BMA-Pipe
Date: Jun 04, 2016 13:41
3.6 Setup:
Note:
1
3.2 Freq. Magnitude
# Hz ips Pk
1 132.5 3.30E+00
2.8 2 170.0 2.06E+00
3 180.6 1.95E+00
4 176.3 1.76E+00
2.4 5 165.0 1.39E+00
Magnitude (ips Pk)

6 212.8 1.16E+00
2 7 167.2 1.05E+00
2.0 3
8 191.6 9.72E-01
4 9 217.2 9.50E-01
10 215.0 9.49E-01
1.6 11 192.8 9.33E-01
5 12 215.9 9.27E-01
13 154.1 9.15E-01
1.2 6
14 161.9 8.97E-01
7
8
11 9
10
12 15 155.3 8.78E-01
1314
1715 16
19
18
20 16 189.1 8.71E-01
0.8
17 151.9 8.52E-01
18 200.0 7.87E-01
0.4 19 198.1 7.85E-01
20 199.4 7.80E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00164\G2, 2_P1sv00000 - 435 436.csv

Spectrum TP: 436 (v)


1.8 Channel: 3 P:BMA-Pipe
Date: Jun 04, 2016 13:41
Setup:
Note:
1.5 1
Freq. Magnitude
3 2 # Hz ips Pk
1 117.5 1.48E+00
4 2 181.6 1.35E+00
1.2 5
3 118.4 1.33E+00
6 4 203.4 1.23E+00
5 115.6 1.14E+00
Magnitude (ips Pk)

6 202.8 1.12E+00
7 80.9 8.18E-01
0.9 8 122.5 8.05E-01
7 8 9 9 201.9 7.83E-01
11 10 10 211.6 7.13E-01
12
13 11 79.4 7.13E-01
12 175.0 6.72E-01
0.6 17 15 16 14
13 175.6 6.70E-01
1918
20 14 215.9 5.66E-01
15 83.4 5.58E-01
16 187.8 5.58E-01
0.3 17 73.1 5.43E-01
18 215.0 5.33E-01
19 208.4 5.28E-01
20 63.8 4.92E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00164\G3, 3_P1sv00000 - 435 436.csv

Spectrum TP: 436 (a)


1.8
Channel: 4 P:BMA-Pipe

Date: Jun 04, 2016 13:41


Setup:
Note:
1.5 1
Freq. Magnitude
# Hz ips Pk
1 132.5 1.46E+00
2 117.5 1.16E+00
1.2 2 3 118.4 1.06E+00
4 80.9 9.08E-01
3
5 115.6 8.83E-01
Magnitude (ips Pk)

6 66.6 8.36E-01
4 7 64.7 8.28E-01
0.9 5
8 122.5 7.62E-01
76
9 181.6 6.85E-01
8
10 124.1 6.65E-01
10 9 11 44.1 5.36E-01
12 71.3 5.30E-01
0.6 11 13 126.6 5.27E-01
12 13
14
15 14 75.0 4.81E-01
19 16 1718 15 72.5 4.77E-01
20
16 68.1 4.33E-01
0.3 17 78.8 4.29E-01
18 83.4 4.25E-01
19 45.0 4.18E-01
20 69.1 4.04E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00164\G4, 4_P1sv00000 - 435 436.csv

Vibration, Dynamics & Noise Page 168 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.73
Spectrum TP: Engine Front (h)
0.55 Channel: 1 EW:BMA-Waukesha Engine
Date: Jun 04, 2016 13:52
0.50 Setup:
Note:
0.45 Freq. Magnitude
# Hz ips Pk
0.40 1 1 48.1 3.86E-01
2 2 25.0 3.78E-01
3 16.9 2.77E-01
0.35 4 26.6 1.76E-01
5 33.1 1.34E-01
Magnitude (ips Pk)

0.30 6 57.8 1.33E-01


3 7 52.5 1.29E-01
8 56.3 1.23E-01
0.25 9 28.8 1.19E-01
10 20.0 1.13E-01
11 41.9 9.79E-02
0.20 12 65.6 9.65E-02
4
13 80.0 8.59E-02
0.15 14 111.3 8.48E-02
5 786 15 109.4 8.45E-02
10 9 16 110.0 8.41E-02
11 12
0.10 13 15
14
19 17
1820 16 17 108.4 8.36E-02
18 81.3 8.30E-02
19 91.9 8.10E-02
0.05 20 89.1 8.08E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00165\G1, 1_P1sv00000 - Engine hv.csv

Spectrum TP: Engine Front (v)


0.55 Channel: 2 EW:BMA-Waukesha Engine
Date: Jun 04, 2016 13:52
0.50 Setup:
Note:
0.45 Freq. Magnitude
# Hz ips Pk
0.40 1 25.0 1.02E-01
2 16.9 8.77E-02
3 30.0 6.23E-02
0.35 4 31.6 5.67E-02
5 39.1 5.59E-02
Magnitude (ips Pk)

0.30 6 56.6 5.25E-02


7 57.5 5.08E-02
8 108.8 4.69E-02
0.25 9 27.8 3.96E-02
10 48.1 3.78E-02
11 244.1 3.62E-02
0.20 12 20.0 3.57E-02
13 240.3 3.57E-02
0.15 14 240.9 3.55E-02
15 181.3 3.50E-02
1
16 43.8 3.50E-02
0.10 2 17 241.6 3.50E-02
18 41.6 3.48E-02
34 5
67 8 19 242.8 3.47E-02
0.05 12 9 18 1610 15 13
2011
14
17
19 20 237.5 3.47E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00165\G2, 2_P1sv00000 - Engine hv.csv

Spectrum TP: Engine Back (h)


0.70 Channel: 3 EW:BMA-Waukesha Engine
Date: Jun 04, 2016 13:52
Setup:
0.60 Note:
1 Freq. Magnitude
# Hz ips Pk
1 25.0 5.54E-01
0.50 2 16.9 4.16E-01
3 26.6 1.90E-01
4 80.3 1.78E-01
2
5 81.3 1.66E-01
Magnitude (ips Pk)

0.40 6 47.8 1.56E-01


7 53.4 1.51E-01
8 33.4 1.33E-01
9 108.4 1.18E-01
0.30 10 75.3 1.03E-01
11 83.4 8.82E-02
12 41.9 7.19E-02
13 50.6 7.14E-02
0.20 3
4
14 66.9 7.09E-02
67
5 15 72.5 6.93E-02
8 16 86.3 6.64E-02
9 17 142.2 6.61E-02
10
0.10 11 18 141.6 6.58E-02
1213 1415 16 19 17
18 20 19 104.4 6.52E-02
20 191.3 6.43E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00165\G3, 3_P1sv00000 - Engine hv.csv

Spectrum TP: Engine Back (v)


0.55
Channel: 4 EW:BMA-Waukesha Engine

Date: Jun 04, 2016 13:52


0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 33.1 2.32E-01
2 32.2 2.25E-01
3 16.9 1.51E-01
0.35 4 25.0 1.43E-01
5 95.9 6.21E-02
Magnitude (ips Pk)

0.30 6 49.1 6.16E-02


7 97.8 6.15E-02
8 94.7 6.06E-02
0.25 9 44.1 5.69E-02
21 10 48.1 5.69E-02
11 91.6 5.62E-02
0.20 12 45.0 5.55E-02
13 65.6 5.53E-02
3 14 81.9 5.51E-02
0.15 4
15 83.4 5.42E-02
16 62.8 5.37E-02
0.10 17 99.7 5.35E-02
18 117.2 5.32E-02
6 13 14 11857
910
2012 16
19 15 17 18 19 64.4 5.28E-02
0.05 20 38.4 5.15E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00165\G4, 4_P1sv00000 - Engine hv.csv

Vibration, Dynamics & Noise Page 169 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.74
Spectrum TP: Engine Back (-a)
0.55 Channel: 1 EW:BMA-Waukesha Engine
Date: Jun 04, 2016 14:01
0.50 Setup:
Note:
0.45 Freq. Magnitude
# Hz ips Pk
0.40 1 33.4 5.94E-02
2 29.1 5.73E-02
3 26.6 5.32E-02
0.35 4 38.8 4.88E-02
5 16.6 4.81E-02
Magnitude (ips Pk)

0.30 6 25.3 4.62E-02


7 243.4 3.63E-02
8 91.9 3.62E-02
0.25 9 178.8 3.52E-02
10 245.6 3.52E-02
11 241.9 3.51E-02
0.20 12 240.3 3.32E-02
13 248.8 3.26E-02
0.15 14 161.6 3.21E-02
15 247.5 3.20E-02
16 239.1 3.19E-02
0.10 17 174.1 3.19E-02
18 160.0 3.18E-02
21 19 250.3 3.17E-02
5 63 4
0.05 8 18 209
14 17 710
11
1213
16 15
19 20 175.0 3.14E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00166\G1, 1_P1sv00000 - eng a frame front.csv

Spectrum TP: Frame Front (h)


0.55 Channel: 2 F:BMA-Frame
Date: Jun 04, 2016 14:01
0.50 Setup:
Note:
0.45 Freq. Magnitude
# Hz ips Pk
0.40 1 33.4 1.76E-01
2 16.6 1.59E-01
3 47.5 1.45E-01
0.35 4 69.7 1.35E-01
5 66.9 1.28E-01
Magnitude (ips Pk)

0.30 6 71.3 1.27E-01


7 68.1 1.22E-01
8 49.4 1.21E-01
0.25 9 90.3 1.16E-01
10 65.6 1.10E-01
11 44.1 1.02E-01
0.20 12 25.0 9.67E-02
1
2 13 75.0 9.45E-02
0.15 3 14 79.7 9.17E-02
4
56 15 83.8 9.06E-02
8 7 9
11
10 16 85.0 8.94E-02
0.10 12 1311416
5 17 178.1 8.41E-02
19 18
20 17
18 116.9 8.13E-02
19 74.1 8.02E-02
0.05 20 118.8 7.88E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00166\G2, 2_P1sv00000 - eng a frame front.csv

Spectrum TP: Frame Front (v)


0.55 Channel: 3 F:BMA-Frame
Date: Jun 04, 2016 14:01
0.50 Setup:
Note:
0.45 Freq. Magnitude
# Hz ips Pk
0.40 1 33.4 1.80E-01
2 79.7 1.43E-01
3 81.6 1.31E-01
0.35 4 82.5 1.29E-01
5 83.4 1.28E-01
Magnitude (ips Pk)

0.30 6 31.6 1.26E-01


7 80.9 1.23E-01
8 30.0 1.09E-01
0.25 9 57.8 1.01E-01
10 74.1 9.80E-02
11 64.7 9.77E-02
0.20 1 12 66.9 9.47E-02
13 75.0 9.23E-02
0.15 2 14 68.4 7.24E-02
3 15 16.6 7.13E-02
6 745
8 16 49.4 6.69E-02
9 11 10
0.10 1213 17 221.3 5.19E-02
15 16 14 18 148.4 5.01E-02
19 18
20 17 19 60.9 5.00E-02
0.05 20 150.3 4.97E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00166\G3, 3_P1sv00000 - eng a frame front.csv

Spectrum TP: Frame Front (a)


0.55
Channel: 4 F:BMA-Frame

Date: Jun 04, 2016 14:01


0.50 Setup:
Note:
0.45
Freq. Magnitude
# Hz ips Pk
0.40 1 31.6 1.26E-01
2 32.8 1.02E-01
3 30.0 8.63E-02
0.35 4 81.6 6.16E-02
5 82.8 5.43E-02
Magnitude (ips Pk)

0.30 6 180.0 4.79E-02


7 79.4 4.16E-02
8 131.3 4.02E-02
0.25 9 130.6 4.00E-02
10 129.1 4.00E-02
11 183.1 3.93E-02
0.20 12 130.0 3.92E-02
13 99.4 3.81E-02
0.15 14 163.4 3.78E-02
1 15 78.4 3.77E-02
2
16 124.7 3.67E-02
0.10 3 17 165.6 3.66E-02
18 221.9 3.58E-02
4
5 6 19 220.9 3.55E-02
0.05 7
15 13 1610
89
12 14
17
20 11 19
18 20 164.4 3.52E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00166\G4, 4_P1sv00000 - eng a frame front.csv

Vibration, Dynamics & Noise Page 170 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.75
Spectrum TP: 414 (h)
2.4 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 14:18
Setup:
1 Note:
2.0
Freq. Magnitude
# Hz ips Pk
1 66.6 2.07E+00
2 2 44.1 1.66E+00
1.6 3 65.0 1.40E+00
4 46.9 1.12E+00
3 5 120.9 1.08E+00
Magnitude (ips Pk)

6 88.1 9.61E-01
7 58.8 6.91E-01
1.2 4 8 133.1 6.10E-01
5
9 245.9 5.90E-01
6 10 31.6 5.83E-01
11 245.3 5.58E-01
12 33.4 5.35E-01
0.8 13 32.8 5.30E-01
7
8 14 217.2 5.21E-01
10 9
12
13 11 15 40.0 5.03E-01
15 14
16
16 180.9 4.42E-01
17 18 19 20 17 50.0 4.35E-01
0.4
18 61.3 4.34E-01
19 128.1 4.25E-01
20 247.8 4.02E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00167\G1, 1_P1sv00000 - 414 c4 212.csv

Spectrum TP: 414 (-a)


4.5 Channel: 2 P:BMA-Pipe
Date: Jun 04, 2016 14:18
4.0 Setup:
Note:
1
Freq. Magnitude
3.5 # Hz ips Pk
1 58.1 3.67E+00
2 60.9 2.76E+00
3.0 3 56.6 2.11E+00
2 4 63.4 2.05E+00
5 33.4 1.40E+00
Magnitude (ips Pk)

2.5 6 32.8 1.38E+00


7 180.9 1.37E+00
3 8 182.2 1.31E+00
4
2.0 9 31.6 1.29E+00
10 175.9 1.18E+00
11 177.8 1.18E+00
12 175.3 1.17E+00
1.5 65 7 13 178.8 1.13E+00
9 8
10
11
12 14 183.4 1.12E+00
1314
15 202.2 9.70E-01
1.0 15
16
17
16 202.8 9.32E-01
18 19
20 17 203.4 8.32E-01
18 40.0 8.05E-01
0.5 19 201.3 7.86E-01
20 87.8 7.26E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00167\G2, 2_P1sv00000 - 414 c4 212.csv

Spectrum TP: Cylinder 4 (v)


1.1 Channel: 3 C:BMA-Cylinder
Date: Jun 04, 2016 14:18
1.0 Setup:
Note:
1
0.9 2 Freq. Magnitude
3 # Hz ips Pk
0.8 1 64.1 9.19E-01
2 60.9 8.61E-01
3 57.5 8.14E-01
0.7 4 66.6 4.60E-01
5 81.9 4.55E-01
Magnitude (ips Pk)

0.6 6 68.4 4.27E-01


7 80.3 3.51E-01
8 178.1 3.23E-01
0.5 9 72.8 3.22E-01
4 5 10 181.9 3.19E-01
6
11 179.4 3.10E-01
0.4 12 110.9 2.73E-01
7
9 810 13 112.2 2.62E-01
11
0.3 14 113.1 2.57E-01
12
13
14 15 200.3 2.26E-01
16 15 16 53.8 2.20E-01
0.2 18 17
19 20 17 75.0 1.76E-01
18 43.8 1.73E-01
19 75.9 1.67E-01
0.1 20 85.9 1.61E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00167\G3, 3_P1sv00000 - 414 c4 212.csv

Spectrum TP: 212 (h)


3.5
Channel: 4 P:BMA-Pipe

Date: Jun 04, 2016 14:18


Setup:
3.0 Note:
1
Freq. Magnitude
# Hz ips Pk
1 90.3 2.84E+00
2.5 2 33.4 1.17E+00
3 49.4 6.53E-01
4 86.6 6.04E-01
5 72.8 5.24E-01
Magnitude (ips Pk)

2.0 6 57.5 5.22E-01


7 60.9 5.21E-01
8 81.6 5.14E-01
9 64.1 5.05E-01
1.5 10 110.0 4.76E-01
11 16.6 4.72E-01
2 12 110.9 4.68E-01
13 45.0 4.41E-01
1.0 14 108.4 4.19E-01
15 112.2 3.76E-01
3 16 58.8 3.59E-01
4 17 84.1 3.34E-01
679 5 8
0.5 11 13 10
12 18 75.9 2.56E-01
1415
16 17 19 96.3 2.47E-01
20 18 19 20 66.9 2.39E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00167\G4, 4_P1sv00000 - 414 c4 212.csv

Vibration, Dynamics & Noise Page 171 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.76
Spectrum TP: Frame Back (h)
0.55 Channel: 1 F:BMA-Frame
Date: Jun 04, 2016 14:36
0.50 Setup:
Note:
0.45 Freq. Magnitude
# Hz ips Pk
0.40 1 16.9 2.81E-01
2 33.4 2.61E-01
3 179.4 2.14E-01
0.35 4 176.9 2.13E-01
5 178.8 2.06E-01
Magnitude (ips Pk)

0.30 6 27.5 1.53E-01


1 7 66.6 1.48E-01
2 8 31.6 1.44E-01
0.25 9 161.9 1.44E-01
10 181.9 1.43E-01
453
11 171.6 1.41E-01
0.20 12 169.7 1.33E-01
13 170.6 1.32E-01
6 7 14 57.8 1.32E-01
0.15 8
1415
9 11 10
12
13
2019 17 16
18 15 65.3 1.29E-01
16 326.9 1.27E-01
0.10 17 110.3 1.26E-01
18 327.5 1.25E-01
19 69.7 1.25E-01
0.05 20 61.6 1.24E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00168\G1, 1_P1sv00000 - frame back 438 408.csv

Spectrum TP: Frame Back (-v)


0.55 Channel: 2 F:BMA-Frame
Date: Jun 04, 2016 14:36
0.50 Setup:
Note:
0.45 Freq. Magnitude
# Hz ips Pk
0.40 1 83.4 1.91E-01
2 85.3 1.44E-01
3 63.4 1.17E-01
0.35 4 90.3 1.02E-01
5 93.4 1.00E-01
Magnitude (ips Pk)

0.30 6 183.4 8.16E-02


7 163.1 7.96E-02
8 29.1 7.91E-02
0.25 9 65.3 7.77E-02
10 66.9 7.65E-02
11 89.1 7.30E-02
0.20 1 12 31.6 7.20E-02
13 182.2 7.02E-02
0.15 2 14 241.3 6.75E-02
15 242.2 6.70E-02
3
45
16 46.9 6.54E-02
0.10 6
17 243.4 6.48E-02
8 190 7
12 16 11 13 14
15
17 18 164.7 6.35E-02
18 19 20
19 180.0 6.15E-02
0.05 20 244.1 6.12E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00168\G2, 2_P1sv00000 - frame back 438 408.csv

Spectrum TP: 408 (h)


1.3 Channel: 3 P:BMA-Pipe

1.2 Date: Jun 04, 2016 14:36


1 Setup:
Note:
1.1
Freq. Magnitude
1.0 # Hz ips Pk
1 176.9 1.14E+00
0.9 2 180.9 5.19E-01
3 85.3 4.88E-01
0.8 4 86.6 4.59E-01
5 65.0 4.54E-01
Magnitude (ips Pk)

6 183.1 3.95E-01
0.7 7 87.8 3.85E-01
8 66.9 3.75E-01
0.6 9 334.7 2.65E-01
2 10 334.1 2.47E-01
0.5 5
3
4
11 225.0 2.29E-01
12 335.9 2.14E-01
0.4 8 7 6 13 215.6 2.05E-01
14 224.1 2.03E-01
15 190.0 1.95E-01
0.3 9 16 151.6 1.83E-01
10
11 12 17 192.8 1.66E-01
15 1314
0.2 16 17
18 19 18 195.0 1.65E-01
20 19 332.2 1.57E-01
0.1 20 337.5 1.34E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00168\G3, 3_P1sv00000 - frame back 438 408.csv

Spectrum TP: 438 (h)


1.5
Channel: 4 P:BMA-Pipe

1.4 Date: Jun 04, 2016 14:36


1 Setup:
1.3 Note:
2
1.2 Freq. Magnitude
3 # Hz ips Pk
1.1 1 155.6 1.34E+00
2 71.3 1.24E+00
1.0 3 77.2 1.11E+00
4 165.6 8.57E-01
0.9 5 239.1 4.03E-01
Magnitude (ips Pk)

4
6 238.1 3.56E-01
0.8 7 162.8 3.29E-01
8 159.7 2.93E-01
0.7 9 327.8 2.80E-01
10 158.8 2.69E-01
0.6 11 180.9 2.52E-01
12 151.6 2.43E-01
0.5 13 152.2 2.38E-01
5 14 235.9 2.29E-01
0.4 6 15 178.4 2.17E-01
7
8 16 63.4 2.13E-01
0.3 10 11
9
12
13 14 17 183.1 2.00E-01
16 1517
0.2 18 19 20 18 150.3 1.97E-01
19 194.4 1.93E-01
0.1 20 325.9 1.93E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00168\G4, 4_P1sv00000 - frame back 438 408.csv

Vibration, Dynamics & Noise Page 172 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.77
Spectrum TP: 320 (a)
1.00 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 14:48
0.90 1
Setup:
2 Note:

0.80 Freq. Magnitude


# Hz ips Pk
1 30.9 8.72E-01
0.70 2 64.1 8.42E-01
43
3 68.1 6.63E-01
4 66.9 6.57E-01
0.60 5 29.1 5.52E-01
Magnitude (ips Pk)

5 6 158.1 5.08E-01
6 7 83.4 4.54E-01
0.50 8 162.2 4.52E-01
10 11 7 98 9 155.9 4.51E-01
12
10 16.9 4.47E-01
0.40 13 11 71.9 4.46E-01
14
15
16 12 61.6 4.26E-01
17 13 175.9 3.71E-01
0.30 14 114.1 3.59E-01
18
19
20 15 111.9 3.48E-01
16 112.8 3.33E-01
0.20 17 135.0 3.11E-01
18 55.9 2.62E-01
0.10 19 257.5 2.49E-01
20 165.9 2.32E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00169\G1, 1_P1sv00000 - 320 315.csv

Spectrum TP: 315 (a)


1.8 Channel: 2 P:BMA-Pipe
Date: Jun 04, 2016 14:48
Setup:
Note:
1.5 1
Freq. Magnitude
# Hz ips Pk
1 31.6 1.48E+00
2 29.1 7.18E-01
1.2 3 64.1 6.32E-01
4 61.3 5.89E-01
5 16.9 5.17E-01
Magnitude (ips Pk)

6 68.1 5.05E-01
7 66.9 4.41E-01
0.9 8 40.0 3.07E-01
9 55.9 3.03E-01
2 10 72.2 2.98E-01
11 83.4 2.73E-01
3
4 12 45.9 2.47E-01
0.6 13 114.1 2.29E-01
5 6 14 112.8 1.91E-01
7 15 151.9 1.85E-01
16 151.3 1.84E-01
8 9 10 17 111.9 1.80E-01
0.3 12
11
13 18 162.8 1.62E-01
14
17 15
16 19 253.8 1.58E-01
18 19
20
20 254.7 1.51E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00169\G2, 2_P1sv00000 - 320 315.csv

Spectrum TP: 320 (-v)


1.1 Channel: 3 P:BMA-Pipe
Date: Jun 04, 2016 14:48
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 61.9 5.98E-01
2 106.6 5.32E-01
3 105.6 4.30E-01
0.7 4 217.2 4.00E-01
5 219.1 2.98E-01
Magnitude (ips Pk)

0.6 1 6 68.4 2.89E-01


7 219.7 2.76E-01
2 8 221.3 2.64E-01
0.5 9 114.1 2.61E-01
3
10 220.6 2.53E-01
4 11 183.4 2.45E-01
0.4 12 222.8 2.42E-01
13 203.8 2.42E-01
0.3 6 5 14 181.9 2.28E-01
9 78
11 13 10
12 15 116.9 2.28E-01
16
17 20 15 14 19
18 16 57.2 2.27E-01
0.2 17 58.1 2.24E-01
18 202.5 2.20E-01
19 201.6 2.20E-01
0.1 20 100.3 2.16E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00169\G3, 3_P1sv00000 - 320 315.csv

Spectrum TP: 315 (-v)


1.1
Channel: 4 P:BMA-Pipe

Date: Jun 04, 2016 14:48


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 63.4 7.03E-01
2 62.5 5.81E-01
1 3 56.9 4.40E-01
0.7 4 55.9 4.37E-01
5 83.8 3.66E-01
Magnitude (ips Pk)

0.6 2
6 106.6 3.11E-01
7 105.6 2.59E-01
8 68.4 2.40E-01
0.5 9 49.4 2.14E-01
43 10 70.0 2.14E-01
11 47.2 2.14E-01
0.4 5 12 134.7 2.10E-01
13 175.6 2.05E-01
6
0.3 14 138.8 1.94E-01
8
7 15 140.0 1.85E-01
119 10 12 13 16 153.8 1.77E-01
0.2 14
15 17
16 17 154.4 1.73E-01
181920
18 152.2 1.60E-01
19 156.3 1.60E-01
0.1 20 164.7 1.52E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00169\G4, 4_P1sv00000 - 320 315.csv

Vibration, Dynamics & Noise Page 173 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.78
Spectrum TP: 320 (h)
1.1 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 14:58
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 177.2 5.32E-01
2 63.8 5.23E-01
3 83.4 4.58E-01
0.7 4 106.6 4.07E-01
5 16.6 3.58E-01
Magnitude (ips Pk)

0.6 6 174.7 3.41E-01


7 113.4 3.40E-01
2 1 8 181.9 3.23E-01
0.5 9 105.3 3.21E-01
3 10 183.1 3.16E-01
4 11 56.9 3.10E-01
0.4 12 56.3 3.00E-01
5
7 6 13 49.4 2.89E-01
11 9 8
10
0.3 1312
14 14 46.9 2.79E-01
15 15 80.6 2.50E-01
16
17 16 100.3 2.40E-01
0.2 18
20 19 17 44.4 2.06E-01
18 93.8 1.86E-01
19 201.3 1.69E-01
0.1 20 149.1 1.68E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00170\G1, 1_P1sv00000 - 320 c1.csv

Spectrum TP: Cylinder 1 (-h)


0.77 Channel: 2 C:BMA-Cylinder
Date: Jun 04, 2016 14:58
Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 16.6 3.03E-01
0.55 2 177.2 2.83E-01
3 176.6 2.79E-01
4 61.6 2.23E-01
5 180.6 1.83E-01
Magnitude (ips Pk)

0.44 6 181.9 1.73E-01


7 69.4 1.57E-01
8 138.8 1.55E-01
9 174.4 1.51E-01
0.33 1 10 68.4 1.47E-01
23 11 46.9 1.46E-01
12 90.6 1.45E-01
4 13 71.3 1.43E-01
0.22 14 135.0 1.40E-01
5 15 164.1 1.39E-01
6
7 8 9 16 49.4 1.37E-01
11 10
13 12 14 15
1816 17
20
19 17 83.4 1.31E-01
0.11 18 45.6 1.27E-01
19 82.2 1.27E-01
20 81.6 1.26E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00170\G2, 2_P1sv00000 - 320 c1.csv

Spectrum TP: Cylinder 1 (v)


1.00 Channel: 3 C:BMA-Cylinder
Date: Jun 04, 2016 14:58
1
0.90 Setup:
Note:

0.80 Freq. Magnitude


# Hz ips Pk
1 63.8 8.95E-01
0.70 2 56.9 4.76E-01
3 68.8 3.56E-01
4 83.1 3.44E-01
0.60 5 47.2 2.26E-01
Magnitude (ips Pk)

6 70.9 2.25E-01
7 49.4 2.08E-01
0.50 2 8 33.4 1.48E-01
9 30.3 1.41E-01
10 177.8 1.39E-01
0.40 11 44.4 1.39E-01
3 4 12 16.6 1.35E-01
13 31.9 1.32E-01
0.30 14 15.6 1.29E-01
5 6 15 85.0 1.28E-01
7 16 215.9 1.27E-01
0.20
17 86.3 1.26E-01
98 11
12 13 10 18 90.6 1.14E-01
14 15
1718 16
20 19
0.10 19 213.8 1.14E-01
20 87.5 1.07E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00170\G3, 3_P1sv00000 - 320 c1.csv

Spectrum TP: Cylinder 1 (a)


1.2
Channel: 4 C:BMA-Cylinder

Date: Jun 04, 2016 14:58


1 Setup:
Note:
1.0
Freq. Magnitude
# Hz ips Pk
1 31.9 1.07E+00
2 61.3 4.13E-01
0.8 3 16.6 4.09E-01
4 56.9 3.69E-01
5 29.1 3.60E-01
Magnitude (ips Pk)

6 64.4 3.33E-01
7 40.0 1.50E-01
0.6 8 68.4 1.49E-01
9 177.2 1.44E-01
10 204.7 1.43E-01
11 82.2 1.30E-01
3 2 12 202.2 1.22E-01
0.4 5 4 13 71.3 1.20E-01
6 14 215.6 1.12E-01
15 215.0 1.11E-01
16 183.1 1.09E-01
0.2 17 72.5 1.04E-01
7 8 9 10 18 181.9 1.02E-01
13 11 16 12 15
14 19 80.0 9.52E-02
1719 18 20
20 210.9 9.48E-02

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00170\G4, 4_P1sv00000 - 320 c1.csv

Vibration, Dynamics & Noise Page 174 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.79
Spectrum TP: 330 (v)
1.1 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 15:07
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 83.4 5.82E-01
2 177.2 5.07E-01
3 215.3 3.50E-01
0.7 4 214.4 3.43E-01
5 213.4 3.32E-01
Magnitude (ips Pk)

0.6 1
6 211.3 3.28E-01
7 179.7 3.17E-01
2
8 180.6 3.16E-01
0.5 9 63.8 3.06E-01
10 179.1 2.87E-01
11 62.2 2.79E-01
0.4 12 56.6 2.67E-01
43 13 200.0 2.66E-01
78 65
9 14 200.6 2.64E-01
0.3 1211 10
13
16 1815
19
14
17
20
15 139.1 2.62E-01
16 57.2 2.61E-01
0.2 17 202.2 2.56E-01
18 134.4 2.49E-01
19 133.4 2.42E-01
0.1 20 205.9 2.36E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00171\G1, 1_P1sv00000 - 330 335.csv

Spectrum TP: 335 (v)


1.1 Channel: 2 P:BMA-Pipe
Date: Jun 04, 2016 15:07
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 61.9 7.49E-01
1 2 63.4 6.92E-01
3 177.2 5.25E-01
0.7 2
4 82.8 4.45E-01
5 180.6 3.99E-01
Magnitude (ips Pk)

0.6 6 215.3 3.80E-01


7 57.2 3.40E-01
3 8 182.5 3.10E-01
0.5 9 68.4 3.08E-01
4 10 211.3 2.64E-01
5 11 151.9 2.03E-01
0.4 6 12 150.9 2.01E-01
7 13 134.4 1.97E-01
9 8
0.3 14 47.2 1.92E-01
10 15 218.8 1.91E-01
11
16 218.1 1.88E-01
14 13 12 15
0.2 16
1718
17 219.7 1.71E-01
19 20 18 222.2 1.62E-01
19 79.4 1.54E-01
0.1 20 220.6 1.54E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00171\G2, 2_P1sv00000 - 330 335.csv

Spectrum TP: 330 (a)


1.1 Channel: 3 P:BMA-Pipe
Date: Jun 04, 2016 15:07
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 83.4 6.40E-01
2 122.8 4.87E-01
3 61.3 4.07E-01
0.7 4 95.6 3.44E-01
1 5 64.4 2.95E-01
Magnitude (ips Pk)

0.6 6 125.3 2.81E-01


7 116.9 2.78E-01
8 132.5 2.78E-01
0.5 2 9 129.7 2.69E-01
10 113.8 2.69E-01
3 11 128.8 2.61E-01
0.4 12 112.8 2.59E-01
4 13 130.9 2.53E-01
0.3 5 14 118.8 2.44E-01
107 611
12 98 15 99.7 2.13E-01
14 13
16 17 15 18 16 31.3 2.10E-01
0.2 20 19 17 56.3 2.10E-01
18 135.3 2.07E-01
19 98.8 1.90E-01
0.1 20 57.2 1.82E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00171\G3, 3_P1sv00000 - 330 335.csv

Spectrum TP: 335 (a)


1.1
Channel: 4 P:BMA-Pipe

Date: Jun 04, 2016 15:07


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 61.6 6.96E-01
2 31.3 5.27E-01
1 3 64.4 4.76E-01
0.7 4 66.9 4.12E-01
5 56.3 3.76E-01
Magnitude (ips Pk)

0.6 6 57.2 3.52E-01


7 95.6 3.21E-01
2 8 68.1 2.95E-01
0.5 3 9 123.1 2.67E-01
10 83.4 2.36E-01
4 11 138.4 2.35E-01
0.4 5 12 116.9 2.29E-01
6
7 13 132.5 2.28E-01
0.3 8 14 29.1 2.21E-01
9 15 16.6 2.10E-01
10 12 1311
15 14 16 99.7 2.01E-01
16 17
0.2 1819
17 114.7 2.00E-01
20
18 90.3 1.65E-01
19 98.8 1.63E-01
0.1 20 129.7 1.58E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00171\G4, 4_P1sv00000 - 330 335.csv

Vibration, Dynamics & Noise Page 175 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.80
Spectrum TP: 335 (-h)
1.1 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 15:18
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 135.9 5.60E-01
2 136.6 5.60E-01
3 135.3 5.59E-01
0.7 4 63.8 5.38E-01
5 115.6 5.34E-01
Magnitude (ips Pk)

0.6 6 199.4 3.84E-01


312 7 68.8 3.70E-01
4 5 8 71.3 3.45E-01
0.5 9 70.3 3.43E-01
10 152.2 3.41E-01
11 119.1 3.29E-01
0.4 7 6 12 175.3 3.26E-01
98 11 10 13 153.8 3.10E-01
12
14
17
18 13 15
19 16
20
0.3 14 122.8 3.09E-01
15 195.6 3.09E-01
16 213.8 3.07E-01
0.2 17 120.9 3.05E-01
18 120.3 3.03E-01
19 194.7 3.03E-01
0.1 20 215.3 3.02E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00172\G1, 1_P1sv00000 - 335 336.csv

Spectrum TP: 336 (h)


1.8 Channel: 2 P:BMA-Pipe
Date: Jun 04, 2016 15:18
Setup:
Note:
1.5 1
Freq. Magnitude
2 # Hz ips Pk
1 180.9 1.48E+00
4 3
5 2 180.0 1.36E+00
1.2 6
3 199.4 1.26E+00
10 978
11 4 151.9 1.25E+00
5 183.1 1.21E+00
Magnitude (ips Pk)

12
13
15 14 6 178.1 1.19E+00
19 16 17
18
20 7 194.7 1.10E+00
0.9 8 195.6 1.10E+00
9 193.1 1.10E+00
10 153.8 1.09E+00
11 194.1 1.09E+00
12 202.2 1.01E+00
0.6 13 201.6 1.00E+00
14 213.8 9.83E-01
15 203.8 9.62E-01
16 205.3 9.17E-01
0.3 17 215.0 9.14E-01
18 189.7 9.11E-01
19 191.3 9.11E-01
20 190.6 9.07E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00172\G2, 2_P1sv00000 - 335 336.csv

Spectrum TP: 336 (v)


2.2 Channel: 3 P:BMA-Pipe
Date: Jun 04, 2016 15:18
2.0 Setup:
Note:
1
1.8 2
Freq. Magnitude
# Hz ips Pk
1.6 1 81.6 1.83E+00
2 82.5 1.79E+00
3 3 80.0 1.42E+00
1.4 4 61.3 1.01E+00
5 178.1 9.62E-01
Magnitude (ips Pk)

1.2 6 136.6 9.25E-01


7 135.9 9.23E-01
4
8 135.3 9.13E-01
1.0 5 9 215.3 7.84E-01
876 10 63.4 7.84E-01
10 9
11 214.1 7.38E-01
0.8 12 11 12 175.3 7.32E-01
14 13 13 180.0 6.49E-01
15 14 132.2 6.42E-01
0.6 16
17 15 123.1 6.10E-01
18
19 20 16 68.8 5.41E-01
0.4 17 85.0 4.86E-01
18 76.3 4.48E-01
19 199.7 4.14E-01
0.2 20 210.9 4.10E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00172\G3, 3_P1sv00000 - 335 336.csv

Spectrum TP: 336 (a)


1.1
Channel: 4 P:BMA-Pipe

Date: Jun 04, 2016 15:18


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 1 61.3 7.84E-01
2 81.6 6.03E-01
3 82.5 5.54E-01
0.7 4 68.4 5.14E-01
5 80.6 4.59E-01
Magnitude (ips Pk)

2 6 80.0 4.55E-01
0.6
3 7 164.7 4.22E-01
4 8 163.4 3.81E-01
0.5 9 165.6 3.67E-01
65 10 71.9 3.63E-01
7
11 66.9 3.25E-01
0.4 10
8
9 12 70.3 3.10E-01
11 13 65.9 2.79E-01
12
0.3 13
14 116.9 2.72E-01
15 14
15 65.3 2.69E-01
16 16 31.9 2.30E-01
17 20 18 19
0.2 17 63.4 2.06E-01
18 177.5 2.01E-01
19 272.2 2.00E-01
0.1 20 76.3 1.96E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00172\G4, 4_P1sv00000 - 335 336.csv

Vibration, Dynamics & Noise Page 176 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.81
Spectrum TP: 314 (-h)
3.5 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 15:41
Setup:
3.0 Note:

1 Freq. Magnitude
# Hz ips Pk
1 61.9 2.73E+00
2.5 2 57.2 1.26E+00
3 56.3 1.04E+00
4 111.9 7.61E-01
5 175.6 6.87E-01
Magnitude (ips Pk)

2.0 6 113.8 5.68E-01


7 114.7 5.23E-01
8 54.7 4.94E-01
9 158.4 4.85E-01
1.5 10 162.8 4.77E-01
2 11 163.8 4.69E-01
12 164.7 4.62E-01
3 13 50.0 4.61E-01
1.0 14 116.9 4.21E-01
15 135.6 3.72E-01
4
5 16 155.9 3.62E-01
6 17 45.3 3.60E-01
7
0.5 138 14
910
11
12 18 181.6 3.39E-01
17
20 15 16 18
19 19 180.9 3.39E-01
20 46.9 3.27E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00173\G1, 1_P1sv00000 - 314 400 399.csv

Spectrum TP: 314 (-a)


2.2 Channel: 2 P:BMA-Pipe
Date: Jun 04, 2016 15:41
2.0 Setup:
1 Note:
1.8 Freq. Magnitude
2
# Hz ips Pk
1.6 1 31.6 1.88E+00
2 61.3 1.70E+00
3 63.8 1.07E+00
1.4 4 28.8 7.56E-01
5 53.1 5.76E-01
Magnitude (ips Pk)

1.2 6 56.3 5.54E-01


7 66.9 5.45E-01
3
8 16.6 5.42E-01
1.0 9 71.9 5.29E-01
10 40.0 4.78E-01
11 57.2 4.71E-01
0.8 4 12 76.6 4.69E-01
13 67.8 4.38E-01
0.6 56 14 54.7 4.36E-01
8 79
15 58.1 4.12E-01
10 11 12
14
15 13 16 106.6 3.77E-01
0.4 16
17
18
17 322.2 3.42E-01
19 20 18 321.3 3.24E-01
19 105.3 3.06E-01
0.2 20 320.6 2.78E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00173\G2, 2_P1sv00000 - 314 400 399.csv

Spectrum TP: 400 (a)


3.0 Channel: 3 P:BMA-Pipe
Date: Jun 04, 2016 15:41
2.7 1 Setup:
Note:

2.4 Freq. Magnitude


# Hz ips Pk
1 29.1 2.66E+00
2.1 2 32.8 2.87E-01
3 85.9 8.49E-02
4 65.3 8.15E-02
1.8 5 214.7 7.10E-02
Magnitude (ips Pk)

6 79.1 6.82E-02
7 44.4 6.71E-02
1.5 8 167.5 6.17E-02
9 40.3 5.26E-02
10 174.7 5.17E-02
1.2 11 81.3 5.07E-02

0.9

0.6

0.3 2

97 4 6113 8 10 5
0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00173\G3, 3_P1sv00000 - 314 400 399.csv

Spectrum TP: 399 (a)


2.4
Channel: 4 P:BMA-Pipe

Date: Jun 04, 2016 15:41


Setup:
1
Note:
2.0
Freq. Magnitude
2 # Hz ips Pk
1 86.3 2.07E+00
2 29.1 1.82E+00
1.6 3 65.0 1.31E+00
4 79.1 1.15E+00
5 81.3 9.81E-01
Magnitude (ips Pk)

3 6 77.8 7.80E-01
7 181.3 4.11E-01
1.2 4 8 189.1 3.64E-01
9 177.8 3.20E-01
5 10 176.6 2.56E-01
11 33.4 2.21E-01
6 12 256.9 2.02E-01
0.8 13 75.0 1.79E-01
14 73.4 1.69E-01
15 284.1 1.60E-01
16 258.1 1.60E-01
7 17 58.1 1.55E-01
0.4 8
9 18 185.3 1.50E-01
10 19 186.3 1.38E-01
11 12
13
17 14 16 15
18
19 20 20 285.0 1.33E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00173\G4, 4_P1sv00000 - 314 400 399.csv

Vibration, Dynamics & Noise Page 177 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.82
Spectrum TP: 210 (h)
2.0 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 16:02
1.8 1 Setup:
Note:

1.6 Freq. Magnitude


# Hz ips Pk
1 33.4 1.76E+00
1.4 2 45.0 5.54E-01
3 90.6 4.77E-01
4 35.0 3.79E-01
1.2 5 41.9 2.79E-01
Magnitude (ips Pk)

6 40.6 2.53E-01
7 50.0 1.95E-01
1.0 8 328.1 1.94E-01
9 217.2 1.83E-01
10 223.4 1.83E-01
0.8 11 327.5 1.82E-01
12 224.1 1.76E-01
13 48.1 1.76E-01
0.6 2 14 63.8 1.70E-01
3 15 221.9 1.60E-01
16 57.5 1.54E-01
0.4 4
17 56.6 1.51E-01
65 18 244.4 1.45E-01
0.2 137 17 910
12 8
11 19 16.6 1.45E-01
19 1614 20 15 18 20 159.7 1.37E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00174\G1, 1_P1sv00000 - 210 300 299 460.csv

Spectrum TP: 300 (a)


4.5 Channel: 2 P:BMA-Pipe
Date: Jun 04, 2016 16:02
4.0 Setup:
1
Note:

Freq. Magnitude
3.5 # Hz ips Pk
1 31.9 3.90E+00
2 68.1 6.58E-01
3.0 3 66.9 3.74E-01
4 64.4 2.81E-01
5 53.4 2.32E-01
Magnitude (ips Pk)

2.5 6 62.2 2.08E-01


7 194.7 1.60E-01
8 200.0 1.60E-01
2.0 9 193.8 1.59E-01
10 55.9 1.56E-01
11 71.6 1.52E-01
12 55.3 1.49E-01
1.5 13 197.2 9.79E-02
14 127.2 9.06E-02
15 128.4 8.15E-02
1.0 16 37.2 8.09E-02
17 357.8 7.54E-02
2
18 217.2 6.99E-02
0.5 3 19 155.9 6.78E-02
5 64 20 115.6 6.36E-02
10 11
12 97138
16 20 14
15 19 18 17
0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00174\G2, 2_P1sv00000 - 210 300 299 460.csv

Spectrum TP: 210 Sight Glass (tan)


2.0 Channel: 1 P:BMA-Pipe
Date: Jun 04, 2016 16:16
1.8 1 Setup:
Note:

1.6 Freq. Magnitude


# Hz ips Pk
1 96.9 1.79E+00
1.4 2 90.6 6.68E-01
3 64.1 5.60E-01
4 70.6 5.07E-01
1.2 5 33.4 3.44E-01
Magnitude (ips Pk)

6 313.4 3.35E-01
7 312.8 3.15E-01
1.0 8 321.3 3.04E-01
9 318.1 2.99E-01
10 319.1 2.99E-01
0.8 11 320.6 2.98E-01
2 12 319.7 2.95E-01
13 314.7 2.89E-01
0.6 3 14 316.9 2.85E-01
4
15 315.6 2.71E-01
16 111.3 2.40E-01
0.4 5
7611208
911
17 321.9 2.40E-01
13
14
15
16 17 18 18 360.3 2.37E-01
19
20
0.2 19 359.7 2.31E-01
20 361.9 2.31E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00175\G1, 1_P1sv00000 - 210 sg 237 puls.csv

Spectrum TP: 237 (v)


1.6
Channel: 2 P:BMA-Pipe

Date: Jun 04, 2016 16:16


Setup:
1.4 1
2 Note:

Freq. Magnitude
# Hz ips Pk
1.2
1 111.9 1.38E+00
2 113.1 1.35E+00
3 114.1 8.53E-01
1.0 4 221.3 8.37E-01
5 225.6 8.31E-01
Magnitude (ips Pk)

3 6 220.3 8.27E-01
645 7 224.7 7.89E-01
0.8 7
8 226.9 7.13E-01
8 9 80.9 6.17E-01
10 181.9 6.02E-01
9 10
0.6 11
12
14 13 11 180.9 5.98E-01
15
12 182.8 5.92E-01
16 17 13 228.4 5.84E-01
18 14 183.8 5.81E-01
0.4 15 116.9 5.68E-01
19 20 16 75.9 5.01E-01
17 109.1 4.85E-01
18 77.5 4.24E-01
0.2 19 83.4 3.36E-01
20 232.5 3.36E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00175\G2, 2_P1sv00000 - 210 sg 237 puls.csv

Vibration, Dynamics & Noise Page 178 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.6.6 Vibration Data – Night Operation with Side Stream)


Fig: B.6.83
Spectrum TP: 420 (-a)
1.4 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 16:01
1
Setup:
1.2 Note:

Freq. Magnitude
# Hz ips Pk
1 65.0 1.26E+00
1.0 2 58.1 8.84E-01
2 3
3 73.8 8.83E-01
4 63.1 7.65E-01
5 110.9 5.88E-01
Magnitude (ips Pk)

0.8 4 6 69.4 5.65E-01


7 93.8 5.62E-01
8 33.4 4.83E-01
9 31.9 4.63E-01
0.6 5
6 7 10 67.8 4.46E-01
11 179.4 4.03E-01
8 12 105.3 3.25E-01
9 10
11
13 177.5 3.04E-01
0.4 14 106.9 2.91E-01
12 15 90.0 2.64E-01
14 13
15 16 115.0 2.55E-01
17 16 18
20 19 17 89.4 2.54E-01
0.2 18 217.2 2.53E-01
19 202.8 2.31E-01
20 82.8 2.21E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00180\G1, 1_P1sv00000 - 420 415.csv

Spectrum TP: 415 (-a)


1.6 Channel: 2 P:BMA-Pipe
Date: Jun 05, 2016 16:01
1 Setup:
1.4 Note:

Freq. Magnitude
1.2 # Hz ips Pk
1 73.8 1.40E+00
2 85.9 9.33E-01
3 33.4 9.11E-01
1.0 4 31.9 8.61E-01
2 5 69.4 7.29E-01
Magnitude (ips Pk)

3
4 6 60.6 6.99E-01
7 65.3 6.66E-01
0.8 8 58.8 5.69E-01
5
6 9 62.8 5.63E-01
7 10 82.2 5.62E-01
0.6 11 47.8 3.44E-01
89 10
12 202.8 2.90E-01
13 110.9 2.54E-01
14 198.8 2.50E-01
0.4 11
15 28.1 2.49E-01
16 29.1 2.40E-01
12
15
16 13 14 17 200.6 2.35E-01
20 18 17 19 18 191.9 2.27E-01
0.2 19 215.6 2.18E-01
20 89.1 2.18E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00180\G2, 2_P1sv00000 - 420 415.csv

Spectrum TP: 420 (v)


3.5 Channel: 3 P:BMA-Pipe
Date: Jun 05, 2016 16:01
Setup:
1 Note:
3.0
Freq. Magnitude
# Hz ips Pk
1 74.4 3.01E+00
2.5 2 66.6 6.99E-01
3 63.1 6.05E-01
4 83.4 5.13E-01
5 58.4 4.88E-01
Magnitude (ips Pk)

2.0 6 315.6 4.44E-01


7 215.6 4.25E-01
8 86.3 4.25E-01
9 217.2 4.15E-01
1.5 10 216.6 4.07E-01
11 60.3 4.02E-01
12 202.8 3.98E-01
13 315.0 3.95E-01
1.0 14 316.3 3.91E-01
15 203.8 3.73E-01
2 16 80.0 3.30E-01
3 17 210.9 3.28E-01
5 4
0.5 8 79 6 18 200.6 3.07E-01
11 15 10
12 13
14
19 198.8 2.96E-01
16 1820
19 17
20 209.1 2.89E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00180\G3, 3_P1sv00000 - 420 415.csv

Spectrum TP: 415 (v)


2.4 Channel: 4 P:BMA-Pipe
Date: Jun 05, 2016 16:01
Setup:
1 Note:
2.0
2 Freq. Magnitude
# Hz ips Pk
1 65.6 2.04E+00
2 73.8 1.88E+00
1.6 3 3 58.1 1.53E+00
4 4 69.7 1.44E+00
5 61.3 8.16E-01
Magnitude (ips Pk)

6 315.6 3.96E-01
7 316.3 3.69E-01
1.2 8 315.0 3.42E-01
9 85.9 2.66E-01
10 176.9 2.56E-01
11 31.9 2.45E-01
5 12 32.8 2.30E-01
0.8 13 217.2 2.27E-01
14 215.6 2.24E-01
15 179.4 2.12E-01
16 89.1 1.95E-01
0.4 6 17 182.2 1.82E-01
87 18 48.8 1.76E-01
11 9 10
12
16 15 13
14 19 319.7 1.70E-01
18 17 20 19 20 265.9 1.70E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00180\G4, 4_P1sv00000 - 420 415.csv

Vibration, Dynamics & Noise Page 179 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.84
Spectrum TP: 420 (-h)
3.0 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 16:11
2.7 Setup:
Note:

2.4 1
Freq. Magnitude
# Hz ips Pk
1 73.4 2.31E+00
2.1 2 65.6 1.81E+00
3 70.6 1.30E+00
2 4 69.7 1.26E+00
1.8 5 57.8 1.22E+00
Magnitude (ips Pk)

6 67.8 1.16E+00
7 63.4 8.14E-01
1.5 8 62.5 7.63E-01
3 9 16.6 3.70E-01
5 4 10 176.6 3.12E-01
1.2 6
11 199.1 3.09E-01
12 175.9 3.00E-01
13 32.8 2.83E-01
0.9 7 14 214.7 2.75E-01
8
15 183.8 2.72E-01
16 85.6 2.71E-01
0.6 17 182.5 2.56E-01
9 18 48.8 2.49E-01
13 18 10
12 11 14 19 31.6 2.47E-01
0.3 19 16 1520
17
20 191.6 2.34E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00181\G1, 1_P1sv00000 - 420 c2.csv

Spectrum TP: Cylinder 2 (h)


0.77 Channel: 2 C:BMA-Cylinder
Date: Jun 05, 2016 16:11
Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 176.6 3.03E-01
0.55 2 175.9 3.01E-01
3 16.6 2.85E-01
4 65.6 2.28E-01
5 66.6 2.19E-01
Magnitude (ips Pk)

0.44 6 215.6 2.06E-01


7 32.8 2.03E-01
8 198.1 1.94E-01
9 68.1 1.94E-01
0.33 10 31.6 1.81E-01
21
3 11 216.9 1.80E-01
12 178.1 1.80E-01
45 13 48.4 1.75E-01
0.22 7 9 8
6 14 70.6 1.75E-01
10 13
17 14 1512
16 11 15 172.8 1.74E-01
1819
20 16 178.8 1.73E-01
17 47.8 1.70E-01
0.11 18 204.4 1.53E-01
19 208.1 1.48E-01
20 203.4 1.48E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00181\G2, 2_P1sv00000 - 420 c2.csv

Spectrum TP: Cylinder 2 (v)


2.2 Channel: 3 C:BMA-Cylinder
Date: Jun 05, 2016 16:11
2.0 1
Setup:
Note:
1.8 Freq. Magnitude
# Hz ips Pk
1.6 1 65.3 1.99E+00
2 63.4 1.17E+00
3 62.5 1.09E+00
1.4 4 57.8 8.83E-01
5 69.1 6.86E-01
Magnitude (ips Pk)

1.2 2 6 75.3 6.07E-01


3 7 74.4 5.88E-01
8 70.9 4.99E-01
1.0 9 83.4 3.28E-01
4 10 49.1 2.64E-01
11 32.8 2.41E-01
0.8 12 31.6 2.22E-01
5 13 90.3 2.09E-01
0.6 76 14 85.3 1.74E-01
8 15 86.3 1.62E-01
16 88.4 1.54E-01
0.4 9
17 16.9 1.48E-01
18 15.3 1.37E-01
11 10
12 13 19 216.9 1.31E-01
0.2 17
18
20
14
15
16 19 20 14.4 1.31E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00181\G3, 3_P1sv00000 - 420 c2.csv

Spectrum TP: Cylinder 2 (-a)


1.2
Channel: 4 C:BMA-Cylinder

Date: Jun 05, 2016 16:11


Setup:
1 Note:
1.0
Freq. Magnitude
# Hz ips Pk
2 1 33.4 1.01E+00
2 31.9 8.65E-01
0.8 3 58.4 4.05E-01
4 48.1 3.36E-01
5 16.6 3.27E-01
Magnitude (ips Pk)

6 65.3 2.96E-01
7 28.1 2.60E-01
0.6 8 222.2 2.42E-01
9 223.1 2.41E-01
10 223.8 2.41E-01
11 40.0 2.35E-01
3 12 60.3 2.23E-01
0.4 13 220.9 2.20E-01
5 4
14 73.4 2.07E-01
6
15 71.3 2.05E-01
7
11 12
89
10 16 229.4 1.92E-01
14
15 13
0.2 20 1918 17 16 17 66.9 1.89E-01
18 50.0 1.81E-01
19 44.7 1.79E-01
20 35.9 1.79E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00181\G4, 4_P1sv00000 - 420 c2.csv

Vibration, Dynamics & Noise Page 180 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.85
Spectrum TP: 430 (v)
1.4 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 16:19
1 Setup:
1.2 Note:

Freq. Magnitude
# Hz ips Pk
1 83.8 1.23E+00
1.0 2 65.0 4.67E-01
3 85.3 4.34E-01
4 176.9 4.26E-01
5 62.8 3.84E-01
Magnitude (ips Pk)

0.8 6 133.8 3.32E-01


7 57.8 3.23E-01
8 89.1 3.10E-01
9 90.0 2.92E-01
0.6 10 262.5 2.41E-01
11 179.7 2.40E-01
2 12 261.6 2.30E-01
3 4 13 263.8 2.11E-01
0.4 5 14 136.3 2.06E-01
7 89
6 15 180.9 2.02E-01
16 74.4 1.85E-01
11 10
12 17 265.0 1.49E-01
14 15 13
0.2 16 18 256.3 1.46E-01
20 18 17 19 19 583.8 1.46E-01
20 92.2 1.41E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00182\G1, 1_P1sv00000 - 430 435.csv

Spectrum TP: 435 (v)


1.6 Channel: 2 P:BMA-Pipe
Date: Jun 05, 2016 16:19
1 Setup:
1.4 Note:

2 Freq. Magnitude
# Hz ips Pk
1.2 1 65.3 1.42E+00
2 66.6 1.25E+00
3 75.0 8.77E-01
1.0 4 74.4 8.70E-01
5 62.2 8.41E-01
Magnitude (ips Pk)

43 6 83.8 7.94E-01
5
6 7 81.9 7.08E-01
0.8 8 68.8 6.49E-01
7 9 57.8 6.42E-01
9 8 10 70.9 5.56E-01
0.6 11 133.8 5.40E-01
10 11 12 176.9 3.72E-01
13 136.3 3.54E-01
14 85.3 2.86E-01
0.4 13 12 15 181.3 2.46E-01
16 179.7 2.43E-01
14
15
16 17 119.1 2.28E-01
17 18 48.8 2.02E-01
18 19
0.2 20
19 89.1 1.98E-01
20 197.5 1.82E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00182\G2, 2_P1sv00000 - 430 435.csv

Spectrum TP: 430 (-a)


1.8 Channel: 3 P:BMA-Pipe
Date: Jun 05, 2016 16:19
1 Setup:
Note:
1.5
Freq. Magnitude
# Hz ips Pk
1 47.5 1.61E+00
2 85.6 7.50E-01
1.2 3 58.1 4.83E-01
4 74.1 4.65E-01
5 66.9 4.33E-01
Magnitude (ips Pk)

6 81.9 3.80E-01
7 31.9 3.16E-01
0.9 8 70.6 2.78E-01
9 50.0 2.78E-01
2 10 33.4 2.78E-01
11 76.9 2.33E-01
12 62.8 2.07E-01
0.6 13 110.9 1.96E-01
3 4 14 93.8 1.79E-01
5 15 89.7 1.71E-01
6 16 16.9 1.31E-01
7 17 120.6 1.29E-01
0.3 10 9 8
11 18 119.4 1.28E-01
12 13
1514 19 97.5 1.21E-01
16 1920 1817 20 104.7 1.10E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00182\G3, 3_P1sv00000 - 430 435.csv

Spectrum TP: 435 (-a)


1.8
Channel: 4 P:BMA-Pipe

Date: Jun 05, 2016 16:19


1 Setup:
Note:
1.5
Freq. Magnitude
# Hz ips Pk
1 47.5 1.58E+00
2 33.4 5.84E-01
1.2 3 31.9 5.42E-01
4 85.6 4.36E-01
5 57.8 3.16E-01
Magnitude (ips Pk)

6 74.4 2.97E-01
7 40.3 2.36E-01
0.9 8 119.4 2.16E-01
9 81.9 2.15E-01
10 64.7 2.10E-01
11 67.5 2.00E-01
12 49.7 1.97E-01
0.6 2
3 13 76.9 1.75E-01
14 133.8 1.71E-01
4 15 16.9 1.66E-01
16 28.1 1.50E-01
5 6 17 122.2 1.48E-01
0.3 7 18 70.6 1.39E-01
11 9
12 10 8
15 16 13
17 14 19 126.6 1.11E-01
18
19
20 20 127.2 1.08E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00182\G4, 4_P1sv00000 - 430 435.csv

Vibration, Dynamics & Noise Page 181 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.86
Spectrum TP: 435 (-h)
1.1 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 16:28
1.0 1 Setup:
2 Note:
0.9 43
Freq. Magnitude
# Hz ips Pk
0.8 5
1 65.0 9.84E-01
6 2 66.6 9.32E-01
3 83.4 8.89E-01
0.7 4 82.8 8.85E-01
7
5 74.4 7.68E-01
Magnitude (ips Pk)

0.6 6 75.9 7.45E-01


8
9 7 62.5 6.56E-01
10
11
8 132.5 5.79E-01
0.5 9 118.1 5.52E-01
10 57.8 5.41E-01
11 71.3 5.05E-01
0.4 12 12 68.8 3.77E-01
13 13 135.9 3.23E-01
0.3 14 14 85.3 2.97E-01
15 15 172.8 2.53E-01
16 17 16 138.8 2.26E-01
0.2 18
19 20 17 324.7 2.25E-01
18 114.4 1.79E-01
19 115.6 1.78E-01
0.1 20 175.9 1.75E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00183\G1, 1_P1sv00000 - 435 436.csv

Spectrum TP: 436 (h)


4.0 Channel: 2 P:BMA-Pipe
Date: Jun 05, 2016 16:28
3.6 Setup:
1 Note:

3.2 Freq. Magnitude


# Hz ips Pk
2 1 174.1 3.43E+00
2.8 2 132.5 2.90E+00
3
3 176.6 2.65E+00
4 179.7 1.66E+00
2.4 5 136.3 1.45E+00
Magnitude (ips Pk)

6 165.9 1.04E+00
7 138.8 9.85E-01
2.0 8 166.9 9.64E-01
9 161.9 8.72E-01
4 10 118.8 8.32E-01
1.6 11 125.6 8.32E-01
5
12 159.4 7.86E-01
13 149.7 6.62E-01
1.2 14 145.0 6.58E-01
6
7 8
9
15 144.1 6.48E-01
1011 12 16 151.9 6.23E-01
0.8
1413
15 16 17 155.3 5.59E-01
18
17 20
19 18 154.4 5.59E-01
0.4 19 196.6 5.46E-01
20 195.9 5.42E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00183\G2, 2_P1sv00000 - 435 436.csv

Spectrum TP: 436 (v)


2.2 Channel: 3 P:BMA-Pipe
Date: Jun 05, 2016 16:28
2.0 1 Setup:
Note:
1.8 Freq. Magnitude
# Hz ips Pk
1.6 1 118.4 1.96E+00
2 175.0 1.06E+00
3 176.3 1.01E+00
1.4 4 178.1 9.76E-01
5 83.4 7.91E-01
Magnitude (ips Pk)

1.2 6 182.8 7.02E-01


7 180.0 6.96E-01
2 8 198.4 6.96E-01
3
1.0 4 9 121.9 6.40E-01
10 167.2 6.11E-01
5 11 200.3 5.73E-01
0.8 12 66.6 5.70E-01
76 8
9 13 202.2 5.03E-01
10 14 184.4 4.90E-01
0.6 12 11
14 13
15 15 203.1 4.88E-01
18 17
20 16
19 16 114.4 4.82E-01
0.4 17 74.4 4.80E-01
18 65.3 4.68E-01
19 115.6 4.64E-01
0.2 20 76.6 4.62E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00183\G3, 3_P1sv00000 - 435 436.csv

Spectrum TP: 436 (a)


3.0
Channel: 4 P:BMA-Pipe

Date: Jun 05, 2016 16:28


2.7 Setup:
Note:

2.4 1 Freq. Magnitude


# Hz ips Pk
1 66.9 2.33E+00
2.1 2 118.4 1.54E+00
3 64.4 1.53E+00
4 70.3 1.09E+00
1.8 5 69.4 9.82E-01
Magnitude (ips Pk)

6 47.8 9.31E-01
3 2 7 132.5 7.74E-01
1.5 8 61.6 4.93E-01
9 127.8 4.78E-01
10 128.4 4.71E-01
1.2 11 125.6 4.63E-01
4
5 12 83.4 4.06E-01
6 13 82.2 3.97E-01
0.9 14 135.9 3.93E-01
7
15 58.4 3.81E-01
16 114.4 3.40E-01
0.6 8 9
10
11 17 115.6 3.24E-01
15 12
13 14 18 111.9 2.37E-01
16
17
0.3 19 85.6 2.37E-01
19 18 20
20 174.7 2.31E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00183\G4, 4_P1sv00000 - 435 436.csv

Vibration, Dynamics & Noise Page 182 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.87
Spectrum TP: 414 (h)
3.0 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 16:38
2.7 Setup:
1 Note:

2.4 Freq. Magnitude


# Hz ips Pk
1 66.3 2.53E+00
2.1 2 47.8 1.79E+00
3 120.6 1.65E+00
4 44.7 1.43E+00
1.8 2
5 59.1 1.03E+00
Magnitude (ips Pk)

3 6 45.9 1.03E+00
7 57.8 1.01E+00
1.5 4 8 177.5 6.65E-01
9 85.6 5.23E-01
10 132.5 5.17E-01
1.2 11 128.4 4.77E-01
6 75 12 33.1 4.67E-01
13 245.3 4.29E-01
0.9 14 191.9 4.24E-01
8 15 133.8 4.15E-01
16 191.3 4.15E-01
0.6 9 10 17 31.9 4.10E-01
12 11
17 15 14
2016 13
18 19 18 182.2 3.93E-01
0.3 19 246.6 3.91E-01
20 182.8 3.91E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00184\G1, 1_P1sv00000 - 414 C4 212.csv

Spectrum TP: 414 (-a)


6.0 Channel: 2 P:BMA-Pipe
Date: Jun 05, 2016 16:38
Setup:
Note:
1
5.0
Freq. Magnitude
# Hz ips Pk
1 57.8 5.00E+00
2 64.7 1.99E+00
4.0 3 177.5 1.60E+00
4 33.1 1.34E+00
5 31.9 1.13E+00
Magnitude (ips Pk)

6 70.6 1.03E+00
7 191.9 9.85E-01
3.0 8 191.3 9.50E-01
9 199.7 8.93E-01
10 174.1 8.84E-01
11 67.5 8.76E-01
2 12 183.4 8.58E-01
2.0 13 195.0 8.54E-01
3 14 182.8 8.51E-01
4 15 194.4 8.44E-01
5 16 195.9 8.33E-01
6 17 196.6 8.31E-01
1.0 11 10 14 87 9
19 12 18
13
15
1720
16 18 193.4 8.23E-01
19 85.6 7.83E-01
20 201.3 7.58E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00184\G2, 2_P1sv00000 - 414 C4 212.csv

Spectrum TP: Cylinder 4 (v)


1.6 Channel: 3 C:BMA-Cylinder
Date: Jun 05, 2016 16:38
1 Setup:
1.4 Note:

Freq. Magnitude
# Hz ips Pk
1.2 1 64.7 1.41E+00
2 62.8 8.97E-01
3 61.3 8.18E-01
1.0 4 69.1 6.10E-01
5 47.2 3.10E-01
Magnitude (ips Pk)

2
6 180.0 2.92E-01
3 7 178.4 2.90E-01
0.8 8 180.9 2.75E-01
9 48.1 2.45E-01
10 111.9 2.43E-01
4 11 110.3 2.42E-01
0.6
12 175.3 2.37E-01
13 182.2 2.28E-01
14 115.3 2.28E-01
0.4 15 83.4 2.22E-01
5 16 56.3 2.19E-01
768
9 11
10 17 57.5 2.05E-01
16 15 14 1213
17 18 27.5 1.80E-01
0.2 18 20 19
19 172.8 1.73E-01
20 74.4 1.72E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00184\G3, 3_P1sv00000 - 414 C4 212.csv

Spectrum TP: 212 (h)


1.3
Channel: 4 P:BMA-Pipe

1.2 Date: Jun 05, 2016 16:38


1 Setup:
3 2 Note:
1.1
Freq. Magnitude
1.0 4
# Hz ips Pk
1 90.3 1.15E+00
0.9 2 48.1 1.11E+00
5
3 33.4 1.11E+00
0.8 4 64.4 9.90E-01
6
5 47.2 8.65E-01
Magnitude (ips Pk)

7 6 91.6 7.70E-01
0.7 8 7 62.8 7.05E-01
8 61.6 6.68E-01
0.6 9 9 109.7 5.61E-01
10 87.5 5.05E-01
10
0.5 11 16.6 4.54E-01
11
12 73.8 3.85E-01
0.4 12 13 111.6 3.56E-01
13 14 429.4 3.27E-01
15 16 14
18 17 15 28.1 3.26E-01
0.3 19
20 16 94.1 3.19E-01
17 69.1 3.09E-01
0.2 18 56.3 2.97E-01
19 95.0 2.88E-01
0.1 20 115.0 2.64E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00184\G4, 4_P1sv00000 - 414 C4 212.csv

Vibration, Dynamics & Noise Page 183 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.88
Spectrum TP: 320 (a)
1.00 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 17:47
0.90 Setup:
1 Note:

0.80 Freq. Magnitude


# Hz ips Pk
2 1 31.6 8.49E-01
3
0.70 2 64.7 7.23E-01
4 3 68.8 7.09E-01
5 4 66.9 6.34E-01
0.60 5 164.4 6.11E-01
Magnitude (ips Pk)

6 83.1 4.89E-01
7 114.4 4.66E-01
0.50 6
7 8 115.3 4.50E-01
8 9 76.9 4.13E-01
11 190 10 77.5 4.08E-01
0.40 12
13
15 14 11 16.9 4.01E-01
16
12 71.9 3.91E-01
17 13 149.7 3.61E-01
0.30 1918 14 259.1 3.60E-01
20
15 146.6 3.56E-01
16 138.1 3.24E-01
0.20 17 141.6 3.08E-01
18 156.6 2.73E-01
0.10 19 152.8 2.68E-01
20 28.8 2.55E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00186\G1, 1_P1sv00000 - 320 315.csv

Spectrum TP: 315 (a)


1.6 Channel: 2 P:BMA-Pipe
Date: Jun 05, 2016 17:47
Setup:
1.4 1
Note:

Freq. Magnitude
# Hz ips Pk
1.2 1 31.6 1.38E+00
2 68.8 5.41E-01
3 64.7 4.64E-01
1.0 4 16.9 4.63E-01
5 66.9 4.29E-01
Magnitude (ips Pk)

6 62.5 4.26E-01
7 83.1 4.05E-01
0.8 8 27.8 3.56E-01
9 28.8 3.27E-01
10 29.7 2.87E-01
0.6 11 60.0 2.72E-01
2 12 72.5 2.59E-01
4 3 13 115.3 2.57E-01
65 7
14 114.4 2.52E-01
0.4 8 15 57.2 2.47E-01
9 16 252.5 2.41E-01
10 11 12 13
14 17 77.2 2.32E-01
18 15 17 16
2019 18 46.3 2.27E-01
0.2 19 48.4 2.20E-01
20 40.0 2.04E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00186\G2, 2_P1sv00000 - 320 315.csv

Spectrum TP: 320 (-v)


1.1 Channel: 3 P:BMA-Pipe
Date: Jun 05, 2016 17:47
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 62.8 5.96E-01
2 107.5 5.04E-01
3 222.8 3.43E-01
0.7 4 115.3 3.35E-01
5 220.3 3.21E-01
Magnitude (ips Pk)

0.6 1 6 220.9 3.19E-01


7 215.6 3.04E-01
2
8 259.1 3.03E-01
0.5 9 216.9 3.02E-01
10 214.7 2.92E-01
11 213.4 2.89E-01
0.4 12 214.1 2.88E-01
4 3 13 227.5 2.85E-01
56
79
10 8 14 212.8 2.84E-01
0.3 17
11
12
14
16
18
13 15
20 19 15 259.7 2.82E-01
16 211.9 2.70E-01
0.2 17 69.1 2.69E-01
18 211.3 2.62E-01
19 229.1 2.61E-01
0.1 20 114.4 2.51E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00186\G3, 3_P1sv00000 - 320 315.csv

Spectrum TP: 315 (-v)


1.00
Channel: 4 P:BMA-Pipe

Date: Jun 05, 2016 17:47


0.90 Setup:
Note:
1
0.80 Freq. Magnitude
# Hz ips Pk
1 64.1 8.18E-01
0.70 2 57.5 3.41E-01
3 83.4 3.22E-01
4 107.5 3.01E-01
0.60 5 69.4 2.75E-01
Magnitude (ips Pk)

6 48.8 2.65E-01
7 53.4 2.39E-01
0.50 8 46.3 2.04E-01
9 177.2 1.83E-01
10 165.3 1.81E-01
0.40 11 138.1 1.78E-01
2 12 115.3 1.64E-01
3
4 13 59.7 1.62E-01
0.30 6 5 14 258.8 1.59E-01
7 15 72.5 1.47E-01
8 16 141.3 1.45E-01
0.20 11 10 9
13 12 14 17 259.7 1.45E-01
15 16 17
20 18 19 18 116.6 1.39E-01
0.10 19 261.3 1.35E-01
20 105.3 1.32E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00186\G4, 4_P1sv00000 - 320 315.csv

Vibration, Dynamics & Noise Page 184 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.89
Spectrum TP: 320 (-h)
1.1 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 17:55
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 64.7 5.90E-01
2 83.1 5.74E-01
3 141.3 5.37E-01
0.7 4 136.9 4.91E-01
5 189.7 4.34E-01
Magnitude (ips Pk)

0.6 1 6 187.5 4.32E-01


2
7 116.9 4.00E-01
3
8 153.8 3.80E-01
0.5 4 9 70.6 3.74E-01
65
10 199.1 3.74E-01
7 11 69.1 3.72E-01
0.4 9
11
12 8 10 12 70.0 3.70E-01
14 13 15
17 16 13 183.4 3.51E-01
2018 19 14 150.3 3.47E-01
0.3
15 196.9 3.41E-01
16 182.2 3.25E-01
0.2 17 146.6 3.24E-01
18 131.9 3.09E-01
19 194.7 3.03E-01
0.1 20 124.4 3.01E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00187\G1, 1_P1sv00000 - 320 c1.csv

Spectrum TP: Cylinder 1 (-h)


0.77 Channel: 2 C:BMA-Cylinder
Date: Jun 05, 2016 17:55
Setup:
0.66 Note:

Freq. Magnitude
# Hz ips Pk
1 16.9 3.28E-01
0.55 2 62.8 2.52E-01
3 177.2 2.20E-01
4 177.8 2.15E-01
5 68.4 1.98E-01
Magnitude (ips Pk)

0.44 6 47.2 1.95E-01


7 45.9 1.89E-01
8 70.6 1.87E-01
1 9 181.6 1.47E-01
0.33 10 223.1 1.46E-01
11 167.2 1.44E-01
2 12 83.4 1.39E-01
13 81.3 1.26E-01
34
0.22 5 14 228.1 1.18E-01
76 8 15 219.4 1.12E-01
11 9 10 16 56.6 1.10E-01
12
13 17 66.9 1.10E-01
16 17 19 15 14
18 20
0.11 18 217.2 1.10E-01
19 162.5 1.09E-01
20 229.7 1.07E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00187\G2, 2_P1sv00000 - 320 c1.csv

Spectrum TP: Cylinder 1 (v)


1.1 Channel: 3 C:BMA-Cylinder
Date: Jun 05, 2016 17:55
1.0 Setup:
1 Note:
0.9 Freq. Magnitude
2 # Hz ips Pk
0.8 1 64.4 9.41E-01
2 62.8 8.32E-01
3 83.1 4.82E-01
0.7 4 68.8 4.55E-01
5 66.6 4.33E-01
Magnitude (ips Pk)

0.6 6 57.5 3.96E-01


7 48.4 2.59E-01
8 47.5 2.47E-01
0.5 3 9 46.9 2.41E-01
4 10 45.9 2.41E-01
5
6 11 59.1 2.35E-01
0.4 12 60.0 1.89E-01
13 72.8 1.77E-01
0.3 14 16.6 1.77E-01
7
98 11
10
15 15.9 1.73E-01
16 14.1 1.34E-01
0.2 14
15
12 13 17 30.9 1.28E-01
16 17 18 33.1 1.21E-01
18
19
20 19 32.2 1.18E-01
0.1 20 199.4 1.03E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00187\G3, 3_P1sv00000 - 320 c1.csv

Spectrum TP: Cylinder 1 (a)


1.1
Channel: 4 C:BMA-Cylinder

Date: Jun 05, 2016 17:55


1.0 Setup:
1 Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 31.6 9.31E-01
2 16.6 4.15E-01
3 57.5 2.89E-01
0.7 4 28.8 2.65E-01
5 204.4 2.64E-01
Magnitude (ips Pk)

0.6 6 27.8 2.59E-01


7 62.8 2.59E-01
8 62.2 2.57E-01
0.5 9 65.3 2.23E-01
10 206.9 2.10E-01
2 11 66.9 2.02E-01
0.4 12 82.5 1.88E-01
13 59.4 1.57E-01
0.3 3 14 68.1 1.49E-01
64 87 5 15 81.6 1.48E-01
9 10 16 53.1 1.46E-01
11 12
0.2 17 60.0 1.46E-01
13 14 15
1617 18 19
20
18 100.0 1.35E-01
19 177.2 1.29E-01
0.1 20 177.8 1.28E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00187\G4, 4_P1sv00000 - 320 c1.csv

Vibration, Dynamics & Noise Page 185 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.90
Spectrum TP: 330 (v)
1.1 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 18:02
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 83.4 4.46E-01
2 64.4 3.60E-01
3 197.5 3.07E-01
0.7 4 199.1 2.99E-01
5 190.0 2.88E-01
Magnitude (ips Pk)

0.6 6 160.9 2.72E-01


7 160.3 2.70E-01
8 154.1 2.70E-01
0.5 9 155.6 2.65E-01
1 10 154.7 2.62E-01
11 156.3 2.51E-01
0.4 12 187.2 2.50E-01
2
13 202.8 2.48E-01
3
0.3 5 4 14 194.7 2.46E-01
89 76
10 15 200.9 2.39E-01
11
16 121415
13
17
18 16 158.4 2.38E-01
19 20
0.2 17 202.2 2.37E-01
18 141.3 2.15E-01
19 57.5 1.95E-01
0.1 20 146.6 1.92E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00188\G1, 1_P1sv00000 - 330 335.csv

Spectrum TP: 335 (v)


1.00 Channel: 2 P:BMA-Pipe
Date: Jun 05, 2016 18:02
0.90 Setup:
1 Note:

0.80 Freq. Magnitude


# Hz ips Pk
1 64.4 8.48E-01
0.70 2 69.1 4.40E-01
3 161.9 3.53E-01
4 83.4 3.39E-01
0.60 5 160.3 3.26E-01
Magnitude (ips Pk)

6 163.4 3.18E-01
7 156.3 2.73E-01
0.50 8 199.1 2.72E-01
2 9 202.8 2.47E-01
10 157.8 2.46E-01
0.40 11 197.5 2.44E-01
3
4
56 12 57.5 2.33E-01
13 202.2 2.32E-01
0.30 7 8 14 154.7 2.31E-01
10 9
1113
12 17 14
15 16 15 154.1 2.27E-01
19 20 18 16 200.9 2.24E-01
0.20
17 72.8 2.23E-01
18 212.5 2.03E-01
0.10 19 46.3 2.03E-01
20 190.0 2.02E-01

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00188\G2, 2_P1sv00000 - 330 335.csv

Spectrum TP: 330 (a)


1.1 Channel: 3 P:BMA-Pipe
Date: Jun 05, 2016 18:02
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 128.8 4.57E-01
2 83.4 4.48E-01
3 128.1 4.31E-01
0.7 4 126.3 3.96E-01
5 124.4 3.75E-01
Magnitude (ips Pk)

0.6 6 100.0 3.48E-01


7 114.1 3.35E-01
8 115.0 3.33E-01
0.5 9 62.5 2.51E-01
2 1 10 134.1 2.37E-01
3
4 11 132.8 2.33E-01
0.4 5 12 133.4 2.30E-01
6 78 13 65.0 2.16E-01
0.3 14 68.4 2.16E-01
9 15 66.9 2.08E-01
10
11
12
1314
15 17
16
16 110.6 2.05E-01
0.2 20 19 18 17 109.7 2.03E-01
18 117.2 1.95E-01
19 108.1 1.90E-01
0.1 20 31.6 1.87E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00188\G3, 3_P1sv00000 - 330 335.csv

Spectrum TP: 335 (a)


1.1
Channel: 4 P:BMA-Pipe

Date: Jun 05, 2016 18:02


1.0 Setup:
Note:
0.9
Freq. Magnitude
# Hz ips Pk
0.8 1 62.2 5.52E-01
2 31.6 4.96E-01
3 68.8 4.58E-01
0.7 4 100.0 3.76E-01
5 72.5 3.48E-01
Magnitude (ips Pk)

0.6 6 115.3 3.45E-01


1 7 66.9 3.41E-01
8 114.1 3.29E-01
2
0.5 9 64.7 3.24E-01
3 10 83.1 3.03E-01
11 81.9 2.55E-01
0.4 4 12 124.4 2.08E-01
75 6
8 13 128.8 2.03E-01
9
10 14 75.9 1.96E-01
0.3
11 15 141.3 1.95E-01
1213 15 16 57.5 1.93E-01
17 16 14
0.2 20 19 18 17 16.9 1.92E-01
18 128.1 1.88E-01
19 98.1 1.80E-01
0.1 20 85.9 1.75E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00188\G4, 4_P1sv00000 - 330 335.csv

Vibration, Dynamics & Noise Page 186 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.91
Spectrum TP: 335 (-h)
1.1 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 18:11
1.0 Setup:
Note:
0.9 Freq. Magnitude
# Hz ips Pk
0.8 1 140.6 5.58E-01
2 64.7 5.47E-01
3 139.4 5.10E-01
0.7 4 136.9 4.99E-01
5 138.8 4.98E-01
Magnitude (ips Pk)

0.6 6 83.4 4.84E-01


2 1 7 134.1 4.06E-01
8 186.3 3.81E-01
453
0.5 6 9 189.4 3.78E-01
10 69.7 3.74E-01
7 11 116.9 3.74E-01
0.4 10 11 12
13
89
14 12 154.4 3.73E-01
17 16 15
20 19
18 13 153.8 3.67E-01
0.3 14 199.4 3.63E-01
15 194.4 3.53E-01
16 155.0 3.53E-01
0.2 17 70.6 3.53E-01
18 197.2 3.42E-01
19 193.8 3.41E-01
0.1 20 182.8 3.41E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00189\G1, 1_P1sv00000 - 335 336.csv

Spectrum TP: 336 (h)


2.2 Channel: 2 P:BMA-Pipe
Date: Jun 05, 2016 18:11
2.0 Setup:
1 Note:
1.8 Freq. Magnitude
# Hz ips Pk
1.6 1 161.3 1.88E+00
2
2 83.4 1.54E+00
3 164.4 1.37E+00
1.4 3
4 158.1 1.11E+00
5 157.2 1.07E+00
Magnitude (ips Pk)

1.2 6 155.9 1.06E+00


4 7 213.8 9.48E-01
65 8 215.0 8.56E-01
1.0 7 9 212.8 8.48E-01
10 216.3 8.21E-01
8
910
11 11 216.9 8.15E-01
0.8 12 13 14 12 64.4 7.40E-01
16 15
18
1917
20 13 167.2 7.33E-01
0.6 14 194.4 7.23E-01
15 193.8 7.12E-01
16 186.3 6.89E-01
0.4 17 189.4 6.73E-01
18 182.8 6.62E-01
19 181.9 6.50E-01
0.2 20 187.5 6.49E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00189\G2, 2_P1sv00000 - 335 336.csv

Spectrum TP: 336 (v)


4.0 Channel: 3 P:BMA-Pipe
Date: Jun 05, 2016 18:11
3.6 Setup:
1 Note:

3.2 Freq. Magnitude


# Hz ips Pk
1 83.4 3.41E+00
2.8 2 64.4 1.17E+00
3 62.8 1.06E+00
4 84.7 9.70E-01
2.4 5 80.3 8.74E-01
Magnitude (ips Pk)

6 68.8 7.77E-01
7 140.6 7.62E-01
2.0 8 75.9 7.46E-01
9 139.4 6.88E-01
10 199.4 6.73E-01
1.6 11 155.3 6.51E-01
12 154.4 6.32E-01
2 13 200.6 5.96E-01
1.2 3 14 197.2 5.90E-01
4 15 136.9 5.70E-01
5
68 16 72.8 5.66E-01
0.8 7
9 11
12 10 17 189.4 5.63E-01
16 15
19
20 1714
13
18 18 201.6 5.44E-01
0.4 19 134.1 5.43E-01
20 135.3 5.43E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00189\G3, 3_P1sv00000 - 335 336.csv

Spectrum TP: 336 (a)


1.6
Channel: 4 P:BMA-Pipe

Date: Jun 05, 2016 18:11


1 Setup:
1.4 Note:

Freq. Magnitude
# Hz ips Pk
1.2
1 83.4 1.42E+00
2 71.3 4.81E-01
3 68.8 4.61E-01
1.0 4 72.8 4.58E-01
5 63.1 3.90E-01
Magnitude (ips Pk)

6 64.4 3.84E-01
7 187.5 3.84E-01
0.8 8 189.1 3.49E-01
9 183.8 2.67E-01
10 191.3 2.57E-01
0.6 11 76.6 2.56E-01
12 87.5 2.29E-01
2
34
13 31.6 2.03E-01
14 181.9 1.88E-01
0.4 56 7 15 66.6 1.87E-01
8
16 204.1 1.86E-01
11 9 10 17 203.1 1.76E-01
12
13 14 18 85.3 1.58E-01
0.2 15
18 19 20
16
17
19 128.4 1.51E-01
20 184.7 1.45E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00189\G4, 4_P1sv00000 - 335 336.csv

Vibration, Dynamics & Noise Page 187 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.92
Spectrum TP: 314 (-h)
2.4 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 18:25
Setup:
1 Note:
2.0 2
Freq. Magnitude
3 # Hz ips Pk
1 62.8 2.03E+00
2 61.9 1.94E+00
1.6 3 64.1 1.81E+00
4 56.9 1.12E+00
5 113.8 9.43E-01
Magnitude (ips Pk)

6 115.3 7.58E-01
7 175.9 5.65E-01
1.2 4 8 46.3 5.35E-01
9 175.0 5.34E-01
5 10 31.6 5.08E-01
11 66.6 5.06E-01
12 165.6 4.76E-01
0.8 6
13 165.0 4.72E-01
14 180.6 4.50E-01
97 15 178.4 4.41E-01
10 8 11
13
12 14
15
16 48.8 3.85E-01
16 17 183.8 3.61E-01
0.4 17
18
19 20 18 182.8 3.53E-01
19 137.8 3.08E-01
20 258.4 3.04E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00190\G1, 1_P1sv00000 - 314 400 399.csv

Spectrum TP: 314 (-a)


2.2 Channel: 2 P:BMA-Pipe
Date: Jun 05, 2016 18:25
2.0 Setup:
1 Note:
1.8 2
Freq. Magnitude
# Hz ips Pk
1.6 1 62.8 1.90E+00
3 2 31.3 1.79E+00
3 64.1 1.47E+00
1.4 4 53.1 7.51E-01
5 72.2 5.68E-01
Magnitude (ips Pk)

1.2 6 16.9 5.22E-01


7 68.1 4.98E-01
8 81.6 4.34E-01
1.0 9 75.6 4.11E-01
10 27.5 4.08E-01
11 54.7 4.06E-01
0.8 4 12 323.8 3.89E-01
13 40.0 3.82E-01
0.6 5 14 82.5 3.72E-01
6 7 15 56.9 3.62E-01
10 13 11 98 16 106.6 3.50E-01
12
0.4 1718 19 15 14 16 17 28.8 3.37E-01
20 18 33.8 3.35E-01
19 44.7 3.10E-01
0.2 20 45.3 3.09E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00190\G2, 2_P1sv00000 - 314 400 399.csv

Spectrum TP: 400 (a)


4.0 Channel: 3 P:BMA-Pipe
Date: Jun 05, 2016 18:25
3.6 1 Setup:
Note:

3.2 Freq. Magnitude


# Hz ips Pk
1 28.8 3.54E+00
2.8 2 33.1 2.48E-01
3 79.1 1.76E-01
4 82.2 1.58E-01
2.4 5 65.3 9.58E-02
Magnitude (ips Pk)

6 44.1 8.17E-02
7 167.2 5.53E-02
2.0 8 205.3 5.21E-02
9 174.4 5.08E-02
10 175.0 5.03E-02
1.6

1.2

0.8

0.4
2
34
6 5 7 10
9 8
0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00190\G3, 3_P1sv00000 - 314 400 399.csv

Spectrum TP: 399 (a)


4.0
Channel: 4 P:BMA-Pipe

Date: Jun 05, 2016 18:25


3.6 Setup:
Note:
1
3.2 Freq. Magnitude
# Hz ips Pk
1 82.2 3.28E+00
2.8 2 2 79.1 2.75E+00
3 28.8 2.34E+00
4 85.9 1.54E+00
2.4 3 5 65.3 1.27E+00
Magnitude (ips Pk)

6 189.1 3.13E-01
7 191.9 2.46E-01
2.0 8 180.9 2.46E-01
9 73.8 2.27E-01
10 74.7 2.23E-01
1.6 4
11 178.8 2.12E-01
12 284.7 2.02E-01
5
13 57.8 2.00E-01
1.2 14 285.3 1.88E-01
15 158.8 1.86E-01
16 33.1 1.85E-01
0.8
17 256.6 1.78E-01
18 183.8 1.73E-01
0.4 19 182.5 1.66E-01
6
13 190 11819 7 12
14
20 194.1 1.61E-01
16 15 18 20 17

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00190\G4, 4_P1sv00000 - 314 400 399.csv

Vibration, Dynamics & Noise Page 188 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.6.93
Spectrum TP: 210 (h)
2.2 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 18:38
2.0 Setup:
1 Note:
1.8 Freq. Magnitude
# Hz ips Pk
1.6 1 33.4 1.86E+00
2 34.7 3.57E-01
3 45.6 3.34E-01
1.4 4 47.2 3.30E-01
5 90.6 2.83E-01
Magnitude (ips Pk)

1.2 6 43.4 2.66E-01


7 48.1 2.65E-01
8 50.0 2.40E-01
1.0 9 221.9 2.09E-01
10 28.8 2.01E-01
11 42.2 1.98E-01
0.8 12 40.9 1.82E-01
13 30.3 1.60E-01
0.6 14 61.6 1.50E-01
15 159.1 1.41E-01
16 331.9 1.39E-01
0.4 2 34 17 16.6 1.36E-01
678 5 18 109.7 1.36E-01
10 12
11 9 19 160.0 1.33E-01
0.2 17 13 14 18 15
19 20 16 20 245.6 1.32E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00191\G1, 1_P1sv00000 - 210 300 299 460 closed.csv

Spectrum TP: 300 (a)


3.0 Channel: 2 P:BMA-Pipe
Date: Jun 05, 2016 18:38
1
2.7 Setup:
Note:

2.4 Freq. Magnitude


# Hz ips Pk
1 31.9 2.71E+00
2.1 2 33.4 1.49E+00
3 68.4 1.11E+00
4 28.8 4.41E-01
1.8 5 64.7 3.23E-01
Magnitude (ips Pk)

6 64.1 3.23E-01
2 7 53.1 2.18E-01
1.5 8 71.6 1.68E-01
9 72.2 1.67E-01
10 193.4 1.46E-01
1.2 3 11 360.3 1.42E-01
12 198.4 1.09E-01
13 199.1 1.05E-01
0.9 14 363.4 1.04E-01
15 201.3 1.00E-01
16 364.4 8.96E-02
0.6
17 196.9 8.87E-02
4
18 55.3 8.38E-02
65 19 36.6 8.25E-02
0.3 7
89 1012 11 20 161.9 7.52E-02
19 18 20 13
1715 14
16
0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00191\G2, 2_P1sv00000 - 210 300 299 460 closed.csv

Spectrum TP: 210 Sight Glass (tan)


2.0 Channel: 1 P:BMA-Pipe
Date: Jun 05, 2016 18:49
1.8 1 Setup:
Note:

1.6 Freq. Magnitude


# Hz ips Pk
1 97.5 1.78E+00
1.4 2 90.6 5.78E-01
3 180.9 5.18E-01
4 61.6 4.20E-01
1.2 5 80.3 3.98E-01
Magnitude (ips Pk)

6 62.8 3.98E-01
7 79.4 3.94E-01
1.0 8 179.7 3.48E-01
9 66.9 3.13E-01
10 310.9 3.04E-01
0.8 11 312.2 3.00E-01
12 311.6 2.98E-01
13 68.4 2.94E-01
0.6 2
14 94.7 2.81E-01
3
15 313.8 2.79E-01
46 16 313.1 2.76E-01
75
0.4 8
913 10
11
17 102.2 2.54E-01
14 12
15
16
1718
20 19 18 110.6 2.48E-01
0.2 19 314.7 2.48E-01
20 100.9 2.43E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00192\G1, 1_P1sv00000 - 210sg 237 299 460 open.csv

Spectrum TP: 237 (v)


1.3
Channel: 2 P:BMA-Pipe

1.2 Date: Jun 05, 2016 18:49


1 Setup:
Note:
1.1
Freq. Magnitude
1.0 2 # Hz ips Pk
3 1 111.9 1.14E+00
45
0.9 6 2 225.0 9.67E-01
7 3 222.5 9.25E-01
0.8 4 221.6 9.04E-01
8 5 223.8 8.99E-01
Magnitude (ips Pk)

9
6 220.6 8.81E-01
0.7 10 7 80.0 8.23E-01
8 227.8 7.59E-01
0.6 9 180.6 7.43E-01
10 182.5 6.63E-01
0.5 11 230.6 4.62E-01
12 11
13 12 215.6 4.60E-01
14 15
17 16
0.4 19 18 20
13 75.6 4.25E-01
14 76.9 4.11E-01
15 116.9 4.10E-01
0.3 16 216.9 4.01E-01
17 120.0 4.01E-01
0.2 18 214.7 3.91E-01
19 87.8 3.78E-01
0.1 20 231.9 3.76E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00192\G2, 2_P1sv00000 - 210sg 237 299 460 open.csv

Vibration, Dynamics & Noise Page 189 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.7 Pulsation Data


Fig: B.7.1
Spectrum TP: 460 4D Day no SS (Valve Closed)
0.18 Channel: 4
Date: May 30, 2016 09:59
Setup:
1 Note:
0.15
2 Freq. Magnitude
# Hz psi Pk-Pk
1 150.3 1.55E-01
3 2 152.8 1.42E-01
0.12 3 149.1 1.22E-01
4 148.1 1.06E-01
Magnitude (psi Pk-Pk)

4 5 155.9 8.91E-02
6 183.1 8.91E-02
5 6 7 201.6 8.59E-02
0.09 8
7 8 145.6 8.36E-02
9 9 181.9 7.75E-02
10 10 202.5 7.22E-02
13 11 12
14 15 11 136.6 7.00E-02
1916 17 18
20
12 192.5 6.88E-02
0.06 13 72.2 6.82E-02
14 70.3 6.76E-02
15 158.8 6.68E-02
16 78.1 6.57E-02
17 194.1 6.56E-02
0.03
18 204.1 6.55E-02
19 71.3 6.47E-02
20 193.4 6.43E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00049\G4, 4_P1sv00000 - C5 460.csv

Spectrum TP: 460 4D Day no SS (Valve Open)


54 Channel: 4 H:DPL-API 618 5th Ed
Date: May 30, 2016 10:10
49 Setup:
Note:

43 Freq. Magnitude
# Hz psi Pk-Pk
1 64.4 2.48E+01
38 2 53.4 1.53E+01
3 33.1 1.19E+01
4 70.9 1.11E+01
Magnitude (psi Pk-Pk)

32 5 76.3 8.75E+00
6 28.8 8.50E+00
7 55.9 8.16E+00
27 8 30.3 7.72E+00
1
9 83.1 7.32E+00
10 69.1 6.87E+00
22 11 26.6 6.75E+00
12 79.7 6.46E+00
13 78.8 6.09E+00
16 2
14 13.4 5.74E+00
3 15 86.3 5.39E+00
4 16 41.9 5.06E+00
11
6 7 5 17 42.8 3.83E+00
8
11 10 129 18 43.4 3.79E+00
14 13
5 16 15 19 211.6 3.46E+00
20 17
18 19 20 16.6 3.45E+00

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00050\G4, 4_P1sv00000 - C3 460 open.csv

Spectrum TP: 299 3S Day no SS (Valve Closed)


1.2 Channel: 4
Date: Jun 02, 2016 09:18
1 Setup:
Note:
1.0
Freq. Magnitude
2 # Hz psi Pk-Pk
3
4 1 7.2 1.05E+00
5 2 8.1 9.11E-01
0.8 3 5.6 8.84E-01
6 4 31.3 8.56E-01
Magnitude (psi Pk-Pk)

5 34.1 8.26E-01
7 6 18.4 7.23E-01
7 40.3 6.64E-01
0.6 8 22.5 5.54E-01
10 89
11
12 9 27.5 5.49E-01
1413 16
15
10 14.1 5.43E-01
19 17 18 11 16.3 5.32E-01
20
12 19.4 5.26E-01
0.4 13 30.0 5.06E-01
14 26.3 5.05E-01
15 25.3 5.04E-01
16 39.4 4.91E-01
0.2 17 21.3 4.67E-01
18 42.8 4.52E-01
19 11.3 4.52E-01
20 12.8 4.28E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00102\G4, 4_P1sv00000 - 470 360 160 299.csv

Spectrum TP: 299 3S Day no SS (Valve Open)


11
Channel: 4 H:DPL-API 618 5th Ed

10 Date: Jun 02, 2016 09:26


Setup:
Note:
9
Freq. Magnitude
8 # Hz psi Pk-Pk
1 16.9 1.17E+00
8 2 15.3 9.39E-01
3 5.9 8.39E-01
7 4 5.0 8.17E-01
Magnitude (psi Pk-Pk)

5 32.2 7.98E-01
6 36.6 7.79E-01
6 7 20.3 7.75E-01
8 31.3 7.72E-01
5 9 32.8 7.62E-01
10 7.8 6.96E-01
4 11 10.0 6.58E-01
12 29.1 6.49E-01
3 13 8.8 6.19E-01
14 26.3 5.83E-01
15 11.3 5.30E-01
3 16 40.3 5.19E-01
17 33.8 5.12E-01
2 18 39.7 4.90E-01
1 19 21.9 4.90E-01
4310 2 7 856
1 11
13 129 16 20 22.5 4.82E-01
15 1920141718

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00103\G4, 4_P1sv00000 - 470 360 160 299 op.csv

Vibration, Dynamics & Noise Page 190 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.7.2
Spectrum TP: 299 3S Day w/ SS 1000 rpm (Valve Open)
11 Channel: 3 H:DPL-API 618 5th Ed
Date: Jun 03, 2016 10:59
10
Setup:
Note:
9
Freq. Magnitude
8 # Hz psi Pk-Pk
1 16.6 1.67E+00
8

7
Magnitude (psi Pk-Pk)

3
1
2

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00124\G3, 3_P1sv00000 - Sidestream puls 1000.csv

Spectrum TP: 460 4D Day w/ SS 1000 rpm (Valve Open)


54
Channel: 4 H:DPL-API 618 5th Ed

Date: Jun 03, 2016 10:59


49 Setup:
Note:

43 Freq. Magnitude
# Hz psi Pk-Pk
1 33.4 1.13E+01
38 2 66.6 8.07E+00
3 50.3 4.12E+00
4 16.9 4.02E+00
Magnitude (psi Pk-Pk)

32 5 83.1 3.52E+00
6 200.3 2.46E+00
7 116.6 1.87E+00
27

22

16

1
11
2

5 4 3 5
7 6

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00124\G4, 4_P1sv00000 - Sidestream puls 1000.csv

Spectrum TP: 299 3S Day w/ SS 900 rpm (Valve Open)


11 Channel: 3 H:DPL-API 618 5th Ed

10 Date: Jun 03, 2016 11:13


Setup:
Note:
9
Freq. Magnitude
8 # Hz psi Pk-Pk
1 15.0 1.09E+00
8 2 59.7 4.01E-01
3 56.6 3.86E-01
7
Magnitude (psi Pk-Pk)

2
1
1
32

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00125\G3, 3_P1sv00000 - Sidestream puls 900.csv

Spectrum TP: 460 4D Day w/ SS 900 rpm (Valve Open)


54 Channel: 4 H:DPL-API 618 5th Ed
Date: Jun 03, 2016 11:13
49 Setup:
Note:

43 Freq. Magnitude
# Hz psi Pk-Pk
1 60.9 9.63E+00
38 2 60.0 9.38E+00
3 30.0 9.24E+00
4 75.6 8.07E+00
Magnitude (psi Pk-Pk)

32 5 15.0 3.49E+00
6 45.0 3.29E+00
7 45.9 3.10E+00
27

22

16

11 3 21
4

5 5 67

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00125\G4, 4_P1sv00000 - Sidestream puls 900.csv

Vibration, Dynamics & Noise Page 191 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.7.3
Spectrum TP: 299 3S Day w/ SS 800 rpm (Valve Open)
11 Channel: 3 H:DPL-API 618 5th Ed
Date: Jun 03, 2016 11:25
10
Setup:
Note:
9
Freq. Magnitude
8 # Hz psi Pk-Pk
1 66.6 1.36E+00
8 2 68.8 1.16E+00
3 67.8 9.87E-01
7 4 53.4 9.44E-01
Magnitude (psi Pk-Pk)

5 47.2 6.78E-01
6 49.1 6.59E-01
6 7 47.8 6.07E-01
8 63.8 5.79E-01
5 9 63.1 5.65E-01
10 44.4 5.02E-01
4 11 62.2 5.01E-01
12 50.9 4.71E-01
3 13 13.1 4.56E-01
14 40.0 4.39E-01
15 50.3 4.35E-01
3 16 61.3 4.10E-01
17 43.4 4.06E-01
2 1 18 70.9 3.80E-01
2 19 41.3 3.74E-01
4 3
1 13
56 98
10715 11 18
12 16
20 42.8 3.72E-01
14
17
19
20

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00126\G3, 3_P1sv00000 - Sidestream puls 800.csv

Spectrum TP: 460 4D Day w/ SS 800 rpm (Valve Open)


54
Channel: 4 H:DPL-API 618 5th Ed

Date: Jun 03, 2016 11:25


49 Setup:
Note:

43 Freq. Magnitude
# Hz psi Pk-Pk
1 53.4 1.19E+01
38 2 26.6 7.43E+00
3 13.4 5.86E+00
4 66.6 5.29E+00
Magnitude (psi Pk-Pk)

32 5 40.0 4.28E+00
6 80.0 2.37E+00
7 93.4 2.12E+00
27 8 200.0 1.91E+00

22

16
1
11
2
3 4
5 5
6 7 8

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00126\G4, 4_P1sv00000 - Sidestream puls 800.csv

Spectrum TP: 299 3S Night no SS (Valve Closed)


0.18 Channel: 3

Date: Jun 04, 2016 16:02


1 Setup:
Note:
0.15
Freq. Magnitude
# Hz psi Pk-Pk
1 200.9 1.59E-01
2 2 194.7 1.23E-01
3
0.12 3 193.8 1.19E-01
4 195.9 9.67E-02
Magnitude (psi Pk-Pk)

5 217.2 8.87E-02
4 6 197.2 8.81E-02
7 218.8 8.61E-02
0.09 6 5
7 89 8 270.3 8.58E-02
9 270.9 8.51E-02
10 10 271.9 7.28E-02
11
11 267.5 6.42E-02
12 259.7 5.65E-02
0.06 13 12 13 215.3 5.45E-02
16 14 15
17 14 258.8 5.10E-02
20 18 19 15 299.4 5.05E-02
16 212.5 5.00E-02
0.03 17 284.1 4.77E-02
18 205.6 4.34E-02
19 256.9 4.21E-02
20 32.2 4.17E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00174\G3, 3_P1sv00000 - 210 300 299 460.csv

Spectrum TP: 460 4D Night no SS (Valve Closed)


0.30 Channel: 4

1 Date: Jun 04, 2016 16:02


0.27 2 Setup:
Note:

0.24 Freq. Magnitude


# Hz psi Pk-Pk
1 182.2 2.73E-01
0.21 2 182.8 2.66E-01
3
3 137.8 1.98E-01
4 185.6 1.65E-01
Magnitude (psi Pk-Pk)

0.18 5 133.8 1.63E-01


5 4 6 135.3 1.50E-01
6 7 75.3 1.38E-01
0.15 8 188.8 1.37E-01
7 9 810
9 149.4 1.35E-01
11
10 191.3 1.34E-01
0.12 12 11 178.8 1.27E-01
12 141.9 1.10E-01
13 13 201.3 9.05E-02
0.09 16 15
18
14 17 14 176.6 8.58E-02
20 19
15 145.6 8.50E-02
16 118.1 8.35E-02
0.06
17 300.0 8.23E-02
18 146.6 8.07E-02
0.03 19 268.1 7.40E-02
20 153.1 7.30E-02

0.00
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00174\G4, 4_P1sv00000 - 210 300 299 460.csv

Vibration, Dynamics & Noise Page 192 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.7.4
Spectrum TP: 299 3S Night no SS (Valve Open)
11 Channel: 3 H:DPL-API 618 5th Ed
Date: Jun 04, 2016 16:16
10
Setup:
Note:
9
Freq. Magnitude
8 # Hz psi Pk-Pk
1 16.6 1.24E+00
8 2 15.0 6.62E-01

7
Magnitude (psi Pk-Pk)

2
1

1 2

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00175\G3, 3_P1sv00000 - 210 sg 237 puls.csv

Spectrum TP: 460 4D Night no SS (Valve Open)


54
Channel: 4 H:DPL-API 618 5th Ed

Date: Jun 04, 2016 16:16


49 Setup:
Note:

43 Freq. Magnitude
# Hz psi Pk-Pk
1 64.4 2.72E+01
38 2 65.9 1.84E+01
3 53.4 1.81E+01
4 33.1 1.35E+01
Magnitude (psi Pk-Pk)

32 5 70.9 1.32E+01
6 76.3 9.57E+00
1 7 82.8 9.28E+00
27 8 56.3 9.14E+00
9 69.4 9.03E+00
10 29.1 8.30E+00
22 11 59.4 8.11E+00
3 2 12 26.6 6.90E+00
13 80.3 6.73E+00
16 14 86.3 6.17E+00
4 5 15 13.8 5.96E+00
16 41.3 5.76E+00
11 8 96 7 17 43.8 3.99E+00
10 11
12 1314 18 16.6 3.53E+00
15 16
5 19 50.0 3.35E+00
1719
18 20 20 212.2 3.31E+00

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00175\G4, 4_P1sv00000 - 210 sg 237 puls.csv

Spectrum TP: 299 3S Night with SS (Valve Closed)


3.0 Channel: 3

Date: Jun 05, 2016 18:38


2.7 Setup:
Note:

2.4 Freq. Magnitude


1
# Hz psi Pk-Pk
1 63.8 2.29E+00
2.1 32 2 62.8 2.07E+00
5
4 3 62.2 2.06E+00
4 68.4 1.95E+00
Magnitude (psi Pk-Pk)

1.8 6 5 57.2 1.89E+00


6 58.4 1.69E+00
7 59.7 1.24E+00
1.5 8 60.9 9.28E-01
9 35.9 7.45E-01
7 10 53.1 7.33E-01
1.2 11 50.9 6.70E-01
12 51.9 6.65E-01
8 13 46.3 6.53E-01
0.9 14 52.5 6.45E-01
9 10
1311
12 15 36.9 6.26E-01
15 14
1716 16 44.7 6.09E-01
0.6 18
19
20
17 37.8 6.00E-01
18 48.4 5.61E-01
0.3 19 49.7 5.57E-01
20 47.2 5.54E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00191\G3, 3_P1sv00000 - 210 300 299 460 closed.csv

Spectrum TP: 460 4D Night with SS (Valve Closed)


2.0 Channel: 4
Date: Jun 05, 2016 18:38
1.8 1 Setup:
Note:

1.6 Freq. Magnitude


# Hz psi Pk-Pk
1 31.3 1.76E+00
1.4 2 33.4 1.15E+00
3 18.4 7.16E-01
4 9.4 7.11E-01
Magnitude (psi Pk-Pk)

1.2 2 5 16.9 6.64E-01


6 15.9 6.61E-01
7 5.0 6.51E-01
1.0 8 20.0 6.46E-01
9 28.1 6.38E-01
10 10.6 6.37E-01
0.8 11 8.1 6.30E-01
4 3
711 65 12 19.4 6.03E-01
10 8 9
12 13 23.4 5.72E-01
0.6 13
1415 14 20.6 5.65E-01
20 16 191178
15 25.6 5.47E-01
16 21.6 5.41E-01
0.4
17 26.3 5.37E-01
18 29.7 5.34E-01
0.2 19 22.2 5.25E-01
20 7.2 5.23E-01

0.0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00191\G4, 4_P1sv00000 - 210 300 299 460 closed.csv

Vibration, Dynamics & Noise Page 193 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.7.5
Spectrum TP: 299 3S Night with SS (Valve Open)
11 Channel: 3 H:DPL-API 618 5th Ed
Date: Jun 05, 2016 18:49
10
Setup:
Note:
9
Freq. Magnitude
8 # Hz psi Pk-Pk
1 64.4 1.95E+00
8 2 68.4 1.95E+00
3 63.8 1.94E+00
7 4 58.4 1.73E+00
Magnitude (psi Pk-Pk)

5 16.6 1.58E+00
6 62.2 1.50E+00
6 7 59.4 1.47E+00
8 53.8 1.18E+00
5 9 53.1 1.08E+00
10 55.6 1.03E+00
4 11 60.9 1.02E+00
12 66.9 8.05E-01
3 13 14.7 7.92E-01
14 40.3 7.82E-01
15 41.9 6.81E-01
3 16 44.4 6.55E-01
312 17 43.1 6.34E-01
4
2 5 76 18 45.0 6.16E-01
981011 19 50.6 6.15E-01
13 14 12
1 15
118
17619
20 20 45.9 5.48E-01

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00192\G3, 3_P1sv00000 - 210sg 237 299 460 open.csv

Spectrum TP: 460 4D Night with SS (Valve Open)


54
Channel: 4 H:DPL-API 618 5th Ed

Date: Jun 05, 2016 18:49


49 Setup:
Note:

43 Freq. Magnitude
# Hz psi Pk-Pk
1 64.1 3.13E+01
38 2 33.1 1.58E+01
3 65.9 1.42E+01
4 53.4 1.28E+01
Magnitude (psi Pk-Pk)

32 1 5 69.4 1.21E+01
6 70.9 1.07E+01
7 30.6 9.74E+00
27 8 82.2 8.79E+00
9 55.9 8.66E+00
10 59.4 8.42E+00
22 11 28.4 8.42E+00
12 75.9 7.86E+00
2 13 26.6 7.46E+00
16 14 41.3 6.97E+00
3
4
5 15 80.0 6.94E+00
6 16 13.4 5.32E+00
11 7
17 85.6 5.14E+00
11 910 8
13 14 12
15 18 50.0 4.50E+00
5 16
18
17 19 16.6 4.24E+00
19 20 20 200.6 3.85E+00

0
0 100 200 300 400 500 600 700 800 900 1000
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Torsional.trf\ASCII00192\G4, 4_P1sv00000 - 210sg 237 299 460 open.csv

Vibration, Dynamics & Noise Page 194 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.8 Torsional Data

Figure B.8.1 – Cold Start – Run 58, Waterfall and Time History of Response at Compressor Lube Oil Pump

Vibration, Dynamics & Noise Page 195 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure B.8.2 – Controlled Shutdown – Run 60, Waterfall and Time History of Response at Compressor Lube Oil Pump

Vibration, Dynamics & Noise Page 196 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure B.8.3 – Warm Start – Run 61, Waterfall and Time History of Response at Compressor Lube Oil Pump

Vibration, Dynamics & Noise Page 197 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure B.8.4 – Unloaded Speed Sweep – Run 62, Waterfall and Time History of Response at Compressor Lube Oil Pump

Vibration, Dynamics & Noise Page 198 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure B.8.5 – Loading at 900 rpm – Run 63, Waterfall and Time History of Response at Compressor Lube Oil Pump

Vibration, Dynamics & Noise Page 199 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure B.8.6 – Loaded Speed Sweep – Run 64, Waterfall and Time History of Response at Compressor Lube Oil Pump
First Torsional Natural Frequency (Coupling Mode) is 10.9 Hz (or 654 rpm at 1X).
Fourth Torsional Natural Frequency (Compressor Mode) is 98 Hz (or 840 rpm at 7X, or 980 Hz at 6X)

Vibration, Dynamics & Noise Page 200 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure B.8.7 – Cold Start – Run 177, Waterfall and Time History of Response at Compressor Lube Oil Pump

Vibration, Dynamics & Noise Page 201 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure B.8.8 – Loaded ESD – Run 196, Waterfall and Time History of Response at Compressor Lube Oil Pump

Vibration, Dynamics & Noise Page 202 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

B.9 Impact Response Data


Fig: B.9.1

Transfer Function TP: 415 (a) [Hit 415] (a)


0.020
Channel: 2
Date: May 28, 2016 09:08
0.018 Setup:
Note:
1

0.016 Freq. Amplitude


# Hz ips / lbf
1 94.1 1.68E-02
0.014 2 88.8 6.94E-03
3 100.3 6.09E-03
4 95.3 5.89E-03
0.012 5 96.9 5.24E-03
Amplitude (ips / lbf)

6 100.9 5.05E-03
7 101.9 4.39E-03
0.010 8 45.6 3.03E-03
9 284.4 2.91E-03
10 110.3 2.85E-03
0.008 11 31.6 2.75E-03
2 12 131.6 2.55E-03
4 3 13 82.2 2.32E-03
0.006 14 103.8 2.29E-03
56
7
15 35.6 2.24E-03
16 83.4 2.20E-03
0.004 17 80.9 1.87E-03
8 10 9
11 12 18 247.5 1.86E-03
15 13
16 14
17 20
19 18 19 130.0 1.82E-03
0.002 20 129.4 1.82E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00001\H1, 2_I1sv00000 - s4bot a.csv

Transfer Function TP: 415 (a) [Hit 415] (a)


Channel: 2
200

9
Date: May 28, 2016 09:08
20 18
160 3 Setup:
7 10 19 Note:
6 12
4
120 5 Freq. Phase
14 # Hz degrees
1 94.1 -176
80 2 88.8 -170
3 100.3 154
4 95.3 123
40 5 96.9 117
Phase (degrees)

6 100.9 131
7 101.9 141
0 8 45.6 -177
9 284.4 163
10 110.3 142
-40 11 31.6 -137
12 131.6 132
13 82.2 -136
-80 14 103.8 104
15 35.6 -175
16 83.4 -138
-120 17 17 80.9 -131
11 13
16
18 247.5 162
-160 19 130.0 137
15 2 20 129.4 161
8 1

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00001\H1, 2_I1sv00000 - s4bot a.csv

Coherence TP: 415 (a) [Hit 415] (a)


Channel:11152 2 145 36714 10 20
19
12 18 9
1.00 8 13
16
17
Date: May 28, 2016 09:08
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 94.1 9.98E-01
0.70 2 88.8 9.98E-01
3 100.3 9.99E-01
4 95.3 9.99E-01
0.60 5 96.9 9.98E-01
6 100.9 9.99E-01
Magnitude

7 101.9 9.99E-01
0.50 8 45.6 9.83E-01
9 284.4 9.98E-01
10 110.3 9.99E-01
0.40 11 31.6 9.96E-01
12 131.6 9.97E-01
13 82.2 9.87E-01
0.30 14 103.8 9.99E-01
15 35.6 9.93E-01
16 83.4 9.74E-01
0.20 17 80.9 9.69E-01
18 247.5 9.94E-01
19 130.0 9.96E-01
0.10 20 129.4 9.97E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00001\C1, 2_I1sv00000 - s4bot a.csv

Vibration, Dynamics & Noise Page 203 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.2

Transfer Function TP: 420 (a) [Hit 415] (a)


0.020
Channel: 3
Date: May 28, 2016 09:08
1
0.018 Setup:
Note:

0.016 2 Freq. Amplitude


# Hz ips / lbf
1 101.9 1.81E-02
0.014 2 100.0 1.55E-02
3 110.3 6.61E-03
4 89.1 4.80E-03
0.012 5 94.4 4.68E-03
Amplitude (ips / lbf)

6 103.8 4.07E-03
7 96.6 3.89E-03
0.010 8 129.1 2.66E-03
9 131.3 2.27E-03
10 114.4 1.72E-03
0.008 11 115.0 1.69E-03
3 12 241.9 1.45E-03
13 284.4 1.37E-03
0.006 14 125.0 1.35E-03
4 5 15 124.1 1.33E-03
7 6 16 35.6 1.29E-03
0.004 17 118.8 1.25E-03
8 18 247.5 1.24E-03
9
19 121.6 1.24E-03
0.002 10
11 1218 13
16 17
2015
14
19 20 120.3 1.21E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00001\H1, 3_I1sv00000 - s4bot a.csv

Transfer Function TP: 420 (a) [Hit 415] (a)


200
Channel: 3

16 1 Date: May 28, 2016 09:08


160 3 Setup:
Note:

120 6 Freq. Phase


10
11 # Hz degrees
2015
171914 1 101.9 171
80 2 100.0 -142
3 110.3 156
4 89.1 -45
40 8 5 94.4 -62
Phase (degrees)

12
9 6 103.8 116
7 96.6 -100
0 8 129.1 33
18 13
9 131.3 19
10 114.4 99
-40 4
11 115.0 98
5 12 241.9 24
13 284.4 -16
-80 14 125.0 88
7
15 124.1 92
16 35.6 166
-120 17 118.8 93
2
18 247.5 -18
19 121.6 88
-160
20 120.3 93

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00001\H1, 3_I1sv00000 - s4bot a.csv

Coherence TP: 420 (a) [Hit 415] (a)


Channel: 163 4 57 216 310
1117
201489
15
19 1218 13
1.00
Date: May 28, 2016 09:08
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 101.9 9.99E-01
0.70 2 100.0 1.00E+00
3 110.3 9.99E-01
4 89.1 9.98E-01
0.60 5 94.4 9.99E-01
6 103.8 9.99E-01
Magnitude

7 96.6 1.00E+00
0.50 8 129.1 9.98E-01
9 131.3 9.95E-01
10 114.4 9.91E-01
0.40 11 115.0 9.90E-01
12 241.9 9.95E-01
13 284.4 9.98E-01
0.30 14 125.0 1.00E+00
15 124.1 9.99E-01
16 35.6 9.91E-01
0.20 17 118.8 9.98E-01
18 247.5 9.94E-01
0.10 19 121.6 9.96E-01
20 120.3 9.98E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00001\C1, 3_I1sv00000 - s4bot a.csv

Vibration, Dynamics & Noise Page 204 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.3

Transfer Function TP: 415 Flange (a) [Hit 415] (a)


0.035
Channel: 4
Date: May 28, 2016 09:08
Setup:
0.030 1 Note:

Freq. Amplitude
# Hz ips / lbf
1 94.1 3.00E-02
0.025 2 89.1 1.41E-02
3 95.3 1.19E-02
4 96.9 1.04E-02
5 100.9 6.92E-03
Amplitude (ips / lbf)

0.020 6 101.6 6.85E-03


7 45.6 5.51E-03
8 82.2 3.86E-03
9 131.6 3.78E-03
0.015 2 10 31.6 3.63E-03
11 83.4 3.34E-03
3 12 80.9 3.05E-03
4 13 130.0 2.95E-03
0.010 14 35.6 2.87E-03
15 129.4 2.82E-03
56 16 29.1 2.62E-03
7 17 284.4 2.37E-03
0.005 18 46.9 2.37E-03
10 8 9
11
12 13
19 76.3 2.34E-03
16 14 18 19
20
15 17 20 77.2 2.27E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00001\H1, 4_I1sv00000 - s4bot a.csv

Transfer Function TP: 415 Flange (a) [Hit 415] (a)


200
Channel: 4
Date: May 28, 2016 09:08
15 Setup:
160 18
2 Note:
13
9
120 3 Freq. Phase
45
# Hz degrees
1 94.1 -179
80 6 2 89.1 144
3 95.3 118
4 96.9 111
40 5 100.9 107
Phase (degrees)

6 101.6 73
17 7 45.6 -180
0 8 82.2 -144
9 131.6 128
10 31.6 -140
-40 11 83.4 -138
12 80.9 -139
13 130.0 134
-80 14 35.6 -174
15 129.4 158
16
16 29.1 -113
-120 17 284.4 2
10 11
12
8 18 46.9 150
19
19 76.3 -150
-160 20
14
7 1 20 77.2 -165

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00001\H1, 4_I1sv00000 - s4bot a.csv

Coherence TP: 415 Flange (a) [Hit 415] (a)


Channel: 4
1014
16 18 2 134 56 15
139 17
1.00 7 8
11
12

19
Date: May 28, 2016 09:08
20
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 94.1 9.98E-01
0.70 2 89.1 9.98E-01
3 95.3 9.99E-01
4 96.9 9.98E-01
0.60 5 100.9 9.99E-01
6 101.6 9.99E-01
Magnitude

7 45.6 9.85E-01
0.50 8 82.2 9.84E-01
9 131.6 9.97E-01
10 31.6 9.96E-01
0.40 11 83.4 9.65E-01
12 80.9 9.62E-01
13 130.0 9.96E-01
0.30 14 35.6 9.92E-01
15 129.4 9.97E-01
16 29.1 9.94E-01
0.20 17 284.4 9.98E-01
18 46.9 9.91E-01
0.10 19 76.3 9.07E-01
20 77.2 9.05E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00001\C1, 4_I1sv00000 - s4bot a.csv

Vibration, Dynamics & Noise Page 205 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.4

Transfer Function TP: 415 (v) [Hit 415] (v)


0.020
Channel: 2
Date: May 28, 2016 09:13
0.018 Setup:
1 Note:

0.016 Freq. Amplitude


# Hz ips / lbf
1 321.6 1.70E-02
0.014 2 74.7 7.40E-03
3 75.9 6.93E-03
4 77.5 6.80E-03
0.012 5 247.5 2.33E-03
Amplitude (ips / lbf)

6 336.6 2.11E-03
7 338.4 2.08E-03
0.010 8 94.4 2.00E-03
9 80.9 1.95E-03
10 345.0 1.69E-03
0.008 2 11 345.6 1.67E-03
34 12 448.8 1.63E-03
13 69.1 1.58E-03
0.006 14 242.2 1.55E-03
15 83.4 1.52E-03
16 88.8 1.39E-03
0.004 17 383.1 1.36E-03
5
18 381.9 1.34E-03
9 8 67 19 62.5 1.30E-03
0.002 13 1516 14 10
11
17
12
19 18
20 20 380.0 1.24E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00002\H1, 2_I1sv00000 - s4bot v.csv

Transfer Function TP: 415 (v) [Hit 415] (v)


200
Channel: 2
Date: May 28, 2016 09:13
1 Setup:
160
Note:

120 6
Freq. Phase
19 7 # Hz degrees
13 10
11 1 321.6 158
80 20
18
2 74.7 30
17 3 75.9 1
4 77.5 -31
40 2 5 247.5 -178
Phase (degrees)

12
6 336.6 106
3 7 338.4 100
0 8 94.4 -65
9 80.9 -64
4
10 345.0 92
-40 16 11 345.6 88
9
15
8 12 448.8 11
13 69.1 90
-80 14 242.2 -128
15 83.4 -70
16 88.8 -54
-120 14
17 383.1 61
18 381.9 66
19 62.5 101
-160
5 20 380.0 71

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00002\H1, 2_I1sv00000 - s4bot v.csv

Coherence TP: 415 (v) [Hit 415] (v)


Channel: 2 13 234 91516 8 14 5 1 67 10
11 20
18
17
1.00 12

Date: May 28, 2016 09:13


0.90 19 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 321.6 9.98E-01
0.70 2 74.7 9.98E-01
3 75.9 9.96E-01
4 77.5 9.98E-01
0.60 5 247.5 9.89E-01
6 336.6 9.96E-01
Magnitude

7 338.4 9.97E-01
0.50 8 94.4 9.97E-01
9 80.9 9.96E-01
10 345.0 9.98E-01
0.40 11 345.6 9.98E-01
12 448.8 9.77E-01
13 69.1 9.97E-01
0.30 14 242.2 9.95E-01
15 83.4 9.97E-01
16 88.8 9.97E-01
0.20 17 383.1 9.98E-01
18 381.9 9.98E-01
0.10 19 62.5 8.84E-01
20 380.0 9.99E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00002\C1, 2_I1sv00000 - s4bot v.csv

Vibration, Dynamics & Noise Page 206 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.5

Transfer Function TP: 420 (v) [Hit 415] (v)


0.022
Channel: 3
Date: May 28, 2016 09:13
0.020 Setup:
1 Note:
0.018 Freq. Amplitude
# Hz ips / lbf
0.016 1 321.6 1.88E-02
2 74.7 1.15E-02
3 77.5 1.12E-02
0.014 4 75.9 1.10E-02
5 94.1 4.07E-03
Amplitude (ips / lbf)

6 247.5 3.81E-03
0.012 23 7 80.9 3.02E-03
4
8 218.4 2.56E-03
0.010 9 336.3 2.51E-03
10 88.8 2.43E-03
11 214.7 2.43E-03
0.008 12 61.3 2.42E-03
13 242.5 2.31E-03
0.006 14 338.4 2.31E-03
15 243.8 2.29E-03
5
16 284.4 2.22E-03
0.004 6 17 69.1 2.20E-03
7 18 83.8 2.08E-03
12 17 10 118 13
15 914
18 19 16 20 19 95.3 2.02E-03
0.002 20 345.0 2.01E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00002\H1, 3_I1sv00000 - s4bot v.csv

Transfer Function TP: 420 (v) [Hit 415] (v)


200
Channel: 3
8 6
5 Date: May 28, 2016 09:13
160 1 Setup:
3
Note:
10

120 718
19 9 Freq. Phase
14 20 # Hz degrees
1 321.6 157
80 2 74.7 -150
3 77.5 147
4 75.9 -178
40 5 94.1 170
Phase (degrees)

6 247.5 176
7 80.9 116
0 8 218.4 177
9 336.3 112
10 88.8 133
-40 11 214.7 -142
12 61.3 -116
13 242.5 -143
-80 14 338.4 105
17 15 243.8 -150
12 16 284.4 -168
-120 17 69.1 -105
11 13
2 15 18 83.8 112
19 95.3 108
-160 16
4 20 345.0 102

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00002\H1, 3_I1sv00000 - s4bot v.csv

Coherence TP: 420 (v) [Hit 415] (v)


Channel: 3 12 17 23
4 71810 19
5 118 156
13 16 1 914 20
1.00
Date: May 28, 2016 09:13
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 321.6 9.98E-01
0.70 2 74.7 9.98E-01
3 77.5 9.98E-01
4 75.9 9.96E-01
0.60 5 94.1 9.91E-01
6 247.5 9.90E-01
Magnitude

7 80.9 9.97E-01
0.50 8 218.4 9.92E-01
9 336.3 9.98E-01
10 88.8 9.96E-01
0.40 11 214.7 9.98E-01
12 61.3 9.95E-01
13 242.5 9.95E-01
0.30 14 338.4 9.97E-01
15 243.8 9.97E-01
16 284.4 9.97E-01
0.20 17 69.1 9.93E-01
18 83.8 9.98E-01
0.10 19 95.3 9.97E-01
20 345.0 9.96E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00002\C1, 3_I1sv00000 - s4bot v.csv

Vibration, Dynamics & Noise Page 207 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.6

Transfer Function TP: 415 Flange (v) [Hit 415] (v)


0.018
Channel: 4
Date: May 28, 2016 09:13
1 Setup:
Note:
23
0.015
Freq. Amplitude
# Hz ips / lbf
1 74.7 1.58E-02
2 75.9 1.50E-02
0.012 3 77.5 1.50E-02
4 80.9 4.35E-03
5 94.4 3.70E-03
Amplitude (ips / lbf)

6 88.8 3.49E-03
7 284.4 3.37E-03
0.009 8 285.3 3.33E-03
9 83.4 3.26E-03
10 69.1 3.12E-03
11 247.5 3.08E-03
12 95.3 2.41E-03
0.006 13 66.9 2.31E-03
14 242.2 2.25E-03
4 15 293.4 2.22E-03
6 5 78 16 96.9 2.18E-03
10 9 11 17 194.4 2.15E-03
0.003 12 18 58.4 2.09E-03
13
18 20
19 16 17 14 15
19 66.3 2.09E-03
20 65.6 1.95E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00002\H1, 4_I1sv00000 - s4bot v.csv

Transfer Function TP: 415 Flange (v) [Hit 415] (v)


200
Channel: 4
11 7
Date: May 28, 2016 09:13
160 8 Setup:
Note:
15

120 Freq. Phase


18 # Hz degrees
20
1910 1 74.7 28
80 13 2 75.9 0
3 77.5 -33
4 80.9 -65
40 1 5 94.4 -69
Phase (degrees)

6 88.8 -53
2 7 284.4 177
0 8 285.3 155
9 83.4 -71
3 10 69.1 83
-40 6 11 247.5 177
4 5 12 95.3 -78
9
12
16 13 66.9 77
-80 14 242.2 -146
15 293.4 133
16 96.9 -79
-120 17 194.4 -149
17 14 18 58.4 97
19 66.3 82
-160
20 65.6 83

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00002\H1, 4_I1sv00000 - s4bot v.csv

Coherence TP: 415 Flange (v) [Hit 415] (v)


Channel: 4 10 123 49 6 12
516 17 1411 78 15
1.00 18
19
Date: May 28, 2016 09:13
0.90 20 Setup:
Note:
13

0.80 Freq. Magnitude


#Hz
1 74.7 9.98E-01
0.70 2 75.9 9.96E-01
3 77.5 9.98E-01
4 80.9 9.96E-01
0.60 5 94.4 9.97E-01
6 88.8 9.97E-01
Magnitude

7 284.4 9.99E-01
0.50 8 285.3 9.99E-01
9 83.4 9.97E-01
10 69.1 9.97E-01
0.40 11 247.5 9.87E-01
12 95.3 9.97E-01
13 66.9 8.33E-01
0.30 14 242.2 9.95E-01
15 293.4 9.98E-01
16 96.9 9.96E-01
0.20 17 194.4 9.93E-01
18 58.4 9.66E-01
0.10 19 66.3 9.46E-01
20 65.6 8.76E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00002\C1, 4_I1sv00000 - s4bot v.csv

Vibration, Dynamics & Noise Page 208 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.7

Transfer Function TP: 420 (h) [Hit 420] (h)


0.0060
Channel: 2
Date: May 28, 2016 09:21
1
Setup:
Note:
0.0050 2
3 Freq. Amplitude
# Hz ips / lbf
1 74.7 5.44E-03
2 76.3 4.87E-03
0.0040 3 77.5 4.75E-03
4 56.6 2.74E-03
5 55.9 2.30E-03
Amplitude (ips / lbf)

6 94.1 1.99E-03
7 58.4 1.62E-03
0.0030 8 185.3 1.49E-03
4
9 321.6 1.42E-03
10 53.8 1.28E-03
5 11 83.8 1.07E-03
6 12 57.5 9.85E-04
0.0020 13 59.4 9.78E-04
7 14 95.3 9.58E-04
8 9 15 183.4 8.86E-04
10
16 52.2 8.86E-04
11
12
13 14 17 96.9 8.17E-04
0.0010 16 18 17 15
18 89.1 8.10E-04
20 19
19 51.3 7.69E-04
20 45.3 7.52E-04

0.0000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00003\H1, 2_I1sv00000 - s4bot h.csv

Transfer Function TP: 420 (h) [Hit 420] (h)


200
Channel: 2
4 6
7 9
5 2 Date: May 28, 2016 09:21
160 Setup:
3 Note:
13
120 1118 14
17 Freq. Phase
# Hz degrees
1 74.7 -153
80 2 76.3 168
3 77.5 145
4 56.6 180
40 5 55.9 169
Phase (degrees)

6 94.1 178
7 58.4 174
0 8 185.3 -179
9 321.6 172
10 53.8 -121
-40 11 83.8 110
12 57.5 -165
13 59.4 128
-80 14 95.3 111
19 15 183.4 -141
16
20 10 16 52.2 -114
-120 17 96.9 109
15
1
18 89.1 109
19 51.3 -108
-160 12
8 20 45.3 -123

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00003\H1, 2_I1sv00000 - s4bot h.csv

Coherence TP: 420 (h) [Hit 420] (h)


Channel: 2 19
1012
16 547 123 1118 14
617 158 9
1.00
20
Date: May 28, 2016 09:21
0.90 Setup:
Note:
13
0.80 Freq. Magnitude
#Hz
1 74.7 9.97E-01
0.70 2 76.3 9.95E-01
3 77.5 9.93E-01
4 56.6 9.99E-01
0.60 5 55.9 9.98E-01
6 94.1 9.91E-01
Magnitude

7 58.4 9.89E-01
0.50 8 185.3 9.97E-01
9 321.6 9.97E-01
10 53.8 9.98E-01
0.40 11 83.8 9.94E-01
12 57.5 9.98E-01
13 59.4 8.13E-01
0.30 14 95.3 9.94E-01
15 183.4 9.93E-01
16 52.2 9.97E-01
0.20 17 96.9 9.95E-01
18 89.1 9.95E-01
0.10 19 51.3 9.98E-01
20 45.3 9.60E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00003\C1, 2_I1sv00000 - s4bot h.csv

Vibration, Dynamics & Noise Page 209 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.8

Transfer Function TP: 415 (h) [Hit 420] (h)


0.0080
Channel: 3
Date: May 28, 2016 09:21
Setup:
0.0070 1 Note:

23 Freq. Amplitude
# Hz ips / lbf
0.0060 1 74.7 6.87E-03
2 76.3 6.23E-03
3 77.5 6.17E-03
0.0050 4 56.6 3.06E-03
5 55.9 2.75E-03
Amplitude (ips / lbf)

6 321.6 2.27E-03
7 450.3 1.86E-03
0.0040 8 449.4 1.85E-03
9 58.4 1.74E-03
10 94.4 1.67E-03
4 11 448.1 1.66E-03
0.0030 5 12 83.8 1.44E-03
13 53.8 1.41E-03
6
14 455.0 1.29E-03
0.0020 9
87 15 408.4 1.25E-03
10 11 16 404.1 1.25E-03
13 12
14 17 395.6 1.22E-03
20 1618
17 15 19
18 406.9 1.19E-03
0.0010 19 446.3 1.18E-03
20 396.9 1.18E-03

0.0000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00003\H1, 3_I1sv00000 - s4bot h.csv

Transfer Function TP: 415 (h) [Hit 420] (h)


200
Channel: 3
49 20 8
5 2 Date: May 28, 2016 09:21
16 7 Setup:
160 18
3 15 Note:
14
120 10 Freq. Phase
12 # Hz degrees
1 74.7 -154
80 2 76.3 167
3 77.5 144
4 56.6 177
40 5 55.9 165
Phase (degrees)

6 321.6 -13
7 450.3 160
0 6 8 449.4 174
9 58.4 174
10 94.4 115
-40 11 448.1 -169
12 83.8 105
13 53.8 -120
-80 14 455.0 129
15 408.4 141
13 16 404.1 157
-120 17 395.6 -175
19 18 406.9 147
1
19 446.3 -149
-160 11
17 20 396.9 173

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00003\H1, 3_I1sv00000 - s4bot h.csv

Coherence TP: 415 (h) [Hit 420] (h)


Channel: 3 13549 123 12 10 6 20 1618
17 15
1.00 1187 14
19

Date: May 28, 2016 09:21


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 74.7 9.97E-01
0.70 2 76.3 9.95E-01
3 77.5 9.93E-01
4 56.6 9.99E-01
0.60 5 55.9 9.98E-01
6 321.6 9.98E-01
Magnitude

7 450.3 9.86E-01
0.50 8 449.4 9.81E-01
9 58.4 9.89E-01
10 94.4 9.96E-01
0.40 11 448.1 9.80E-01
12 83.8 9.96E-01
13 53.8 9.97E-01
0.30 14 455.0 9.86E-01
15 408.4 9.94E-01
16 404.1 9.94E-01
0.20 17 395.6 9.95E-01
18 406.9 9.97E-01
0.10 19 446.3 9.77E-01
20 396.9 9.91E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00003\C1, 3_I1sv00000 - s4bot h.csv

Vibration, Dynamics & Noise Page 210 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.9

Transfer Function TP: 414 (h) [Hit 420] (h)


0.011
Channel: 4
Date: May 28, 2016 09:21
0.010 1 Setup:
Note:
0.009 Freq. Amplitude
# Hz ips / lbf
0.008 1 45.9 9.66E-03
2 53.8 6.85E-03
3 94.1 5.85E-03
0.007 2 4 55.9 4.31E-03
5 47.2 4.10E-03
Amplitude (ips / lbf)

6 131.6 4.04E-03
0.006 3
7 67.2 3.75E-03
8 321.6 3.42E-03
0.005 9 89.1 2.73E-03
4
10 129.4 2.64E-03
5 6 11 121.9 2.38E-03
0.004 7 12 123.4 2.24E-03
8 13 60.3 2.01E-03
0.003 14 185.0 1.73E-03
9 10 15 57.5 1.63E-03
11
12 16 52.5 1.53E-03
13
0.002 14 17 95.3 1.52E-03
1615
18 17 18 50.3 1.39E-03
20 19
19 58.4 1.31E-03
0.001 20 50.9 1.28E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00003\H1, 4_I1sv00000 - s4bot h.csv

Transfer Function TP: 414 (h) [Hit 420] (h)


200
Channel: 4
12
11
Date: May 28, 2016 09:21
19 10
160 Setup:
Note:
17 6
120 1
Freq. Phase
# Hz degrees
1 45.9 107
80 2 53.8 -174
3 94.1 -168
7 4 55.9 -36
40 13 5 47.2 14
Phase (degrees)

5 14 8 6 131.6 129
7 67.2 46
0 8 321.6 14
9 89.1 -54
4 10 129.4 161
-40 9 11 121.9 178
12 123.4 180
13 60.3 30
-80 18 14 185.0 18
20 15 57.5 -154
16 52.5 -126
-120 16
17 95.3 126
18 50.3 -92
15
19 58.4 157
-160 3
2 20 50.9 -104

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00003\H1, 4_I1sv00000 - s4bot h.csv

Coherence TP: 414 (h) [Hit 420] (h)


Channel: 4 4
16215
20 3 12 6
11 14 8
1.00 15
18 19 9
17
10
Date: May 28, 2016 09:21
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 45.9 9.68E-01
0.70 13
2 53.8 9.96E-01
3 94.1 9.91E-01
4 55.9 9.98E-01
0.60 5 47.2 9.74E-01
6 131.6 9.94E-01
Magnitude

7 67.2 2.78E-01
0.50 8 321.6 9.96E-01
9 89.1 9.72E-01
10 129.4 9.57E-01
0.40 11 121.9 9.93E-01
12 123.4 9.97E-01
13 60.3 6.66E-01
0.30 7 14 185.0 9.98E-01
15 57.5 9.95E-01
16 52.5 9.88E-01
0.20 17 95.3 9.86E-01
18 50.3 9.84E-01
0.10 19 58.4 9.84E-01
20 50.9 9.92E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00003\C1, 4_I1sv00000 - s4bot h.csv

Vibration, Dynamics & Noise Page 211 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.10

Transfer Function TP: 320 (a) [Hit 320] (a)


0.020
Channel: 2
Date: May 28, 2016 09:24
0.018 Setup:
1
Note:

0.016 Freq. Amplitude


2
# Hz ips / lbf
1 112.8 1.74E-02
0.014 2 83.1 1.47E-02
3 59.1 8.05E-03
4 157.5 6.50E-03
0.012 5 75.9 6.46E-03
Amplitude (ips / lbf)

6 62.2 6.23E-03
7 165.0 6.22E-03
0.010 8 159.7 6.17E-03
9 159.1 6.06E-03
3 10 260.6 5.99E-03
0.008 11 166.6 5.42E-03
5 4
12 66.9 5.19E-03
6 98 7 10 13 56.6 4.98E-03
0.006 11 14 30.9 4.90E-03
14 13 12
15 144.4 4.35E-03
15
16 30.0 3.03E-03
0.004 17 257.2 2.90E-03
16 17
18
20 19 18 77.2 2.65E-03
19 140.9 2.55E-03
0.002
20 77.8 2.48E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00004\H1, 2_I1sv00000 - s3bot a.csv

Transfer Function TP: 320 (a) [Hit 320] (a)


200
Channel: 2
Date: May 28, 2016 09:24
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 112.8 11
80 2 83.1 5
16 13 3 59.1 -10
4 157.5 12
40 14 19 17 5 75.9 12
Phase (degrees)

6 62.2 -10
12 5 1 15
4
2 7 165.0 -35
0 18
20
36 9 8 159.7 -17
8
10 9 159.1 -8
7 10 260.6 -27
-40 11 166.6 -62
11 12 66.9 10
13 56.6 57
-80 14 30.9 27
15 144.4 7
16 30.0 60
-120 17 257.2 29
18 77.2 -2
19 140.9 28
-160
20 77.8 -3

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00004\H1, 2_I1sv00000 - s3bot a.csv

Coherence TP: 320 (a) [Hit 320] (a)


Channel:
14 2
16 13 6 2 1 1915 498 11
7 1710
1.00 5

3 18 Date: May 28, 2016 09:24


0.90 Setup:
Note:

0.80 Freq. Magnitude


20 #Hz
1 112.8 9.97E-01
0.70 2 83.1 9.97E-01
3 59.1 9.24E-01
4 157.5 9.99E-01
0.60 5 75.9 9.81E-01
6 62.2 9.86E-01
Magnitude

12 7 165.0 9.98E-01
0.50 8 159.7 9.96E-01
9 159.1 9.96E-01
10 260.6 9.88E-01
0.40 11 166.6 9.99E-01
12 66.9 5.16E-01
13 56.6 9.98E-01
0.30 14 30.9 9.96E-01
15 144.4 9.96E-01
16 30.0 9.95E-01
0.20 17 257.2 9.91E-01
18 77.2 9.15E-01
0.10 19 140.9 9.89E-01
20 77.8 7.46E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00004\C1, 2_I1sv00000 - s3bot a.csv

Vibration, Dynamics & Noise Page 212 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.11

Transfer Function TP: 315 (a) [Hit 320] (a)


0.014
Channel: 3
Date: May 28, 2016 09:24
1 Setup:
0.012 Note:

Freq. Amplitude
# Hz ips / lbf
1 83.1 1.24E-02
0.010 2 59.1 8.26E-03
3 30.9 8.13E-03
4 260.0 6.84E-03
3 2 5 56.6 5.54E-03
Amplitude (ips / lbf)

0.008 6 112.8 5.09E-03


7 62.2 4.99E-03
4
8 33.8 4.22E-03
9 75.9 4.18E-03
0.006 5 10 66.9 3.85E-03
7 6 11 332.2 3.45E-03
12 467.8 3.09E-03
8 9 13 34.4 3.07E-03
0.004 10 14 341.3 2.99E-03
11 15 340.6 2.94E-03
13 14
15 12
16 88.8 2.48E-03
16 17 17 346.3 2.40E-03
18 20 19
0.002 18 32.8 2.31E-03
19 344.1 2.31E-03
20 89.7 2.27E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00004\H1, 3_I1sv00000 - s3bot a.csv

Transfer Function TP: 315 (a) [Hit 320] (a)


200
Channel: 3
11
15 Date: May 28, 2016 09:24
160 14 Setup:
Note:
19 12
17
120 Freq. Phase
# Hz degrees
1 83.1 1
80 2 59.1 -19
3 30.9 21
5 4 260.0 -171
40 5 56.6 43
Phase (degrees)

3 6 112.8 2
6 7 62.2 -17
0 10 9 1
8 8 33.8 -9
18 27 9 75.9 0
13
10 66.9 -3
-40 11 332.2 178
16
12 467.8 134
20 13 34.4 -43
-80 14 341.3 156
15 340.6 167
16 88.8 -71
-120 17 346.3 127
18 32.8 -22
19 344.1 134
-160 4 20 89.7 -77

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00004\H1, 3_I1sv00000 - s3bot a.csv

Coherence TP: 315 (a) [Hit 320] (a)


Channel:31813
83 5 7 1 16
20 6 4 11
1.00 9 17
1419
15
2 Date: May 28, 2016 09:24
0.90 Setup:
Note:
12
0.80 Freq. Magnitude
#Hz
1 83.1 9.97E-01
0.70 2 59.1 9.31E-01
3 30.9 9.96E-01
4 260.0 9.94E-01
0.60 5 56.6 9.97E-01
6 112.8 9.97E-01
Magnitude

10 7 62.2 9.85E-01
0.50 8 33.8 9.97E-01
9 75.9 9.80E-01
10 66.9 5.18E-01
0.40 11 332.2 9.90E-01
12 467.8 8.10E-01
13 34.4 9.93E-01
0.30 14 341.3 9.71E-01
15 340.6 9.62E-01
16 88.8 9.99E-01
0.20 17 346.3 9.80E-01
18 32.8 9.84E-01
0.10 19 344.1 9.68E-01
20 89.7 9.99E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00004\C1, 3_I1sv00000 - s3bot a.csv

Vibration, Dynamics & Noise Page 213 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.12

Transfer Function TP: 315 Flange (a) [Hit 320] (a)


0.012
Channel: 4
Date: May 28, 2016 09:24
1 Setup:
Note:
0.010 2
Freq. Amplitude
3 # Hz ips / lbf
4
1 83.1 1.06E-02
2 30.9 9.85E-03
0.008 5 3 59.1 9.13E-03
4 112.8 8.96E-03
5 56.6 7.79E-03
Amplitude (ips / lbf)

6 33.8 5.24E-03
7 157.2 4.88E-03
0.006 8 144.1 4.72E-03
6 9 165.0 4.61E-03
8
7 10 159.1 4.34E-03
9
10
11 11 159.7 4.34E-03
12 12 34.4 3.98E-03
0.004 13 13 166.6 3.77E-03
14 14 60.3 3.35E-03
15
16 15 260.3 3.08E-03
17 18
19 20 16 32.8 2.89E-03
17 57.5 2.74E-03
0.002 18 140.6 2.69E-03
19 66.9 2.50E-03
20 88.8 2.47E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00004\H1, 4_I1sv00000 - s3bot a.csv

Transfer Function TP: 315 Flange (a) [Hit 320] (a)


200
Channel: 4
11 15 Date: May 28, 2016 09:24
160 9 Setup:
Note:
13
120 Freq. Phase
# Hz degrees
1 83.1 2
80 2 30.9 20
3 59.1 -26
4 112.8 -165
40 5 5 56.6 34
Phase (degrees)

2 6 33.8 -10
1 7 157.2 -155
0 6
17 8 144.1 -155
16 3 19 9 165.0 152
10 159.1 -179
-40 12
11 159.7 172
20
12 34.4 -44
14
13 166.6 122
-80 14 60.3 -72
15 260.3 173
18 16 32.8 -25
-120 17 57.5 -5
18 140.6 -120
8 7
19 66.9 -29
-160 4
10 20 88.8 -70

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00004\H1, 4_I1sv00000 - s3bot a.csv

Coherence TP: 315 Flange (a) [Hit 320] (a)


Channel:21612
64 5 1 20 4 188 710
11 13
9
1.00 17 15
3
Date: May 28, 2016 09:24
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
14 1 83.1 9.97E-01
0.70 2 30.9 9.96E-01
3 59.1 9.40E-01
4 112.8 9.97E-01
0.60 5 56.6 9.97E-01
19 6 33.8 9.97E-01
Magnitude

7 157.2 9.98E-01
0.50 8 144.1 9.98E-01
9 165.0 9.98E-01
10 159.1 9.96E-01
0.40 11 159.7 9.95E-01
12 34.4 9.93E-01
13 166.6 9.99E-01
0.30 14 60.3 7.08E-01
15 260.3 9.84E-01
16 32.8 9.85E-01
0.20 17 57.5 9.83E-01
18 140.6 9.98E-01
0.10 19 66.9 5.39E-01
20 88.8 9.99E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00004\C1, 4_I1sv00000 - s3bot a.csv

Vibration, Dynamics & Noise Page 214 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.13

Transfer Function TP: 320 (v) [Hit 320] (v)


0.012
Channel: 2
Date: May 28, 2016 09:26
Setup:
Note:
1
0.010
Freq. Amplitude
# Hz ips / lbf
1 106.3 1.00E-02
2 250.6 5.00E-03
0.008 3 262.5 4.30E-03
4 264.7 4.05E-03
5 114.1 3.93E-03
Amplitude (ips / lbf)

6 248.4 3.92E-03
7 263.4 3.83E-03
0.006 8 257.2 3.80E-03
9 257.8 3.76E-03
2 10 465.9 3.76E-03
3
11 259.4 3.69E-03
5 6 4 12 265.6 3.61E-03
0.004 9 712
811 10 13 227.5 3.49E-03
18 14 13
15 16 19
17
20 14 113.1 3.45E-03
15 226.6 3.43E-03
16 260.3 3.39E-03
17 258.8 3.35E-03
0.002 18 103.8 3.34E-03
19 267.2 3.27E-03
20 225.3 3.23E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00005\H1, 2_I1sv00000 - s3bot v.csv

Transfer Function TP: 320 (v) [Hit 320] (v)


200
Channel: 2
Date: May 28, 2016 09:26
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 106.3 5
80 2 250.6 19
18 3 262.5 -26
4 264.7 -34
6
40 20 5 114.1 -30
Phase (degrees)

15 2 6 248.4 38
1 7 263.4 -47
0 14 13 8
8 257.2 -4
916 9 257.8 -21
5 173
11 4
10 465.9 -156
-40 712 11 259.4 -32
19
12 265.6 -48
13 227.5 -4
-80 14 113.1 -2
15 226.6 15
16 260.3 -23
-120 17 258.8 -30
18 103.8 60
10
19 267.2 -57
-160
20 225.3 31

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00005\H1, 2_I1sv00000 - s3bot v.csv

Coherence TP: 320 (v) [Hit 320] (v)


Channel: 2
1.00 181 14
5 15
13
20 2
6 17
9
8 Date: May 28, 2016 09:26
11
1612
0.90 419
Setup:
Note:
3
0.80 Freq. Magnitude
#Hz
10 1 106.3 9.84E-01
0.70 7
2 250.6 9.61E-01
3 262.5 8.17E-01
4 264.7 8.75E-01
0.60 5 114.1 9.76E-01
6 248.4 9.48E-01
Magnitude

7 263.4 6.67E-01
0.50 8 257.2 9.19E-01
9 257.8 9.38E-01
10 465.9 7.18E-01
0.40 11 259.4 9.02E-01
12 265.6 9.00E-01
13 227.5 9.61E-01
0.30 14 113.1 9.79E-01
15 226.6 9.75E-01
16 260.3 9.00E-01
0.20 17 258.8 9.42E-01
18 103.8 9.84E-01
0.10 19 267.2 8.66E-01
20 225.3 9.60E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00005\C1, 2_I1sv00000 - s3bot v.csv

Vibration, Dynamics & Noise Page 215 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.14

Transfer Function TP: 315 (v) [Hit 320] (v)


0.0090
Channel: 3
Date: May 28, 2016 09:26
Setup:
0.0080 1
Note:

Freq. Amplitude
0.0070 # Hz ips / lbf
1 106.3 7.84E-03
2 250.6 5.16E-03
0.0060 3 114.1 4.35E-03
4 248.4 4.28E-03
5 257.2 2.74E-03
Amplitude (ips / lbf)

2
0.0050 6 257.8 2.71E-03
7 262.5 2.68E-03
3 4 8 103.8 2.50E-03
0.0040 9 263.4 2.36E-03
10 259.4 2.29E-03
11 264.7 2.23E-03
12 260.3 2.12E-03
0.0030 56 7 13 261.3 1.98E-03
8 14 265.6 1.92E-03
10911
12
1314
15 274.7 1.86E-03
0.0020 15 16 267.2 1.66E-03
19 18 16 17
20 17 465.9 1.65E-03
18 227.8 1.63E-03
0.0010 19 46.3 1.57E-03
20 266.6 1.55E-03

0.0000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00005\H1, 3_I1sv00000 - s3bot v.csv

Transfer Function TP: 315 (v) [Hit 320] (v)


200
Channel: 3
Date: May 28, 2016 09:26
3 Setup:
160
18 Note:

120 Freq. Phase


# Hz degrees
1 106.3 -176
80 2 250.6 21
3 114.1 159
4 4 248.4 44
40 5 257.2 -10
Phase (degrees)

2 6 257.8 -26
19 7 262.5 -34
0 5 8 103.8 -119
612
13
9 263.4 -54
107 10 259.4 -35
-40 11 15
914
20
11 264.7 -44
16 12 260.3 -27
13 261.3 -29
-80 14 265.6 -56
15 274.7 -43
8 16 267.2 -64
-120 17 465.9 -161
18 227.8 137
17 19 46.3 0
-160
1 20 266.6 -56

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00005\H1, 3_I1sv00000 - s3bot v.csv

Coherence TP: 315 (v) [Hit 320] (v)


Channel: 3
1.00 81
3
19 18 42
612 15
510 14 Date: May 28, 2016 09:26
1116 Setup:
0.90
20 Note:
7
13
0.80 Freq. Magnitude
17 #Hz
9 1 106.3 9.84E-01
0.70 2 250.6 9.61E-01
3 114.1 9.68E-01
4 248.4 9.53E-01
0.60 5 257.2 9.18E-01
6 257.8 9.41E-01
Magnitude

7 262.5 8.35E-01
0.50 8 103.8 9.86E-01
9 263.4 7.16E-01
10 259.4 9.28E-01
0.40 11 264.7 8.95E-01
12 260.3 9.32E-01
13 261.3 8.18E-01
0.30 14 265.6 9.12E-01
15 274.7 9.38E-01
16 267.2 8.95E-01
0.20 17 465.9 7.39E-01
18 227.8 9.53E-01
0.10 19 46.3 9.60E-01
20 266.6 8.61E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00005\C1, 3_I1sv00000 - s3bot v.csv

Vibration, Dynamics & Noise Page 216 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.15

Transfer Function TP: 315 Flange (v) [Hit 320] (v)


0.015
Channel: 4

0.014 Date: May 28, 2016 09:26


1 Setup:
0.013 Note:

0.012 Freq. Amplitude


# Hz ips / lbf
0.011 1 106.3 1.33E-02
2 114.1 6.21E-03
0.010 3 103.8 3.86E-03
4 250.6 2.36E-03
0.009 5 83.1 2.06E-03
Amplitude (ips / lbf)

6 248.4 1.93E-03
0.008 7 66.9 1.83E-03
8 117.8 1.81E-03
0.007 9 82.5 1.70E-03
2 10 110.3 1.66E-03
0.006 11 118.4 1.66E-03
12 70.0 1.61E-03
0.005 13 46.3 1.40E-03
3 14 177.5 1.24E-03
0.004 15 257.8 1.21E-03
16 257.2 1.21E-03
0.003 17 120.9 1.20E-03
4
5 6 18 325.3 1.19E-03
0.002 7
12 9 8
10 11
19 256.6 1.17E-03
13 14
20 17 16
15
19 18
0.001 20 59.1 1.14E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00005\H1, 4_I1sv00000 - s3bot v.csv

Transfer Function TP: 315 Flange (v) [Hit 320] (v)


200
Channel: 4
Date: May 28, 2016 09:26
2 Setup:
160
10 Note:

120 Freq. Phase


817
11 # Hz degrees
1 106.3 -177
80 14 2 114.1 158
3 103.8 -115
6 4 250.6 21
40 5 83.1 -170
Phase (degrees)

4 6 248.4 44
7 66.9 -73
0 13
19
16
8 117.8 103
9 82.5 -127
15
12 10 110.3 140
-40 11 118.4 101
12 70.0 -40
7
13 46.3 -3
-80 14 177.5 69
15 257.8 -31
3 16 257.2 -16
-120 9
17 120.9 102
18 325.3 -165
20 19 256.6 -13
-160 5 18
1 20 59.1 -158

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00005\H1, 4_I1sv00000 - s3bot v.csv

Coherence TP: 315 Flange (v) [Hit 320] (v)


Channel: 4 95
1.00 3110 17
8
211
13 64 19
15
16 Date: May 28, 2016 09:26
0.90 12 14 18 Setup:
Note:

0.80 Freq. Magnitude


#Hz
20 1 106.3 9.84E-01
0.70 2 114.1 9.68E-01
3 103.8 9.85E-01
4 250.6 9.57E-01
0.60 5 83.1 9.97E-01
6 248.4 9.57E-01
Magnitude

7 66.9 1.85E-01
0.50 8 117.8 9.73E-01
9 82.5 9.92E-01
10 110.3 9.82E-01
0.40 11 118.4 9.66E-01
12 70.0 8.84E-01
13 46.3 9.60E-01
0.30 14 177.5 8.90E-01
15 257.8 9.39E-01
16 257.2 9.14E-01
0.20 7
17 120.9 9.75E-01
18 325.3 8.93E-01
0.10 19 256.6 9.50E-01
20 59.1 7.10E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00005\C1, 4_I1sv00000 - s3bot v.csv

Vibration, Dynamics & Noise Page 217 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.16

Transfer Function TP: 320 (h) [Hit 320] (h)


0.0090
Channel: 2
Date: May 28, 2016 09:29
Setup:
0.0080 1 Note:

Freq. Amplitude
0.0070 # Hz ips / lbf
1 106.3 7.75E-03
2 420.0 3.53E-03
0.0060 3 424.1 3.50E-03
4 421.3 3.50E-03
5 422.5 3.49E-03
Amplitude (ips / lbf)

0.0050 6 418.4 3.42E-03


7 416.3 3.40E-03
8 433.4 3.38E-03
0.0040 9 417.2 3.36E-03
23
10 419.1 3.36E-03
12 791604513
14 11 8 11 425.9 3.36E-03
17
20 18 15
19 16
12 114.1 3.33E-03
0.0030 13 424.7 3.29E-03
14 415.6 3.29E-03
15 450.6 3.23E-03
0.0020 16 460.3 3.22E-03
17 414.1 3.22E-03
18 427.2 3.22E-03
0.0010 19 451.6 3.21E-03
20 414.7 3.20E-03

0.0000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00006\H1, 2_I1sv00000 - s3bot h.csv

Transfer Function TP: 320 (h) [Hit 320] (h)


200
Channel: 2
Date: May 28, 2016 09:29
160 Setup:
12
Note:

120 Freq. Phase


# Hz degrees
1 106.3 -172
80 2 420.0 -108
3 424.1 -104
4 421.3 -109
40 5 422.5 -108
Phase (degrees)

6 418.4 -105
7 416.3 -108
0 8 433.4 -87
9 417.2 -104
10 419.1 -105
-40 19 16
15 11 425.9 -102
12 114.1 148
13 424.7 -103
-80 8
14 415.6 -111
18
311
7916204513
14
20
15 450.6 -54
17
16 460.3 -48
-120 17 414.1 -114
18 427.2 -100
19 451.6 -50
-160 1 20 414.7 -112

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00006\H1, 2_I1sv00000 - s3bot h.csv

Coherence TP: 320 (h) [Hit 320] (h)


Channel: 2 1
1.00 12
Date: May 28, 2016 09:29
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
762 16 1 106.3 9.94E-01
20
17
0.70 14910 2 420.0 6.99E-01
45 15 3 424.1 6.31E-01
3 19
13
18
4 421.3 6.56E-01
0.60 11 5 422.5 6.61E-01
8 6 418.4 7.10E-01
Magnitude

7 416.3 7.02E-01
0.50 8 433.4 5.48E-01
9 417.2 6.87E-01
10 419.1 6.80E-01
0.40 11 425.9 5.88E-01
12 114.1 9.68E-01
13 424.7 6.05E-01
0.30 14 415.6 6.87E-01
15 450.6 6.51E-01
16 460.3 7.05E-01
0.20 17 414.1 6.93E-01
18 427.2 6.00E-01
0.10 19 451.6 6.28E-01
20 414.7 6.97E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00006\C1, 2_I1sv00000 - s3bot h.csv

Vibration, Dynamics & Noise Page 218 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.17

Transfer Function TP: Cylinder 2 (v) [Hit Cylinder 2] (v)


0.0030
Channel: 2
Date: May 29, 2016 08:44
1
0.0027 2 Setup:
Note:

0.0024 Freq. Amplitude


# Hz ips / lbf
1 55.0 2.71E-03
0.0021 2 55.9 2.65E-03
3 51.9 1.26E-03
4 58.4 1.19E-03
0.0018 5 322.2 1.02E-03
Amplitude (ips / lbf)

6 45.0 9.86E-04
7 60.0 8.81E-04
0.0015 8 43.8 8.80E-04
9 47.5 8.52E-04
3
4 10 59.4 8.35E-04
0.0012 11 76.9 7.92E-04
6 5 12 48.8 7.84E-04
89 7 13 320.0 7.79E-04
0.0009 10
11 14 61.3 7.76E-04
16 12 14
15 13
17 15 61.9 7.71E-04
18 16 42.5 7.57E-04
0.0006 19
20 17 317.5 6.75E-04
18 63.4 5.91E-04
19 66.9 5.14E-04
0.0003
20 64.4 5.00E-04

0.0000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00008\H1, 2_I1sv00000 - Cyl 2 v.csv

Transfer Function TP: Cylinder 2 (v) [Hit Cylinder 2] (v)


200
Channel: 2
Date: May 29, 2016 08:44
160 Setup:
Note:

120 Freq. Phase


16
# Hz degrees
8 1 55.0 8
80 2 55.9 -13
6
3 51.9 45
93 4 58.4 -65
40 12
17 5 322.2 -33
Phase (degrees)

6 45.0 53
1 7 60.0 -60
13
0 2 8 43.8 81
9 47.5 47
5 10 59.4 -54
11
-40 10 11 76.9 -41
14
7 19
415
20 12 48.8 37
18
13 320.0 2
-80 14 61.3 -56
15 61.9 -66
16 42.5 94
-120 17 317.5 31
18 63.4 -73
19 66.9 -58
-160
20 64.4 -67

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00008\H1, 2_I1sv00000 - Cyl 2 v.csv

Coherence TP: Cylinder 2 (v) [Hit Cylinder 2] (v)


Channel: 2 8612
9 3 124 1819 17
135
1.00 16 14
15
11 Date: May 29, 2016 08:44
1020
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
7
1 55.0 9.91E-01
0.70 2 55.9 9.94E-01
3 51.9 9.92E-01
4 58.4 9.85E-01
0.60 5 322.2 9.83E-01
6 45.0 9.91E-01
Magnitude

7 60.0 7.33E-01
0.50 8 43.8 9.85E-01
9 47.5 9.87E-01
10 59.4 9.01E-01
0.40 11 76.9 9.16E-01
12 48.8 9.94E-01
13 320.0 9.89E-01
0.30 14 61.3 9.67E-01
15 61.9 9.63E-01
16 42.5 9.67E-01
0.20 17 317.5 9.91E-01
18 63.4 9.89E-01
0.10 19 66.9 9.84E-01
20 64.4 8.94E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00008\C1, 2_I1sv00000 - Cyl 2 v.csv

Vibration, Dynamics & Noise Page 219 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.18

Transfer Function TP: 414 (h) [Hit 414] (h)


0.13
Channel: 2
Date: May 29, 2016 08:48
0.12 1 Setup:
Note:
0.11
Freq. Amplitude
0.10 # Hz ips / lbf
1 120.6 1.16E-01
2
0.09 2 45.0 9.08E-02
3 52.8 4.01E-02
0.08 4 129.1 4.01E-02
5 116.3 3.54E-02
Amplitude (ips / lbf)

6 127.5 3.49E-02
0.07 7 61.3 3.22E-02
8 60.0 3.05E-02
0.06 9 307.2 2.93E-02
10 62.2 2.72E-02
0.05 11 132.5 2.69E-02
12 58.1 2.68E-02
3 4 13 56.9 2.50E-02
0.04 5 6 14 55.9 2.44E-02
7
8 9 15 88.4 2.39E-02
0.03 1210 11 16 110.0 2.25E-02
13
14 15
18 17 16 19
20 17 93.1 2.21E-02
0.02 18 46.6 2.20E-02
19 242.2 2.19E-02
0.01 20 241.6 2.15E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00009\H1, 2_I1sv00000 - 414 h.csv

Transfer Function TP: 414 (h) [Hit 414] (h)


200
Channel: 2
Date: May 29, 2016 08:48
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 120.6 -35
80 2 45.0 -11
3 52.8 12
5 4 129.1 -48
40 16 5 116.3 43
Phase (degrees)

3
6 127.5 -33
7 61.3 -43
0 17
2 14
13 8 60.0 -24
128
15 9 307.2 -32
1 6 20 9
18 7 19 10 62.2 -54
-40 10
4 11 132.5 -65
11 12 58.1 -22
13 56.9 -14
-80 14 55.9 -10
15 88.4 -28
16 110.0 31
-120 17 93.1 -3
18 46.6 -42
19 242.2 -40
-160
20 241.6 -30

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00009\H1, 2_I1sv00000 - 414 h.csv

Coherence TP: 414 (h) [Hit 414] (h)


Channel: 2 16 5 1 6411
1.00 12810
13
218 314 7 1517 20
19
9
Date: May 29, 2016 08:48
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 120.6 9.85E-01
0.70 2 45.0 9.78E-01
3 52.8 9.65E-01
4 129.1 9.79E-01
0.60 5 116.3 9.95E-01
6 127.5 9.88E-01
Magnitude

7 61.3 9.82E-01
0.50 8 60.0 9.77E-01
9 307.2 9.57E-01
10 62.2 9.88E-01
0.40 11 132.5 9.83E-01
12 58.1 9.80E-01
13 56.9 9.78E-01
0.30 14 55.9 9.76E-01
15 88.4 9.83E-01
16 110.0 9.90E-01
0.20 17 93.1 9.84E-01
18 46.6 9.66E-01
0.10 19 242.2 9.78E-01
20 241.6 9.82E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00009\C1, 2_I1sv00000 - 414 h.csv

Vibration, Dynamics & Noise Page 220 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.19

Transfer Function TP: 412 (h) [Hit 414] (h)


0.14
Channel: 3
Date: May 29, 2016 08:48
Setup:
0.12 1 Note:

Freq. Amplitude
# Hz ips / lbf
1 120.6 1.18E-01
0.10 2 45.3 4.99E-02
3 129.1 4.43E-02
4 116.3 4.29E-02
5 93.4 3.77E-02
Amplitude (ips / lbf)

0.08 6 127.5 3.33E-02


7 132.5 3.17E-02
8 195.9 2.66E-02
9 242.2 2.62E-02
0.06 10 241.6 2.62E-02
2
11 240.0 2.37E-02
12 88.4 2.22E-02
3
4 13 109.7 2.20E-02
0.04 5 14 140.9 2.00E-02
67 15 179.1 2.00E-02
8 10
9 16 237.5 1.90E-02
12 13 11 17 425.9 1.88E-02
0.02 18 1914 15 16 17
20 18 48.1 1.84E-02
19 137.8 1.84E-02
20 424.1 1.82E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00009\H1, 3_I1sv00000 - 414 h.csv

Transfer Function TP: 412 (h) [Hit 414] (h)


200
Channel: 3
Date: May 29, 2016 08:48
160 6 Setup:
1
3 Note:
7 1914
120 Freq. Phase
# Hz degrees
1 120.6 148
80 2 45.3 -55
3 129.1 138
16
4 116.3 -132
40 5 93.4 -71
Phase (degrees)

15 11
6 127.5 156
20
7 132.5 120
0 10 17 8 195.9 -76
9 9 242.2 -24
12 10 241.6 -12
-40 2 11 240.0 12
5
12 88.4 -42
18 8 13 109.7 -106
-80 14 140.9 117
13 15 179.1 15
16 237.5 39
-120 4 17 425.9 -12
18 48.1 -78
19 137.8 123
-160
20 424.1 10

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00009\H1, 3_I1sv00000 - 414 h.csv

Coherence TP: 412 (h) [Hit 414] (h)


Channel: 3 12 5 13 4 6 19 15 1611
1.00 218 1 3 7 14
8 10
9
Date: May 29, 2016 08:48
0.90 17 Setup:
20
Note:

0.80 Freq. Magnitude


#Hz
1 120.6 9.85E-01
0.70 2 45.3 9.79E-01
3 129.1 9.77E-01
4 116.3 9.95E-01
0.60 5 93.4 9.91E-01
6 127.5 9.90E-01
Magnitude

7 132.5 9.78E-01
0.50 8 195.9 9.68E-01
9 242.2 9.69E-01
10 241.6 9.78E-01
0.40 11 240.0 9.88E-01
12 88.4 9.86E-01
13 109.7 9.98E-01
0.30 14 140.9 9.82E-01
15 179.1 9.90E-01
16 237.5 9.92E-01
0.20 17 425.9 8.94E-01
18 48.1 9.81E-01
0.10 19 137.8 9.89E-01
20 424.1 8.76E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00009\C1, 3_I1sv00000 - 414 h.csv

Vibration, Dynamics & Noise Page 221 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.20

Transfer Function TP: 414B (h) [Hit 414] (h)


0.026
Channel: 4
Date: May 29, 2016 08:48
0.024 Setup:
1 Note:
0.022
Freq. Amplitude
0.020 # Hz ips / lbf
1 120.6 2.20E-02
0.018 2 45.0 1.54E-02
3 425.9 1.37E-02
0.016 4 241.6 1.35E-02
2
5 242.2 1.33E-02
Amplitude (ips / lbf)

6 240.0 1.25E-02
0.014 45 3
7 424.1 1.18E-02
6 8 422.8 1.07E-02
0.012 7
9 418.1 9.04E-03
8 10 418.8 8.96E-03
0.010 11 428.8 8.19E-03
9
10 12 129.1 8.15E-03
12 11 13 416.3 7.59E-03
0.008 14 13
15 14 52.8 7.54E-03
16
15 127.5 6.69E-03
0.006 17
18
20 19 16 132.5 5.74E-03
17 59.7 5.72E-03
0.004 18 59.1 5.64E-03
19 216.9 5.49E-03
0.002 20 61.3 5.46E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00009\H1, 4_I1sv00000 - 414 h.csv

Transfer Function TP: 414B (h) [Hit 414] (h)


200
Channel: 4
Date: May 29, 2016 08:48
160 Setup:
Note:

120 13 Freq. Phase


# Hz degrees
1 120.6 -35
80 9 2 45.0 -19
10 3 425.9 -10
4 241.6 -37
40 8 5 242.2 -48
Phase (degrees)

6 240.0 -10
14 7 7 424.1 8
0 6 3 8 422.8 32
2 9 418.1 77
18 15
17 1 4 11 10 418.8 59
19
-40 20 12 5 11 428.8 -39
16 12 129.1 -47
13 416.3 110
-80 14 52.8 10
15 127.5 -30
16 132.5 -64
-120 17 59.7 -39
18 59.1 -26
19 216.9 -41
-160
20 61.3 -45

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00009\H1, 4_I1sv00000 - 414 h.csv

Coherence TP: 414B (h) [Hit 414] (h)


Channel: 4
1.00 2
14 18
17
1 15
1216
64
5
20 19
Date: May 29, 2016 08:48
9 7311
10
13 Setup:
0.90
8 Note:

0.80 Freq. Magnitude


#Hz
1 120.6 9.85E-01
0.70 2 45.0 9.78E-01
3 425.9 9.06E-01
4 241.6 9.79E-01
0.60 5 242.2 9.74E-01
6 240.0 9.88E-01
Magnitude

7 424.1 8.85E-01
0.50 8 422.8 8.46E-01
9 418.1 8.97E-01
10 418.8 9.00E-01
0.40 11 428.8 8.86E-01
12 129.1 9.76E-01
13 416.3 8.94E-01
0.30 14 52.8 9.65E-01
15 127.5 9.87E-01
16 132.5 9.79E-01
0.20 17 59.7 9.67E-01
18 59.1 9.72E-01
0.10 19 216.9 9.57E-01
20 61.3 9.60E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00009\C1, 4_I1sv00000 - 414 h.csv

Vibration, Dynamics & Noise Page 222 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.21

Transfer Function TP: 414 (a) [Hit 414] (a)


0.12
Channel: 2
Date: May 29, 2016 08:50
1
Setup:
Note:
0.10
Freq. Amplitude
# Hz ips / lbf
1 59.7 1.05E-01
2 240.9 3.74E-02
0.08 3 238.4 3.66E-02
4 88.4 3.38E-02
5 41.6 2.87E-02
Amplitude (ips / lbf)

6 93.1 1.86E-02
7 193.8 1.74E-02
0.06 8 194.4 1.62E-02
9 55.9 1.45E-02
10 179.7 1.44E-02
11 45.0 1.44E-02
12 81.6 1.43E-02
0.04 32 13 44.4 1.43E-02
4 14 38.8 1.42E-02
5 15 64.1 1.38E-02
16 52.8 1.37E-02
17 74.1 1.34E-02
0.02 6 78
18 127.5 1.34E-02
1413
11 169 15 17 12
19 18 10
20 19 55.0 1.31E-02
20 184.7 1.25E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00010\H1, 2_I1sv00000 - 414 a.csv

Transfer Function TP: 414 (a) [Hit 414] (a)


200
Channel: 2
Date: May 29, 2016 08:50
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 59.7 14
80 2 240.9 -29
14 9 3 238.4 9
19
16 4 88.4 -39
40 513 5 41.6 27
Phase (degrees)

1 10 6 93.1 -35
3
7 193.8 -12
0 11
17 18
20 7 8 194.4 -27
8 2
9 55.9 56
12
46 10 179.7 13
-40 11 45.0 -4
15 12 81.6 -32
13 44.4 28
-80 14 38.8 57
15 64.1 -69
16 52.8 45
-120 17 74.1 -10
18 127.5 -8
19 55.0 50
-160
20 184.7 -13

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00010\H1, 2_I1sv00000 - 414 a.csv

Coherence TP: 414 (a) [Hit 414] (a)


Channel: 2145 9 1 15 17 12 4 6
19
16 1020 78 32
1.00 13 18
11
Date: May 29, 2016 08:50
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 59.7 9.95E-01
0.70 2 240.9 9.98E-01
3 238.4 9.96E-01
4 88.4 9.91E-01
0.60 5 41.6 9.95E-01
6 93.1 9.85E-01
Magnitude

7 193.8 9.97E-01
0.50 8 194.4 9.98E-01
9 55.9 9.97E-01
10 179.7 9.97E-01
0.40 11 45.0 9.55E-01
12 81.6 9.94E-01
13 44.4 9.68E-01
0.30 14 38.8 9.96E-01
15 64.1 9.97E-01
16 52.8 9.93E-01
0.20 17 74.1 9.94E-01
18 127.5 9.80E-01
0.10 19 55.0 9.96E-01
20 184.7 9.99E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00010\C1, 2_I1sv00000 - 414 a.csv

Vibration, Dynamics & Noise Page 223 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.22

Transfer Function TP: 412 (a) [Hit 414] (a)


0.012
Channel: 3
Date: May 29, 2016 08:50
1
Setup:
Note:
0.010
Freq. Amplitude
2 # Hz ips / lbf
4 3 1 59.7 1.08E-02
5 2 52.8 8.90E-03
0.008 3 470.0 8.73E-03
4 47.2 8.70E-03
5 465.3 8.32E-03
Amplitude (ips / lbf)

6 41.6 6.09E-03
6 7 88.1 5.82E-03
0.006 7 8 93.1 5.52E-03
8
9 87.2 4.57E-03
10 74.1 4.16E-03
9 11 127.5 4.01E-03
10 12 184.7 3.92E-03
11 12
0.004 14 13
13 240.6 3.84E-03
17 15 16 19 18 20
14 81.6 3.84E-03
15 75.3 3.27E-03
16 185.9 3.22E-03
17 49.4 3.15E-03
0.002 18 321.6 3.14E-03
19 239.1 3.11E-03
20 453.1 3.07E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00010\H1, 3_I1sv00000 - 414 a.csv

Transfer Function TP: 412 (a) [Hit 414] (a)


200
Channel: 3
13 18 Date: May 29, 2016 08:50
12
8 Setup:
160
Note:
16
120 Freq. Phase
5 # Hz degrees
1 59.7 16
80 2 52.8 -164
3 470.0 15
4 47.2 -43
40 5 465.3 104
Phase (degrees)

6 1 6 41.6 20
3
11 7 88.1 -175
0 10 8 93.1 158
9 87.2 -135
15
4
10 74.1 -12
-40 14 11 127.5 0
12 184.7 165
13 240.6 173
-80 14 81.6 -54
17 15 75.3 -32
16 185.9 131
-120 17 49.4 -109
9
20 18 321.6 170
2 19 19 239.1 -163
-160 7 20 453.1 -148

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00010\H1, 3_I1sv00000 - 414 a.csv

Coherence TP: 412 (a) [Hit 414] (a)


Channel: 3 6 4 1 15 14 97
10 12
16 19
13
1.00 2 8 11 18

17 53 Date: May 29, 2016 08:50


20
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 59.7 9.94E-01
0.70 2 52.8 9.80E-01
3 470.0 9.30E-01
4 47.2 9.90E-01
0.60 5 465.3 9.30E-01
6 41.6 9.94E-01
Magnitude

7 88.1 9.91E-01
0.50 8 93.1 9.81E-01
9 87.2 9.95E-01
10 74.1 9.91E-01
0.40 11 127.5 9.74E-01
12 184.7 9.98E-01
13 240.6 9.95E-01
0.30 14 81.6 9.93E-01
15 75.3 9.96E-01
16 185.9 9.94E-01
0.20 17 49.4 9.23E-01
18 321.6 9.72E-01
0.10 19 239.1 9.95E-01
20 453.1 9.15E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00010\C1, 3_I1sv00000 - 414 a.csv

Vibration, Dynamics & Noise Page 224 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.23

Transfer Function TP: 414B (a) [Hit 414] (a)


0.045
Channel: 4
Date: May 29, 2016 08:50
Setup:
0.040 1
Note:

2 Freq. Amplitude
0.035 # Hz ips / lbf
1 59.7 3.92E-02
3
2 88.4 3.49E-02
0.030 3 93.1 3.00E-02
4 41.6 1.43E-02
5 61.6 1.10E-02
Amplitude (ips / lbf)

0.025 6 45.0 9.94E-03


7 127.5 8.46E-03
8 101.3 7.90E-03
0.020 9 76.6 7.10E-03
10 38.8 6.94E-03
11 96.6 6.92E-03
12 321.6 5.95E-03
0.015 4
13 81.9 5.92E-03
14 33.4 5.57E-03
5 15 128.8 5.04E-03
6
0.010 7 16 34.7 4.96E-03
8 17 99.4 4.95E-03
10 9 11
14 13 12 18 78.8 4.84E-03
16 20 1918 17 15
0.005 19 75.3 4.80E-03
20 46.3 4.66E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00010\H1, 4_I1sv00000 - 414 a.csv

Transfer Function TP: 414B (a) [Hit 414] (a)


200
Channel: 4
12
Date: May 29, 2016 08:50
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 59.7 14
80 2 88.4 -35
1410
3 93.1 -31
16 4 41.6 20
40 13 5 61.6 -63
Phase (degrees)

4 19
1 6 45.0 -25
18
7 127.5 -159
0 9 8 101.3 -71
6 9 76.6 -8
23 10 38.8 50
-40 20 11 96.6 -84
5 12 321.6 176
8
11 13 81.9 35
-80 17 14 33.4 54
15 128.8 -161
16 34.7 44
-120 17 99.4 -91
18 78.8 9
7
15 19 75.3 25
-160
20 46.3 -53

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00010\H1, 4_I1sv00000 - 414 a.csv

Coherence TP: 414B (a) [Hit 414] (a)


Channel:14164104 20 15 91813 2 311178
19
1.00 7
15 12
6
Date: May 29, 2016 08:50
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 59.7 9.95E-01
0.70 2 88.4 9.90E-01
3 93.1 9.83E-01
4 41.6 9.95E-01
0.60 5 61.6 9.91E-01
6 45.0 9.62E-01
Magnitude

7 127.5 9.78E-01
0.50 8 101.3 9.99E-01
9 76.6 9.93E-01
10 38.8 9.93E-01
0.40 11 96.6 9.99E-01
12 321.6 9.76E-01
13 81.9 9.96E-01
0.30 14 33.4 9.98E-01
15 128.8 9.74E-01
16 34.7 9.94E-01
0.20 17 99.4 9.98E-01
18 78.8 9.87E-01
0.10 19 75.3 9.96E-01
20 46.3 9.90E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00010\C1, 4_I1sv00000 - 414 a.csv

Vibration, Dynamics & Noise Page 225 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.24

Transfer Function TP: 210 (h) [Hit 210] (h)


0.035
Channel: 2
Date: May 31, 2016 00:03
Setup:
0.030 Note:
1
Freq. Amplitude
2 # Hz ips / lbf
1 35.0 2.87E-02
0.025 2 33.8 2.59E-02
3 224.7 4.86E-03
4 220.6 3.77E-03
5 41.6 3.16E-03
Amplitude (ips / lbf)

0.020 6 216.6 3.09E-03


7 91.9 2.79E-03
8 42.2 2.61E-03
9 500.0 2.42E-03
0.015 10 498.8 2.28E-03
11 25.9 2.06E-03
12 25.0 2.04E-03
13 495.3 2.04E-03
0.010 14 493.8 1.99E-03
15 51.3 1.97E-03
16 48.8 1.97E-03
17 50.0 1.96E-03
3 18 329.1 1.96E-03
0.005 4
5 6 19 330.6 1.95E-03
8 7
12
11 1615
17 18
19 20 13109
14 20 475.0 1.94E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00011\H1, 2_I1sv00000 - 210 h.csv

Transfer Function TP: 210 (h) [Hit 210] (h)


200
Channel: 2
1 19
7 Date: May 31, 2016 00:03
160 Setup:
Note:
16
120 5 17
8
15 Freq. Phase
# Hz degrees
1 35.0 172
80 2 33.8 -121
3 224.7 -157
4 220.6 -161
40 5 41.6 113
Phase (degrees)

6 216.6 -141
7 91.9 168
0 8 42.2 107
9 500.0 -109
10 498.8 -110
-40 11 25.9 -91
12 25.0 -100
13 495.3 -115
-80 11 14 493.8 -115
12
9 15 51.3 113
20 1310
14 16 48.8 132
2
-120 17 50.0 115
6
18 329.1 -174
43 19 330.6 174
-160 18 20 475.0 -114

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00011\H1, 2_I1sv00000 - 210 h.csv

Coherence TP: 210 (h) [Hit 210] (h)


Channel:
11 212 8 1615 7 6 43
1.00 17
12 5 19
18
20 14
1310 Date: May 31, 2016 00:03
9 Setup:
0.90
Note:

0.80 Freq. Magnitude


#Hz
1 35.0 9.93E-01
0.70 2 33.8 9.92E-01
3 224.7 9.93E-01
4 220.6 9.93E-01
0.60 5 41.6 9.55E-01
6 216.6 9.92E-01
Magnitude

7 91.9 9.95E-01
0.50 8 42.2 9.91E-01
9 500.0 8.98E-01
10 498.8 9.12E-01
0.40 11 25.9 9.90E-01
12 25.0 9.55E-01
13 495.3 9.13E-01
0.30 14 493.8 9.21E-01
15 51.3 9.94E-01
16 48.8 9.82E-01
0.20 17 50.0 9.84E-01
18 329.1 9.57E-01
0.10 19 330.6 9.59E-01
20 475.0 9.24E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00011\C1, 2_I1sv00000 - 210 h.csv

Vibration, Dynamics & Noise Page 226 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.25

Transfer Function TP: 210 (a) [Hit 210] (a)


0.0045
Channel: 2
Date: May 31, 2016 00:08
1
Setup:
0.0040 Note:

Freq. Amplitude
0.0035 # Hz ips / lbf
1 71.3 4.06E-03
2 78.1 2.52E-03
0.0030 3 69.1 2.48E-03
4 486.3 2.34E-03
5 487.2 2.34E-03
Amplitude (ips / lbf)

3 2
0.0025 6 485.6 2.31E-03
45 7 484.7 2.26E-03
769 8
121011 8 491.3 2.26E-03
13
14
15
0.0020 16 20 17
18
19 9 488.1 2.24E-03
10 488.8 2.24E-03
11 491.9 2.19E-03
12 483.4 2.19E-03
0.0015 13 481.6 2.06E-03
14 479.7 2.06E-03
15 480.3 2.06E-03
0.0010 16 36.6 1.99E-03
17 453.8 1.98E-03
18 454.4 1.98E-03
0.0005 19 455.0 1.97E-03
20 77.2 1.96E-03

0.0000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00012\H1, 2_I1sv00000 - 210 a.csv

Transfer Function TP: 210 (a) [Hit 210] (a)


200
Channel: 2
20 Date: May 31, 2016 00:08
160 2
Setup:
Note:

120 Freq. Phase


# Hz degrees
1 71.3 -172
80 2 78.1 149
3 69.1 -126
4 486.3 -103
40 5 487.2 -106
Phase (degrees)

6 485.6 -102
7 484.7 -101
0 8 491.3 -109
9 488.1 -106
10 488.8 -109
-40 11 491.9 -113
12 483.4 -99
13 481.6 -98
-80 14 479.7 -97
14
15
13
12
764
17
18
510
98 15 480.3 -98
19 11
16 36.6 -148
-120 3
17 453.8 -109
16 18 454.4 -112
19 455.0 -115
-160 1 20 77.2 171

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00012\H1, 2_I1sv00000 - 210 a.csv

Coherence TP: 210 (a) [Hit 210] (a)


Channel: 16
2 1 2
1.00 3 18
17
19 14
13
15 764510
12 911
8
20
Date: May 31, 2016 00:08
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 71.3 9.95E-01
0.70 2 78.1 9.93E-01
3 69.1 9.78E-01
4 486.3 9.53E-01
0.60 5 487.2 9.58E-01
6 485.6 9.59E-01
Magnitude

7 484.7 9.58E-01
0.50 8 491.3 9.48E-01
9 488.1 9.53E-01
10 488.8 9.49E-01
0.40 11 491.9 9.41E-01
12 483.4 9.57E-01
13 481.6 9.55E-01
0.30 14 479.7 9.59E-01
15 480.3 9.52E-01
16 36.6 9.88E-01
0.20 17 453.8 9.68E-01
18 454.4 9.73E-01
0.10 19 455.0 9.66E-01
20 77.2 9.42E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00012\C1, 2_I1sv00000 - 210 a.csv

Vibration, Dynamics & Noise Page 227 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.26

Transfer Function TP: 210 Sight Glass (tan) [Hit 210 Sight Glass] (tan)
1.6
Channel: 2
Date: May 31, 2016 00:11
Setup:
1.4 1 Note:

Freq. Amplitude
# Hz ips / lbf
1.2 1 97.8 1.38E+00
2 181.9 1.64E-01
3 91.6 9.23E-02
1.0 4 292.8 8.75E-02
5 293.4 8.56E-02
Amplitude (ips / lbf)

6 195.0 7.33E-02
7 294.1 7.27E-02
0.8

0.6

0.4

0.2 2
3 457
6

0.0
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00013\H1, 2_I1sv00000 - 210 sg.csv

Transfer Function TP: 210 Sight Glass (tan) [Hit 210 Sight Glass] (tan)
200
Channel: 2
2
1
Date: May 31, 2016 00:11
160 Setup:
Note:

120 Freq. Phase


6 # Hz degrees
5 1 97.8 163
80 2 181.9 178
3 91.6 -93
4 292.8 -70
40 5 293.4 91
Phase (degrees)

7
6 195.0 97
7 294.1 23
0

-40
4
-80 3

-120

-160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00013\H1, 2_I1sv00000 - 210 sg.csv

Coherence TP: 210 Sight Glass (tan) [Hit 210 Sight Glass] (tan)
Channel: 2 3 1
1.00 2

Date: May 31, 2016 00:11


0.90 Setup:
Note:
6
0.80 Freq. Magnitude
#Hz
5 1 97.8 9.88E-01
0.70 2 181.9 9.78E-01
7
3 91.6 1.00E+00
4 292.8 3.78E-01
0.60 5 293.4 7.16E-01
6 195.0 8.19E-01
Magnitude

7 294.1 6.60E-01
0.50 8 0.0 3.71E-01

0.40 8 4

0.30

0.20

0.10

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00013\C1, 2_I1sv00000 - 210 sg.csv

Vibration, Dynamics & Noise Page 228 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.27

Transfer Function TP: 450 psv (h) [Hit 450 psv] (h)
0.45
Channel: 2
Date: May 31, 2016 00:17
Setup:
0.40 1 Note:
23
Freq. Amplitude
0.35 # Hz ips / lbf
1 94.1 3.84E-01
2 248.1 3.68E-01
0.30 3 249.1 3.66E-01
4 4 277.8 2.74E-01
5 279.1 2.57E-01
Amplitude (ips / lbf)

65
0.25 7 6 277.2 2.56E-01
7 245.6 2.43E-01
8 276.6 2.04E-01
8
0.20 10 9
11
12
9 244.4 2.00E-01
13 10 212.5 1.97E-01
14
11 281.9 1.93E-01
15
16
17 12 283.1 1.92E-01
0.15 19
20 18
13 90.6 1.86E-01
14 242.2 1.61E-01
15 87.8 1.58E-01
0.10 16 88.8 1.56E-01
17 241.6 1.47E-01
18 284.7 1.43E-01
0.05 19 240.0 1.42E-01
20 240.6 1.39E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00014\H1, 2_I1sv00000 - 450 h.csv

Transfer Function TP: 450 psv (h) [Hit 450 psv] (h)
200
Channel: 2
Date: May 31, 2016 00:17
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 94.1 -39
80 2 248.1 1
19
17 3 249.1 -17
20
149 8
7 4 277.8 34
40 15 64 5 279.1 14
Phase (degrees)

16 5 6 277.2 36
10 7 245.6 41
2
0 13
11
12 8 276.6 50
3
18 9 244.4 50
1 10 212.5 8
-40 11 281.9 -12
12 283.1 -13
13 90.6 -5
-80 14 242.2 51
15 87.8 37
16 88.8 17
-120 17 241.6 57
18 284.7 -28
19 240.0 57
-160
20 240.6 53

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00014\H1, 2_I1sv00000 - 450 h.csv

Coherence TP: 450 psv (h) [Hit 450 psv] (h)


Channel: 2 15
16
13
1.00 1

Date: May 31, 2016 00:17


0.90 Setup:
10 Note:

0.80 Freq. Magnitude


20 7 #Hz
19
1 94.1 9.82E-01
0.70 9
5
6 11 2 248.1 6.42E-01
2 84 12
18 3 249.1 6.15E-01
17 3
4 277.8 6.52E-01
14
0.60 5 279.1 6.88E-01
6 277.2 6.74E-01
Magnitude

7 245.6 7.44E-01
0.50 8 276.6 6.51E-01
9 244.4 6.66E-01
10 212.5 8.47E-01
0.40 11 281.9 6.71E-01
12 283.1 6.61E-01
13 90.6 9.96E-01
0.30 14 242.2 5.97E-01
15 87.8 9.97E-01
16 88.8 9.96E-01
0.20 17 241.6 6.25E-01
18 284.7 6.57E-01
0.10 19 240.0 7.32E-01
20 240.6 7.41E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00014\C1, 2_I1sv00000 - 450 h.csv

Vibration, Dynamics & Noise Page 229 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.28

Transfer Function TP: 450 mp (h) [Hit 450 psv] (h)


0.40
Channel: 3
Date: May 31, 2016 00:17
0.36 1 Setup:
Note:

0.32 Freq. Amplitude


# Hz ips / lbf
1 94.1 3.53E-01
0.28 2 90.6 1.54E-01
3 212.5 1.34E-01
4 88.8 1.27E-01
0.24 5 87.8 1.25E-01
Amplitude (ips / lbf)

6 75.9 9.95E-02
7 86.6 8.84E-02
0.20 8 60.6 6.91E-02
9 260.0 6.32E-02
10 74.4 6.28E-02
0.16 2
11 100.0 6.13E-02
3 12 60.0 5.96E-02
54 13 248.1 5.88E-02
0.12 14 258.4 5.69E-02
6
7
15 259.4 5.56E-02
16 249.1 5.49E-02
0.08 8 17 247.5 5.35E-02
12 10 11 13 9
16 14
17 15
18 18 260.9 5.16E-02
20 19
19 261.6 4.59E-02
0.04
20 245.9 4.42E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00014\H1, 3_I1sv00000 - 450 h.csv

Transfer Function TP: 450 mp (h) [Hit 450 psv] (h)


200
Channel: 3
16 15 Date: May 31, 2016 00:17
160 Setup:
18
19 Note:
9
120 Freq. Phase
# Hz degrees
1 94.1 -41
80 2 90.6 -8
3 212.5 -176
12 10 7 4 88.8 14
40 5 5 87.8 35
Phase (degrees)

6 4 6 75.9 13
8 7 86.6 47
0 2 8 60.6 3
9 260.0 121
1 10 74.4 49
-40 11 100.0 -87
12 60.0 48
13 248.1 -175
-80 11
14 258.4 -139
15 259.4 173
16 249.1 171
-120 17 247.5 -161
20 14
18 260.9 140
17 19 261.6 137
-160
3 13 20 245.9 -137

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00014\H1, 3_I1sv00000 - 450 h.csv

Coherence TP: 450 mp (h) [Hit 450 psv] (h)


Channel: 3 542 11
1.00 10
7 1

Date: May 31, 2016 00:17


0.90 Setup:
6 3 Note:

0.80 Freq. Magnitude


#Hz
17 1 94.1 9.82E-01
20
0.70 2 90.6 9.96E-01
3 212.5 8.55E-01
4 88.8 9.96E-01
13
0.60 16 19 5 87.8 9.97E-01
8 6 75.9 8.59E-01
Magnitude

14 7 86.6 9.74E-01
0.50 8 60.6 5.33E-01
18 9 260.0 3.83E-01
10 74.4 9.89E-01
0.40 9 11 100.0 9.95E-01
12 60.0 2.93E-01
12 13 248.1 5.96E-01
0.30 14 258.4 4.98E-01
15 259.4 1.95E-01
15 16 249.1 5.80E-01
0.20 17 247.5 7.12E-01
18 260.9 4.40E-01
0.10 19 261.6 5.89E-01
20 245.9 6.98E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00014\C1, 3_I1sv00000 - 450 h.csv

Vibration, Dynamics & Noise Page 230 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.29

Transfer Function TP: 250 psv (h) [Hit 250 psv] (h)
0.20
Channel: 2
Date: May 31, 2016 00:20
0.18 Setup:
Note:
1
2
0.16 Freq. Amplitude
# Hz ips / lbf
1 60.0 1.66E-01
0.14 2 198.4 1.64E-01
3 62.2 8.58E-02
4 203.1 7.26E-02
0.12 5 59.1 6.54E-02
Amplitude (ips / lbf)

6 62.8 6.06E-02
7 63.4 4.57E-02
0.10 8 60.9 4.03E-02
3 9 390.3 2.87E-02
10 57.5 2.85E-02
0.08 11 88.8 2.55E-02
4
5 12 118.8 2.45E-02
6 13 65.0 2.27E-02
0.06 14 56.6 2.21E-02
7 15 260.0 2.16E-02
8 16 66.9 2.15E-02
0.04 17 211.6 2.12E-02
10 9
11 12 18 213.1 1.89E-02
14 13
16 17 15
18
1920 19 213.8 1.86E-02
0.02
20 216.6 1.84E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00015\H1, 2_I1sv00000 - 250 h.csv

Transfer Function TP: 250 psv (h) [Hit 250 psv] (h)
200
Channel: 2
Date: May 31, 2016 00:20
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
14
10
5 1 60.0 24
80 2 198.4 9
3 62.2 7
4 203.1 -49
40 5 59.1 82
Phase (degrees)

1
9 6 62.8 -99
3 12 2
11 7 63.4 -52
0 8 60.9 -67
9 390.3 13
10 57.5 89
-40 7
16 4 11 88.8 6
13
8 15 12 118.8 7
1920
18
17
13 65.0 -58
-80 14 56.6 93
6
15 260.0 -67
16 66.9 -46
-120 17 211.6 -84
18 213.1 -83
19 213.8 -83
-160
20 216.6 -79

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00015\H1, 2_I1sv00000 - 250 h.csv

Coherence TP: 250 psv (h) [Hit 250 psv] (h)


Channel: 2 11 24
1.00 12 17
19
18
20 Date: May 31, 2016 00:20
0.90 10
Setup:
14 Note:

0.80 Freq. Magnitude


13 #Hz
1 1 60.0 7.23E-01
5
0.70 2 198.4 9.90E-01
3 62.2 5.80E-01
16 4 203.1 9.88E-01
0.60 3 5 59.1 6.96E-01
15 6 62.8 4.11E-01
Magnitude

7 63.4 4.72E-01
0.50 7 8 60.9 2.99E-01
9 390.3 3.44E-01
6 10 57.5 8.76E-01
0.40 11 88.8 9.92E-01
9 12 118.8 9.80E-01
8 13 65.0 7.48E-01
0.30 14 56.6 8.58E-01
15 260.0 5.45E-01
16 66.9 6.16E-01
0.20 17 211.6 9.72E-01
18 213.1 9.57E-01
0.10 19 213.8 9.61E-01
20 216.6 9.21E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00015\C1, 2_I1sv00000 - 250 h.csv

Vibration, Dynamics & Noise Page 231 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.30

Transfer Function TP: 250 mid (h) [Hit 250 psv] (h)
0.11
Channel: 3
Date: May 31, 2016 00:20
0.10 Setup:
1
Note:
0.09 Freq. Amplitude
# Hz ips / lbf
0.08 1 60.0 9.57E-02
2 62.2 4.94E-02
3 59.1 3.73E-02
0.07 4 62.8 3.52E-02
5 63.4 2.65E-02
Amplitude (ips / lbf)

6 60.9 2.36E-02
0.06 7 118.8 1.90E-02
8 88.8 1.61E-02
2 9 57.5 1.60E-02
0.05
10 198.4 1.34E-02
11 66.9 1.33E-02
0.04 3 12 65.0 1.32E-02
4
13 56.6 1.24E-02
0.03 14 97.5 1.22E-02
5 15 121.3 1.16E-02
6
16 109.4 1.12E-02
0.02 7 17 121.9 1.07E-02
9 8
18 141.9 1.05E-02
13 12
11 14 15
10
19 16 20
17 18 19 65.6 1.02E-02
0.01 20 120.3 1.00E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00015\H1, 3_I1sv00000 - 250 h.csv

Transfer Function TP: 250 mid (h) [Hit 250 psv] (h)
200
Channel: 3
Date: May 31, 2016 00:20
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
13
9 1 60.0 23
3
80 2 62.2 5
3 59.1 80
4 62.8 -101
40 5 63.4 -53
Phase (degrees)

1
6 60.9 -69
2 8 16 7 10 7 118.8 2
0 14 8 88.8 5
9 57.5 88
20 10 198.4 3
15
-40 11
519 11 66.9 -47
12 17
18 12 65.0 -59
6
13 56.6 90
-80 14 97.5 -10
4
15 121.3 -40
16 109.4 3
-120 17 121.9 -55
18 141.9 -61
19 65.6 -48
-160
20 120.3 -33

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00015\H1, 3_I1sv00000 - 250 h.csv

Coherence TP: 250 mid (h) [Hit 250 psv] (h)


Channel: 3 8 10
1.00 7
15
17
16 20
Date: May 31, 2016 00:20
0.90 9 18 Setup:
13 Note:
14
0.80 Freq. Magnitude
12 #Hz
1 1 60.0 7.23E-01
19
0.70 3 2 62.2 5.79E-01
3 59.1 6.93E-01
11 4 62.8 4.16E-01
0.60 2 5 63.4 4.78E-01
6 60.9 3.05E-01
Magnitude

7 118.8 9.80E-01
0.50 5 8 88.8 9.93E-01
9 57.5 8.73E-01
4 10 198.4 9.90E-01
0.40 11 66.9 6.14E-01
12 65.0 7.54E-01
6 13 56.6 8.53E-01
0.30 14 97.5 8.06E-01
15 121.3 9.58E-01
16 109.4 9.08E-01
0.20 17 121.9 9.43E-01
18 141.9 8.80E-01
0.10 19 65.6 7.06E-01
20 120.3 9.20E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00015\C1, 3_I1sv00000 - 250 h.csv

Vibration, Dynamics & Noise Page 232 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.31

Transfer Function TP: 250 mp (h) [Hit 250 psv] (h)


0.060
Channel: 4
Date: May 31, 2016 00:20
1 Setup:
Note:
0.050 2
Freq. Amplitude
# Hz ips / lbf
1 60.0 5.39E-02
2 198.4 4.78E-02
0.040 3 62.2 2.78E-02
4 59.1 2.09E-02
5 62.8 1.99E-02
Amplitude (ips / lbf)

6 203.1 1.93E-02
7 165.3 1.60E-02
0.030 8 118.8 1.58E-02
3
9 163.4 1.51E-02
10 63.4 1.50E-02
11 164.1 1.39E-02
4 12 60.9 1.35E-02
5
0.020 6
13 162.2 1.32E-02
8 7 14 161.3 1.24E-02
10 9
12 11
13
15 141.9 1.19E-02
15 14 16 160.6 1.13E-02
18 16 17
19 20 17 167.2 1.11E-02
0.010 18 121.3 1.07E-02
19 109.4 1.06E-02
20 142.5 1.01E-02

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00015\H1, 4_I1sv00000 - 250 h.csv

Transfer Function TP: 250 mp (h) [Hit 250 psv] (h)


200
Channel: 4
17
Date: May 31, 2016 00:20
160 Setup:
Note:
6
120 Freq. Phase
# Hz degrees
4
1 60.0 23
80 2 198.4 -169
3 62.2 5
4 59.1 80
40 5 62.8 -100
Phase (degrees)

1
6 203.1 132
3 19 8 7 165.3 -152
0 8 118.8 2
9 163.4 -131
18 10 63.4 -53
-40 10 11 164.1 -140
15 12 60.9 -69
12 20
13 162.2 -109
-80 14 161.3 -109
5 16
14
13 15 141.9 -62
16 160.6 -101
-120 9 17 167.2 178
11
7 18 121.3 -37
19 109.4 6
-160 2
20 142.5 -73

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00015\H1, 4_I1sv00000 - 250 h.csv

Coherence TP: 250 mp (h) [Hit 250 psv] (h)


Channel: 4 26
1.00 8 9
18 11
20 13
16 717 Date: May 31, 2016 00:20
19
0.90 15 Setup:
Note:
14
0.80 Freq. Magnitude
#Hz
1 1 60.0 7.23E-01
0.70 4 2 198.4 9.90E-01
3 62.2 5.79E-01
4 59.1 6.90E-01
0.60 3 5 62.8 4.21E-01
6 203.1 9.89E-01
Magnitude

7 165.3 9.24E-01
0.50 10 8 118.8 9.80E-01
9 163.4 9.70E-01
5
10 63.4 4.84E-01
0.40 11 164.1 9.44E-01
12 60.9 3.10E-01
12 13 162.2 9.40E-01
0.30 14 161.3 8.30E-01
15 141.9 8.90E-01
16 160.6 9.14E-01
0.20 17 167.2 9.26E-01
18 121.3 9.55E-01
0.10 19 109.4 9.03E-01
20 142.5 9.31E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00015\C1, 4_I1sv00000 - 250 h.csv

Vibration, Dynamics & Noise Page 233 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.32

Transfer Function TP: 250 psv (a) [Hit 250 psv] (a)
0.070
Channel: 2
Date: May 31, 2016 00:24
Setup:
0.060 Note:
1

Freq. Amplitude
# Hz ips / lbf
2
1 74.4 5.85E-02
0.050 2 75.3 5.11E-02
3 76.9 4.31E-02
3 4 121.6 4.17E-02
4
5 123.8 3.90E-02
Amplitude (ips / lbf)

0.040 5
6 96.3 2.39E-02
7 118.8 1.88E-02
8 68.8 1.73E-02
9 78.4 1.68E-02
0.030 10 130.6 1.61E-02
11 131.3 1.61E-02
6 12 70.0 1.61E-02
13 116.6 1.52E-02
0.020 7 14 60.0 1.41E-02
8
12 9 10
11 15 198.8 1.36E-02
13
14 15 16 93.8 1.27E-02
1917
18 16
20 17 66.9 1.22E-02
0.010 18 65.9 1.22E-02
19 62.5 1.21E-02
20 63.4 1.19E-02

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00016\H1, 2_I1sv00000 - 250 a.csv

Transfer Function TP: 250 psv (a) [Hit 250 psv] (a)
200
Channel: 2
Date: May 31, 2016 00:24
160 Setup:
Note:

120 Freq. Phase


20 # Hz degrees
17
18 1 74.4 14
80 19
8
12
2 75.3 -6
14 3 76.9 -30
16 4 121.6 -7
40 5 123.8 -40
Phase (degrees)

15 6 96.3 -1
1 137
6 7 118.8 7
0 2 4 8 68.8 66
9 78.4 -49
3
5 10 130.6 -48
-40 9 10 11 131.3 -60
11
12 70.0 66
13 116.6 10
-80 14 60.0 55
15 198.8 20
16 93.8 40
-120 17 66.9 84
18 65.9 83
19 62.5 73
-160
20 63.4 103

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00016\H1, 2_I1sv00000 - 250 a.csv

Coherence TP: 250 psv (a) [Hit 250 psv] (a)


Channel: 2 13745 11
1.00 12
6 10
8 1
17 2 16 15
18 39 Date: May 31, 2016 00:24
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 74.4 9.65E-01
0.70 19
2 75.3 9.47E-01
3 76.9 9.10E-01
4 121.6 9.91E-01
0.60 5 123.8 9.93E-01
6 96.3 9.89E-01
Magnitude

7 118.8 9.90E-01
0.50 8 68.8 9.59E-01
9 78.4 9.26E-01
10 130.6 9.81E-01
0.40 20
11 131.3 9.85E-01
12 70.0 9.71E-01
14
13 116.6 9.94E-01
0.30 14 60.0 3.17E-01
15 198.8 9.48E-01
16 93.8 9.47E-01
0.20 17 66.9 9.40E-01
18 65.9 9.15E-01
0.10 19 62.5 6.66E-01
20 63.4 3.86E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00016\C1, 2_I1sv00000 - 250 a.csv

Vibration, Dynamics & Noise Page 234 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.33

Transfer Function TP: 250 mid (a) [Hit 250 psv] (a)
0.030
Channel: 3
Date: May 31, 2016 00:24
0.027 Setup:
1 Note:

0.024 Freq. Amplitude


# Hz ips / lbf
1 74.4 2.56E-02
0.021 2 2 75.3 2.02E-02
3 76.9 1.87E-02
3 4 96.3 1.25E-02
0.018 5 260.0 1.10E-02
Amplitude (ips / lbf)

6 123.8 1.00E-02
7 390.0 9.67E-03
0.015 8 121.6 9.35E-03
9 258.4 9.24E-03
4 10 391.3 7.85E-03
0.012 5 11 390.6 7.78E-03
6 12 255.9 7.72E-03
8 7
9 13 68.8 7.51E-03
0.009 14 78.4 7.07E-03
13 12 10
11
15 14 15 70.0 6.85E-03
16 16 82.5 5.95E-03
0.006 17
18 20 19 17 65.9 5.37E-03
18 66.9 5.26E-03
19 249.7 4.96E-03
0.003
20 101.9 4.96E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00016\H1, 3_I1sv00000 - 250 a.csv

Transfer Function TP: 250 mid (a) [Hit 250 psv] (a)
200
Channel: 3
Date: May 31, 2016 00:24
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
18 1 74.4 9
17
80 2 75.3 -10
13
15 3 76.9 -31
4 96.3 -10
40 19 5 260.0 -30
Phase (degrees)

6 123.8 -47
1 12 7 390.0 -43
0 2 16 4 8 8 121.6 -14
9
9 258.4 -15
3 5
20 7
10 391.3 -88
-40 14 6 11 390.6 -80
12 255.9 8
11 13 68.8 63
-80 10 14 78.4 -49
15 70.0 62
16 82.5 -11
-120 17 65.9 80
18 66.9 81
19 249.7 27
-160
20 101.9 -39

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00016\H1, 3_I1sv00000 - 250 a.csv

Coherence TP: 250 mid (a) [Hit 250 psv] (a)


Channel: 3 86
1.00 151
16 4 20 19 125
9
13 2 10
18 14 Date: May 31, 2016 00:24
17 3
0.90 7
11 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 74.4 9.65E-01
0.70 2 75.3 9.49E-01
3 76.9 9.11E-01
4 96.3 9.88E-01
0.60 5 260.0 9.77E-01
6 123.8 9.94E-01
Magnitude

7 390.0 8.94E-01
0.50 8 121.6 9.91E-01
9 258.4 9.69E-01
10 391.3 9.51E-01
0.40 11 390.6 8.87E-01
12 255.9 9.85E-01
13 68.8 9.58E-01
0.30 14 78.4 9.28E-01
15 70.0 9.67E-01
16 82.5 9.82E-01
0.20 17 65.9 9.08E-01
18 66.9 9.30E-01
0.10 19 249.7 9.83E-01
20 101.9 9.88E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00016\C1, 3_I1sv00000 - 250 a.csv

Vibration, Dynamics & Noise Page 235 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.34

Transfer Function TP: 250 mp (a) [Hit 250 psv] (a)


0.015
Channel: 4

0.014 Date: May 31, 2016 00:24


Setup:
1 Note:
0.013
0.012 Freq. Amplitude
# Hz ips / lbf
0.011 1 74.4 1.30E-02
2 372.8 9.73E-03
0.010 3 2 3 76.9 9.67E-03
4 75.3 8.87E-03
0.009 4
5 370.0 8.70E-03
Amplitude (ips / lbf)

6 57
98
10 6 121.6 8.68E-03
0.008 11 12
13 7 371.6 8.67E-03
15 1614
19 18 17
20 8 373.4 8.45E-03
0.007 9 370.9 8.39E-03
10 368.8 7.98E-03
0.006 11 375.0 7.73E-03
12 482.5 7.60E-03
0.005 13 481.9 7.46E-03
14 483.1 7.44E-03
0.004 15 374.4 7.41E-03
16 480.9 7.30E-03
0.003 17 484.7 7.23E-03
18 480.3 7.19E-03
0.002 19 123.8 7.19E-03
0.001 20 485.6 7.09E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00016\H1, 4_I1sv00000 - 250 a.csv

Transfer Function TP: 250 mp (a) [Hit 250 psv] (a)


200
Channel: 4
Date: May 31, 2016 00:24
160 Setup:
Note:

120 Freq. Phase


10
5 # Hz degrees
9
1 74.4 2
80 2 372.8 48
7
3 76.9 -33
2 4 75.3 -17
40 8
15 5 370.0 97
Phase (degrees)

11
6 121.6 -156
1 7 371.6 64
0 8 373.4 36
4 18
16 9 370.9 81
3 13 10 368.8 105
-40 12
14 11 375.0 25
17 12 482.5 -45
20 13 481.9 -38
-80 14 483.1 -53
15 374.4 34
16 480.9 -26
-120 17 484.7 -67
18 480.3 -20
6
19 123.8 -176
-160
19 20 485.6 -78

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00016\H1, 4_I1sv00000 - 250 a.csv

Coherence TP: 250 mp (a) [Hit 250 psv] (a)


Channel: 4 619
1.00 1
4
3 Date: May 31, 2016 00:24
0.90 Setup:
Note:
5
8 18
16
0.80 12
14
13
Freq. Magnitude
2 17
20 #Hz
7
9 1 74.4 9.64E-01
0.70 11 2 372.8 7.52E-01
10 3 76.9 9.12E-01
15 4 75.3 9.51E-01
0.60 5 370.0 8.26E-01
6 121.6 9.90E-01
Magnitude

7 371.6 7.33E-01
0.50 8 373.4 7.95E-01
9 370.9 7.16E-01
10 368.8 6.55E-01
0.40 11 375.0 6.76E-01
12 482.5 7.80E-01
13 481.9 7.68E-01
0.30 14 483.1 7.79E-01
15 374.4 6.03E-01
16 480.9 7.95E-01
0.20 17 484.7 7.57E-01
18 480.3 8.06E-01
0.10 19 123.8 9.88E-01
20 485.6 7.51E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00016\C1, 4_I1sv00000 - 250 a.csv

Vibration, Dynamics & Noise Page 236 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.35

Transfer Function TP: 400 (a) [Hit 400] (a)


0.080
Channel: 2
Date: May 31, 2016 00:30
Setup:
0.070 1
Note:

Freq. Amplitude
# Hz ips / lbf
0.060 1 29.4 6.93E-02
2 480.9 8.70E-03
3 479.7 8.62E-03
0.050 4 321.6 7.87E-03
5 487.8 4.94E-03
Amplitude (ips / lbf)

6 317.2 4.65E-03
7 489.1 4.61E-03
0.040 8 25.3 4.32E-03
9 324.4 4.00E-03
10 492.2 3.93E-03
0.030

0.020

0.010 4 32

8 6 9 5710

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00017\H1, 2_I1sv00000 - 400 a.csv

Transfer Function TP: 400 (a) [Hit 400] (a)


200
Channel: 2
4 2 Date: May 31, 2016 00:30
160 Setup:
5
7 Note:
10
9
120 Freq. Phase
# Hz degrees
1 29.4 -138
80 2 480.9 172
3 479.7 -173
4 321.6 168
40 5 487.8 143
Phase (degrees)

6 317.2 -149
7 489.1 137
0 8 25.3 -108
9 324.4 123
10 492.2 129
-40

-80
8
-120
1
6
-160 3

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00017\H1, 2_I1sv00000 - 400 a.csv

Coherence TP: 400 (a) [Hit 400] (a)


Channel:1 2 6 49
1.00 8 5710
32
Date: May 31, 2016 00:30
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 29.4 9.86E-01
0.70 2 480.9 9.53E-01
3 479.7 9.55E-01
4 321.6 9.94E-01
0.60 5 487.8 9.79E-01
6 317.2 9.97E-01
Magnitude

7 489.1 9.81E-01
0.50 8 25.3 9.78E-01
9 324.4 9.97E-01
10 492.2 9.90E-01
0.40 11 0.0 1.82E-01

0.30

0.20 11

0.10

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00017\C1, 2_I1sv00000 - 400 a.csv

Vibration, Dynamics & Noise Page 237 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.36

Transfer Function TP: 300 (a) [Hit 300] (a)


0.040
Channel: 2
Date: May 31, 2016 00:34
0.036 Setup:
Note:
1
0.032 Freq. Amplitude
# Hz ips / lbf
1 31.6 3.22E-02
0.028 2 360.3 1.62E-02
3 362.8 1.35E-02
4 365.3 1.15E-02
0.024 5 476.6 9.94E-03
Amplitude (ips / lbf)

6 33.8 8.05E-03
7 410.0 6.72E-03
0.020 8 409.4 6.71E-03
9 387.5 6.28E-03
2 10 482.8 6.10E-03
0.016 11 484.1 5.92E-03
3 12 485.3 5.85E-03
13 484.7 5.83E-03
0.012 4
14 486.6 5.68E-03
5
15 487.5 5.50E-03
6 16 342.8 5.33E-03
0.008 87 17 489.4 5.06E-03
9 10
11
13
12
16 14
15 18 414.7 4.95E-03
19 18 1720
19 318.8 4.88E-03
0.004
20 493.8 4.78E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00018\H1, 2_I1sv00000 - 300 a.csv

Transfer Function TP: 300 (a) [Hit 300] (a)


200
Channel: 2
1 2
Date: May 31, 2016 00:34
160 3
Setup:
6 Note:
9 5
4 8
120 7 Freq. Phase
10
11
13
12 # Hz degrees
18 14
1720
15
1 31.6 180
80 2 360.3 178
3 362.8 149
4 365.3 126
40 5 476.6 134
Phase (degrees)

6 33.8 138
7 410.0 116
0 8 409.4 123
9 387.5 134
10 482.8 101
-40 11 484.1 99
12 485.3 98
13 484.7 98
-80 14 486.6 93
15 487.5 91
16 342.8 -161
-120 17 489.4 92
18 414.7 93
19 16 19 318.8 -160
-160
20 493.8 92

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00018\H1, 2_I1sv00000 - 300 a.csv

Coherence TP: 300 (a) [Hit 300] (a)


Channel:162 234
1.00 19 16 87 18 12
11
1015 20
14
13
9 5 17
Date: May 31, 2016 00:34
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 31.6 9.95E-01
0.70 2 360.3 9.96E-01
3 362.8 9.97E-01
4 365.3 9.91E-01
0.60 5 476.6 9.48E-01
6 33.8 9.96E-01
Magnitude

7 410.0 9.86E-01
0.50 8 409.4 9.86E-01
9 387.5 9.44E-01
10 482.8 9.72E-01
0.40 11 484.1 9.76E-01
12 485.3 9.83E-01
13 484.7 9.72E-01
0.30 14 486.6 9.74E-01
15 487.5 9.75E-01
16 342.8 9.85E-01
0.20 17 489.4 9.59E-01
18 414.7 9.88E-01
0.10 19 318.8 9.84E-01
20 493.8 9.81E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00018\C1, 2_I1sv00000 - 300 a.csv

Vibration, Dynamics & Noise Page 238 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.37

Transfer Function TP: 350 psv (h) [Hit 350 psv] (h)
1.00
Channel: 2

1
Date: May 31, 2016 00:39
0.90 Setup:
Note:

0.80 Freq. Amplitude


# Hz ips / lbf
1 94.7 9.07E-01
0.70 2 197.5 1.92E-01
3 179.4 1.81E-01
4 68.8 1.49E-01
0.60 5 137.2 1.47E-01
Amplitude (ips / lbf)

6 138.8 1.45E-01
7 139.7 1.44E-01
0.50 8 264.7 1.41E-01
9 265.6 1.35E-01
10 278.8 1.19E-01
0.40 11 166.9 1.16E-01
12 256.3 1.10E-01
13 256.9 1.10E-01
0.30 14 257.8 1.08E-01
15 165.6 1.08E-01
2 16 255.3 1.07E-01
0.20 3
17 260.0 1.07E-01
4 567 89
10 18 261.3 1.06E-01
11
15 19
20 12
13
1617
1418 19 182.8 1.05E-01
0.10
20 181.9 1.03E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00019\H1, 2_I1sv00000 - 350 H.csv

Transfer Function TP: 350 psv (h) [Hit 350 psv] (h)
200
Channel: 2
Date: May 31, 2016 00:39
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 94.7 -24
80 2 197.5 -20
3 179.4 10
4 68.8 -7
40 15 5 137.2 26
Phase (degrees)

5
16 6 138.8 11
6 11 3 12
13 7 139.7 -7
14
0 4 7 20
17
18 8 264.7 -24
19
1 2 8 9 265.6 -37
9 10 278.8 -45
-40 10
11 166.9 14
12 256.3 12
13 256.9 7
-80 14 257.8 2
15 165.6 31
16 255.3 20
-120 17 260.0 -5
18 261.3 -9
19 182.8 -15
-160
20 181.9 -11

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00019\H1, 2_I1sv00000 - 350 H.csv

Coherence TP: 350 psv (h) [Hit 350 psv] (h)


Channel: 2 15
11 320
19 2 141889
1617
12
13
1.00 567 10
1
4
Date: May 31, 2016 00:39
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 94.7 9.63E-01
0.70 2 197.5 9.90E-01
3 179.4 9.94E-01
4 68.8 9.49E-01
0.60 5 137.2 9.81E-01
6 138.8 9.82E-01
Magnitude

7 139.7 9.84E-01
0.50 8 264.7 9.90E-01
9 265.6 9.95E-01
10 278.8 9.88E-01
0.40 11 166.9 9.91E-01
12 256.3 9.93E-01
13 256.9 9.91E-01
0.30 14 257.8 9.95E-01
15 165.6 9.91E-01
16 255.3 9.93E-01
0.20 17 260.0 9.96E-01
18 261.3 9.96E-01
0.10 19 182.8 9.91E-01
20 181.9 9.91E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00019\C1, 2_I1sv00000 - 350 H.csv

Vibration, Dynamics & Noise Page 239 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.38

Transfer Function TP: 350 mid (h) [Hit 350 psv] (h)
0.70
Channel: 3
Date: May 31, 2016 00:39
Setup:
0.60 Note:
1
Freq. Amplitude
# Hz ips / lbf
1 94.7 5.78E-01
0.50 2 68.8 1.21E-01
3 58.8 6.18E-02
4 57.5 6.01E-02
5 479.4 5.79E-02
Amplitude (ips / lbf)

0.40 6 441.3 4.65E-02


7 140.0 4.28E-02
8 137.2 3.79E-02
9 481.9 3.58E-02
0.30 10 180.0 3.58E-02
11 483.1 3.56E-02
12 167.8 3.02E-02
13 167.2 2.98E-02
0.20

2
0.10
43 5
6
87 12
13 10 9
11

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00019\H1, 3_I1sv00000 - 350 H.csv

Transfer Function TP: 350 mid (h) [Hit 350 psv] (h)
200
Channel: 3
9
11 Date: May 31, 2016 00:39
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 94.7 -26
80 2 68.8 -13
3 58.8 -21
4 57.5 26
40 5 479.4 -153
Phase (degrees)

4
6 441.3 -149
7 140.0 -44
0 2
8
8 137.2 -4
3 9 481.9 178
1 13
12 10 180.0 -46
-40 7 10
11 483.1 168
12 167.8 -41
13 167.2 -29
-80

-120
6 5
-160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00019\H1, 3_I1sv00000 - 350 H.csv

Coherence TP: 350 mid (h) [Hit 350 psv] (h)


Channel: 3 12
13 10 6
1.00 87 511
9
1
2
4
3 Date: May 31, 2016 00:39
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 94.7 9.63E-01
0.70 2 68.8 9.47E-01
3 58.8 9.17E-01
4 57.5 9.34E-01
0.60 5 479.4 9.88E-01
6 441.3 9.96E-01
Magnitude

7 140.0 9.84E-01
0.50 8 137.2 9.78E-01
9 481.9 9.88E-01
10 180.0 9.94E-01
0.40 11 483.1 9.88E-01
12 167.8 9.94E-01
13 167.2 9.91E-01
0.30 14 0.0 2.46E-01
14

0.20

0.10

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00019\C1, 3_I1sv00000 - 350 H.csv

Vibration, Dynamics & Noise Page 240 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.39

Transfer Function TP: 350 mp (h) [Hit 350 psv] (h)


0.35
Channel: 4
Date: May 31, 2016 00:39
Setup:
1 Note:
0.30
Freq. Amplitude
# Hz ips / lbf
1 94.7 3.02E-01
0.25 2 68.8 7.65E-02
3 58.8 6.35E-02
4 57.5 5.58E-02
5 197.5 5.40E-02
Amplitude (ips / lbf)

0.20 6 138.8 3.54E-02


7 136.9 3.49E-02
8 139.4 3.48E-02
9 480.0 3.43E-02
0.15 10 204.7 3.17E-02
11 192.5 3.06E-02
12 183.8 2.90E-02
13 179.1 2.83E-02
0.10 14 200.9 2.67E-02
15 189.4 2.37E-02
2
16 188.8 2.36E-02
3
4 5 17 106.9 2.36E-02
0.05 18 107.5 2.33E-02
78
6 9 19 110.6 2.32E-02
1312 11 1410
17
1819 20 16
15 20 130.6 2.31E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00019\H1, 4_I1sv00000 - 350 H.csv

Transfer Function TP: 350 mp (h) [Hit 350 psv] (h)


200
Channel: 4
5 Date: May 31, 2016 00:39
14 Setup:
160 10 9
Note:

120 Freq. Phase


# Hz degrees
1 94.7 -26
80 2 68.8 -16
3 58.8 -28
4 57.5 19
40 5 197.5 172
Phase (degrees)

4 6 138.8 -140
7 136.9 -120
0 8 139.4 -148
2
3 1 9 480.0 147
10 204.7 146
-40 11 192.5 -165
12 183.8 -164
13 179.1 -135
-80 17
1819 20 14 200.9 158
15 189.4 -157
7 16 188.8 -156
-120 17 106.9 -91
13
6
8 18 107.5 -91
16
15 19 110.6 -92
-160 12 11
20 130.6 -94

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00019\H1, 4_I1sv00000 - 350 H.csv

Coherence TP: 350 mp (h) [Hit 350 psv] (h)


Channel: 4 1511 51410
131216 9
1.00 1819
17
20 768
1
2
4 Date: May 31, 2016 00:39
3
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 94.7 9.63E-01
0.70 2 68.8 9.46E-01
3 58.8 9.10E-01
4 57.5 9.32E-01
0.60 5 197.5 9.90E-01
6 138.8 9.83E-01
Magnitude

7 136.9 9.80E-01
0.50 8 139.4 9.84E-01
9 480.0 9.91E-01
10 204.7 9.96E-01
0.40 11 192.5 9.96E-01
12 183.8 9.91E-01
13 179.1 9.94E-01
0.30 14 200.9 9.94E-01
15 189.4 9.95E-01
16 188.8 9.89E-01
0.20 17 106.9 9.66E-01
18 107.5 9.65E-01
0.10 19 110.6 9.72E-01
20 130.6 9.79E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00019\C1, 4_I1sv00000 - 350 H.csv

Vibration, Dynamics & Noise Page 241 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.40

Transfer Function TP: 350 psv (a) [Hit 350 psv] (a)
0.24
Channel: 2
Date: May 31, 2016 00:43
Setup:
1 Note:
0.20
Freq. Amplitude
# Hz ips / lbf
1 197.5 2.06E-01
2 181.9 1.02E-01
0.16 3 175.3 8.17E-02
4 202.5 6.37E-02
5 185.0 6.16E-02
Amplitude (ips / lbf)

6 180.3 5.26E-02
7 178.1 4.15E-02
0.12 8 179.1 4.11E-02
9 164.7 4.06E-02
2
10 128.8 3.08E-02
11 135.9 2.84E-02
3 12 168.4 2.74E-02
0.08 13 161.3 2.29E-02
5 4 14 143.8 2.21E-02
15 213.8 2.20E-02
6
16 213.1 2.20E-02
9 78 17 144.4 2.19E-02
0.04 18 228.4 2.17E-02
10 11
12
2014
17 13 16
15 18
19
19 230.3 2.01E-02
20 139.4 2.00E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00020\H1, 2_I1sv00000 - 350 a.csv

Transfer Function TP: 350 psv (a) [Hit 350 psv] (a)
200
Channel: 2
Date: May 31, 2016 00:43
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 197.5 -8
80 13 2 181.9 7
10 3 175.3 35
12
1120 9 4 202.5 -37
40 14 36 5 185.0 -34
17
Phase (degrees)

8 6 180.3 36
7
2 7 178.1 15
0 1 8 179.1 20
9 164.7 43
5 4 10 128.8 58
-40 18
11 135.9 43
19 12 168.4 50
16
15
13 161.3 69
-80 14 143.8 33
15 213.8 -71
16 213.1 -69
-120 17 144.4 28
18 228.4 -46
19 230.3 -61
-160
20 139.4 47

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00020\H1, 2_I1sv00000 - 350 a.csv

Coherence TP: 350 psv (a) [Hit 350 psv] (a)


Channel: 2 17
10 112014 13912 37862 5 14 16
15
1.00 19
18

Date: May 31, 2016 00:43


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 197.5 9.95E-01
0.70 2 181.9 9.98E-01
3 175.3 9.99E-01
4 202.5 9.97E-01
0.60 5 185.0 9.89E-01
6 180.3 9.98E-01
Magnitude

7 178.1 9.94E-01
0.50 8 179.1 9.98E-01
9 164.7 9.98E-01
10 128.8 9.98E-01
0.40 11 135.9 9.94E-01
12 168.4 9.99E-01
13 161.3 9.97E-01
0.30 14 143.8 9.98E-01
15 213.8 9.97E-01
16 213.1 9.99E-01
0.20 17 144.4 9.98E-01
18 228.4 9.83E-01
0.10 19 230.3 9.86E-01
20 139.4 9.93E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00020\C1, 2_I1sv00000 - 350 a.csv

Vibration, Dynamics & Noise Page 242 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.41

Transfer Function TP: 350 mid (a) [Hit 350 psv] (a)
0.090
Channel: 3
Date: May 31, 2016 00:43
Setup:
0.080 1
Note:

Freq. Amplitude
0.070 # Hz ips / lbf
1 197.5 7.86E-02
2 181.9 3.88E-02
0.060 3 185.0 3.13E-02
4 175.3 2.75E-02
5 202.8 2.23E-02
Amplitude (ips / lbf)

0.050 6 180.3 2.14E-02


7 179.1 1.71E-02
8 178.1 1.67E-02
0.040 2 9 164.7 1.35E-02
10 168.8 9.80E-03
11 213.8 8.82E-03
3 12 160.6 8.55E-03
0.030 4 13 228.4 8.45E-03
14 230.3 8.05E-03
5
6 15 218.4 7.88E-03
0.020 16 278.8 7.39E-03
87
17 250.9 7.05E-03
9
18 250.0 6.95E-03
10 19 245.9 6.86E-03
0.010 12 1115 13
14 17
1918 16
20 20 135.6 6.67E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00020\H1, 3_I1sv00000 - 350 a.csv

Transfer Function TP: 350 mid (a) [Hit 350 psv] (a)
200
Channel: 3
Date: May 31, 2016 00:43
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 197.5 -10
80 12 2 181.9 11
10 3 185.0 -27
20 9
46 4 175.3 42
40 87
5 202.8 -50
Phase (degrees)

6 180.3 40
2
7 179.1 28
0 1 8 178.1 25
3 9 164.7 49
10 168.8 55
-40 5 11 213.8 -74
13 19
14 18
17 16
12 160.6 72
1115
13 228.4 -55
-80 14 230.3 -67
15 218.4 -71
16 278.8 -70
-120 17 250.9 -70
18 250.0 -64
19 245.9 -55
-160
20 135.6 51

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00020\H1, 3_I1sv00000 - 350 a.csv

Coherence TP: 350 mid (a) [Hit 350 psv] (a)


Channel: 3 20 12910 48762 3 1 5 1115 13 1918
17
1.00 14 16

Date: May 31, 2016 00:43


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 197.5 9.95E-01
0.70 2 181.9 9.98E-01
3 185.0 9.87E-01
4 175.3 9.99E-01
0.60 5 202.8 9.97E-01
6 180.3 9.98E-01
Magnitude

7 179.1 9.98E-01
0.50 8 178.1 9.96E-01
9 164.7 9.98E-01
10 168.8 9.98E-01
0.40 11 213.8 9.96E-01
12 160.6 9.98E-01
13 228.4 9.86E-01
0.30 14 230.3 9.89E-01
15 218.4 9.97E-01
16 278.8 9.86E-01
0.20 17 250.9 9.97E-01
18 250.0 9.92E-01
0.10 19 245.9 9.98E-01
20 135.6 9.92E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00020\C1, 3_I1sv00000 - 350 a.csv

Vibration, Dynamics & Noise Page 243 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.42

Transfer Function TP: 350 mp (a) [Hit 350 psv] (a)


0.011
Channel: 4
Date: May 31, 2016 00:43
0.010 Setup:
1 Note:
2
3
0.009 Freq. Amplitude
# Hz ips / lbf
0.008 1 94.4 9.51E-03
4 2 93.8 9.30E-03
5 3 185.0 9.03E-03
0.007 4 197.2 7.38E-03
5 202.2 7.19E-03
Amplitude (ips / lbf)

6 129.1 5.68E-03
0.006 6 7 65.9 5.19E-03
7 8 181.9 5.00E-03
9 8
0.005 9 92.8 4.94E-03
10 10 188.8 4.58E-03
11
12 11 65.3 4.27E-03
0.004 14 15 13 12 189.7 4.12E-03
16
17 13 193.8 3.73E-03
18
0.003 20 19 14 67.2 3.60E-03
15 74.1 3.51E-03
16 180.3 3.48E-03
0.002 17 179.1 3.24E-03
18 70.0 3.13E-03
19 176.9 2.96E-03
0.001 20 145.3 2.84E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00020\H1, 4_I1sv00000 - 350 a.csv

Transfer Function TP: 350 mp (a) [Hit 350 psv] (a)


200
Channel: 4
5
20 Date: May 31, 2016 00:43
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
19 1 94.4 -143
80 2 93.8 -92
17 3 185.0 -17
16
11 4 197.2 -145
40 8 5 202.2 179
Phase (degrees)

7
6 129.1 -146
7 65.9 12
0 8 181.9 31
3
15 9 92.8 -63
18 10 188.8 -76
-40 11 65.3 43
9 12 189.7 -83
14 10 13 193.8 -105
-80 12
2 14 67.2 -76
13 15 74.1 -24
16 180.3 52
-120 17 179.1 59
1 6 4 18 70.0 -42
19 176.9 84
-160
20 145.3 167

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00020\H1, 4_I1sv00000 - 350 a.csv

Coherence TP: 350 mp (a) [Hit 350 psv] (a)


Channel: 4 6 20 168 310
17
19 12134 5
1.00
15 Date: May 31, 2016 00:43
11 Setup:
0.90
7 Note:
9

0.80 2 Freq. Magnitude


#Hz
1 94.4 5.53E-01
0.70 2 93.8 7.75E-01
3 185.0 9.87E-01
4 197.2 9.92E-01
0.60 5 202.2 9.99E-01
14 1 6 129.1 9.94E-01
Magnitude

18 7 65.9 8.62E-01
0.50 8 181.9 9.98E-01
9 92.8 8.33E-01
10 188.8 9.92E-01
0.40 11 65.3 9.00E-01
12 189.7 9.93E-01
13 193.8 9.95E-01
0.30 14 67.2 5.52E-01
15 74.1 9.22E-01
16 180.3 9.98E-01
0.20 17 179.1 9.97E-01
18 70.0 5.16E-01
0.10 19 176.9 9.93E-01
20 145.3 9.97E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00020\C1, 4_I1sv00000 - 350 a.csv

Vibration, Dynamics & Noise Page 244 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.43

Transfer Function TP: 314 (a) [Hit 314] (a)


0.040
Channel: 2
Date: May 31, 2016 01:00
0.036 1 Setup:
Note:

0.032 Freq. Amplitude


# Hz ips / lbf
1 78.1 3.57E-02
0.028 2 2 55.6 2.72E-02
3 54.4 1.74E-02
4 82.5 1.24E-02
0.024 5 323.8 1.22E-02
Amplitude (ips / lbf)

6 31.9 1.21E-02
7 30.6 1.20E-02
0.020 8 76.6 1.04E-02
3 9 33.8 9.50E-03
10 72.2 8.37E-03
0.016 11 73.4 7.46E-03
12 68.1 6.26E-03
76 4 5 13 313.1 5.18E-03
0.012 14 340.0 5.04E-03
8
9 15 34.7 5.01E-03
10 16 69.4 4.58E-03
0.008 11
17 107.5 4.51E-03
12
15 13 14 18 27.5 4.41E-03
18 19 16 17
20 19 49.1 4.33E-03
0.004
20 113.8 3.97E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00021\H1, 2_I1sv00000 - 314 a.csv

Transfer Function TP: 314 (a) [Hit 314] (a)


200
Channel: 2
Date: May 31, 2016 01:00
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
18 1 78.1 -27
80 2 55.6 -14
3 54.4 39
19 3 4 82.5 -54
40 108 13
7 12 5 323.8 0
Phase (degrees)

6 6 31.9 17
11 7 30.6 30
16 5
0 2 8 76.6 38
1 9 33.8 -43
9 17 10 72.2 37
-40 4
14 11 73.4 8
15
20 12 68.1 30
13 313.1 38
-80 14 340.0 -48
15 34.7 -57
16 69.4 1
-120 17 107.5 -41
18 27.5 81
19 49.1 43
-160
20 113.8 -62

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00021\H1, 2_I1sv00000 - 314 a.csv

Coherence TP: 314 (a) [Hit 314] (a)


Channel: 92
187615 1181 4
1210 17 20 13
1.00 19 32 5 14

16 Date: May 31, 2016 01:00


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 78.1 9.97E-01
0.70 2 55.6 9.89E-01
3 54.4 9.90E-01
4 82.5 9.99E-01
0.60 5 323.8 9.86E-01
6 31.9 9.92E-01
Magnitude

7 30.6 9.94E-01
0.50 8 76.6 9.98E-01
9 33.8 9.97E-01
10 72.2 9.95E-01
0.40 11 73.4 9.94E-01
12 68.1 9.88E-01
13 313.1 9.93E-01
0.30 14 340.0 9.85E-01
15 34.7 9.96E-01
16 69.4 9.10E-01
0.20 17 107.5 9.95E-01
18 27.5 9.98E-01
0.10 19 49.1 9.81E-01
20 113.8 9.95E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00021\C1, 2_I1sv00000 - 314 a.csv

Vibration, Dynamics & Noise Page 245 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.44

Transfer Function TP: 314 (h) [Hit 314] (h)


0.13
Channel: 2
Date: May 31, 2016 01:02
0.12 Setup:
1 Note:
0.11
Freq. Amplitude
0.10 # Hz ips / lbf
1 61.6 1.11E-01
0.09 2 113.1 4.19E-02
3 54.4 1.44E-02
0.08 4 339.7 1.28E-02
5 139.1 9.03E-03
Amplitude (ips / lbf)

6 48.8 8.01E-03
0.07 7 261.3 7.93E-03
8 95.9 7.61E-03
0.06 9 263.1 6.86E-03
10 343.8 6.54E-03
0.05 11 344.4 6.35E-03
12 68.4 6.25E-03
2
0.04 13 345.3 6.17E-03
14 345.9 6.14E-03
15 55.3 6.00E-03
0.03 16 347.2 5.73E-03
17 119.1 5.72E-03
0.02
3
4
0.01 6 8 5 79
15 12 17 10
11
13
14
16

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00022\H1, 2_I1sv00000 - 314 h.csv

Transfer Function TP: 314 (h) [Hit 314] (h)


200
Channel: 2
Date: May 31, 2016 01:02
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 61.6 -35
80 2 113.1 -20
3 54.4 35
6 4 339.7 -19
15
40 3 5 139.1 -29
Phase (degrees)

6 48.8 48
7 261.3 -11
0 8
7 8 95.9 -5
2 4 9 263.1 -47
5
1 10 343.8 -58
-40 9 11 344.4 -60
10
11
13
17
14
16
12 68.4 -74
12
13 345.3 -60
-80 14 345.9 -63
15 55.3 42
16 347.2 -70
-120 17 119.1 -69

-160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00022\H1, 2_I1sv00000 - 314 h.csv

Coherence TP: 314 (h) [Hit 314] (h)


Channel: 2 6 3 1 12 8 2 17 5 79 410
1116
13
14
1.00 15
Date: May 31, 2016 01:02
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 61.6 9.92E-01
0.70 2 113.1 9.97E-01
3 54.4 9.89E-01
4 339.7 9.94E-01
0.60 5 139.1 9.91E-01
6 48.8 9.88E-01
Magnitude

7 261.3 9.96E-01
0.50 8 95.9 9.91E-01
18 9 263.1 9.92E-01
10 343.8 9.97E-01
0.40 11 344.4 9.95E-01
12 68.4 9.96E-01
13 345.3 9.94E-01
0.30 14 345.9 9.95E-01
15 55.3 9.64E-01
16 347.2 9.96E-01
0.20 17 119.1 9.98E-01
18 0.0 4.45E-01
0.10

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00022\C1, 2_I1sv00000 - 314 h.csv

Vibration, Dynamics & Noise Page 246 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.45

Transfer Function TP: 336 (v) [Hit 336] (v)


0.030
Channel: 2
Date: May 31, 2016 01:06
0.027 Setup:
1 Note:

0.024 Freq. Amplitude


# Hz ips / lbf
1 68.1 2.54E-02
0.021 2 2 130.3 2.02E-02
3 135.6 1.53E-02
4 113.1 1.30E-02
0.018 5 138.8 1.27E-02
Amplitude (ips / lbf)

6 133.8 1.20E-02
3 7 126.3 1.14E-02
0.015 8 57.5 9.37E-03
4 9 180.0 9.33E-03
5
6 10 148.4 9.16E-03
0.012 7 11 276.6 8.85E-03
12 149.4 8.75E-03
8 10 9 13 45.3 6.90E-03
12 11
0.009 14 44.1 6.46E-03
13 15 60.9 6.37E-03
14 15 16
18 17 16 110.3 6.26E-03
0.006 19 20 17 182.8 5.86E-03
18 43.4 5.82E-03
19 49.4 5.17E-03
0.003
20 157.8 4.92E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00023\H1, 2_I1sv00000 - 336 v.csv

Transfer Function TP: 336 (v) [Hit 336] (v)


200
Channel: 2
Date: May 31, 2016 01:06
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 68.1 3
80 18 2 130.3 5
14 16 3 135.6 -28
15 7 4 113.1 -2
40 13 8 5 138.8 -48
Phase (degrees)

19
6 133.8 -13
1 4
2 7 126.3 48
0 6 8 57.5 34
3 10 11 9 180.0 -37
9 10 148.4 -29
-40 5 12 11 276.6 -26
20
17 12 149.4 -49
13 45.3 31
-80 14 44.1 56
15 60.9 51
16 110.3 54
-120 17 182.8 -68
18 43.4 70
19 49.4 25
-160
20 157.8 -55

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00023\H1, 2_I1sv00000 - 336 v.csv

Coherence TP: 336 (v) [Hit 336] (v)


Channel: 2 1819
14
13 8 1 164 7 2 63 5 10
12 20 917 11
1.00 15

Date: May 31, 2016 01:06


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 68.1 9.88E-01
0.70 2 130.3 9.98E-01
3 135.6 9.91E-01
4 113.1 9.95E-01
0.60 5 138.8 9.99E-01
6 133.8 9.97E-01
Magnitude

7 126.3 9.98E-01
0.50 8 57.5 9.92E-01
9 180.0 9.95E-01
10 148.4 9.94E-01
0.40 11 276.6 9.94E-01
12 149.4 9.96E-01
13 45.3 9.96E-01
0.30 14 44.1 9.96E-01
15 60.9 9.72E-01
16 110.3 9.98E-01
0.20 17 182.8 9.94E-01
18 43.4 9.97E-01
0.10 19 49.4 9.97E-01
20 157.8 9.91E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00023\C1, 2_I1sv00000 - 336 v.csv

Vibration, Dynamics & Noise Page 247 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.46

Transfer Function TP: 399 (h) [Hit 399] (h)


0.30
Channel: 2
Date: May 31, 2016 01:13
0.27 Setup:
Note:
1
0.24 Freq. Amplitude
# Hz ips / lbf
2 1 213.8 2.41E-01
0.21 2 226.6 2.18E-01
3 158.1 7.06E-02
4 205.9 4.80E-02
0.18 5 232.8 4.42E-02
Amplitude (ips / lbf)

6 262.2 4.19E-02
7 163.1 4.03E-02
0.15 8 179.4 3.69E-02
9 161.6 3.30E-02
10 152.8 2.91E-02
0.12 11 25.0 2.73E-02
12 134.7 1.79E-02
13 257.2 1.48E-02
0.09 14 274.4 1.46E-02
3 15 170.9 1.33E-02
16 173.1 1.27E-02
0.06
4
5 6
7 8
9
11 10
0.03
12 13 14
15
16

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00024\H1, 2_I1sv00000 - 399 h.csv

Transfer Function TP: 399 (h) [Hit 399] (h)


200
Channel: 2
Date: May 31, 2016 01:13
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 213.8 14
80 2 226.6 -36
12 10 4 3 158.1 41
3 4 205.9 61
40 11 5 232.8 -84
Phase (degrees)

9
15 1 6 262.2 -54
7 16 7 163.1 3
0 8 13 8 179.4 -12
9 161.6 19
2 10 152.8 56
-40 6 11 25.0 26
12 134.7 56
5 13 257.2 -14
-80 14 14 274.4 -93
15 170.9 12
16 173.1 2
-120

-160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00024\H1, 2_I1sv00000 - 399 h.csv

Coherence TP: 399 (h) [Hit 399] (h)


Channel:
11 2 12 10 3 97 15
16 4 1 2 5 13 6 14
1.00 8

Date: May 31, 2016 01:13


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 213.8 9.99E-01
0.70 2 226.6 9.95E-01
3 158.1 9.97E-01
4 205.9 1.00E+00
0.60 5 232.8 9.99E-01
6 262.2 9.99E-01
Magnitude

7 163.1 9.96E-01
0.50 8 179.4 9.74E-01
9 161.6 9.99E-01
10 152.8 9.98E-01
0.40 11 25.0 9.96E-01
12 134.7 9.93E-01
13 257.2 9.96E-01
0.30 14 274.4 9.99E-01
15 170.9 9.96E-01
16 173.1 9.96E-01
0.20 17 0.0 7.30E-02

0.10 17

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00024\C1, 2_I1sv00000 - 399 h.csv

Vibration, Dynamics & Noise Page 248 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.47

Transfer Function TP: 399 (a) [Hit 399] (a)


0.70
Channel: 2
Date: May 31, 2016 01:15
1 Setup:
0.60 Note:

Freq. Amplitude
# Hz ips / lbf
1 79.4 6.28E-01
0.50 2 86.3 2.76E-01
3 87.2 1.91E-01
4 288.4 9.68E-02
5 287.5 9.49E-02
Amplitude (ips / lbf)

0.40 6 29.4 4.71E-02


7 65.6 3.96E-02
8 135.0 3.74E-02
9 296.9 3.71E-02
0.30 2 10 233.4 3.24E-02

0.20 3

0.10 54

6 7 8 10 9

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00025\H1, 2_I1sv00000 - 399 a.csv

Transfer Function TP: 399 (a) [Hit 399] (a)


200
Channel: 2
Date: May 31, 2016 01:15
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 79.4 0
80 2 86.3 4
7 3 87.2 -44
4 288.4 -18
40 10 5 287.5 -3
Phase (degrees)

6 6 29.4 22
1 2 7 65.6 60
0 5
8 135.0 -17
8 4
9 296.9 -70
10 233.4 28
-40 3

9
-80

-120

-160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00025\H1, 2_I1sv00000 - 399 a.csv

Coherence TP: 399 (a) [Hit 399] (a)


Channel:6 2 7 23 8 10 54 9
1.00 1

Date: May 31, 2016 01:15


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 79.4 9.72E-01
0.70 2 86.3 9.87E-01
3 87.2 9.94E-01
4 288.4 9.99E-01
0.60 5 287.5 9.98E-01
6 29.4 9.94E-01
Magnitude

7 65.6 9.97E-01
0.50 8 135.0 9.95E-01
9 296.9 9.98E-01
10 233.4 9.97E-01
0.40 11 0.0 4.28E-02

0.30

0.20

0.10
11

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00025\C1, 2_I1sv00000 - 399 a.csv

Vibration, Dynamics & Noise Page 249 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.48

Transfer Function TP: 437 (h) [Hit 437] (h)


1.6
Channel: 2
Date: May 31, 2016 01:19
1 Setup:
1.4 Note:

Freq. Amplitude
# Hz ips / lbf
1.2 1 51.6 1.42E+00

1.0
Amplitude (ips / lbf)

0.8

0.6

0.4

0.2

0.0
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00026\H1, 2_I1sv00000 - 437 h.csv

Transfer Function TP: 437 (h) [Hit 437] (h)


200
Channel: 2
2
Date: May 31, 2016 01:19
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 51.6 61
80 2 0.0 180
1

40
Phase (degrees)

-40

-80

-120

-160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00026\H1, 2_I1sv00000 - 437 h.csv

Coherence TP: 437 (h) [Hit 437] (h)


Channel: 2
1.00 1

Date: May 31, 2016 01:19


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 51.6 9.78E-01
0.70 2 0.0 2.88E-02

0.60
Magnitude

0.50

0.40

0.30

0.20

0.10
2
0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00026\C1, 2_I1sv00000 - 437 h.csv

Vibration, Dynamics & Noise Page 250 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.49

Transfer Function TP: 237 (v) [Hit 237] (v)


0.080
Channel: 2
Date: May 31, 2016 01:21
Setup:
0.070 Note:
1

Freq. Amplitude
# Hz ips / lbf
0.060 1 113.4 6.67E-02
2 114.7 3.89E-02
3 109.7 3.53E-02
0.050 4 123.8 3.24E-02
5 108.4 2.72E-02
Amplitude (ips / lbf)

6 105.9 2.04E-02
7 117.2 1.79E-02
0.040 2 8 103.4 1.69E-02
3 9 121.9 1.56E-02
4 10 131.3 1.31E-02
0.030 11 101.6 1.17E-02
5 12 120.0 1.13E-02
13 78.1 1.13E-02
6
14 99.4 9.52E-03
0.020 7 15 135.0 8.41E-03
8 16 135.9 8.19E-03
9
10 17 134.4 8.17E-03
13 11 12
14 18 97.8 7.73E-03
0.010 18 15
17
16 19 140.0 6.70E-03
20 19
20 86.3 6.57E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00027\H1, 2_I1sv00000 - 237 v.csv

Transfer Function TP: 237 (v) [Hit 237] (v)


200
Channel: 2
Date: May 31, 2016 01:21
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
18
14
1 113.4 -16
80 11 2 114.7 -45
8
6 3 109.7 33
5
4 123.8 -36
40 13 20 3 5 108.4 51
Phase (degrees)

6 105.9 61
7 117.2 -42
0 8 103.4 68
1
12 9 121.9 -33
94 10 131.3 -64
-40 27
11 101.6 77
10 12 120.0 -27
17
1519 13 78.1 34
16
-80 14 99.4 80
15 135.0 -74
16 135.9 -81
-120 17 134.4 -74
18 97.8 87
19 140.0 -74
-160
20 86.3 39

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00027\H1, 2_I1sv00000 - 237 v.csv

Coherence TP: 237 (v) [Hit 237] (v)


Channel: 2 13 20 181186 3 127129 1017
14 1519
1.00 5 4 16

Date: May 31, 2016 01:21


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 113.4 9.98E-01
0.70 2 114.7 9.97E-01
3 109.7 9.91E-01
4 123.8 9.76E-01
0.60 5 108.4 9.81E-01
6 105.9 9.89E-01
Magnitude

7 117.2 9.98E-01
0.50 8 103.4 9.94E-01
9 121.9 9.84E-01
10 131.3 9.98E-01
0.40 11 101.6 9.95E-01
12 120.0 9.88E-01
13 78.1 9.95E-01
0.30 14 99.4 9.98E-01
15 135.0 9.92E-01
16 135.9 9.83E-01
0.20 17 134.4 9.94E-01
18 97.8 9.97E-01
0.10 19 140.0 9.93E-01
20 86.3 9.87E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00027\C1, 2_I1sv00000 - 237 v.csv

Vibration, Dynamics & Noise Page 251 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.50

Transfer Function TP: 212 (h) [Hit 212] (h)


4.0
Channel: 2
Date: May 31, 2016 01:26
3.6 Setup:
Note:
1
3.2 Freq. Amplitude
# Hz ips / lbf
1 428.1 3.26E+00
2.8

2.4
Amplitude (ips / lbf)

2.0

1.6

1.2

0.8

0.4

0.0
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00028\H1, 2_I1sv00000 - 212 h.csv

Transfer Function TP: 212 (h) [Hit 212] (h)


200
Channel: 2
2
Date: May 31, 2016 01:26
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 428.1 -175
80 2 0.0 180

40
Phase (degrees)

-40

-80

-120

-160
1

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00028\H1, 2_I1sv00000 - 212 h.csv

Coherence TP: 212 (h) [Hit 212] (h)


Channel: 2
1.00
1
Date: May 31, 2016 01:26
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 428.1 9.62E-01
0.70 2 0.0 5.18E-02

0.60
Magnitude

0.50

0.40

0.30

0.20

0.10
2

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00028\C1, 2_I1sv00000 - 212 h.csv

Vibration, Dynamics & Noise Page 252 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.51

Transfer Function TP: 436 (h) [Hit 436] (h)


0.50
Channel: 2
Date: May 31, 2016 01:31
1
0.45 Setup:
Note:

0.40 Freq. Amplitude


# Hz ips / lbf
1 156.6 4.51E-01
0.35 2 125.9 3.24E-01
2 3 155.3 2.31E-01
4 51.9 2.14E-01
0.30 5 183.8 1.55E-01
Amplitude (ips / lbf)

6 82.2 8.78E-02
7 63.8 6.00E-02
0.25 8 82.8 5.91E-02
3
4 9 150.0 5.02E-02
10 148.8 4.91E-02
0.20 11 113.1 3.96E-02
12 132.8 3.73E-02
5 13 335.9 3.49E-02
0.15 14 135.6 3.10E-02
15 134.1 3.06E-02
16 177.2 2.56E-02
0.10 6 17 136.9 2.48E-02
7 8
9
10
0.05 11 1214 13
1517 16

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00029\H1, 2_I1sv00000 - 436 h.csv

Transfer Function TP: 436 (h) [Hit 436] (h)


200
Channel: 2
18
Date: May 31, 2016 01:31
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 156.6 -14
80 11 2 125.9 5
3 155.3 21
9
10 4 51.9 -27
40 7 5 183.8 -46
Phase (degrees)

3 6 82.2 7
68 2 7 63.8 35
0 1 13 8 82.8 10
4 9 150.0 44
10 148.8 43
-40 17
14
15
12 5
11 113.1 70
12 132.8 -50
16 13 335.9 -14
-80 14 135.6 -45
15 134.1 -48
16 177.2 -81
-120 17 136.9 -45
18 0.0 180
-160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00029\H1, 2_I1sv00000 - 436 h.csv

Coherence TP: 436 (h) [Hit 436] (h)


Channel: 2 4 68 11 2 12
15
17
14 10
9 1 16 5
1.00 7 3 13

Date: May 31, 2016 01:31


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
18
1 156.6 9.98E-01
0.70 2 125.9 9.99E-01
3 155.3 9.88E-01
4 51.9 9.93E-01
0.60 5 183.8 9.97E-01
6 82.2 9.96E-01
Magnitude

7 63.8 9.78E-01
0.50 8 82.8 9.96E-01
9 150.0 1.00E+00
10 148.8 1.00E+00
0.40 11 113.1 9.99E-01
12 132.8 9.99E-01
13 335.9 9.87E-01
0.30 14 135.6 9.97E-01
15 134.1 9.99E-01
16 177.2 1.00E+00
0.20 17 136.9 9.99E-01
18 0.0 7.32E-01
0.10

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00029\C1, 2_I1sv00000 - 436 h.csv

Vibration, Dynamics & Noise Page 253 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.52

Transfer Function TP: 435 (a) [Hit 435] (a)


0.020
Channel: 2
Date: May 31, 2016 01:35
0.018 1
Setup:
Note:

0.016 Freq. Amplitude


# Hz ips / lbf
1 29.4 1.75E-02
0.014 2
2 26.3 1.33E-02
3 38.1 9.15E-03
4 42.2 4.85E-03
0.012 5 43.4 3.63E-03
Amplitude (ips / lbf)

6 33.8 2.92E-03
7 44.7 2.70E-03
0.010 8 45.9 2.55E-03
3
9 47.2 2.37E-03
10 35.3 2.20E-03
0.008 11 51.9 1.58E-03
12 64.1 1.47E-03
13 55.3 1.28E-03
0.006 14 54.7 1.27E-03
4 15 335.9 1.21E-03
16 164.7 1.16E-03
0.004 5
17 163.1 1.09E-03
6 7
8 18 57.5 1.07E-03
10 9
19 82.5 1.04E-03
0.002 11 12
14
13
18 19 16
17 15 20 59.7 9.26E-04
20

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00030\H1, 2_I1sv00000 - 435 a.csv

Transfer Function TP: 435 (a) [Hit 435] (a)


200
Channel: 2

15 Date: May 31, 2016 01:35


17
160 10 Setup:
6 Note:
4
16
19
120 578
11 12 Freq. Phase
9 14
1320 # Hz degrees
18
1 29.4 -161
80 2 26.3 -120
3 38.1 -166
4 42.2 134
40 5 43.4 109
Phase (degrees)

6 33.8 142
7 44.7 107
0 8 45.9 110
9 47.2 99
10 35.3 150
-40 11 51.9 116
12 64.1 113
13 55.3 95
-80 14 54.7 96
15 335.9 165
2 16 164.7 129
-120 17 163.1 160
18 57.5 94
1 19 82.5 121
-160 3
20 59.7 97

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00030\H1, 2_I1sv00000 - 435 a.csv

Coherence TP: 435 (a) [Hit 435] (a)


Channel:102 5789 1114
13
18 19 16
17 15
1.00 20
12
6 4
2
Date: May 31, 2016 01:35
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 29.4 5.85E-01
0.70 2 26.3 9.07E-01
3 38.1 5.19E-01
4 42.2 9.49E-01
0.60 1 5 43.4 9.88E-01
6 33.8 9.51E-01
Magnitude

3 7 44.7 9.91E-01
0.50 8 45.9 9.95E-01
9 47.2 9.95E-01
10 35.3 9.85E-01
0.40 11 51.9 9.94E-01
12 64.1 9.72E-01
13 55.3 9.98E-01
0.30 14 54.7 9.95E-01
15 335.9 9.92E-01
16 164.7 9.97E-01
0.20 17 163.1 9.94E-01
18 57.5 9.96E-01
0.10 19 82.5 9.93E-01
20 59.7 9.87E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00030\C1, 2_I1sv00000 - 435 a.csv

Vibration, Dynamics & Noise Page 254 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.53

Transfer Function TP: 430 (v) [Hit 430] (v)


0.011
Channel: 2
Date: May 31, 2016 01:40
0.010 1 Setup:
Note:
2
0.009 Freq. Amplitude
# Hz ips / lbf
0.008 1 29.4 9.82E-03
2 26.6 9.18E-03
3 239.7 5.46E-03
0.007 4 239.1 5.42E-03
5 238.1 4.69E-03
Amplitude (ips / lbf)

6 28.4 3.72E-03
0.006 7 54.1 3.14E-03
43
8 243.1 2.83E-03
0.005 5
9 64.1 2.23E-03
10 51.9 1.74E-03
11 157.5 1.72E-03
0.004 6 12 50.6 1.29E-03
13 23.1 1.09E-03
7
0.003 8 14 256.9 9.84E-04
15 256.3 9.74E-04
9 16 67.2 9.64E-04
0.002 10 11 17 257.8 9.58E-04
12
18 44.7 8.82E-04
13 15
14 19 60.0 8.67E-04
0.001 18 19 16 20 17
20 84.7 8.62E-04

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00031\H1, 2_I1sv00000 - 430 v.csv

Transfer Function TP: 430 (v) [Hit 430] (v)


200
Channel: 2
Date: May 31, 2016 01:40
160 Setup:
Note:

120 Freq. Phase


13 # Hz degrees
1 29.4 -14
80 2 26.6 34
6 3 239.7 -11
4 239.1 5
40 2 5 238.1 20
Phase (degrees)

12
10 5 6 28.4 58
18 4 7 54.1 -9
0 11
1
7 9 3 8 243.1 -50
9 64.1 -11
19 20 10 51.9 22
-40 8 11 157.5 -3
16
15
14
12 50.6 24
17 13 23.1 95
-80 14 256.9 -70
15 256.3 -67
16 67.2 -57
-120 17 257.8 -76
18 44.7 4
19 60.0 -35
-160
20 84.7 -39

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00031\H1, 2_I1sv00000 - 430 v.csv

Coherence TP: 430 (v) [Hit 430] (v)


Channel:
13 2 18 12
107 19 16 11 543 8 15
14
17
1.00 6
20

1 9 Date: May 31, 2016 01:40


0.90 Setup:
Note:

0.80 2 Freq. Magnitude


#Hz
1 29.4 9.23E-01
0.70 2 26.6 7.74E-01
3 239.7 9.99E-01
4 239.1 9.99E-01
0.60 5 238.1 9.99E-01
6 28.4 9.67E-01
Magnitude

7 54.1 9.95E-01
0.50 8 243.1 9.99E-01
9 64.1 9.15E-01
10 51.9 9.91E-01
0.40 11 157.5 9.91E-01
12 50.6 9.96E-01
13 23.1 9.94E-01
0.30 14 256.9 9.97E-01
15 256.3 9.98E-01
16 67.2 9.94E-01
0.20 17 257.8 9.97E-01
18 44.7 9.97E-01
0.10 19 60.0 9.88E-01
20 84.7 9.86E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00031\C1, 2_I1sv00000 - 430 v.csv

Vibration, Dynamics & Noise Page 255 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.54

Transfer Function TP: 436 (v) [Hit 436] (v)


0.35
Channel: 2
Date: May 31, 2016 01:43
1 Setup:
0.30 Note:

Freq. Amplitude
2 # Hz ips / lbf
1 63.8 3.07E-01
0.25 2 81.9 2.61E-01
3 82.8 2.07E-01
4 51.9 8.37E-02
3
5 30.0 6.63E-02
Amplitude (ips / lbf)

0.20 6 163.1 4.56E-02


7 163.8 4.52E-02
8 91.3 2.78E-02
9 91.9 2.72E-02
0.15 10 66.3 2.72E-02
11 156.6 2.72E-02
12 93.4 2.68E-02
13 92.8 2.61E-02
0.10 14 67.2 2.41E-02
4 15 339.4 2.23E-02
5 16 27.2 2.21E-02
17 95.3 2.21E-02
0.05 67 18 335.9 1.76E-02
19 155.0 1.66E-02
10
14 812
9
13 11
16 17 15
19 18

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00032\H1, 2_I1sv00000 - 436 v.csv

Transfer Function TP: 436 (v) [Hit 436] (v)


200
Channel: 2
Date: May 31, 2016 01:43
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 63.8 -10
80 16 2 81.9 37
3 82.8 -17
4 51.9 -41
40 2
5 30.0 -3
Phase (degrees)

19 6 163.1 -22
18 7 163.8 -38
0 5
1 8 91.3 -76
3 11
6 15 9 91.9 -76
4 7 10 66.3 -63
-40 11 156.6 -16
10 12 93.4 -77
14 9
812
13 13 92.8 -78
-80 17
14 67.2 -80
15 339.4 -23
16 27.2 71
-120 17 95.3 -85
18 335.9 8
19 155.0 18
-160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00032\H1, 2_I1sv00000 - 436 v.csv

Coherence TP: 436 (v) [Hit 436] (v)


Channel: 2 110
14 812
917
23 13 67
1.00 4 1815
16
Date: May 31, 2016 01:43
0.90 11
Setup:
19 Note:

0.80 20 5 Freq. Magnitude


#Hz
1 63.8 9.95E-01
0.70 2 81.9 9.95E-01
3 82.8 9.98E-01
4 51.9 9.84E-01
0.60 5 30.0 7.75E-01
6 163.1 9.96E-01
Magnitude

7 163.8 9.92E-01
0.50 8 91.3 9.99E-01
9 91.9 9.99E-01
10 66.3 9.97E-01
0.40 11 156.6 8.74E-01
12 93.4 9.96E-01
13 92.8 9.98E-01
0.30 14 67.2 9.91E-01
15 339.4 9.85E-01
16 27.2 9.35E-01
0.20 17 95.3 9.98E-01
18 335.9 9.77E-01
0.10 19 155.0 8.58E-01
20 0.0 7.85E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00032\C1, 2_I1sv00000 - 436 v.csv

Vibration, Dynamics & Noise Page 256 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.55

Transfer Function TP: Cylinder 4 (v) [Hit Cylinder 4] (v)


0.0030
Channel: 2
Date: May 31, 2016 03:36
0.0027 1 Setup:
Note:

0.0024 Freq. Amplitude


2 # Hz ips / lbf
3 1 60.6 2.66E-03
0.0021 2 59.7 2.26E-03
3 59.1 2.15E-03
4 77.2 1.69E-03
0.0018 5 63.8 1.45E-03
Amplitude (ips / lbf)

4
6 62.8 1.28E-03
7 64.4 1.15E-03
0.0015 5 8 80.3 1.04E-03
6
9 202.2 1.01E-03
10 110.0 9.91E-04
0.0012 7 11 70.0 9.87E-04
8 9 12 69.4 9.62E-04
11
12 10
13 72.8 7.50E-04
0.0009 14 65.3 7.30E-04
15 14 13 15 42.2 7.00E-04
16
17 16 41.3 6.69E-04
0.0006 18 20 19
17 66.6 5.73E-04
18 43.1 5.68E-04
19 117.2 5.51E-04
0.0003
20 85.3 5.51E-04

0.0000
0 50 100 150 200 250 300 350 400 450 500
FrequencyC:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00033\H1,
(Hz) 2_I1sv00000 - c4 v.csv

Transfer Function TP: Cylinder 4 (v) [Hit Cylinder 4] (v)


200
Channel: 2
Date: May 31, 2016 03:36
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 60.6 13
80 2 59.7 28
3 59.1 40
16 4 77.2 -19
3
40 15 2 5 63.8 -36
Phase (degrees)

18 1 6 62.8 -23
12 7 64.4 -55
0 11 10 9 8 80.3 -33
13
617 4 9 202.2 -11
5 8 10 110.0 -12
-40 14 11 70.0 -11
7
20 19 12 69.4 -1
13 72.8 -18
-80 14 65.3 -49
15 42.2 30
16 41.3 49
-120 17 66.6 -25
18 43.1 14
19 117.2 -62
-160
20 85.3 -64

-200
0 50 100 150 200 250 300 350 400 450 500
FrequencyC:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00033\H1,
(Hz) 2_I1sv00000 - c4 v.csv

Coherence TP: Cylinder 4 (v) [Hit Cylinder 4] (v)


Channel: 21615 12 4 8 20
9
1.00 18 13
19
3 10
11
Date: May 31, 2016 03:36
2 Setup:
0.90
614 Note:
17

0.80 7 Freq. Magnitude


#Hz
1
1 60.6 7.03E-01
0.70 2 59.7 8.96E-01
5 3 59.1 9.60E-01
4 77.2 9.82E-01
0.60 5 63.8 6.54E-01
6 62.8 8.63E-01
Magnitude

7 64.4 7.79E-01
0.50 8 80.3 9.79E-01
9 202.2 9.98E-01
10 110.0 9.50E-01
0.40 11 70.0 9.07E-01
12 69.4 9.86E-01
13 72.8 9.64E-01
0.30 14 65.3 8.52E-01
15 42.2 9.85E-01
16 41.3 9.92E-01
0.20 17 66.6 8.36E-01
18 43.1 9.72E-01
0.10 19 117.2 9.82E-01
20 85.3 9.97E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
FrequencyC:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00033\C1,
(Hz) 2_I1sv00000 - c4 v.csv

Vibration, Dynamics & Noise Page 257 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.56

Transfer Function TP: 436 (a) [Hit 436] (a)


0.070
Channel: 2
Date: May 31, 2016 04:07
Setup:
0.060 Note:
1
Freq. Amplitude
# Hz ips / lbf
1 334.7 5.63E-02
0.050 2 333.4 3.60E-02
3 340.6 3.28E-02
4 74.1 2.76E-02
5 336.3 2.76E-02
Amplitude (ips / lbf)

0.040 6 332.8 2.59E-02


2 7 82.2 2.48E-02
3 8 162.8 2.39E-02
9 331.9 2.38E-02
0.030 4 5
10 164.4 2.29E-02
6 11 337.5 2.28E-02
7
12
8
10
9
11 12 150.6 2.27E-02
13
14 13 340.0 2.20E-02
1816 15
17
0.020 19
20 14 339.4 2.18E-02
15 341.3 2.01E-02
16 152.8 1.97E-02
17 342.5 1.95E-02
0.010 18 149.4 1.93E-02
19 344.1 1.88E-02
20 341.9 1.86E-02

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00034\H1, 2_I1sv00000 - 436 a.csv

Transfer Function TP: 436 (a) [Hit 436] (a)


200
Channel: 2
Date: May 31, 2016 04:07
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 334.7 20
80 9
2 333.4 48
3 340.6 -29
62 4 74.1 7
40 18 14 5 336.3 -50
Phase (degrees)

1 6 332.8 48
4 12 7 82.2 -15
0 8
13 8 162.8 -14
7 16
113 9 331.9 67
15
20 10 164.4 -48
-40 10 5 17 11 337.5 -27
19 12 150.6 7
13 340.0 -8
-80 14 339.4 34
15 341.3 -34
16 152.8 -19
-120 17 342.5 -46
18 149.4 32
19 344.1 -64
-160
20 341.9 -35

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00034\H1, 2_I1sv00000 - 436 a.csv

Coherence TP: 436 (a) [Hit 436] (a)


Channel: 2 4 18
12
1.00 7
16 10
8

Date: May 31, 2016 04:07


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 334.7 6.15E-01
0.70 2 333.4 5.33E-01
3 340.6 2.19E-01
6
1 4 74.1 9.99E-01
0.60 5 336.3 2.37E-01
9 6 332.8 6.30E-01
Magnitude

2
7 82.2 9.68E-01
0.50 8 162.8 9.77E-01
9 331.9 5.50E-01
10 164.4 9.80E-01
0.40 17
11 337.5 2.32E-01
12 150.6 9.91E-01
19 13 340.0 7.74E-02
0.30 15 14 339.4 4.38E-02
20
5
11 15 341.3 2.80E-01
3
16 152.8 9.84E-01
0.20 17 342.5 3.88E-01
18 149.4 9.92E-01
0.10 19 344.1 3.11E-01
13
20 341.9 2.56E-01
14

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00034\C1, 2_I1sv00000 - 436 a.csv

Vibration, Dynamics & Noise Page 258 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.57

Transfer Function TP: Cylinder 1 (a) [Hit Cylinder 1] (a)


0.0060
Channel: 2
Date: May 31, 2016 04:15
Setup:
Note:
0.0050 1
Freq. Amplitude
# Hz ips / lbf
1 32.8 4.81E-03
2
2 31.6 4.18E-03
0.0040 3 29.7 2.31E-03
4 55.6 1.88E-03
5 28.1 1.66E-03
Amplitude (ips / lbf)

6 36.6 1.02E-03
7 25.3 9.27E-04
0.0030 8 82.2 7.73E-04
9 76.9 7.59E-04
10 207.2 7.31E-04
3
11 208.8 6.17E-04
12 81.6 6.11E-04
0.0020 4 13 57.8 6.02E-04
5 14 51.9 5.97E-04
15 86.6 5.73E-04
16 77.8 5.35E-04
6 17 48.4 5.17E-04
0.0010 7
18 89.1 5.02E-04
9 8 10
14 13 1215 11 19 71.6 5.00E-04
17 19 16
20 18
20 80.3 4.68E-04

0.0000
0 50 100 150 200 250 300 350 400 450 500
FrequencyC:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00035\H1,
(Hz) 2_I1sv00000 - c1 a.csv

Transfer Function TP: Cylinder 1 (a) [Hit Cylinder 1] (a)


200
Channel: 2
Date: May 31, 2016 04:15
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
7 1 32.8 -30
80 5
2 31.6 9
3 3 29.7 54
4 55.6 -16
40 5 28.1 67
Phase (degrees)

6 36.6 -72
2 10
19 9 12 7 25.3 82
0 14
4 11 8 82.2 -25
17 208
16 9 76.9 -4
1
10 207.2 11
-40 15
11 208.8 -14
13 18 12 81.6 -2
6
13 57.8 -63
-80 14 51.9 -2
15 86.6 -45
16 77.8 -25
-120 17 48.4 -22
18 89.1 -67
19 71.6 0
-160
20 80.3 -21

-200
0 50 100 150 200 250 300 350 400 450 500
FrequencyC:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00035\H1,
(Hz) 2_I1sv00000 - c1 a.csv

Coherence TP: Cylinder 1 (a) [Hit Cylinder 1] (a)


Channel:
75321 2
6 17144 15
18 10
11
1.00 16
920
12
8
Date: May 31, 2016 04:15
0.90 13 Setup:
Note:

0.80 Freq. Magnitude


19
#Hz
1 32.8 9.98E-01
0.70 2 31.6 9.98E-01
3 29.7 9.98E-01
4 55.6 9.97E-01
0.60 5 28.1 9.95E-01
6 36.6 9.99E-01
Magnitude

7 25.3 9.98E-01
0.50 8 82.2 9.57E-01
9 76.9 9.45E-01
10 207.2 9.97E-01
0.40 11 208.8 9.98E-01
12 81.6 9.39E-01
13 57.8 8.92E-01
0.30 14 51.9 9.94E-01
15 86.6 9.99E-01
16 77.8 9.77E-01
0.20 17 48.4 9.94E-01
18 89.1 9.96E-01
0.10 19 71.6 7.34E-01
20 80.3 9.57E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
FrequencyC:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00035\C1,
(Hz) 2_I1sv00000 - c1 a.csv

Vibration, Dynamics & Noise Page 259 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.58

Transfer Function TP: 450 psv (a) [Hit 450 psv] (a)
0.20
Channel: 2
Date: May 31, 2016 06:45
0.18 Setup:
Note:
1

0.16 Freq. Amplitude


2 # Hz ips / lbf
1 253.4 1.67E-01
0.14 2 252.5 1.48E-01
3 456.6 1.10E-01
4 250.9 1.08E-01
0.12 5 451.6 1.02E-01
Amplitude (ips / lbf)

4 3 6 474.4 1.02E-01
57 6 7 454.4 1.01E-01
0.10 8 8 457.5 9.43E-02
10 9 9 458.4 8.79E-02
1213 11
14 10 452.5 8.63E-02
15
0.08 11 459.4 8.54E-02
16 12 450.3 8.33E-02
17 1819
20 13 453.1 8.16E-02
0.06 14 449.4 8.16E-02
15 455.3 8.01E-02
16 256.3 6.75E-02
0.04 17 448.8 6.32E-02
18 473.1 6.15E-02
19 476.6 6.14E-02
0.02
20 471.3 6.09E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00036\H1, 2_I1sv00000 - 450 a.csv

Transfer Function TP: 450 psv (a) [Hit 450 psv] (a)
200
Channel: 2
Date: May 31, 2016 06:45
160 Setup:
16 Note:

120 Freq. Phase


# Hz degrees
1 253.4 -173
80 2 252.5 -145
3 456.6 -21
4 250.9 -121
40 5 451.6 9
Phase (degrees)

17 6 474.4 -66
5
14
12
10 7 454.4 -31
0 13 8 457.5 -25
38 9 458.4 -57
7
10 452.5 2
-40 15 11 459.4 -64
9 18
11
206
12 450.3 3
19 13 453.1 -6
-80 14 449.4 5
15 455.3 -47
4 16 256.3 142
-120 17 448.8 21
2 18 473.1 -58
19 476.6 -81
-160 1 20 471.3 -71

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00036\H1, 2_I1sv00000 - 450 a.csv

Coherence TP: 450 psv (a) [Hit 450 psv] (a)


Channel: 2
1.00
Date: May 31, 2016 06:45
0.90 21 Setup:
4
Note:
16

0.80 Freq. Magnitude


#Hz
1 253.4 8.85E-01
0.70 20
186
2 252.5 8.88E-01
5
3 456.6 3.47E-01
19 4 250.9 8.70E-01
0.60 14 5 451.6 6.61E-01
13
12
107 11
9 6 474.4 6.57E-01
Magnitude

7 454.4 5.46E-01
0.50 8 457.5 3.36E-01
9 458.4 5.36E-01
17 10 452.5 5.46E-01
0.40 11 459.4 5.58E-01
38
15 12 450.3 5.46E-01
13 453.1 5.52E-01
0.30 14 449.4 5.82E-01
15 455.3 3.45E-01
16 256.3 8.34E-01
0.20 17 448.8 4.03E-01
18 473.1 6.64E-01
0.10 19 476.6 6.20E-01
20 471.3 6.64E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00036\C1, 2_I1sv00000 - 450 a.csv

Vibration, Dynamics & Noise Page 260 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.59

Transfer Function TP: 450 mid (a) [Hit 450 psv] (a)
0.10
Channel: 3
Date: May 31, 2016 06:45
0.09 1 Setup:
Note:

0.08 2 Freq. Amplitude


# Hz ips / lbf
1 253.4 8.83E-02
0.07 2 252.5 7.82E-02
3 250.9 5.72E-02
4 456.6 4.89E-02
0.06 5 454.4 4.56E-02
Amplitude (ips / lbf)

3
6 474.4 4.49E-02
7 451.6 4.40E-02
0.05 4
8 457.5 4.17E-02
5 6
7 9 458.4 4.00E-02
8 10 459.4 3.89E-02
9
0.04 11 10
1312 11 452.5 3.77E-02
15 1614
1917
20 18 12 455.3 3.66E-02
13 450.3 3.64E-02
0.03 14 453.1 3.60E-02
15 245.6 3.57E-02
16 449.4 3.51E-02
0.02 17 246.3 3.48E-02
18 256.3 3.39E-02
19 243.4 3.38E-02
0.01
20 247.2 3.33E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00036\H1, 3_I1sv00000 - 450 a.csv

Transfer Function TP: 450 mid (a) [Hit 450 psv] (a)
200
Channel: 3
Date: May 31, 2016 06:45
160 Setup:
18 Note:

120 Freq. Phase


# Hz degrees
1 253.4 -170
80 2 252.5 -142
3 250.9 -117
4 456.6 -25
40 5 454.4 -35
Phase (degrees)

6 474.4 -71
7
16
13
7 451.6 5
0 11
14 8 457.5 -31
4 9 458.4 -62
58 10 459.4 -69
-40 12 11 452.5 -3
9 12 455.3 -51
10 6
13 450.3 -1
-80 14 453.1 -10
19
15 15 245.6 -109
17 3 16 449.4 2
-120 20
17 246.3 -116
2
18 256.3 144
19 243.4 -105
-160 1 20 247.2 -125

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00036\H1, 3_I1sv00000 - 450 a.csv

Coherence TP: 450 mid (a) [Hit 450 psv] (a)


Channel: 3
1.00

1920
17
Date: May 31, 2016 06:45
15 Setup:
0.90 2
31
Note:
18
0.80 Freq. Magnitude
#Hz
1 253.4 8.84E-01
0.70 2 252.5 8.85E-01
6
7 3 250.9 8.72E-01
4 456.6 3.63E-01
0.60 16 10 5 454.4 5.50E-01
13154 9 6 474.4 6.61E-01
Magnitude

11
7 451.6 6.46E-01
0.50 8 457.5 3.44E-01
9 458.4 5.63E-01
10 459.4 5.84E-01
0.40 12 11 452.5 5.32E-01
4
8 12 455.3 3.68E-01
13 450.3 5.56E-01
0.30 14 453.1 5.54E-01
15 245.6 9.00E-01
16 449.4 5.76E-01
0.20 17 246.3 9.07E-01
18 256.3 8.07E-01
0.10 19 243.4 9.08E-01
20 247.2 9.20E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00036\C1, 3_I1sv00000 - 450 a.csv

Vibration, Dynamics & Noise Page 261 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.60

Transfer Function TP: 450 mp (a) [Hit 450 psv] (a)


0.030
Channel: 4
Date: May 31, 2016 06:45
0.027 Setup:
Note:

0.024 1 Freq. Amplitude


# Hz ips / lbf
1 74.1 2.32E-02
0.021 2 327.2 1.56E-02
3 370.6 1.55E-02
4 326.3 1.51E-02
0.018 5 325.3 1.50E-02
Amplitude (ips / lbf)

6 343.4 1.47E-02
2 3 7 323.1 1.44E-02
54 6
0.015 7 8
9 8 328.4 1.42E-02
10
11 12
13
17 18 1516
20 19
14 9 324.1 1.40E-02
10 354.7 1.37E-02
0.012 11 342.8 1.36E-02
12 354.1 1.35E-02
13 340.6 1.33E-02
0.009 14 451.6 1.33E-02
15 335.6 1.32E-02
16 341.6 1.32E-02
0.006 17 321.9 1.31E-02
18 329.4 1.29E-02
19 368.4 1.29E-02
0.003
20 321.3 1.29E-02

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00036\H1, 4_I1sv00000 - 450 a.csv

Transfer Function TP: 450 mp (a) [Hit 450 psv] (a)


200
Channel: 4

1 Date: May 31, 2016 06:45


20 Setup:
160 17
7 Note:
95
120 4
2
Freq. Phase
8 # Hz degrees
18
1 74.1 164
80 15 2 327.2 106
3 370.6 -104
13
16 4 326.3 115
40 11 5 325.3 128
Phase (degrees)

6 343.4 11
6
7 323.1 141
0 8 328.4 99
9 324.1 131
12 10 354.7 -64
-40 11 342.8 26
10 12 354.1 -38
13 340.6 42
-80 14 451.6 -153
3 15 335.6 73
19
16 341.6 40
-120 17 321.9 150
14
18 329.4 93
19 368.4 -113
-160
20 321.3 160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00036\H1, 4_I1sv00000 - 450 a.csv

Coherence TP: 450 mp (a) [Hit 450 psv] (a)


Channel: 4 1
1.00
Date: May 31, 2016 06:45
0.90 5
Setup:
4 Note:
2079 218
17
0.80 Freq. Magnitude
8 15
#Hz
16 1 74.1 9.93E-01
6
0.70 13
11 2 327.2 8.35E-01
14 3 370.6 4.08E-01
12 4 326.3 8.42E-01
0.60 5 325.3 8.75E-01
6 343.4 6.95E-01
Magnitude

7 323.1 8.17E-01
0.50 10 8 328.4 7.62E-01
9 324.1 8.25E-01
3 10 354.7 4.69E-01
0.40 11 342.8 6.85E-01
19 12 354.1 6.09E-01
13 340.6 6.89E-01
0.30 14 451.6 6.50E-01
15 335.6 7.57E-01
16 341.6 7.22E-01
0.20 17 321.9 8.05E-01
18 329.4 8.27E-01
0.10 19 368.4 3.49E-01
20 321.3 8.24E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00036\C1, 4_I1sv00000 - 450 a.csv

Vibration, Dynamics & Noise Page 262 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.61

Transfer Function TP: Cylinder 2 (a) [Hit Cylinder 2] (a)


0.0035
Channel: 2
Date: Jun 01, 2016 01:08
Setup:
0.0030 Note:
1
Freq. Amplitude
2 # Hz ips / lbf
1 46.6 2.84E-03
0.0025 3 2 41.6 2.62E-03
4 5
3 45.9 2.40E-03
4 26.9 2.37E-03
5 42.2 2.35E-03
Amplitude (ips / lbf)

0.0020 6 35.3 1.85E-03


6
7 43.1 1.58E-03
8 33.8 1.45E-03
7
9 44.7 1.30E-03
0.0015 8 10 50.6 1.14E-03
9 11 236.3 8.85E-04
10
12 235.6 8.41E-04
13 63.4 8.26E-04
0.0010 11
14 52.8 8.22E-04
14 13 12 15 231.3 7.78E-04
15
16
17
18
19
20
16 232.5 7.74E-04
17 231.9 7.62E-04
0.0005 18 233.4 7.58E-04
19 59.7 6.62E-04
20 60.3 6.52E-04

0.0000
0 50 100 150 200 250 300 350 400 450 500
FrequencyC:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00037\H1,
(Hz) 2_I1sv00000 - c2 a.csv

Transfer Function TP: Cylinder 2 (a) [Hit Cylinder 2] (a)


200
Channel: 2
91 18
Date: Jun 01, 2016 01:08
12
160 19 11 Setup:
5
13
Note:
20
10
120 14 Freq. Phase
# Hz degrees
1 46.6 178
80 2 41.6 -176
3 45.9 -172
4 26.9 -145
40 5 42.2 148
Phase (degrees)

6 35.3 -152
7 43.1 -168
0 8 33.8 -133
9 44.7 178
10 50.6 120
-40 11 236.3 152
12 235.6 161
13 63.4 136
-80 14 52.8 115
15 231.3 -167
16 232.5 -177
-120 8 17 231.9 -173
4 18 233.4 176
6
19 59.7 154
-160 7 15
23 17
16 20 60.3 126

-200
0 50 100 150 200 250 300 350 400 450 500
FrequencyC:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00037\H1,
(Hz) 2_I1sv00000 - c2 a.csv

Coherence TP: Cylinder 2 (a) [Hit Cylinder 2] (a)


Channel:
4 862 25793110
14 1512
11
18
17
16
1.00 19

2013 Date: Jun 01, 2016 01:08


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 46.6 9.96E-01
0.70 2 41.6 9.97E-01
3 45.9 9.97E-01
4 26.9 9.90E-01
0.60 5 42.2 9.96E-01
6 35.3 9.93E-01
Magnitude

7 43.1 9.97E-01
0.50 8 33.8 9.96E-01
9 44.7 9.97E-01
10 50.6 9.98E-01
0.40 11 236.3 9.98E-01
12 235.6 9.98E-01
13 63.4 9.05E-01
0.30 14 52.8 9.98E-01
15 231.3 9.98E-01
16 232.5 9.97E-01
0.20 17 231.9 9.96E-01
18 233.4 9.98E-01
0.10 19 59.7 9.74E-01
20 60.3 9.13E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
FrequencyC:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00037\C1,
(Hz) 2_I1sv00000 - c2 a.csv

Vibration, Dynamics & Noise Page 263 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.62

Transfer Function TP: 430 (a) [Hit 430] (a)


0.015
Channel: 2

0.014 Date: Jun 01, 2016 02:18


1 Setup:
2
0.013 3 Note:

0.012 Freq. Amplitude


# Hz ips / lbf
0.011 1 27.8 1.35E-02
2 28.8 1.33E-02
0.010 3 38.4 1.28E-02
4 40.6 5.46E-03
0.009 5 41.9 5.30E-03
Amplitude (ips / lbf)

6 44.7 3.12E-03
0.008 7 33.4 2.98E-03
8 50.6 2.19E-03
0.007 9 54.7 1.89E-03
10 55.6 1.88E-03
0.006 45 11 53.4 1.84E-03
12 63.8 1.82E-03
0.005 13 56.9 1.81E-03
14 58.8 1.67E-03
0.004 15 67.5 1.34E-03
7 6 16 82.2 1.25E-03
0.003 17 84.4 1.21E-03
8
1913
0 12 18 152.5 1.11E-03
0.002 11 14
19 81.6 1.05E-03
15 16
1917 1820 20 156.3 1.00E-03
0.001
0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00038\H1, 2_I1sv00000 - 430 a.csv

Transfer Function TP: 430 (a) [Hit 430] (a)


200
Channel: 2
7
18
Date: Jun 01, 2016 02:18
160 3 Setup:
20
Note:
8
4 19
16
120 110 12
56 1913
Freq. Phase
14 17 # Hz degrees
15
1 27.8 -130
80 2 28.8 -156
3 38.4 152
4 40.6 119
40 5 41.9 107
Phase (degrees)

6 44.7 105
7 33.4 178
0 8 50.6 128
9 54.7 110
10 55.6 110
-40 11 53.4 112
12 63.8 110
13 56.9 108
-80 14 58.8 104
15 67.5 94
16 82.2 122
-120 1 17 84.4 104
18 152.5 164
2
19 81.6 122
-160
20 156.3 135

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00038\H1, 2_I1sv00000 - 430 a.csv

Coherence TP: 430 (a) [Hit 430] (a)


Channel: 23456 811 1215 16 18
1.00 9
19
17 20
10
1314 Date: Jun 01, 2016 02:18
0.90 Setup:
Note:
7
0.80 Freq. Magnitude
#Hz
1 27.8 4.76E-01
0.70 2 28.8 5.99E-01
3 38.4 9.89E-01
2
4 40.6 9.95E-01
0.60 5 41.9 9.95E-01
6 44.7 9.97E-01
Magnitude

7 33.4 8.07E-01
0.50 1 8 50.6 9.93E-01
9 54.7 9.63E-01
10 55.6 9.49E-01
0.40 11 53.4 9.90E-01
12 63.8 9.93E-01
13 56.9 9.34E-01
0.30 14 58.8 9.34E-01
15 67.5 9.95E-01
16 82.2 9.93E-01
0.20 17 84.4 9.74E-01
18 152.5 9.92E-01
0.10 19 81.6 9.88E-01
20 156.3 9.77E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00038\C1, 2_I1sv00000 - 430 a.csv

Vibration, Dynamics & Noise Page 264 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.63

Transfer Function TP: 435 (a) [Hit 430] (a)


0.0100
Channel: 3
Date: Jun 01, 2016 02:18
0.0090 1 Setup:
Note:

0.0080 2 Freq. Amplitude


3 # Hz ips / lbf
1 38.1 8.82E-03
0.0070 2 27.8 7.73E-03
3 28.4 7.54E-03
4 30.0 5.11E-03
0.0060 5 33.8 3.75E-03
Amplitude (ips / lbf)

6 41.6 2.79E-03
4 7 45.0 8.58E-04
0.0050 8 155.6 7.50E-04
9 159.7 7.19E-04
10 47.2 6.63E-04
0.0040 5 11 81.3 6.23E-04
12 63.4 5.62E-04
13 278.4 5.60E-04
0.0030 6 14 82.2 5.25E-04
15 50.9 5.14E-04
16 55.0 5.03E-04
0.0020 17 56.3 4.95E-04
18 80.6 4.91E-04
19 161.6 4.78E-04
0.0010 7 89
10
17 12
1520
16 11
14
18 19 13 20 53.8 4.65E-04

0.0000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00038\H1, 3_I1sv00000 - 430 a.csv

Transfer Function TP: 435 (a) [Hit 430] (a)


200
Channel: 3
3 13 Date: Jun 01, 2016 02:18
19
160 Setup:
Note:
4

120 5
Freq. Phase
# Hz degrees
1 38.1 3
80 2 27.8 -151
3 28.4 174
11
18 4 30.0 134
40 5 33.8 107
Phase (degrees)

12 6 41.6 -59
1 7 45.0 -88
0 14 8 155.6 -120
9 159.7 -149
10 47.2 -86
-40 11 81.3 51
6
12 63.4 15
13 278.4 171
-80 710 14 82.2 -8
15 15 50.9 -107
8 16 55.0 -148
-120 20 17 56.3 -177
2 16 9 18 80.6 50
19 161.6 163
-160
17 20 53.8 -133

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00038\H1, 3_I1sv00000 - 430 a.csv

Coherence TP: 435 (a) [Hit 430] (a)


Channel: 31 6 15 13
1.00 5 710 11
19
9
20 12 18 8
Date: Jun 01, 2016 02:18
0.90 14
Setup:
Note:
16
0.80 Freq. Magnitude
#Hz
1 38.1 9.90E-01
0.70 2 27.8 4.27E-01
3 28.4 5.65E-01
17 4 30.0 5.76E-01
0.60 34 5 33.8 9.68E-01
6 41.6 9.86E-01
Magnitude

7 45.0 9.64E-01
0.50 8 155.6 9.51E-01
2
9 159.7 9.64E-01
10 47.2 9.63E-01
0.40 11 81.3 9.68E-01
12 63.4 9.28E-01
13 278.4 9.90E-01
0.30 14 82.2 8.73E-01
15 50.9 9.92E-01
16 55.0 7.99E-01
0.20 17 56.3 6.05E-01
18 80.6 9.51E-01
0.10 19 161.6 9.82E-01
20 53.8 9.39E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00038\C1, 3_I1sv00000 - 430 a.csv

Vibration, Dynamics & Noise Page 265 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.64

Transfer Function TP: 435 Flange (a) [Hit 430] (a)


0.020
Channel: 4
Date: Jun 01, 2016 02:18
0.018 Setup:
1
Note:

0.016 Freq. Amplitude


# Hz ips / lbf
1 38.1 1.74E-02
0.014 2 28.4 6.87E-03
3 41.9 6.13E-03
4 34.4 5.42E-03
0.012 5 44.7 2.50E-03
Amplitude (ips / lbf)

6 152.5 2.15E-03
7 150.0 2.13E-03
0.010 8 47.2 2.01E-03
9 50.9 1.47E-03
10 53.1 1.31E-03
0.008 11 278.1 1.29E-03
2 12 333.8 1.24E-03
3 13 54.7 1.20E-03
0.006 4 14 63.8 8.99E-04

0.004
5
8 76
0.002 910 11
13 12
14

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00038\H1, 4_I1sv00000 - 430 a.csv

Transfer Function TP: 435 Flange (a) [Hit 430] (a)


200
Channel: 4
6
12 Date: Jun 01, 2016 02:18
160 2 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 38.1 -3
80 4 2 28.4 152
3 41.9 -74
4 34.4 77
40 5 44.7 -80
Phase (degrees)

6 152.5 180
7 150.0 -136
0 1
8 47.2 -81
9 50.9 -89
10 53.1 -91
-40 11 278.1 -169
14 12 333.8 172
3 13 54.7 -102
58
-80 910 14 63.8 -65
13

-120
7

-160 11

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00038\H1, 4_I1sv00000 - 430 a.csv

Coherence TP: 435 Flange (a) [Hit 430] (a)


Channel: 441 358 910 76 11
1.00 13 14

Date: Jun 01, 2016 02:18


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
12
1 38.1 9.90E-01
0.70 2 28.4 6.18E-01
15 3 41.9 9.91E-01
2 4 34.4 9.84E-01
0.60 5 44.7 9.91E-01
6 152.5 9.94E-01
Magnitude

7 150.0 9.91E-01
0.50 8 47.2 9.92E-01
9 50.9 9.97E-01
10 53.1 9.93E-01
0.40 11 278.1 9.93E-01
12 333.8 7.02E-01
13 54.7 9.77E-01
0.30 14 63.8 9.75E-01
15 0.0 6.48E-01
0.20

0.10

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00038\C1, 4_I1sv00000 - 430 a.csv

Vibration, Dynamics & Noise Page 266 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.65

Transfer Function TP: 105 (h) [Hit 105] (h)


0.11
Channel: 3
Date: Jun 03, 2016 00:55
0.10 1
Setup:
Note:
0.09 Freq. Amplitude
# Hz ips / lbf
0.08 1 103.8 9.90E-02
2 313.1 2.97E-02
3 107.8 2.55E-02
0.07 4 107.2 2.38E-02
5 100.3 2.31E-02
Amplitude (ips / lbf)

6 105.6 2.25E-02
0.06 7 221.3 2.23E-02
8 310.3 2.20E-02
0.05 9 216.6 2.06E-02
10 221.9 2.05E-02
11 223.1 1.86E-02
0.04 12 98.1 1.54E-02
13 324.1 1.51E-02
0.03 2 14 319.1 1.48E-02
3 15 321.3 1.42E-02
5 64 7 8 16 322.8 1.41E-02
9 10
0.02 11 17 322.2 1.40E-02
12 14
1513
16 18 304.1 1.27E-02
18 17
19
20
19 94.4 1.25E-02
0.01 20 96.9 1.21E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00039\H1, 3_I1sv00000 - 105 h.csv

Transfer Function TP: 105 (h) [Hit 105] (h)


200
Channel: 3
7
10 2 Date: Jun 03, 2016 00:55
160 1 11 Setup:
4 Note:
63 14
15
17
16
13
120 Freq. Phase
# Hz degrees
1 103.8 156
80 2 313.1 166
3 107.8 133
4 107.2 141
40 5 100.3 -104
Phase (degrees)

6 105.6 132
7 221.3 177
0 8 310.3 -157
9 216.6 -158
10 221.9 169
-40 11 223.1 155
12 98.1 -119
13 324.1 118
-80 14 319.1 127
5 15 321.3 124
19
212
0 16 322.8 123
-120 17 322.2 124
18 18 304.1 -144
9 8 19 94.4 -117
-160
20 96.9 -118

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00039\H1, 3_I1sv00000 - 105 h.csv

Coherence TP: 105 (h) [Hit 105] (h)


Channel: 3 05 1643
212
19 711
9 10 18 82 14
1713
1.00 16
15

Date: Jun 03, 2016 00:55


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 103.8 9.87E-01
0.70 2 313.1 9.97E-01
3 107.8 9.94E-01
4 107.2 9.98E-01
0.60 5 100.3 9.97E-01
6 105.6 9.96E-01
Magnitude

7 221.3 9.94E-01
0.50 8 310.3 9.95E-01
9 216.6 9.95E-01
10 221.9 9.93E-01
0.40 11 223.1 9.97E-01
12 98.1 9.94E-01
13 324.1 9.95E-01
0.30 14 319.1 9.84E-01
15 321.3 9.81E-01
16 322.8 9.84E-01
0.20 17 322.2 9.90E-01
18 304.1 9.92E-01
0.10 19 94.4 9.93E-01
20 96.9 9.93E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00039\C1, 3_I1sv00000 - 105 h.csv

Vibration, Dynamics & Noise Page 267 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.66

Transfer Function TP: 105 (a) [Hit 105] (a)


0.15
Channel: 3

0.14 Date: Jun 03, 2016 00:58


Setup:
1 Note:
0.13
0.12 Freq. Amplitude
# Hz ips / lbf
0.11 1 77.8 1.30E-01
2 355.3 7.68E-02
0.10 3 354.4 7.33E-02
4 81.6 5.90E-02
0.09 5 75.3 5.08E-02
Amplitude (ips / lbf)

6 140.6 3.95E-02
0.08 2 7 84.7 2.73E-02
3
8 365.9 1.91E-02
0.07 9 366.6 1.90E-02
4
10 88.4 1.55E-02
0.06 11 371.3 1.35E-02
5 12 371.9 1.35E-02
0.05 13 372.8 1.32E-02
6 14 374.7 1.24E-02
0.04 15 377.2 1.16E-02
16 378.1 1.13E-02
0.03 7
17 90.9 1.10E-02
89 18 91.6 1.10E-02
0.02 10 19 378.8 1.09E-02
11
12
13
14
17
18 15
16
19
20
0.01 20 380.6 1.08E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00040\H1, 3_I1sv00000 - 105 a.csv

Transfer Function TP: 105 (a) [Hit 105] (a)


200
Channel: 3
1 2 Date: Jun 03, 2016 00:58
6 Setup:
160
4 Note:

120 7
10
89
11
12
13
14
Freq. Phase
18
17 16
19
1520 # Hz degrees
1 77.8 172
80 2 355.3 171
3 354.4 -168
4 81.6 136
40 5 75.3 -122
Phase (degrees)

6 140.6 159
7 84.7 115
0 8 365.9 116
9 366.6 113
10 88.4 107
-40 11 371.3 109
12 371.9 109
13 372.8 107
-80 14 374.7 106
15 377.2 103
5 16 378.1 105
-120 17 90.9 100
18 91.6 101
19 378.8 104
-160 3
20 380.6 103

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00040\H1, 3_I1sv00000 - 105 a.csv

Coherence TP: 105 (a) [Hit 105] (a)


Channel: 3 51 4 710
17
18
1.00 6
32 89 11
1214
13 19
116
520

Date: Jun 03, 2016 00:58


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 77.8 9.91E-01
0.70 2 355.3 9.77E-01
3 354.4 9.83E-01
4 81.6 9.96E-01
0.60 5 75.3 9.98E-01
6 140.6 9.63E-01
Magnitude

7 84.7 9.98E-01
0.50 8 365.9 9.86E-01
9 366.6 9.85E-01
10 88.4 9.97E-01
0.40 11 371.3 9.82E-01
12 371.9 9.84E-01
13 372.8 9.82E-01
0.30 14 374.7 9.85E-01
15 377.2 9.82E-01
16 378.1 9.83E-01
0.20 17 90.9 9.97E-01
18 91.6 9.97E-01
0.10 19 378.8 9.85E-01
20 380.6 9.75E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00040\C1, 3_I1sv00000 - 105 a.csv

Vibration, Dynamics & Noise Page 268 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.67

Transfer Function TP: 490 (h) [Hit 490] (h)


0.60
Channel: 2
Date: Jun 03, 2016 01:10
Setup:
Note:
0.50
1 Freq. Amplitude
# Hz ips / lbf
1 32.2 4.63E-01
2 31.3 3.98E-01
2
0.40 3 35.0 1.43E-01
4 34.4 1.39E-01
5 26.6 1.17E-01
Amplitude (ips / lbf)

6 36.6 1.09E-01
7 40.0 1.01E-01
0.30 8 87.8 8.61E-02
9 37.5 7.99E-02
10 39.1 7.63E-02
11 81.6 7.20E-02
12 41.6 6.69E-02
0.20 13 23.4 6.37E-02
14 42.8 5.76E-02
43 15 84.4 4.83E-02
5 16 78.4 4.72E-02
6
7 17 45.9 4.11E-02
0.10 910 8
18 46.9 3.78E-02
12 11
13 14 19 91.6 3.64E-02
17 16 15
18 20 19 20 74.1 3.43E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00041\H1, 2_I1sv00000 - 490 h.csv

Transfer Function TP: 490 (h) [Hit 490] (h)


200
Channel: 2
11 Date: Jun 03, 2016 01:10
160 1 20
Setup:
15 Note:
8

120 4 10 Freq. Phase


3697 19
12
1417
# Hz degrees
18
1 32.2 149
80 2 31.3 -177
3 35.0 110
4 34.4 117
40 5 26.6 -111
Phase (degrees)

6 36.6 106
7 40.0 106
0 8 87.8 138
9 37.5 110
10 39.1 119
-40 11 81.6 171
12 41.6 96
13 23.4 -101
-80 14 42.8 95
13 15 84.4 144
5
16 78.4 -145
-120 17 45.9 95
16 18 46.9 92
19 91.6 109
-160
2 20 74.1 149

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00041\H1, 2_I1sv00000 - 490 h.csv

Coherence TP: 490 (h) [Hit 490] (h)


Channel:
135 21432
69112
701417
18 161115819
1.00 20

Date: Jun 03, 2016 01:10


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 32.2 9.96E-01
0.70 2 31.3 9.97E-01
3 35.0 9.98E-01
4 34.4 9.98E-01
0.60 5 26.6 9.99E-01
6 36.6 9.98E-01
Magnitude

7 40.0 9.98E-01
0.50 8 87.8 9.99E-01
9 37.5 9.97E-01
10 39.1 9.96E-01
0.40 11 81.6 9.95E-01
12 41.6 9.98E-01
13 23.4 9.99E-01
0.30 14 42.8 9.97E-01
15 84.4 9.99E-01
16 78.4 9.94E-01
0.20 17 45.9 9.99E-01
18 46.9 9.98E-01
0.10 19 91.6 9.99E-01
20 74.1 9.78E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00041\C1, 2_I1sv00000 - 490 h.csv

Vibration, Dynamics & Noise Page 269 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.68

Transfer Function TP: 390 (a) [Hit 390] (a)


0.12
Channel: 2
Date: Jun 03, 2016 01:15
1
Setup:
Note:
0.10
Freq. Amplitude
# Hz ips / lbf
1 42.8 1.05E-01
2 388.4 2.74E-02
0.08 3 387.8 2.50E-02
4 389.7 2.40E-02
5 390.6 2.30E-02
Amplitude (ips / lbf)

6 391.6 2.26E-02
7 339.1 1.93E-02
0.06 8 338.1 1.90E-02
9 170.9 1.75E-02
10 170.3 1.75E-02
11 201.9 1.68E-02
12 399.1 1.67E-02
0.04 13 399.7 1.63E-02
14 398.4 1.61E-02
2 15 400.6 1.61E-02
34 16 394.7 1.59E-02
56
87 17 384.4 1.55E-02
0.02 10
9 11 12
13
14
15 18 396.9 1.54E-02
17 16
19 18
20
19 383.8 1.53E-02
20 395.9 1.50E-02

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00042\H1, 2_I1sv00000 - 390 a.csv

Transfer Function TP: 390 (a) [Hit 390] (a)


200
Channel: 2
11 14
18
12
20 Date: Jun 03, 2016 01:15
1613
15
160 1 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 42.8 152
80 2 388.4 -156
3 387.8 -146
4 389.7 -165
40 5 390.6 -173
Phase (degrees)

6 391.6 -177
7 339.1 -159
0 8 338.1 -149
9 170.9 -165
10 170.3 -155
-40 11 201.9 173
12 399.1 170
13 399.7 165
-80 14 398.4 174
15 400.6 164
16 394.7 163
-120 19 17 384.4 -138
17
8 3 18 396.9 173
10 2
7 19 383.8 -134
-160 9 4
56 20 395.9 169

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00042\H1, 2_I1sv00000 - 390 a.csv

Coherence TP: 390 (a) [Hit 390] (a)


Channel: 2 9
10 11
1.00 87
1 3245616
2013
15
17 18
19 12
14 Date: Jun 03, 2016 01:15
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 42.8 9.31E-01
0.70 2 388.4 9.37E-01
3 387.8 9.35E-01
4 389.7 9.46E-01
0.60 5 390.6 9.35E-01
6 391.6 9.33E-01
Magnitude

7 339.1 9.76E-01
0.50 8 338.1 9.79E-01
9 170.9 9.97E-01
10 170.3 9.96E-01
0.40 11 201.9 9.90E-01
12 399.1 9.24E-01
13 399.7 9.44E-01
0.30 14 398.4 9.23E-01
15 400.6 9.37E-01
16 394.7 9.36E-01
0.20 17 384.4 9.20E-01
18 396.9 9.27E-01
0.10 19 383.8 9.20E-01
20 395.9 9.38E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00042\C1, 2_I1sv00000 - 390 a.csv

Vibration, Dynamics & Noise Page 270 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.69

Transfer Function TP: 270 (h) [Hit 270] (h)


0.080
Channel: 2
Date: Jun 03, 2016 01:24
1 Setup:
0.070 Note:

Freq. Amplitude
# Hz ips / lbf
0.060 1 32.8 7.08E-02
2 26.9 5.29E-02
32
3 26.3 5.28E-02
0.050 4 69.1 3.93E-02
5 37.5 1.62E-02
Amplitude (ips / lbf)

6 54.4 1.48E-02
7 23.1 1.35E-02
0.040 4
8 73.1 1.30E-02
9 36.3 1.25E-02
10 89.1 1.08E-02
0.030 11 87.8 9.72E-03
12 90.6 9.72E-03
13 21.3 9.64E-03
14 86.9 9.49E-03
0.020 15 76.6 8.95E-03
5
6
16 18.8 7.27E-03
7 9 8 17 390.3 7.07E-03
13
10
1112 18 40.0 7.05E-03
0.010 15 14
16 18 20 17
19 19 391.9 7.04E-03
20 48.1 6.98E-03

0.000
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00043\H1, 2_I1sv00000 - 270 h.csv

Transfer Function TP: 270 (h) [Hit 270] (h)


200
Channel: 2
Date: Jun 03, 2016 01:24
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
13 1 32.8 -33
80 16 7 2 26.9 8
3 26.3 25
4 69.1 3
40 5 37.5 -65
Phase (degrees)

3
6 54.4 -33
2 7 23.1 78
20 4
0 8 73.1 -53
17 9 36.3 -74
1 6 14 10 89.1 -53
11 19
-40 8 10 11 87.8 -42
5 15 12 90.6 -69
12
9 13 21.3 82
18
-80 14 86.9 -34
15 76.6 -62
16 18.8 76
-120 17 390.3 -27
18 40.0 -81
19 391.9 -42
-160
20 48.1 1

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00043\H1, 2_I1sv00000 - 270 h.csv

Coherence TP: 270 (h) [Hit 270] (h)


Channel:
16137 32 1 2
918 20 6 4 815 14
11
10
12
1.00 5
19
Date: Jun 03, 2016 01:24
0.90 17 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 32.8 9.96E-01
0.70 2 26.9 9.99E-01
3 26.3 9.99E-01
4 69.1 9.98E-01
0.60 5 37.5 9.85E-01
6 54.4 9.86E-01
Magnitude

7 23.1 9.99E-01
0.50 8 73.1 9.98E-01
9 36.3 9.97E-01
10 89.1 9.99E-01
0.40 11 87.8 9.99E-01
12 90.6 9.98E-01
13 21.3 9.94E-01
0.30 14 86.9 9.98E-01
15 76.6 9.97E-01
16 18.8 9.99E-01
0.20 17 390.3 8.78E-01
18 40.0 9.97E-01
0.10 19 391.9 9.43E-01
20 48.1 9.85E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00043\C1, 2_I1sv00000 - 270 h.csv

Vibration, Dynamics & Noise Page 271 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.70

Transfer Function TP: 360 (h) [Hit 360] (h)


0.10
Channel: 2
Date: Jun 03, 2016 01:31
0.09 1 Setup:
Note:

0.08 2 Freq. Amplitude


# Hz ips / lbf
1 26.3 8.82E-02
0.07 2 27.2 7.77E-02
3 47.2 2.44E-02
4 45.9 2.31E-02
0.06 5 69.1 1.78E-02
Amplitude (ips / lbf)

6 48.4 1.67E-02
7 68.4 1.56E-02
0.05 8 23.1 1.48E-02
9 42.8 1.47E-02
10 420.0 1.34E-02
0.04 11 419.4 1.31E-02
12 21.3 1.20E-02
13 75.0 1.19E-02
0.03 14 74.4 1.17E-02
43 15 77.2 1.07E-02
16 52.8 1.02E-02
0.02 6 5 17 17.5 1.01E-02
8 9 7
12 13
14
10
11 18 72.8 1.01E-02
17 16
20 1815
19 19 78.1 9.56E-03
0.01
20 54.1 9.11E-03

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00044\H1, 2_I1sv00000 - 360 h.csv

Transfer Function TP: 360 (h) [Hit 360] (h)


200
Channel: 2
10
5 Date: Jun 03, 2016 01:31
160 Setup:
2 3 16 18
14
6 20
Note:
13
15
120 19 Freq. Phase
# Hz degrees
1 26.3 -156
80 2 27.2 147
3 47.2 146
4 45.9 -170
40 5 69.1 170
Phase (degrees)

6 48.4 136
7 68.4 -169
0 8 23.1 -105
9 42.8 -158
10 420.0 176
-40 11 419.4 -173
12 21.3 -105
13 75.0 132
-80 14 74.4 144
128 15 77.2 124
16 52.8 151
-120 17
17 17.5 -126
18 72.8 148
1 9 19 78.1 114
-160 4 7 11 20 54.1 131

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00044\H1, 2_I1sv00000 - 360 h.csv

Coherence TP: 360 (h) [Hit 360] (h)


Channel:
128 12 2 9436 16
20 14
13
751819
15
1.00 17 11
10
Date: Jun 03, 2016 01:31
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 26.3 9.98E-01
0.70 2 27.2 9.98E-01
3 47.2 9.99E-01
4 45.9 9.97E-01
0.60 5 69.1 9.96E-01
6 48.4 9.98E-01
Magnitude

7 68.4 9.94E-01
0.50 8 23.1 9.99E-01
9 42.8 9.93E-01
10 420.0 9.66E-01
0.40 11 419.4 9.68E-01
12 21.3 9.99E-01
13 75.0 9.99E-01
0.30 14 74.4 9.98E-01
15 77.2 9.95E-01
16 52.8 9.97E-01
0.20 17 17.5 9.77E-01
18 72.8 9.97E-01
0.10 19 78.1 9.97E-01
20 54.1 9.98E-01

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00044\C1, 2_I1sv00000 - 360 h.csv

Vibration, Dynamics & Noise Page 272 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.71

Transfer Function TP: 470 (a) [Hit 470] (a)


1.1
Channel: 2
Date: Jun 03, 2016 01:37
1.0 1 Setup:
Note:
0.9 Freq. Amplitude
# Hz ips / lbf
0.8 1 17.5 9.75E-01
2 16.3 1.43E-01
3 15.3 7.26E-02
0.7 4 19.4 6.23E-02
5 38.4 5.76E-02
Amplitude (ips / lbf)

6 21.6 5.21E-02
0.6

0.5

0.4

0.3

0.2
2

0.1 34
6 5

0.0
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00045\H1, 2_I1sv00000 - 470 a.csv

Transfer Function TP: 470 (a) [Hit 470] (a)


200
Channel: 2
7
1 Date: Jun 03, 2016 01:37
160 Setup:
5 Note:

120 6 Freq. Phase


# Hz degrees
4 1 17.5 167
80 2 16.3 -142
3 15.3 -103
4 19.4 89
40 5 38.4 138
Phase (degrees)

6 21.6 110
7 0.0 180
0

-40

-80
3

-120
2

-160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00045\H1, 2_I1sv00000 - 470 a.csv

Coherence TP: 470 (a) [Hit 470] (a)


Channel:
32146 25
1.00
Date: Jun 03, 2016 01:37
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 17.5 9.88E-01
7
0.70 2 16.3 9.87E-01
3 15.3 9.92E-01
4 19.4 9.89E-01
0.60 5 38.4 9.94E-01
6 21.6 9.92E-01
Magnitude

7 0.0 7.01E-01
0.50

0.40

0.30

0.20

0.10

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00045\C1, 2_I1sv00000 - 470 a.csv

Vibration, Dynamics & Noise Page 273 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.72

Transfer Function TP: 408 (h) [Hit 408] (h)


0.90
Channel: 2
Date: Jun 03, 2016 01:43
Setup:
0.80 1
Note:

Freq. Amplitude
0.70 # Hz ips / lbf
1 86.6 7.85E-01
2 177.8 3.96E-01
0.60 3 152.5 6.11E-02
4 337.8 5.66E-02
Amplitude (ips / lbf)

0.50

2
0.40

0.30

0.20

0.10
3 4

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00046\H1, 2_I1sv00000 - 408 h.csv

Transfer Function TP: 408 (h) [Hit 408] (h)


200
Channel: 2
Date: Jun 03, 2016 01:43
160 Setup:
Note:

120 Freq. Phase


# Hz degrees
1 86.6 -1
80 2 177.8 -1
3 152.5 -2
4 337.8 -15
40
Phase (degrees)

1 3 2
0
4

-40

-80

-120

-160

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00046\H1, 2_I1sv00000 - 408 h.csv

Coherence TP: 408 (h) [Hit 408] (h)


Channel: 2
1.00 3 4
2
1 Date: Jun 03, 2016 01:43
0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 86.6 9.27E-01
0.70 2 177.8 9.47E-01
3 152.5 9.71E-01
4 337.8 9.77E-01
0.60 5 0.0 1.06E-03
Magnitude

0.50

0.40

0.30

0.20

0.10

5
0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00046\C1, 2_I1sv00000 - 408 h.csv

Vibration, Dynamics & Noise Page 274 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Fig: B.9.73

Transfer Function TP: 438 (h) [Hit 438] (h)


0.70
Channel: 2
Date: Jun 03, 2016 01:47
Setup:
0.60 Note:
1
2
Freq. Amplitude
# Hz ips / lbf
1 158.8 5.61E-01
0.50 2 80.3 5.39E-01
3 73.8 1.67E-01
4 75.3 1.25E-01
5 171.3 4.96E-02
Amplitude (ips / lbf)

0.40 6 89.1 2.88E-02

0.30

0.20
3

0.10
5
6

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00047\H1, 2_I1sv00000 - 438 h.csv

Transfer Function TP: 438 (h) [Hit 438] (h)


200
Channel: 2
1 Date: Jun 03, 2016 01:47
4
160 Setup:
Note:
5
120 Freq. Phase
6 # Hz degrees
1 158.8 173
80 2 80.3 -179
3 73.8 -158
4 75.3 166
40 5 171.3 123
Phase (degrees)

6 89.1 101
0

-40

-80

-120

3
-160
2

-200
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00047\H1, 2_I1sv00000 - 438 h.csv

Coherence TP: 438 (h) [Hit 438] (h)


Channel: 2 6 1 5
1.00 34 2

Date: Jun 03, 2016 01:47


0.90 Setup:
Note:

0.80 Freq. Magnitude


#Hz
1 158.8 9.94E-01
0.70 2 80.3 9.75E-01
3 73.8 9.84E-01
4 75.3 9.88E-01
0.60 5 171.3 9.91E-01
6 89.1 9.99E-01
Magnitude

7 0.0 3.17E-01
0.50

0.40
7
0.30

0.20

0.10

0.00
0 50 100 150 200 250 300 350 400 450 500
Frequency (Hz) C:\projects\US00365\FieldData\US00365_GEOilAndGas_Egypt_Bump.trf\ASCII00047\C1, 2_I1sv00000 - 438 h.csv

Vibration, Dynamics & Noise Page 275 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

APPENDIX C Pulsation | Vibration | Mechanical Natural Frequency Guidelines

C.1 Guidelines
The following four guidelines are useful for assessing the pulsation and vibration levels of a reciprocating
compressor piping system, and vibration levels for the skid.
Care must be taken in applying these vibration guidelines, as the real concern is with stress levels. Vibrations are
only an indirect indication of stress.
Pulsations vary greatly in a piping system depending on the location of the measurement. As a result, measured
pulsations are almost always less than the highest pulsation present in the system. Cylinder side pulsations are
typically highest at the valves, but only occasionally can be measured through the valve cover.
Mechanical resonance can be a problem even if Mechanical Natural Frequencies (MNFs) are at frequencies
above the limits stated below. Experience has shown that the limits shown are an excellent starting point for a
good design. Vibration levels can be acceptable even though MNFs are below the guidelines, but this is seldom
true.
BETA Machinery Analysis Ltd. has other standards for allowable compressor cylinder stretch vibrations. These
must be calculated for the specific operating conditions of each cylinder.

C.2 Vibration Guidelines for Piping


The figures attached show allowable piping vibrations in two forms:
a. A BETA Machinery Analysis standard that suggests 10 mils p-p, or 1 in/sec peak as an upper limit at any
frequency, whichever is less. There are situations where 0.6 in/sec peak is a preferred limit (e.g., on
compressor frames, or on vessels with many appendages).
b. A guideline adapted from Southwest Research Institute, which allows the guidelines to increase with
frequency raised to the half power. (This guideline is for resonant parts, as opposed to components
whose motion will cause other components to resonate.)

C.3 Acoustical Pulsation Guidelines for Field Measurements


C.3.1 Line Side Pulsation Limits (Based on API 618 4th Edition)
Pulsation levels from the bottle away from the compressor into the system shall be less than the following:
% Pulsation = 300 /[SQRT (P x ID x ƒ)]
Where:
% Pulsation = % allowable peak to peak pulsation referred to absolute line pressure at frequency ƒ
P = average line pressure (psia)
ID = inside pipe diameter (inches)
ƒ = pulsation harmonic frequency (cycles per second)
SQRT = square root

Vibration, Dynamics & Noise Page 276 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

C.3.2 Compressor Side Pulsation Limits (Based on API 618 4th Edition)
Pulsation levels measured at the cylinder flange shall be less than the following:
CPL = 3R with 7% Maximum
Where:
CPL = % allowable unfiltered peak-to-peak pulsation referred to absolute line pressure
R = Stage Compression Ratio

C.4 Mechanical Natural Frequency Guidelines


The mechanical natural frequencies (MNFs) of the vessels and piping should be above 2.4 times crankshaft
speed or 30 Hz, whichever is higher, in the immediate area of the compressor. The special case of two-nozzle
bottles on 4 throw compressors requires avoidance of the in-phase bottle mode in the horizontal direction
coinciding with 4 times compressor speed. The special case of three-nozzle bottles on 6 throw compressors
requires avoidance of the in-phase bottle mode in the horizontal direction coinciding with 3 or 6 times
compressor speed.

C.5 Vibration Guidelines for Skid Vibrations for Reciprocating Compressors


Marginally acceptable: less than 0.1 ips peak
Good (startup): less than 0.05 ips peak
Threshold of perception * : 0.006 ips peak
* For threshold of perception, refer to Figure 19.7, "Shock and Vibration Handbook," Harris and Crede
Assumptions:
1. motion in vertical or horizontal plane
2. vibrations at one or two times crankshaft speed
3. speeds from 300 to 1800 RPM
Vibration levels on sleepers at pipe clamps should conform to the foundation guideline, at least in the vertical
direction.

C.6 Vibration Guidelines for Relief Valves and Small Bore Appendages.
Some vibration guidelines are based on overall (unfiltered) vibrations. (Note that measuring overall vibrations
accurately is difficult.)

C.6.1 Relief Valves


Experience has shown that overall accelerations cause forces that result in internal damage due to
fretting. A realistic guideline of 2 g true peak OA is based on this experience.

C.6.2 Small Bore Appendages


True peak overall displacement measurements converted into stress estimates are required, unless all of
the vibration is at one frequency. These measurements are usually required to be differential between
the free end of the appendage and the base (pipe, or vessel).

Vibration, Dynamics & Noise Page 277 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Figure C.1 – Guidelines for Recip. Compressors (1800 RPM max.) – Vibration Amplitude (in/s Peak)

Vibration, Dynamics & Noise Page 278 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

APPENDIX D Common Issues

D.1 Orifice Plates


A common, and simple to implement, method for reducing pulsations in piping is to install orifice plates with an
inner diameter (ID) approximately 60% of the line ID. An orifice of this size can reduce pulsations without
introducing excessive pressure drop to the system. Location of the orifice plate(s) is dependent on the pulsation
frequency and the order of run speed.
If implementing the 60% “rule of thumb” solution is not acceptable or proves to be insufficient, BETA can
perform an acoustical design analysis to optimize a pulsation control solution.
Orifices plates are usually installed in flange sets in the piping or flanged nozzles on vessels so they can be easily
removed or modified if necessary. The orifice is typically a plate with a circular hole cut in the middle of the
plate. The plate is installed in the flange connection between two gaskets. Orifices may also be welded into the
pipe, flange or nozzle rather installing between two gaskets in a flange set.
For units that have full bore orifice plates (hole ID equals the pipe ID) and two gaskets in vessel flange sets, the
full bore orifice can be replaced with an appropriately sized orifice. If the units use a single gasket at the flange
connection may not have space to install a plate and two gaskets. In this case, orifice plates installed as the inner
ring to a spiral wound gasket are acceptable only if they have been successfully used in other applications or
specific calculations have been done to show the orifice and gasket integrity will be maintained.
The typical orifice plate thickness for different pipe sizes is shown in the table below. The static and dynamic
forces acting on the orifice plate are typically low so specific evaluation of the orifice plate thickness is not
usually done.
The hole in the plate is to be a circular hole centered in the gas flow. The hole edge profile is not critical for
control of pressure pulsations from reciprocating compressors. High frequency pulsations (greater than 1000 Hz)
can be created in some occasional cases simply by flow through the orifice. These high frequency pulsations may
create excessive noise and contribute to failure of the orifice plate if the frequency is coincident with mechanical
natural frequencies of the plate. A bevel on the downstream edge of the hole will reduce or eliminate these high
frequency pulsations. Adding a bevel on the downstream edge is a proactive measure to improve the orifice
reliability.
Orifices are typically fabricated from 316 stainless steel plate. Other materials may be required for specific
applications. Consult the compressor packager or equipment supplier for your application.

Table D.1.1 – Typical Orifice Plate Thickness


Nominal Line Size Orifice Thickness
inches mm inches mm
1/2 to 8 15 to 200 1/8 3
10 to 14 250 to 350 1/4 3
16 to 26 400 to 650 3/8 10
30 to 35 750 to 900 1/2 13
44 1100 3/4 19

Vibration, Dynamics & Noise Page 279 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

D.2 Pipe Strain


Improper support installation can induce pipe strain. The following figure shows 3 different scenarios where a
pipe could be held away from its neutral position.

Figure D.2.1 – Pipe Strain Examples

Check for pipe strain by loosening clamps and determining if any of the scenarios apply. This should be done
when the pipe is near operating temperature. Modifications need to be implemented according to the pipe
strain case.
1. Clamp bolt holes in support should be repositioned or elongated.
2. Sleeper should be lowered
3. Shims should be added (up to a maximum of 3 shims thick). Measure the gap, and then lift the pipe
slightly (with a pry bar) so that the shims can be installed easily. Shims should not be forced into
position.

Vibration, Dynamics & Noise Page 280 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Pipe Strain (cont’d)


At installation, a ½" packer (temporary spacer) should be added. Once hot (operating temperature) the packer
can be removed, as required, to check for pipe strain Condition II (sleeper too high) and replaced with the
correct thickness. Proper shims must be used (up to a maximum of 3 shims). Provision must be made to prevent
the shims from working out from between the pipe and the sleeper (e.g. tack weld shims to sleeper).

Figure D.2.2 – Pipe Clamp Packer and Oversized Hole Example

The goal is to support the pipe in its neutral, hot position, at each support. Bolts for a properly fitting clamp
should be tightened until snug, and then tightened approximately a quarter turn more.
In some installations, a clamp close to the discharge bottle may be designed to be an anchor. In that case, the
anchor should be set cold, and not loosened when the system is hot. Loosening the other clamps when hot will
cause the pipe to expand away from the anchor, as per design.

Vibration, Dynamics & Noise Page 281 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

D.3 Flange Alignment


The flange connections up and downstream of the PSV’s and between the PSV’s and the relief lines should be
broken to check the alignment. Lateral misalignment of the bolt holes should be checked. Furthermore, it is
possible to mistake a very tight fit of two flanges for a good fit. Often if the crushed gaskets and or orifice plates
do not slide in and out easily, there is a good chance pipe strain exists. However, in some cases installation of
the uncrushed gaskets may require using a flange spreader. The crushed length of each gasket needs to be
considered. This is particularly critical in areas where significant stiffness exists, such as the scrubber-to-bottle
connections.
If bolt holes do not line up or re-tightening the flanges is very difficult, (the bolts are forcing the flange faces to
move into alignment) the issue needs to be corrected. This can involve adjusting other clamps and flange sets on
the same line, installing “special” flange spacers, or re-fabricating the pipe component to generate the proper
alignment. Forcing the pipe back into alignment using a come-along or a jack is not acceptable.
Allowable flange misalignment is defined by ASME B31.3 for pipe spools. An excerpt is shown in the box below.
There are three main types of flange misalignment. In all 3 cases, maximum allowable flange misalignment at
the scrubber-to-bottle, bottle-to-cylinder and the PSV-to-flare connections is lower than specified here.
 Lateral and Rotational Misalignment - The bolt holes of one flange do not line up with those of the
mating flange. The maximum allowable offset is 1/8 inch.
 Axial Misalignment – The mating flange faces are either (a) too close together to permit insertion of a
gasket or orifice plate without applying significant spreading force, or (b) too far apart to permit closing
the gap without applying significant clamping force.
 Angular Misalignment - The flange faces are not parallel to each other. They should be parallel, in any
direction, to within 1/16 inch per foot.

Vibration, Dynamics & Noise Page 282 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

Flange Alignment (cont’d)

Excerpt from ASME B31.3

Vibration, Dynamics & Noise Page 283 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

D.4 Fastener Preload


Preload is the tensile force in a fastener acting to hold separate components together. Failure to maintain
adequate preload on fasteners in vibratory service typically results in increased alternating tensile loading and
loosening and eventual breakage.
Several factors affect the accuracy of preload achieved by applying a specified torque to a fastener. These
include:
 mating surface fit and finish (surface friction can vary significantly)
 lubrication (choice may vary with application)
 preload level (higher preloads increase fastener friction effects)
 effective fastener length (longer allows more stretch which improves accuracy)
 load interaction of multiple fasteners (preloads will keep changing until all are torqued)
 torque measurement accuracy (wrenches require calibration)
Considering these factors, the following general procedure is recommended for maximizing accuracy and
consistency when measuring torque to establish fastener preload in the field:
1. Minimize bending loads on the fastener by ensuring joint mating surfaces and nut-to-joint surfaces are
parallel to each other and perpendicular to the fastener axis.
2. Thoroughly clean and dress joint mating surfaces and all sliding surfaces (friction between nut-to-joint
mating surfaces provides more resistance to turning than does friction of mating threads).
3. Calibrate the torque wrench for the required torque of critical fasteners.
4. Use hardened washers on “soft” joint surfaces to minimize surface deformation and friction.
5. Maintain an effective fastener length of at least 6 times the nominal diameter of the fastener. Effective
length can be estimated roughly as distance between bolt head and nut when tight. Spacers, with a
cross-sectional area of at least 3 times the bolt area, can be used to increase the effective length.
6. Refer to manufacturer’s specifications for fastener lubrication. In the absence of manufacturer’s
specifications, lubricate all fastener sliding surfaces with a compatible lubricant.
7. When performing the final tightening of fasteners in close proximity to each other, stop short at about
75% of recommended torque and tighten the next fastener the same way*. This allows the other
fastener/joint areas to settle before the final torquing which should be performed in one smooth,
steady motion.
* Torquing the first of multiple fasteners will compress the joint to the extent dictated by the load in the
fastener. When torquing the second fastener it will further compress the joint, effectively changing the
load on the first fastener. It is for this reason that, in order to achieve adequate preload in each fastener,
multiple fasteners must be tightened in increments and in a sequence that optimizes the equal
interaction of the fasteners on the joint.

When “re-torquing” fasteners to achieve adequate preload, it is critical that the fastener be “backed off” and all
mating surfaces dressed and lubricated prior to tightening. Torque must be measured while the fastener is
turning in order for the relationship between torque and preload to be at all valid. There is considerable
resistance to turning once the fastener is at rest (static friction). Static friction will cause the torque reading to
be higher than when the fastener is turning, resulting in a preload that is lower than expected.
If it becomes necessary to further improve the evaluation of preload, installing load-indicating fasteners can be
an effective solution. Some commercial examples include “SmartBolts”, “RotaBolt”, Valley Forge “SPC4” and
“Maxbolt”.

Vibration, Dynamics & Noise Page 284 www.BETAMachinery.com


GE Oil & Gas | U-150.2.5 | Egypt | US00365-01-1 | Rev.00

D.5 Vibration Control Products

Vibration, Dynamics & Noise Page 285 www.BETAMachinery.com