CALCULATION SHEET No: Int 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Bearings
By:
References/Results
Introduction

Deck Articulation

1. The deck is to be supported above each sub-structure by elastomeric block bearings.


This type of bearing will allow shear movements at each support.
2. The deck will be continuous between abutments
and expansion joints will be installed at each end of the deck above each abutment.
3. It is proposed that the deck will be fixed at the north abutment.

The deck has spans of 71 m, 89 m, 89 m, 89 m & 71m total length between abutments of 409 m

The projected maximum shear displacement of the bearings is


- 130 mm over pier 2
- 165 mm over the south abutment

Deck Loads

Preliminary deck loads have been calculated

Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date: 1/4/03
Check
Date:
Subject: Taw Bridge - Bearings
By:
References/Results
CALCULATION SHEET No: BR 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jack Zones
By:
References/Results
Introduction

Five zones of the superstructure require reinforcing to withstand local load effects

1 - the soffits of the deck immediately above the bearings

2 - the soffits above the pier walls supported by jackinfg effects

3 - the areas around the soffit slab stressing anchorages

4 - the areas around the top slab stressing anchorages

5 - the areas around the web (abutment end) stressing anchorages

Consider the bearing zones

Consider bearing load as a bursting force

Bearing reactions SLS = 18925 kN

ULS = 22779 kN

Deck - bearing layout


Zone of diaphragm affected by bursting under bearings

300 Diaphragm 1500 at piers

600 Bearings 1000 x 1000 elastomer blocks on


1200 x 1200 steel plates.
elastomer displaces 125 mm longitudinally
50 mm transversly
750 750
R

Bursting force above bearing in a zone of depth = 1100 mm thickness of web

Bursting reinforcement required over a zone 150 mm to 1500 mm above bearing

yb/yo = (1000-125) /1500 = 0.58 Fb = 0.15*R*1.1

= 3759 kN

Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: BR 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jack Zones
By:
References/Results
The bursting force acts both longitudinally and transversely

Longitudinal effect Direct force in bottom flange is due to Moment WL/10

W=R M = 22779 x 89 / 10

= 202737 kNm (at 1 No web ie 1/2 deck)

This is countered by the effects of prestressing

P = 0.75 x 279 x 0.85 x 19 x 16 = 54070 kN 0.85 = load after losses

P/A = 54070 / 7.24 = 7468 kN/m2 Consider half section

M = 54070 x 2.33 = 125984 kNm

Force in bottom flange = -125984 / ( 4.6*0.7*3.4) + 7468

+ 202737 / ( 4.6*0.7*3.4)

= 14479 kN/m2 Compression force

Compressive force in soffit slab greater than bursting force

No reinf required for soffit slab or web in the longitudinal direction

Check height of bursting zone

σ = 2* 3759 *1000/(1500*1350)
780 mm above
σ 1125 mm soffit slab = 3.71 N/mm2

225 mm 720 mm
150 mm

Bursting force above soffit slab = 3.71 *(780/1125)*780*900/(2*1000)


allow 600 for web
= 903 kN

Reinforcement above soffit slab = 903 *1000/400

= 2259 mm2 Use 4 No links = 8 No legs


= 282 mm2 Use T20 links
Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: BR 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jacking Zones
By:
References/Results
Transverse bursting through web

yb/yo = (1000-50) /1500 = 0.63 Fb = 0.13*R*1.1

= 3257 kN

σ = 2* 3257 *1000/(1500*1350)

750 = 3.22 N/mm2

225 σ
150

Bursting force above soffit slab = 3.22 *(780/1125)*780*900/(2*1000)

= 783 kN

Reinforcementt to resist bursting force use 9 No pairs of links = 2 x 18 No legs

Reinforcement above soffit slab = 3257 *1000/400

= 8144 mm2 Use 9 No links = 18 No legs

= 226 mm2 Use T20 links

H H = horizontal tension load lower section of web

La Web = 0 x 500 / 3750


= 0.75 x web Shear
= 3750 mm = 0 kN
500 mm
compressive force in lower 1200 mm of diaphragm
CL Bearing C=H

This reinforcement will be dealt with by diaphragm design


Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: BR 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jacking Zones
By:
References/Results
Consider Anti-spalling Reinforcement

load = 0.04 x V = 22779 x 0.04 = 911 kN

Increase reinforcement to accommodate moment from eccentricity D2 = 50 mm

V*0.2{(D1-D2)/(D1+D2)}^3 = 22779 x 0.2 x [ 750+50-(750-50))/(1500)]^3

= 1.35 kN

Total load longit = 913 kN Total load Trans = 913 kN

Area of anti spalling steel limit fy to equivalent to 0.001 strain = 200 N/mm2

Transversely there is no retsraint on the external face of deck to spalling

Ast = 913 x 1000 / ( 10 x 200 )= 456 mm2 T25's or paired T16+T20 Cover cannot be achieved
use stainless steel bars
Transversely internal forces restrain spalling forces across the bottom of the diaphragm

compressive stress = 3341 kN

Spalling force effect acts over approx 0.3*2yo = the tensile zone depth of a centrally loaded
stressing block prism (see Leonhardt 9.2)

= 0.3*1500 = 450 mm depth

Force on this zone assuming lowest compression force transversely

F spall zone = 0.45 x 913 / 1.20 = 342 > 913 Spalling force

spalling force countered

Longitudinally the force in the soffit slab acts agiainst bursting and spalling

assume soffit slab force in lower 450 mm acts against spalling force See diagram page 2

Resistance = 0.45 x 1.50 x 14479 = 9773 kN

Bursting force in this zone = 3.71 x 300 x 1500 / 1000 = 1670 kN


Spalling force = 913 kN

Resistance > than bursting + spalling effects adverse effects countered

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: BR 5 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jacking Zones
By:
References/Results
Consider the jacking zones

Consider jacking load as a bursting force

Bearing reactions SLS = 16481 kN


Dead load
ULS = 19368 kN

Deck - jack layout


Zone of diaphragm affected by bursting under bearings

300 Diaphragm 1500 at piers

600
Zone of diaphragm affected by
bursting under jacks

720 1800 Jacks with 800 mm plates above


at 900 ctrs

Bursting effect through width of diaphragm - where opening is not present

780 mm above
σ 1125 mm soffit slab

225 mm 720 mm
150 mm

Bursting force above bearing in a zone of depth = 1500 mm thickness of web

Bursting reinforcement required over a zone 150 mm to 1500 mm above bearing

yb/yo = 800 /1500 = 0.53 Fb = 0.16*R*1.1

= 3409 kN
σ = 2* 3409 *1000/(1500*1350)

= 3.37 N/mm2

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: BR 6 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jacking Zones
By:
References/Results
Bursting force above soffit slab = 3.37 *(780/1125)*780*900/(2*1000)
allow 600 for web
= 819 kN

Reinforcement above soffit slab = 819 *1000/400

= 2048 mm2 Use 4 No links = 8 No legs

= 256 mm2 Use T20 links

Bursting effect through width of diaphragm - where opening is present

350 From calculations page 2

q q = 14479 kN/m2
P 700
H = 14479 x 0.70

= 10135 kN

σ' = 3.37 x 450 / 1125 = 1.35

σ 1125 mm Bursting force I bottom flange zone


675
225 mm B = 3.37 x 225 / 2
150 mm
+ 1.35 x 675

+ 2.02 x 675 / 2

= 379 + 909 + 682


= 1970 kN

Moments on section due to P = 10135 x 0.18 = 1774 kNm

due to B = 379 x 0.23 + 909 x -0.19 + 682 x -0.08

= -136 kNm

Check P/A +/- M/Z


Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: BR 7 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Bearing & Jacking Zones
By:
References/Results
Check P/A +/- M/Z

σ = ( 10135 - 1970 ) / 1050 +/- ( 1774 + -136 ) x 6 / 1.050 ^2

= 7.78 +/- 8.91

= 16.69 or -1.14

tensile force in top of beam = (1/2)*1.14*(1.14/14.94)*1050

= 45.67 kN

Allow steel stress of 200 N/mm2 Ast = 45.67 *1000/200

= 228 mm2

T 16's at 150 ctrs provide 1340 - satisfactory

Spalling may be treated as bearing spalling case

Reinforcement for the abutment diaphragms to be as pier diaphragms


Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: AR 1 Rev:

PCG
Project: By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Introduction

Five zones of the superstructure require reinforcing to withstand local load effects

1 - the soffits of the deck immediately above the bearings

2 - the soffits above the pier walls supported by jackinfg effects

3 - the areas around the soffit slab stressing anchorages

4 - the areas around the top slab stressing anchorages

5 - the areas around the web (abutment end) stressing anchorages

Consider the Anchorage Zones

Soffit slab anchorages

Tendon in soffit - VSL 19 - 15 UTS = 279 kN/strand Stressing force = 0.75 UTS

Stressing force = .7 x 260.7 x 37 = 6752 kN

Anchor Block layouts


End plates 310 mm sq
400 400 400 400 400

t 400 400

300 400
s

400 400 400

t 400

300
s

Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: AR 2 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Longitudinal section of anchor blocks

130 3445 - 130


P = 6752 x 1.2
800
P = 8103

Acs = reinforcement to tension zone design using corbel formula

For single tendon anchorage assume forces are distributed to base and wall
in proportion to their distances from the wall and the associated shear distorsion

P base = P*400/(000+400) = 8103 kN

P wall = 8103 - 8103 = 0 kN

Using Table 172 Reynolds For base

400 or 480 θ = 7.4 P = 8103 kN


F P
x =( 5 x 8103 x E6 ) / (Sin 2θ x 850 x 50 )
.
R d = 3751 mm
θ x
d = 3870 mm fy = 400 kN/mm2

Acs = ( 400 x 8103 )/(( 3870 - 1875 ) x 400 ) = 4062 mm2

To be distributed over a width of 2*(450 - 50(cover) -180/2 anchor) = 2 x 310 310 mm half width

room for 6 No bars Area of bar = 677 mm2 / bar use T32's

For wall θ = 9.5 P = 0 kN

x =( 5 x 0 x E6 ) / (Sin 2θ x 700 x 50 ) = 0 mm

d = 3870 mm fy = 400 kN/mm2 .

Acs = ( 480 x 0 )/(( 3870 - 0 )x 400 ) = 0 mm2

To be distributed over a width of 2*(330 - 50(cover) -180/2 anchor) = 2 x 190 mm 190 mm half width

room for 5 No bars Area of bar = 0 mm2 / bar use T16's


Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 3 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
For double tendon anchorage assume forces are distributed to base and wall
in proportion to their distances from the wall and the associated shear distorsion

Utilising results for single tendon P = 8103 kN

P base = P*980/(330+980) + 8103 = 14164 kN 480 wall off set

P wall = 8103 + 8103 - 14164 = 2041 kN

or P base = P*1130/(330+1130) + 8103 = 14374 kN 630 wall off set

P wall = 8103 + 8103 - 14374 = 1831 kN

For base θ = 7.4 ΣP = 14374 kN

x =( 5 x 14374 x E6 ) / (Sin 2θ x 1250 x 50 ) = 4524 mm

d = 3870 mm fy = 400 kN/mm2 .

Acs = ( 330 x 14374 )/(( 3870 - 2262 ) x 400 ) = 7375 mm2

To be distributed over a width of 2*(450 - 50(cover) -180/2 anchor) = 3 x 310 mm 310 mm third width

room for 9 No bars Area of bar = 819 mm2 / bar use T20's

For wall θ = 16.5 P = 0 + 2041 = 2041

x =( 5 x 2041 x E6 ) / (Sin 2θ x 700 x 50 ) = 534 mm

d = 3870 mm fy = 400 kN/mm2 .

Acs =( 480 x 0 + 830 x 2041 )/(( 3870 - 267 ) x 400 )= 1175 mm2

To be distributed over a width of 2*(330 - 50(cover) -180/2 anchor) = 2 x 190 mm 190 mm half width

room for 5 No bars Area of bar = 235 mm2 / bar

Reinforcement to counter spalling Ast = 0.04*P/fy = ( 0.04 x 6752 )/ 200

= 1350 mm2 distribute over 5 No bars = 270 mm2 / bar

Total are per bar = 270 + 235 = 505 mm2 / bar


Use T25's to counter corbel and spalling effects

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 4 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Check shear effect on the corbel/base or wall interface - Shear links in corbel

BS 5400 Pt 4 Cl 7.3.2.3

Design for shear at wall as max of either ratio of prying effects or shear area of anchorage

Prying - 1 No tendon shear at wall = 0 kN shear at base = 8103 kN

2 No tendons shear at wall = 2041 kN shear at base = 14164 kN

Wall areas - 1 No tendon wall area = 0.5*780*3770 = 1.47

base area = 930*3770 = 3.51

P*A/ΣA shear at wall = 2393 kN shear at base = 5709 kN

Wall areas - 2 No tendons wall area = 0.5*780*3770 = 1.47

base area = 1430*3770 = 5.39

P*A/ΣA shear at wall = 3472 kN shear at base = 12733 kN

Capacity of shear faces 1 No tendon Anchorage

V1 = wall area = 0.15*780*3770*50/2 = 11027 kN

base area = 0.15*930*3770*50 = 26296 kN

Shear capacity greater than applied load on 2 tendon anchorages both types satisfactory

Shear reinforcement for anchorage Ast = V/(0.7*fy)

1 No tendon Anchorage wall area = 0 x 1000 / (0.7*460 ) = 0 mm2

base area = 5709 x 1000 / (0.7*460 ) = 17730 mm2

2 No tendon Anchorage wall area = 2041 x 1000 / (0.7*460 ) = 6339 mm2

base area = 12733 x 1000 / (0.7*460 ) = 39544 mm2


the reinforcement is to be used in the 2000 mm behind the anchor plate or 60% of the
corbell section

Bars at 150 ctrs using links - 13 No sets

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 5 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Shear reinforcement for anchorages Ast = V/(0.7*fy) 1 No tendon Anchorage

wall area 1 No link 2 legs = 0 / (13*2) = 0 mm2 Use T 20 mm link

base area 1 No link 2 legs = 17730 / (13*2) = 682 mm2 Use T 25 mm link

2 No tendon Anchorage

wall area 1 No link 2 legs = 6339 / (13*2) = 244 mm2 Use T 25 mm link

base area 2 No links 2 legs = 39544 / (13*4) = 760 mm2 Use T 25 mm link

Effect of tendon curvature beyond 1500 mm from anchor

Vertical pull off force due to tendon curvature - min radius = 7.5 m

P/R = p / m run p = 5060 / 7.5 = 675 kN/m/tendon

Use links at 150 ctrs Asp = 675 x 1000 / ( 400 x 2 x 6 ) = 141 mm2

Vertical push off effect of horizontal curvature - min radius = 7.5 m

P/Rπ = p / m run p = 5060 / 7.5 π = 215 kN/m/tendon

Use links at 150 ctrs Asp = 215 x 1000 / ( 400 x 2 x 6 = 45 mm2

Total area reinforcement against pull off + push off = 141 + 45 = 185 mm2 Vertical bars

(Consider reinforcement at right angles to this force) AASHTO LRFD

Check shear capacity of concrete


450 mm 400 mm
100 dia V = 0.9*0.33*450*sqrt fc fc = 0.8*fcu fcu = 50
110 oD
= 845 kN

Load using AASHTO factors =( 675 + 215 )*1.2 / 1.1


= 970 kN > 845 kN Reinf required

The same forces will act horizontally at the Anchorage provide anchored reinforcement
horizontally = to that that has been used vertically

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 6 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Check tensile force direct in the slab & wall immediately behind the anchorage

block 700 wide


P P = 5060 kN per strand
1100
660 ciria guide 1 recommends that reinforcement to resist
T 0.5P be provided

330 -630
480 500 450 Twin anchorage has the highest load

Ass to resist = 5060 kN


300 450
Ass = 5060 x 1000 / 400
330
= 12650 mm2 to be distributed
around a length of
330
340 sq L = 330 + 500 + 450 + 330 + 330 + 450

= 2390 mm

Reinforcement to resist this load using bars at 150 centres each face 15 x 2

= 12650 / 30 = 422 mm2 / bar Use T25's to counter tensile effects

Bursting force - containment reinforcement behind stressing head use spiral Anti-Bursting
Reinforcement
P = 5060 kN Fb - ypo/yo = 170/450 = 0.38 k = 0.21 Table 30 BS 5400 pt 4

Fb = 5060 x 0.21 = 1063 kN

Ast = 1063 x 400 = 2657 mm2 to be distributed over a zone from

90 mm to 900 mm behind the anchorage


Use 5 No spiral turns 6 to give 5 anchored bars

Abst leg = 2657 / 10 = 266 mm2

Use T20's to produce spiral

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 7 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Consider the effect of tendon curvature on the base slab

CL On cantilever segment 3 only Force R2 acts


F1 from tendons S8 & S9
3.4
F2 Min radius of tendons 8.5 m

4.7 Force in tendon P = 8103 kN per tendon

Forces F1 = F2 = 2p / m run p = 8103 / 8.5 = 953 kN/m/tendon

F1 = F2 = 2 x 953 = 1906 kN/m

F1 and F2 orientated at 16 ° to deck CL

F1 Transverse is tensile from the Cl F1t = 1906 x cos 16 = 1833 kN/m

Reinforcement to resist F1t = 1833 x 1000 / 400 = 4582 mm2/m

Using bars at 150 ctrs 12 No bars - 6 top 6 bottom

= 4582 / 12 = 153 mm2 / bar To counter tensile effects

F1 Longitudinal is tensile from joint F1l = 1906 x sin 16 = 525 kN/m

Reinforcement to resist F1l = 525 x 1000 / 400 = 1314 mm2/m

Using bars at 150 ctrs 12 No bars - 6 top 6 bottom

= 1314 / 12 = 44 mm2 / bar To counter tensile effects


F2 Transverse is tensile from the web but prop of compressed slab acting

use 50% of F2T 0.5 x F2t = 0.5 x 1906 x cos 16 = 916 kN/m

Reinforcement to resist F2t = 916 x 1000 / 400 = 2291 mm2/m

Using bars at 150 ctrs 12 No bars - 6 top 6 bottom

= 2291 / 12 = 76 mm2 / bar To counter tensile effects

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 8 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
F2 Longitudinal is tensile from joint F2l = 1906 x sin 16 = 525 kN/m

Reinforcement to resist F2l = 525 x 1000 / 400 = 1314 mm2/m

Using bars at 150 ctrs 12 No bars - 6 top 6 bottom

= 1314 / 12 = 44 mm2 / bar To counter tensile effects

The tendons exert vertical (pull out) forces - at right angles to the planr of curvature AASHTO LRDP
5.10.4.3.1
R = 8.5 m

P/Rπ = p / m run p = 8103 / 8.5 π = 303 kN/m/tendon Using 5400 factors

The bottom curvature of the span wll cause afuther downwards pull out force

Rs = 260 m

P/Rs = p / m run p = 8103 / 260 = 31 kN/m/tendon

(Consider reinforcement at right angles to this force)

Slab 275 mm thick

120 mm 85 mm Check shear capacity of concrete top of slab


- 5 mm
100 dia V = 0.9*0.33*115*sqrt fc fc = 0.8*fcu AASHTO LRDP
110 oD 5.10.4.3.1
= 216 kN
Applied load using AASHTO Factors = 6752 x 1.2 = 8103 kN

P/Rπ = 8103 / 8.5 π = 303 kN/m/tendon

Less than shear capacity of slab acceptable

Bottom of slab V = 0.9*0.33*150*sqrt fc = 282 kN

P/Rπ + P/Rs = 8103 / 8.5 π + 8103 / 260 = 335 kN/m/tendon

Load applied less than shear capacity of slab acceptable no reinforcement required

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 9 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Deck slab anchorages

Tendons in deck slab - VSL 19 - 15 UTS = 279 kN/strand

Stressing force = 0.75 UTS

Stressing force = 0.75 x 279 x 19 = 3976 kN

Anchor Zone Layouts


Anti spalling reinforcement
500
Ast = 0.04*P*/fy

= ( 0.04 x 3976 x 1.0 )/ 200

= 795 mm2

2950 distribute over 4 No bars


from CL of deck 310 mm sq
= 199 mm2 / bar

Use T16's to counter spalling effects

In plan the Tendons diverge - this causes a tension in the top slab
P 6 °
P = 3976 x 1.0 = 3976 kN

Ft Ft = P x sin 6

= 3976 x sin 6 = 415.6 kN

to prevent cracking transverse strains between the anchors must be limited

For bars at 150 ctrs, cover = 30 mm assume T20 bars


and limit crack width to 0.25 mm

Cw = 3 x Acr x ε Acr approx 70 mm

ε = 0.25 / (3 x 70) = 1.2/1000

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 10 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results

Limit reinforcement stress to 200*1000*1.2/1000 = 240 N/mm2

The tensile zone is 300 mm deep - determined by check calcs using Poulos & Davis
line load - on semi infinite mass Cerutti problem

space for 4 No bars As = 415.6 x 1000 / (4 x 240)

= 432.9 mm2/bar

Use 2 T20 closed links around the anchors

Check the longitudinal stability of the anchors in the deck slab splay
1500
Assume a rectangular section
V 130
275 d = 675 mm
H 470
b = 500 mm ctr of anchors

Check shear capacity of the section = Vc = 0.67bdsqrt(ft*ft + fcp*ft)

H = 3976 kN ft = 0.24sqrt 50 = 1.70

V = H x sin 4.2 = 416 kN


at anchorage P/A +/- M/Z = 11.78 +/- 6.54 = 18.32 or 5.24

Vc = 0.67*500*675 *sqrt(1.7*1.7+1.7*11.78) /1000

= 1082 kN > 416 kN applied the section is stable

The strand is curved vertically check pull in force R = 12.8 m

Check shear capacity of concrete bottom of slab in splay

V = 0.9*0.33*470*sqrt fc fc = 0.8*fcu AASHTO LRDP


5.10.4.3.1
= 883 kN

p = 3976 / 12.8 = 311 kN/m/tendon Section adequate

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 11 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results

Bursting force - containment reinforcement behind stressing head use spiral Anti-Bursting
Reinforcement
P = 3976 kN Fb - ypo/yo = 165/275 = 0.60 k = 0.14 Table 30 BS 5400 pt 4

Fb = 3976 x 0.14 = 557 kN

Because there are bars used to resist tearing force between the anchorages for which
fs has been limited to 240 N/mm2 use the reduced stress for the antibursting reinforcement

Ast = 557 / 240 = 2319 mm2 to be distributed over a zone from

60 mm to 550 mm behind the anchorage

Use 3 No spiral 6 anchored bars Total area required = 0 + 2319

Abst leg = 2319 / 6 = 387 mm2

Total = 387 mm2

Use T25's in links to counter splitting effects

Check transverse load effect of a single tendon stressed


Transverse load = 415.6 kN

shear on deck slab = 1.1 x 415.6 x 10^3 / (12.2 x 10^3 * 275)

= 0.14 N/mm2 less than minimum Cl 5.3 BS 5400 pt4

At 1 m from the tendon anchorage the load is dispersed over 600 mm as a compressive
zone in front of the force if the cantilever tendon is stressed first there wiil be a tension
across the deck slab between the webs

check reinforcement required fs = 345 4 No bars picked up

As = 415.6 x 1000 / (4 x 345)

= 301.1 mm2/bar T20's required

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 12 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Wall & slab anchorages at abutments

Tendons S25 to S31

Tendons in deck slab - VSL 22 - 15 UTS = 279 kN/strand

Stressing force = 0.75 UTS

Stressing force = 0.75 x 279 x 22 = 4604 kN *1.1

Bursting force - containment reinforcement behind stressing head use spiral Anti-Bursting
as detailed for blister anchorages. Reinforcement
see page 6

Anchor layout in slab

600
300

300

430 340
340 sq
660

Anti spalling reinforcement

Ast = 0.04*P/fy = ( 0.04 x 4604 )/ 200 = 921 mm2

distribute over 4 No bars = 230 mm2 / bar Vertically

Use T20's to counter spalling effects vertically

distribute over 4 No bars = 230 mm2 / bar Horizontally

Use T20's to counter spalling effects horizontally

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 13 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results

Tendons 27 to 31

Effect of tendon curvature beyond 1500 mm from anchor

Vertical pull off force due to tendon curvature - min radius = 39.4 m

P/R = p / m run p = 5060 / 39.4 = 128 kN/m/tendon

Vertical push off effect of horizontal curvature - min radius = 13.8 m

P/Rπ = p / m run p = 5060 / 13. π = 117 kN/m/tendon

(Consider reinforcement at right angles to this force) AASHTO LRFD

Check shear capacity of concrete


150 mm 120 mm
100 dia V = 0.9*0.33*150*sqrt fc fc = 0.8*fcu fcu = 50
110 oD
= 282 kN

Load using AASHTO factors =( 128 + 117 )*1.2 / 1.1


= 267 kN < 282 kN Reinf not required

Check the effect of horizontal cuvature of the 5 No tendons

F1 CL There are 5 No tendons sum the force F1

3.4 P/R = p / m run

4.7

Tendon P R p θ p*cosθ
27 5060 13.3 380 14.9 368
28 5060 17.1 296 11.7 290
29 5060 24.0 211 8.4 209
30 5060 40.0 127 5.1 126
31 5060 120.0 42 1.7 42

Σ = 1034 kN/m

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 14 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Reinforcement to resist F1t = 1034 x 1000 / 400 = 2585 mm2/m

Using bars at 150 ctrs 12 No bars - 6 top 6 bottom

= 2585 / 12 = 86 mm2 / bar To counter tensile effects

Tendons 25 & 26

The tendons are installled within the web

Vertical pull off force due to tendon curvature - min radius = 13.8 m

P/R = p / m run p = 5060 / 13.8 = 367 kN/m/tendon AASHTO LRFD

Check shear capacity of concrete

V = 0.9*0.33*500*sqrt fc fc = 0.8*fcu fcu = 50

= 939 kN
Concrete capacity exceeds applied load reinforcement required

The tendons are curved horizontally in the web and exert outward forces

Horizontal pull off force due to tendon curvature - min radius = 8.1 m

P/R = p / m run p = 5060 / 8.1 = 625 kN/m/tendon

Horizontal push off effect of vertical curvature - min radius = 13.8 m

P/Rπ = p / m run p = 5060 / 13. π = 117 kN/m/tendon

Total Pull off force = 625 + 117 = 741 kN/m/tendon

Check shear capacity of concrete AASHTO LRFD

V = 0.9*0.33*225*sqrt fc fc = 0.8*fcu = 423 kN Reinf required fcu = 50

Provide Ast as links 12 legs / m = 741 * 1000 / (400 * 12)

= 154 mm2/bar

Use T16 ties around the tendons

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 15 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results

Check the effect of horizontal cuvature of the tendon

F1 CL There are single tendons sum the force F1

3.4 P/R = p / m run

Min radius of tendons 8.5 m


4.7
Force in tendon P = 8103 kN per tendon

Force F1 = p / m run p = 8103 / 8.5 = 953 kN/m/tendon

F1 orientated at 26 ° to deck CL

F1 Transverse is tensile from the Cl F1t = 953 x cos 26 = 857 kN/m

Reinforcement to resist F1t = 857 x 1000 / 400 = 2142 mm2/m


Using bars at 150 ctrs 12 No bars - 6 top 6 bottom

= 2142 / 12 = 71 mm2 / bar To counter tensile effects

F1 Longitudinal is tensile from joint F1l = 953 x sin 26 = 418 kN/m

Reinforcement to resist F1l = 418 x 1000 / 400 = 1045 mm2/m

Using bars at 150 ctrs 12 No bars - 6 top 6 bottom

= 1045 / 12 = 35 mm2 / bar To counter tensile effects

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 16 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
Check blisters as corbels on walls

At the end check reinf stresses in reinforcement


300 x 300 due to axial stressing loads

CoG 1880 x 1100 section


1880 x 1100 300 x 300
or 1730 x 1100 X' = 952 mm
Y Y' = 562 mm
X
e of load x = 1180 - 950 = 230 mm MX = 3727

e of load y = 630 - 560 = 70. mm MY = 1134

Load P = 8103 x 2 CoG 1730 x 1100 section


X' = 878 mm
Y' = 563 mm

e of load x = 1030 - 880 = 250 mm MX = 4051

e of load y = 630 - 560 = 115 mm MY = 1134

300 walls CoG 2030 x 1400 section

X' = 711 mm
1400 Y' = 571 mm
2030
e of load x = 1180 - 711 = 470 mm

e of load y = 675 - 571 = 105 mm

Area = 939000 mm2 behind the block a residual stress of 4 N/mm 2 ia assumed

load on the walls = area x 4 - P/2

Axial load on walls = 1226 kN

Moments on walls from compressive force Mx = 2036

My = -457

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 17 Rev:

PCG
Project: 0 By:
W
Date:
Check
Date:
Subject: Reinforcement - Deck Anchorage Zones
By:
References/Results
The blisters have been analysed using the SAM program

the results show 1 No cracking

2 No excees streeses in either the concrete or reinforcement


Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: ES 1 Rev:

PCG
Project: By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Introduction

During stressing the deck segments will be subjected to out of balance forces
due to the possibility that one tendon to one side of the deck has been stressed

Assumptions

1 that longitudinal stress effects are adequately countered by the stressing

2 that transverse effects are to be countered by reinforcement

3 that the smallest & largest sections affected by the loading only need to be considered

Deck section
A2

A1
PT
A3

A4
PB

For eqilibrium reinforcement for

Top slab A1 the cantilever stresses may be used to directly determine


equilibrium reinforcement

Top slab A2 the slab stresses + web shear and stressing forces must be used to
determine equilibrium reinforcement

Web A3 The web stresses + slab shears and stressing forces must be used to
determine equilibrium reinforcement

Bottom slab A4 the slab stresses + web shear and stressing forces must be used to
determine equilibrium reinforcement

Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: ES 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results

The segments will be cast in 4.685 m lengthts the end block size will vary from

1 2 x 4.685 = 9.37 m at the piers 2 No segments

2 0.5*4.685 + 4.865 + 4.20 = 11.23 m at mid span

3 12.20 m at all other sections

Consider overlap of effects


12.2
4.7 6.1 moment overlap

9.37 4.7 4.7


1.87 12.2
6.5 12.2 shear overlap

Shear overlap affects 3 No segments

moment overlap remote from anchorages 1.9 m for 2 segments


Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: ES 3 Rev:

PCG
Project: By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Consider cantilever

Longitudinal shear = 3300 kN

Max shear stress = 1.1*3*3300*10^3/(12.2*10^3*500)

= 1.79 N/mm2

allowable concrete stress = 1.25 Ast crossing the surface = ( 1.79 - 1.25)*500*150
of bars / (0.7*400*2)

= 72 mm2

Transverse moment effect remote from anchorage M =

Top tendons = 2 x 4707 x 1.1 = 10355

bottom tendons = 2 x 1124 x 1.1 = 2473 Total = 12828

Ast/bar = 12828 x 10^6 / (0.75*12.2*10^3*400*2*40) = 44 mm2

or = 12828 x 10^6 / (0.875*12.2*10^3*400*2*20) = 75 mm2

Consider top slab between webs

Longitudinal shear = 3500 kN at web

Longitudinal shear = ( 3500 - 2000 ) x 0.75 + 2000 = 3125

Max shear stress = 1.1*3*3500*10^3/(12.2*10^3*500) = 1.89 N/mm2

or = 1.1*3*3125*10^3/(12.2*10^3*260) = 3.25 N/mm2

allowable concrete stress = 1.25

Ast crossing the surface = ( 3.25 - 1.25)*500*150 / (0.7*400*2) = 86 mm2


of bars
or = ( 3.25 - 1.25)*260*150 / (0.7*400*2) = 139 mm2

Moment in top slab = moment on cantilever use the same area of reinforcement.
Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: ES 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Consider webs

Longitudinal shear = 3600 kN bottom of web

Max shear stress = 1.1*3*3600*10^3/(12.2*10^3*300)

= 3.25 N/mm2

allowable concrete stress = 1.25 Ast crossing the surface = ( 3.25 - 1.25)*300*150
of bars / (0.7*400*2)

= 160 mm2

Longitudinal shear = 2500 kN top of web

Max shear stress = 1.1*3*2500*10^3/(12.2*10^3*300)

= 2.25 N/mm2

allowable concrete stress = 0.5 Ast crossing the surface = ( 2.25 - 0.5)*300*150
of bars / (0.7*400*2)

= 141 mm2

vertical moment effect remote from anchorage M =

Top tendons = 2 x 3600 x 1.1 = 7920

bottom tendons = 2 x 3600 x 1.1 = 7920

Total = 15840

Ast/bar = 15840 x 10^6 / (0.875*12.2*10^3*400*2*20) = 93 mm2

or = 15840 x 10^6 / (0.75*12.2*10^3*400*2*40) = 54 mm2


Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: ES 5 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Consider bottom slab between webs

Longitudinal shear = 4400 kN at web

Longitudinal shear = 4400 - 996 - 864 = 2540

Max shear stress = 1.1*3*4400*10^3/(12.2*10^3*425) = 2.80 N/mm2

or = 1.1*3*2540*10^3/(12.2*10^3*275) = 2.54 N/mm2

allowable concrete stress = 1.25 Ast crossing the surface = ( 2.80 - 1.25)*425*150
of bars / (0.7*400*2)

= 176 mm2

or = ( 2.54 - 1.25)*275*150
/ (0.7*400*2)

= 95 mm2

Transverse moment effect remote from anchorage M =

Top tendons = 2 x 1300 x 1.1 = 2860

bottom tendons = 2 x 5500 x 1.1 = 12100

Total = 14960

Ast/bar = 14960 x 10^6 / (0.75*12.2*10^3*400*2*40) = 51 mm2

or = 14960 x 10^6 / (0.875*12.2*10^3*400*2*20) = 88 mm2


Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: ES 6 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Check Anchor Span

P = 4606 kN No of strands = 14

Centroid of strands below top of deck = 2*((2090 - 1000) + (2090-570) + 5*(2090-310))/14

= 1644 mm

Consider cantilever

Longitudinal shear = 1324 kN

Max shear stress = 1.1*1324*10^3/(12.2*10^3*500)

= 0.24 N/mm2

allowable concrete stress = 1.25 Ast crossing the surface = 0 mm2

Transverse moment effect remote from anchorage M =

Top tendons = 1 x 1508 x 1.1 = 3318

Ast/bar = 3318 x 10^6 / (0.75*12.2*10^3*400*2*40) = 11 mm2

or = 3318 x 10^6 / (0.875*12.2*10^3*400*2*20) = 19 mm2

Consider top slab between webs

Longitudinal shear = 1443 kN at web

Longitudinal shear = 1443 - 744 - 384 = 315

Max shear stress = 1.1*1443*10^3/(12.2*10^3*500) = 0.26 N/mm2

or = 1.1*315*10^3/(12.2*10^3*260) = 0.11 N/mm2


allowable concrete stress = 1.25

Ast crossing the surface = ( 0.26 - 1.25)*500*150 / (0.7*400*2) = 0 mm2


of bars
or = ( 0.11 - 1.25)*260*150 / (0.7*400*2) = 0 mm2

Moment in top slab = moment on cantilever use the same area of reinforcement.

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: ES 7 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Consider webs

Longitudinal shear = 5000 kN middle of web

Max shear stress = 1.1*5000*10^3/(12.2*10^3*300)

= 1.50 N/mm2

allowable concrete stress = 1.25 Ast crossing the surface = ( 1.50 - 1.25)*300*150
of bars / (0.7*400*2)

= 20 mm2

Longitudinal shear = 3040 kN top of web

Max shear stress = 1.1*3040*10^3/(12.2*10^3*300)

= 0.91 N/mm2

allowable concrete stress = 0.5 Ast crossing the surface = ( 0.91 - 0.5)*300*150
of bars / (0.7*400*2)

= 33 mm2

vertical moment effect remote from anchorage M =

Top tendons = 1 x 3600 x 1.1 = 3960

bottom tendons = 1x 0 x 1.1 = 0

Total = 3960

Ast/bar = 3960 x 10^6 / (0.875*12.2*10^3*400*2*20) = 23 mm2


or = 3960 x 10^6 / (0.75*12.2*10^3*400*2*40) = 14 mm2

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: ES 8 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Deck Equilibrium Reinforcement
By:
References/Results
Consider bottom slab between webs

Longitudinal shear = 10280 kN at web

Max shear stress = 1.1*10280*10^3/(12.2*10^3*425) = 2.18 N/mm2

or = 1.1*10280*10^3/(12.2*10^3*275) = 3.43 N/mm2

allowable concrete stress = 1.25 Ast crossing the surface = ( 2.18 - 1.25)*425*150
of bars / (0.7*400*2)

= 106 mm2

or = ( 3.43 - 1.25)*275*150
/ (0.7*400*2)

= 161 mm2

Transverse moment effect remote from anchorage M = 34360 x 1.1

= 37796

Ast/bar = 37796 x 10^6 / (0.75*12.2*10^3*400*2*40) = 129 mm2

or = 37796 x 10^6 / (0.875*12.2*10^3*400*2*20) = 221 mm2


Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: AR 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
Introduction

The tendons of the preestressing are deflected in the region of the anchorages

The profile is a parabolic curve with varing radius

R = {[ 1 + (dy/dx)2 ]1.5} / (d2y/dx2)

(d2y/dx2) = 4 * Yc * (-2) / L2 L = 2 *S2

(dy/dx) = 4 * Yc * (L - 2 x) / L2

Y = 4 * Yc * (L * x - 2 x2) / L2

Yc L (d2y/dx2) x (dy/dx) R Y

0.18742 4.4000 -0.0774 0.0000 0.1704 -13.4785 0.0000


0.2000 0.1549 -13.3796 0.0186
0.4000 0.1394 -13.2904 0.0372
0.6000 0.1239 -13.2107 0.0558
0.8000 0.1084 -13.1405 0.0743
1.0000 0.0929 -13.0798 0.0929
1.2000 0.0774 -13.0285 0.1115
1.4000 0.0620 -12.9866 0.1301
1.6000 0.0465 -12.9540 0.1487
1.8000 0.0310 -12.9308 0.1673
2.0000 0.0155 -12.9168 0.1859
2.2000 0.0000 -12.9122 0.2045

Rev 1 BPG121_F01(Excel)
CALCULATION SHEET No: AR 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
P = 4910
V
P H = P*cos 10 = 4836
H
V = P*sin 10 = 853

330
500

325 x 1870 2833

x y D e M = H*y - V*x

0 450 1105 103 2176

300 397 1013 95 1664

600 344 921 88 1152

900 291 830 81 641

1200 238 738 74 129

1500 185 646 67 -383

1800 132 554 60 -895

2100 79 463 53 -1407

2400 26 371 46 -1918

2550 0 325 43 -2174


Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results

P
R 4 = ( z2 + x2 ) 2 q = 1250 kN/m = 415/.35 anchor load over
z R anchor length
P = 35875 kN/m
x

σz = σy = 2qxz2/πR4 τxz = 2qx2z/πR4

σx = 2qx3/πR4

Consider 0 < z < 2 x = 0.5


x=1
4
x z R σx R4

0.5 0.0 0.06 6518986.47 1.00 99.47


0.5 0.1 0.07 4763359.56 1.02 91.86
0.5 0.2 0.08 1988456.83 1.08 72.68
0.5 0.3 0.12 557017.47 1.19 49.92
0.5 0.4 0.17 124574.54 1.35 30.34
0.5 0.5 0.25 25464.79 1.56 16.69
0.5 0.6 0.37 5188.73 1.85 8.50
0.5 0.7 0.55 1106.23 2.22 4.09
0.5 0.8 0.79 252.69 2.69 1.90
0.5 0.9 1.12 62.41 3.28 0.86
0.5 1.0 1.56 16.69 4.00 0.39
0.5 1.1 2.13 4.82 4.88 0.17
0.5 1.2 2.86 1.49 5.95 0.08
0.5 1.3 3.76 0.50 7.24 0.04
0.5 1.4 4.88 0.17 8.76 0.02
0.5 1.5 6.25 0.07 10.56 0.01
0.5 1.6 7.90 0.03 12.67 0.00
0.5 1.7 9.86 0.01 15.13 0.00
0.5 1.8 12.18 0.00 17.98 0.00
0.5 1.9 14.90 0.00 21.25 0.00
0.5 2.0 18.06 0.00 25.00 0.00
Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results

Consider 0 < z < 2 x = 1.0

x z R σx

1.0 0.0 1.00 795.77


1.0 0.1 1.02 734.88
1.0 0.2 1.08 581.46
1.0 0.3 1.19 399.37
1.0 0.4 1.35 242.73
1.0 0.5 1.56 133.51
1.0 0.6 1.85 68.00
1.0 0.7 2.22 32.76
1.0 0.8 2.69 15.21
1.0 0.9 3.28 6.91
1.0 1.0 4.00 3.11
1.0 1.1 4.88 1.40
1.0 1.2 5.95 0.63
1.0 1.3 7.24 0.29
1.0 1.4 8.76 0.14
1.0 1.5 10.56 0.06
1.0 1.6 12.67 0.03
1.0 1.7 15.13 0.02
1.0 1.8 17.98 0.01
1.0 1.9 21.25 0.00
1.0 2.0 25.00 0.00
Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 5 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results

Consider 0 < z < 2 x = 2

x z R σx

2 0.0 16.00 0.10


2 0.1 16.08 0.10
2 0.2 16.32 0.09
2 0.3 16.73 0.08
2 0.4 17.31 0.07
2 0.5 18.06 0.06
2 0.6 19.01 0.05
2 0.7 20.16 0.04
2 0.8 21.53 0.03
2 0.9 23.14 0.02
2 1.0 25.00 0.02
2 1.1 27.14 0.01
2 1.2 29.59 0.01
2 1.3 32.38 0.01
2 1.4 35.52 0.00
2 1.5 39.06 0.00
2 1.6 43.03 0.00
2 1.7 47.47 0.00
2 1.8 52.42 0.00
2 1.9 57.91 0.00
2 2.0 64.00 0.00
Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 6 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
P/A = 0 / 13.78 = 0.00

Mt/Z = 0 / 0.0 = ###

Mv/Z = 0 / 0 = ### t ### b

###
###
### ### 1.39

0.00 ###

### ###

Deck section
A2

A1

A3

A4

2700*(250 + 500)/2 = 1012500 P= 0

1215
260*5600+1500*450 = 2443000

1234

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 7 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results
d= 2090

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2

1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 411 2.37E+10


2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 386 2.46E+10
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 361 2.48E+10
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 336 2.43E+10
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 311 2.32E+10
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 301 2.27E+10
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 246 1.85E+10
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 316 2.35E+10
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 386 2.46E+10
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 421 2.31E+10
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 421 2.31E+10
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 421 2.77E+10

2.32E+06 2.92E+13 4.80E+08 2.84E+11

b= 300 d= 1165

13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 -65 2.98E+08
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 -298 6.22E+09
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -531 1.97E+10
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -764 4.08E+10
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -997 6.95E+10

d= 275 3.50E+05 3.30E+13 3.78E+08 1.37E+11

18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1326 2.24E+11
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1339 3.58E+11
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1364 3.25E+11
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1389 2.89E+11
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1401 2.70E+11
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1401 2.70E+11
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1401 3.24E+11

1.09E+06 4.82E+12 1.49E+09 1.48E+12

3.77E+06 6.70E+13 2.08E+09 2.07E+12

1.34E+14 (ΣA*xv)/ΣA

= 551

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 8 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results

I = 1.00E+03 1/EI

1 L = 3600 b = 1000 d = 1100 I = 1.11E+11 3.01E-16


2 = 3300 1000 1031 = 9.14E+10 3.65E-16
3 = 3000 1000 963 = 7.43E+10 4.49E-16
4 = 2700 1000 894 = 5.95E+10 5.60E-16
5 = 2400 1000 825 = 4.68E+10 7.12E-16
6 = 2100 1000 756 = 3.60E+10 9.25E-16
7 = 1800 1000 688 = 2.71E+10 1.23E-15
8 = 1500 1000 619 = 1.97E+10 1.69E-15
9 = 1200 1000 550 = 1.39E+10 2.40E-15
10 = 900 1000 481 = 9.29E+09 3.59E-15
11 = 600 1000 413 = 5.85E+09 5.70E-15
12 = 300 1000 344 = 3.38E+09 9.85E-15
13 = 0 1000 275 = 1.73E+09 1.92E-14

1 M = 450 M/EI = 1.35E-07 0.00E+00


2 413 1.50E-07 A{M/EI} = 4.29E-05 = 6.43E-03 9.64E-01
3 375 1.68E-07 4.78E-05 2.15E-02 4.19E+00
4 338 1.89E-07 5.36E-05 4.02E-02 9.26E+00
5 300 2.14E-07 6.04E-05 6.34E-02 1.55E+01
6 263 2.43E-07 6.85E-05 9.24E-02 2.34E+01
7 225 2.77E-07 7.80E-05 1.29E-01 3.32E+01
8 188 3.17E-07 8.90E-05 1.74E-01 4.53E+01
9 150 3.61E-07 1.02E-04 2.29E-01 6.03E+01
10 113 4.04E-07 1.15E-04 2.92E-01 7.81E+01
11 75 4.27E-07 1.25E-04 3.55E-01 9.72E+01
12 38 3.69E-07 1.20E-04 3.76E-01 1.10E+02
13 0 0.00E+00 5.54E-05 1.91E-01 8.51E+01

3.25E-06 9.56E-04 1.97E+00 5.62E+02

Islab = 1.73E+09 1.70E-06 2.15E-01

Rev 1 BPG121_F01(Excel)

CALCULATION SHEET No: AR 9 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones
By:
References/Results

1 M = 3.600 M/EI = 1.08E-15


2 3.300 1.20E-15 3.43E-13 5.14E-11
3 3.000 1.35E-15 3.82E-13 1.72E-10
4 2.700 1.51E-15 4.29E-13 3.22E-10
5 2.400 1.71E-15 4.83E-13 5.08E-10
6 2.100 1.94E-15 5.48E-13 7.39E-10
7 1.800 2.22E-15 6.24E-13 1.03E-09
8 1.500 2.53E-15 7.12E-13 1.39E-09
9 1.200 2.89E-15 8.13E-13 1.83E-09
10 0.900 3.23E-15 9.17E-13 2.34E-09
11 0.600 3.42E-15 9.97E-13 2.84E-09
12 0.300 2.95E-15 9.56E-13 3.01E-09
13 0.000 0.00E+00 4.43E-13 1.53E-09

7.65E-12 1.58E-08

2.12E-12

1 M = 1.000 M/EI = 3.01E-16


2 1.000 3.65E-16 9.98E-14 1.50E-11
3 1.000 4.49E-16 1.22E-13 5.49E-11
4 1.000 5.60E-16 1.51E-13 1.13E-10
5 1.000 7.12E-16 1.91E-13 2.00E-10
6 1.000 9.25E-16 2.46E-13 3.32E-10
7 1.000 1.23E-15 3.23E-13 5.34E-10
8 1.000 1.69E-15 4.38E-13 8.54E-10
9 1.000 2.40E-15 6.14E-13 1.38E-09
10 1.000 3.59E-15 8.99E-13 2.29E-09
11 1.000 5.70E-15 1.39E-12 3.97E-09
12 1.000 9.85E-15 2.33E-12 7.35E-09
13 1.000 1.92E-14 4.36E-12 1.50E-08

1.12E-11 3.21E-08

6.82E-10

1 M = 0.000 M/EI = 0.00E+00


2 300 1.09E-13 1.64E-11 2.46E-09
3 600 2.69E-13 5.68E-11 2.56E-08
4 900 5.04E-13 1.16E-10 8.70E-08
5 1200 8.55E-13 2.04E-10 2.14E-07 BPG121_F01(Excel)
6 1500 1.39E-12 3.36E-10 4.54E-07
7 1800 2.22E-12 5.40E-10 8.92E-07
8 2100 3.55E-12 8.64E-10 1.69E-06
9 2400 5.77E-12 1.40E-09 3.14E-06
10 2700 9.69E-12 2.32E-09 5.91E-06
11 3000 1.71E-11 4.02E-09 1.15E-05
12 3300 3.25E-11 7.44E-09 2.34E-05
13 3600 6.92E-11 1.53E-08 5.26E-05

3.26E-08 1.00E-04

6.96E-10 7.38E-07

1 M = 1.000 M/EI = 3.01E-16


2 1.000 3.65E-16 9.98E-14 1.50E-11
3 1.000 4.49E-16 1.22E-13 5.49E-11
4 1.000 5.60E-16 1.51E-13 1.13E-10
5 1.000 7.12E-16 1.91E-13 2.00E-10
6 1.000 9.25E-16 2.46E-13 3.32E-10
7 1.000 1.23E-15 3.23E-13 5.34E-10
8 1.000 1.69E-15 4.38E-13 8.54E-10
9 1.000 2.40E-15 6.14E-13 1.38E-09
10 1.000 3.59E-15 8.99E-13 2.29E-09
11 1.000 5.70E-15 1.39E-12 3.97E-09
12 1.000 9.85E-15 2.33E-12 7.35E-09
13 1.000 1.92E-14 4.36E-12 1.50E-08

1.12E-11 3.21E-08

7.85E-13
1 M = 0.000 M/EI = 0.00E+00
2 300 1.09E-13 1.64E-11 5.66E-08
3 600 2.69E-13 5.68E-11 1.79E-07
4 900 5.04E-13 1.16E-10 3.31E-07
5 1200 8.55E-13 2.04E-10 5.20E-07
6 1500 1.39E-12 3.36E-10 7.57E-07
7 1800 2.22E-12 5.40E-10 1.05E-06
8 2100 3.55E-12 8.64E-10 1.43E-06
9 2400 5.77E-12 1.40E-09 1.89E-06
10 2700 9.69E-12 2.32E-09 2.43E-06
11 3000 1.71E-11 4.02E-09 3.01E-06
12 3300 3.25E-11 7.44E-09 3.35E-06
13 3600 6.92E-11 1.53E-08 2.29E-06

1.77E-06 3.26E-08 1.73E-05

1 M = 3.600 M/EI = 1.08E-15


2 3.300 1.20E-15 3.43E-13 1.18E-09
3 3.000 1.35E-15 3.82E-13 1.20E-09
4 2.700 1.51E-15 4.29E-13 1.22E-09
5 2.400 1.71E-15 4.83E-13 1.23E-09
6 2.100 1.94E-15 5.48E-13 1.23E-09
7 1.800 2.22E-15 6.24E-13 1.22E-09
8 1.500 2.53E-15 7.12E-13 1.18E-09
9 1.200 2.89E-15 8.13E-13 1.10E-09
10 0.900 3.23E-15 9.17E-13 9.63E-10
11 0.600 3.42E-15 9.97E-13 7.48E-10
12 0.300 2.95E-15 9.56E-13 4.30E-10
13 0.000 0.00E+00 4.43E-13 6.65E-11

7.65E-12 1.18E-08
9.56E-04
4.29E-05 9.13E-04
9.07E-05 8.65E-04
1.44E-04 8.12E-04
2.05E-04 7.51E-04
2.73E-04 6.83E-04
3.51E-04 6.05E-04
4.40E-04 5.16E-04
5.42E-04 4.14E-04
6.56E-04 3.00E-04
7.81E-04 1.75E-04
9.01E-04 5.54E-05
9.56E-04

2.06E-01

2.88E+08
CALCULATION SHEET No: AR 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab One Tendon stressed
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H 1 tendon V 1 tendon Forces on section ΣQ ΣM
0 0
Top 1 6.0 4.2 3976 3954 3.200 12723 0.51 2021 1 252 252 63
Tendons 7908 416 291 2 281 532 259
3 305 837 601 Q on top slab cantilever
Segment 4 324 1161 1101 = 1633 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 339 1500 1766 M on top slab cantilever
6 330 329 76 -3954 -1719 2264 = 2393 kNm
12200 2090 500 275 7.53E+06 786 4.63E+12 5.89E+09 7.54E+13 1.24E+10 275 7 370 104 -1244 1523
8 273 75 -897 988
9 183 50 -664 598
Bottom slab stability 10 135 33 -496 308
11 124 22 -350 96
Q = shear at webs 12 134 11 -205 -70
13 119 -6 -92 -159
QL 14 87 -17 -22 -188
QH 15 76 -29 25 -187
LH RH 16 80 -43 62 -165
17 87 -63 85 -129
QS MS 18 78 -87 77 -88 M on top slab cantilever
Q ΣQ la MR -213 0 19 49 -52 -63 0 10 -78 = -78 kNm
RH 7 104 104 0.25 26 -108 -80 20 28 38 -66 Q on top slab cantilever
8 75 179 0.75 56 -33 -116 21 9 47 -45 = 41 kNm
9 50 229 1.25 62 16 -120 = M on bottom slab 22 -6 42 -23
10 33 262 1.75 58 50 -103 23 -17 25 -6
11 22 284 2.25 49 72 -73 24 -25 -3954 0 0
12 11 295 2.80 31 83 -27 3616 277 62 0
13 -6 290 3.40 -19 77 21
14 -17 272 3.95 -69 60 55
15 -29 243 4.45 -129 31 78
16 -43 200 4.95 -215 -13 82 = M on bottom slab
17 -63 136 5.45 -345 -76 60
18 -87 49 5.95 -518 -163 0

49 ###

290 QL = -163

-240 QH = 213

Rev 1
CALCULATION SHEET No: AR 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab One Tendon stressed
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 617 QT = -279
LH RH
QB = 288 QB = -227
QS MS MS
Q ΣQ la' MR -1127 0 2264 2264 62
RH 7 370 370 0.25 93 -756 -471 2044 1573 QB
8 273 643 0.75 204 -484 -781 1860 1079
9 183 825 1.25 228 -301 -977 1676 699
10 135 960 1.75 236 -166 -1094 1492 398 Q ΣQ M Q ΣQ M
11 124 1084 2.25 279 -42 -1146 1308 162 RH 13 288 288 0 LH 1 -227 -227 0
12 134 1219 2.80 376 92 -1131 1088 -43 14 52 340 73 2 -25 -251 -56
13 119 1337 3.40 404 211 -1040 867 -173 15 59 399 159 3 -18 -269 -116
14 87 1424 3.95 343 298 -913 684 -230 16 66 465 260 4 -10 -279 -180
15 76 1500 4.45 338 374 -746 500 -246 17 73 537 377 5 -3 -283 -246
16 80 1580 4.95 396 454 -539 316 -223 18 80 617 511 6 4 -279 -311
17 87 1667 5.45 475 541 -290 132 -158
18 78 1746 5.95 465 619 0 -52 -52
0 -88 -88
1746 ### = M on bottom slab

QL = 619 - 386 = 233

QH = 1127 + 386 = 1513

Shear on top slab due to moments =( 2393 - -78 )/ 6.40 = 386

Rev 1
Rev:

Date:

Date:

erences/Results
Rev:

Date:

Date:

erences/Results
CALCULATION SHEET No: AR 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab One Tendon stressed
By:
References/Results

d= 2090 Pt = 3954 x 1 P = 3954 P/A = 0.52 Mt = 12654 Mt/Zt = 1.02 Mv = 2021 Mv/Zv = 0.34 or 0.57

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 646 5.86E+10 9.27E+08 1 1.79 -0.18 252 -25
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 621 6.38E+10 1.51E+09 2 1.69 -0.10 281 -17
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 596 6.76E+10 2.31E+09 3 1.60 -0.03 305 -6
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 571 7.02E+10 3.34E+09 4 1.50 0.04 324 9
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 546 7.16E+10 4.64E+09 5 1.41 0.12 339 28
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 536 7.19E+10 5.21E+09 6 1.32 0.20 330 49
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 481 7.06E+10 9.46E+09 7 1.21 0.26 370 78
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 551 7.14E+10 4.33E+09 8 1.16 0.37 273 87
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 621 6.37E+10 1.50E+09 9 1.11 0.49 183 80
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 656 5.60E+10 7.32E+08 10 1.04 0.58 135 76
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 656 5.60E+10 7.32E+08 11 0.95 0.67 124 87
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 656 6.72E+10 8.79E+08 12 0.86 0.76 134 119

6100 383 2.32E+06 2.92E+13 4.80E+08 7.89E+11 3.56E+10 3049 566


207
b= 300 d= 1165

13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 170 2.01E+09 3.16E+08 13 1.14 0.05 80 4
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 -63 2.80E+08 3.16E+08 14 1.04 -0.05 73 -3
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -296 6.14E+09 3.16E+08 15 0.94 -0.15 66 -10
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -529 1.96E+10 3.16E+08 16 0.84 -0.25 59 -18
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -762 4.06E+10 3.16E+08 17 0.74 -0.35 52 -25

d= 275 3.50E+05 3.69E+12 3.78E+08 6.86E+10 1.58E+09 329 -52

18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1091 1.52E+11 1.92E+09 18 0.59 -0.50 76 -63
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1104 2.44E+11 2.67E+09 19 0.52 -0.44 104 -87
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1129 2.23E+11 1.79E+09 20 0.43 -0.36 75 -63
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1154 2.00E+11 1.13E+09 21 0.33 -0.29 50 -43
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1166 1.87E+11 8.67E+08 22 0.24 -0.21 33 -29
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1166 1.87E+11 8.67E+08 23 0.16 -0.13 22 -17
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1166 2.24E+11 1.04E+09 24 0.07 -0.03 11 -6

3100 211 1.09E+06 4.82E+12 2.10E+09 1.42E+12 5.68E+09 371 -309

3.77E+06 3.77E+13 2.96E+09 2.27E+12 4.28E+10 ΣF = 3954

A = 7.53E+06 7.54E+13 (ΣA*xv)/ΣA 4.63E+12 ΣF - P = 0

= 786
Rev 1
CALCULATION SHEET No: AR 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab One Tendon stressed
By:
References/Results

Rev 1
Rev:

Date:

Date:

erences/Results
Rev:

Date:

Date:

erences/Results
CALCULATION SHEET No: AR1 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab three tendons stressed
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H 1 tendon V 1 tendon Forces on section ΣQ ΣM
0 0
Top 3 6.0 4.2 3976 11863 3.200 12723 0.51 6064 1 478 478 120
Tendons 7908 416 291 2 544 1023 495
3 604 1627 1157 Q on top slab cantilever
Segment 4 658 2285 2135 = 3275 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 706 2991 3454 M on top slab cantilever
6 710 606 88 -7908 -3514 4440 = 4707 kNm
12200 2090 500 275 7.53E+06 786 4.63E+12 5.89E+09 7.54E+13 1.24E+10 275 7 818 122 -2574 2918
8 632 86 -1855 1811
9 445 56 -1354 1009
Bottom slab stability 10 346 38 -970 428
11 335 26 -609 33
Q = shear at webs 12 388 16 -205 -211
13 372 0 167 -222
QL 14 298 -13 452 -68
QH 15 287 -25 714 224
LH RH 16 343 -37 1020 657
17 447 -52 1415 1266
QS MS 18 526 -70 1872 2088 M on top slab cantilever
Q ΣQ la MR -262 0 19 429 224 -51 -3954 -1481 1610 = 2236 kNm
RH 7 122 122 0.25 30 -140 -101 20 395 -1085 968 Q on top slab cantilever
8 86 208 0.75 65 -54 -149 21 343 -742 511 = -1270 kNm
9 56 264 1.25 70 2 -162 = M on bottom slab 22 294 -449 213
10 38 302 1.75 66 40 -152 23 247 -202 51
11 26 328 2.25 59 66 -125 24 202 -11863 0 0
12 16 345 2.80 46 83 -81 10847 830 186 0
13 0 344 3.40 -1 82 -31
14 -13 331 3.95 -51 69 7
15 -25 307 4.45 -109 45 35
16 -37 270 4.95 -183 8 48 = M on bottom slab
17 -52 218 5.45 -283 -44 39
18 -70 148 5.95 -414 -114 0

148 ###

344 QL = -114

-196 QH = 262

Rev 1
CALCULATION SHEET No: AR1 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three tendons stressed
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 956 QT = 60
LH RH
QB = 350 QB = -165
QS MS MS
Q ΣQ la' MR -2872 0 4440 4440 186
RH 7 818 818 0.25 205 -2054 -1232 4220 2988 QB
8 632 1451 0.75 474 -1422 -2100 4036 1935
9 445 1896 1.25 557 -976 -2700 3852 1152
10 346 2242 1.75 605 -630 -3101 3668 567 Q ΣQ M Q ΣQ M
11 335 2577 2.25 754 -295 -3333 3484 151 RH 13 350 350 0 LH 1 -165 -165 0
12 388 2964 2.80 1085 92 -3394 3264 -130 14 78 429 91 2 2 -162 -38
13 372 3336 3.40 1264 464 -3227 3043 -184 15 100 529 202 3 24 -139 -73
14 298 3634 3.95 1176 762 -2921 2860 -61 16 121 650 340 4 45 -94 -100
15 287 3921 4.45 1277 1049 -2468 2676 208 17 142 792 508 5 66 -28 -115
16 343 4264 4.95 1697 1391 -1858 2492 634 18 164 956 711 6 87 60 -111
17 447 4711 5.45 2436 1838 -1051 2308 1257
18 526 5237 5.95 3133 2365 0 2124 2124
0 2088 2088
5237 ### = M on bottom slab

QL = 2365 - 386 = 1979

QH = 2872 + 386 = 3258

Shear on top slab due to moments =( 4707 - 2236 ) / 6.40 = 386

Rev 1
CALCULATION SHEET No: AR1 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab three tendons stressed
By:
References/Results

d= 2090 Pt = 3954 x 3 P = 11863 P/A = 1.57 Mt = 12654 Mt/Zt = 1.02 Mv = 6064 Mv/Zv = 1.03 or 1.71

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 646 5.86E+10 9.27E+08 1 3.40 1.44 478 202
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 621 6.38E+10 1.51E+09 2 3.29 1.49 544 247
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 596 6.76E+10 2.31E+09 3 3.17 1.54 604 294
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 571 7.02E+10 3.34E+09 4 3.05 1.59 658 343
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 546 7.16E+10 4.64E+09 5 2.94 1.64 706 395
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 536 7.19E+10 5.21E+09 6 2.84 1.71 710 429
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 481 7.06E+10 9.46E+09 7 2.68 1.73 818 526
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 551 7.14E+10 4.33E+09 8 2.69 1.90 632 447
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 621 6.37E+10 1.50E+09 9 2.70 2.08 445 343
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 656 5.60E+10 7.32E+08 10 2.66 2.21 346 287
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 656 5.60E+10 7.32E+08 11 2.58 2.29 335 298
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 656 6.72E+10 8.79E+08 12 2.48 2.38 388 372

6100 383 2.32E+06 2.92E+13 4.80E+08 7.89E+11 3.56E+10 6665 4,182


207
b= 300 d= 1165

13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 170 2.01E+09 3.16E+08 13 2.34 1.25 164 87
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 -63 2.80E+08 3.16E+08 14 2.04 0.95 142 66
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -296 6.14E+09 3.16E+08 15 1.73 0.64 121 45
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -529 1.96E+10 3.16E+08 16 1.43 0.34 100 24
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -762 4.06E+10 3.16E+08 17 1.12 0.03 78 2

d= 275 3.50E+05 3.69E+12 3.78E+08 6.86E+10 1.58E+09 606 224

18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1091 1.52E+11 1.92E+09 18 0.69 -0.40 88 -51
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1104 2.44E+11 2.67E+09 19 0.61 -0.35 122 -70
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1129 2.23E+11 1.79E+09 20 0.49 -0.30 86 -52
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1154 2.00E+11 1.13E+09 21 0.38 -0.25 56 -37
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1166 1.87E+11 8.67E+08 22 0.28 -0.18 38 -25
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1166 1.87E+11 8.67E+08 23 0.19 -0.09 26 -13
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1166 2.24E+11 1.04E+09 24 0.10 0.00 16 -0

3100 211 1.09E+06 4.82E+12 2.10E+09 1.42E+12 5.68E+09 433 -247

3.77E+06 3.77E+13 2.96E+09 2.27E+12 4.28E+10 ΣF = 11863

A = 7.53E+06 7.54E+13 (ΣA*xv)/ΣA 4.63E+12 ΣF - P = 0

= 786
Rev 1
CALCULATION SHEET No: AR1 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three tendons stressed
By:
References/Results

Rev 1
CALCULATION SHEET No: AR2 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Mid Span
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H V Forces on section ΣQ ΣM
0 0
Top 4 6.0 4.2 3976 15817 3.200 0 0.51 8086 1 455 455 114
Tendons 416 291 2 529 984 473
3 600 1584 1115 Q on top slab cantilever
Segment 4 669 2253 2074 = 3294 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 736 2990 3385 M on top slab cantilever
6 761 555 25 -7931 -3600 4364 = 4642 kNm
12200 2090 500 275 7.53E+06 786 4.63E+12 5.89E+09 7.54E+13 1.24E+10 275 7 899 35 -2666 2797
8 722 23 -1922 1650
9 527 13 -1382 824
Bottom slab stability 10 423 9 -950 241
11 423 9 -518 -126
Q = shear at webs 12 508 11 0 -282
13 508 11 518 -126
QL 14 423 9 950 241
QH 15 423 9 1382 824
LH RH 16 527 13 1922 1650
17 722 23 2666 2797
QS MS 18 899 35 3600 4364 M on top slab cantilever
Q ΣQ la MR -99 0 19 761 555 25 -7931 -2990 3385 = 4642 kNm
RH 7 35 35 0.25 9 -64 -41 20 736 -2253 2074 Q on top slab cantilever
8 23 58 0.75 17 -41 -67 21 669 -1584 1115 = -2630 kNm
9 13 71 1.25 16 -28 -85 22 600 -984 473
10 9 80 1.75 16 -19 -97 23 529 -455 114
11 9 88 2.25 20 -11 -104 24 455 -15861 0 0
12 11 99 2.85 30 0 -107 = M on bottom slab 14503 1110 248 0
13 11 110 3.45 37 11 -104
14 9 119 3.95 35 20 -96
15 9 128 4.45 40 29 -84
16 13 141 4.95 64 42 -66
17 23 163 5.45 124 65 -40
18 35 198 5.95 207 99 1

198 ###

QL = 99

QH = 99

Rev 1
CALCULATION SHEET No: AR2 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Mid Span
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 679 QT = 679
LH RH
QB = 124 QB = 124
QS MS MS
Q ΣQ la' MR -3501 0 4364 4364
RH 7 899 899 0.25 225 -2602 -1526 4364 2838 QB
8 722 1621 0.75 541 -1881 -2646 4364 1718
9 527 2147 1.25 659 -1354 -3455 4364 909
10 423 2570 1.75 740 -931 -4026 4364 338 Q ΣQ M Q ΣQ M
11 423 2994 2.25 952 -508 -4386 4364 -22 RH 13 124 124 0 LH 1 124 124 0
12 508 3501 2.80 1421 0 -4538 4364 -174 14 54 178 35 2 54 178 35
13 508 4009 3.40 1726 508 -4386 4364 -22 15 82 260 86 3 82 261 86
14 423 4432 3.95 1671 931 -4026 4364 338 16 111 371 160 4 111 372 160
15 423 4855 4.45 1883 1354 -3455 4364 909 17 139 511 263 5 139 511 263
16 527 5382 4.95 2608 1881 -2646 4364 1718 18 168 679 401 6 168 679 402
17 722 6103 5.45 3932 2602 -1526 4364 2838
18 899 7002 5.95 5350 3501 0 4364 4364
0 4364 4364
7002 ### = M on bottom slab

QL = 3501 - 0 = 3501

QH = 3501 + 0 = 3501

Shear on top slab due to moments =( 4642 - 4642 ) / 6.40 = 0

Rev 1
CALCULATION SHEET No: AR2 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Mid Span
By:
References/Results

d= 2090 Pt = 3965 x 4 P = 15861 P/A = 2.11 Mt = 0 Mt/Zt = 0.00 Mv = 8108 Mv/Zv = 1.38 or 2.28

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 646 5.86E+10 9.27E+08 1 3.24 3.24 455 455
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 621 6.38E+10 1.51E+09 2 3.19 3.19 529 529
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 596 6.76E+10 2.31E+09 3 3.15 3.15 600 600
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 571 7.02E+10 3.34E+09 4 3.10 3.10 669 669
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 546 7.16E+10 4.64E+09 5 3.06 3.06 736 736
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 536 7.19E+10 5.21E+09 6 3.04 3.04 761 761
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 481 7.06E+10 9.46E+09 7 2.95 2.95 899 899
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 551 7.14E+10 4.33E+09 8 3.07 3.07 722 722
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 621 6.37E+10 1.50E+09 9 3.19 3.19 527 527
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 656 5.60E+10 7.32E+08 10 3.25 3.25 423 423
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 656 5.60E+10 7.32E+08 11 3.25 3.25 423 423
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 656 6.72E+10 8.79E+08 12 3.25 3.25 508 508

3100 383 2.32E+06 2.92E+13 4.80E+08 7.89E+11 3.56E+10 7252 7,252

b= 300 d= 1165

13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 170 2.01E+09 3.16E+08 13 2.40 2.40 168 168
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 -63 2.80E+08 3.16E+08 14 2.00 2.00 139 139
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -296 6.14E+09 3.16E+08 15 1.59 1.59 111 111
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -529 1.96E+10 3.16E+08 16 1.18 1.18 82 82
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -762 4.06E+10 3.16E+08 17 0.77 0.77 54 54

d= 275 3.50E+05 3.69E+12 3.78E+08 6.86E+10 1.58E+09 555 555

18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1091 1.52E+11 1.92E+09 18 0.20 0.20 25 25
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1104 2.44E+11 2.67E+09 19 0.17 0.17 35 35
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1129 2.23E+11 1.79E+09 20 0.13 0.13 23 23
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1154 2.00E+11 1.13E+09 21 0.09 0.09 13 13
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1166 1.87E+11 8.67E+08 22 0.06 0.06 9 9
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1166 1.87E+11 8.67E+08 23 0.06 0.06 9 9
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1166 2.24E+11 1.04E+09 24 0.06 0.06 11 11

211 1.09E+06 4.82E+12 2.10E+09 1.42E+12 5.68E+09 124 124

3.77E+06 3.77E+13 2.96E+09 2.27E+12 4.28E+10 ΣF = 15861

7.54E+13 (ΣA*xv)/ΣA 4.63E+12 ΣF - P = 0

= 786
Rev 1
CALCULATION SHEET No: AR2 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Mid Span
By:
References/Results

Rev 1
CALCULATION SHEET No: AR3 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H V Forces on section ΣQ ΣM
0 0
Top 3 6.0 4.2 3976 11863 3.200 12723 2.39 28351 1 0 0 0
Tendons 416 291 2 0 0 0
3 325 325 49 Q on top slab cantilever
Segment 4 598 923 360 = 1834 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 649 1571 984 M on top slab cantilever
6 657 1587 50 -7908 -4043 1389 = 1665 kNm
12200 5085 500 750 1.37E+07 2665 5.11E+13 1.92E+10 9.99E+13 1.64E+10 275 7 773 1587 55 -1628 130
8 590 20 -1018 -532
9 410 -11 -619 -941
Bottom slab stability 10 317 -37 -338 -1180
11 309 -61 -90 -1287
Q = shear at webs 12 360 -104 166 -1264
13 348 -138 376 -1101
QL 14 281 -141 516 -878
QH 15 273 -165 624 -593
LH RH 16 333 -192 764 -246
17 450 -225 989 192
QS MS 18 553 720 -260 2001 868 M on top slab cantilever
Q ΣQ la MR 295 0 19 445 720 -173 -3954 -962 589 = 1009 kNm
RH 7 55 55 0.25 14 350 161 20 414 -547 212 Q on top slab cantilever
8 20 76 0.75 15 370 341 21 360 -187 28 = -741 kNm
9 -11 65 1.25 -14 359 524 22 187 0 0
10 -37 28 1.75 -64 323 694 23 0 0 0
11 -61 -33 2.25 -136 262 840 24 0 0 0
12 -104 -137 2.85 -296 158 966 -1259
13 -138 -275 3.45 -477 20 1020 = M on bottom slab
14 -141 -416 3.95 -558 -122 994
15 -165 -581 4.45 -734 -287 892
16 -192 -774 4.95 -952 -479 701
17 -225 -999 5.45 -1227 -704 405
18 -260 -1259 5.95 -1550 -965 -12

-1259 ###

QL = -965

QH = -295

Rev 1
CALCULATION SHEET No: AR3 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 2930 QT = -418
LH RH
QB = -245 QB = -1137
QS MS MS
Q ΣQ la' MR -2690 0 1389 1389
RH 7 773 773 0.25 193 -1917 -1152 1340 188 QB
8 590 1362 0.75 442 -1327 -1962 1299 -663
9 410 1772 1.25 512 -917 -2524 1258 -1265
10 317 2090 1.75 555 -600 -2903 1218 -1685 Q ΣQ M Q ΣQ M
11 309 2399 2.25 695 -291 -3125 1177 -1948 RH 13 -245 -245 0 LH 1 -1137 -1137 0
12 360 2759 2.80 1008 69 -3192 1128 -2064 14 274 29 -80 2 -74 -1211 -865
13 348 3107 3.40 1184 418 -3046 1079 -1966 15 454 483 109 3 107 -1104 -1718
14 281 3388 3.95 1110 699 -2766 1039 -1728 16 635 1118 698 4 288 -816 -2425
15 273 3661 4.45 1214 972 -2349 998 -1351 17 816 1933 1823 5 469 -347 -2854
16 333 3994 4.95 1647 1304 -1780 957 -823 18 996 2930 3615 6 649 302 -2870
17 450 4444 5.45 2452 1754 -1015 916 -99
18 553 4996 5.95 3289 2307 0 876 876
0 868 868
4996 ### = M on bottom slab

QL = 2307 - 102 = 2204

QH = 2690 + 102 = 2792

Shear on top slab due to moments =( 1665 - 1009 ) / 6.40 = 102

Rev 1
CALCULATION SHEET No: AR3 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results

d= 5085 Pt = 3954 x 3 P = 11863 P/A = 0.86 Mt = 12654 Mt/Zt = 0.77 Mv = 28351 Mv/Zv = 1.48 or -1.34

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 0 281 0.00E+00 4900 0.00E+00 141 0.00E+00 2524 0.00E+00 0.00E+00 1 2.88 1.64 0 0
2 A2 0 331 0.00E+00 4900 0.00E+00 166 0.00E+00 2499 0.00E+00 0.00E+00 2 2.87 1.63 0 0
3 A3 300 381 1.14E+05 4750 2.58E+12 191 2.18E+07 2474 7.00E+11 1.39E+09 3 2.84 1.63 325 187
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 2449 1.29E+12 3.34E+09 4 2.77 1.67 598 360
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 2424 1.41E+12 4.64E+09 5 2.70 1.72 649 414
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 2415 1.46E+12 5.21E+09 6 2.63 1.78 657 445
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 2360 1.70E+12 9.46E+09 7 2.53 1.81 773 553
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 2430 1.39E+12 4.33E+09 8 2.51 1.91 590 450
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 2500 1.03E+12 1.50E+09 9 2.48 2.02 410 333
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 2535 8.35E+11 7.32E+08 10 2.44 2.10 317 273
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 2535 8.35E+11 7.32E+08 11 2.38 2.16 309 281
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 2535 1.00E+12 8.79E+08 12 2.31 2.23 360 348

3100 383 1.94E+06 1.77E+13 4.18E+08 1.17E+13 3.22E+10 4987 3,644

b= 600 d= 3685

13 A13 600 737 4.42E+05 3100 4.25E+12 869 3.84E+08 1796 1.43E+12 2.00E+10 13 2.25 1.47 996 649
14 A14 600 737 4.42E+05 3100 4.25E+12 1606 7.10E+08 1059 4.96E+11 2.00E+10 14 1.84 1.06 816 469
15 A15 600 737 4.42E+05 3100 4.25E+12 2343 1.04E+09 322 4.60E+10 2.00E+10 15 1.44 0.65 635 288
16 A16 600 737 4.42E+05 3100 4.25E+12 3080 1.36E+09 -415 7.60E+10 2.00E+10 16 1.03 0.24 454 107
17 A17 600 737 4.42E+05 3100 4.25E+12 3817 1.69E+09 -1152 5.86E+11 2.00E+10 17 0.62 -0.17 274 -74

d= 750 2.21E+06 2.12E+13 5.18E+09 2.63E+12 1.00E+11 3175 1,439

18 A18 300 900 2.70E+05 3250 2.85E+12 4635 1.25E+09 -1970 1.05E+12 1.82E+10 18 0.18 -0.64 50 -173
19 A19 500 875 4.38E+05 2850 3.55E+12 4648 2.03E+09 -1983 1.72E+12 2.79E+10 19 0.13 -0.60 55 -260
20 A20 500 825 4.13E+05 2350 2.28E+12 4673 1.93E+09 -2008 1.66E+12 2.34E+10 20 0.05 -0.55 20 -225
21 A21 500 775 3.88E+05 1850 1.33E+12 4698 1.82E+09 -2033 1.60E+12 1.94E+10 21 -0.03 -0.50 -11 -192
22 A22 500 750 3.75E+05 1350 6.83E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 22 -0.10 -0.44 -37 -165
23 A23 500 750 3.75E+05 850 2.71E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 23 -0.16 -0.38 -61 -141
24 A24 600 750 4.50E+05 300 4.05E+10 4710 2.12E+09 -2045 1.88E+12 2.11E+10 24 -0.23 -0.31 -104 -138

482 2.71E+06 1.10E+13 1.27E+10 1.10E+13 9.90E+10 -87 -1295

6.86E+06 5.00E+13 1.83E+10 2.53E+13 2.31E+11 ΣF = 11863

9.99E+13 (ΣA*xv)/ΣA 5.11E+13 ΣF - P = 0

= 2665
Rev 1
CALCULATION SHEET No: AR3 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results

Rev 1
CALCULATION SHEET No: AR1 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Two tendons stressed (for Segment 5N4)
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H 1 tendon V 1 tendon Forces on section ΣQ ΣM
0 0
Top 2 6.0 4.2 3976 7908 3.200 25446 0.51 4043 1 503 503 126
Tendons 7908 416 291 2 561 1064 518

3 610 1674 1202 Q on top slab cantilever


Segment 4 649 2323 2201 = 3265 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 678 3001 3532 M on top slab cantilever

6 661 658 152 -7908 -3437 4528 = 4785 kNm


12200 2090 500 275 7.53E+06 786 4.63E+12 5.89E+09 7.54E+13 1.24E+10 275 7 740 209 -2488 3047

8 545 149 -1794 1977


9 365 100 -1329 1196
Bottom slab stability 10 270 67 -992 616
11 248 44 -700 193
Q = shear at webs 12 269 22 -410 -140

13 237 -11 -184 -318


QL 14 174 -35 -45 -375
QH 15 152 -58 50 -374
LH RH 16 160 -87 123 -331
17 174 -127 171 -257
QS MS 18 156 -174 153 -177 M on top slab cantilever
Q ΣQ la MR -425 0 19 98 -105 -127 0 20 -157 = -157 kNm
RH 7 209 209 0.25 52 -216 -160 20 56 76 -133 Q on top slab cantilever
8 149 358 0.75 112 -67 -231 21 19 95 -90 = 82 kNm
9 100 458 1.25 125 33 -240 = M on bottom slab 22 -11 83 -46
10 67 525 1.75 117 99 -207 23 -34 49 -12
11 44 568 2.25 98 143 -146 24 -49 -7908 0 0
12 22 590 2.80 61 165 -54 7231 553 124 0
13 -11 579 3.40 -38 154 42
14 -35 544 3.95 -137 119 110
15 -58 486 4.45 -258 61 155
16 -87 400 4.95 -429 -26 164 = M on bottom slab
17 -127 273 5.45 -691 -152 120
18 -174 99 5.95 -1036 -326 0

99 ###

579 QL = -326

-480 QH = 425

Rev 1
CALCULATION SHEET No: AR1 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three tendons stressed
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 1235 QT = -558
LH RH
QB = 577 QB = -453
QS MS MS
Q ΣQ la' MR -2253 0 4528 4528 124
RH 7 740 740 0.25 185 -1513 -942 4087 3146 QB
8 545 1285 0.75 409 -968 -1562 3720 2158
9 365 1651 1.25 456 -603 -1954 3352 1398
10 270 1920 1.75 472 -333 -2188 2985 796 Q ΣQ M Q ΣQ M
11 248 2168 2.25 558 -85 -2292 2617 325 RH 13 577 577 0 LH 1 -453 -453 0
12 269 2437 2.80 753 184 -2263 2176 -87 14 103 680 146 2 -49 -502 -111
13 237 2675 3.40 807 422 -2081 1735 -346 15 117 797 319 3 -35 -538 -232
14 174 2848 3.95 687 595 -1827 1367 -459 16 132 929 520 4 -21 -559 -360
15 152 3000 4.45 676 747 -1491 1000 -491 17 146 1075 753 5 -7 -565 -491
16 160 3161 4.95 793 908 -1077 632 -445 18 160 1235 1022 6 7 -558 -622
17 174 3335 5.45 950 1082 -580 265 -315
18 156 3491 5.95 931 1238 0 -103 -103
0 -177 -177
3491 ### = M on bottom slab

QL = 1238 - 772 = 466

QH = 2253 + 772 = 3025

Shear on top slab due to moments =( 4785 - -157 )/ 6.40 = 772

Rev 1
CALCULATION SHEET No: AR1 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab three tendons stressed
By:
References/Results

d= 2090 Pt = 3954 x 2 P = 7908 P/A = 1.05 Mt = 25307 Mt/Zt = 2.05 Mv = 4043 Mv/Zv = 0.69 or 1.14

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 646 5.86E+10 9.27E+08 1 3.58 -0.35 503 -49
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 621 6.38E+10 1.51E+09 2 3.39 -0.21 561 -34
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 596 6.76E+10 2.31E+09 3 3.20 -0.06 610 -11
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 571 7.02E+10 3.34E+09 4 3.01 0.09 649 19
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 546 7.16E+10 4.64E+09 5 2.82 0.23 678 56
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 536 7.19E+10 5.21E+09 6 2.64 0.39 661 98
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 481 7.06E+10 9.46E+09 7 2.43 0.51 740 156
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 551 7.14E+10 4.33E+09 8 2.32 0.74 545 174
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 621 6.37E+10 1.50E+09 9 2.21 0.97 365 160
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 656 5.60E+10 7.32E+08 10 2.08 1.17 270 152
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 656 5.60E+10 7.32E+08 11 1.91 1.34 248 174
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 656 6.72E+10 8.79E+08 12 1.72 1.52 269 237

6100 383 2.32E+06 2.92E+13 4.80E+08 7.89E+11 3.56E+10 6099 1,133


207
b= 300 d= 1165

13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 170 2.01E+09 3.16E+08 13 2.29 0.11 160 7
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 -63 2.80E+08 3.16E+08 14 2.09 -0.10 146 -7
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -296 6.14E+09 3.16E+08 15 1.88 -0.30 132 -21
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -529 1.96E+10 3.16E+08 16 1.68 -0.50 117 -35
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -762 4.06E+10 3.16E+08 17 1.48 -0.71 103 -49

d= 275 3.50E+05 3.69E+12 3.78E+08 6.86E+10 1.58E+09 658 -105

18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1091 1.52E+11 1.92E+09 18 1.19 -0.99 152 -127
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1104 2.44E+11 2.67E+09 19 1.04 -0.87 209 -174
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1129 2.23E+11 1.79E+09 20 0.85 -0.72 149 -127
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1154 2.00E+11 1.13E+09 21 0.66 -0.58 100 -87
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1166 1.87E+11 8.67E+08 22 0.49 -0.42 67 -58
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1166 1.87E+11 8.67E+08 23 0.32 -0.25 44 -35
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1166 2.24E+11 1.04E+09 24 0.13 -0.07 22 -11

3100 211 1.09E+06 4.82E+12 2.10E+09 1.42E+12 5.68E+09 742 -618

3.77E+06 3.77E+13 2.96E+09 2.27E+12 4.28E+10 ΣF = 7908

A = 7.53E+06 7.54E+13 (ΣA*xv)/ΣA 4.63E+12 ΣF - P = 0

= 786
Rev 1
CALCULATION SHEET No: AR1 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three tendons stressed
By:
References/Results

Rev 1
CALCULATION SHEET No: AR3 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Two Tendons Stressed Pier (for Segment 5N4)
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H V Forces on section ΣQ ΣM
0 0
Top 2 6.0 4.2 3976 7908 3.200 25446 2.39 18901 1 0 0 0
Tendons 416 291 2 0 0 0

3 308 308 46 Q on top slab cantilever


Segment 4 557 865 340 = 1686 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 589 1454 919 M on top slab cantilever

6 579 1637 181 -7908 -4057 1273 = 1547 kNm


12200 5085 500 750 1.37E+07 2665 5.11E+13 1.92E+10 9.99E+13 1.64E+10 275 7 662 1637 247 -1511 45

8 486 177 -848 -545


9 325 114 -409 -859
Bottom slab stability 10 241 61 -107 -988
11 225 13 131 -982
Q = shear at webs 12 248 -47 333 -843

13 224 -115 442 -610


QL 14 169 -148 463 -384
QH 15 152 -195 420 -164
LH RH 16 170 -249 341 26
17 207 -314 233 170
QS MS 18 222 -99 -384 -28 231 M on top slab cantilever
Q ΣQ la MR -247 0 19 155 -99 -263 0 -235 129 = 236 kNm
RH 7 247 247 0.25 62 0 -62 20 120 -115 42 Q on top slab cantilever
8 177 425 0.75 133 177 -18 21 82 -33 5 = -146 kNm
9 114 538 1.25 142 291 99 22 33 0 0
10 61 599 1.75 107 352 260 23 0 0 0
11 13 613 2.25 30 365 439 24 0 0 0
12 -47 566 2.85 -133 319 644 -840
13 -115 451 3.45 -397 204 801 = M on bottom slab
14 -148 303 3.95 -585 56 866
15 -195 108 4.45 -870 -140 845
16 -249 -142 4.95 -1234 -389 712
17 -314 -455 5.45 -1710 -703 439
18 -384 -840 5.95 -2286 -1087 -8

-840 ###

QL = -1087

QH = 247

Rev 1
CALCULATION SHEET No: AR3 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 3702 QT = -1449
LH RH
QB = 429 QB = -1350
QS MS MS
Q ΣQ la' MR -2048 0 1273 1273
RH 7 662 662 0.25 165 -1386 -859 1175 317 QB
8 486 1148 0.75 365 -900 -1430 1094 -336
9 325 1473 1.25 406 -575 -1799 1013 -786
10 241 1714 1.75 422 -334 -2026 931 -1095 Q ΣQ M Q ΣQ M
11 225 1939 2.25 506 -109 -2137 850 -1287 RH 13 429 429 0 LH 1 -1350 -1350 0
12 248 2187 2.80 694 139 -2128 752 -1376 14 414 843 468 2 -280 -1631 -1098
13 224 2411 3.40 762 363 -1977 654 -1323 15 534 1377 1286 3 -160 -1791 -2359
14 169 2580 3.95 667 532 -1753 573 -1180 16 655 2031 2542 4 -40 -1830 -3693
15 152 2732 4.45 678 684 -1449 492 -958 17 775 2807 4325 5 81 -1749 -5012
16 170 2903 4.95 843 854 -1065 410 -655 18 896 3702 6724 6 201 -1548 -6227
17 207 3109 5.45 1126 1061 -586 329 -257
18 222 3331 5.95 1319 1283 0 247 247
0 231 231
3331 ### = M on bottom slab

QL = 1283 - 205 = 1078

QH = 2048 + 205 = 2253

Shear on top slab due to moments =( 1547 - 236 )/ 6.40 = 205

Rev 1
CALCULATION SHEET No: AR3 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results

d= 5085 Pt = 3954 x 2 P = 7908 P/A = 0.58 Mt = 25307 Mt/Zt = 1.54 Mv = 18901 Mv/Zv = 0.98 or -0.89

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 0 281 0.00E+00 4900 0.00E+00 141 0.00E+00 2524 0.00E+00 0.00E+00 1 2.75 0.27 0 0
2 A2 0 331 0.00E+00 4900 0.00E+00 166 0.00E+00 2499 0.00E+00 0.00E+00 2 2.74 0.26 0 0
3 A3 300 381 1.14E+05 4750 2.58E+12 191 2.18E+07 2474 7.00E+11 1.39E+09 3 2.69 0.29 308 33
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 2449 1.29E+12 3.34E+09 4 2.58 0.38 557 82
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 2424 1.41E+12 4.64E+09 5 2.45 0.50 589 120
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 2415 1.46E+12 5.21E+09 6 2.32 0.62 579 155
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 2360 1.70E+12 9.46E+09 7 2.17 0.73 662 222
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 2430 1.39E+12 4.33E+09 8 2.07 0.88 486 207
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 2500 1.03E+12 1.50E+09 9 1.97 1.03 325 170
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 2535 8.35E+11 7.32E+08 10 1.86 1.17 241 152
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 2535 8.35E+11 7.32E+08 11 1.73 1.30 225 169
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 2535 1.00E+12 8.79E+08 12 1.59 1.44 248 224

3100 383 1.94E+06 1.77E+13 4.18E+08 1.17E+13 3.22E+10 4220 1,534

b= 600 d= 3685

13 A13 600 737 4.42E+05 3100 4.25E+12 869 3.84E+08 1796 1.43E+12 2.00E+10 13 2.03 0.46 896 201
14 A14 600 737 4.42E+05 3100 4.25E+12 1606 7.10E+08 1059 4.96E+11 2.00E+10 14 1.75 0.18 775 81
15 A15 600 737 4.42E+05 3100 4.25E+12 2343 1.04E+09 322 4.60E+10 2.00E+10 15 1.48 -0.09 655 -40
16 A16 600 737 4.42E+05 3100 4.25E+12 3080 1.36E+09 -415 7.60E+10 2.00E+10 16 1.21 -0.36 534 -160
17 A17 600 737 4.42E+05 3100 4.25E+12 3817 1.69E+09 -1152 5.86E+11 2.00E+10 17 0.94 -0.63 414 -280

d= 750 2.21E+06 2.12E+13 5.18E+09 2.63E+12 1.00E+11 3274 -198

18 A18 300 900 2.70E+05 3250 2.85E+12 4635 1.25E+09 -1970 1.05E+12 1.82E+10 18 0.67 -0.97 181 -263
19 A19 500 875 4.38E+05 2850 3.55E+12 4648 2.03E+09 -1983 1.72E+12 2.79E+10 19 0.57 -0.88 247 -384
20 A20 500 825 4.13E+05 2350 2.28E+12 4673 1.93E+09 -2008 1.66E+12 2.34E+10 20 0.43 -0.76 177 -314
21 A21 500 775 3.88E+05 1850 1.33E+12 4698 1.82E+09 -2033 1.60E+12 1.94E+10 21 0.29 -0.64 114 -249
22 A22 500 750 3.75E+05 1350 6.83E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 22 0.16 -0.52 61 -195
23 A23 500 750 3.75E+05 850 2.71E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 23 0.04 -0.39 13 -148
24 A24 600 750 4.50E+05 300 4.05E+10 4710 2.12E+09 -2045 1.88E+12 2.11E+10 24 -0.10 -0.26 -47 -115

482 2.71E+06 1.10E+13 1.27E+10 1.10E+13 9.90E+10 747 -1669

6.86E+06 5.00E+13 1.83E+10 2.53E+13 2.31E+11 ΣF = 7908

9.99E+13 (ΣA*xv)/ΣA 5.11E+13 ΣF - P = 0

= 2665
Rev 1
CALCULATION SHEET No: AR3 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Three Tendons Stressed Pier
By:
References/Results

Rev 1
CALCULATION SHEET No: AR4 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Pier
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H V Forces on section ΣQ ΣM
0 0
Top 4 6.0 4.2 3976 15817 3.200 0 2.39 37802 1 0 0 0
Tendons 416 291 2 0 0 0
3 342 342 51 Q on top slab cantilever
Segment 4 641 983 382 = 1988 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 711 1693 1052 M on top slab cantilever
6 737 1542 -82 -7931 -4041 1508 = 1788 kNm
12200 5085 500 750 1.37E+07 2665 5.11E+13 1.92E+10 9.99E+13 1.64E+10 275 7 886 1542 -137 -1749 215
8 695 -137 -1191 -520
9 497 -136 -831 -1026
Bottom slab stability 10 395 -135 -571 -1376
11 395 -135 -312 -1597
Q = shear at webs 12 473 -162 0 -1690
13 473 -162 312 -1597
QL 14 395 -135 571 -1376
QH 15 395 -135 831 -1026
LH RH 16 497 -136 1191 -520
17 695 -137 1749 215
QS MS 18 886 1542 -137 4041 1508 M on top slab cantilever
Q ΣQ la MR 839 0 19 737 1542 -82 -7931 -1693 1052 = 1788 kNm
RH 7 -137 -137 0.25 -34 702 385 20 711 -983 382 Q on top slab cantilever
8 -137 -274 0.75 -103 565 702 21 641 -342 51 = -1339 kNm
9 -136 -410 1.25 -170 429 951 22 342 0 0
10 -135 -545 1.75 -236 294 1132 23 0 0 0
11 -135 -680 2.25 -304 159 1245 24 0 0 0
12 -162 -842 2.85 -462 -3 1292 = M on bottom slab -1684 M on top slab cantilever
13 -162 -1004 3.45 -559 -165 1242 = 1475 kNm
14 -135 -1139 3.95 -533 -300 1126
15 -135 -1274 4.45 -601 -434 942
16 -136 -1410 4.95 -673 -570 691
17 -137 -1547 5.45 -747 -707 372
18 -137 -1684 5.95 -816 -845 -16

-1684 ###

QL = -845

QH = -839

Rev 1
CALCULATION SHEET No: AR4 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Pier
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 621 QT = 616
LH RH
QB = -921 QB = -927
QS MS MS
Q ΣQ la' MR -3340 0 1508 1508
RH 7 886 886 0.25 222 -2454 -1449 1508 60 QB
8 695 1581 0.75 521 -1759 -2502 1508 -994
9 497 2078 1.25 621 -1263 -3257 1508 -1749
10 395 2472 1.75 690 -868 -3790 1508 -2282 Q ΣQ M Q ΣQ M
11 395 2867 2.25 888 -473 -4125 1508 -2617 RH 13 -921 -921 0 LH 1 -927 -927 0
12 473 3340 2.80 1326 0 -4267 1508 -2759 14 134 -788 -630 2 134 -793 -634
13 473 3814 3.40 1610 473 -4125 1508 -2617 15 375 -412 -1072 3 375 -418 -1080
14 395 4208 3.95 1559 868 -3790 1508 -2282 16 617 205 -1149 4 617 199 -1160
15 395 4603 4.45 1756 1263 -3257 1508 -1749 17 858 1063 -682 5 858 1058 -697
16 497 5099 4.95 2458 1759 -2502 1508 -994 18 1100 2163 507 6 1100 2158 488
17 695 5794 5.45 3788 2454 -1449 1508 60
18 886 6681 5.95 5273 3340 0 1508 1508
0 1508 1508
6681 ### = M on bottom slab

QL = 3340 - 0 = 3340

QH = 3340 + 0 = 3340

Shear on top slab due to moments =( 1788 - 1788 ) / 6.40 = 0

Rev 1
CALCULATION SHEET No: AR4 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Pier
By:
References/Results

d= 5085 Pt = 3965 x 4 P = 15861 P/A = 1.16 Mt = 0 Mt/Zt = 0.00 Mv = 37908 Mv/Zv = 1.98 or 1.79

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 0 281 0.00E+00 4900 0.00E+00 141 0.00E+00 2524 0.00E+00 0.00E+00 1 3.03 3.03 0 0
2 A2 0 331 0.00E+00 4900 0.00E+00 166 0.00E+00 2499 0.00E+00 0.00E+00 2 3.01 3.01 0 0
3 A3 300 381 1.14E+05 4750 2.58E+12 191 2.18E+07 2474 7.00E+11 1.39E+09 3 2.99 2.99 342 342
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 2449 1.29E+12 3.34E+09 4 2.97 2.97 641 641
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 2424 1.41E+12 4.64E+09 5 2.95 2.95 711 711
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 2415 1.46E+12 5.21E+09 6 2.95 2.95 737 737
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 2360 1.70E+12 9.46E+09 7 2.91 2.91 886 886
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 2430 1.39E+12 4.33E+09 8 2.96 2.96 695 695
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 2500 1.03E+12 1.50E+09 9 3.01 3.01 497 497
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 2535 8.35E+11 7.32E+08 10 3.04 3.04 395 395
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 2535 8.35E+11 7.32E+08 11 3.04 3.04 395 395
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 2535 1.00E+12 8.79E+08 12 3.04 3.04 473 473

3100 383 1.94E+06 1.77E+13 4.18E+08 1.17E+13 3.22E+10 5770 5,770

b= 600 d= 3685

13 A13 600 737 4.42E+05 3100 4.25E+12 869 3.84E+08 1796 1.43E+12 2.00E+10 13 2.49 2.49 1100 1,100
14 A14 600 737 4.42E+05 3100 4.25E+12 1606 7.10E+08 1059 4.96E+11 2.00E+10 14 1.94 1.94 858 858
15 A15 600 737 4.42E+05 3100 4.25E+12 2343 1.04E+09 322 4.60E+10 2.00E+10 15 1.40 1.40 617 617
16 A16 600 737 4.42E+05 3100 4.25E+12 3080 1.36E+09 -415 7.60E+10 2.00E+10 16 0.85 0.85 375 375
17 A17 600 737 4.42E+05 3100 4.25E+12 3817 1.69E+09 -1152 5.86E+11 2.00E+10 17 0.30 0.30 134 134

d= 750 2.21E+06 2.12E+13 5.18E+09 2.63E+12 1.00E+11 3085 3,085

18 A18 300 900 2.70E+05 3250 2.85E+12 4635 1.25E+09 -1970 1.05E+12 1.82E+10 18 -0.30 -0.30 -82 -82
19 A19 500 875 4.38E+05 2850 3.55E+12 4648 2.03E+09 -1983 1.72E+12 2.79E+10 19 -0.31 -0.31 -137 -137
20 A20 500 825 4.13E+05 2350 2.28E+12 4673 1.93E+09 -2008 1.66E+12 2.34E+10 20 -0.33 -0.33 -137 -137
21 A21 500 775 3.88E+05 1850 1.33E+12 4698 1.82E+09 -2033 1.60E+12 1.94E+10 21 -0.35 -0.35 -136 -136
22 A22 500 750 3.75E+05 1350 6.83E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 22 -0.36 -0.36 -135 -135
23 A23 500 750 3.75E+05 850 2.71E+11 4710 1.77E+09 -2045 1.57E+12 1.76E+10 23 -0.36 -0.36 -135 -135
24 A24 600 750 4.50E+05 300 4.05E+10 4710 2.12E+09 -2045 1.88E+12 2.11E+10 24 -0.36 -0.36 -162 -162

482 2.71E+06 1.10E+13 1.27E+10 1.10E+13 9.90E+10 -924 -924

6.86E+06 5.00E+13 1.83E+10 2.53E+13 2.31E+11 ΣF = 15861

A = 1.37E+07 9.99E+13 (ΣA*xv)/ΣA 5.11E+13 ΣF - P = 0

= 2665
Rev 1
CALCULATION SHEET No: AR4 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Top Slab Four Tendons Stressed Pier
By:
References/Results

Rev 1
CALCULATION SHEET No: AR5 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed In Span
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H V Forces on section ΣQ ΣM
0 0
Top 3 6.0 4.2 4604 13736 2.370 10911 -1.11 -15230 1 114 114 28
Tendons 4579 481 337 2 130 244 118
3 144 388 276 Q on top slab cantilever
Segment 4 158 546 509 = 781 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 170 715 825 M on top slab cantilever
6 164 1251 601 2731 1501 = 1124 kNm
12200 2800 500 350 8.96E+06 1141 1.04E+13 9.14E+09 8.63E+13 1.41E+10 2250 7 205 625 944 4506 3420
8 119 839 -9183 -3719 3433
9 56 736 -2927 1771
Bottom slab stability 10 30 679 -2219 485
11 21 668 -1530 -452
Q = shear at webs 12 15 787 -728 -1130
13 3 771 45 -1335
QL 14 -7 630 669 -1156
QH 15 -15 619 1273 -671
LH RH 16 -21 648 1901 123
17 -20 713 -4592 -1998 190
QS MS 18 -14 409 774 -829 -588 M on top slab cantilever
Q ΣQ la MR 19 -48 818 478 419 -561 = -732 kNm
RH 7 0 0 0.000 0 3081 0 20 -64 355 -367 Q on top slab cantilever
8 252 252 0.075 19 2830 443 21 -79 276 -209 = 414 kNm
9 736 987 0.400 294 2094 1674 22 -89 187 -94
10 679 1666 0.900 611 1415 2552 23 -94 94 -23
11 668 2334 1.400 935 748 3092 24 -94 0 0
12 787 3120 1.950 1534 -39 3305 = M on bottom slab 8807
13 771 3891 2.550 1965 -810 3051
14 630 4521 3.100 1953 -1440 2488
15 619 5140 3.600 2229 -2059 1614
16 648 5788 4.100 2657 -2707 422
17 214 6002 4.425 947 -2921 0
18 0 0.000
2.190
6002 ###

QL = 2921

QH = 3081

Rev 1
CALCULATION SHEET No: AR5 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed In Span
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 1546 QT = -761
LH RH
QB = 2586 QB = 50
QS MS MS
Q ΣQ la' MR -377 0 1501 1501
RH 7 205 205 0.25 51 -172 -137 1305 1168 QB
8 119 324 0.75 89 -53 -194 1142 949
9 56 381 1.25 70 3 -206 979 773 Q ΣQ M Q ΣQ M
10 30 410 1.75 52 33 -197 816 619
11 21 432 2.25 48 54 -175 652 478 RH 13 1546 1546 387 LH 1 -761 -761 -381
12 15 446 2.80 41 69 -138 457 319 14 204 1751 980 2 75 -686 -641
13 3 449 3.40 10 72 -95 261 165 15 290 2041 1663 3 160 -526 -859
14 -7 443 3.95 -26 66 -61 97 37 16 375 2416 2465 4 245 -281 -1005
15 -15 428 4.45 -66 51 -32 -66 -98 17 461 2876 3417 5 331 50 -1046
16 -21 407 4.95 -102 30 -12 -229 -241 18 6
17 -20 387 5.45 -110 10 -1 -392 -394
18 -14 373 5.95 -84 -4 0 -555 -555
0 -588 -588
373 ### = M on bottom slab

QL = -4 - 290 = -294

QH = 377 + 290 = 667

Shear on top slab due to moments =( 1124 - -732 )/ 6.40 = 290

Rev 1
CALCULATION SHEET No: AR5 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed In Span
By:
References/Results

d= 2800 Pt = 4592 x 3 P = 13775 P/A = 1.54 Mt = 10882 Mt/Zt = 0.77 Mv = -15273 Mv/Zv = -1.67 or 2.43

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 1001 1.41E+11 9.27E+08 1 0.81 -0.67 114 -94
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 976 1.58E+11 1.51E+09 2 0.78 -0.57 130 -94
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 951 1.72E+11 2.31E+09 3 0.76 -0.47 144 -89
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 926 1.85E+11 3.34E+09 4 0.73 -0.37 158 -79
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 901 1.95E+11 4.64E+09 5 0.70 -0.27 170 -64
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 891 1.99E+11 5.21E+09 6 0.66 -0.19 164 -48
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 836 2.13E+11 9.46E+09 7 0.67 -0.05 205 -14
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 906 1.93E+11 4.33E+09 8 0.51 -0.09 119 -20
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 976 1.57E+11 1.50E+09 9 0.34 -0.13 56 -21
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 1011 1.33E+11 7.32E+08 10 0.23 -0.11 30 -15
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 1011 1.33E+11 7.32E+08 11 0.16 -0.05 21 -7
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 1011 1.60E+11 8.79E+08 12 0.09 0.02 15 3

3100 383 2.32E+06 2.92E+13 4.80E+08 2.04E+12 3.56E+10 1326 -540

b= 450 d= 1800

13 A13 450 360 1.62E+05 3175 1.63E+12 680 1.10E+08 461 3.45E+10 1.75E+09 13 1.26 0.46 204 75
14 A14 450 360 1.62E+05 3175 1.63E+12 1040 1.68E+08 101 1.66E+09 1.75E+09 14 1.79 0.99 290 160
15 A15 450 360 1.62E+05 3175 1.63E+12 1400 2.27E+08 -259 1.08E+10 1.75E+09 15 2.32 1.51 375 245
16 A16 450 360 1.62E+05 3175 1.63E+12 1760 2.85E+08 -619 6.20E+10 1.75E+09 16 2.84 2.04 461 331
17 A17 450 360 1.62E+05 3175 1.63E+12 2120 3.43E+08 -979 1.55E+11 1.75E+09 17 3.37 2.57 546 416

d= 350 8.10E+05 8.17E+12 1.13E+09 2.64E+11 8.75E+09 1876 1,227

18 A18 300 500 1.50E+05 3250 1.58E+12 2550 3.83E+08 -1409 2.98E+11 3.13E+09 18 4.01 3.19 601 478
19 A19 500 475 2.38E+05 2850 1.93E+12 2563 6.09E+08 -1421 4.80E+11 4.47E+09 19 3.98 3.26 944 774
20 A20 500 425 2.13E+05 2350 1.17E+12 2588 5.50E+08 -1446 4.44E+11 3.20E+09 20 3.95 3.36 839 713
21 A21 500 375 1.88E+05 1850 6.42E+11 2613 4.90E+08 -1471 4.06E+11 2.20E+09 21 3.92 3.46 736 648
22 A22 500 350 1.75E+05 1350 3.19E+11 2625 4.59E+08 -1484 3.85E+11 1.79E+09 22 3.88 3.54 679 619
23 A23 500 350 1.75E+05 850 1.26E+11 2625 4.59E+08 -1484 3.85E+11 1.79E+09 23 3.82 3.60 668 630
24 A24 600 350 2.10E+05 300 1.89E+10 2625 5.51E+08 -1484 4.62E+11 2.14E+09 24 3.75 3.67 787 771

254 1.35E+06 5.79E+12 3.50E+09 2.86E+12 1.11E+10 5253 4,633

4.48E+06 4.31E+13 5.11E+09 5.16E+12 5.54E+10 ΣF = 13775

A = 8.96E+06 It = 8.63E+13 (ΣA*xv)/ΣA 1.04E+13 ΣF - P = 0

= 1141
Rev 1
CALCULATION SHEET No: AR5 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed In Span
By:
References/Results

Rev 1
CALCULATION SHEET No: AR6 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed In Span
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H V Forces on section ΣQ ΣM
0 0
Top 4 6.0 4.2 4604 18315 2.370 0 -1.11 -20306 1 14 14 3
Tendons 481 337 2 24 38 16
3 37 75 44 Q on top slab cantilever
Segment 4 52 127 95 = 228 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 70 197 176 M on top slab cantilever
6 78 1034 720 2029 557 = 261 kNm
12200 2800 500 350 8.96E+06 1141 1.04E+13 9.14E+09 8.63E+13 1.41E+10 2250 7 127 1034 1145 4336 2329
8 66 1035 -9183 -3746 2293
9 24 922 -2800 656
Bottom slab stability 10 10 865 -1925 -525
11 10 865 -1050 -1269
Q = shear at webs 12 12 1038 0 -1584
13 12 1038 1050 -1269
QL 14 10 865 1925 -525
QH 15 10 865 2800 656
LH RH 16 24 922 3746 2293
17 66 1035 -9183 -4336 2329
QS MS 18 127 1034 1145 -2029 557 M on top slab cantilever
Q ΣQ la MR 19 78 1034 720 -197 176 = 261 kNm
RH 7 0 0 0.000 0 4002 0 20 70 -127 95 Q on top slab cantilever
8 311 311 0.075 23 3691 577 21 52 -75 44 = -146 kNm
9 922 1233 0.400 369 2769 2192 22 37 -38 16
10 865 2098 0.900 779 1904 3360 23 24 -14 3
11 865 2963 1.400 1211 1039 4096 24 14 0 0
12 1038 4002 1.950 2025 0 4408 = M on bottom slab 1047 11743
13 1038 5040 2.550 2648 -1038 4096
14 865 5905 3.100 2682 -1903 3361
15 865 6770 3.600 3115 -2768 2193
16 922 7693 4.100 3782 -3691 579
17 311 8003 4.425 1374 -4001 2
18 0 0.000
2.250
8003 ###

QL = 4002

QH = 4002

Rev 1
CALCULATION SHEET No: AR6 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed In Span
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 524 QT = 524
LH RH
QB = 2592 QB = 2592
QS MS MS
Q ΣQ la' MR -249 0 557 557
RH 7 127 127 0.25 32 -121 -93 557 465 QB
8 66 193 0.75 49 -55 -137 557 420
9 24 217 1.25 30 -32 -158 557 399
10 10 227 1.75 17 -22 -172 557 385 Q ΣQ M Q ΣQ M
11 10 237 2.25 22 -12 -180 557 377 RH 13 524 524 0 LH 1 524 524 0
12 12 249 2.80 33 0 -184 557 373 14 641 1165 304 2 641 1165 304
13 12 261 3.40 40 12 -180 557 377 15 528 1692 818 3 528 1692 818
14 10 270 3.95 39 22 -172 557 385 16 414 2106 1502 4 414 2106 1502
15 10 280 4.45 44 32 -158 557 399 17 300 2406 2314 5 300 2406 2314
16 24 304 4.95 118 55 -137 557 420 18 186 2592 3214 6 186 2592 3214
17 66 370 5.45 360 121 -93 557 465
18 127 497 5.95 758 249 0 557 557
0 557 557
497 ### = M on bottom slab

QL = 249 - 0 = 249

QH = 249 + 0 = 249

Shear on top slab due to moments =( 261 - 261 )/ 6.40 = 0

Rev 1
CALCULATION SHEET No: AR6 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed In Span
By:
References/Results

d= 2800 Pt = 4592 x 4 P = 18367 P/A = 2.05 Mt = 0 Mt/Zt = 0.00 Mv = -20363 Mv/Zv = -2.23 or 3.24

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 1001 1.41E+11 9.27E+08 1 0.10 0.10 14 14
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 976 1.58E+11 1.51E+09 2 0.15 0.15 24 24
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 951 1.72E+11 2.31E+09 3 0.19 0.19 37 37
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 926 1.85E+11 3.34E+09 4 0.24 0.24 52 52
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 901 1.95E+11 4.64E+09 5 0.29 0.29 70 70
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 891 1.99E+11 5.21E+09 6 0.31 0.31 78 78
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 836 2.13E+11 9.46E+09 7 0.42 0.42 127 127
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 906 1.93E+11 4.33E+09 8 0.28 0.28 66 66
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 976 1.57E+11 1.50E+09 9 0.14 0.14 24 24
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 1011 1.33E+11 7.32E+08 10 0.08 0.08 10 10
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 1011 1.33E+11 7.32E+08 11 0.08 0.08 10 10
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 1011 1.60E+11 8.79E+08 12 0.08 0.08 12 12

3100 383 2.32E+06 2.92E+13 4.80E+08 2.04E+12 3.56E+10 524 524

b= 450 d= 1800

13 A13 450 360 1.62E+05 3175 1.63E+12 680 1.10E+08 461 3.45E+10 1.75E+09 13 1.15 1.15 186 186
14 A14 450 360 1.62E+05 3175 1.63E+12 1040 1.68E+08 101 1.66E+09 1.75E+09 14 1.85 1.85 300 300
15 A15 450 360 1.62E+05 3175 1.63E+12 1400 2.27E+08 -259 1.08E+10 1.75E+09 15 2.55 2.55 414 414
16 A16 450 360 1.62E+05 3175 1.63E+12 1760 2.85E+08 -619 6.20E+10 1.75E+09 16 3.26 3.26 528 528
17 A17 450 360 1.62E+05 3175 1.63E+12 2120 3.43E+08 -979 1.55E+11 1.75E+09 17 3.96 3.96 641 641

d= 350 8.10E+05 8.17E+12 1.13E+09 2.64E+11 8.75E+09 2069 2,069

18 A18 300 500 1.50E+05 3250 1.58E+12 2550 3.83E+08 -1409 2.98E+11 3.13E+09 18 4.80 4.80 720 720
19 A19 500 475 2.38E+05 2850 1.93E+12 2563 6.09E+08 -1421 4.80E+11 4.47E+09 19 4.82 4.82 1145 1,145
20 A20 500 425 2.13E+05 2350 1.17E+12 2588 5.50E+08 -1446 4.44E+11 3.20E+09 20 4.87 4.87 1035 1,035
21 A21 500 375 1.88E+05 1850 6.42E+11 2613 4.90E+08 -1471 4.06E+11 2.20E+09 21 4.92 4.92 922 922
22 A22 500 350 1.75E+05 1350 3.19E+11 2625 4.59E+08 -1484 3.85E+11 1.79E+09 22 4.94 4.94 865 865
23 A23 500 350 1.75E+05 850 1.26E+11 2625 4.59E+08 -1484 3.85E+11 1.79E+09 23 4.94 4.94 865 865
24 A24 600 350 2.10E+05 300 1.89E+10 2625 5.51E+08 -1484 4.62E+11 2.14E+09 24 4.94 4.94 1038 1,038

254 1.35E+06 5.79E+12 3.50E+09 2.86E+12 1.11E+10 6591 6,591

4.48E+06 4.31E+13 5.11E+09 5.16E+12 5.54E+10 ΣF = 18367

8.63E+13 (ΣA*xv)/ΣA 1.04E+13 ΣF - P = 0

= 1141
Rev 1
CALCULATION SHEET No: AR6 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed In Span
By:
References/Results

Rev 1
CALCULATION SHEET No: AR7 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed Mid Span
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H V Forces on section ΣQ ΣM
0 0
Top 3 6.0 4.2 4604 13736 2.370 10911 -0.66 -9041 1 0 0 0
Tendons 481 337 2 0 0 0
3 185 185 28 Q on top slab cantilever
Segment 4 342 527 206 = 1042 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 369 897 562 M on top slab cantilever
6 363 1114 620 -9183 -6189 443 = 949 kNm
12200 2090 500 275 6.77E+06 857 4.29E+12 5.01E+09 5.25E+13 8.60E+09 1515 7 446 962 -4781 -2300
8 285 833 -3663 -4411
9 158 706 -2799 -6027
Bottom slab stability 10 102 637 -2061 -7242
11 88 622 -1350 -8094
Q = shear at webs 12 88 728 -535 -8660
13 68 707 241 -8748
QL 14 42 574 857 -8474
QH 15 29 559 1445 -7898
LH RH 16 31 591 2067 -7020
17 55 662 2783 -5808
QS MS 18 85 725 3593 -4214 M on top slab cantilever
Q ΣQ la MR 0 0 19 14 642 448 -4592 105 -3869 = -114 kNm
RH 7 0 0 0.25 0 -3421 -342 20 -16 89 -3820 Q on top slab cantilever
8 833 833 0.75 625 -2589 -1845 21 -48 41 -3788 = -99 kN
9 706 1539 1.25 883 -1882 -2962 22 -41 0 -3782
10 637 2175 1.75 1114 -1246 -3744 23 0 0 0
11 622 2798 2.25 1400 -624 -4212 24 0 0 0
12 728 3526 2.85 2074 104 -4368 = M on bottom slab 8305
13 707 4233 3.45 2440 812 -4093
14 574 4807 3.95 2266 1385 -3544
15 559 5366 4.45 2489 1945 -2711
16 591 5957 4.95 2924 2535 -1591
17 662 6618 5.45 3606 3197 -158
18 0 6618 5.95 0 0 0

6618 ###

QL = 3197

QH = 3421

Rev 1
CALCULATION SHEET No: AR7 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed Mid Span
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 2478 QT = 372
LH RH
QB = 3593 QB = 1013
QS MS MS
Q ΣQ la' MR -1053 0 443 443
RH 7 446 446 0.25 112 -607 -415 6 -409 QB
8 285 731 0.75 214 -322 -647 -358 -1005
9 158 889 1.25 198 -164 -768 -722 -1490
10 102 991 1.75 178 -62 -825 -1085 -1910 Q ΣQ M Q ΣQ M
11 88 1079 2.25 198 26 -834 -1449 -2283 RH 13 2478 2478 0 LH 1 372 372 0
12 88 1167 2.80 246 114 -792 -1886 -2677 14 292 2770 611 2 197 569 110
13 68 1235 3.40 233 182 -703 -2322 -3025 15 257 3027 1287 3 163 732 261
14 42 1278 3.95 166 225 -601 -2686 -3287 16 223 3250 2018 4 128 860 447
15 29 1306 4.45 127 253 -481 -3050 -3531 17 188 3439 2797 5 94 954 658
16 31 1337 4.95 155 285 -347 -3414 -3760 18 154 3593 3616 6 60 1013 887
17 55 1392 5.45 299 339 -191 -3777 -3968
18 85 1477 5.95 504 424 0 -4141 -4141
0 -4214 -4214
1477 ### = M on bottom slab

QL = 424 - 166 = 258

QH = 1053 + 166 = 1219

Shear on top slab due to moments =( 949 - -114 )/ 6.40 = 166

Rev 1
CALCULATION SHEET No: AR7 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed Mid Span
By:
References/Results

d= 2090 Pt = 4592 x 3 P = 13775 P/A = 2.04 Mt = 10911 Mt/Zt = 1.27 Mv = -9066 Mv/Zv = -1.81 or -2.60

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 0 281 0.00E+00 4900 0.00E+00 141 0.00E+00 716 0.00E+00 0.00E+00 1 1.54 -0.50 0 0
2 A2 0 331 0.00E+00 4900 0.00E+00 166 0.00E+00 691 0.00E+00 0.00E+00 2 1.60 -0.44 0 0
3 A3 300 381 1.14E+05 4750 2.58E+12 191 2.18E+07 666 5.08E+10 1.39E+09 3 1.62 -0.36 185 -41
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 641 8.87E+10 3.34E+09 4 1.59 -0.22 342 -48
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 616 9.14E+10 4.64E+09 5 1.54 -0.07 369 -16
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 607 9.21E+10 5.21E+09 6 1.45 0.06 363 14
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 552 9.29E+10 9.46E+09 7 1.46 0.28 446 85
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 622 9.09E+10 4.33E+09 8 1.21 0.23 285 55
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 692 7.90E+10 1.50E+09 9 0.96 0.19 158 31
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 727 6.87E+10 7.32E+08 10 0.78 0.22 102 29
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 727 6.87E+10 7.32E+08 11 0.68 0.32 88 42
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 727 8.24E+10 8.79E+08 12 0.56 0.44 88 68

3100 383 1.94E+06 1.77E+13 4.18E+08 8.05E+11 3.22E+10 2426 219

b= 300 d= 1165

13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 240 4.04E+09 3.16E+08 13 2.20 0.85 154 60
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 7 3.76E+06 3.16E+08 14 2.70 1.34 188 94
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -226 3.56E+09 3.16E+08 15 3.19 1.84 223 128
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -459 1.47E+10 3.16E+08 16 3.68 2.33 257 163
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -692 3.34E+10 3.16E+08 17 4.17 2.82 292 197

d= 275 3.50E+05 3.69E+12 3.78E+08 5.57E+10 1.58E+09 1114 642

18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1021 1.33E+11 1.92E+09 18 4.87 3.51 620 448
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1033 2.13E+11 2.67E+09 19 4.81 3.62 962 725
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1058 1.96E+11 1.79E+09 20 4.76 3.78 833 662
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1083 1.76E+11 1.13E+09 21 4.71 3.94 706 591
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1096 1.65E+11 8.67E+08 22 4.63 4.07 637 559
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1096 1.65E+11 8.67E+08 23 4.53 4.17 622 574
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1096 1.98E+11 1.04E+09 24 4.41 4.29 728 707

211 1.09E+06 4.82E+12 2.10E+09 1.25E+12 5.68E+09 5108 4,265

3.38E+06 2.62E+13 2.90E+09 2.11E+12 3.95E+10 ΣF = 13775

5.25E+13 (ΣA*xv)/ΣA 4.29E+12 ΣF - P = 0

= 857
Rev 1
CALCULATION SHEET No: AR7 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Three Tendons Stressed Mid Span
By:
References/Results

Rev 1
CALCULATION SHEET No: AR8 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed Mid Span
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H V Forces on section ΣQ ΣM
0 0
Top 4 6.0 4.2 4604 18315 2.370 0 -0.66 -12054 1 0 0 0
Tendons 481 337 2 0 0 0
3 96 96 14 Q on top slab cantilever
Segment 4 196 292 111 = 628 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 236 528 316 M on top slab cantilever
6 251 1171 712 -9183 -6521 7 = 547 kNm
12200 2090 500 275 6.77E+06 857 4.29E+12 5.01E+09 5.25E+13 8.60E+09 1515 7 354 1125 -5043 -2884
8 226 996 -3820 -5100
9 126 864 -2829 -6762
Bottom slab stability 10 87 797 -1945 -7956
11 87 797 -1061 -8707
Q = shear at webs 12 104 957 0 -9026
13 104 957 1061 -8707
QL 14 87 797 1945 -7956
QH 15 87 797 2829 -6762
LH RH 16 126 864 3820 -5100
17 226 996 5043 -2884
QS MS 18 354 1125 6521 7 M on top slab cantilever
Q ΣQ la MR 0 0 19 251 1171 712 -9183 -528 316 = 547 kNm
RH 7 0 0 0.25 0 -4397 0 20 236 -292 111 Q on top slab cantilever
8 996 996 0.75 747 -3400 -1949 21 196 -96 14 = -386 kNm
9 864 1861 1.25 1081 -2536 -3433 22 96 0 0
10 797 2658 1.75 1395 -1739 -4502 23 0 0 0
11 797 3455 2.25 1794 -941 -5172 24 0 0 0
12 957 4412 2.85 2727 15 -5450 = M on bottom slab 3527 11073
13 957 5369 3.45 3301 972 -5153
14 797 6166 3.95 3149 1769 -4468
15 797 6963 4.45 3548 2567 -3384
16 864 7828 4.95 4279 3431 -1884
17 996 8824 5.45 5430 4428 80
18 0 8824 5.95 0 0 0

8824 ###

QL = 4428

QH = 4397

Rev 1
CALCULATION SHEET No: AR8 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed Mid Span
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 1764 QT = 1764
LH RH
QB = 2934 QB = 2934
QS MS MS
Q ΣQ la' MR -985 0 7 7
RH 7 354 354 0.25 88 -631 -404 7 -397 QB
8 226 580 0.75 170 -404 -663 7 -656
9 126 707 1.25 158 -278 -833 7 -826
10 87 794 1.75 152 -191 -950 7 -943 Q ΣQ M Q ΣQ M
11 87 881 2.25 195 -104 -1024 7 -1017 RH 13 1764 1764 0 LH 1 1764 1764 0
12 104 985 2.80 292 0 -1055 7 -1048 14 326 2090 449 2 326 2090 449
13 104 1089 3.40 354 104 -1024 7 -1017 15 280 2369 968 3 280 2369 968
14 87 1176 3.95 343 191 -950 7 -943 16 234 2604 1548 4 234 2604 1548
15 87 1263 4.45 386 278 -833 7 -826 17 188 2792 2176 5 188 2792 2176
16 126 1389 4.95 626 404 -663 7 -656 18 142 2934 2843 6 142 2934 2843
17 226 1615 5.45 1234 631 -404 7 -397
18 354 1969 5.95 2106 985 0 7 7
0 7 7
1969 ### = M on bottom slab

QL = 985 - 0 = 985

QH = 985 + 0 = 985

Shear on top slab due to moments =( 547 - 547 )/ 6.40 = 0

Rev 1
CALCULATION SHEET No: AR8 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed Mid Span
By:
References/Results

d= 2090 Pt = 4592 x 4 P = 18367 P/A = 2.71 Mt = 0 Mt/Zt = 0.00 Mv = -12088 Mv/Zv = -2.41 or 3.47

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 0 281 0.00E+00 4900 0.00E+00 141 0.00E+00 716 0.00E+00 0.00E+00 1 0.70 0.70 0 0
2 A2 0 331 0.00E+00 4900 0.00E+00 166 0.00E+00 691 0.00E+00 0.00E+00 2 0.77 0.77 0 0
3 A3 300 381 1.14E+05 4750 2.58E+12 191 2.18E+07 666 5.08E+10 1.39E+09 3 0.84 0.84 96 96
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 641 8.87E+10 3.34E+09 4 0.91 0.91 196 196
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 616 9.14E+10 4.64E+09 5 0.98 0.98 236 236
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 607 9.21E+10 5.21E+09 6 1.01 1.01 251 251
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 552 9.29E+10 9.46E+09 7 1.16 1.16 354 354
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 622 9.09E+10 4.33E+09 8 0.96 0.96 226 226
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 692 7.90E+10 1.50E+09 9 0.77 0.77 126 126
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 727 6.87E+10 7.32E+08 10 0.67 0.67 87 87
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 727 6.87E+10 7.32E+08 11 0.67 0.67 87 87
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 727 8.24E+10 8.79E+08 12 0.67 0.67 104 104

3100 383 1.94E+06 1.77E+13 4.18E+08 8.05E+11 3.22E+10 1764 1,764

b= 300 d= 1165

13 A13 300 233 6.99E+04 3250 7.38E+11 617 4.31E+07 240 4.04E+09 3.16E+08 13 2.04 2.04 142 142
14 A14 300 233 6.99E+04 3250 7.38E+11 850 5.94E+07 7 3.76E+06 3.16E+08 14 2.69 2.69 188 188
15 A15 300 233 6.99E+04 3250 7.38E+11 1083 7.57E+07 -226 3.56E+09 3.16E+08 15 3.35 3.35 234 234
16 A16 300 233 6.99E+04 3250 7.38E+11 1316 9.20E+07 -459 1.47E+10 3.16E+08 16 4.01 4.01 280 280
17 A17 300 233 6.99E+04 3250 7.38E+11 1549 1.08E+08 -692 3.34E+10 3.16E+08 17 4.66 4.66 326 326

d= 275 3.50E+05 3.69E+12 3.78E+08 5.57E+10 1.58E+09 1171 1,171

18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1021 1.33E+11 1.92E+09 18 5.59 5.59 712 712
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1033 2.13E+11 2.67E+09 19 5.62 5.62 1125 1,125
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1058 1.96E+11 1.79E+09 20 5.69 5.69 996 996
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1083 1.76E+11 1.13E+09 21 5.76 5.76 864 864
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1096 1.65E+11 8.67E+08 22 5.80 5.80 797 797
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1096 1.65E+11 8.67E+08 23 5.80 5.80 797 797
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1096 1.98E+11 1.04E+09 24 5.80 5.80 957 957

211 1.09E+06 4.82E+12 2.10E+09 1.25E+12 5.68E+09 6249 6,249

3.38E+06 2.62E+13 2.90E+09 2.11E+12 3.95E+10 ΣF = 18367

5.25E+13 (ΣA*xv)/ΣA 4.29E+12 ΣF - P = 0

= 857
Rev 1
CALCULATION SHEET No: AR8 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Bottom Slab Four Tendons Stressed Mid Span
By:
References/Results

Rev 1
CALCULATION SHEET No: AS 1 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Anchor Span all tendons stressed
By:
References/Results

Segment No of Tendon Tendon Tendon Tendon loads


Tendons Inc H Inc V Force P Et Mt Ev Mv H 1 tendon V 1 tendon Forces on section ΣQ ΣM
0 0
Top 14 6.0 4.2 4604 64103 3.200 0 -0.84 -54145 1 77 77 19
Tendons 4579 481 337 2 138 216 92
3 214 430 254 Q on top slab cantilever
Segment 4 304 734 545 = 1324 kNm
S9 W ds ts db A Yv It Zt Iv Zv Td 5 409 1143 1014 M on top slab cantilever
6 452 3982 2620 8197 2689 = 1508 kNm
12200 2090 500 275 7.88E+06 799 4.70E+12 5.88E+09 7.85E+13 1.29E+10 1644 7 744 1991 4138 -9158 5913 8854
8 384 3671 9969 12825
9 137 3190 -4579 8717 17130
Bottom slab stability 10 55 2944 -4579 7138 21780
11 55 2944 -4579 5558 24153
Q = shear at webs 12 66 3533 -9158 0 23894
13 66 3533 -9158 -5558 24153
QL 14 55 2944 -4579 -7138 21780
QH 15 55 2944 -4579 -8717 17130
LH RH 16 137 3190 -4579 -9969 12825
17 384 3671 -5913 8854
Q P ΣQ la MQ laP MQ ΣM 18 744 1991 4138 -9158 -8197 2689 M on top slab cantilever
6 2473 0 2473 3.25 8037 0.00 0 0 19 452 3982 2620 -1143 1014 = 1508 kNm
RH 7 4138 0 6611 2.85 19831 0.00 0 0 20 409 -734 545 Q on top slab cantilever
8 3671 0 10283 2.35 28459 0.00 0 0 21 304 -430 254 = -845 kNm
9 3190 -4579 8894 1.85 34361 1.93 -8837 25524 22 214 -216 92
10 2944 -4579 7259 1.35 38336 1.50 -15705 22630 23 138 -77 19
11 2944 -4579 5625 0.85 40838 1.08 -20650 20188 24 77 -64103 0 0
12 3533 -9158 0 0.30 41898 0.43 -24588 17310 6075 11946 46082 0
13 3533 -9158
14 2944 -4579 -294
15 2944 -4579
16 3190 -4579
17 3671 0
18 4138 0
19 2473 0
45788 -45788 9.55

23954 QL = 2

16888 QH = 45786

Rev 1
CALCULATION SHEET No: AS 2 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Anchor Span all tendons stressed
By:
References/Results

Top slab stability Web stability

Q = shear at webs Q = Shear at slabs RH Web LH Web

QL
QH QT C QT = 3038 QT = 1443
LH RH
QB = -147 QB = -147
QS MS MS
Q ΣQ la' MR -1443 0 1508 1508 -294
RH 7 744 744 0.25 186 -698 -535 1508 972 QB
8 384 1129 0.75 288 -314 -788 1508 719
9 137 1265 1.25 171 -177 -911 1508 597
10 55 1321 1.75 97 -122 -986 1508 522 Q ΣQ QP M Q ΣQ M
11 55 1376 2.25 125 -66 -1033 1508 475 RH 13 3038 3038 0 759 LH 1 0 0
12 66 1443 2.80 186 0 -1053 1508 455 14 632 3670 0 833 2 0 0
13 66 1509 3.40 226 66 -1033 1508 475 15 913 4583 0 939 3 0 0
14 55 1564 3.95 219 122 -986 1508 522 16 1195 1199 -4579 575 4 0 0
15 55 1620 4.45 246 177 -911 1508 597 17 1476 2675 0 747 5 0 0
16 137 1756 4.95 677 314 -788 1508 719 18 1757 -147 -4579 333 6 0 0
17 384 2141 5.45 2094 698 -535 1508 972
18 744 2885 5.95 4430 1443 0 1508 1508 9011
0 1508 1508
2885 ### = M on bottom slab

QL = 1443 - 0 = 1443

QH = 1443 + 0 = 1443

Shear on top slab due to moments =( 1508 - 1508 ) / 6.40 = 0

Rev 1
Rev:

Date:

Date:

s/Results
Rev:

Date:

Date:

s/Results
CALCULATION SHEET No: AS 3 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Anchor Span all tendons stressed
By:
References/Results

d= 2090 Pt = 4579 x 14 P = 64103 P/A = 8.13 Mt = 0 Mt/Zt = 0.00 Mv = -54145 Mv/Zv = -9.20 or 14.86

A=b*d xt A*xt^2 xv A*xv xbar A*xv^2 bd^3/12 σR σL FR FL

1 A1 500 281 1.41E+05 5850 4.81E+12 141 1.98E+07 659 6.10E+10 9.27E+08 1 0.55 0.55 77 77
2 A2 500 331 1.66E+05 5350 4.74E+12 166 2.74E+07 634 6.65E+10 1.51E+09 2 0.84 0.84 138 138
3 A3 500 381 1.91E+05 4850 4.48E+12 191 3.63E+07 609 7.06E+10 2.31E+09 3 1.12 1.12 214 214
4 A4 500 431 2.16E+05 4350 4.08E+12 216 4.65E+07 584 7.35E+10 3.34E+09 4 1.41 1.41 304 304
5 A5 500 481 2.41E+05 3850 3.57E+12 241 5.79E+07 559 7.51E+10 4.64E+09 5 1.70 1.70 409 409
6 A6 500 500 2.50E+05 3350 2.81E+12 250 6.25E+07 549 7.54E+10 5.21E+09 6 1.81 1.81 452 452
7 A7 500 610 3.05E+05 2850 2.48E+12 305 9.30E+07 494 7.45E+10 9.46E+09 7 2.44 2.44 744 744
8 A8 500 470 2.35E+05 2350 1.30E+12 235 5.52E+07 564 7.48E+10 4.33E+09 8 1.63 1.63 384 384
9 A9 500 330 1.65E+05 1850 5.65E+11 165 2.72E+07 634 6.64E+10 1.50E+09 9 0.83 0.83 137 137
10 A10 500 260 1.30E+05 1350 2.37E+11 130 1.69E+07 669 5.82E+10 7.32E+08 10 0.43 0.43 55 55
11 A11 500 260 1.30E+05 850 9.39E+10 130 1.69E+07 669 5.82E+10 7.32E+08 11 0.43 0.43 55 55
12 A12 600 260 1.56E+05 300 1.40E+10 130 2.03E+07 669 6.99E+10 8.79E+08 12 0.43 0.43 66 66

6100 383 2.32E+06 2.92E+13 4.80E+08 8.24E+11 3.56E+10 3038 3,038


207
b= 450 d= 1165

13 A13 450 233 1.05E+05 3175 1.06E+12 617 6.46E+07 183 3.51E+09 4.74E+08 13 6.03 6.03 632 632
14 A14 450 233 1.05E+05 3175 1.06E+12 850 8.91E+07 -50 2.64E+08 4.74E+08 14 8.71 8.71 913 913
15 A15 450 233 1.05E+05 3175 1.06E+12 1083 1.14E+08 -283 8.41E+09 4.74E+08 15 11.39 11.39 1195 1,195
16 A16 450 233 1.05E+05 3175 1.06E+12 1316 1.38E+08 -516 2.79E+10 4.74E+08 16 14.08 14.08 1476 1,476
17 A17 450 233 1.05E+05 3175 1.06E+12 1549 1.62E+08 -749 5.88E+10 4.74E+08 17 16.76 16.76 1757 1,757

d= 275 5.24E+05 5.28E+12 5.68E+08 9.90E+10 2.37E+09 5973 5,973

18 A18 300 425 1.28E+05 3250 1.35E+12 1878 2.39E+08 -1078 1.48E+11 1.92E+09 18 20.55 20.55 2620 2,620
19 A19 500 400 2.00E+05 2850 1.62E+12 1890 3.78E+08 -1091 2.38E+11 2.67E+09 19 20.69 20.69 4138 4,138
20 A20 500 350 1.75E+05 2350 9.66E+11 1915 3.35E+08 -1116 2.18E+11 1.79E+09 20 20.98 20.98 3671 3,671
21 A21 500 300 1.50E+05 1850 5.13E+11 1940 2.91E+08 -1141 1.95E+11 1.13E+09 21 21.27 21.27 3190 3,190
22 A22 500 275 1.38E+05 1350 2.51E+11 1953 2.68E+08 -1153 1.83E+11 8.67E+08 22 21.41 21.41 2944 2,944
23 A23 500 275 1.38E+05 850 9.93E+10 1953 2.68E+08 -1153 1.83E+11 8.67E+08 23 21.41 21.41 2944 2,944
24 A24 600 275 1.65E+05 300 1.49E+10 1953 3.22E+08 -1153 2.19E+11 1.04E+09 24 21.41 21.41 3533 3,533

3100 211 1.09E+06 4.82E+12 2.10E+09 1.38E+12 5.68E+09 23041 23041

3.94E+06 3.93E+13 3.15E+09 2.31E+12 4.36E+10 ΣF = 64103

A = 7.88E+06 7.85E+13 (ΣA*xv)/ΣA 4.70E+12 ΣF - P = 0

= 799
Rev 1
CALCULATION SHEET No: AS 4 Rev:

PCG
Project: Barnstable Western By-Pass By:
W
Date:
Check
Date:
Subject: Taw Bridge - Reinforcement Deck Anchorage Zones Anchor Span all tendons stressed
By:
References/Results

Rev 1
Rev:

Date:

Date:

s/Results
Rev:

Date:

Date:

s/Results

Vous aimerez peut-être aussi