Vous êtes sur la page 1sur 73

HARGA SATUAN DASAR BAHAN DAN UPAH

No Uraian Satuan Kode Harga Satuan Dasar (Rp)


I UPAH PEKERJA
1 Pekerja OH L.01 67,595.00
2 Tukang Gali OH L.02 86,030.00
3 Kepala Tukang batu OH L.03 98,320.00
4 Tukang batu OH L.04 86,030.00
5 Kepala Tukang kayu OH L.05 98,320.00
6 Tukang kayu OH L.06 92,175.00
7 Kepala Tukang besi beton OH L.07 98,320.00
8 Tukang besi beton OH L.08 86,030.00
9 Kepala Tukang cat/politur OH L.09 98,320.00
10 Tukang cat/politur OH L.10 86,030.00
11 Tukang pipa OH L.11 86,030.00
12 Tukang penganyam bronjong OH L.12 86,030.00
13 Tukang tebas OH L.13 86,030.00
14 Tukang las OH L.14 86,030.00
15 Mandor OH L.15 98,320.00
16 Juru Ukur OH L.16 122,900.00
17 Pembantu Juru Ukur OH L.17 67,595.00
18 Operator Alat Besar OH L.18 208,930.00
19 Pembantu operator / mekanik Supir truck OH L.19 184,350.00
20 Supir truck OH L.20 92,175.00
21 Kenek truck OH L.21 67,595.00
22 Penjaga malam OH L.22 73,740.00

II BAHAN / MATERIAL
A KELOMPOK AIR TANAH BATUAN
1 Air m³ M.01 19,458.76
2 Tanah liat m³ M.02 81,932.51
3 Tanah urug m³ M.03 55,305.00
4 Lempengan rumput m³ M.04 2,458.00
5 Pasir urug m³ M.05 158,541.00
6 Sirtu m³ M.06 152,764.70
7 Pasir teras m³ M.07 152,764.70
8 Pasir pasang kali m³ M.08 110,610.00
9 Pasir beton m³ M.09 339,941.40
10 Abu Batu m³ M.10 184,350.00
11 Batu kali / belah m³ M.11 155,591.40
12 Batu Brojol (Untuk bronjong) m³ M.12 145,329.25
13 Batu bata / merah bakar kelas I bh M.13 7,773.43
14 Batu bata / merah bakar kelas II bh M.14 10,206.85
15 Batu bata (per m3) m³ M.15 16,898.75
16 Kerikil cor beton m³ M.16 172,060.00
17 Portland Cement (PC 50 kg / zak) zak M.17 89,717.00
18 Portland Cement (PC 50 kg / zak) kg M.18 1,812.78
19 Kapur m³ M.19 337,975.00
20 Bahan Aditif Strorox - 100 ltr M.20 36,870.00
21 Bahan Aditif lain ltr M.21 43,015.00
22 Tiang pancang beton dia 20 cm m M.22 122,900.00
23 Tiang pancang beton dia 30 cm m M.23 184,350.00
24 Tiang pancang beton ukuran 30x30 cm m M.24 282,670.00
25 Tiang pancang beton ukuran 40x40 cm m M.25 491,600.00
26 Turap beton pre-cast ukuran 30x12 cm m M.26 122,900.00
27 Turap beton pre-cast ukuran 40x20 cm m M.27 221,220.00
28 Tiang Pancang beton tulang 30x30 cm m M.28 356,410.00
29 Tiang Pancang beton tulang 40x40 cm m M.29 619,416.00
30 Batu muka m² M.30 122,900.00
31 Batu Candi m M.31 172,674.50
32 Turap beton tulang pre-cast 30x12 cm m M.32 245,800.00
33 Turap beton tulang pre-cast 40x15 cm bj M.33 368,700.00
34 Karung plastik / bagor m M.34 9,217.50
35 Tali rapia / plastik m² M.35 614.50
36 Bangunan bertingkat 2 @ 3x5 m2 set M.36 3,072,500.00
37 Minic Panel untuk 6 channel pintu air set M.37 7,374,000.00
38 Perlengkapan ruang jaga meja kursi bh M.38 1,229,000.00
39 Buis Beton dia 30 cm tanpa tulang bh M.39 50,696.25
40 Buis Beton dia 40 cm tanpa tulang bh M.40 80,438.05
41 Buis Beton dia 50 cm tanpa tulang bh M.41 118,967.20
42 Buis Beton dia 60 cm tanpa tulang bh M.42.a 141,949.50
43 Box Culvert 430x2500x1200 m M.42.b 18,840,570.00
B KELOMPOK KAYU
1 Kayu papan klas 2 (Kamper Banjar) m³ M.43 10,612,415.00
2 Kayu papan klas 2 (Kamper Samarinda) m³ M.44 10,292,875.00
3 Kayu papan klas 2 (Kamper Medan) m³ M.45 8,662,299.25
4 Kayu papan klas 3 (Borneo Super) m³ M.46 5,130,460.50
5 Kayu balok klas 2 (Kamper Banjar) m³ M.47 8,854,945.00
6 Kayu balok klas 2 (Kamper Samarinda) m³ M.48 9,801,275.00
7 Kayu balok klas 2 (Kamper Medan) m³ M.49 7,592,946.35
8 Kayu balok klas 3 (Borneo Super) m³ M.50 4,799,245.00
9 Kayu usuk klas 1 4/10 m³ M.51 19,504,230.00
10 Kayu usuk klas 2 4/10 m³ M.52 9,832,000.00
11 Kayu begesting m³ M.53 1,474,800.00
12 Kaso 5/7 m³ M.54 7,988,500.00
13 Kayu untuk cerucuk dia 2" bt M.55 14,370.90
14 Kayu untuk cerucuk dia 3" bt M.56 20,278.50
15 Kayu untuk cerucuk dia 4" bt M.57 24,334.20
16 Kayu untuk cerucuk dia 6" bt M.58 31,093.70
17 Dolken kayu galam dia 8 cm m M.59 24,580.00
18 Dolken kayu galam dia 8 cm m³ M.60 1,566,975.00
19 Multiplek tebal 1,2 cm lbr M.61 165,915.00
20 Multiplek tebal 1,8 cm lbr M.62 245,800.00
21 Bambu bt M.63 12,290.00
22 Ijuk tebal 5 cm kg M.64 14,194.95
23 Tiang Pancang kayu dia 20 cm m M.65 61,450.00
24 Kayu kelas II (min) ukuran 5/12 m³ M.66 9,217,500.00
25 Kayu kelas II (min) ukuran 8/12 m³ M.67 9,217,500.00
26 Kayu kelas II (min) ukuran 10/15 m³ M.68 9,217,500.00
27 Tusuk bambu bh M.69 1,229.00
C KELOMPOK LOGAM DAN MINYAK
1 Besi beton biasa kg M.70 12,290.00
2 Besi beton biasa 10 mm kg M.71 7,811.52
3 Besi beton biasa 12 mm kg M.72 6,578.84
4 Besi beton ulir 10 mm kg M.73 10,603.81
5 Baja Profil kg M.74 14,870.90
6 Kawat beton / Bendrat kg M.75 17,820.50
7 Paku biasa 1 cm - 3 cm kg M.76 28,389.90
8 Paku biasa 4cm - 7 cm kg M.77 15,362.50
9 Paku seng gelombang kg M.78 17,820.50
10 Besi siku L 50.50.5 m M.79 34,823.72
11 Kawat las listrik kg M.80 30,417.75
12 Kawat bronjong dia 4 mm kg M.81 23,781.15
13 Kawat bronjong dia 6 mm kg M.82 23,781.15
14 Kawat bronjong dia 8 mm kg M.83 23,781.15
15 Kawat bronjong dia 10 mm kg M.84 23,781.15
16 Kabel baja kg M.85 36,870.00
17 Pipa PVC D 10" panjang 4 m m M.86 1,038,505.00
18 Pipa PVC D 12" panjang 4 m m M.87 1,474,800.00
19 Pipa PVC D 14" panjang 6 m m M.88 4,178,600.00
20 Dynabolt/raamset dia 8 mm panjang 4-5 bh M.89 6,145.00
21 Besi siku L 40.40.4 m M.90 20,484.66
22 Bensin Premiun ltr M.91 6,083.55
23 Solar ltr M.92 5,813.17
24 Minyak tanah ltr M.93 878.35
25 Olie mesin (Mesran 40 SAE) ltr M.94 37,177.25
26 Minyak begesting ltr M.95 5,530.50
27 Cuka Bibit ltr M.96 30,725.00
28 Laburan meni / ter m² M.97 9,217.50
29 Tiang Pancang Baja dia 30 cm m M.98 614,500.00
30 Tiang Pancang baja kotak 30 x 30 cm m M.99 706,675.00
31 Besi beton biasa dia 10 mm m M.100 7,811.52
32 Turap baja profi larsen lebar 350 mm m M.101 172.06
33 Baja Pelat tebal 3 mm m² M.102 122,900.00
34 Ulir kasar diameter 16 mm kg M.103 61,450.00
35 Stang ulir diameter 16 mm bh M.104 153,625.00
36 Stang ulir diameter 16 mm + gear bh M.105 184,350.00
37 Ulir halus diameter 20 mm bh M.106 245,800.00
38 Stang ulir diameter 20 mm + gear bh M.107 368,700.00
39 Motor 2 KW 1350 rpm + pengkabelan bh M.108 12,290,000.00
40 Baut dia 12 mm panjang 2 cm bh M.109 2,703.80
41 Cat dinding kg M.110 19,868.01
42 Aspal Panas kg M.111 11,220.77
43 Cat Besi kg M.112 50,542.63
44 Baja Profil siku kg M.113 14,748.00
45 Pintu Air (satu drad) b=2,00, h=1,00 bh M.114 25,747,550.00
46 Pipa GI tebal Class dia 1/2" m M.115.a 22,982.30
47 Pipa GI Medium Class dia 1/2" m M.115.b 22,285.86
48 Pipa GI Medium Class dia 3/4" m M.115.c 31,462.40
49 Pipa GI Medium Class dia 1 1/2" m M.115.d 64,256.21
50 Pipa GI Medium Class dia 2" m M.115.e 78,676.49
51 Pipa GI Medium Class dia 2 1/2" m M.115.f 100,532.20
52 Pipa GI Medium Class dia 3" m M.115.g 131,134.30
53 Pipa GI Medium Class dia 4" m M.115.h 191,232.40
III KELOMPOK ALAT-ALAT BANTU
1 Keranjang/pengki bh E.01 14,133.50
2 Kereta dorong unit E.02 9,832.00
3 Jack hammer unit E.03 165,915.00
4 Pemadat timbunan (vibro roller/stemper) Hari-sewa E.04 18,435.00
5 Timbris unit/m3 bh E.05 18,435.00
6 Tang / alat pemotong kawat bh E.06 14,748.00
7 Palu pemecah batu unit/hari E.07 12,290.00
8 Molen (Concrete Mixer 0.5 m3) unit/hari E.08 491,600.00
9 Molen (Concrete Mixer 0.125 m3) unit/hari E.09 165,607.75
10 Vibrator unit/hari E.10 30,725.75
11 Kotak adukan bh E.11 30,725.00
12 Ember bh E.12 6,145.00
13 Gergaji bh E.13 30,725.00
14 Gunting pemotong baja bh E.14 30,725.00
15 Kunci pembelok tulangan bh E.15 6,145.00
16 Cetok bh E.16 3,687.00
17 Kuas bh E.17 1,843.50
18 Linggis bh E.18 62,863.35
19 Kayu pemikul + tampar unit E.19 14,748.00
20 Bodem bh E.20 64,215.25
21 Steel whell roller unit/hari E.21 491,600.00
22 Tandem roller unit/hari E.22 491,600.00
23 Alat pelancip bh E.23 18,435.00
24 Tusuk bambu bh E.24 12,290.00
25 Kayu Kasut bh E.25 6,145.00
26 Chainsaw jam E.26 24,580.00
27 Bulldozer jam E.27 206,472.00
28 Exsavator jam E.28 206,472.00
29 Pick up unit/hari E.29 167,758.50
30 Dump truck 3,5 ton unit/hari E.30 578,613.20
31 Dump truck 5 ton unit/hari E.31 662,431.00
32 Mesin las listrik unit/hari E.32 250,101.50
33 Mesin pompa air 3" unit/hari E.33 165,607.75
34 Waterpass Hari-sewa E.34 245,800.00
35 Jack Stressing Hari-sewa E.35 165,915.00
36 Conveyon Beton Hari-sewa E.36 245,800.00
37 Pahat Beton Hari-sewa E.37 24,580.00
38 Bor listrik Hari-sewa E.38 24,580.00
39 Tripod tinggi 5 m Hari-sewa E.39 399,425.00
40 Alat pancang tipe Hammer 2 ton Hari-sewa E.40 543,218.00
41 Alat pancang tipe Hammer 1 ton Hari-sewa E.41 368,700.00
42 Crane kecil Hari-sewa E.42 897,170.00
43 Crane besar Hari-sewa E.43 1,149,115.00
44 Las listrik 250 A diesel Hari-sewa E.44 288,815.00
45 Mesin pancang tenaga uap 8 ton Hari-sewa E.45 903,315.00
46 Mesin pancang tenaga diesel 8 ton Hari-sewa E.46 1,044,650.00
47 Mesin pancang kompresor udara 8 ton Hari-sewa E.47 921,750.00
48 Alat penyambung tiang pancang Hari-sewa E.48 245,800.00
49 Pompa air diesel 5 KW Hari-sewa E.49 276,525.00
50 Pompa air diesel 10 KW Hari-sewa E.50 543,218.00
51 Pompa air diesel 20 KW Hari-sewa E.51 1,020,070.00
52 Theodolit Hari-sewa E.52 307,250.00
53 Loader Hari-sewa E.53 206,472.00
54 Water Tank Hari-sewa E.54 250,101.50
55 Pneumatic Roller Hari-sewa E.55 470,461.20
DAFTAR ANALISA SATUAN HARGA PEKERJAAN

L.01 Pembuatan Papan Nama Pekerjaan

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Mandor L.15 OH

B. BAHAN
1 Multiplek tebal 12 mm lbr
2 Paku biasa 4cm - 7 cm M.77 kg
3 Cat kayu kg

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²

L.02 Pemasangan Bouwplank dan Pengukuran

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang kayu L.06 OH
3 Kepala tukang L.05 OH
4 Mandor L.15 OH

B. BAHAN
1 Kayu 5/7 x 4m kayu sengon m³
2 Paku biasa 2"-5" kg
3 Kayu papan 2/20 sengon m³

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²
L.03 Pembersihan Lapangan

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang tebas L.13 OH
3 Mandor L.15 OH

B. BAHAN

C. ALAT
1 Chainsaw E.26 jam

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²

T.01 Galian Tanah Biasa

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Tukang gali L.02 OH
2 Mandor L.15 OH

B. BAHAN

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m³

T.02 Timbunan Tanah

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Mandor L.15 OH

B. BAHAN
1 Bahan timbunan M.08 m³

C. ALAT
1 Pemadat timbunan E.4 unit/m3
Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m³

T.03 Pekerjaan Batu Kali

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.04 OH
3 Kepala tukang batu L.03 OH
4 Mandor L.15 OH

B. BAHAN
1 Batu Belah 15/20 M.11 m³
2 Portland Cement M.18 kg
3 Pasir Pasang M.08 m³

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m³
T.04 Pekerjaan Siaran 1:2

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.04 OH
3 Kepala tukang batu L.03 OH
4 Mandor L.15 OH

B. BAHAN
1 Portland Cement M.18 kg
2 Pasir Pasang M.08 m³

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²

T.05 Pekerjaan Beton (K225)

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.04 OH
3 Kepala tukang batu L.03 OH
4 Mandor L.15 OH

B. BAHAN
1 Portland Cement M.18 kg
2 Pasir Beton M.09 kg
3 Krikil M.16 kg
4 Air M.01 ltr

C. ALAT
1 Molen E.8 Hari-sewa

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m³

T.06 Pekerjaan Pondasi 1:3

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.04 OH
3 Kepala tukang batu L.03 OH
4 Mandor L.15 OH

B. BAHAN
1 Portland Cement M.18 kg
2 Pasir pasang M.09 m³
3 Batu belah M.11 m³

C. ALAT
1 Molen E.8 Hari-sewa

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m³
T.07 Pekerjaan Lantai Kerja

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.04 OH
3 Kepala tukang batu L.03 OH
4 Mandor L.15 OH

B. BAHAN
1 Portland Cement M.18 kg
2 Pasir Beton M.09 kg
3 Krikil M.16 kg
4 Air M.01 ltr

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m³

T.08 Pekerjaan Pembesian Pagar

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang besi L.08 OH
3 Kepala tukang L.03 OH
4 Mandor L.15 OH

B. BAHAN
1 Besi tebal 4mm kg
2 Cat Besi M.112 kg

C. ALAT
1 Mesin potong besi E.14 Hari-sewa

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m

T.09 Pekerjaan Plesteran

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.04 OH
3 Kepala tukang L.03 OH
4 Mandor L.15 OH

B. BAHAN
1 Pasir pasang M.08 m³
2 Portland cement M.18 kg

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²
T.10 Bekisting beton biasa

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang kayu L.06 OH
3 Kepala tukang L.05 OH
4 Mandor L.15 OH

B. BAHAN
1 Papan 3/10 cm kayu kelas II M.45 m³
2 Kaso 5/7 cm M.54 m³
3 Paku 5 cm dan 7 cm M.77 kg
4 Minyak Bakesting M.95 ltr

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²

T.11 Pemasangan Pipa Saluran Diameter 2m

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Mandor L.15 OH
3 Operator crane L.18 OH

B. BAHAN
1 Pipa Saluran diameter 2m m

C. ALAT
1 Crane besar E.43 Hari-sewa

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m

T.12Pemasangan Pipa Drainase pada Pas Batu Kali

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang pipa L.06 OH
3 Kepala Tukang L.05 OH
4 Mandor L.15 OH

B. BAHAN
1 Pipa PVC 2" tipe AW m

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m
T.13 Pembesian Beton

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang besi beton L.08 OH
3 Kepala tukang batu L.07 OH
4 Mandor L.15 OH

B. BAHAN
1 Besi Beton M.70 kg
2 Kawat besi / bendrat M.75 kg

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m³

T.14 Pasangan Pasir Pondasi

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Mandor L.15 OH

B. BAHAN
1 Pasir pasang M.08 m³

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m³

T.15 Pintu Besi

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang las L.14 OH
3 Kepala tukang L.07 OH
4 Mandor L.15 OH

B. BAHAN
1 Baja L.40.40.4 M.90 m
2 Baja pelat tebal 3mm M.102 m2
3 Ulir kasar d16 mm M.103 kg
4 Stang ulir d16 mm M.104 bh

C. ALAT
1 Mesin las listrik 250 A E.44 hari-sewa

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²
T.16 Jendela Besi

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang las L.14 OH
3 Kepala tukang L.07 OH
4 Mandor L.15 OH

B. BAHAN
1 Baja L.40.40.4 M.90 m
2 Baja pelat tebal 3mm M.102 m2
3 Ulir kasar d16 mm M.103 kg
4 Stang ulir d16 mm M.104 bh

C. ALAT
1 Mesin las listrik 250 A E.44 hari-sewa

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²

T.17 Pekerjaan Cat Tembok

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang cat L.10 OH
3 Mandor L.15 OH

B. BAHAN
1 Cat dinding M.110 kg

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²

T.18 Pekerjaan Cat Besi

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang cat L.10 OH
3 Mandor L.15 OH

B. BAHAN
1 Cat besi M.112 kg

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²
T.19 Pekerjaan Atap

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang kayu L.06 OH
3 Kepala tukang kayu L.05 OH
4 Mandor L.15 OH

B. BAHAN
1 Kaso 4/6 M.54 m³
2 Plafon asbes 3 mm Paku biasa 4cm - 7 cm Asbes gelombang lbr
3 Paku biasa 4cm - 7 cm M.77 kg
4 Asbes gelombang lbr
5 Paku asbes bh

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m²

T.20 Pasangan Batu Kosong

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.04 OH
3 Kepala tukang L.03 OH
4 Mandor L.15 OH

B. BAHAN
1 Batu/ Batu belah M.11 m³
2 Pasir Pasang M.08 m³

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m³

T.21Pasangan Tembok Batu Bata

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang batu L.04 OH
3 Kepala tukang batu L.03 OH
4 Mandor L.15 OH

B. BAHAN
1 Batu Bata M.15 m³
2 Portland Cement M.18 kg
3 Pasir Pasang M.08 m³

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m³
T.22Pemasangan Pompa Submersible 3 ltr Had 100

No Uraian Kode Satuan


1 2 3 4
A. TENAGA

B. BAHAN
1 Pompa Submersible 3ltr Had 100 bh
2 Selling D16mm
3 Kabel Pompa

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - bh

T.23 Pemasangan Panel Pompa

No Uraian Kode Satuan


1 2 3 4
A. TENAGA

B. BAHAN
1 Pompa Submersible 1,5 ltr Head 100 bh

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - bh

T.24Pekerjaan Pipa Pompa

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang pipa L.11 OH
3 Kepala tukang L.03 OH
4 Mandor L.15 OH

B. BAHAN
1 Pipa PVC D 12" M.87 m

C. ALAT

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m

T.25 Gorong-gorong Box Culvert

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Mandor L.15 OH

B. BAHAN
1 Box Culvert 4300 x 2500 M.42.b m

C. ALAT
1 Exsavator E.28 hari

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - m
T.26 Pintu Angkat

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang las L.02 OH
3 Kepala tukang L.03 OH
4 Mandor L.04 OH

B. BAHAN
1 Besi pengaku M.113 kg
2 Kawat las listrik M.80 kg
3 Pintu Air satu drad (b=2,00, h=1,00) M.114 bh

C. ALAT
1 Tackle/Tripod tinggi 4-5 m E.39 sewa-hari
2 Mesin las listrik 250A, diesel E.44 sewa-hari

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - bh

T.27 Besi Railling

No Uraian Kode Satuan


1 2 3 4
A. TENAGA
1 Pekerja L.01 OH
2 Tukang las L.02 OH
3 Kepala tukang L.03 OH
4 Mandor L.04 OH

B. BAHAN
1 Pipa GI Medium Class dia 2 1/2" M.155.f m'

C. ALAT
1 Mesin las listrik 250A, diesel E.44 sewa-hari

Sub Total
D. Overhead + Keuntungan 15%
E. Jumlah Harga
F. Harga satuan Pekerjaan per - bh
A PEKERJAAN

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.05 67,595.00 3,379.75


0.005 98,320.00 491.60

1 135,000.00 135,000.00
0.25 12,500.00 3,125.00
1 37450 37450

179,446.35
26916.9525
206,363.30
206,363.30

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.1 67,595.00 6,759.50


0.1 92,175.00 9,217.50
0.01 98,320.00 983.20
0.005 98,320.00 491.60

0.1 1,550,000.00 155,000.00


0.15 12,000.00 1,800.00
0.08 1550000 124000

298,251.80
44737.77
342,989.57
342,989.57
Koefisien Harga Satuan (RP) Jumlah (Rp)
5 6 7

0.008 67,595.00 540.76


0.024 86,030.00 2,064.72
0.001 98,320.00 98.32

0.011 24,580.00 270.38

2,974.18
446.127
3,420.31
3,420.31

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.675 86,030.00 58,070.25


0.023 98,320.00 2,261.36

60,331.61
9049.7415
69,381.35
69,381.35

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.33 67,595.00 22,306.35


0.012 98,320.00 1,179.84

1.2 96,500.00 115,800.00

0.05 15,000.00 750.00


140,036.19
21005.4285
161,041.62
161,041.62

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

2.73 67,595.00 184,534.35


0.9 86,030.00 77,427.00
0.09 98,320.00 8,848.80
0.135 98,320.00 13,273.20

1.2 155,591.40 186,709.68


252 1,812.78 456,820.56
0.44 110,610.00 48,668.40

976,281.99
146442.2985
1,122,724.29
1,122,724.29
Koefisien Harga Satuan (RP) Jumlah (Rp)
5 6 7

0.3 67,595.00 20,278.50


0.15 86,030.00 12,904.50
0.015 98,320.00 1,474.80
0.015 98,320.00 1,474.80

6.34 1,250.00 7,925.00


0.012 162,500.00 1,950.00

46,007.60
6901.14
52,908.74
52,908.74

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

1.32 67,595.00 89,225.40


0.25 86,030.00 21,507.50
0.02 98,320.00 1,966.40
0.06 98,320.00 5,899.20

371 1,240.00 460,040.00


698 100.00 69,800.00
1047 103.70 108,573.90
215 3.08 662.20

0.2 400,000.00 80,000.00

837,674.60
125651.19
963,325.79
963,325.79

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7
1.5 67,595.00 101,392.50
0.75 86,030.00 64,522.50
0.075 98,320.00 7,374.00
0.075 98,320.00 7,374.00

202 1,240.00 250,480.00


0.485 100.00 48.50
1.2 146,200.00 175,440.00

0.2 400,000.00 80,000.00

686,631.50
102994.725
789,626.23
789,626.23
Koefisien Harga Satuan (RP) Jumlah (Rp)
5 6 7

1.2 67,595.00 81,114.00


0.2 86,030.00 17,206.00
0.02 98,320.00 1,966.40
0.06 98,320.00 5,899.20

230 1,240.00 285,200.00


893 100.00 89,300.00
1027 103.70 106,499.90
200 3.08 616.00

587,801.50
88170.225
675,971.73
675,971.73

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.7 67,595.00 47,316.50


0.7 86,030.00 60,221.00
0.07 98,320.00 6,882.40
0.04 98,320.00 3,932.80

0.985 1,035,000.00 1,019,475.00


1 50,542.63 50,542.63

0.05 400,000.00 20,000.00

1,208,370.33
181255.5495
1,389,625.88
1,389,625.88

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7
0.3 67,595.00 20,278.50
0.15 86,030.00 12,904.50
0.015 98,320.00 1,474.80
0.015 98,320.00 1,474.80

0.082 90,000.00 7,380.00


2.25 1,240.00 2,790.00

46,302.60
6945.39
53,247.99
53,247.99
Koefisien Harga Satuan (RP) Jumlah (Rp)
5 6 7

0.66 67,595.00 44,612.70


0.33 92,175.00 30,417.75
0.033 98,320.00 3,244.56
0.033 98,320.00 3,244.56

0.04 7,048,250.00 281,930.00


0.02 6,500,000.00 130,000.00
0.4 12,500.00 5,000.00
0.2 4,500.00 900.00

499,349.57
74902.4355
574,252.01
574,252.01

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.05 67,595.00 3,379.75


0.005 98,320.00 491.60
0.05 208,930.00 10,446.50

1.01 10,657,321.46 10,763,894.67

1 1,149,115.00 1,149,115.00

11,927,327.52
1789099.12869
13,716,426.65
13,716,426.65

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.05 92,175.00 4,608.75


0.03 92,175.00 2,765.25
0.003 98,320.00 294.96
0.003 98,320.00 294.96

0.25 95,000.00 23,750.00

31,713.92
4757.088
36,471.01
36,471.01
Koefisien Harga Satuan (RP) Jumlah (Rp)
5 6 7

1.2 67,595.00 81,114.00


0.4 86,030.00 34,412.00
0.04 98,320.00 3,932.80
0.05 98,320.00 4,916.00

1 12,290.00 12,290.00
1 17,820.50 17,820.50

154,485.30
23172.795
177,658.10
177,658.10

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

1.2 67,595.00 81,114.00


0.05 98,320.00 4,916.00

1.2 110,610.00 132,732.00

218,762.00
32814.3
251,576.30
251,576.30

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

5.78 67,595.00 390,699.10


2.89 86,030.00 248,626.70
0.34 98,320.00 33,428.80
0.017 98,320.00 1,671.44
24.48 20,484.66 501,464.48
1.225 122,900.00 150,552.50
5.335 61,450.00 327,835.75
1 153,625.00 153,625.00

1.36 288,815.00 392,788.40

2,200,692.17
330103.82502
2,530,795.99
2,530,795.99
Koefisien Harga Satuan (RP) Jumlah (Rp)
5 6 7

5.78 67,595.00 390,699.10


2.89 86,030.00 248,626.70
0.34 98,320.00 33,428.80
0.017 98,320.00 1,671.44

12.24 20,484.66 250,732.24


0.6125 122,900.00 75,276.25
2.6675 61,450.00 163,917.88
0.5 153,625.00 76,812.50

1.36 288,815.00 392,788.40

1,633,953.30
245092.99551
1,879,046.30
1,879,046.30

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.5 67,595.00 33,797.50


1 86,030.00 86,030.00
0.05 98,320.00 4,916.00

1.2 19,868.01 23,841.61

148,585.11
22287.7668
170,872.88
170,872.88

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.5 67,595.00 33,797.50


1 86,030.00 86,030.00
0.05 98,320.00 4,916.00

1.2 50,542.63 60,651.16

185,394.66
27809.1984
213,203.85
213,203.85
Koefisien Harga Satuan (RP) Jumlah (Rp)
5 6 7

1.2 67,595.00 81,114.00


0.4 92,175.00 36,870.00
0.04 98,320.00 3,932.80
0.05 98,320.00 4,916.00

0.05 7,988,500.00 399,425.00


1 16,500.00 16,500.00
0.75 12,500.00 9,375.00
0.3 59,950.00 17,985.00
9 825.00 7,425.00

577,542.80
86631.42
664,174.22
664,174.22

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

1 67,595.00 67,595.00
0.4 86,030.00 34,412.00
0.04 98,320.00 3,932.80
0.08 98,320.00 7,865.60

1.2 155,591.40 186,709.68


0.432 110,610.00 47,783.52

348,298.60
52244.79
400,543.39
400,543.39

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7
2.73 67,595.00 184,534.35
0.9 86,030.00 77,427.00
0.09 98,320.00 8,848.80
0.135 98,320.00 13,273.20

1.2 16,898.75 20,278.50


252 1,812.78 456,820.56
0.44 110,610.00 48,668.40

809,850.81
121477.6215
931,328.43
931,328.43
Koefisien Harga Satuan (RP) Jumlah (Rp)
5 6 7

1 47,360,000.00 47,360,000.00

47,360,000.00
7104000
54,464,000.00
54,464,000.00

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

1 2,500,000.00 2,500,000.00

2,500,000.00
375000
2,875,000.00
2,875,000.00

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.055 67,595.00 3,717.73


0.04 86,030.00 3,441.20
0.004 98,320.00 393.28
0.004 98,320.00 393.28

1.05 1,474,800.00 1,548,540.00

1,556,485.49
233472.82275
1,789,958.31
1,789,958.31

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.05 67,595.00 3,379.75


0.005 98,320.00 491.60

0.833 18,840,570.00 15,694,194.81

1 206,472.00 206,472.00

15,698,066.16
2354709.924
18,052,776.08
18,052,776.08
Koefisien Harga Satuan (RP) Jumlah (Rp)
5 6 7

0.62 67,595.00 41,908.90


0.31 86,030.00 26,669.30
0.031 98,320.00 3,047.92
0.062 98,320.00 6,095.84

1.86 14,748.00 27,431.28


0.413 30,417.75 12,562.53
1 25,747,550.00 25,747,550.00

0.093 399,425.00 37,146.53


0.093 288,815.00 26,859.80

25,865,265.77
3879789.865613
29,745,055.64
29,745,055.64

Koefisien Harga Satuan (RP) Jumlah (Rp)


5 6 7

0.62 19,458.76 12,064.43


0.31 10,206.85 3,164.12
0.031 55,305.00 1,714.46
0.062 16,898.75 1,047.72

1 100,532.20 100,532.20

0.093 288,815.00 26,859.80

118,522.93
17778.43983
136,301.37
136,301.37
KOMPONEN PEKERJAAN SAL

1. Pekerjaan Persiapan

No Sket Gambar dan Penjelasan Kode Uraian P

1 Pembuatan papan nama proyek dalam SI.1 Pek. Pembuatan Papan Nama Proyek
semasa konstruksi berlangsung uraian panjang x
2.00 x

2 Pembersihan lokasi dilakukan agar SI.2 Pek. Pembersihan Lokasi


pelaksanaan proyek tidak ada yang uraian panjang x
menghambat proses pekerjaan A 3988.30 x

panjang x
B 336.01 x

3 Pemasangan bowplank dan pengukuran SI.3 Pek. Pemasangan Bowplank dan Pengukura
uraian
Papan 2/20 Saluran =
Kasau 5/7
A Saluran =
Saluran =
B Saluran =
2m

kebutuhan kayu =
papan 2/20 =
1.5m
2 x kayu 5/7 =

2. Pekerjaan Tanah

No Sket Gambar dan Penjelasan Kode Uraian P


1 Penggalian tanah saluran TA.1 Pek. Galian Tanah Saluran
Uraian Panjang x
Saluran A 3,988.30 x

2 Penggalian tanah storage TA.2 Pek. Galian Tanah Storage


Uraian Panjang x
Storage 25.00 x
3 Penggalian bangunan pelimpah TA.3 Pek. Galian Bangunan Pelimpah
Uraian Panjang x
B. Pelimpah 12.66 x
3. Pekerjaan Pasangan

No Sket Gambar dan Penjelasan Kode Uraian P


1 Pasangan batu kali Saluran PA.1 Pek. Pasangan Batu Kali Saluran
A Panjang x
3,988.30 x
B Panjang x
3,988.30 x

Saluran Panjang x
3,988.30 x

Total Saluran -
612,024.58 -

2 Pasangan batu kali storage PA.2 Pek. Pasangan Batu Kali Storage
Uraian Panjang x
25.00 x
25.00 x

3 Siaran pada saluran PA.3 Pek. Siaran 1:2 Saluran


Uraian Panjang x
Siaran Saluran 3,988.30 x
3,988.30 x

4 Plesteran pada Storage PA.4 Pek. Plesteran Storage


Uraian Panjang x
25.00 x

5 Pasir pasang bawah saluran PA.5 Pek. Pasir Pasang Saluran


Uraian Panjang x
Pasir pasang 3,988.30 x

6 Pasir pasang bawah storage PA.6 Pek. Pasir Pasang Storage


Uraian Panjang x
Batu Kosong 25.00 x
4. Pekerjaan Bangunan Pelimpah

No Sket Gambar dan Penjelasan Kode Uraian P


1 Dinding beton bangunan pelimpah PE.1 Pek. Beton K225 Dinding Bangunan Pelimp
Uraian Panjang x
Beton 12.66 x

2 Beton dasar bangunan pelimpah PE.2 Pek. Beton K225 Dasar Bangunan Pelimpah
Uraian Panjang x
Beton 12.66 x

3 Pemasangan besi tulangan tembok beton PE.3 Pek. Pembesian Dinding Bangunan Pelimpa
Uraian Panjang x
Tulangan 12.66 x

4 Pemasangan besi tulangan dasar PE.4 Pek. Pembesian Dasar Bangunan Pelimpah
bangunan pelimpah Uraian Panjang x
Tulangan 12.66 x

5 Pondasi batu kali dinding bangunan PE.5 Pek. Pondasi Dinding Bangunan Pelimpah
pelimpah Uraian Panjang x
12.66 x

6 Pondasi batu kali dasar bangunan PE.6 Pek. Pondasi Dasar Bangunan Pelimpah
pelimpah Uraian Panjang x
12.66 x

7 Plesteran dinding bangunan pelimpah PE.7 Pek. Plesteran Dinding Bangunan Pelimpah
Uraian Panjang x
12.66 x

8 Plesteran dasar bangunan pelimpah PE.8 Pek. Plesteran Dasar Bangunan Pelimpah
Uraian Panjang x
12.66 x
9 Pintu air bangunan pelimpah (b=2,00, PE.9 Pek. Pintu Air
h=1,00) Uraian unit =
8 =

10 Pengecatan pintu air PE.10 Pek. Pengecatan Pintu Air


Uraian unit =
8 =

11 Beton Jembatan PE.11 Pek. Beton Jembatan Bangunan Pelimpah


Uraian Panjang x
Beton 8.00 x

12 Pemasangan besi tulangan tembok beton PE.12 Pek. Pembesian Jembatan Bangunan Pelim
Uraian Panjang x
Tulangan 8.00 x

13 Bakesting jembatan PE.13 Pek. Bakesting Jembatan


Uraian Panjang x
Bakesting 8.00 x

14 Beton railling jembatan PE.14 Pek. Beton Railling Jembatan


Uraian Panjang x
Beton 0.20 x

15 Pemasangan besi tulangan railling PE.15 Pek. Pembesian Railling Jembatan


jembatan Uraian Panjang x
Tulangan 0.20 x

16 Pembesian railling jembatan PE.16 Pek. Besi Railling Jembatan


Uraian Panjang x
8.00 x

17 Pengecatan railling jembatan PE.17 Pek. Pengecatan Railling Jembatan


Uraian Panjang x
Besi 8.00 x
5. Pekerjaan Rumah Pompa dan Pompa

No Sket Gambar dan Penjelasan Kode Uraian P


1 Galian tanah pondasi RU.1 Pek. Galian Tanah Pondasi
Uraian Panjang x
Galian 4.00 x
4.00 x

2 Pasir pasang pondasi RU.2 Pek. Pasir Pasang Pondasi


Uraian Panjang x
Pasir pasang 4.00 x
4.00 x

3 Batu kosong pondasi batu kali rumah RU.3 Pek. Batu Kosong Pondasi
pompa Uraian Panjang x
Batu Kosong 4.00 x
4.00 x

4 Pasangan pondasi batu kali RU.4 Pek. Pas. Pondasi Batu Kali
Uraian Panjang x
Pondasi 4.00 x
4.00 x

5 Urugan tanah kembali pondasi RU.5 Pek. Urugan Tanah Kembali


Uraian Panjang x
Urugan 4.00 x
4.00 x

6 Bakesting beton sloof RU.6 Pek. Bakesting Sloof


Uraian Panjang x
Bakesting 4.00 x
4.00 x

7 Sloof beton RU.7 Pek. Beton Sloof


Uraian Panjang x
Beton 4.00 x
4.00 x

8 Pembesian beton sloof RU.8 Pek. Tulangan Sloof Beton


Uraian Panjang x
Pembesian 4.00 x
4.00 x

9 Pasangan tembok batu bata 3x4 RU.9 Pek. Pasangan Tembok Batu Bata
Uraian Panjang x
Tembok 4.00 x
4.00 x
Pengurang Panjang x
Pintu 0.80 x
Jendela 1.00 x

10 Pintu besi rumah pompa RU.10 Pek. Pintu Besi


Uraian Lebar x
Pintu 1.50 x

11 Jendela besi rumah pompa RU.11 Pek. Jendela Besi


Uraian Lebar x
Jendela 1.50 x

12 Cat Tembok luar dan dalam rumah pompa RU.12 Pek. Cat Batu Bata
Uraian Panjang x
Tembok 4.00 x
4.00 x
Pengurang Panjang x
Pintu 1.50 x
Jendela 1.50 x

13 Cat pintu besi RU.13 Pek. Cat Pintu Besi


Uraian Lebar x
Pintu 1.50 x

14 Cat jendela besi RU.14 Pek. Cat Jendela Besi


Uraian Lebar x
Jendela 1.50 x

15 Bakesting kolom rumah pompa RU.15 Pek. Bakesting Kolom Rumah Pompa
Uraian Panjang x
Bakesting 0.15 x

16 Kolom rumah pompa 15x15 cm RU.16 Pek. Beton Kolom


Uraian Panjang x
Beton 0.15 x

17 Pembesian kolom rumah pompa RU.17 Pek. Tulangan Kolom Beton


Uraian Panjang x
Pembesian 0.15 x

18 Bakesting Balok Rumah Pompa RU.18 Pek. Bakesting Balok Rumah Pompa
Uraian Panjang x
Bakesting 4.00 x
4.00 x

19 Balok rumah pompa 15x20 cm RU.19 Pek. Balok Rumah Pompa


Uraian Panjang x
Beton 4.00 x
4.00 x
20 Pembesian balok rumah pompa RU.20 Pek. Tulangan Balok Beton
Uraian Panjang x
Pembesian 4.00 x
4.00 x

21 Dudukan Genset dan Pompa RU.21 Pek. Beton Dudukan Genset dan Pompa
Uraian Panjang x
Beton 3.00 x
3.00 x

22 Pembesian Dudukan Genset dan Pompa RU.22 Pek. Tulangan Beton Dudukan Genset dan P
Uraian Panjang x
Pembesian 2.00 x
3.00 x

23 Pengecoran lantai RU.23 Pek. Lantai Beton


Uraian Panjang x
Beton 4.00 x

24 Pembesian lantai rumah pompa RU.24 Pek. Pembesian Lantai Rumah Pompa
Uraian Panjang x
Pembesian 4.00 x

25 Pemasangan Pompa Submersible 1,5 m³ RU.25 Pek. Pemasangan Pompa Submersible


Head 100 Uraian Jumlah
Pompa 4.00

26 Pemasangan Panel Pompa RU.26 Pek. Pemasangan Panel Pompa


Uraian Jumlah
Panel 4.00

27 Pemasangan Pipa Pompa D12" RU.27 Pek. Pemasangan Pipa Pompa


Uraian Panjang x
Pipa Depan 6.00 x
Pipa Belakang 8.00 x

28 Bakesting atap rumah RU.28 Pek. Bakesting Atap Rumah Pompa


Uraian Panjang x
Bakesting 5.40 x

29 Beton atap rumah pompa RU.29 Pek. Beton Rumah Pompa


Uraian Panjang x
Beton 5.40 x

30 Pemasangan besi tulangan atap rumah RU.30 Pek. Pembesian Atap Rumah Pompa
pompa Uraian Panjang x
Tulangan 5.40 x
6. Pekerjaan Tanggul

No Sket Gambar dan Penjelasan Kode Uraian P


1 Timbunan tanggul TG.1 Pek. Timbunan Tanggul
Uraian Panjang x
C 1,921.63 x
D 336.01 x

7. Pekerjaan Gorong-gorong

No Sket Gambar dan Penjelasan Kode Uraian P


1 Galian gorong-gorong GR.1 Pek. Galian Gorong-gorong
Uraian Panjang x
Galian 43.82 x

2 Pemasangan gorong-gorong Box Culvert GR.2 Pek. Gorong-gorong Box Culvert


Uraian Panjang x
43.82 x

3 Timbunan tanah kembali gorong-gorong GR.3 Pek. Timbunan Gorong-gorong


Uraian Panjang x
43.82 x
PEKERJAAN SALURAN NABIRE

Uraian Pekerjaan dan Perhitungan Volume

an Nama Proyek 2.00 m²


lebar x unit = jumlah
1.00 x 1.00 = 2.00

203,500.88 m²
lebar x unit = jumlah
25.00 x 2.00 = 199415.00

lebar x unit = jumlah


12.16 x 1.00 = 4085.88

wplank dan Pengukuran 16,749.54 m¹

Keliling kawasan
3988.30 + 25.00 x 2.00 x 2.00 = 16053.20
Keliling kawasan
336.01 + 12.16 x 2.00 x 1.00 = 696.34

b x h x panjang x unit = jumlah 0.20 m³


0.02 x 0.20 x 1.50 x 10.00 = 0.06
0.05 x 0.07 x 2.00 x 20.00 = 0.14

Uraian Pekerjaan dan Perhitungan Volume

Lebar x Tinggi x unit = jumlah 612,024.58 m³


11.75 x 6.53 x 2.00 = 612024.58

Lebar x Tinggi x unit = jumlah 4,375.00 m³


25.00 x 3.50 x 2.00 = 4375.00
n Pelimpah
Lebar x Tinggi x unit = jumlah 708.96 m³
8.00 x 3.50 x 2.00 = 708.96
Uraian Pekerjaan dan Perhitungan Volume
Kali Saluran
(Lebar atas + Lebar bwh)/2 x Tinggi x unit = jumlah 288,872.57 m³
9.25 + 6.25 x 3.50 x 2.00 = 216365.28
Lebar x Tinggi x Unit = jumlah
8.75 x 1.53 x 2.00 = 106786.73

Lebar x Tinggi x Unit = jumlah


11.75 x 6.53 x 2.00 = 612024.58

(A + B) = jumlah
216365.28 + 106786.73 = 288872.57

Kali Storage
Tebal x Tinggi x Sisi x Unit = jumlah 292.50 m³
0.15 x 3.50 x 4.00 x 2.00 = 105.00
0.15 x 25.00 x 1.00 x 2.00 = 187.50

Lebar x unit = jumlah 81,066.19 m²


3.91 x 2.00 = 31212.44
6.25 x 2.00 = 49853.75

Tinggi x Sisi x unit = jumlah 700.00 m²


3.50 x 4.00 2.00 = 700.00

Lebar x Tinggi x unit = jumlah 239.30 m³


0.15 x 0.10 x 4.00 = 239.30

Lebar x Tinggi x unit = jumlah 125.00 m³


25.00 x 0.10 x 2.00 = 125.00
Uraian Pekerjaan dan Perhitungan Volume
ding Bangunan Pelimpah
Tebal x Tinggi x unit = jumlah 26.59 m³
0.15 x 3.50 x 4.00 = 26.59

ar Bangunan Pelimpah
Lebar x Tinggi x unit = jumlah 30.38 m³
8.00 x 0.15 x 2.00 = 30.38

ing Bangunan Pelimpah


Tebal x Tinggi x unit = jumlah 26.59 m³
0.15 x 3.50 x 4.00 = 26.59

ar Bangunan Pelimpah
Lebar x Tinggi x unit = jumlah 30.38 m³
8.00 x 0.15 x 2.00 = 30.38

g Bangunan Pelimpah
(Lebar atas + Lebar bawah)/2 x Tinggi x unit = jumlah 6.33 m³
0.15 + 0.10 x 2.00 x 2.00 = 6.33

Bangunan Pelimpah
Lebar x Tinggi x unit = jumlah 20.26 m³
8.00 x 0.10 x 2.00 = 20.26

ng Bangunan Pelimpah
Tinggi x Sisi x unit = jumlah 177.24 m²
3.50 x 2.00 x 2.00 = 177.24

Bangunan Pelimpah
Lebar x unit = jumlah 202.56 m²
8.00 x 2.00 = 202.56
jumlah 8.00 bh
8

jumlah 8.00 bh
8

Bangunan Pelimpah
Lebar x Tinggi x unit = jumlah 7.20 m³
3.00 x 0.15 x 2.00 = 7.20

batan Bangunan Pelimpah


Lebar x Tinggi x unit = jumlah 7.20 m³
3.00 x 0.15 x 2.00 = 7.20

Lebar x unit = jumlah 48.00 m²


3.00 x 2.00 = 48.00

Lebar x Tinggi x unit = jumlah 0.60 m³


0.15 x 1.00 x 20.00 = 0.60

ing Jembatan
Lebar x Tinggi x unit = jumlah 0.60 m³
0.15 x 1.00 x 20.00 = 0.60

unit = jumlah 32.00 m¹


4.00 = 32.00

ling Jembatan
unit = jumlah 32.00 m¹
4.00 = 32.00
Uraian Pekerjaan dan Perhitungan Volume

Lebar x Tinggi x unit = jumlah 9.52 m³


0.70 x 0.85 x 2.00 = 4.76
0.70 x 0.85 x 2.00 = 4.76

Lebar x Tinggi x unit = jumlah 1.12 m³


0.70 x 0.10 x 2.00 = 0.56
0.70 x 0.10 x 2.00 = 0.56

Lebar x Tinggi x unit = jumlah 1.68 m³


0.70 x 0.15 x 2.00 = 0.84
0.70 x 0.15 x 2.00 = 0.84

(Lebar atas + Lebar bawah)/2 x Tinggi x unit = jumlah 4.80 m³


0.30 + 0.7 x 0.60 x 2.00 = 2.40
0.30 + 0.7 x 0.60 x 2.00 = 2.40

Lebar x Tinggi x unit = jumlah 9.52 m³


0.70 x 0.85 x 2.00 = 4.76
0.70 x 0.85 x 2.00 = 4.76

Lebar x Tinggi x unit = jumlah 0.36 m²


0.15 x 0.15 x 2.00 = 0.18
0.15 x 0.15 x 2.00 = 0.18

Lebar x Tinggi x unit = jumlah 0.36 m³


0.15 x 0.15 x 2.00 = 0.18
0.15 x 0.15 x 2.00 = 0.18

Lebar x Tinggi x unit = jumlah 0.36 m³


0.15 x 0.15 x 2.00 = 0.18
0.15 x 0.15 x 2.00 = 0.18

ok Batu Bata
Lebar x Tinggi x unit = jumlah 62.60 m³
1.50 x 3.00 x 2.00 = 36.00
2.00 x 2.00 x 2.00 = 32.00
Lebar x Tinggi x unit = jumlah
1.50 x 2.00 x 1.00 = 2.40
1.50 x 1.00 x 2.00 = 3.00

Tinggi x unit = jumlah 3.00 m²


2.00 x 1.00 = 3.00

Tinggi x unit = jumlah 3.00 m²


1.00 x 2.00 = 3.00

Tinggi x unit = jumlah 42.00 m²


3.00 x 2.00 = 24.00
3.00 x 2.00 = 24.00
Tinggi x unit = jumlah
2.00 x 1.00 = 3.00
1.00 x 2.00 = 3.00

Tinggi x unit = jumlah 3.00 m²


2.00 x 1.00 = 3.00

Tinggi x unit = jumlah 3.00 m²


1.00 x 2.00 = 3.00

m Rumah Pompa
Lebar x Tinggi x unit = jumlah 0.27 m²
0.15 x 3.00 x 4.00 = 0.27

Lebar x Tinggi x unit = jumlah 0.27 m³


0.15 x 3.00 x 4.00 = 0.27

Lebar x Tinggi x unit = jumlah 0.75 m³


0.15 x 3.00 x 4.00 = 0.27

Rumah Pompa
Lebar x Tinggi x unit = jumlah 0.48 m³
0.15 x 0.20 x 2.00 = 0.24
0.15 x 0.20 x 2.00 = 0.24

Lebar x Tinggi x unit = jumlah 0.48 m³


0.15 x 0.20 x 2.00 = 0.24
0.15 x 0.20 x 2.00 = 0.24
Lebar x Tinggi x unit = jumlah 0.48 m³
0.15 x 0.20 x 2.00 = 0.24
0.15 x 0.20 x 2.00 = 0.24

Genset dan Pompa


Lebar x Tinggi x unit = jumlah 0.36 m³
0.15 x 0.20 x 2.00 = 0.18
0.15 x 0.20 x 2.00 = 0.18

Dudukan Genset dan Pompa


Lebar x Tinggi x unit = jumlah 0.30 m³
0.15 x 0.20 x 2.00 = 0.12
0.15 x 0.20 x 2.00 = 0.18

Lebar x Tinggi x unit = jumlah 2.40 m³


4.00 x 0.15 x 1.00 = 2.40

ai Rumah Pompa
Lebar x Tinggi x unit = jumlah 2.40 m³
4.00 x 0.15 x 1.00 = 2.40

mpa Submersible
4.00 bh

nel Pompa
4.00 bh

pa Pompa
unit = jumlah 56.00 m¹
4.00 = 24.00
4.00 = 32.00

Rumah Pompa
Lebar x unit = jumlah 58.32 m²
5.40 x 2.00 = 58.32

Lebar x Tinggi x unit = jumlah 8.75 m³


5.40 x 0.15 x 2.00 = 8.75

Rumah Pompa
Tebal x Tinggi x unit = jumlah 8.75 m3
5.40 x 0.15 x 2.00 = 8.75
Uraian Pekerjaan dan Perhitungan Volume

(Lebar atas + Lebar bawah)/2 x Tinggi x unit = jumlah 33,350.57 m³


3.00 + 7.5 x 1.52 x 2.00 = 30669.21
3.00 + 7.5 x 1.52 x 1.00 = 2681.36

Uraian Pekerjaan dan Perhitungan Volume

Lebar x Tinggi x unit = jumlah 2,760.66 m³


9.00 x 3.50 x 2.00 = 2760.66

Box Culvert
unit = jumlah 87.64 m¹
2.00 = 87.64

Lebar x Tinggi x unit = jumlah 87.64 m³


1.00 x 1.00 x 2.00 = 87.64
REKAPITULASI PEKERJAAN KOLAM

NO URAIAN PEKERJAAN KODE VOLUME SATUAN


1 2 3 4 5
I Pekerjaan Persiapan
1 Mobilisasi Peralatan dan SDM 1 LS
2 Pembuatan Papan Nama Proyek SI.1 2.00 m²
3 Pembersihan Lokasi SI.2 203,500.88 m²
4 Pemasangan Bowplank dan Pengukuran SI.3 16,749.54 m¹
SUB TOTAL
II Pekerjaan Tanah
1 Galian Tanah Saluran TA.1 612,024.58 m³
2 Galian Tanah Storage TA.2 4,375.00 m³
3 Galian Bangunan Pelimpah TA.3 708.96 m³
SUB TOTAL
III Pekerjaan Pasangan
1 Pasangan Batu Kali Saluran PA.1 288,872.57 m³
2 Pasangan Batu Kali Storage PA.2 292.50 m³
3 Siaran 1:2 Saluran PA.3 81,066.19 m²
4 Plesteran Storage PA.4 700.00 m²
5 Pasir Pasang Saluran PA.5 239.30 m³
6 Pasir Pasang Storage PA.6 125.00 m³
SUB TOTAL
IV Pekerjaan Bangunan Pelimpah
1 Beton K225 Dinding Bangunan Pelimpah PE.1 26.59 m³
2 Beton K225 Dasar Bangunan Pelimpah PE.2 30.38 m³
3 Pembesian Dinding Bangunan Pelimpah PE.3 26.59 m³
4 Pembesian Dasar Bangunan Pelimpah PE.4 30.38 m³
5 Pondasi Dinding Bangunan Pelimpah PE.5 6.33 m³
6 Pondasi Dasar Bangunan Pelimpah PE.6 20.26 m³
7 Plesteran Dinding Bangunan Pelimpah PE.7 177.24 m²
8 Plesteran Dasar Bangunan Pelimpah PE.8 202.56 m²
9 Pintu Air PE.9 8.00 bh
10 Pengecatan Pintu Air PE.10 8.00 bh
11 Beton Jembatan Bangunan Pelimpah PE.11 7.20 m³
12 Pembesian Jembatan Bangunan Pelimpah PE.12 7.20 m³
13 Bakesting Jembatan PE.13 48.00 m²
14 Beton Railling Jembatan PE.14 0.60 m³
15 Pembesian Railling Jembatan PE.15 0.60 m³
16 Besi Railling Jembatan PE.16 32.00 m¹
17 Pengecatan Railling Jembatan PE.17 32.00 m¹
SUB TOTAL
V Pekerjaan Rumah Pompa dan Pompa
1 Galian Tanah Pondasi RU.1 9.52 m³
2 Pasir Pasang Pondasi RU.2 1.12 m³
3 Batu Kosong Pondasi RU.3 1.68 m³
4 Pas. Pondasi Batu Kali RU.4 4.80 m³
5 Urugan Tanah Kembali RU.5 9.52 m³
6 Bakesting sloof RU.6 0.36 m²
7 Beton sloof RU.7 0.36 m³
8 Tulangan Sloof Beton RU.8 0.36 m³
9 Pasangan Tembok Batu Bata RU.9 62.60 m³
10 Pintu Besi RU.10 3.00 m²
11 Jendela Besi RU.11 3.00 m²
12 Cat Batu Bata RU.12 42.00 m²
13 Cat Pintu Besi RU.13 3.00 m²
14 Cat Jendela Besi RU.14 3.00 m²
15 Bakesting Kolom Rumah Pompa RU.15 0.27 m²
16 Beton Kolom RU.16 0.27 m³
17 Tulangan Kolom Beton RU.17 0.75 m³
18 Bakesting Balok Rumah Pompa RU.18 0.48 m³
19 Balok Rumah Pompa RU.19 0.48 m³
20 Tulangan Balok Beton RU.20 0.48 m³
21 Beton Dudukan Genset dan Pompa RU.21 0.36 m³
22 Tulangan Beton Dudukan Genset dan Pompa RU.22 0.30 m³
23 Lantai Beton RU.23 2.40 m³
24 Pembesian Lantai Rumah Pompa RU.24 2.40 m³
25 Pemasangan Pompa Submersible RU.25 4.00 bh
26 Pemasangan Panel Pompa RU.26 4.00 bh
27 Pemasangan Pipa Pompa RU.27 56.00 m¹
28 Bakesting Atap Rumah Pompa RU.28 58.32 m²
29 Beton Rumah Pompa RU.29 8.75 m³
30 Pembesian Atap Rumah Pompa RU.30 8.75 m3
SUB TOTAL
VI Pekerjaan Tanggul
1 Timbunan Tanggul TG.1 33,350.57 m³
SUB TOTAL
VII Pekerjaan Gorong-gorong
1 Galian Gorong-gorong GR.1 2,760.66 m³
2 Gorong-gorong Box Culvert GR.2 87.64 m¹
3 Timbunan Gorong-gorong GR.3 87.64 m³
SUB TOTAL
Jumlah
Pajak PPN: 10%
Jumlah Total
KOLAM

HSP (Rp) JUMLAH HARGA (Rp)


6 7

10,000,000.00 10,000,000.00
206,363.30 412,726.61
3,420.31 696,035,489.84
342,989.57 5,744,917,522.30
6,451,365,738.75

69,381.35 42,463,092,268.79
69,381.35 303,543,412.81
69,381.35 49,188,602.96
42,815,824,284.56

1,122,724.29 324,324,249,497.69
1,122,724.29 328,396,854.39
52,908.74 4,289,109,747.28
53,247.99 37,273,593.00
251,576.30 60,201,705.44
251,576.30 31,447,037.50
329,070,678,435.30

963,325.79 25,610,979.45
963,325.79 29,269,690.80
177,658.10 4,723,218.11
177,658.10 5,397,963.56
789,626.23 4,998,334.00
789,626.23 15,994,668.81
53,247.99 9,437,673.75
53,247.99 10,785,912.85
29,745,055.64 237,960,445.09
213,203.85 1,705,630.84
963,325.79 6,935,945.69
177,658.10 1,279,138.28
574,252.01 27,564,096.26
963,325.79 577,995.47
177,658.10 106,594.86
136,301.37 4,361,643.90
213,203.85 6,822,523.34
393,532,455.09

69,381.35 660,510.47
251,576.30 281,765.46
400,543.39 672,912.90
789,626.23 3,790,205.88
161,041.62 1,533,116.21
574,252.01 206,730.72
963,325.79 346,797.28
177,658.10 63,956.91
931,328.43 58,301,159.81
2,530,795.99 7,592,387.98
1,879,046.30 5,637,138.90
170,872.88 7,176,660.91
213,203.85 639,611.56
213,203.85 639,611.56
574,252.01 155,048.04
963,325.79 260,097.96
177,658.10 133,243.57
574,252.01 275,640.96
963,325.79 462,396.38
177,658.10 85,275.89
963,325.79 346,797.28
177,658.10 53,297.43
963,325.79 2,311,981.90
177,658.10 426,379.43
54,464,000.00 217,856,000.00
2,875,000.00 11,500,000.00
1,789,958.31 100,237,665.23
574,252.01 33,490,376.96
963,325.79 8,427,174.01
177,658.10 1,554,153.02
465,118,094.61
161,041.62 5,370,830,511.49
5,370,830,511.49

69,381.35 191,538,321.83
18,052,776.08 1,582,145,296.00
161,041.62 14,113,687.45
1,787,797,305.28
386,355,146,825.07
38,635,514,682.51
424,990,661,507.57
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN NABIRE

No Uraian Pekerjaan Jumlah


1 2 3

1 Pekerjaan Persiapan Rp 6,451,365,738.75


2 Pekerjaan Tanah Rp 42,815,824,284.56
3 Pekerjaan Pasangan Rp 329,070,678,435.30
4 Pekerjaan Bangunan Pelimpah Rp 393,532,455.09
5 Pekerjaan Rumah Pompa dan Pompa Rp 465,118,094.61
6 Pekerjaan Tanggul Rp 5,370,830,511.49
7 Pekerjaan Gorong-gorong Rp 1,787,797,305.28

JUMLAH ( A ) Rp 386,355,146,825.07
PPN 10 % x ( A ) Rp 38,635,514,682.51
JUMLAH TOTAL ANGGARAN Rp 424,990,661,507.57
DIBULATKAN Rp 425,000,000,000.00
NABIRE

Bobot (%)
4

1.67
11.08
85.17
0.10
0.12
1.39
0.46

100

Vous aimerez peut-être aussi