March 21, 2019

INSTRUCTION

Project : Construction of One (1) Unit 2 – Storey 8 – Classroom School


Building at Kinablangan Village, Brgy. Kinablangan, Baganga,
Davao Oriental

To : ENGR. SOLOMON M. ARTEZUELA


Project Engineer
VERZONTAL BUILDERS, INC.

Subject : As-Built Plan

The following must be revised on the submitted as-built plan:

1. Use standard line weight and line type. Drawing lines and labels are not
noticeable.
2. The new signatory block can be seen on Sheet No. “A 1/8” – Perspective Page.
3. The actual dimension should be indicated on Var. or Variable dimensions. See
Sheet no. “P 3/3”.

For compliance.

EDBERT GIO R. SUAN


Senior Engineer A

Received by:

Name and Signature


Date:

District 2 - Region XI, Tagum City


2nd Floor Consuelo Business Center, Pioneer Avenue, Tagum City
March 21, 2019

INSTRUCTION

Project : Construction of One (1) Unit 2 – Storey 8 – Classroom School


Building at Baculin Housing Project, Brgy. Baculin, Baganga,
Davao Oriental

To : ENGR. SOLOMON M. ARTEZUELA


Project Engineer
VERZONTAL BUILDERS, INC.

Subject : As-Built Plan

The following must be revised on the submitted as-built plan:

1. Use standard line weight and line type. Drawing lines and labels are
unnoticeable.
2. The new signatory block can be seen on Sheet No. “A 1/8” – Perspective Page.
3. The actual dimension should be indicated on Var. or Variable dimensions. See
Sheet no. “P 3/3”.

For compliance.

EDBERT GIO R. SUAN


Senior Engineer A

Received by:

Name and Signature


Date:

District 2 - Region XI, Tagum City


2nd Floor Consuelo Business Center, Pioneer Avenue, Tagum City
District 2 - Region XI, Tagum City
2nd Floor Consuelo Business Center, Pioneer Avenue, Tagum City

Vous aimerez peut-être aussi