Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Bearings
By:
References/Results
Introduction
Deck Articulation
The deck has spans of 71 m, 89 m, 89 m, 89 m & 71m total length between abutments of 409 m
Deck Loads
Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date: 1/4/03
Check
Date:
Subject: Taw Bridge - Bearings
By:
References/Results
CALCULATION SHEET No: BR 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jack Zones
By:
References/Results
Introduction
Five zones of the superstructure require reinforcing to withstand local load effects
ULS = 22779 kN
= 3759 kN
Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: BR 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jack Zones
By:
References/Results
The bursting force acts both longitudinally and transversely
W=R M = 22779 x 89 / 10
+ 202737 / ( 4.6*0.7*3.4)
σ = 2* 3759 *1000/(1500*1350)
780 mm above
σ 1125 mm soffit slab = 3.71 N/mm2
225 mm 720 mm
150 mm
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jacking Zones
By:
References/Results
Transverse bursting through web
= 3257 kN
σ = 2* 3257 *1000/(1500*1350)
225 σ
150
= 783 kN
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jacking Zones
By:
References/Results
Consider Anti-spalling Reinforcement
= 1.35 kN
Area of anti spalling steel limit fy to equivalent to 0.001 strain = 200 N/mm2
Ast = 913 x 1000 / ( 10 x 200 )= 456 mm2 T25's or paired T16+T20 Cover cannot be achieved
use stainless steel bars
Transversely internal forces restrain spalling forces across the bottom of the diaphragm
Spalling force effect acts over approx 0.3*2yo = the tensile zone depth of a centrally loaded
stressing block prism (see Leonhardt 9.2)
F spall zone = 0.45 x 913 / 1.20 = 342 > 913 Spalling force
Longitudinally the force in the soffit slab acts agiainst bursting and spalling
assume soffit slab force in lower 450 mm acts against spalling force See diagram page 2
Rev 1 BPG121_F01(Excel)
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jacking Zones
By:
References/Results
Consider the jacking zones
600
Zone of diaphragm affected by
bursting under jacks
780 mm above
σ 1125 mm soffit slab
225 mm 720 mm
150 mm
= 3409 kN
σ = 2* 3409 *1000/(1500*1350)
= 3.37 N/mm2
Rev 1 BPG121_F01(Excel)
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jacking Zones
By:
References/Results
Bursting force above soffit slab = 3.37 *(780/1125)*780*900/(2*1000)
allow 600 for web
= 819 kN
q q = 14479 kN/m2
P 700
H = 14479 x 0.70
= 10135 kN
+ 2.02 x 675 / 2
= -136 kNm
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jacking Zones
By:
References/Results
Check P/A +/- M/Z
= 16.69 or -1.14
= 45.67 kN
= 228 mm2
PCG
Project: By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Introduction
Five zones of the superstructure require reinforcing to withstand local load effects
Tendon in soffit - VSL 19 - 15 UTS = 279 kN/strand Stressing force = 0.75 UTS
t 400 400
300 400
s
t 400
300
s
Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: AR 2 Rev:
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Longitudinal section of anchor blocks
For single tendon anchorage assume forces are distributed to base and wall
in proportion to their distances from the wall and the associated shear distorsion
To be distributed over a width of 2*(450 - 50(cover) -180/2 anchor) = 2 x 310 310 mm half width
room for 6 No bars Area of bar = 677 mm2 / bar use T32's
x =( 5 x 0 x E6 ) / (Sin 2θ x 700 x 50 ) = 0 mm
To be distributed over a width of 2*(330 - 50(cover) -180/2 anchor) = 2 x 190 mm 190 mm half width
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
For double tendon anchorage assume forces are distributed to base and wall
in proportion to their distances from the wall and the associated shear distorsion
To be distributed over a width of 2*(450 - 50(cover) -180/2 anchor) = 3 x 310 mm 310 mm third width
room for 9 No bars Area of bar = 819 mm2 / bar use T20's
Acs =( 480 x 0 + 830 x 2041 )/(( 3870 - 267 ) x 400 )= 1175 mm2
To be distributed over a width of 2*(330 - 50(cover) -180/2 anchor) = 2 x 190 mm 190 mm half width
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Check shear effect on the corbel/base or wall interface - Shear links in corbel
BS 5400 Pt 4 Cl 7.3.2.3
Design for shear at wall as max of either ratio of prying effects or shear area of anchorage
Shear capacity greater than applied load on 2 tendon anchorages both types satisfactory
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Shear reinforcement for anchorages Ast = V/(0.7*fy) 1 No tendon Anchorage
base area 1 No link 2 legs = 17730 / (13*2) = 682 mm2 Use T 25 mm link
2 No tendon Anchorage
wall area 1 No link 2 legs = 6339 / (13*2) = 244 mm2 Use T 25 mm link
base area 2 No links 2 legs = 39544 / (13*4) = 760 mm2 Use T 25 mm link
Vertical pull off force due to tendon curvature - min radius = 7.5 m
Use links at 150 ctrs Asp = 675 x 1000 / ( 400 x 2 x 6 ) = 141 mm2
Total area reinforcement against pull off + push off = 141 + 45 = 185 mm2 Vertical bars
The same forces will act horizontally at the Anchorage provide anchored reinforcement
horizontally = to that that has been used vertically
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Check tensile force direct in the slab & wall immediately behind the anchorage
330 -630
480 500 450 Twin anchorage has the highest load
= 2390 mm
Reinforcement to resist this load using bars at 150 centres each face 15 x 2
Bursting force - containment reinforcement behind stressing head use spiral Anti-Bursting
Reinforcement
P = 5060 kN Fb - ypo/yo = 170/450 = 0.38 k = 0.21 Table 30 BS 5400 pt 4
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Consider the effect of tendon curvature on the base slab
use 50% of F2T 0.5 x F2t = 0.5 x 1906 x cos 16 = 916 kN/m
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
F2 Longitudinal is tensile from joint F2l = 1906 x sin 16 = 525 kN/m
The tendons exert vertical (pull out) forces - at right angles to the planr of curvature AASHTO LRDP
5.10.4.3.1
R = 8.5 m
The bottom curvature of the span wll cause afuther downwards pull out force
Rs = 260 m
Load applied less than shear capacity of slab acceptable no reinforcement required
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Deck slab anchorages
= 795 mm2
In plan the Tendons diverge - this causes a tension in the top slab
P 6 °
P = 3976 x 1.0 = 3976 kN
Ft Ft = P x sin 6
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
The tensile zone is 300 mm deep - determined by check calcs using Poulos & Davis
line load - on semi infinite mass Cerutti problem
= 432.9 mm2/bar
Check the longitudinal stability of the anchors in the deck slab splay
1500
Assume a rectangular section
V 130
275 d = 675 mm
H 470
b = 500 mm ctr of anchors
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Bursting force - containment reinforcement behind stressing head use spiral Anti-Bursting
Reinforcement
P = 3976 kN Fb - ypo/yo = 165/275 = 0.60 k = 0.14 Table 30 BS 5400 pt 4
Because there are bars used to resist tearing force between the anchorages for which
fs has been limited to 240 N/mm2 use the reduced stress for the antibursting reinforcement
At 1 m from the tendon anchorage the load is dispersed over 600 mm as a compressive
zone in front of the force if the cantilever tendon is stressed first there wiil be a tension
across the deck slab between the webs
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Wall & slab anchorages at abutments
Bursting force - containment reinforcement behind stressing head use spiral Anti-Bursting
as detailed for blister anchorages. Reinforcement
see page 6
600
300
300
430 340
340 sq
660
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Tendons 27 to 31
Vertical pull off force due to tendon curvature - min radius = 39.4 m
4.7
Tendon P R p θ p*cosθ
27 5060 13.3 380 14.9 368
28 5060 17.1 296 11.7 290
29 5060 24.0 211 8.4 209
30 5060 40.0 127 5.1 126
31 5060 120.0 42 1.7 42
Σ = 1034 kN/m
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Reinforcement to resist F1t = 1034 x 1000 / 400 = 2585 mm2/m
Tendons 25 & 26
Vertical pull off force due to tendon curvature - min radius = 13.8 m
= 939 kN
Concrete capacity exceeds applied load reinforcement required
The tendons are curved horizontally in the web and exert outward forces
Horizontal pull off force due to tendon curvature - min radius = 8.1 m
= 154 mm2/bar
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
F1 orientated at 26 ° to deck CL
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Check blisters as corbels on walls
X' = 711 mm
1400 Y' = 571 mm
2030
e of load x = 1180 - 711 = 470 mm
Area = 939000 mm2 behind the block a residual stress of 4 N/mm 2 ia assumed
My = -457
Rev 1 BPG121_F01(Excel)
PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
The blisters have been analysed using the SAM program
PCG
Project: By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Introduction
During stressing the deck segments will be subjected to out of balance forces
due to the possibility that one tendon to one side of the deck has been stressed
Assumptions
3 that the smallest & largest sections affected by the loading only need to be considered
Deck section
A2
A1
PT
A3
A4
PB
Top slab A2 the slab stresses + web shear and stressing forces must be used to
determine equilibrium reinforcement
Web A3 The web stresses + slab shears and stressing forces must be used to
determine equilibrium reinforcement
Bottom slab A4 the slab stresses + web shear and stressing forces must be used to
determine equilibrium reinforcement
Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: ES 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
The segments will be cast in 4.685 m lengthts the end block size will vary from
PCG
Project: By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Consider cantilever
= 1.79 N/mm2
allowable concrete stress = 1.25 Ast crossing the surface = ( 1.79 - 1.25)*500*150
of bars / (0.7*400*2)
= 72 mm2
Moment in top slab = moment on cantilever use the same area of reinforcement.
Rev 1 BPG121_F01(Excel)
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Consider webs
= 3.25 N/mm2
allowable concrete stress = 1.25 Ast crossing the surface = ( 3.25 - 1.25)*300*150
of bars / (0.7*400*2)
= 160 mm2
= 2.25 N/mm2
allowable concrete stress = 0.5 Ast crossing the surface = ( 2.25 - 0.5)*300*150
of bars / (0.7*400*2)
= 141 mm2
Total = 15840
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Consider bottom slab between webs
allowable concrete stress = 1.25 Ast crossing the surface = ( 2.80 - 1.25)*425*150
of bars / (0.7*400*2)
= 176 mm2
or = ( 2.54 - 1.25)*275*150
/ (0.7*400*2)
= 95 mm2
Total = 14960
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Check Anchor Span
P = 4606 kN No of strands = 14
= 1644 mm
Consider cantilever
= 0.24 N/mm2
Moment in top slab = moment on cantilever use the same area of reinforcement.
Rev 1 BPG121_F01(Excel)
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Consider webs
= 1.50 N/mm2
allowable concrete stress = 1.25 Ast crossing the surface = ( 1.50 - 1.25)*300*150
of bars / (0.7*400*2)
= 20 mm2
= 0.91 N/mm2
allowable concrete stress = 0.5 Ast crossing the surface = ( 0.91 - 0.5)*300*150
of bars / (0.7*400*2)
= 33 mm2
Total = 3960
Rev 1 BPG121_F01(Excel)
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Consider bottom slab between webs
allowable concrete stress = 1.25 Ast crossing the surface = ( 2.18 - 1.25)*425*150
of bars / (0.7*400*2)
= 106 mm2
or = ( 3.43 - 1.25)*275*150
/ (0.7*400*2)
= 161 mm2
= 37796
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
Introduction
The tendons of the preestressing are deflected in the region of the anchorages
(dy/dx) = 4 * Yc * (L - 2 x) / L2
Y = 4 * Yc * (L * x - 2 x2) / L2
Yc L (d2y/dx2) x (dy/dx) R Y
Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: AR 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
P = 4910
V
P H = P*cos 10 = 4836
H
V = P*sin 10 = 853
330
500
x y D e M = H*y - V*x
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
P
R 4 = ( z2 + x2 ) 2 q = 1250 kN/m = 415/.35 anchor load over
z R anchor length
P = 35875 kN/m
x
σx = 2qx3/πR4
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
x z R σx
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
x z R σx
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
P/A = 0 / 13.78 = 0.00
###
###
### ### 1.39
0.00 ###
### ###
Deck section
A2
A1
A3
A4
1215
260*5600+1500*450 = 2443000
1234
Rev 1 BPG121_F01(Excel)
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
d= 2090
b= 300 d= 1165
13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 -65 2.98E+08
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 -298 6.22E+09
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -531 1.97E+10
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -764 4.08E+10
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -997 6.95E+10
18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1326 2.24E+11
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1339 3.58E+11
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1364 3.25E+11
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1389 2.89E+11
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1401 2.70E+11
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1401 2.70E+11
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1401 3.24E+11
1.34E+14 (ΣA*xv)/ΣA
= 551
Rev 1 BPG121_F01(Excel)
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
I = 1.00E+03 1/EI
Rev 1 BPG121_F01(Excel)
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
7.65E-12 1.58E-08
2.12E-12
1.12E-11 3.21E-08
6.82E-10
3.26E-08 1.00E-04
6.96E-10 7.38E-07
1.12E-11 3.21E-08
7.85E-13
1 M = 0.000 M/EI = 0.00E+00
2 300 1.09E-13 1.64E-11 5.66E-08
3 600 2.69E-13 5.68E-11 1.79E-07
4 900 5.04E-13 1.16E-10 3.31E-07
5 1200 8.55E-13 2.04E-10 5.20E-07
6 1500 1.39E-12 3.36E-10 7.57E-07
7 1800 2.22E-12 5.40E-10 1.05E-06
8 2100 3.55E-12 8.64E-10 1.43E-06
9 2400 5.77E-12 1.40E-09 1.89E-06
10 2700 9.69E-12 2.32E-09 2.43E-06
11 3000 1.71E-11 4.02E-09 3.01E-06
12 3300 3.25E-11 7.44E-09 3.35E-06
13 3600 6.92E-11 1.53E-08 2.29E-06
7.65E-12 1.18E-08
9.56E-04
4.29E-05 9.13E-04
9.07E-05 8.65E-04
1.44E-04 8.12E-04
2.05E-04 7.51E-04
2.73E-04 6.83E-04
3.51E-04 6.05E-04
4.40E-04 5.16E-04
5.42E-04 4.14E-04
6.56E-04 3.00E-04
7.81E-04 1.75E-04
9.01E-04 5.54E-05
9.56E-04
2.06E-01
2.88E+08
CALCULATION SHEET No: AR 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab One Tendon stressed
By:
References/Results
49 ###
290 QL = -163
-240 QH = 213
Rev 1
CALCULATION SHEET No: AR 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab One Tendon stressed
By:
References/Results
QL
QH QT C QT = 617 QT = -279
LH RH
QB = 288 QB = -227
QS MS MS
Q ΣQ la' MR -1127 0 2264 2264 62
RH 7 370 370 0.25 93 -756 -471 2044 1573 QB
8 273 643 0.75 204 -484 -781 1860 1079
9 183 825 1.25 228 -301 -977 1676 699
10 135 960 1.75 236 -166 -1094 1492 398 Q ΣQ M Q ΣQ M
11 124 1084 2.25 279 -42 -1146 1308 162 RH 13 288 288 0 LH 1 -227 -227 0
12 134 1219 2.80 376 92 -1131 1088 -43 14 52 340 73 2 -25 -251 -56
13 119 1337 3.40 404 211 -1040 867 -173 15 59 399 159 3 -18 -269 -116
14 87 1424 3.95 343 298 -913 684 -230 16 66 465 260 4 -10 -279 -180
15 76 1500 4.45 338 374 -746 500 -246 17 73 537 377 5 -3 -283 -246
16 80 1580 4.95 396 454 -539 316 -223 18 80 617 511 6 4 -279 -311
17 87 1667 5.45 475 541 -290 132 -158
18 78 1746 5.95 465 619 0 -52 -52
0 -88 -88
1746 ### = M on bottom slab
Rev 1
Rev:
Date:
Date:
erences/Results
Rev:
Date:
Date:
erences/Results
CALCULATION SHEET No: AR 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab One Tendon stressed
By:
References/Results
d= 2090 Pt = 3954 x 1 P = 3954 P/A = 0.52 Mt = 12654 Mt/Zt = 1.02 Mv = 2021 Mv/Zv = 0.34 or 0.57
1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 646 5.86E+10 9.27E+08 1 1.79 -0.18 252 -25
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 621 6.38E+10 1.51E+09 2 1.69 -0.10 281 -17
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 596 6.76E+10 2.31E+09 3 1.60 -0.03 305 -6
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 571 7.02E+10 3.34E+09 4 1.50 0.04 324 9
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 546 7.16E+10 4.64E+09 5 1.41 0.12 339 28
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 536 7.19E+10 5.21E+09 6 1.32 0.20 330 49
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 481 7.06E+10 9.46E+09 7 1.21 0.26 370 78
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 551 7.14E+10 4.33E+09 8 1.16 0.37 273 87
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 621 6.37E+10 1.50E+09 9 1.11 0.49 183 80
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 656 5.60E+10 7.32E+08 10 1.04 0.58 135 76
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 656 5.60E+10 7.32E+08 11 0.95 0.67 124 87
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 656 6.72E+10 8.79E+08 12 0.86 0.76 134 119
13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 170 2.01E+09 3.16E+08 13 1.14 0.05 80 4
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 -63 2.80E+08 3.16E+08 14 1.04 -0.05 73 -3
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -296 6.14E+09 3.16E+08 15 0.94 -0.15 66 -10
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -529 1.96E+10 3.16E+08 16 0.84 -0.25 59 -18
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -762 4.06E+10 3.16E+08 17 0.74 -0.35 52 -25
18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1091 1.52E+11 1.92E+09 18 0.59 -0.50 76 -63
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1104 2.44E+11 2.67E+09 19 0.52 -0.44 104 -87
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1129 2.23E+11 1.79E+09 20 0.43 -0.36 75 -63
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1154 2.00E+11 1.13E+09 21 0.33 -0.29 50 -43
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1166 1.87E+11 8.67E+08 22 0.24 -0.21 33 -29
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1166 1.87E+11 8.67E+08 23 0.16 -0.13 22 -17
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1166 2.24E+11 1.04E+09 24 0.07 -0.03 11 -6
= 786
Rev 1
CALCULATION SHEET No: AR 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab One Tendon stressed
By:
References/Results
Rev 1
Rev:
Date:
Date:
erences/Results
Rev:
Date:
Date:
erences/Results
CALCULATION SHEET No: AR1 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab three tendons stressed
By:
References/Results
148 ###
344 QL = -114
-196 QH = 262
Rev 1
CALCULATION SHEET No: AR1 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three tendons stressed
By:
References/Results
QL
QH QT C QT = 956 QT = 60
LH RH
QB = 350 QB = -165
QS MS MS
Q ΣQ la' MR -2872 0 4440 4440 186
RH 7 818 818 0.25 205 -2054 -1232 4220 2988 QB
8 632 1451 0.75 474 -1422 -2100 4036 1935
9 445 1896 1.25 557 -976 -2700 3852 1152
10 346 2242 1.75 605 -630 -3101 3668 567 Q ΣQ M Q ΣQ M
11 335 2577 2.25 754 -295 -3333 3484 151 RH 13 350 350 0 LH 1 -165 -165 0
12 388 2964 2.80 1085 92 -3394 3264 -130 14 78 429 91 2 2 -162 -38
13 372 3336 3.40 1264 464 -3227 3043 -184 15 100 529 202 3 24 -139 -73
14 298 3634 3.95 1176 762 -2921 2860 -61 16 121 650 340 4 45 -94 -100
15 287 3921 4.45 1277 1049 -2468 2676 208 17 142 792 508 5 66 -28 -115
16 343 4264 4.95 1697 1391 -1858 2492 634 18 164 956 711 6 87 60 -111
17 447 4711 5.45 2436 1838 -1051 2308 1257
18 526 5237 5.95 3133 2365 0 2124 2124
0 2088 2088
5237 ### = M on bottom slab
Rev 1
CALCULATION SHEET No: AR1 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab three tendons stressed
By:
References/Results
d= 2090 Pt = 3954 x 3 P = 11863 P/A = 1.57 Mt = 12654 Mt/Zt = 1.02 Mv = 6064 Mv/Zv = 1.03 or 1.71
1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 646 5.86E+10 9.27E+08 1 3.40 1.44 478 202
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 621 6.38E+10 1.51E+09 2 3.29 1.49 544 247
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 596 6.76E+10 2.31E+09 3 3.17 1.54 604 294
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 571 7.02E+10 3.34E+09 4 3.05 1.59 658 343
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 546 7.16E+10 4.64E+09 5 2.94 1.64 706 395
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 536 7.19E+10 5.21E+09 6 2.84 1.71 710 429
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 481 7.06E+10 9.46E+09 7 2.68 1.73 818 526
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 551 7.14E+10 4.33E+09 8 2.69 1.90 632 447
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 621 6.37E+10 1.50E+09 9 2.70 2.08 445 343
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 656 5.60E+10 7.32E+08 10 2.66 2.21 346 287
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 656 5.60E+10 7.32E+08 11 2.58 2.29 335 298
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 656 6.72E+10 8.79E+08 12 2.48 2.38 388 372
13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 170 2.01E+09 3.16E+08 13 2.34 1.25 164 87
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 -63 2.80E+08 3.16E+08 14 2.04 0.95 142 66
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -296 6.14E+09 3.16E+08 15 1.73 0.64 121 45
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -529 1.96E+10 3.16E+08 16 1.43 0.34 100 24
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -762 4.06E+10 3.16E+08 17 1.12 0.03 78 2
18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1091 1.52E+11 1.92E+09 18 0.69 -0.40 88 -51
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1104 2.44E+11 2.67E+09 19 0.61 -0.35 122 -70
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1129 2.23E+11 1.79E+09 20 0.49 -0.30 86 -52
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1154 2.00E+11 1.13E+09 21 0.38 -0.25 56 -37
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1166 1.87E+11 8.67E+08 22 0.28 -0.18 38 -25
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1166 1.87E+11 8.67E+08 23 0.19 -0.09 26 -13
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1166 2.24E+11 1.04E+09 24 0.10 0.00 16 -0
= 786
Rev 1
CALCULATION SHEET No: AR1 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three tendons stressed
By:
References/Results
Rev 1
CALCULATION SHEET No: AR2 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Mid Span
By:
References/Results
198 ###
QL = 99
QH = 99
Rev 1
CALCULATION SHEET No: AR2 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Mid Span
By:
References/Results
QL
QH QT C QT = 679 QT = 679
LH RH
QB = 124 QB = 124
QS MS MS
Q ΣQ la' MR -3501 0 4364 4364
RH 7 899 899 0.25 225 -2602 -1526 4364 2838 QB
8 722 1621 0.75 541 -1881 -2646 4364 1718
9 527 2147 1.25 659 -1354 -3455 4364 909
10 423 2570 1.75 740 -931 -4026 4364 338 Q ΣQ M Q ΣQ M
11 423 2994 2.25 952 -508 -4386 4364 -22 RH 13 124 124 0 LH 1 124 124 0
12 508 3501 2.80 1421 0 -4538 4364 -174 14 54 178 35 2 54 178 35
13 508 4009 3.40 1726 508 -4386 4364 -22 15 82 260 86 3 82 261 86
14 423 4432 3.95 1671 931 -4026 4364 338 16 111 371 160 4 111 372 160
15 423 4855 4.45 1883 1354 -3455 4364 909 17 139 511 263 5 139 511 263
16 527 5382 4.95 2608 1881 -2646 4364 1718 18 168 679 401 6 168 679 402
17 722 6103 5.45 3932 2602 -1526 4364 2838
18 899 7002 5.95 5350 3501 0 4364 4364
0 4364 4364
7002 ### = M on bottom slab
QL = 3501 - 0 = 3501
QH = 3501 + 0 = 3501
Rev 1
CALCULATION SHEET No: AR2 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Mid Span
By:
References/Results
d= 2090 Pt = 3965 x 4 P = 15861 P/A = 2.11 Mt = 0 Mt/Zt = 0.00 Mv = 8108 Mv/Zv = 1.38 or 2.28
1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 646 5.86E+10 9.27E+08 1 3.24 3.24 455 455
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 621 6.38E+10 1.51E+09 2 3.19 3.19 529 529
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 596 6.76E+10 2.31E+09 3 3.15 3.15 600 600
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 571 7.02E+10 3.34E+09 4 3.10 3.10 669 669
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 546 7.16E+10 4.64E+09 5 3.06 3.06 736 736
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 536 7.19E+10 5.21E+09 6 3.04 3.04 761 761
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 481 7.06E+10 9.46E+09 7 2.95 2.95 899 899
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 551 7.14E+10 4.33E+09 8 3.07 3.07 722 722
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 621 6.37E+10 1.50E+09 9 3.19 3.19 527 527
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 656 5.60E+10 7.32E+08 10 3.25 3.25 423 423
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 656 5.60E+10 7.32E+08 11 3.25 3.25 423 423
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 656 6.72E+10 8.79E+08 12 3.25 3.25 508 508
b= 300 d= 1165
13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 170 2.01E+09 3.16E+08 13 2.40 2.40 168 168
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 -63 2.80E+08 3.16E+08 14 2.00 2.00 139 139
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -296 6.14E+09 3.16E+08 15 1.59 1.59 111 111
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -529 1.96E+10 3.16E+08 16 1.18 1.18 82 82
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -762 4.06E+10 3.16E+08 17 0.77 0.77 54 54
18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1091 1.52E+11 1.92E+09 18 0.20 0.20 25 25
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1104 2.44E+11 2.67E+09 19 0.17 0.17 35 35
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1129 2.23E+11 1.79E+09 20 0.13 0.13 23 23
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1154 2.00E+11 1.13E+09 21 0.09 0.09 13 13
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1166 1.87E+11 8.67E+08 22 0.06 0.06 9 9
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1166 1.87E+11 8.67E+08 23 0.06 0.06 9 9
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1166 2.24E+11 1.04E+09 24 0.06 0.06 11 11
= 786
Rev 1
CALCULATION SHEET No: AR2 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Mid Span
By:
References/Results
Rev 1
CALCULATION SHEET No: AR3 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results
-1259 ###
QL = -965
QH = -295
Rev 1
CALCULATION SHEET No: AR3 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results
QL
QH QT C QT = 2930 QT = -418
LH RH
QB = -245 QB = -1137
QS MS MS
Q ΣQ la' MR -2690 0 1389 1389
RH 7 773 773 0.25 193 -1917 -1152 1340 188 QB
8 590 1362 0.75 442 -1327 -1962 1299 -663
9 410 1772 1.25 512 -917 -2524 1258 -1265
10 317 2090 1.75 555 -600 -2903 1218 -1685 Q ΣQ M Q ΣQ M
11 309 2399 2.25 695 -291 -3125 1177 -1948 RH 13 -245 -245 0 LH 1 -1137 -1137 0
12 360 2759 2.80 1008 69 -3192 1128 -2064 14 274 29 -80 2 -74 -1211 -865
13 348 3107 3.40 1184 418 -3046 1079 -1966 15 454 483 109 3 107 -1104 -1718
14 281 3388 3.95 1110 699 -2766 1039 -1728 16 635 1118 698 4 288 -816 -2425
15 273 3661 4.45 1214 972 -2349 998 -1351 17 816 1933 1823 5 469 -347 -2854
16 333 3994 4.95 1647 1304 -1780 957 -823 18 996 2930 3615 6 649 302 -2870
17 450 4444 5.45 2452 1754 -1015 916 -99
18 553 4996 5.95 3289 2307 0 876 876
0 868 868
4996 ### = M on bottom slab
Rev 1
CALCULATION SHEET No: AR3 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results
d= 5085 Pt = 3954 x 3 P = 11863 P/A = 0.86 Mt = 12654 Mt/Zt = 0.77 Mv = 28351 Mv/Zv = 1.48 or -1.34
1 A1 0 281 0.00E+00 4900 0.00E+00 141 0.00E+00 2524 0.00E+00 0.00E+00 1 2.88 1.64 0 0
2 A2 0 331 0.00E+00 4900 0.00E+00 166 0.00E+00 2499 0.00E+00 0.00E+00 2 2.87 1.63 0 0
3 A3 300 381 1.14E+05 4750 2.58E+12 191 2.18E+07 2474 7.00E+11 1.39E+09 3 2.84 1.63 325 187
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 2449 1.29E+12 3.34E+09 4 2.77 1.67 598 360
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 2424 1.41E+12 4.64E+09 5 2.70 1.72 649 414
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 2415 1.46E+12 5.21E+09 6 2.63 1.78 657 445
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 2360 1.70E+12 9.46E+09 7 2.53 1.81 773 553
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 2430 1.39E+12 4.33E+09 8 2.51 1.91 590 450
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 2500 1.03E+12 1.50E+09 9 2.48 2.02 410 333
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 2535 8.35E+11 7.32E+08 10 2.44 2.10 317 273
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 2535 8.35E+11 7.32E+08 11 2.38 2.16 309 281
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 2535 1.00E+12 8.79E+08 12 2.31 2.23 360 348
b= 600 d= 3685
13 A13 600 737 4.42E+05 3100 4.25E+12 869 3.84E+08 1796 1.43E+12 2.00E+10 13 2.25 1.47 996 649
14 A14 600 737 4.42E+05 3100 4.25E+12 1606 7.10E+08 1059 4.96E+11 2.00E+10 14 1.84 1.06 816 469
15 A15 600 737 4.42E+05 3100 4.25E+12 2343 1.04E+09 322 4.60E+10 2.00E+10 15 1.44 0.65 635 288
16 A16 600 737 4.42E+05 3100 4.25E+12 3080 1.36E+09 -415 7.60E+10 2.00E+10 16 1.03 0.24 454 107
17 A17 600 737 4.42E+05 3100 4.25E+12 3817 1.69E+09 -1152 5.86E+11 2.00E+10 17 0.62 -0.17 274 -74
18 A18 300 900 2.70E+05 3250 2.85E+12 4635 1.25E+09 -1970 1.05E+12 1.82E+10 18 0.18 -0.64 50 -173
19 A19 500 875 4.38E+05 2850 3.55E+12 4648 2.03E+09 -1983 1.72E+12 2.79E+10 19 0.13 -0.60 55 -260
20 A20 500 825 4.13E+05 2350 2.28E+12 4673 1.93E+09 -2008 1.66E+12 2.34E+10 20 0.05 -0.55 20 -225
21 A21 500 775 3.88E+05 1850 1.33E+12 4698 1.82E+09 -2033 1.60E+12 1.94E+10 21 -0.03 -0.50 -11 -192
22 A22 500 750 3.75E+05 1350 6.83E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 22 -0.10 -0.44 -37 -165
23 A23 500 750 3.75E+05 850 2.71E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 23 -0.16 -0.38 -61 -141
24 A24 600 750 4.50E+05 300 4.05E+10 4710 2.12E+09 -2045 1.88E+12 2.11E+10 24 -0.23 -0.31 -104 -138
= 2665
Rev 1
CALCULATION SHEET No: AR3 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results
Rev 1
CALCULATION SHEET No: AR1 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Two tendons stressed (for Segment 5N4)
By:
References/Results
99 ###
579 QL = -326
-480 QH = 425
Rev 1
CALCULATION SHEET No: AR1 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three tendons stressed
By:
References/Results
QL
QH QT C QT = 1235 QT = -558
LH RH
QB = 577 QB = -453
QS MS MS
Q ΣQ la' MR -2253 0 4528 4528 124
RH 7 740 740 0.25 185 -1513 -942 4087 3146 QB
8 545 1285 0.75 409 -968 -1562 3720 2158
9 365 1651 1.25 456 -603 -1954 3352 1398
10 270 1920 1.75 472 -333 -2188 2985 796 Q ΣQ M Q ΣQ M
11 248 2168 2.25 558 -85 -2292 2617 325 RH 13 577 577 0 LH 1 -453 -453 0
12 269 2437 2.80 753 184 -2263 2176 -87 14 103 680 146 2 -49 -502 -111
13 237 2675 3.40 807 422 -2081 1735 -346 15 117 797 319 3 -35 -538 -232
14 174 2848 3.95 687 595 -1827 1367 -459 16 132 929 520 4 -21 -559 -360
15 152 3000 4.45 676 747 -1491 1000 -491 17 146 1075 753 5 -7 -565 -491
16 160 3161 4.95 793 908 -1077 632 -445 18 160 1235 1022 6 7 -558 -622
17 174 3335 5.45 950 1082 -580 265 -315
18 156 3491 5.95 931 1238 0 -103 -103
0 -177 -177
3491 ### = M on bottom slab
Rev 1
CALCULATION SHEET No: AR1 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab three tendons stressed
By:
References/Results
d= 2090 Pt = 3954 x 2 P = 7908 P/A = 1.05 Mt = 25307 Mt/Zt = 2.05 Mv = 4043 Mv/Zv = 0.69 or 1.14
1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 646 5.86E+10 9.27E+08 1 3.58 -0.35 503 -49
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 621 6.38E+10 1.51E+09 2 3.39 -0.21 561 -34
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 596 6.76E+10 2.31E+09 3 3.20 -0.06 610 -11
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 571 7.02E+10 3.34E+09 4 3.01 0.09 649 19
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 546 7.16E+10 4.64E+09 5 2.82 0.23 678 56
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 536 7.19E+10 5.21E+09 6 2.64 0.39 661 98
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 481 7.06E+10 9.46E+09 7 2.43 0.51 740 156
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 551 7.14E+10 4.33E+09 8 2.32 0.74 545 174
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 621 6.37E+10 1.50E+09 9 2.21 0.97 365 160
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 656 5.60E+10 7.32E+08 10 2.08 1.17 270 152
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 656 5.60E+10 7.32E+08 11 1.91 1.34 248 174
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 656 6.72E+10 8.79E+08 12 1.72 1.52 269 237
13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 170 2.01E+09 3.16E+08 13 2.29 0.11 160 7
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 -63 2.80E+08 3.16E+08 14 2.09 -0.10 146 -7
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -296 6.14E+09 3.16E+08 15 1.88 -0.30 132 -21
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -529 1.96E+10 3.16E+08 16 1.68 -0.50 117 -35
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -762 4.06E+10 3.16E+08 17 1.48 -0.71 103 -49
18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1091 1.52E+11 1.92E+09 18 1.19 -0.99 152 -127
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1104 2.44E+11 2.67E+09 19 1.04 -0.87 209 -174
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1129 2.23E+11 1.79E+09 20 0.85 -0.72 149 -127
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1154 2.00E+11 1.13E+09 21 0.66 -0.58 100 -87
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1166 1.87E+11 8.67E+08 22 0.49 -0.42 67 -58
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1166 1.87E+11 8.67E+08 23 0.32 -0.25 44 -35
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1166 2.24E+11 1.04E+09 24 0.13 -0.07 22 -11
= 786
Rev 1
CALCULATION SHEET No: AR1 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three tendons stressed
By:
References/Results
Rev 1
CALCULATION SHEET No: AR3 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Two Tendons Stressed Pier (for Segment 5N4)
By:
References/Results
-840 ###
QL = -1087
QH = 247
Rev 1
CALCULATION SHEET No: AR3 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results
QL
QH QT C QT = 3702 QT = -1449
LH RH
QB = 429 QB = -1350
QS MS MS
Q ΣQ la' MR -2048 0 1273 1273
RH 7 662 662 0.25 165 -1386 -859 1175 317 QB
8 486 1148 0.75 365 -900 -1430 1094 -336
9 325 1473 1.25 406 -575 -1799 1013 -786
10 241 1714 1.75 422 -334 -2026 931 -1095 Q ΣQ M Q ΣQ M
11 225 1939 2.25 506 -109 -2137 850 -1287 RH 13 429 429 0 LH 1 -1350 -1350 0
12 248 2187 2.80 694 139 -2128 752 -1376 14 414 843 468 2 -280 -1631 -1098
13 224 2411 3.40 762 363 -1977 654 -1323 15 534 1377 1286 3 -160 -1791 -2359
14 169 2580 3.95 667 532 -1753 573 -1180 16 655 2031 2542 4 -40 -1830 -3693
15 152 2732 4.45 678 684 -1449 492 -958 17 775 2807 4325 5 81 -1749 -5012
16 170 2903 4.95 843 854 -1065 410 -655 18 896 3702 6724 6 201 -1548 -6227
17 207 3109 5.45 1126 1061 -586 329 -257
18 222 3331 5.95 1319 1283 0 247 247
0 231 231
3331 ### = M on bottom slab
Rev 1
CALCULATION SHEET No: AR3 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results
d= 5085 Pt = 3954 x 2 P = 7908 P/A = 0.58 Mt = 25307 Mt/Zt = 1.54 Mv = 18901 Mv/Zv = 0.98 or -0.89
1 A1 0 281 0.00E+00 4900 0.00E+00 141 0.00E+00 2524 0.00E+00 0.00E+00 1 2.75 0.27 0 0
2 A2 0 331 0.00E+00 4900 0.00E+00 166 0.00E+00 2499 0.00E+00 0.00E+00 2 2.74 0.26 0 0
3 A3 300 381 1.14E+05 4750 2.58E+12 191 2.18E+07 2474 7.00E+11 1.39E+09 3 2.69 0.29 308 33
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 2449 1.29E+12 3.34E+09 4 2.58 0.38 557 82
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 2424 1.41E+12 4.64E+09 5 2.45 0.50 589 120
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 2415 1.46E+12 5.21E+09 6 2.32 0.62 579 155
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 2360 1.70E+12 9.46E+09 7 2.17 0.73 662 222
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 2430 1.39E+12 4.33E+09 8 2.07 0.88 486 207
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 2500 1.03E+12 1.50E+09 9 1.97 1.03 325 170
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 2535 8.35E+11 7.32E+08 10 1.86 1.17 241 152
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 2535 8.35E+11 7.32E+08 11 1.73 1.30 225 169
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 2535 1.00E+12 8.79E+08 12 1.59 1.44 248 224
b= 600 d= 3685
13 A13 600 737 4.42E+05 3100 4.25E+12 869 3.84E+08 1796 1.43E+12 2.00E+10 13 2.03 0.46 896 201
14 A14 600 737 4.42E+05 3100 4.25E+12 1606 7.10E+08 1059 4.96E+11 2.00E+10 14 1.75 0.18 775 81
15 A15 600 737 4.42E+05 3100 4.25E+12 2343 1.04E+09 322 4.60E+10 2.00E+10 15 1.48 -0.09 655 -40
16 A16 600 737 4.42E+05 3100 4.25E+12 3080 1.36E+09 -415 7.60E+10 2.00E+10 16 1.21 -0.36 534 -160
17 A17 600 737 4.42E+05 3100 4.25E+12 3817 1.69E+09 -1152 5.86E+11 2.00E+10 17 0.94 -0.63 414 -280
18 A18 300 900 2.70E+05 3250 2.85E+12 4635 1.25E+09 -1970 1.05E+12 1.82E+10 18 0.67 -0.97 181 -263
19 A19 500 875 4.38E+05 2850 3.55E+12 4648 2.03E+09 -1983 1.72E+12 2.79E+10 19 0.57 -0.88 247 -384
20 A20 500 825 4.13E+05 2350 2.28E+12 4673 1.93E+09 -2008 1.66E+12 2.34E+10 20 0.43 -0.76 177 -314
21 A21 500 775 3.88E+05 1850 1.33E+12 4698 1.82E+09 -2033 1.60E+12 1.94E+10 21 0.29 -0.64 114 -249
22 A22 500 750 3.75E+05 1350 6.83E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 22 0.16 -0.52 61 -195
23 A23 500 750 3.75E+05 850 2.71E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 23 0.04 -0.39 13 -148
24 A24 600 750 4.50E+05 300 4.05E+10 4710 2.12E+09 -2045 1.88E+12 2.11E+10 24 -0.10 -0.26 -47 -115
= 2665
Rev 1
CALCULATION SHEET No: AR3 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results
Rev 1
CALCULATION SHEET No: AR4 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Pier
By:
References/Results
-1684 ###
QL = -845
QH = -839
Rev 1
CALCULATION SHEET No: AR4 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Pier
By:
References/Results
QL
QH QT C QT = 621 QT = 616
LH RH
QB = -921 QB = -927
QS MS MS
Q ΣQ la' MR -3340 0 1508 1508
RH 7 886 886 0.25 222 -2454 -1449 1508 60 QB
8 695 1581 0.75 521 -1759 -2502 1508 -994
9 497 2078 1.25 621 -1263 -3257 1508 -1749
10 395 2472 1.75 690 -868 -3790 1508 -2282 Q ΣQ M Q ΣQ M
11 395 2867 2.25 888 -473 -4125 1508 -2617 RH 13 -921 -921 0 LH 1 -927 -927 0
12 473 3340 2.80 1326 0 -4267 1508 -2759 14 134 -788 -630 2 134 -793 -634
13 473 3814 3.40 1610 473 -4125 1508 -2617 15 375 -412 -1072 3 375 -418 -1080
14 395 4208 3.95 1559 868 -3790 1508 -2282 16 617 205 -1149 4 617 199 -1160
15 395 4603 4.45 1756 1263 -3257 1508 -1749 17 858 1063 -682 5 858 1058 -697
16 497 5099 4.95 2458 1759 -2502 1508 -994 18 1100 2163 507 6 1100 2158 488
17 695 5794 5.45 3788 2454 -1449 1508 60
18 886 6681 5.95 5273 3340 0 1508 1508
0 1508 1508
6681 ### = M on bottom slab
QL = 3340 - 0 = 3340
QH = 3340 + 0 = 3340
Rev 1
CALCULATION SHEET No: AR4 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Pier
By:
References/Results
d= 5085 Pt = 3965 x 4 P = 15861 P/A = 1.16 Mt = 0 Mt/Zt = 0.00 Mv = 37908 Mv/Zv = 1.98 or 1.79
1 A1 0 281 0.00E+00 4900 0.00E+00 141 0.00E+00 2524 0.00E+00 0.00E+00 1 3.03 3.03 0 0
2 A2 0 331 0.00E+00 4900 0.00E+00 166 0.00E+00 2499 0.00E+00 0.00E+00 2 3.01 3.01 0 0
3 A3 300 381 1.14E+05 4750 2.58E+12 191 2.18E+07 2474 7.00E+11 1.39E+09 3 2.99 2.99 342 342
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 2449 1.29E+12 3.34E+09 4 2.97 2.97 641 641
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 2424 1.41E+12 4.64E+09 5 2.95 2.95 711 711
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 2415 1.46E+12 5.21E+09 6 2.95 2.95 737 737
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 2360 1.70E+12 9.46E+09 7 2.91 2.91 886 886
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 2430 1.39E+12 4.33E+09 8 2.96 2.96 695 695
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 2500 1.03E+12 1.50E+09 9 3.01 3.01 497 497
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 2535 8.35E+11 7.32E+08 10 3.04 3.04 395 395
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 2535 8.35E+11 7.32E+08 11 3.04 3.04 395 395
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 2535 1.00E+12 8.79E+08 12 3.04 3.04 473 473
b= 600 d= 3685
13 A13 600 737 4.42E+05 3100 4.25E+12 869 3.84E+08 1796 1.43E+12 2.00E+10 13 2.49 2.49 1100 1,100
14 A14 600 737 4.42E+05 3100 4.25E+12 1606 7.10E+08 1059 4.96E+11 2.00E+10 14 1.94 1.94 858 858
15 A15 600 737 4.42E+05 3100 4.25E+12 2343 1.04E+09 322 4.60E+10 2.00E+10 15 1.40 1.40 617 617
16 A16 600 737 4.42E+05 3100 4.25E+12 3080 1.36E+09 -415 7.60E+10 2.00E+10 16 0.85 0.85 375 375
17 A17 600 737 4.42E+05 3100 4.25E+12 3817 1.69E+09 -1152 5.86E+11 2.00E+10 17 0.30 0.30 134 134
18 A18 300 900 2.70E+05 3250 2.85E+12 4635 1.25E+09 -1970 1.05E+12 1.82E+10 18 -0.30 -0.30 -82 -82
19 A19 500 875 4.38E+05 2850 3.55E+12 4648 2.03E+09 -1983 1.72E+12 2.79E+10 19 -0.31 -0.31 -137 -137
20 A20 500 825 4.13E+05 2350 2.28E+12 4673 1.93E+09 -2008 1.66E+12 2.34E+10 20 -0.33 -0.33 -137 -137
21 A21 500 775 3.88E+05 1850 1.33E+12 4698 1.82E+09 -2033 1.60E+12 1.94E+10 21 -0.35 -0.35 -136 -136
22 A22 500 750 3.75E+05 1350 6.83E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 22 -0.36 -0.36 -135 -135
23 A23 500 750 3.75E+05 850 2.71E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 23 -0.36 -0.36 -135 -135
24 A24 600 750 4.50E+05 300 4.05E+10 4710 2.12E+09 -2045 1.88E+12 2.11E+10 24 -0.36 -0.36 -162 -162
= 2665
Rev 1
CALCULATION SHEET No: AR4 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Pier
By:
References/Results
Rev 1
CALCULATION SHEET No: AR5 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed In Span
By:
References/Results
QL = 2921
QH = 3081
Rev 1
CALCULATION SHEET No: AR5 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed In Span
By:
References/Results
QL
QH QT C QT = 1546 QT = -761
LH RH
QB = 2586 QB = 50
QS MS MS
Q ΣQ la' MR -377 0 1501 1501
RH 7 205 205 0.25 51 -172 -137 1305 1168 QB
8 119 324 0.75 89 -53 -194 1142 949
9 56 381 1.25 70 3 -206 979 773 Q ΣQ M Q ΣQ M
10 30 410 1.75 52 33 -197 816 619
11 21 432 2.25 48 54 -175 652 478 RH 13 1546 1546 387 LH 1 -761 -761 -381
12 15 446 2.80 41 69 -138 457 319 14 204 1751 980 2 75 -686 -641
13 3 449 3.40 10 72 -95 261 165 15 290 2041 1663 3 160 -526 -859
14 -7 443 3.95 -26 66 -61 97 37 16 375 2416 2465 4 245 -281 -1005
15 -15 428 4.45 -66 51 -32 -66 -98 17 461 2876 3417 5 331 50 -1046
16 -21 407 4.95 -102 30 -12 -229 -241 18 6
17 -20 387 5.45 -110 10 -1 -392 -394
18 -14 373 5.95 -84 -4 0 -555 -555
0 -588 -588
373 ### = M on bottom slab
QL = -4 - 290 = -294
Rev 1
CALCULATION SHEET No: AR5 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed In Span
By:
References/Results
d= 2800 Pt = 4592 x 3 P = 13775 P/A = 1.54 Mt = 10882 Mt/Zt = 0.77 Mv = -15273 Mv/Zv = -1.67 or 2.43
1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 1001 1.41E+11 9.27E+08 1 0.81 -0.67 114 -94
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 976 1.58E+11 1.51E+09 2 0.78 -0.57 130 -94
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 951 1.72E+11 2.31E+09 3 0.76 -0.47 144 -89
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 926 1.85E+11 3.34E+09 4 0.73 -0.37 158 -79
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 901 1.95E+11 4.64E+09 5 0.70 -0.27 170 -64
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 891 1.99E+11 5.21E+09 6 0.66 -0.19 164 -48
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 836 2.13E+11 9.46E+09 7 0.67 -0.05 205 -14
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 906 1.93E+11 4.33E+09 8 0.51 -0.09 119 -20
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 976 1.57E+11 1.50E+09 9 0.34 -0.13 56 -21
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 1011 1.33E+11 7.32E+08 10 0.23 -0.11 30 -15
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 1011 1.33E+11 7.32E+08 11 0.16 -0.05 21 -7
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 1011 1.60E+11 8.79E+08 12 0.09 0.02 15 3
b= 450 d= 1800
13 A13 450 360 1.62E+05 3175 1.63E+12 680 1.10E+08 461 3.45E+10 1.75E+09 13 1.26 0.46 204 75
14 A14 450 360 1.62E+05 3175 1.63E+12 1040 1.68E+08 101 1.66E+09 1.75E+09 14 1.79 0.99 290 160
15 A15 450 360 1.62E+05 3175 1.63E+12 1400 2.27E+08 -259 1.08E+10 1.75E+09 15 2.32 1.51 375 245
16 A16 450 360 1.62E+05 3175 1.63E+12 1760 2.85E+08 -619 6.20E+10 1.75E+09 16 2.84 2.04 461 331
17 A17 450 360 1.62E+05 3175 1.63E+12 2120 3.43E+08 -979 1.55E+11 1.75E+09 17 3.37 2.57 546 416
18 A18 300 500 1.50E+05 3250 1.58E+12 2550 3.83E+08 -1409 2.98E+11 3.13E+09 18 4.01 3.19 601 478
19 A19 500 475 2.38E+05 2850 1.93E+12 2563 6.09E+08 -1421 4.80E+11 4.47E+09 19 3.98 3.26 944 774
20 A20 500 425 2.13E+05 2350 1.17E+12 2588 5.50E+08 -1446 4.44E+11 3.20E+09 20 3.95 3.36 839 713
21 A21 500 375 1.88E+05 1850 6.42E+11 2613 4.90E+08 -1471 4.06E+11 2.20E+09 21 3.92 3.46 736 648
22 A22 500 350 1.75E+05 1350 3.19E+11 2625 4.59E+08 -1484 3.85E+11 1.79E+09 22 3.88 3.54 679 619
23 A23 500 350 1.75E+05 850 1.26E+11 2625 4.59E+08 -1484 3.85E+11 1.79E+09 23 3.82 3.60 668 630
24 A24 600 350 2.10E+05 300 1.89E+10 2625 5.51E+08 -1484 4.62E+11 2.14E+09 24 3.75 3.67 787 771
= 1141
Rev 1
CALCULATION SHEET No: AR5 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed In Span
By:
References/Results
Rev 1
CALCULATION SHEET No: AR6 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed In Span
By:
References/Results
QL = 4002
QH = 4002
Rev 1
CALCULATION SHEET No: AR6 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed In Span
By:
References/Results
QL
QH QT C QT = 524 QT = 524
LH RH
QB = 2592 QB = 2592
QS MS MS
Q ΣQ la' MR -249 0 557 557
RH 7 127 127 0.25 32 -121 -93 557 465 QB
8 66 193 0.75 49 -55 -137 557 420
9 24 217 1.25 30 -32 -158 557 399
10 10 227 1.75 17 -22 -172 557 385 Q ΣQ M Q ΣQ M
11 10 237 2.25 22 -12 -180 557 377 RH 13 524 524 0 LH 1 524 524 0
12 12 249 2.80 33 0 -184 557 373 14 641 1165 304 2 641 1165 304
13 12 261 3.40 40 12 -180 557 377 15 528 1692 818 3 528 1692 818
14 10 270 3.95 39 22 -172 557 385 16 414 2106 1502 4 414 2106 1502
15 10 280 4.45 44 32 -158 557 399 17 300 2406 2314 5 300 2406 2314
16 24 304 4.95 118 55 -137 557 420 18 186 2592 3214 6 186 2592 3214
17 66 370 5.45 360 121 -93 557 465
18 127 497 5.95 758 249 0 557 557
0 557 557
497 ### = M on bottom slab
QL = 249 - 0 = 249
QH = 249 + 0 = 249
Rev 1
CALCULATION SHEET No: AR6 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed In Span
By:
References/Results
d= 2800 Pt = 4592 x 4 P = 18367 P/A = 2.05 Mt = 0 Mt/Zt = 0.00 Mv = -20363 Mv/Zv = -2.23 or 3.24
1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 1001 1.41E+11 9.27E+08 1 0.10 0.10 14 14
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 976 1.58E+11 1.51E+09 2 0.15 0.15 24 24
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 951 1.72E+11 2.31E+09 3 0.19 0.19 37 37
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 926 1.85E+11 3.34E+09 4 0.24 0.24 52 52
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 901 1.95E+11 4.64E+09 5 0.29 0.29 70 70
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 891 1.99E+11 5.21E+09 6 0.31 0.31 78 78
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 836 2.13E+11 9.46E+09 7 0.42 0.42 127 127
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 906 1.93E+11 4.33E+09 8 0.28 0.28 66 66
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 976 1.57E+11 1.50E+09 9 0.14 0.14 24 24
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 1011 1.33E+11 7.32E+08 10 0.08 0.08 10 10
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 1011 1.33E+11 7.32E+08 11 0.08 0.08 10 10
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 1011 1.60E+11 8.79E+08 12 0.08 0.08 12 12
b= 450 d= 1800
13 A13 450 360 1.62E+05 3175 1.63E+12 680 1.10E+08 461 3.45E+10 1.75E+09 13 1.15 1.15 186 186
14 A14 450 360 1.62E+05 3175 1.63E+12 1040 1.68E+08 101 1.66E+09 1.75E+09 14 1.85 1.85 300 300
15 A15 450 360 1.62E+05 3175 1.63E+12 1400 2.27E+08 -259 1.08E+10 1.75E+09 15 2.55 2.55 414 414
16 A16 450 360 1.62E+05 3175 1.63E+12 1760 2.85E+08 -619 6.20E+10 1.75E+09 16 3.26 3.26 528 528
17 A17 450 360 1.62E+05 3175 1.63E+12 2120 3.43E+08 -979 1.55E+11 1.75E+09 17 3.96 3.96 641 641
18 A18 300 500 1.50E+05 3250 1.58E+12 2550 3.83E+08 -1409 2.98E+11 3.13E+09 18 4.80 4.80 720 720
19 A19 500 475 2.38E+05 2850 1.93E+12 2563 6.09E+08 -1421 4.80E+11 4.47E+09 19 4.82 4.82 1145 1,145
20 A20 500 425 2.13E+05 2350 1.17E+12 2588 5.50E+08 -1446 4.44E+11 3.20E+09 20 4.87 4.87 1035 1,035
21 A21 500 375 1.88E+05 1850 6.42E+11 2613 4.90E+08 -1471 4.06E+11 2.20E+09 21 4.92 4.92 922 922
22 A22 500 350 1.75E+05 1350 3.19E+11 2625 4.59E+08 -1484 3.85E+11 1.79E+09 22 4.94 4.94 865 865
23 A23 500 350 1.75E+05 850 1.26E+11 2625 4.59E+08 -1484 3.85E+11 1.79E+09 23 4.94 4.94 865 865
24 A24 600 350 2.10E+05 300 1.89E+10 2625 5.51E+08 -1484 4.62E+11 2.14E+09 24 4.94 4.94 1038 1,038
= 1141
Rev 1
CALCULATION SHEET No: AR6 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed In Span
By:
References/Results
Rev 1
CALCULATION SHEET No: AR7 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed Mid Span
By:
References/Results
6618 ###
QL = 3197
QH = 3421
Rev 1
CALCULATION SHEET No: AR7 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed Mid Span
By:
References/Results
QL
QH QT C QT = 2478 QT = 372
LH RH
QB = 3593 QB = 1013
QS MS MS
Q ΣQ la' MR -1053 0 443 443
RH 7 446 446 0.25 112 -607 -415 6 -409 QB
8 285 731 0.75 214 -322 -647 -358 -1005
9 158 889 1.25 198 -164 -768 -722 -1490
10 102 991 1.75 178 -62 -825 -1085 -1910 Q ΣQ M Q ΣQ M
11 88 1079 2.25 198 26 -834 -1449 -2283 RH 13 2478 2478 0 LH 1 372 372 0
12 88 1167 2.80 246 114 -792 -1886 -2677 14 292 2770 611 2 197 569 110
13 68 1235 3.40 233 182 -703 -2322 -3025 15 257 3027 1287 3 163 732 261
14 42 1278 3.95 166 225 -601 -2686 -3287 16 223 3250 2018 4 128 860 447
15 29 1306 4.45 127 253 -481 -3050 -3531 17 188 3439 2797 5 94 954 658
16 31 1337 4.95 155 285 -347 -3414 -3760 18 154 3593 3616 6 60 1013 887
17 55 1392 5.45 299 339 -191 -3777 -3968
18 85 1477 5.95 504 424 0 -4141 -4141
0 -4214 -4214
1477 ### = M on bottom slab
Rev 1
CALCULATION SHEET No: AR7 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed Mid Span
By:
References/Results
d= 2090 Pt = 4592 x 3 P = 13775 P/A = 2.04 Mt = 10911 Mt/Zt = 1.27 Mv = -9066 Mv/Zv = -1.81 or -2.60
1 A1 0 281 0.00E+00 4900 0.00E+00 141 0.00E+00 716 0.00E+00 0.00E+00 1 1.54 -0.50 0 0
2 A2 0 331 0.00E+00 4900 0.00E+00 166 0.00E+00 691 0.00E+00 0.00E+00 2 1.60 -0.44 0 0
3 A3 300 381 1.14E+05 4750 2.58E+12 191 2.18E+07 666 5.08E+10 1.39E+09 3 1.62 -0.36 185 -41
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 641 8.87E+10 3.34E+09 4 1.59 -0.22 342 -48
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 616 9.14E+10 4.64E+09 5 1.54 -0.07 369 -16
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 607 9.21E+10 5.21E+09 6 1.45 0.06 363 14
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 552 9.29E+10 9.46E+09 7 1.46 0.28 446 85
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 622 9.09E+10 4.33E+09 8 1.21 0.23 285 55
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 692 7.90E+10 1.50E+09 9 0.96 0.19 158 31
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 727 6.87E+10 7.32E+08 10 0.78 0.22 102 29
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 727 6.87E+10 7.32E+08 11 0.68 0.32 88 42
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 727 8.24E+10 8.79E+08 12 0.56 0.44 88 68
b= 300 d= 1165
13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 240 4.04E+09 3.16E+08 13 2.20 0.85 154 60
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 7 3.76E+06 3.16E+08 14 2.70 1.34 188 94
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -226 3.56E+09 3.16E+08 15 3.19 1.84 223 128
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -459 1.47E+10 3.16E+08 16 3.68 2.33 257 163
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -692 3.34E+10 3.16E+08 17 4.17 2.82 292 197
18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1021 1.33E+11 1.92E+09 18 4.87 3.51 620 448
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1033 2.13E+11 2.67E+09 19 4.81 3.62 962 725
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1058 1.96E+11 1.79E+09 20 4.76 3.78 833 662
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1083 1.76E+11 1.13E+09 21 4.71 3.94 706 591
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1096 1.65E+11 8.67E+08 22 4.63 4.07 637 559
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1096 1.65E+11 8.67E+08 23 4.53 4.17 622 574
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1096 1.98E+11 1.04E+09 24 4.41 4.29 728 707
= 857
Rev 1
CALCULATION SHEET No: AR7 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed Mid Span
By:
References/Results
Rev 1
CALCULATION SHEET No: AR8 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed Mid Span
By:
References/Results
8824 ###
QL = 4428
QH = 4397
Rev 1
CALCULATION SHEET No: AR8 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed Mid Span
By:
References/Results
QL
QH QT C QT = 1764 QT = 1764
LH RH
QB = 2934 QB = 2934
QS MS MS
Q ΣQ la' MR -985 0 7 7
RH 7 354 354 0.25 88 -631 -404 7 -397 QB
8 226 580 0.75 170 -404 -663 7 -656
9 126 707 1.25 158 -278 -833 7 -826
10 87 794 1.75 152 -191 -950 7 -943 Q ΣQ M Q ΣQ M
11 87 881 2.25 195 -104 -1024 7 -1017 RH 13 1764 1764 0 LH 1 1764 1764 0
12 104 985 2.80 292 0 -1055 7 -1048 14 326 2090 449 2 326 2090 449
13 104 1089 3.40 354 104 -1024 7 -1017 15 280 2369 968 3 280 2369 968
14 87 1176 3.95 343 191 -950 7 -943 16 234 2604 1548 4 234 2604 1548
15 87 1263 4.45 386 278 -833 7 -826 17 188 2792 2176 5 188 2792 2176
16 126 1389 4.95 626 404 -663 7 -656 18 142 2934 2843 6 142 2934 2843
17 226 1615 5.45 1234 631 -404 7 -397
18 354 1969 5.95 2106 985 0 7 7
0 7 7
1969 ### = M on bottom slab
QL = 985 - 0 = 985
QH = 985 + 0 = 985
Rev 1
CALCULATION SHEET No: AR8 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed Mid Span
By:
References/Results
d= 2090 Pt = 4592 x 4 P = 18367 P/A = 2.71 Mt = 0 Mt/Zt = 0.00 Mv = -12088 Mv/Zv = -2.41 or 3.47
1 A1 0 281 0.00E+00 4900 0.00E+00 141 0.00E+00 716 0.00E+00 0.00E+00 1 0.70 0.70 0 0
2 A2 0 331 0.00E+00 4900 0.00E+00 166 0.00E+00 691 0.00E+00 0.00E+00 2 0.77 0.77 0 0
3 A3 300 381 1.14E+05 4750 2.58E+12 191 2.18E+07 666 5.08E+10 1.39E+09 3 0.84 0.84 96 96
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 641 8.87E+10 3.34E+09 4 0.91 0.91 196 196
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 616 9.14E+10 4.64E+09 5 0.98 0.98 236 236
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 607 9.21E+10 5.21E+09 6 1.01 1.01 251 251
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 552 9.29E+10 9.46E+09 7 1.16 1.16 354 354
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 622 9.09E+10 4.33E+09 8 0.96 0.96 226 226
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 692 7.90E+10 1.50E+09 9 0.77 0.77 126 126
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 727 6.87E+10 7.32E+08 10 0.67 0.67 87 87
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 727 6.87E+10 7.32E+08 11 0.67 0.67 87 87
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 727 8.24E+10 8.79E+08 12 0.67 0.67 104 104
b= 300 d= 1165
13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 240 4.04E+09 3.16E+08 13 2.04 2.04 142 142
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 7 3.76E+06 3.16E+08 14 2.69 2.69 188 188
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -226 3.56E+09 3.16E+08 15 3.35 3.35 234 234
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -459 1.47E+10 3.16E+08 16 4.01 4.01 280 280
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -692 3.34E+10 3.16E+08 17 4.66 4.66 326 326
18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1021 1.33E+11 1.92E+09 18 5.59 5.59 712 712
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1033 2.13E+11 2.67E+09 19 5.62 5.62 1125 1,125
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1058 1.96E+11 1.79E+09 20 5.69 5.69 996 996
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1083 1.76E+11 1.13E+09 21 5.76 5.76 864 864
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1096 1.65E+11 8.67E+08 22 5.80 5.80 797 797
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1096 1.65E+11 8.67E+08 23 5.80 5.80 797 797
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1096 1.98E+11 1.04E+09 24 5.80 5.80 957 957
= 857
Rev 1
CALCULATION SHEET No: AR8 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed Mid Span
By:
References/Results
Rev 1
CALCULATION SHEET No: AS 1 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Anchor Span all tendons stressed
By:
References/Results
23954 QL = 2
16888 QH = 45786
Rev 1
CALCULATION SHEET No: AS 2 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Anchor Span all tendons stressed
By:
References/Results
QL
QH QT C QT = 3038 QT = 1443
LH RH
QB = -147 QB = -147
QS MS MS
Q ΣQ la' MR -1443 0 1508 1508 -294
RH 7 744 744 0.25 186 -698 -535 1508 972 QB
8 384 1129 0.75 288 -314 -788 1508 719
9 137 1265 1.25 171 -177 -911 1508 597
10 55 1321 1.75 97 -122 -986 1508 522 Q ΣQ QP M Q ΣQ M
11 55 1376 2.25 125 -66 -1033 1508 475 RH 13 3038 3038 0 759 LH 1 0 0
12 66 1443 2.80 186 0 -1053 1508 455 14 632 3670 0 833 2 0 0
13 66 1509 3.40 226 66 -1033 1508 475 15 913 4583 0 939 3 0 0
14 55 1564 3.95 219 122 -986 1508 522 16 1195 1199 -4579 575 4 0 0
15 55 1620 4.45 246 177 -911 1508 597 17 1476 2675 0 747 5 0 0
16 137 1756 4.95 677 314 -788 1508 719 18 1757 -147 -4579 333 6 0 0
17 384 2141 5.45 2094 698 -535 1508 972
18 744 2885 5.95 4430 1443 0 1508 1508 9011
0 1508 1508
2885 ### = M on bottom slab
QL = 1443 - 0 = 1443
QH = 1443 + 0 = 1443
Rev 1
Rev:
Date:
Date:
s/Results
Rev:
Date:
Date:
s/Results
CALCULATION SHEET No: AS 3 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Anchor Span all tendons stressed
By:
References/Results
d= 2090 Pt = 4579 x 14 P = 64103 P/A = 8.13 Mt = 0 Mt/Zt = 0.00 Mv = -54145 Mv/Zv = -9.20 or 14.86
1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 659 6.10E+10 9.27E+08 1 0.55 0.55 77 77
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 634 6.65E+10 1.51E+09 2 0.84 0.84 138 138
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 609 7.06E+10 2.31E+09 3 1.12 1.12 214 214
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 584 7.35E+10 3.34E+09 4 1.41 1.41 304 304
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 559 7.51E+10 4.64E+09 5 1.70 1.70 409 409
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 549 7.54E+10 5.21E+09 6 1.81 1.81 452 452
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 494 7.45E+10 9.46E+09 7 2.44 2.44 744 744
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 564 7.48E+10 4.33E+09 8 1.63 1.63 384 384
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 634 6.64E+10 1.50E+09 9 0.83 0.83 137 137
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 669 5.82E+10 7.32E+08 10 0.43 0.43 55 55
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 669 5.82E+10 7.32E+08 11 0.43 0.43 55 55
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 669 6.99E+10 8.79E+08 12 0.43 0.43 66 66
13 A13 450 233 1.05E+05 3175 1.06E+12 617 6.46E+07 183 3.51E+09 4.74E+08 13 6.03 6.03 632 632
14 A14 450 233 1.05E+05 3175 1.06E+12 850 8.91E+07 -50 2.64E+08 4.74E+08 14 8.71 8.71 913 913
15 A15 450 233 1.05E+05 3175 1.06E+12 1083 1.14E+08 -283 8.41E+09 4.74E+08 15 11.39 11.39 1195 1,195
16 A16 450 233 1.05E+05 3175 1.06E+12 1316 1.38E+08 -516 2.79E+10 4.74E+08 16 14.08 14.08 1476 1,476
17 A17 450 233 1.05E+05 3175 1.06E+12 1549 1.62E+08 -749 5.88E+10 4.74E+08 17 16.76 16.76 1757 1,757
18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1078 1.48E+11 1.92E+09 18 20.55 20.55 2620 2,620
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1091 2.38E+11 2.67E+09 19 20.69 20.69 4138 4,138
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1116 2.18E+11 1.79E+09 20 20.98 20.98 3671 3,671
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1141 1.95E+11 1.13E+09 21 21.27 21.27 3190 3,190
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1153 1.83E+11 8.67E+08 22 21.41 21.41 2944 2,944
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1153 1.83E+11 8.67E+08 23 21.41 21.41 2944 2,944
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1153 2.19E+11 1.04E+09 24 21.41 21.41 3533 3,533
= 799
Rev 1
CALCULATION SHEET No: AS 4 Rev:
PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Anchor Span all tendons stressed
By:
References/Results
Rev 1
Rev:
Date:
Date:
s/Results
Rev:
Date:
Date:
s/Results