Labour supply for client office ( as per bill - 1 65 621 - 1 65 621
attached) -July '2017
12th R.A. Bill -Certified (Bill Period From 30.11.201
Running Account Bill No. M/s. J. K. Construction Co.
H ADD TAXES
J
Labour supply for client office ( as per bill 47 875 47 875
attached) -Upto June'2017
S Payment so far
( Rupees Eight Lakh Seventy Three Thousand Five Hundred Fifty Only
Note- 1:- A/c please check the advance & tax detail prior to release the payment.
2:- Accounts Department is advised to take the HR consent, towards EPF prior to make payment to the party.
-1884820
- 18 84 820
-39027
0
- 39 027
0
Bill -Certified (Bill Period From 30.11.2017 to 18.02.2018)
Construction Co.
- 19 23 847
Bill -Certified (Bill Period From 30.11.2017 to 18.02.2018)
Construction Co.
-346292
- 3 46 292
- 22 70 139
- 1 13 507
- 96 192
- 9 424
Bill -Certified (Bill Period From 30.11.2017 to 18.02.2018)
Construction Co.
- 2 19 123
- 20 51 016
- 19 238
- 20 31 778
Bill -Certified (Bill Period From 30.11.2017 to 18.02.2018)
Construction Co.
- 20 31 778
Signature- Date-
Signature- Date-
Signature- Date-
Signature- Date-
Date - 20-02-2018
Ref. : Work order dt - 11-03-2016
The Project Manager
Nirala Housing Pvt Ltd
Nirala Aspire
Plot No.GH-03, Sector-16
Greater Noida West (U.P.)
Sub.: 12th RA bill for Finishing Works of Tower D-1 & D5 for Group Housing Project "Nirala Aspire" at GH-
03, Sector - 16, Greater Noida West
Dear Sir,
Please find attached herewith our 12th RA bill for Rs. 64,93,453/- ( Rupees sixty four Lacs ninty tree Thousand
four Hundred Fifty three Only) for Finishing Work of Tower No D-1 & D5 for Group Housing Project "Nirala
Aspire". We request you to kindly release our payment.
You are requested to kindly process our bill for early payment.
Thanking you.
Authorized Signatory
J.K. CONSTRUCTION CO.
ABSTRACT OF QUANTITY OF FINISHING WORKS OF TOWER (D-1) OF NIRALA ASPIRE AT
GREATER NOIDA WEST
Total qty
Unit available at Purchase Claim Rate
S.No Description Amount Amount
Rate 85%
site/Store
ABSTRACT OF QTY. OF FINISHING WORKS OF TOWER -D1 & D5 OF NIRALA ASPIRE (PHASE - I) AT GREATER NOIDA WEST
Name of Contractor : J.K CONSTRUCTION CO.
12th R.A. Bill -Certified (Bill Period From 30.11.2017 to 18.02.2018)
TOWER (D-1 & D5) Annexture- 'A'
BOQ. Executed Quantity Executed Amount (Rs.)
Item No. Description of Item Unit Remarks
Amount
Rate Qty. (Rs.) Total Total This Bill Total Total This Bill
1.1.4 From 11th Floor level to 15th Floor level Sqm 453 1730
1.1.5 From 16th Floor level to 20th Floor level Sqm 493 1384
Providing and laying ceramic Antiskid floor
tiles of size 300x300mm (thickness to be
specified by the manufacturer) of 1st quality
conforming to IS: 15622 of approved make in
colours such as White, Ivory, Grey, Fume Red
1.3 Brown,laid on 20mm thick cement mortar 1:4 0 0 0.00 - - -
(1 cement : 4 coarse sand) at various locations
wherever required, including grouting the joints
with white cement and matching pigments
Tile Flooring
etc.,complete inSize of Tileas
all respects 300mm x 300mm
per pattern and 0 0 0 0 0 0
drawing with satisfaction of engineer in charge.
1.3.1 Up to Plinth Level Sqm 0 0 0.00 - - -
1.3.2 Above Plinth level and up to 5th Floor level Sqm 404 706 285224 1107.25 1107.25 447,329.00 447,329.00 -
Part RATE @ 95% 384 0 10.29 10.29 0.00 3,949.30 3,949.30 -
NIRALA HOUSING PVT. LTD.
Part RATE @ 95% for This Bill 384 0 306.91 306.91 0.00 117,792.06 117,792.06 -
1.3.3 From 6th Floor level to 10th Floor level Sqm 428 706 302168 1160.31 1160.31 496,612.68 496,612.68 -
Part RATE @ 95% 407 0 254.18 254.18 0.00 103,349.59 103,349.59 -
1.3.4 From 11th Floor level to 15th Floor level Sqm 453 706 319818 1284.75 1284.75 581,991.75 581,991.75 -
Part RATE @ 95% 430 0 139.70 139.70 0.00 60,119.90 60,119.90 -
1.3.5 From 16th Floor level to 20th Floor level Sqm 493 565 278545 1070.72 1070.72 527,864.96 527,864.96 -
Part RATE @ 95% 468 68.84 68.84 32,241.21 32,241.21
Tile Skirting 0 0 0 0 0
For above floor tile item, Providing and Laying
tile in skirting of 75mm to 100mm in height laid
over 12mm thick cement mortar 1:3 (1cement :
1.6 3 coarse sand) grouted with tile grout of 0 0.00 - - -
matching shade of tile including cutting,
complete in all respects as per drawing.
1.6.1 Up to Plinth Level Sqm 0 - - -
1.6.2 Above Plinth level and up to 5th Floor level Sqm 418 254 106172 427.33 427.33 0.00 178,623.94 178,623.94 -
Part RATE @ 95% for This Bill 397 0 51.78 51.78 0.00 20,561.84 20,561.84 -
1.6.3 From 6th Floor level to 10th Floor level Sqm 443 254 112522 479.10 479.10 0.00 212,241.30 212,241.30 -
1.6.4 From 11th Floor level to 15th Floor level Sqm 473 254 120142 479.10 479.10 0.00 226,614.30 226,614.30 -
Part RATE @ 95% for This Bill 445 0 240.49 240.49 0.00 106,921.85 106,921.85 -
1.7.3 From 6th Floor level to 10th Floor level Sqm 493 1179 581247 2346.35 2346.35 0.00 1,156,750.55 1,156,750.55 -
Part RATE @ 95% for This Bill 468 49.31 49.31 23,095.51 23,095.51 -
1.7.4 From 11th Floor level to 15th Floor level Sqm 532 1179 627228 2370.44 2370.44 0.00 1,261,074.08 1,261,074.08 -
-
1.7.5 From 16th Floor level to 20th Floor level Sqm 561 943 529023 1919.16 1919.16 0.00 1,076,648.76 1,076,648.76 -
Stone Cladding 0 0
With 18 to 20mm thick Granite Stone and joint
to be filled with cement slurry mixed with
2.2.1 pigment to match the shade of stone including 0 0 0.00 - - -
rubbing and mirror polishing, etc., complete in
all respect.
2.2.1.1 Up to Plinth Level Sqm 1970 25.00 25.00 0.00 49,250.00 49,250.00 -
Part RATE @ 95% 1872 0 2.47 2.47 0.00 4,622.61 4,622.61 -
Part RATE @ 90% for This Bill 1872 0 27.47 27.47 0.00 51,410.11 51,410.11 -
2.2.1.2 Above Plinth level and up to 5th Floor level Sqm 2019 0 193.99 193.99 0.00 391,657.73 391,657.73 -
Part RATE @ 90% for This Bill 1918 0 61.97 61.97 0.00 118,869.23 118,869.23 -
2.2.1.3 From 6th Floor level to 10th Floor level Sqm 2069 0 86.85 86.85 0.00 179,692.65 179,692.65 -
Part RATE @ 95% 1966 0 43.43 43.43 0.00 85,354.01 85,354.01 -
Part RATE @ 95% for This Bill 1966 0 43.43 43.43 0.00 85,354.01 85,354.01 -
2.2.1.4 From 11th Floor level to 15th Floor level Sqm 2142 0 86.85 86.85 0.00 186,032.70 186,032.70 -
Part RATE @ 95% 2035 0 43.43 43.43 0.00 88,365.53 88,365.53 -
Part RATE @ 95% for This Bill 2035 0 43.43 43.43 0.00 88,365.53 88,365.53 -
2.2.1.5 From 16th Floor level to 20th Floor level Sqm 2216 0 69.48 69.48 0.00 153,967.68 153,967.68 -
Part RATE @ 95% 2105 0 39.95 39.95 0.00 84,104.85 84,104.85 -
Part RATE @ 95% for This Bill 2105 0 29.53 29.53 0.00 62,164.45 62,164.45 -
Stone Skirting
Providing and Laying skirting in stone in 12 mm 0 0 0 0 0
average thick cement mortar 1:3 (1 cement : 3
coarse sand) jointed cement slurry mixed with
2.3 pigment to match the shade of slab,for all floors 0 0.00 - - -
& all heights in same floor, complete in all
Providing
respect as and
per Laying skirting
design & of 75mm
drawing with to
100mm height
satisfaction with 18 to
of engineer in20mm
charge.thick polished
Granite and joint to be filled with white cement
2.3.1 slurry mixed with pigment to match the shade of 0 0.00 - - -
stone including rubbing and polishing, etc.,
complete in all respect.
NIRALA HOUSING PVT. LTD.
2.3.1.1 Up to Plinth Level Sqm 1872 0 1.43 1.43 0.00 2,676.96 2,676.96 -
Part RATE @ 90% for This Bill 1778 0 1.43 1.43 0.00 2,543.11 2,543.11 -
2.3.1.2 Above Plinth level and up to 5th Floor level Sqm 1921 8 15368 50.99 50.99 0.00 97,951.79 97,951.79 -
Part RATE @ 90% for This Bill 1825 0 10.51 10.51 0.00 19,180.22 19,180.22 -
Part RATE @ 95% 1825 0 0.00 - - -
2.3.1.3 From 6th Floor level to 10th Floor level Sqm 1970 17 33490 50.60 50.60 0.00 99,682.00 99,682.00 -
Part RATE @ 95% 1872 0 0.00 - - -
2.3.1.4 From 11th Floor level to 15th Floor level Sqm 2019 17 34323 25.30 25.30 0.00 51,080.70 51,080.70 -
Part RATE @ 95% 1918 0 25.30 25.30 0.00 48,526.67 48,526.67 -
2.3.1.5 From 16th Floor level to 20th Floor level Sqm 2088 13 27144 20.24 20.24 0.00 42,261.12 42,261.12 -
Providing and Laying machine cut 18 thick
Granite
Part RATEstone
@ pre-polished
95% stone slab/ back 1984 0 20.24 20.24 0.00 40,148.06 40,148.06 -
spalsh/facia in kitchen platforms, vanity
counters, window sills, facias and similar 0 0 0.00 - - -
locations of required size, approved shade,
colour
Counter andtop,
texture laidledge
Facia, over average 20 mm 0 0 0 0 0
thick cement mortar 1:4 (1 cement : 4 coarse
sand) and joints neatly finish with white cement
mixed with matching pigment including full
2.5 round nosing at bottam and top edges of the 0 0 0.00 - - -
stone, making openings/ holes for sink/ wash
basin, mixers, soap dispenser, ledge/
sorrounding of bath tub,back splash, facia,
2.5.1 Up to Plinth
ledges Levelarea etc. as required and
of shower 0 0.00 - - -
mirror polishing of moulding and cut edges,
2.5.2 filling
Above silicon
Plinth level and upwith
at junctions to 5th Floor level
sanitary fixtures Sqm 2955 107 316185 140.30 140.30 0.00 414,586.50 414,586.50 -
and corners with wall wherever required etc
Part RATEin@
complete all95% for This
respects Bill
as per pattern and 2807 0 20.39 20.39 0.00 57,239.83 57,239.83 -
drawing with satisfaction of engineer in charge.
2.5.3 From 6th Floor level to 10th Floor level Sqm 3004 107 321428 71.80 71.80 0.00 215,687.20 215,687.20 -
Part RATE @ 95% 2854 0 84.40 84.40 0.00 240,860.72 240,860.72 -
2.5.4 From 11th Floor level to 15th Floor level Sqm 3054 107 326778 71.80 71.80 0.00 219,277.20 219,277.20 -
Part RATE @ 95% 2901 0 84.40 84.40 0.00 244,869.72 244,869.72 -
2.5.5 From 16th Floor level to 20th Floor level Sqm 3103 86 266858 117.12 117.12 0.00 363,423.36 363,423.36 -
Part RATE @ 95% 2948 0 7.84 7.84 0.00 23,111.14 23,111.14 -
NIRALA HOUSING PVT. LTD.
2.6.2 Up to 50 mm thick Sqm 320 100 32000 2489.12 2489.12 0.00 796,518.40 796,518.40 -
4.1.1 Above Plinth level and up to 5th Floor level Sqm 271 345 93495 0.00 - - -
Part RATE @ 95% Sqm 257 0 702.25 702.25 0.00 180,478.25 180,478.25 -
4.1.2 From 6th Floor level to 10th Floor level Sqm 320 345 110400 0.00 - - -
Part RATE @ 95% Sqm 304 0 702.25 702.25 0.00 213,484.00 213,484.00 -
4.1.3 From 11th Floor level to 15th Floor level Sqm 369 345 127305 0.00 - - -
Part RATE @ 95% Sqm 351 0 702.25 702.25 0.00 246,489.75 246,489.75 -
4.1.4 From 16th Floor level to 20th Floor level Sqm 419 345 144555 0.00 - - -
Part RATE @ 95% Sqm 398 0 561.80 561.80 0.00 223,596.40 223,596.40 -
Release Rate @ 20% for Double Coat Putty Sqm 17 0 21041.94 21041.94 0.00 353,504.55 353,504.55 -
Release Rate @ 10% for Primer Coat Sqm 8 0 11627.92 11627.92 0.00 97,674.53 97,674.53 -
Release Rate @ 15% for Single Coat OBD Sqm 13 0 8793.14 8793.14 0.00 110,793.56 110,793.56 -
Release Rate @ 15% for final Coat OBD Sqm 13 1742.28 1742.28 0.00 21,952.73 21,952.73 -
NIRALA HOUSING PVT. LTD.
5.2.3 From 6th Floor level to 10th Floor level Sqm 89 10827 963603 - - -
Part Rate @ 30% for Single Coat Putty Sqm 27 0 21940.19 21940.19 0.00 585,803.07 585,803.07 -
Release Rate @ 20% for Double Coat Putty Sqm 18 0 21184.19 21184.19 0.00 377,078.58 377,078.58 -
Release Rate @ 10% for Primer Coat Sqm 9 0 10383.95 10383.95 0.00 92,417.16 92,417.16 -
Release Rate @ 15% for Single Coat OBD Sqm 13 0 6097.98 6097.98 0.00 81,408.03 81,408.03 -
Release Rate @ 15% for final Coat OBD Sqm 13 1742.28 1742.28 0.00 23,259.44 23,259.44 -
5.2.4 From 11th Floor level to 15th Floor level Sqm 94 10827 1017738 - - -
Part Rate @ 30% for Single Coat Putty Sqm 28 0 21940.19 21940.19 0.00 618,713.36 618,713.36 -
Release Rate @ 20% for Double Coat Putty Sqm 19 0 11860.19 11860.19 0.00 222,971.57 222,971.57 -
Release Rate @ 10% for Primer Coat Sqm 9 0 10383.95 10383.95 0.00 97,609.13 97,609.13 -
Release Rate @ 15% for Single Coat OBD Sqm 14 0 9001.78 9001.78 0.00 126,925.10 126,925.10 -
Release Rate @ 15% for final Coat OBD Sqm 14 871.14 871.14 0.00 12,283.07 12,283.07 -
5.2.5 From 16th Floor level to 20th Floor level Sqm 99 10827 1071873 - - -
Part Rate @ 30% for Single Coat Putty Sqm 30 0 17548.20 17548.20 0.00 521,181.54 521,181.54 -
Release Rate @ 20% for Double Coat Putty Sqm 20 0 13516.20 13516.20 0.00 267,620.76 267,620.76 -
Release Rate @ 10% for Primer Coat Sqm 10 0 8307.16 8307.16 0.00 82,240.88 82,240.88 -
Release Rate @ 15% for Single Coat OBD Sqm 15 0 2903.80 2903.80 0.00 43,121.43 43,121.43 -
Release Rate @ 15% for final Coat OBD Sqm 15 0 0 1161.52 1161.52 0.00 17,248.57 17,248.57 -
Providing and applying three or more coats of
Synthetic
SyntheticEnamel
Enamel paint of approved brand and
Paint 0 0 0 0 0 0
colour to give an even shade on new plastered
work over a coat of approved primer including
the cost of preparing the surface with filling
5.3 materials (putty), along with sand papering 0 0 0.00 - - -
wherever required, scaffolding etc.for all floors
& all heights in same floor, complete in all
respects as per pattern and drawing with
5.3.2 satisfaction
On WoodenofSurface
engineer in charge. ( LOW VOC as 0 - - - -
per LEEDs Requirements)
5.3.2.1 Up to Plinth Level Sqm 0 0.00 - - -
5.3.2.2 Above Plinth level and up to 5th Floor level Sqm 99 0 0.00 - - -
NIRALA HOUSING PVT. LTD.
Part Rate @60% for Double Coat Sqm 59 0 485.10 485.10 0.00 28,814.94 28,814.94 -
Part Rate @15% for Single Coat Paint Sqm 9 0 88.20 88.20 0.00 785.86 785.86 -
5.3.2.3 From 6th Floor level to 10th Floor level Sqm 103 0 0.00 - - -
Part Rate @60% for Double Coat Sqm 62 0 485.10 485.10 0.00 29,979.18 29,979.18 -
Part Rate @15% for Single Coat Paint Sqm 9 0 88.20 88.20 0.00 817.61 817.61 -
5.3.2.4 From 11th Floor level to 15th Floor level Sqm 108 0 0.00 - - -
Part Rate @60% for Double Coat Sqm 65 0 326.34 326.34 0.00 21,146.83 21,146.83 -
Part Rate @15% for Single Coat Paint Sqm 10 0 88.20 88.20 0.00 857.30 857.30 -
5.3.2.5 From 16th Floor level to 20th Floor level Sqm 113 0 0.00 - - -
Part Rate @60% for Double Coat Sqm 68 0 308.70 308.70 0.00 20,929.86 20,929.86 -
Part Rate @15% for Single Coat Paint Sqm 10 0 70.56 70.56 0.00 717.60 717.60 -
0 0.00 - - -
5.3.3 On Metal Surface 0 - - - -
5.3.3.1 Up to Plinth Level Sqm 0 0.00 - - -
5.3.3.2 Above Plinth level and up to 5th Floor level Sqm 99 0 0.00 - - -
5.3.3.3 From 6th Floor level to 10th Floor level Sqm 103 0 0.00 - - -
5.3.3.4 From 11th Floor level to 15th Floor level Sqm 108 0 0.00 - - -
5.3.3.5 From 16th Floor level to 20th Floor level Sqm 113 0 0.00 - - -
Amount After Less Discount @4.00% on Balance Work (Tiles, Wood Work, Misc.) (52,391) (63,324) 10,933
ABSTRACT OF QTY. OF FINISHING WORKS OF TOWER -D1 OF NIRALA ASPIRE (PHASE - I) AT GREATER NOIDA WEST
Name of Contractor : J.K CONSTRUCTION CO.
12th R.A. Bill -Certified (Bill Period From 30.11.2017 to 18.02.2018)
TOWER - D-1 Annexture- 'A'
BOQ. Executed Quantity Executed Amount (Rs.)
Item No. Description of Item Unit Remarks
Amount Upto Date Previous This Bill
Rate Qty. Upto Date Amount Previous Amount This Bill Amount
(Rs.) Quantity Quantity Quantity
Tile Skirting 0 0 0 0 0
For above floor tile item, Providing and Laying tile
in skirting of 75mm to 100mm in height laid over
12mm thick cement mortar 1:3 (1cement : 3
1.6 coarse sand) grouted with tile grout of matching 0 0.00 - - -
shade of tile including cutting, complete in all
respects as per drawing.
1.6.1 Up to Plinth Level Sqm 0 - - -
1.6.2 Above Plinth level and up to 5th Floor level Sqm 418 254 106172 220.21 220.21 0.00 92,047.78 92,047.78 -
Part RATE @ 95% for This Bill 397 0
1.6.3 From 6th Floor level to 10th Floor level Sqm 443 254 112522 220.20 220.20 0.00 97,548.60 97,548.60 -
1.6.4 From 11th Floor level to 15th Floor level Sqm 473 254 120142 220.20 220.20 0.00 104,154.60 104,154.60 -
Providing and fixing 1st quality ceramic glazed
1.6.5 Fromtiles
wall 16thconforming
Floor levelto
toIS:
20th Floor(thickness
15622 level to be Sqm 512 203 103936 176.16 176.16 0.00 90,193.92 90,193.92 -
specified by manufacturer), of approved make, in
Tile Dado shades
all colours, (WALLexcept
TILE). burgundy, bottle green, 0 0 0 0 0
black of any size as approved by engineer in
charge, in skirting, risers of steps and dados, at
1.7 various locations wherever required over 12mm 0 0.00
thick bed of cement mortar 1:3 (1 cement : 3
coarse sand) and jointing with grey cement slurry
@ 3.3kg
Size per 300mm
of Tile sqm. including
x 450mm pointing in white 0 0 0.00
cement mixed with pigment of matching shade
1.7.1 Up to Plinth
complete in all
Level
respects as per pattern and 0 0.00
drawing with satisfaction of engineer in charge.
1.7.2 Above Plinth level and up to 5th Floor level Sqm 468 1179 551772 1196.50 1196.50 0.00 559,962.00 559,962.00 -
Part RATE @ 95% for This Bill 445 0 - - -
1.7.3 From 6th Floor level to 10th Floor level Sqm 493 1179 581247 1196.50 1196.50 0.00 589,874.50 589,874.50 -
1.7.4 From 11th Floor level to 15th Floor level Sqm 532 1179 627228 1196.50 1196.50 0.00 636,538.00 636,538.00 -
1.7.5 From 16thand
Floor levelcommercial
to 20th Floor level white Sqm 561 943 529023 957.20 957.20 0.00 536,989.20 536,989.20 -
Providing fixing quality
glazed ceramic tiles of size 200 x 200
Glazed tile in Over head water tanks etc.mm & 0 0 0 0
minimum thickness 5mm (floor, walls, jambs etc.)
on 12mm thick cement plaster 1:3 (1 cement : 3
coarse sand) grouted with tile grout and jointed
1.8 0 0.00
with white cement slurry of matching shade of tile
including cutting, curing etc. complete in all
respect as per drawings with satisfaction of
1.8 Over HeadinWater
engineer charge.Tank
Only Tiles shall be supplied Sqm 542 150 81300 205.38 205.38 0.00 111,315.96 111,315.96 -
free of cost at one point at site.
NIRALA HOUSING PVT. LTD.
Stone Cladding 0 0
With 18 to 20mm thick Granite Stone and joint to
be filled with cement slurry mixed with pigment to
2.2.1 match the shade of stone including rubbing and 0 0 0.00 - - -
mirror polishing, etc., complete in all respect.
2.2.1.1 Up to Plinth Level Sqm 1970 27.47 27.47 0.00 54,115.90 54,115.90 -
Part RATE @ 95% 1872 0 0.00 - - -
Part RATE @ 90% for This Bill 1872 0 - - -
2.2.1.2 Above Plinth level and up to 5th Floor level Sqm 2019 0 127.98 127.98 0.00 258,391.62 258,391.62 -
Part RATE @ 90% for This Bill 1918 0 0.00 - - -
2.2.1.3 From 6th Floor level to 10th Floor level Sqm 2069 0 86.85 86.85 0.00 179,692.65 179,692.65 -
Part RATE @ 95% 1966 0 0.00 - - -
NIRALA HOUSING PVT. LTD.
Stone Skirting
Providing and Laying skirting in stone in 12 mm 0 0 0 0 0
average thick cement mortar 1:3 (1 cement : 3
coarse sand) jointed cement slurry mixed with
2.3 pigment to match the shade of slab,for all floors & 0 0.00
all heights in same floor, complete in all respect as
Providing
per designand Laying skirting
& drawing of 75mm of
with satisfaction to engineer
100mm
height with 18 to 20mm thick polished Granite
in charge.
2.3.1 and joint to be filled with white cement slurry 0 0.00
mixed with pigment to match the shade of stone
including rubbing and polishing, etc., complete in
all respect.
2.3.1.1 Up to Plinth Level Sqm 1872 0 1.43 1.43 0.00 2,676.96 2,676.96 -
Part RATE @ 90% for This Bill 1778 0 0.00 - - -
2.3.1.2 Above Plinth level and up to 5th Floor level Sqm 1921 8 15368 30.75 30.75 0.00 59,070.75 59,070.75 -
Part RATE @ 90% for This Bill 1825 0 0.00 - - -
Part RATE @ 95% 1825 0 0.00 - - -
2.3.1.3 From 6th Floor level to 10th Floor level Sqm 1970 17 33490 25.30 25.30 0.00 49,841.00 49,841.00 -
Part RATE @ 95% 1872 0 0.00 - - -
2.3.1.4 From 11th Floor level to 15th Floor level Sqm 2019 17 34323 25.30 25.30 0.00 51,080.70 51,080.70 -
Part RATE @ 95% 1918 0 0.00 - - -
2.3.1.5 From 16th Floor level to 20th Floor level Sqm 2088 13 27144 20.24 20.24 0.00 42,261.12 42,261.12 -
Part RATE @ 95% 1984 0 0.00 - - -
0 0 0.00
Counter top, Facia, ledge 0 0 0 0 0
NIRALA HOUSING PVT. LTD.
Providing and Laying machine cut 18 thick Granite
stone pre-polished stone slab/ back spalsh/facia in BOQ. Executed Quantity Executed Amount (Rs.)
kitchen platforms, vanity counters, window sills,
Item No. facias and similar
Description ofrequired
locations of Item size, Unit Remarks
approved shade, colour and texture laid over Rate Qty. Amount Upto Date Previous This Bill Upto Date Amount Previous Amount This Bill Amount
average 20 mm thick cement mortar 1:4 (1 (Rs.) Quantity Quantity Quantity
cement : 4 coarse sand) and joints neatly finish
with white cement mixed with matching pigment
including full round nosing at bottam and top
2.5 0 0 0.00
edges of the stone, making openings/ holes for
sink/ wash basin, mixers, soap dispenser, ledge/
sorrounding of bath tub,back splash, facia, ledges
2.5.1 of
Upshower area
to Plinth etc. as required and mirror
Level 0 0.00
polishing of moulding and cut edges, filling silicon
2.5.2 at junctions
Above Plinthwith
levelsanitary
and up fixtures and corners
to 5th Floor level Sqm 2955 107 316185 76.70 76.70 0.00 226,648.50 226,648.50 -
with wall wherever required etc complete in all
respects
Part RATE as @
per95%
pattern and drawing
for This Bill with 2807 0 0.00 - - -
satisfaction of engineer in charge.
2.5.3 From 6th Floor level to 10th Floor level Sqm 3004 107 321428 76.70 76.70 0.00 230,406.80 230,406.80 -
Part RATE @ 95% 2854 0 0.00 - - -
2.5.4 From 11th Floor level to 15th Floor level Sqm 3054 107 326778 76.70 76.70 0.00 234,241.80 234,241.80 -
Part RATE @ 95% 2901 0 0.00 - - -
2.5.5 From 16th Floor level to 20th Floor level Sqm 3103 86 266858 61.36 61.36 0.00 190,400.08 190,400.08 -
Part RATE @ 95% 2948 0 0.00 - - -
Part Rate @ 30% for Single Coat Putty Sqm 25 0 10535.42 10535.42 0.00 265,492.58 265,492.58 -
Release Rate @ 20% for Double Coat Putty Sqm 17 0 10535.42 10535.42 0.00 176,995.06 176,995.06 -
Release Rate @ 10% for Primer Coat Sqm 8 0 10535.42 10535.42 0.00 88,497.53 88,497.53 -
Release Rate @ 15% for Single Coat OBD Sqm 13 0 10535.42 10535.42 0.00 132,746.29 132,746.29 -
5.2.3 From 6th Floor level to 10th Floor level Sqm 89 10827 963603 - - -
Part Rate @ 30% for Single Coat Putty Sqm 27 0 10383.95 10383.95 0.00 277,251.47 277,251.47 -
Release Rate @ 20% for Double Coat Putty Sqm 18 0 10383.95 10408.65 -24.70 184,834.31 185,273.97 (439.66)
Release Rate @ 10% for Primer Coat Sqm 9 0 10383.95 10408.65 -24.70 92,417.16 92,636.99 (219.83)
Release Rate @ 15% for Single Coat OBD Sqm 13 0 10383.95 4163.46 6220.49 138,625.73 55,582.19 83,043.54
5.2.4 From 11th Floor level to 15th Floor level Sqm 94 10827 1017738 - - -
Part Rate @ 30% for Single Coat Putty Sqm 28 0 10383.95 10383.95 0.00 292,827.39 292,827.39 -
Release Rate @ 20% for Double Coat Putty Sqm 19 0 10383.95 10408.65 -24.70 195,218.26 195,682.62 (464.36)
Release Rate @ 10% for Primer Coat Sqm 9 0 10383.95 10408.65 -24.70 97,609.13 97,841.31 (232.18)
Release Rate @ 15% for Single Coat OBD Sqm 14 0 10383.95 8326.92 2057.03 146,413.70 117,409.57 29,004.12
Release Rate @ 25% for final coat Coat OBD Sqm 24 0.00 - - -
5.2.5 From 16th Floor level to 20th Floor level Sqm 99 10827 1071873 - - -
Part Rate @ 30% for Single Coat Putty Sqm 30 0 8307.16 8307.16 0.00 246,722.65 246,722.65 -
Release Rate @ 20% for Double Coat Putty Sqm 20 0 8307.16 8326.92 -19.76 164,481.77 164,873.02 (391.25)
Release Rate @ 10% for Primer Coat Sqm 10 0 8307.16 8326.92 -19.76 82,240.88 82,436.51 (195.62)
NIRALA HOUSING PVT. LTD.
Release Rate @ 15% for Single Coat OBD Sqm 15 0 8307.16 2081.73 6225.43 123,361.33 30,913.69 92,447.64
Part Rate @60% for Double Coat Sqm 59 0 485.10 485.10 0.00 28,814.94 28,814.94 -
5.3.2.3 From 6th Floor level to 10th Floor level Sqm 103 0 0.00 - - -
Part Rate @60% for Double Coat Sqm 62 0 485.10 485.10 0.00 29,979.18 29,979.18 -
5.3.2.4 From 11th Floor level to 15th Floor level Sqm 108 0 0.00 - - -
Part Rate @60% for Double Coat Sqm 65 0 326.34 326.34 0.00 21,146.83 21,146.83 -
5.3.2.5 From 16th Floor level to 20th Floor level Sqm 113 0 0.00 - - -
Part Rate @60% for Double Coat Sqm 68 0 308.70 308.70 0.00 20,929.86 20,929.86 -
0 0.00
5.3.3 On Metal Surface 0 -
5.3.3.1 Up to Plinth Level Sqm 0 0.00
5.3.3.2 Above Plinth level and up to 5th Floor level Sqm 99 0 0.00 - - -
NIRALA HOUSING PVT. LTD.
5.3.3.3 From 6th Floor level to 10th Floor level Sqm 103 0 0.00 - - -
5.3.3.4 From 11th Floor level to 15th Floor level Sqm 108 0 0.00 - - -
5.3.3.5 From 16th Floor level to 20th Floor level Sqm 113 0 0.00 - - -
ABSTRACT OF QTY. OF FINISHING WORKS OF TOWER -D5 OF NIRALA ASPIRE (PHASE - I) AT GREATER NOIDA WEST
Name of Contractor : J.K CONSTRUCTION CO.
12th R.A. Bill -Certified (Bill Period From 30.11.2017 to 18.02.2018)
TOWER - D-5 Annexture- 'A'
BOQ. Executed Quantity Executed Amount (Rs.)
Item No. Description of Item Unit Remarks
Amount Upto Date Previous This Bill
Rate Qty. Upto Date Amount Previous Amount This Bill Amount
(Rs.) Quantity Quantity Quantity
1.3.5 From 16th Floor level to 20th Floor level Sqm 493 565 278545 621.08 621.08 0.00 306,192.44 306,192.44 -
Part RATE @ 95% 468 0 0.00 0.00 - - -
Tile Skirting 0 0 0 0 0
For above floor tile item, Providing and Laying tile
in skirting of 75mm to 100mm in height laid over
12mm thick cement mortar 1:3 (1cement : 3
1.6 0 0.00
coarse sand) grouted with tile grout of matching
shade of tile including cutting, complete in all
respects as per drawing.
1.6.1 Up to Plinth Level Sqm 0 - - -
1.6.2 Above Plinth level and up to 5th Floor level Sqm 418 254 106172 258.90 258.90 0.00 108,220.20 108,220.20 -
Part RATE @ 95% for This Bill 397 0 0.00 0.00 - - -
1.6.3 From 6th Floor level to 10th Floor level Sqm 443 254 112522 258.90 258.90 0.00 114,692.70 114,692.70 -
1.6.4 From 11th Floor level to 15th Floor level Sqm 473 254 120142 258.90 258.90 0.00 122,459.70 122,459.70 -
Providing and fixing 1st quality ceramic glazed
1.6.5 Fromtiles
wall 16thconforming
Floor levelto
toIS:
20th
15622
Floor(thickness
level to be Sqm 512 203 103936 202.93 202.93 0.00 103,898.24 103,898.24 -
specified by manufacturer), of approved make, in
Tile Dado shades
all colours, (WALLexcept
TILE). burgundy, bottle green, 0 0 0 0 0
black of any size as approved by engineer in
charge, in skirting, risers of steps and dados, at
1.7 various locations wherever required over 12mm 0 0.00
thick bed of cement mortar 1:3 (1 cement : 3
coarse sand) and jointing with grey cement slurry
@ 3.3kg
Size per 300mm
of Tile sqm. including
x 450mm pointing in white 0 0 0.00
cement mixed with pigment of matching shade
1.7.1 Up to Plinth
complete in all
Level
respects as per pattern and 0 0.00
drawing with satisfaction of engineer in charge.
1.7.2 Above Plinth level and up to 5th Floor level Sqm 468 1179 551772 1202.45 1202.45 0.00 562,746.60 562,746.60 -
Part RATE @ 95% for This Bill 445 0 0.00 0.00 - - -
1.7.3 From 6th Floor level to 10th Floor level Sqm 493 1179 581247 1199.16 1199.16 0.00 591,187.11 591,187.11 -
1.7.4 From 11th Floor level to 15th Floor level Sqm 532 1179 627228 1173.94 1173.94 0.00 624,536.08 624,536.08 -
1.7.5 From 16thand
Floor levelcommercial
to 20th Floor level white Sqm 561 943 529023 961.96 961.96 0.00 539,659.56 539,659.56 -
Providing fixing quality
glazed
Glazed ceramic tiles of size 200 x 200 mm
tile in Over head water tanks etc. & 0 0 0 0
minimum thickness 5mm (floor, walls, jambs etc.)
on 12mm thick cement plaster 1:3 (1 cement : 3
1.8 coarse sand) grouted with tile grout and jointed 0 0.00
with white cement slurry of matching shade of tile
including cutting, curing etc. complete in all
respect as per drawings with satisfaction of
1.8 Over HeadinWater
engineer charge.Tank
Only Tiles shall be supplied Sqm 542 150 81300 100.79 100.79 0.00 54,628.18 54,628.18 -
free of cost at one point at site.
1.0 Total Amount of Tiles Work 7502039.74 7502039.74 0.00
NIRALA HOUSING PVT. LTD.
Stone Cladding 0 0
With 18 to 20mm thick Granite Stone and joint to
be filled with cement slurry mixed with pigment to
2.2.1 match the shade of stone including rubbing and 0 0 0.00 - - -
mirror polishing, etc., complete in all respect.
2.2.1.1 Up to Plinth Level Sqm 1970 0.00 - - -
Part RATE @ 90% for This Bill 1872 0 27.47 27.47 0.00 51,410.11 51,410.11 -
2.2.1.2 Above Plinth level and up to 5th Floor level Sqm 2019 0 127.98 127.98 0.00 258,391.62 258,391.62 -
Part RATE @ 90% for This Bill 1918 0 0.00 0.00 - - -
2.2.1.3 From 6th Floor level to 10th Floor level Sqm 2069 0 86.85 86.85 0.00 179,692.65 179,692.65 -
Part RATE @ 95% for This Bill 1966 0 0.00 0.00 - - -
2.2.1.4 From 11th Floor level to 15th Floor level Sqm 2142 0 86.85 86.85 0.00 186,032.70 186,032.70 -
Part RATE @ 95% for This Bill 2035 0 0.00 0.00 - - -
2.2.1.5 From 16th Floor level to 20th Floor level Sqm 2216 0 69.48 69.48 0.00 153,967.68 153,967.68 -
NIRALA HOUSING PVT. LTD.
Stone Skirting
Providing and Laying skirting in stone in 12 mm 0 0 0 0 0
average thick cement mortar 1:3 (1 cement : 3
coarse sand) jointed cement slurry mixed with
2.3 pigment to match the shade of slab,for all floors & 0 0.00
all heights in same floor, complete in all respect as
Providing
per designand Laying skirting
& drawing of 75mm of
with satisfaction to engineer
100mm
height with 18 to 20mm thick polished Granite
in charge.
2.3.1 and
joint to be filled with white cement slurry
0 0.00
mixed with pigment to match the shade of stone
including rubbing and polishing, etc., complete in
all respect.
2.3.1.1 Up to Plinth Level Sqm 1872 0 0.00 - - -
Part RATE @ 90% for This Bill 1778 0 1.43 1.43 2,543.11 - 2,543.11
2.3.1.2 Above Plinth level and up to 5th Floor level Sqm 1921 8 15368 30.75 30.75 0.00 59,070.75 59,070.75 -
Part RATE @ 90% for This Bill 1825 0 0.00 0.00 - - -
2.3.1.3 From 6th Floor level to 10th Floor level Sqm 1970 17 33490 0.00 - - -
Part RATE @ 95% 1872 0 25.30 25.30 0.00 47,348.95 47,348.95 -
2.3.1.4 From 11th Floor level to 15th Floor level Sqm 2019 17 34323 0.00 - - -
Part RATE @ 95% 1918 0 25.30 25.30 0.00 48,526.67 48,526.67 -
2.3.1.5 From 16th Floor level to 20th Floor level Sqm 2088 13 27144 0.00 - - -
Providing and Laying machine cut 18 thick Granite
Part
stoneRATE @ 95% stone slab/ back spalsh/facia in
pre-polished 1984 0 20.24 20.24 0.00 40,148.06 40,148.06 -
kitchen platforms, vanity counters, window sills,
facias and similar locations of required size, 0 0 0.00
approved shade, colour and texture laid over
Counter
average 20top,
mmFacia, ledge mortar 1:4 (1
thick cement 0 0 0 0 0
cement : 4 coarse sand) and joints neatly finish
with white cement mixed with matching pigment
2.5 including
full round nosing at bottam and top
0 0 0.00
edges of the stone, making openings/ holes for
sink/ wash basin, mixers, soap dispenser, ledge/
sorrounding of bath tub,back splash, facia, ledges
2.5.1 of
Upshower area
to Plinth etc. as required and mirror
Level 0 0.00
polishing of moulding and cut edges, filling silicon
2.5.2 at junctions
Above Plinthwith
levelsanitary
and up fixtures and corners
to 5th Floor level Sqm 2955 107 316185 83.99 83.99 0.00 248,190.45 248,190.45 -
with wall wherever required etc complete in all
respects
Part RATE as @
per95%
pattern and drawing
for This Bill with 2807 0 0.00 0.00 - - -
satisfaction of engineer in charge.
2.5.3 From 6th Floor level to 10th Floor level Sqm 3004 107 321428 0.00 - - -
NIRALA HOUSING PVT. LTD.
4.1.4 From 16th Floor level to 20th Floor level Sqm 419 105 43995 0.00 - - -
Part RATE @ 95% Sqm 398 0 73.08 73.08 0.00 29,085.84 29,085.84 -
Internal Door Shutters - Providing and Fixing Only
phenol bonded flush door & window shutters
including fixing of all necessary or required
4.2 hardwares, fixing & fitting arrangement etc 0 0.00 - - -
complete in all respect as per design & drawing
with satisfaction of engineer in charge.
4.1.1 Above Plinth level and up to 5th Floor level Sqm 271 345 93495 0.00 - - -
Part RATE @ 95% Sqm 257 0 383.05 383.05 0.00 98,443.85 98,443.85 -
4.1.2 From 6th Floor level to 10th Floor level Sqm 320 345 110400 0.00 - - -
Part RATE @ 95% Sqm 304 0 383.05 383.05 0.00 116,447.20 116,447.20 -
4.1.3 From 11th Floor level to 15th Floor level Sqm 369 345 127305 0.00 - - -
Part RATE @ 95% Sqm 351 0 383.05 383.05 0.00 134,450.55 134,450.55 -
4.1.4 From 16th Floor level to 20th Floor level Sqm 419 345 144555 0.00 - - -
Part RATE @ 95% Sqm 398 0 306.44 306.44 0.00 121,963.12 121,963.12 -
Part Rate @ 30% for Single Coat Putty Sqm 25 0 11262.52 11262.52 0.00 283,815.44 283,815.44 -
Release Rate @ 20% for Double Coat Putty Sqm 17 0 11262.52 11262.52 0.00 189,210.29 189,210.29 -
NIRALA HOUSING PVT. LTD.
Release Rate @ 10% for Primer Coat Sqm 8 0 11262.52 11262.52 0.00 94,605.15 94,605.15 -
Release Rate @ 15% for Single Coat OBD Sqm 13 0 11262.52 11262.52 0.00 141,907.72 141,907.72 -
5.2.3 From 6th Floor level to 10th Floor level Sqm 89 10827 963603 - - -
Part Rate @ 30% for Single Coat Putty Sqm 27 0 11556.24 11556.24 0.00 308,551.61 308,551.61 -
Release Rate @ 20% for Double Coat Putty Sqm 18 0 11556.24 11556.24 0.00 205,701.07 205,701.07 -
Release Rate @ 10% for Primer Coat Sqm 9 0 11556.24 11556.24 0.00 102,850.54 102,850.54 -
Release Rate @ 15% for Single Coat OBD Sqm 13 0 11556.24 11556.24 0.00 154,275.80 154,275.80 -
5.2.4 From 11th Floor level to 15th Floor level Sqm 94 10827 1017738 - - -
Part Rate @ 30% for Single Coat Putty Sqm 28 0 11551.30 11551.30 0.00 325,746.72 325,746.72 -
Release Rate @ 20% for Double Coat Putty Sqm 19 0 11551.30 11551.30 0.00 217,164.48 217,164.48 -
Release Rate @ 10% for Primer Coat Sqm 9 0 11551.30 11551.30 0.00 108,582.24 108,582.24 -
Release Rate @ 15% for Single Coat OBD Sqm 14 0 11551.30 11551.30 0.00 162,873.36 162,873.36 -
Release Rate @ 25% for final coat Coat OBD Sqm 24 0.00 - - -
5.2.5 From 16th Floor level to 20th Floor level Sqm 99 10827 1071873 - - -
Part Rate @ 30% for Single Coat Putty Sqm 30 0 9241.04 9241.04 0.00 274,458.89 274,458.89 -
Release Rate @ 20% for Double Coat Putty Sqm 20 0 9241.04 9241.04 0.00 182,972.59 182,972.59 -
Release Rate @ 10% for Primer Coat Sqm 10 0 9241.04 9241.04 0.00 91,486.30 91,486.30 -
Release Rate @ 15% for Single Coat OBD Sqm 15 0 9241.04 9241.04 0.00 137,229.44 137,229.44 -
5.3.2.3 From 6th Floor level to 10th Floor level Sqm 103 0 0.00 - - -
Part Rate @60% for Double Coat Sqm 62 0 0.00 - - -
Part Rate @15% for Single Coat Paint Sqm 9 0 - - -
5.3.2.4 From 11th Floor level to 15th Floor level Sqm 108 0 0.00 - - -
5.3.2.5 From 16th Floor level to 20th Floor level Sqm 113 0 0.00 - - -
0 0.00
5.3.3 On Metal Surface 0 -
5.3.3.1 Up to Plinth Level Sqm 0 0.00
5.3.3.2 Above Plinth level and up to 5th Floor level Sqm 99 0 0.00 - - -
5.3.3.3 From 6th Floor level to 10th Floor level Sqm 103 0 0.00 - - -
5.3.3.4 From 11th Floor level to 15th Floor level Sqm 108 0 0.00 - - -
5.3.3.5 From 16th Floor level to 20th Floor level Sqm 113 0 0.00 - - -
1 Flooring 600 x 600 mm. Sqm 1072.65 -712.15 360.50 0.248 89.40 0.907 326.97 0.00
2 Flooring 300 x 300 mm. Sqm 5402.95 0.00 5402.95 0.248 1339.93 0.907 4900.48 0.00
3 Skirting 600 x 600/300 x 300 mm. Sqm 1816.40 0.00 1816.40 0.209 379.63 0.529 960.87 0.00
4 Dado 300 x 450 mm. Sqm 9084.21 0.00 9084.21 0.209 1898.60 0.529 4805.55 0.00
5 Flooring & Dado 200 x 200 mm. Sqm 205.38 0.00 205.38 0.209 42.92 0.529 108.65 0.00
1 Lobby Flooring Sqm 2760.87 0.00 2760.87 0.248 684.70 0.907 2504.11 0.00
2 Lobby Skirting Sqm 206.04 0.00 206.04 0.209 43.06 0.529 109.00 0.00
3 Lobby Cladding Sqm 797.26 0.00 797.26 0.275 219.25 0.544 433.71 0.00
4 Staircase Tread Sqm 434.74 59.90 494.64 0.275 136.03 0.544 269.08 0.00
5 Staircase Riser Sqm 259.68 36.66 296.34 0.275 81.49 0.544 161.21 0.00
6 Staircase Mid Landing Sqm 474.05 69.73 543.78 0.275 149.54 0.544 295.82 0.00
7 Staircase Skrting Sqm 107.75 12.99 120.74 0.275 33.20 0.544 65.68 0.00
8 Kitchen Counter Flooring Sqm 598.05 0.00 598.05 0.248 148.32 0.907 542.43 0.00
1 Using Mortar in Passage area Sqm 4891.95 0.00 4891.95 0.160 782.71 0.393 1922.54 0.00
(25mm Thick)
2 Balcony Screeding (50 mm Thick) Sqm 2489.12 0.00 2489.12 0.320 796.52 0.786 1956.45 0.00
2 Skirting Repair 12-15mm thick Wall Sqm 1694.078 187.49 1881.57 0.086 161.82 0.306 575.76 0.00
Plaster (Mortar 1:6)
1 I.P.S. (Avarage 25 mm Thick) Sqm 613.83 27.79 641.62 0.473 303.49 1.061 680.76
3 water proofing in toilet Sqmt 0.00 151.20 151.20 0.120 18.14 0.00
FINISHING WORKS
TILES, DOOR SHUTTERS & NECESSARY HARDWARE SHALL BE
SUPPLIED FREE OF COST AT ONE POINT AT SITE BY NIRALA HOUSING
PVT LTD.
1 (Quoted Rates are
TILE & STONE WORKfor all heights, depths, levels,
leads and lifts
Providing and and forVitrified
laying all designfloor
and pattern shown
tiles in sizes
in drawings)
(thickness to be specified by the manufacturer)
Quoted rateabsorption
with water to include wastage
less thanfor tile and stone
0.08%and
Tile flooring
works
conforming to IS : 15622, of approved make, in all
colours and shades,laid on 20mm thick cement
1.1 mortar 1:4 (1 cement : 4 coarse sand) at various
locations wherever
Size of Tile 600mmrequired,
x 600mm including grouting the
joints with white cement and matching pigments
1.1.1 Up to Plinth Level
etc.,complete in all respects as per pattern and
1.1.2 drawing with satisfaction
Above Plinth level and up of to
engineer in charge.
5th Floor level
1.1.2 Stilt Floor D-1 Sqm 404 0 0 0 0
1.1.2 First Floor D-1 Sqm 404 0.00
1.1.2 2nd Floor D-1 Sqm 404 360.50 357.55 2.95 0.00
1.1.2 3rd Floor D-1 Sqm 404
1.1.2 4th Floor D-1 Sqm 404 0.00
1.1.2 5th Floor D-1 Sqm 404 0.00
1.1.2 SUB-TOTAL 360.50 1072.65 2.95 0.00 433350.60 0.00
1.1.2 Stilt Floor D-5 Sqm 404 0.00 0.00 0.00 0.00
1.1.2 First Floor D-5 Sqm 404 402.92 402.92 0.00 162779.68 162779.68 0.00
1.1.2 2nd Floor D-5 Sqm 404 402.92 402.92 0.00 162779.68 162779.68 0.00
1.1.2 3rd Floor D-5 Sqm 404 402.92 402.92 0.00 162779.68 162779.68 0.00
1.1.2 4th Floor D-5 Sqm 404 402.92 402.92 0.00 162779.68 162779.68 0.00
1.1.2 5th Floor D-5 Sqm 404 402.92 402.92 0.00 162779.68 162779.68 0.00
1.1.2 SUB-TOTAL 2014.60 2014.60 0.00 813898.40 813898.40 0.00
1.1.2 TOTAL 2014.60 2014.60 2.95 813898.40 1247249.00 0.00
0.00 0.00 0.00 0.00
1.1.3 From 6th Floor level to 10th Floor level
1.1.3 6th Floor D-1 Sqm 428 357.55 357.55 0.00 153031.40 153031.40 0.00
1.1.3 7th Floor D-1 Sqm 428 357.55 357.55 0.00 153031.40 153031.40 0.00
1.1.3 8th Floor D-1 Sqm 428 357.55 357.55 0.00 153031.40 153031.40 0.00
1.1.3 9th Floor D-1 Sqm 428 357.55 357.55 0.00 153031.40 153031.40 0.00
1.1.3 10th Floor D-1 Sqm 428 357.55 357.55 0.00 153031.40 153031.40 0.00
5.1.3 SUB-TOTAL 1787.75 1787.75 0.00 765157.00 765157.00 0.00
1.1.2 6th Floor D-5 Sqm 428 402.92 402.92 0.00 172449.76 172449.76 0.00
1.1.2 7th Floor D-5 Sqm 428 402.92 402.92 0.00 172449.76 172449.76 0.00
1.1.2 8th Floor D-5 Sqm 428 402.92 402.92 0.00 172449.76 172449.76 0.00
1.1.2 9th Floor D-5 Sqm 428 402.92 402.92 0.00 172449.76 172449.76 0.00
1.1.2 10th Floor D-5 Sqm 428 398.24 398.24 0.00 170447.79 170447.79 0.00
1.1.2 SUB-TOTAL 2009.92 2009.92 0.00 860246.83 860246.83 0.00
1.1.2 TOTAL 3797.67 3797.67 0.00 1625403.83 1625403.83 0.00
1.1.4 11th Floor D-5 Sqm 453 402.92 402.92 0.00 182522.76 182522.76 0.00
1.1.4 12th Floor D-5 Sqm 453 402.92 402.92 0.00 182522.76 182522.76 0.00
1.1.4 13th Floor D-5 Sqm 453 402.92 402.92 0.00 182522.76 182522.76 0.00
1.1.4 14th Floor D-5 Sqm 453 402.92 402.92 0.00 182522.76 182522.76 0.00
1.1.4 15th Floor D-5 Sqm 453 402.92 402.92 0.00 182522.76 182522.76 0.00
1.1.4 SUB-TOTAL 2014.60 2014.60 0.00 912613.80 912613.80 0.00
1.1.4 TOTAL 3802.35 3802.35 0.00 1722464.55 1722464.55 0.00
1.1.5 16th Floor D-5 Sqm 493 402.92 402.92 0.00 198639.56 198639.56 0.00
1.1.5 17th Floor D-5 Sqm 493 402.92 402.92 0.00 198639.56 198639.56 0.00
1.1.5 18th Floor D-5 Sqm 493 402.92 402.92 0.00 198639.56 198639.56 0.00
Item BOQ. Executed Quantity Executed Amount (Rs.)
No. Description of Item Tower Unit Remarks
Rate Total Pev Qty This Bill Total Total pev. Amt This Bill
1.1.5 19th Floor D-5 Sqm 493 392.56 392.56 0.00 193531.46 193531.46 0.00
1.1.5 SUB-TOTAL 1601.32 1601.32 0.00 789450.14 789450.14 0.00
1.1.5 TOTAL 3031.52 3031.52 0.00 1494538.74 1494538.74 0.00
Providing and laying ceramic Antiskid floor tiles of
size 300x300mm (thickness to be specified by the
Anti Skid Tile of 1st quality conforming to IS:
manufacturer)
15622 of approved make in colours such as White,
Ivory, Grey, Fume Red Brown,laid on 20mm thick
1.3
cement mortar 1:4 (1 cement : 4 coarse sand) at
various locations wherever required, including
grouting the300mm
Size of Tile joints with white cement and matching
x 300mm
pigments etc.,complete in all respects as per pattern
1.3.2 Above Plinth with
and drawing level satisfaction
and up to 5th Floor level
of engineer in charge.
1.3.2 Stilt Floor D-1 Sqm 404
1.3.2 First Floor D-1 Sqm 404 129.62 129.62 0.00 52366.48 52366.48 0.00
1.3.2 2nd Floor D-1 Sqm 404 129.62 129.62 0.00 52366.48 52366.48 0.00
1.3.2 3rd Floor D-1 Sqm 404 129.62 129.62 0.00 52366.48 52366.48 0.00
1.3.2 4th Floor D-1 Sqm 404 129.62 129.62 0.00 52366.48 52366.48 0.00
1.3.2 5th Floor D-1 Sqm 404 129.62 129.62 0.00 52366.48 52366.48 0.00
1.3.2 SUB-TOTAL 648.10 648.10 0.00 261832.40 261832.40 0.00
1.3.3 6th Floor D-5 Sqm 428 155.27 155.27 0.00 66455.56 66455.56 0.00
1.3.3 7th Floor D-5 Sqm 428 155.27 155.27 0.00 66455.56 66455.56 0.00
1.3.3 8th Floor D-5 Sqm 428 155.27 155.27 0.00 66455.56 66455.56 0.00
1.3.3 9th Floor D-5 Sqm 428 155.27 155.27 0.00 66455.56 66455.56 0.00
1.3.3 10th Floor D-5 Sqm 428 155.27 155.27 0.00 66455.56 66455.56 0.00
1.3.3 SUB-TOTAL 776.35 776.35 0.00 332277.80 332277.80 0.00
1.3.3 TOTAL 1414.49 1414.49 0.00 605401.72 605401.72 0.00
1.3.4 11th Floor D-5 Sqm 453 155.27 155.27 0.00 70337.31 70337.31 0.00
1.3.4 12th Floor D-5 Sqm 453 155.27 155.27 0.00 70337.31 70337.31 0.00
1.3.4 13th Floor D-5 Sqm 453 155.27 155.27 0.00 70337.31 70337.31 0.00
1.3.4 14th Floor D-5 Sqm 453 155.27 155.27 0.00 70337.31 70337.31 0.00
1.3.4 15th Floor D-5 Sqm 453 155.27 155.27 0.00 70337.31 70337.31 0.00
1.3.4 0.00 0.00 0.00 0.00
1.3.4 SUB-TOTAL 776.35 776.35 0.00 351686.55 351686.55 0.00
1.3.4 TOTAL 1424.45 1424.45 0.00 645275.85 645275.85 0.00
1.3.5 16th Floor D-5 Sqm 493 155.27 155.27 0.00 76548.11 76548.11 0.00
1.3.5 17th Floor D-5 Sqm 493 155.27 155.27 0.00 76548.11 76548.11 0.00
1.3.5 18th Floor D-5 Sqm 493 155.27 155.27 0.00 76548.11 76548.11 0.00
1.3.5 19th Floor D-5 Sqm 493 155.27 155.27 0.00 76548.11 76548.11 0.00
0.00 0.00 0.00 0.00
1.3.5 SUB-TOTAL 621.08 621.08 0.00 306192.44 306192.44 0.00
1.3.5 TOTAL 1139.56 1139.56 0.00 561803.08 561803.08 0.00
Item BOQ. Executed Quantity Executed Amount (Rs.)
No. Description of Item Tower Unit Remarks
Rate Total Pev Qty This Bill Total Total pev. Amt This Bill
Tile Skirting
For above floor tile item, Providing and Laying tile
in skirting of 75mm to 100mm in height laid over
1.6 12mm thick cement mortar 1:3 (1cement : 3 coarse
sand) grouted with tile grout of matching shade of
tile including cutting, complete in all respects as per
drawing.
1.6.2 Above Plinth level and up to 5th Floor level
1.6.2 Stilt Floor D-1 Sqm 418
1.6.2 First Floor D-1 Sqm 418 44.05 44.05 0.00 18412.90 18412.90 0.00
1.6.2 2nd Floor D-1 Sqm 418 44.04 44.04 0.00 18408.72 18408.72 0.00
1.6.2 3rd Floor D-1 Sqm 418 44.04 44.04 0.00 18408.72 18408.72 0.00
1.6.2 4th Floor D-1 Sqm 418 44.04 44.04 0.00 18408.72 18408.72 0.00
1.6.2 5th Floor D-1 Sqm 418 44.04 44.04 0.00 18408.72 18408.72 0.00
1.6.2 SUB-TOTAL 220.21 220.21 0.00 92047.78 92047.78 0.00
1.6.3 6th Floor D-5 Sqm 443 51.78 51.78 0.00 22938.54 22938.54 0.00
1.6.3 7th Floor D-5 Sqm 443 51.78 51.78 0.00 22938.54 22938.54 0.00
1.6.3 8th Floor D-5 Sqm 443 51.78 51.78 0.00 22938.54 22938.54 0.00
1.6.3 9th Floor D-5 Sqm 443 51.78 51.78 0.00 22938.54 22938.54 0.00
1.6.3 10th Floor D-5 Sqm 443 51.78 51.78 0.00 22938.54 22938.54 0.00
1.6.3 SUB-TOTAL 258.90 258.90 0.00 114692.70 114692.70 0.00
1.6.3 TOTAL 479.10 479.10 0.00 212241.30 212241.30 0.00
1.6.4 11th Floor D-5 Sqm 473 51.78 51.78 0.00 24491.94 24491.94 0.00
1.6.4 12th Floor D-5 Sqm 473 51.78 51.78 0.00 24491.94 24491.94 0.00
1.6.4 13th Floor D-5 Sqm 473 51.78 51.78 0.00 24491.94 24491.94 0.00
1.6.4 14th Floor D-5 Sqm 473 51.78 51.78 0.00 24491.94 24491.94 0.00
1.6.4 15th Floor D-5 Sqm 473 51.78 51.78 0.00 24491.94 24491.94 0.00
1.6.4 SUB-TOTAL 258.90 258.90 0.00 122459.70 122459.70 0.00
1.6.4 TOTAL 479.10 479.10 0.00 226614.30 226614.30 0.00
1.6.5 16th Foor D-5 Sqm 512 51.78 51.78 0.00 26511.36 26511.36 0.00
1.6.5 17th Foor D-5 Sqm 512 51.78 51.78 0.00 26511.36 26511.36 0.00
1.6.5 18th Foor D-5 Sqm 512 51.78 51.78 0.00 26511.36 26511.36 0.00
1.6.5 19th Foor D-5 Sqm 512 47.59 47.59 0.00 24364.16 24364.16 0.00
1.6.5 SUB-TOTAL
Providing and fixing 1st quality ceramic glazed wall 202.93 202.93 0.00 103898.24 103898.24 0.00
1.6.5 TOTAL
tiles conforming to IS: 15622 (thickness to be 379.09 379.09 0.00 194092.16 194092.16 0.00
specified by manufacturer), of approved make, in all
colours,
Tile Dado shades except burgundy, bottle green, black
of any size as approved by engineer in charge, in
skirting, risers of steps and dados, at various
1.7 locations wherever required over 12mm thick bed
of cement mortar 1:3 (1 cement : 3 coarse sand)
and jointing with grey cement slurry @ 3.3kg per
Size
sqm. of Tile 300mm
including x 450mm
pointing in white cement mixed with
1.7.2 Above
pigment Plinth level and
of matching up tocomplete
shade 5th Floorinlevel
all respects
1.7.2 as per pattern
Stilt Floor and drawing with satisfaction of D-1 Sqm 468
engineer in charge.
Item BOQ. Executed Quantity Executed Amount (Rs.)
No. Description of Item Tower Unit Remarks
Rate Total Pev Qty This Bill Total Total pev. Amt This Bill
1.7.2 First Floor D-1 Sqm 468 239.30 239.30 0.00 111992.40 111992.40 0.00
1.7.2 2nd Floor D-1 Sqm 468 239.30 239.30 0.00 111992.40 111992.40 0.00
1.7.2 3rd Floor D-1 Sqm 468 239.30 239.30 0.00 111992.40 111992.40 0.00
1.7.2 4th Floor D-1 Sqm 468 239.30 239.30 0.00 111992.40 111992.40 0.00
1.7.2 5th Floor D-1 Sqm 468 239.30 239.30 0.00 111992.40 111992.40 0.00
1.7.2 SUB-TOTAL 1196.50 1196.50 0.00 559962.00 559962.00 0.00
1.7.3 6th Floor D-5 Sqm 493 240.49 240.49 0.00 118561.57 118561.57 0.00
1.7.3 7th Floor D-5 Sqm 493 240.49 240.49 0.00 118561.57 118561.57 0.00
1.7.3 8th Floor D-5 Sqm 493 240.49 240.49 0.00 118561.57 118561.57 0.00
1.7.3 9th Floor D-5 Sqm 493 240.49 240.49 0.00 118561.57 118561.57 0.00
1.7.3 10th Floor D-5 Sqm 493 237.20 237.20 0.00 116940.83 116940.83 0.00
1.7.3 SUB-TOTAL 1199.16 1199.16 0.00 591187.11 591187.11 0.00
1.7.3 TOTAL 2395.66 2395.66 0.00 1181061.61 1181061.61 0.00
1.7.4 11th Floor D-5 Sqm 532 240.49 240.49 0.00 127940.68 127940.68 0.00
1.7.4 12th Floor D-5 Sqm 532 227.88 227.88 0.00 121231.50 121231.50 0.00
1.7.4 13th Floor D-5 Sqm 532 237.20 237.20 0.00 126191.73 126191.73 0.00
1.7.4 14th Floor D-5 Sqm 532 240.49 240.49 0.00 127940.68 127940.68 0.00
1.7.4 15th Floor D-5 Sqm 532 227.88 227.88 0.00 121231.50 121231.50 0.00
1.7.4 SUB-TOTAL 1173.94 1173.94 0.00 624536.08 624536.08 0.00
1.7.4 TOTAL 2370.44 2370.44 0.00 1261074.08 1261074.08 0.00
1.7.5 16th Floor D-5 Sqm 561 240.49 240.49 0.00 134914.89 134914.89 0.00
1.7.5 17th Floor D-5 Sqm 561 240.49 240.49 0.00 134914.89 134914.89 0.00
1.7.5 18th Floor D-5 Sqm 561 240.49 240.49 0.00 134914.89 134914.89 0.00
1.7.5 19th Floor D-5 Sqm 561 240.49 240.49 0.00 134914.89 134914.89 0.00
1.7.5 SUB-TOTAL 961.96 961.96 0.00 539659.56 539659.56 0.00
1.7.5 TOTAL 1919.16 1919.16 0.00 1076648.76 1076648.76 0.00
Providing
Glazed tileand
in fixing commercial
Over head qualityetc.
water tanks white
glazed ceramic tiles of size 200 x 200 mm &
minimum thickness 5mm (floor, walls, jambs etc.)
on 12mm thick cement plaster 1:3 (1 cement : 3
coarse sand) grouted with tile grout and jointed
1.8
with white cement slurry of matching shade of tile
including cutting, curing etc. complete in all respect
as per drawings with satisfaction of engineer in
charge. Only Tiles shall be supplied free of cost at
1.8 Over HeadatWater
one point site. Tank D-1 Sqm 542 104.59 104.59 0.00 56687.78 56687.78 0.00
1.8 Over Head Water Tank D-5 Sqm 542 100.79 100.79 0.00 54628.18 54628.18 0.00
2 Stone flooring
Providing and Laying stone flooring using stone slab BOQ. Executed Quantity Executed Amount (Rs.)
Item of approved quality in specified size of stone slab as
Description
No. per drawings and of Item
pattern in flooring/ landing bands
Tower Unit Remarks
with 20mm thick (average) base of cement mortar Rate Total Pev Qty This Bill Total Total pev. Amt This Bill
1:4 (1 cement : 4 coarse sand) of adequate
thickness to match the total thickness of 50mm and
2.0 joint to be filled with cement slurry mixed with
pigment to match the shade of stone including
surfaces pointing, curing, rubbing, polishing(as
decided), etc. complete as per specification, pattern
and drawing with satisfaction of engineer in
With 18 mm
charge.for allthick
floorspolished Granite
& all heights and joint
in same floor.to be
2.1 filled
(Stone with white
type shallcement slurry
be as per mixedapproved
sample with pigment
by
to match the shade of stone including rubbing and
NHPL)
polishing, etc., complete in all respect.
2.1.1 Above Plinth level and up to 5th Floor level
2.1.1 Basement Floor Lvl. D-1 Sqm 1822 29.55 29.55 0.00 53840.10 53840.10 0.00
2.1.1 Basement Floor Lvl. D-5 Sqm 1822 26.30 26.30 0.00 47918.60 47918.60 0.00
2.1.1 SUB-TOTAL 55.85 55.85 0.00 101758.70 101758.70 0.00
2.1.2 Stilt Floor D-5 Sqm 1872 85.84 85.84 0.00 160692.48 160692.48 0.00
2.1.2 First Floor D-5 Sqm 1872 67.45 67.45 0.00 126266.40 126266.40 0.00
2.1.2 2nd Floor D-5 Sqm 1872 67.45 67.45 0.00 126266.40 126266.40 0.00
2.1.2 3rd Floor D-5 Sqm 1872 67.45 67.45 0.00 126266.40 126266.40 0.00
2.1.2 4th Floor D-5 Sqm 1872 67.45 67.45 0.00 126266.40 126266.40 0.00
2.1.2 5th Floor D-5 Sqm 1872 67.45 67.45 0.00 126266.40 126266.40 0.00
2.1.2 SUB-TOTAL 423.09 423.09 0.00 792024.48 792024.48 0.00
2.1.2 TOTAL 839.56 839.56 0.00 1571656.32 1571656.32 0.00
2.1.3 6th Foor D-5 Sqm 1921 67.45 67.45 0.00 129571.45 129571.45 0.00
2.1.3 7th Foor D-5 Sqm 1921 67.45 67.45 0.00 129571.45 129571.45 0.00
2.1.3 8th Foor D-5 Sqm 1921 67.45 67.45 0.00 129571.45 129571.45 0.00
2.1.3 9th Foor D-5 Sqm 1921 67.45 67.45 0.00 129571.45 129571.45 0.00
2.1.3 10th Foor D-5 Sqm 1921 67.45 67.45 0.00 129571.45 129571.45 0.00
2.1.3 SUB-TOTAL 337.25 337.25 0.00 647857.25 647857.25 0.00
2.1.3 TOTAL 640.80 640.80 0.00 1230976.80 1230976.80 0.00
2.1.4 11th Foor D-5 Sqm 1970 67.45 67.45 0.00 132876.50 132876.50 0.00
2.1.4 12th Foor D-5 Sqm 1970 67.45 67.45 0.00 132876.50 132876.50 0.00
2.1.4 13th Foor D-5 Sqm 1970 67.45 67.45 0.00 132876.50 132876.50 0.00
2.1.4 14th Foor D-5 Sqm 1970 67.45 67.45 0.00 132876.50 132876.50 0.00
2.1.4 15th Foor D-5 Sqm 1970 67.45 67.45 0.00 132876.50 132876.50 0.00
2.1.4 SUB-TOTAL 337.25 337.25 0.00 664382.50 664382.50 0.00
2.1.4 TOTAL 640.80 640.80 0.00 1262376.00 1262376.00 0.00
2.1.5 16th Foor D-5 Sqm 2044 67.45 67.45 0.00 137867.80 137867.80 0.00
2.1.5 17th Foor D-5 Sqm 2044 67.45 67.45 0.00 137867.80 137867.80 0.00
2.1.5 18th Foor D-5 Sqm 2044 67.45 67.45 0.00 137867.80 137867.80 0.00
2.1.5 19th Foor D-5 Sqm 2044 67.45 67.45 0.00 137867.80 137867.80 0.00
2.1.5 Terrace floor D-5 Sqm 2044 30.45 30.45 0.00 62239.80 62239.80 0.00
Item BOQ. Executed Quantity Executed Amount (Rs.)
No. Description of Item Tower Unit Remarks
Rate Total Pev Qty This Bill Total Total pev. Amt This Bill
2.1.5 SUB-TOTAL 300.25 300.25 0.00 613711.00 613711.00 0.00
2.1.5 TOTAL 583.86 583.86 0.00 1193409.84 1193409.84 0.00
Stone Cladding
With 18 to 20mm thick Granite Stone and joint to be
filled with cement slurry mixed with pigment to
2.2.1 match the shade of stone including rubbing and
mirror polishing, etc., complete in all respect.
2.3.1.1 Up to Plinth Level
2.3.1.1 Basement Floor Lvl. D-1 Sqm 1970 27.47 27.47 0.00 54115.90 54115.90 0.00
2.3.1.1 Basement Floor Lvl. D-5 Sqm 1970 27.47 27.47 0.00 54115.90 54115.90 0.00
2.3.1.1 SUB-TOTAL 54.94 54.94 0.00 108231.80 108231.80 0.00
2.3.1.2 Stilt Floor D-5 Sqm 2019 41.13 41.13 0.00 83041.47 83041.47 0.00
2.3.1.2 First Floor D-5 Sqm 2019 17.37 17.37 0.00 35070.03 35070.03 0.00
2.3.1.2 2nd Floor D-5 Sqm 2019 17.37 17.37 0.00 35070.03 35070.03 0.00
2.3.1.2 3rd Floor D-5 Sqm 2019 17.37 17.37 0.00 35070.03 35070.03 0.00
2.3.1.2 4th Floor D-5 Sqm 2019 17.37 17.37 0.00 35070.03 35070.03 0.00
2.3.1.2 5th Floor D-5 Sqm 2019 17.37 17.37 0.00 35070.03 35070.03 0.00
2.3.1.2 SUB-TOTAL 127.98 127.98 0.00 258391.62 258391.62 0.00
2.3.1.2 SUB-TOTAL 255.96 255.96 0.00 516783.24 516783.24 0.00
2.3.1.3 6th Floor D-5 Sqm 2069 17.37 17.37 0.00 35938.53 35938.53 0.00
2.3.1.3 7th Floor D-5 Sqm 2069 17.37 17.37 0.00 35938.53 35938.53 0.00
2.3.1.3 8th Floor D-5 Sqm 2069 17.37 17.37 0.00 35938.53 35938.53 0.00
2.3.1.3 9th Floor D-5 Sqm 2069 17.37 17.37 0.00 35938.53 35938.53 0.00
2.3.1.3 10th Floor D-5 Sqm 2069 17.37 17.37 0.00 35938.53 35938.53 0.00
2.3.1.3 SUB-TOTAL 86.85 86.85 0.00 179692.65 179692.65 0.00
2.3.1.2 SUB-TOTAL 173.70 173.70 0.00 359385.30 359385.30 0.00
2.3.1.4 11th Floor D-5 Sqm 2142 17.37 17.37 0.00 37206.54 37206.54 0.00
2.3.1.4 12th Floor D-5 Sqm 2142 17.37 17.37 0.00 37206.54 37206.54 0.00
2.3.1.4 13th Floor D-5 Sqm 2142 17.37 17.37 0.00 37206.54 37206.54 0.00
2.3.1.4 14th Floor D-5 Sqm 2142 17.37 17.37 0.00 37206.54 37206.54 0.00
2.3.1.4 15th Floor D-5 Sqm 2142 17.37 17.37 0.00 37206.54 37206.54 0.00
2.3.1.4 SUB-TOTAL 86.85 86.85 0.00 186032.70 186032.70 0.00
2.3.1.4 SUB-TOTAL 173.70 173.70 0.00 372065.40 372065.40 0.00
2.3.1.5 16th Floor D-5 Sqm 2216 17.37 17.37 0.00 38491.92 38491.92 0.00
2.3.1.5 17th Floor D-5 Sqm 2216 17.37 17.37 0.00 38491.92 38491.92 0.00
2.3.1.5 18th Floor D-5 Sqm 2216 17.37 17.37 0.00 38491.92 38491.92 0.00
2.3.1.5 19th Floor D-5 Sqm 2216 17.37 17.37 0.00 38491.92 38491.92 0.00
2.3.1.5 20th Floor D-5 Sqm 2216 0.00 0.00 0.00 0.00
2.3.1.5 SUB-TOTAL 69.48 69.48 0.00 153967.68 153967.68 0.00
2.3.1.5 SUB-TOTAL 138.96 138.96 0.00 307935.36 307935.36 0.00
Item BOQ. Executed Quantity Executed Amount (Rs.)
No. Description of Item Tower Unit Remarks
Rate Total Pev Qty This Bill Total Total pev. Amt This Bill
Providing and Laying skirting in stone in 12 mm
Stone Skirting
average thick cement mortar 1:3 (1 cement : 3
coarse sand) jointed cement slurry mixed with
2.3 pigment
Providingtoand
match
Layingthe skirting
shade ofofslab,for
75mmall to floors
100mm &
all heights
height within18same floor, thick
to 20mm complete in all respect
polished Graniteas
per design
and joint to&bedrawing withwhite
filled with satisfaction
cementof engineer
slurry
2.3.1 mixed
in charge.
with pigment to match the shade of stone
2.3.1.1 including
Up to Plinthrubbing
Level and polishing, etc., complete in all
respect.
2.3.1.1 Basement Floor D-1 Sqm 1872 1.43 1.43 0.00 2676.96 2676.96 0.00
Basement Floor D-5 Sqm 1872 1.43 1.43 0.00 2676.96 2676.96 0.00
2.3.1.1 SUB-TOTAL 2.86 2.86 0.00 5353.92 5353.92 0.00
2.3.1.2 Stilt Floor D-5 Sqm 1921 5.45 5.45 0.00 10469.45 10469.45 0.00
2.3.1.2 1st Floor D-5 Sqm 1921 5.06 5.06 0.00 9720.26 9720.26 0.00
2.3.1.2 2nd Floor D-5 Sqm 1921 5.06 5.06 0.00 9720.26 9720.26 0.00
2.3.1.2 3rd Floor D-5 Sqm 1921 5.06 5.06 0.00 9720.26 9720.26 0.00
2.3.1.2 4th Floor D-5 Sqm 1921 5.06 5.06 0.00 9720.26 9720.26 0.00
2.3.1.2 5th Floor D-5 Sqm 1921 5.06 5.06 0.00 9720.26 9720.26 0.00
2.3.1.2 SUB-TOTAL 30.75 30.75 0.00 59070.75 59070.75 0.00
2.3.1.2 TOTAL 61.50 61.50 0.00 118141.50 118141.50 0.00
2.3.1.3 6th Floor D-5 Sqm 1970 5.06 5.06 0.00 9968.20 9968.20 0.00
2.3.1.3 7th Floor D-5 Sqm 1970 5.06 5.06 0.00 9968.20 9968.20 0.00
2.3.1.3 8th Floor D-5 Sqm 1970 5.06 5.06 0.00 9968.20 9968.20 0.00
2.3.1.3 9th Floor D-5 Sqm 1970 5.06 5.06 0.00 9968.20 9968.20 0.00
2.3.1.3 10th Floor D-5 Sqm 1970 5.06 5.06 0.00 9968.20 9968.20 0.00
2.3.1.3 SUB-TOTAL 25.30 25.30 0.00 49841.00 49841.00 0.00
2.3.1.3 TOTAL 50.60 50.60 0.00 99682.00 99682.00 0.00
2.3.1.4 11th Floor D-5 Sqm 2019 5.06 5.06 0.00 10216.14 10216.14 0.00
2.3.1.4 12th Floor D-5 Sqm 2019 5.06 5.06 0.00 10216.14 10216.14 0.00
2.3.1.4 13th Floor D-5 Sqm 2019 5.06 5.06 0.00 10216.14 10216.14 0.00
2.3.1.4 14th Floor D-5 Sqm 2019 5.06 5.06 0.00 10216.14 10216.14 0.00
2.3.1.4 15th Floor D-5 Sqm 2019 5.06 5.06 0.00 10216.14 10216.14 0.00
2.3.1.4 SUB-TOTAL 25.30 25.30 0.00 51080.70 51080.70 0.00
2.3.1.4 TOTAL 50.60 50.60 0.00 102161.40 102161.40 0.00
2.3.1.5 16th Floor D-5 Sqm 2088 5.06 5.06 0.00 10565.28 10565.28 0.00
2.3.1.5 17th Floor D-5 Sqm 2088 5.06 5.06 0.00 10565.28 10565.28 0.00
2.3.1.5 18th Floor D-5 Sqm 2088 5.06 5.06 0.00 10565.28 10565.28 0.00
2.3.1.5 19th Floor D-5 Sqm 2088 5.06 5.06 0.00 10565.28 10565.28 0.00
2.3.1.5 SUB-TOTAL 20.24 20.24 0.00 42261.12 42261.12 0.00
2.3.1.5 TOTAL 40.48 40.48 0.00 84522.24 84522.24 0.00
2.5.3 6th Floor D-5 Sqm 3004 15.90 15.90 0.00 47763.60 47763.60 0.00
2.5.3 7th Floor D-5 Sqm 3004 15.90 15.90 0.00 47763.60 47763.60 0.00
2.5.3 8th Floor D-5 Sqm 3004 15.90 15.90 0.00 47763.60 47763.60 0.00
2.5.3 9th Floor D-5 Sqm 3004 15.90 15.90 0.00 47763.60 47763.60 0.00
2.5.3 10th Floor D-5 Sqm 3004 15.90 15.90 0.00 47763.60 47763.60 0.00
2.5.3 SUB-TOTAL Sqm 79.50 79.50 0.00 238818.00 238818.00 0.00
2.5.2 SUB-TOTAL Sqm 156.20 156.20 0.00 469224.80 469224.80 0.00
2.5.4 11th Floor D-5 Sqm 3054 15.90 15.90 0.00 48558.60 48558.60 0.00
2.5.4 12th Floor D-5 Sqm 3054 15.90 15.90 0.00 48558.60 48558.60 0.00
2.5.4 13th Floor D-5 Sqm 3054 15.90 15.90 0.00 48558.60 48558.60 0.00
2.5.4 14th Floor D-5 Sqm 3054 15.90 15.90 0.00 48558.60 48558.60 0.00
2.5.4 15th Floor D-5 Sqm 3054 15.90 15.90 0.00 48558.60 48558.60 0.00
2.5.4 SUB-TOTAL Sqm 79.50 79.50 0.00 242793.00 242793.00 0.00
2.5.2 SUB-TOTAL Sqm 156.20 156.20 0.00 477034.80 477034.80 0.00
SCREEDING
Wood Work
Main Entrance Door Shutters - Providing and Fixing
35 mm thuick factory made both side laminated
4.1 door shutters including fixing of all necessary or
required hardwares, fixing & fitting arrangement
etc complete in all respect as per design & drawing
with satisfaction of engineer in charge.
4.1.1 Above Plinth Level and up to 5th Floor Lvl. D-1 Sqm 271 93.63 93.63 0.00 25374.91 25374.91 0.00
4.1.1 Above Plinth Level and up to 5th Floor Lvl. D-5 Sqm 271 91.35 91.35 0.00 24755.85 24755.85 0.00
4.1.1 SUB-TOTAL Sqm 184.98 184.98 0.00 50130.76 50130.76 0.00
4.1.2 From 6th Floor Level to 10th Floor Lvl. D-1 Sqm 320 98.20 98.20 0.00 31424.98 31424.98 0.00
4.1.2 From 6th Floor Level to 10th Floor Lvl. D-5 Sqm 320 91.35 91.35 0.00 29232.00 29232.00 0.00
4.1.2 SUB-TOTAL Sqm 189.55 189.55 0.00 60656.98 60656.98 0.00
4.1.3 From 11th Floor Level to 15th Floor Lvl. D-1 Sqm 369 91.35 91.35 0.00 33708.15 33708.15 0.00
4.1.3 From 11th Floor Level to 15th Floor Lvl. D-5 Sqm 369 91.35 91.35 0.00 33708.15 33708.15 0.00
4.1.3 SUB-TOTAL Sqm 182.70 182.70 0.00 67416.30 67416.30 0.00
4.1.4 From 16th Floor Level to 19th Floor Lvl. D-1 Sqm 419 73.08 73.08 0.00 30620.52 30620.52 0.00
4.1.4 From 16th Floor Level to 19th Floor Lvl. D-5 Sqm 419 73.08 73.08 0.00 30620.52 30620.52 0.00
4.1.4 SUB-TOTAL Sqm 146.16 146.16 0.00 61241.04 61241.04 0.00
4.2.2 From 6th Floor Level to 10th Floor Lvl. D-1 Sqm 320 319.20 319.20 0.00 102144.00 102144.00 0.00
4.2.2 From 6th Floor Level to 10th Floor Lvl. D-5 Sqm 320 383.05 383.05 0.00 122576.00 122576.00 0.00
4.2.2 SUB-TOTAL Sqm 702.25 702.25 0.00 224720.00 224720.00 0.00
4.2.3 From 11th Floor Level to 15th Floor Lvl. D-1 Sqm 369 319.20 319.20 0.00 117784.80 117784.80 0.00
4.2.3 From 11th Floor Level to 15th Floor Lvl. D-5 Sqm 369 383.05 383.05 0.00 141345.45 141345.45 0.00
4.2.3 SUB-TOTAL Sqm 702.25 702.25 0.00 259130.25 259130.25 0.00
4.2.4 From 16th Floor Level to 19th Floor Lvl. D-1 Sqm 419 255.36 255.36 0.00 106995.84 106995.84 0.00
4.2.4 From 16th Floor Level to 19th Floor Lvl. D-5 Sqm 419 306.44 306.44 0.00 128398.36 128398.36 0.00
4.2.4 SUB-TOTAL Sqm 561.80 561.80 0.00 235394.20 235394.20 0.00
Providing and applying three or more coats of white
wash with lime mixed with zinc and fevicol to give
White
an evenWash
smooth finish on new plastered or RCC
surfaces over a coat of approved primer including
the cost of preparing the surfaces with filling
5.1 materials (putty), along with sand papering
wherever required, scaffolding etc., for all floors &
all heights in same floor, complete in all respects as
per pattern and drawing with satisfaction of
5.1 engineer
Tower -D1in charge. ( Low VOC as per LEEDs Sqm 29 2967.85 2967.85 0.00 86067.65 86067.65 0.00
Requirements) ( Basement , Stilt Parking & Shaft )
5.1 Tower -D5 Sqm 29 3819.05 3819.05 0.00 110752.45 110752.45 0.00
5.1 SUB-TOTAL
Providing and applying two or more coats of oil Sqm 6786.90 6786.90 0.00 196820.10 196820.10 0.00
bound distemper of approved brand and colour to
give an even
Oil bound shade on new plastered work over a
distemper
coat of approved primer including the cost of
5.2 preparing the surfaces with filling materials (putty),
along with sand papering wherever required,
scaffolding etc.for all floors & all heights in same
5.2.1 Up to complete
floor, Plinth Level
in all respects as per pattern and
drawing with satisfaction of engineer in charge.
( Low VOC as per LEEDs Requirements)
5.2.2 Above Plinth level and up to 5th Floor level
5.2.2 Stilt Floor D-1 Sqm 84 125.23 125.23 0.00 10519.32 10519.32 0.00
5.2.2 First Floor D-1 Sqm 84 2103.03 2103.03 0.00 176654.52 176654.52 0.00
5.2.2 2nd Floor D-1 Sqm 84 2076.79 2076.79 0.00 174450.36 174450.36 0.00
5.2.2 3rd Floor D-1 Sqm 84 2076.79 2076.79 0.00 174450.36 174450.36 0.00
Item BOQ. Executed Quantity Executed Amount (Rs.)
No. Description of Item Tower Unit Remarks
Rate Total Pev Qty This Bill Total Total pev. Amt This Bill
5.2.2 4th Floor D-1 Sqm 84 2076.79 2076.79 0.00 174450.36 174450.36 0.00
5.2.2 5th Floor D-1 Sqm 84 2076.79 2076.79 0.00 174450.36 174450.36 0.00
5.2.2 SUB-TOTAL 10535.42 10535.42 0.00 884975.28 884975.28 0.00
5.2.3 6th Floor D-5 Sqm 84 2310.26 2310.26 0.00 194061.84 194061.84 0.00
5.2.3 7th Floor D-5 Sqm 84 2310.26 2310.26 0.00 194061.84 194061.84 0.00
5.2.3 8th Floor D-5 Sqm 84 2310.26 2310.26 0.00 194061.84 194061.84 0.00
5.2.3 9th Floor D-5 Sqm 84 2310.26 2310.26 0.00 194061.84 194061.84 0.00
5.2.3 10th Floor D-5 Sqm 84 2315.20 2315.20 0.00 194476.80 194476.80 0.00
5.2.3 SUB-TOTAL 11556.24 11556.24 0.00 970724.16 970724.16 0.00
5.2.3 TOTAL 21940.19 21940.19 0.00 1894895.71 1894895.71 0.00
5.2.4 11th Floor D-5 Sqm 94 2310.26 2310.26 0.00 217164.63 217164.63 0.00
5.2.4 12th Floor D-5 Sqm 94 2310.26 2310.26 0.00 217164.44 217164.44 0.00
5.2.4 13th Floor D-5 Sqm 94 2310.26 2310.26 0.00 217164.44 217164.44 0.00
5.2.4 14th Floor D-5 Sqm 94 2310.26 2310.26 0.00 217164.44 217164.44 0.00
5.2.4 15th Floor D-5 Sqm 94 2310.26 2310.26 0.00 217164.44 217164.44 0.00
5.2.4 SUB-TOTAL 11551.30 11551.30 0.00 1085822.39 1085822.39 0.00 0
5.2.3 TOTAL 21935.25 21935.25 0.00 2061913.69 2061913.69 0.00
5.2.5 16th Floor D-5 Sqm 99 2310.26 2310.26 0.00 228715.74 228715.74 0.00
5.2.5 17th Floor D-5 Sqm 99 2310.26 2310.26 0.00 228715.74 228715.74 0.00
5.2.5 18th Floor D-5 Sqm 99 2310.26 2310.26 0.00 228715.74 228715.74 0.00
5.2.5 19th Floor D-5 Sqm 99 2310.26 2310.26 0.00 228715.74 228715.74 0.00
5.2.5 SUB-TOTAL 9241.04 9241.04 0.00 914862.96 914862.96 0.00
5.2.3 TOTAL 17548.20 17548.20 0.00 1737271.80 1737271.80 0.00
Providing and applying three or more coats of
Synthetic
SyntheticEnamel
Enamelpaint
Paintof approved brand and
colour to give an even shade on new plastered work
On
overWooden
a coat ofSurface
approved primer including the cost of
preparing the surface with filling materials (putty),
5.3 along with sand papering wherever required,
scaffolding etc.for all floors & all heights in same
5.3.2.2 floor,
Abovecomplete in all
Plinth level andrespects as per
up to 5th pattern
Floor level and
drawing with satisfaction of engineer in charge.
5.3.2.2 (Stilt
LOW Floor
VOC as per LEEDs Requirements) - On D-1 Sqm 99 0.00 0.00 0.00 0.00
5.3.2.2 First Floor
Wooden Surface D-1 Sqm 99 97.02 97.02 0.00 9604.98 9604.98 0.00
5.3.2.2 2nd Floor D-1 Sqm 99 97.02 97.02 0.00 9604.98 9604.98 0.00
5.3.2.2 3rd Floor D-1 Sqm 99 97.02 97.02 0.00 9604.98 9604.98 0.00
5.3.2.2 4th Floor D-1 Sqm 99 97.02 97.02 0.00 9604.98 9604.98 0.00
5.3.2.2 5th Floor D-1 Sqm 99 97.02 97.02 0.00 9604.98 9604.98 0.00
5.3.2.2 TOTAL 485.10 485.10 0.00 48024.90 48024.90 0.00
5.3.3.3 6th Floor D-5 Sqm 103 99.80 99.80 0.00 0.00 0.00 0.00
5.3.3.3 7th Floor D-5 Sqm 103 99.80 99.80 0.00 10279.40 10279.40 0.00
5.3.3.3 8th Floor D-5 Sqm 103 99.80 99.80 0.00 10279.40 10279.40 0.00
5.3.3.3 9th Floor D-5 Sqm 103 99.80 99.80 0.00 10279.40 10279.40 0.00
5.3.3.3 10th Floor D-5 Sqm 103 99.80 99.80 0.00 10279.40 10279.40 0.00
5.3.3.3 SUB-TOTAL 499.00 499.00 0.00 41117.60 41117.60 0.00
5.3.3.3 TOTAL 1023.94 1023.94 0.00 95186.42 95186.42 0.00
5.3.3.4 11th Floor D-5 Sqm 108 13.80 13.80 0.00 1490.40 1490.40 0.00
5.3.3.4 12th Floor D-5 Sqm 108 13.80 13.80 0.00 1490.40 1490.40 0.00
5.3.3.4 13th Floor D-5 Sqm 108 13.80 13.80 0.00 1490.40 1490.40 0.00
5.3.3.4 14th Floor D-5 Sqm 108 13.80 13.80 0.00 1490.40 1490.40 0.00
5.3.3.4 15th Floor D-5 Sqm 108 13.80 13.80 0.00 1490.40 1490.40 0.00
5.3.3.4 SUB-TOTAL 69.00 69.00 0.00 7452.00 7452.00 0.00
5.3.3.4 TOTAL 615.25 615.25 0.00 66447.00 66447.00 0.00
5.3.3.5 16th Floor D-5 Sqm 113 13.80 13.80 0.00 1559.40 1559.40 0.00
5.3.3.5 17th Floor D-5 Sqm 113 13.80 13.80 0.00 1559.40 1559.40 0.00
5.3.3.5 18th Floor D-5 Sqm 113 13.80 13.80 0.00 1559.40 1559.40 0.00
5.3.3.5 19th Floor D-5 Sqm 113 13.80 13.80 0.00 1559.40 1559.40 0.00
5.3.3.5 SUB-TOTAL 55.20 55.20 0.00 6237.60 6237.60 0.00
5.3.3.5 TOTAL 492.20 492.20 0.00 55618.60 55618.60 0.00
Providing and laying Vitrified floor tiles in sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08%and
conforming to IS : 15622, of approved make, in all colours and shades,laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand) at
1.1 various locations wherever required, including grouting the joints with white cement and matching pigments etc.,complete in all respects as per
pattern and drawing with satisfaction of engineer in charge.
1.1.2 KITCHEN K1 - UNIT -01, 02, 07 & 08 Sqm. 4 1.888 1.238 9.35
1.1.2 Sqm. 4 0.876 0.139 0.49
1.1.2 Sqm. 4 0.175 0.115 0.08
1.1.2 Sqm. 4 0.826 0.127 0.42 2.59
1.1.2 0.00
Providing and laying ceramic Antiskid floor tiles of size 300x300mm (thickness to be specified by the manufacturer) of 1st quality conforming to
IS: 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown,laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse
1.3 sand) at various locations wherever required, including grouting the joints with white cement and matching pigments etc.,complete in all
respects as per pattern and drawing with satisfaction of engineer in charge.
Tiles Skirting
Providing and laying Tiles (Vitrified, Ceremic, Antiskid) in skirting of 75mm to 100mm in height laid over 12mm thick cement mortar 1:3
1.6 (1cement : 3 coarse sand) grouted with tile grout of matching shade of tile including cutting, complete in all respects as per drawing.
1.6.2 0.00
1.6.2 Total Qty 44.05 Sqm.
Tiles Dado
Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by manufacturer), of approved make,
in all colours, shades except burgundy, bottle green, black of any size as approved by engineer in charge, in skirting, risers of steps and dados, at
1.7 various locations wherever required over 12mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry
@ 3.3kg per sqm. including pointing in white cement mixed with pigment of matching shade complete in all respects as per pattern and drawing
with satisfaction of engineer in charge.
Providing and fixing commercial quality white glazed ceramic tiles of size 200 x 200 mm & minimum thickness 5mm (floor, walls, jambs etc.) on
12mm thick cement plaster 1:3 (1 cement : 3 coarse sand) grouted with tile grout and jointed with white cement slurry of matching shade of tile
1.8 including cutting, curing etc. complete in all respect as per drawings with satisfaction of engineer in charge. Only Tiles shall be supplied free of
cost at one point at site.
1.8 Fire & Domestic Water Tank Sqm 2 6.696 2.390 32.01
1.8 Sqm 2 3.226 2.390 15.42
1.8 -
1.8 Total Qty 104.59 Sqm.
Stone Cladding
With 18 to 20mm thick Granite Stone and joint to be filled with cement slurry mixed with pigment to match the shade of stone including rubbing
2.2.1 and mirror polishing, etc., complete in all respect.
2.2.1.2 Qty attached From 2nd Floor Lvl. Qty 17.37 Sqm.
2.2.1.3 Qty attached From 2nd Floor Lvl. Qty 17.37 Sqm.
2.2.1.3 Qty attached From 2nd Floor Lvl. Qty 17.37 Sqm.
2.2.1.4 Qty attached From 2nd Floor Lvl. Qty 17.37 Sqm.
2.2.1.5 Qty attached From 2nd Floor Lvl. Qty 17.37 Sqm.
2.2.1.5 Qty attached From 2nd Floor Lvl. Qty 17.37 Sqm.
Stone Skirting
2.3.1 Providing and Laying skirting of 75mm to 100mm height with 18 to 20mm thick polished Granite and joint to be filled with white cement slurry
mixed with pigment to match the shade of stone including rubbing and polishing, etc., complete in all respect.
2.3.1.2 Qty attached From 2nd Floor Lvl. Qty 5.06 Sqm.
2.3.1.3 Qty attached From 2nd Floor Lvl. Qty 5.06 Sqm.
2.3.1.4 Qty attached From 2nd Floor Lvl. Qty 5.06 Sqm.
2.3.1.5 Qty attached From 2nd Floor Lvl. Qty 5.06 Sqm.
Providing and Laying machine cut 18 thick Granite stone pre-polished stone slab/ back spalsh/facia in kitchen platforms, vanity counters,
window sills, facias and similar locations of required size, approved shade, colour and texture laid over average 20 mm thick cement mortar 1:4
(1 cement : 4 coarse sand) and joints neatly finish with white cement mixed with matching pigment including full round nosing at bottam and
2.5 top edges of the stone, making openings/ holes for sink/ wash basin, mixers, soap dispenser, ledge/ sorrounding of bath tub,back splash, facia,
ledges of shower area etc. as required and mirror polishing of moulding and cut edges, filling silicon at junctions with sanitary fixtures and
corners with wall wherever required etc complete in all respects as per pattern and drawing with satisfaction of engineer in charge.
2.5.2 Qty attached From 2nd Floor Lvl. Qty 15.34 Sqm.
2.5.2 Qty attached From 2nd Floor Lvl. Qty 15.34 Sqm.
2.5.3 Qty attached From 2nd Floor Lvl. Qty 15.34 Sqm.
2.5.4 Qty attached From 2nd Floor Lvl. Qty 15.34 Sqm.
2.5.4 Qty attached From 2nd Floor Lvl. Qty 15.34 Sqm.
2.5.4 Qty attached From 2nd Floor Lvl. Qty 15.34 Sqm.
2.5.5 Qty attached From 2nd Floor Lvl. Qty 15.34 Sqm.
SCREEDING
2.6 Providing and laying cement concrete screeding of mix 1:2:4 under flooring and location as called for ,complete in true line and level as per
specification.
2.6.1 Up to 25 mm thick
2.6.1 1st Floor Lvl. 0.00
2.6.1 UNIT -03, 04, 05 & 06 0.00
2.6.1 Lobby Area (P-Line Area = 60.04 Sqm.) Sqm 1 60.040 60.04
2.6.1 0.00
2.6.1 Total Qty 76.34 Sqm.
2.6.1 Terrace Floor Lvl.
2.6.1 Area of Lift Lobby after deduction of offset= 40.77 Sqm. Sqm. 1 40.770 40.77
Item
No. Description Unit Nos Length Breadth Height Qty Remarks
2.6.2 Up to 50 mm thick
2.6.2 1st Floor Lvl. 0.00
Main Entrance Door Shutters - Providing and Fixing 35 mm thuick factory made both side laminated door shutters including fixing of all
4.1 necessary or required hardwares, fixing & fitting arrangement etc complete in all respect as per design & drawing with satisfaction of engineer in
charge.
Total Qty for 1st Floor Level and up to 5th Floor Lvl. 91.35 Sqm.
replace door in flat no.106 sqm 1 0.97 2.355 2.28
93.63
Item
No. Description Unit Nos Length Breadth Height Qty Remarks
Total Qty for From 6th Floor Level to 10th Floor Lvl. 91.35 Sqm.
replace door in flat no.607,908,1005 sqm 3 0.97 2.355 6.85
98.20
Total Qty for From 11th Floor Level to 15th Floor Lvl. 91.35 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 73.08 Sqm.
Internal Door Shutters - Providing and Fixing Only phenol bonded flush door & window shutters including fixing of all necessary or required
4.2 hardwares, fixing & fitting arrangement etc complete in all respect as per design & drawing with satisfaction of engineer in charge.
4.2.1 Total Qty for 1st Floor Level and up to 5th Floor Lvl. 319.20 Sqm.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 319.20 Sqm.
Total Qty for From 11th Floor Level to 14th Floor Lvl. 319.20 Sqm.
Total Qty for From 11th Floor Level to 14th Floor Lvl. 255.36 Sqm.
Providing and applying three or more coats of white wash with lime mixed with zinc and fevicol to give an even smooth finish on new plastered
or RCC surfaces over a coat of approved primer including the cost of preparing the surfaces with filling materials (putty), along with sand
5.1 papering wherever required, scaffolding etc., for all floors & all heights in same floor, complete in all respects as per pattern and drawing with
satisfaction of engineer in charge. ( Low VOC as per LEEDs Requirements) ( Basement , Stilt Parking & Shaft )
Total Qty for 1st Floor To Terrace Floor = 19th Floor 1439.63 A
Over Head Tank Roof Sqm. 1 4.900 3.250 15.93
Sqm. 1 1.590 3.250 5.17
Sqm. 1 3.274 2.550 8.35
-
Providing and applying two or more coats of oil bound distemper of approved brand and colour to give an even shade on new plastered work
5.2 over a coat of approved primer including the cost of preparing the surfaces with filling materials (putty), along with sand papering wherever
required, scaffolding etc.for all floors & all heights in same floor, complete in all respects as per pattern and drawing with satisfaction of engineer
in charge. ( Low VOC as per LEEDs Requirements)
5.2.2 Ceiling
5.2.2 Unit Type -1
5.2.2 Master Bedroom (3050x3350) 0.00
5.2.2 Sqm 1 3.026 3.326 10.06
5.2.2 C.B. Area Sqm 1 0.576 0.866 0.50
5.2.2 Wall
5.2.2 Unit Type -1
5.2.2 Master Bedroom (3050x3350) = 4 Nos Sqm 8 3.026 2.675 64.76
5.2.2 Less Kitchen opening (900x2100) = 4 Nos Sqm -2 0.900 2.000 -3.60
5.2.2
5.2.2 Kitchen Balcony (1565x1500) = 4 Nos Sqm 4 1.426 2.590 14.77
5.2.2 Less DW1 (1700x2450) =2 Nos (unit 3&6) Sqm -2 0.900 2.350 -4.23
5.2.2 Sqm -2 0.800 2.150 -3.44
5.2.2 Less DW2 (1625x2450) =2 Nos (unit 4&5) Sqm -2 0.750 2.350 -3.53
5.2.2 Sqm -2 0.875 2.150 -3.76
5.2.2 0.00
5.2.2 Less Kitchen opening (900x2100) = 4 Nos Sqm -2 0.900 2.000 -3.60
5.2.2 0.00
5.2.2 Kitchen Balcony (1835x1500) = 4 Nos Sqm 4 1.835 2.590 19.01
5.2.2 Less DW4 (1100x2450) = 4 Nos Sqm -2 0.750 2.350 -3.53
5.2.2 Sqm -2 0.350 1.400 -0.98
5.2.2 Less CW1 (1200x1450) = 1 Nos Sqm -0.5 1.200 1.450 -0.87
5.2.2 Common Staircase 0.00
5.2.2 Grid : A6/11-17 Sqm 1 2.750 2.950 8.11
5.2.2 Grid : 11 & 17/A6-A10 Sqm 2 3.480 2.950 20.53
5.2.2 Less CW2 (1250x1450) = 1 Nos Sqm -0.5 1.250 1.450 -0.91
Item
No. Description Unit Nos Length Breadth Height Qty Remarks
5.2.2
5.2.2 Total Qty 2103.03 Sqm.
5.2.2 0.00
5.2.2 Sub Total for 1 Unit 76.14
5.2.2 Total Qty for Unit 3,4,5 & 6 =4 Nos 304.56
5.2.2 Wall
5.2.2 Unit Type -1
5.2.2 Master Bedroom (3050x3350) = 4 Nos Sqm 8 3.026 2.675 64.76
5.2.2 Sqm 8 3.326 2.675 71.18
5.2.2 C.B. Area Sqm 8 0.600 2.675 12.84
5.2.2 Less Kitchen opening (900x2100) = 4 Nos Sqm -2 0.900 2.000 -3.60
5.2.2
5.2.2 Kitchen Balcony (1565x1500) = 4 Nos Sqm 4 1.426 2.590 14.77
5.2.2 Less DW4 (1100x2450) = 4 Nos Sqm -2 0.750 2.350 -3.53
5.2.2 Sqm -2 0.350 1.400 -0.98
5.2.2 Less DW2 (1625x2450) =2 Nos (unit 4&5) Sqm -2 0.750 2.350 -3.53
5.2.2 Sqm -2 0.875 2.150 -3.76
5.2.2 0.00
5.2.2 Less Kitchen opening (900x2100) = 4 Nos Sqm -2 0.900 2.000 -3.60
5.2.2 0.00
5.2.2 Kitchen Balcony (1835x1500) = 4 Nos Sqm 4 1.835 2.590 19.01
5.2.2 Less DW4 (1100x2450) = 4 Nos Sqm -2 0.750 2.350 -3.53
5.2.2 Sqm -2 0.350 1.400 -0.98
5.2.2 Less FCD (1200x2100) = 1 Nos Sqm -0.5 1.200 2.000 -1.20
5.2.2 Grid : A10-A11/27 & 18 Sqm 2 0.750 2.625 3.94
5.2.2 Grid : A10/ 18 Sqm 1 0.230 2.625 0.60
5.2.2 Grid : A10-A6/ 22 & 24 Sqm 2 2.960 2.625 15.54
5.2.2 Grid : A6/22 & 24 Sqm 2 0.310 2.625 1.63
5.2.3 Qty attached From 2nd Floor Lvl. Qty 2076.79 Sqm.
5.2.3 Qty attached From 2nd Floor Lvl. Qty 2076.79 Sqm.
5.2.3 Qty attached From 2nd Floor Lvl. Qty 2076.79 Sqm.
Providing and applying three or more coats of Synthetic Enamel paint of approved brand and colour to give an even shade on new plastered
work over a coat of approved primer including the cost of preparing the surface with filling materials (putty), along with sand papering
5.3 wherever required, scaffolding etc.for all floors & all heights in same floor, complete in all respects as per pattern and drawing with satisfaction
of engineer in charge. ( LOW VOC as per LEEDs Requirements) - On Wooden Surface
5.3.2.2 Qty attached From 2nd Floor Lvl. Qty 97.02 Sqm.
5.3.2.2 Qty attached From 2nd Floor Lvl. Qty 97.02 Sqm.
5.3.2.3 Qty attached From 2nd Floor Lvl. Qty 97.02 Sqm.
5.3.2.4 Qty attached From 2nd Floor Lvl. Qty 97.02 Sqm.
5.3.2.4 Qty attached From 2nd Floor Lvl. Qty 17.64 Sqm.
5.3.2.5 Qty attached From 2nd Floor Lvl. Qty 17.64 Sqm.
Providing and applying three or more coats of Synthetic Enamel paint of approved brand and colour to give an even shade on new plastered
5.3.3 work over a coat of approved primer including the cost of preparing the surface with filling materials (putty), along with sand papering
wherever required, scaffolding etc.for all floors & all heights in same floor, complete in all respects as per pattern and drawing with satisfaction
of engineer in charge. ( LOW VOC as per LEEDs Requirements) - On Metel Surface
5.3.3.2 Qty attached From 2nd Floor Lvl. Qty 87.94 Sqm.
5.3.3.3 Qty attached From 2nd Floor Lvl. Qty 109.25 Sqm.
5.3.3.3 Qty attached From 2nd Floor Lvl. Qty 109.25 Sqm.
5.3.3.4 Qty attached From 2nd Floor Lvl. Qty 109.25 Sqm.
5.3.3.5 Qty attached From 2nd Floor Lvl. Qty 109.25 Sqm.
5.3.3.5 Qty attached From 2nd Floor Lvl. Qty 109.25 Sqm.
Providing and laying Vitrified floor tiles in sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08%and
conforming to IS : 15622, of approved make, in all colours and shades,laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand) at
1.1 various locations wherever required, including grouting the joints with white cement and matching pigments etc.,complete in all respects as per
pattern and drawing with satisfaction of engineer in charge.
Providing and laying ceramic Antiskid floor tiles of size 300x300mm (thickness to be specified by the manufacturer) of 1st quality conforming to
IS: 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown,laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse
1.3 sand) at various locations wherever required, including grouting the joints with white cement and matching pigments etc.,complete in all
respects as per pattern and drawing with satisfaction of engineer in charge.
1.3.2 TOILET T4 - UNIT -01, 02, 03, 04, 05, 06, 07 & 08 Sqm. 8 1.501 2.226 26.73
1.3.2 Sqm. 16 0.072 0.726 0.84
1.3.2 Sqm. -8 0.635 0.115 (0.58) 3.37
1.3.2 BALCONY FLOORING
1.3.2 UNIT -01, 02, 03, 04, 05, 06, 07 & 08
Tiles Skirting
Providing and laying Tiles (Vitrified, Ceremic, Antiskid) in skirting of 75mm to 100mm in height laid over 12mm thick cement mortar 1:3
1.6 (1cement : 3 coarse sand) grouted with tile grout of matching shade of tile including cutting, complete in all respects as per drawing.
1.6.2 UNIT -01, 02, 03, 04, 05, 06, 07 & 08 Sqm. 16 3.026 0.100 4.84
1.6.2 Sqm. -8 1.700 0.100 (1.36)
1.6.2 Sqm. -8 0.900 0.100 (0.72)
1.6.2 Sqm. 16 3.310 0.100 5.30
1.6.2 Sqm. -8 0.750 0.100 (0.60) 0.93
1.6.2 UNIT -01, 02, 03, 04, 05, 06, 07 & 08 Sqm. 16 1.130 0.100 1.81
1.6.2 Sqm. 16 5.466 0.100 8.75
Item
No. Description Unit Nos Length Breadth Height Qty Remarks
1.6.2 0.00
1.6.2 Total Qty 51.78 Sqm.
Tiles Dado
Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by manufacturer), of approved make,
in all colours, shades except burgundy, bottle green, black of any size as approved by engineer in charge, in skirting, risers of steps and dados, at
1.7 various locations wherever required over 12mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry
@ 3.3kg per sqm. including pointing in white cement mixed with pigment of matching shade complete in all respects as per pattern and drawing
with satisfaction of engineer in charge.
Kitchen (2450x2035) K-3 (UNIT -01, 02, 03, 04, 05, 06, 07
1.7.2 & 08)
Toilet-T3 (1675x2185) (UNIT -01, 02, 03, 04, 05, 06, 07 &
1.7.2 08)
Toilet-T4 (1525x2250) (UNIT -01, 02, 03, 04, 05, 06, 07 &
1.7.2 08)
Item
No. Description Unit Nos Length Breadth Height Qty Remarks
1.7.2 0.00
1.7.2 Total Qty Sqm.
With 18 to 20mm thick Granite Stone and joint to be filled with cement slurry mixed with pigment to match the shade of stone including rubbing
2.1 and mirror polishing, etc., complete in all respect.
2.1.2 0.00
2.1.2 Total Qty Sqm.
2.1.4 Qty attached From 2nd Floor Lvl. Qty 67.45 Sqm.
2.1.6 Qty attached From 2nd Floor Lvl. Qty 67.45 Sqm.
Stone Cladding
With 18 to 20mm thick Granite Stone and joint to be filled with cement slurry mixed with pigment to match the shade of stone including rubbing
2.2.1 and mirror polishing, etc., complete in all respect.
2.2.1.1 0.00
2.2.1.1 Total Qty 27.47 Sqm.
2.2.1.1
2.2.1.1 Provisional Payable Qty 27.47 Sqm.
2.2.1.1
2.2.1.1 Provisional Payable Qty@85% 41.13 Sqm.
2.2.1.2 0.00
2.2.1.2 Total Qty 17.37 Sqm.
2.2.1.2 Qty attached From 2nd Floor Lvl. Qty 17.37 Sqm.
2.2.1.2 Qty attached From 2nd Floor Lvl. Qty 17.37 Sqm.
2.2.1.3 Qty attached From 2nd Floor Lvl. Qty 17.37 Sqm.
2.2.1.4 Qty attached From 2nd Floor Lvl. Qty 17.37 Sqm.
Stone Skirting
Providing and Laying skirting of 75mm to 100mm height with 18 to 20mm thick polished Granite and joint to be filled with white cement slurry
2.3.1 mixed with pigment to match the shade of stone including rubbing and polishing, etc., complete in all respect.
Providing and Laying machine cut 18 thick Granite stone pre-polished stone slab/ back spalsh/facia in kitchen platforms, vanity counters,
window sills, facias and similar locations of required size, approved shade, colour and texture laid over average 20 mm thick cement mortar 1:4
(1 cement : 4 coarse sand) and joints neatly finish with white cement mixed with matching pigment including full round nosing at bottam and
2.5 top edges of the stone, making openings/ holes for sink/ wash basin, mixers, soap dispenser, ledge/ sorrounding of bath tub,back splash, facia,
ledges of shower area etc. as required and mirror polishing of moulding and cut edges, filling silicon at junctions with sanitary fixtures and
corners with wall wherever required etc complete in all respects as per pattern and drawing with satisfaction of engineer in charge.
2.5.2 Qty attached From 2nd Floor Lvl. Qty 15.90 Sqm.
2.5.3 Qty attached From 2nd Floor Lvl. Qty 15.90 Sqm.
2.5.3 Qty attached From 2nd Floor Lvl. Qty 15.90 Sqm.
2.5.4 Qty attached From 2nd Floor Lvl. Qty 15.90 Sqm.
2.5.5 Qty attached From 2nd Floor Lvl. Qty 15.90 Sqm.
2.5.5 Qty attached From 2nd Floor Lvl. Qty 15.90 Sqm.
SCREEDING
Providing and laying cement concrete screeding of mix 1:2:4 under flooring and location as called for ,complete in true line and level as per
2.6 specification.
2.6.1 Up to 25 mm thick
2.6.1 1st Floor Lvl. 0.00
2.6.1
2.6.1 Terrace Floor Lvl.
2.6.1 Area of Lift Lobby after deduction of offset= 31.17 Sqm. Sqm. 1 31.170 31.17
2.6.1 Stilt Floor Lvl.
2.6.1 Area of Lift Lobby after deduction of offset= 65.37 Sqm. Sqm 1 65.370 65.37
in flat area
under vetrified area
19th,18th,17th,16th,15th,14th,13th,12th,11th,10,9th,8t sqm 12 402.92 sqm
h floor
Item
No. Description Unit Nos Length Breadth Height Qty Remarks
total sqm
grand total 1380.17 sqm
2.6.2 Up to 50 mm thick
2.6.2 1st Floor Lvl. 0.00
2.6.2 UNIT -03, 04, 05 & 06 0.00
8 3.67 29.36
1273.04
4.0 Wood Work
Main Entrance Door Shutters - Providing and Fixing 35 mm thuick factory made both side laminated door shutters including fixing of all
4.1 necessary or required hardwares, fixing & fitting arrangement etc complete in all respect as per design & drawing with satisfaction of engineer in
charge.
Total Qty for 1st Floor Level and up to 5th Floor Lvl. 91.35 Sqm.
Total Qty for 6th Floor Level and up to 10th Floor Lvl. 91.35 Sqm.
Total Qty for 11th Floor Level and up to 15th Floor Lvl. 91.35 Sqm.
Total Qty for 16th Floor Level and up to Terrace Floor Lvl. 73.08 Sqm.
Item
No. Description Unit Nos Length Breadth Height Qty Remarks
Internal Door Shutters - Providing and Fixing Only phenol bonded flush door & window shutters including fixing of all necessary or required
4.2 hardwares, fixing & fitting arrangement etc complete in all respect as per design & drawing with satisfaction of engineer in charge.
0.00
Total Qty 76.61 Sqm.
4.2.1 Total Qty for 1st Floor Level and up to 5th Floor Lvl. 383.05 Sqm.
Total Qty for 6th Floor Level and up to 10th Floor Lvl. 383.05 Sqm.
Total Qty for 11th Floor Level and up to 15th Floor Lvl. 383.05 Sqm.
Total Qty for 16th Floor Level to 19th floor 306.44 Sqm.
Providing and applying two or more coats of oil bound distemper of approved brand and colour to give an even shade on new plastered work
5.2 over a coat of approved primer including the cost of preparing the surfaces with filling materials (putty), along with sand papering wherever
required, scaffolding etc.for all floors & all heights in same floor, complete in all respects as per pattern and drawing with satisfaction of engineer
in charge. ( Low VOC as per LEEDs Requirements)
5.2.2 Less DW2 (1625x2450) =6 Nos (unit 1,2,4,5,7 & 8) Sqm -6 0.750 2.350 -10.58
5.2.2 Sqm -6 0.875 2.150 -11.29
5.2.2 0.00
5.2.2 Living Balcony (1740x1500) = 6 Nos Sqm 6 1.740 2.590 27.04
5.2.2 Sqm 6 1.385 2.620 21.77
5.2.2
5.2.2 Kitchen-K3 (2450x2035) = 8 Nos Sqm 16 2.426 2.675 103.83
5.2.2 Sqm 16 2.011 2.675 86.07
5.2.2 Less for Wall Tile Sqm -8 2.426 0.715 -13.88
5.2.2 Sqm -8 1.896 0.715 -10.85
5.2.2 Less FCD (1200x2100) = 1 Nos Sqm -0.5 1.200 2.000 -1.20
5.2.2 Less Door D3 =1 Nos. Sqm -0.5 1.050 2.350 -1.23
5.2.2 Less Opening Sqm -1 3.910 1.300 -5.08
5.2.2 Sqm 1 3.270 2.625 8.58
5.2.2 Sqm 1 2.330 2.625 6.12
5.2.2
5.2.2 Total Qty for Wall 1537.47 D
5.2.2 Staircase Wall
5.2.2 Fire Staircase 0.00
5.2.2 Grid : A6 & A10/27-33 Sqm 2 5.000 2.800 28.00
Item
No. Description Unit Nos Length Breadth Height Qty Remarks
5.2.2 Less CW1 (1200x1450) = 1 Nos Sqm -0.5 1.200 1.450 -0.87
5.2.2 Common Staircase 0.00
5.2.2 Grid : A6/11-17 Sqm 1 2.750 2.800 7.70
5.2.2 Grid : 11 & 17/A6-A10 Sqm 2 3.480 2.800 19.49
5.2.2 Less CW2 (1250x1450) = 1 Nos Sqm -0.5 1.250 1.450 -0.91
5.2.2 Qty attached From 2nd Floor Lvl. Qty 2021.48 Sqm.
5.2.3 Qty attached From 2nd Floor Lvl. Qty 2310.26 Sqm.
Providing and applying three or more coats of Synthetic Enamel paint of approved brand and colour to give an even shade on new plastered
5.3.3 work over a coat of approved primer including the cost of preparing the surface with filling materials (putty), along with sand papering
wherever required, scaffolding etc.for all floors & all heights in same floor, complete in all respects as per pattern and drawing with satisfaction
of engineer in charge. ( LOW VOC as per LEEDs Requirements) - On Metel Surface
5.3.3.2 Qty attached From 2nd Floor Lvl. Qty 99.80 Sqm.
5.3.3.4 Qty attached From 2nd Floor Lvl. Qty 13.80 Sqm.
5.3.3.5 Qty attached From 2nd Floor Lvl. Qty 13.80 Sqm.
ABSTRACT OF QTY. OF FINISHING WORKS OF TOWER -D1 & D5 OF NIRALA ASPIRE (PHASE - I) AT GREATER NOIDA WEST
Name of Contractor : J.K CONSTRUCTION CO.
12th R.A. Bill -Certified (Bill Period From 30.11.2017 to 18.02.2018)
Non Schedule Items
Providing and Laying stone in
specified size (in single piece) of stone BOQ. Executed Quantity Executed Amount (Rs.)
Item No. slab in treads and risers
Description of of steps as per
Item Unit Remarks
design and pattern shown in drawings Rate Total Exe. Qty. Previous This Bill Total Previous Amount This Bill
laid over 20mm average thick cement Exe. Qty. Exe. Qty. Amount (Rs.) (Rs.) Amount (Rs.)
morter 1:3 (1 cement : 3 coarse sand)
jointed with cement slurry mixed with
NSI-1 Staircase
pigment to flooring
match the shade of slab
including chamfering, corner /edge
grinding
With and
18 to mirror
20mm polishing,
thick Granitemaking
Stone
nosing
and jointastoper
beprofile in steps,
filled with whiterubbing
and
cement
Treadsmirror polishing,
slurry mixed drilling
with holes
pigment to
and grouting
match the shadefor fixing of staircase
of stone including
railing etc. complete as
rubbing and mirror polishing per
specification
complete. forand drawing
all floors with
& all heights in
satisfaction
same floor.toof20mm
engineer
thickin Granite
charge.for
all floors
Stone and&joint
all heights in same
to be filled withfloor.
white
(Stone type
cement slurryshall
mixed bewith
as per sample
pigment to
approved
match by NHPL)
the shade of stone including
Up to Plinth
rubbing and Level
mirror polishing Sqm 1822.00 14.89 14.89 - 27,129.58 27129.58 -
complete. for all floors & all heights in
Part
sameRate
floor.@ 90% for This Bill Sqm 1639.80 1.15 1.15 1,885.77 1885.77 -
Above Plinth level and up to 5th Floor Sqm 1872.00 131.83 131.83 - 246,785.76 246785.76 -
level
Part Rate @ 90% for This Bill Sqm 1684.80 11.75 11.75 19,796.40 19796.4 -
From 6th Floor level to 10th Floor
level Sqm 1921.00 119.65 119.65 - 229,847.65 229847.65 -
Risers
With 18 to 20mm thick Granite Stone
and joint to be filled with white
cement slurry mixed with pigment to
match the shade of stone including
rubbing and mirror polishing
complete. for all floors & all heights in
same floor.
Up to Plinth Level Sqm 1872.00 8.38 8.38 - 15,687.36 15687.36 -
Part Rate @ 90% for This Bill Sqm 1684.80 0.76 0.76 1,280.45 1280.45 -
Above Plinth level and up to 5th Floor Sqm 1921.00 78.98 78.98 - 151,720.58 151720.58 -
level
Part Rate @ 90% for This Bill Sqm 1728.90 7.18 7.18 12,413.50 12413.5 -
From 6th Floor level to 10th Floor
Sqm 1970.00 71.80 71.8 - 141,446.00 141446 -
level
Part Rate @ 95% Sqm 1871.50 - - 0 -
From 11th Floor level to 15th Floor Sqm 2019.00 71.80 71.8 - 144,964.20 144964.2 -
level
Part Rate @ 95% Sqm 1918.05 - - 0 -
From 16th Floor level to 20th Floor
level Sqm 2088.00 28.72 28.72 - 59,967.36 59967.36 -
Part Rate @ 90% for This Bill Sqm 1879.20 28.72 28.72 53,970.62 53970.62 -
Part Rate @ 90% for This Bill Sqm 1839.60 49.60 49.60 91,244.16 91244.16 -
NIRALA HOUSING PVT. LTD.
NSI-2 Repairing above tile skirting with 12 to 15 mm thick cement mortar 1:6 (1 cement : 6 coarse sand) maximum up to 75 mm height from top of skirting
to Internal walls Neatly finished for all heights and at all floors.
Above Plinth level and up to 5th Floor Rmt. 30.00 4393.96 4393.96 - 131,818.80 131818.8 -
level
Part Rate @ 95% Rmt. 28.50 212.16 212.16 - 6,046.56 6046.56 -
From 6th Floor level to 10th Floor Rmt. 32.00 4809.65 4809.65 - 153,908.80 153908.8 -
level
Part Rate @ 95% Rmt. 30.40 265.20 265.2 - 8,062.08 8062.08 -
From 11th Floor level to 15th Floor Rmt. 35.00 4393.96 4393.96 - 153,788.60 153788.6 -
level
Part Rate @ 95% Rmt. 33.25 680.89 680.89 - 22,639.59 22639.59 -
From 16th Floor level to 20th Floor Rmt. 38.00 2184.96 2184.96 - 83,028.48 83028.48 -
level
Part Rate @ 90% for This Bill Sqm 34.20 1,874.92 1,874.92 64,122.26 64122.26 -
- -
Providing and Laying 12 to15 mm thick cement plaster in Cement mortar 1:6 (1 cement : 3 fine sand and 3 coarse sand) to Internal walls Neatly
NSI-3 finished on RCC & Masonary surfaces including jambs, pattas grooves etc. in all positions including necessary scaffolding etc complete for all heights and
at all floors.
Above Plinth level and up to 5th Floor Sqm 228 303.79 303.79 - 69,264.12 69264.12 -
level
Part Rate @ 95% Sqm 216.60 30.16 30.16 - 6,532.66 6532.66 -
Part Rate @ 90% for This Bill Sqm 205.20 37.70 37.70 7,736.04 7736.04 -
From 6th Floor level to 10th Floor Sqm 234.00 333.95 333.95 - 78,144.30 78144.3 -
level
Part Rate @ 95% Sqm 222.30 37.70 37.7 - 8,380.71 8380.71 -
From 11th Floor level to 15th Floor Sqm 241.00 213.31 213.31 - 51,407.71 51407.71 -
level
Part Rate @ 95% Sqm 228.95 7.54 7.54 - 1,726.28 1726.28 -
Part Rate @ 90% for This Bill Sqm 216.90 150.80 150.80 32,708.52 32708.52 -
From 16th Floor level to 20th Floor Sqm 248.00 146.52 146.52 - 36,336.96 36336.96 -
level
Part Rate @ 95% Sqm 235.60 - 0 - - 0 -
- -
NSI-4 Fixing
of single or double bowl Stainless steel sink of any size with or without drain board with CI/MS brackets, waste jali and P.V.C. waste pipe up to
the floor trap & Steel Reinforcement cutting, shifting of sink hole, Sink hole repair (if required) in all respect complete.
Above Plinth level and up to 5th Floor Sqm 730.00 40.00 40.00 - 29,200.00 29200 -
level
Part Rate @ 90% for This Bill Sqm 657.00 40.00 40.00 26,280.00 26280 -
From 6th Floor level to 10th Floor Sqm 752.00 40.00 40.00 - 30,080.00 30080 -
level
Part Rate @ 90% for This Bill Sqm 676.80 40.00 40.00 27,072.00 27072 -
From 11th Floor level to 15th Floor Sqm 773.00 40.00 40.00 - 30,920.00 30920 -
level
Part Rate @ 90% for This Bill Sqm 695.70 40.00 40.00 27,828.00 27828 -
From 16th Floor level to 20th Floor
level Sqm 794 32.00 32.00 - 25,408.00 25408 -
NIRALA HOUSING PVT. LTD.
Providing & laying IPS flooring (as base for Vinyle flooring) or any other location as specified by Engineer-In-Charge of 25mm thickness with cement
concrete nominal mix of proportion 1:2:4 (cement : Sand : Aggregate) in correct level / slope at all levels as per architectural drawings including mixing
NSI-5
of concrete in mixer, lifting, shifting to the work location, compacting / vibrating, finishing smooth to the satisfaction of the Engineer-In-Charge, curing,
and cleaning the surface etc. complete. (Mode of measurements :Plan area of Flooring shall be measured for payment)
Above Plinth level and up to 5th Floor Sqm 617.00 149.31 149.31 - 92,124.27 92124.27 -
level
Part Rate @ 95% for This Bill Sqm 586.15 27.79 27.79 16,289.11 9212.43 7,076.68
From 6th Floor level to 10th Floor Sqm 635.00 165.90 165.9 - 105,346.50 105346.5 -
level
Part Rate @ 95% Sqm 603.25 - - 0 -
From 11th Floor level to 15th Floor Sqm 653.00 165.90 165.9 - 108,332.70 108332.7 -
level
Part Rate @ 95% Sqm 620.35 - - 0 -
From 16th Floor level to 20th Floor Sqm 671.00 132.72 132.72 - 89,055.12 89055.12 -
level
Part Rate @ 95% Sqm 637.45 - - 0 -
Providing and fixing wooden moulded beading to door and window frames with iron screws, plugs and priming coat on unexposed surface etc.,
NSI-6 complete in all respect as per design & drawing with satisfaction of engineer in charge.
(2nd class red meranti wood 35 x 12mm.)
Above Plinth level and up to 5th Floor Sqm 35.00 1,243.00 1243 - 43,505.00 43505 -
level
Part Rate @ 95% Sqm 33.25 - - 0 -
From 6th Floor level to 10th Floor
Sqm 36.00 1,243.00 1243 - 44,748.00 44748 -
level
Part Rate @ 95% Sqm 34.20 - - 0 -
From 11th Floor level to 15th Floor
Sqm 37.00 1,243.00 1243 - 45,991.00 45991 -
level
Part Rate @ 95% Sqm 35.15 - - 0 -
From 16th Floor level to 20th Floor
Sqm 38.00 994.40 994.4 - 37,787.20 37787.2 -
level
Part Rate @ 95% Sqm 36.10 - - 0 -
Providing and Laying stone in specified size (in single piece) of stone slab in treads and risers of steps as per design and pattern shown in
drawings laid over 20mm average thick cement morter 1:3 (1 cement : 3 coarse sand) jointed with cement slurry mixed with pigment to match
the shade of slab including chamfering, corner /edge grinding and mirror polishing, making nosing as per profile in steps, rubbing and mirror
polishing, drilling holes and grouting for fixing of staircase railing etc. complete as per specification and drawing with satisfaction of engineer in
charge.for all floors & all heights in same floor.
NSI-1.1 Treads
With 18 to 20mm thick Granite Stone and joint to be filled with cement slurry mixed with pigment to match the shade of stone including rubbing
and mirror polishing, etc., complete in all respect.
Up to Plinth Level
Total Qty for Ground Floor Level and up to 5th Floor Lvl. 73.08 Sqm.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 60.90 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 60.90 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 48.72 Sqm.
NSI-1.2 With
18 to 20mm thick Granite Stone and joint to be filled with white cement slurry mixed with pigment to match the shade of stone including
rubbing and mirror polishing complete. for all floors & all heights in same floor.
Up to Plinth Level
Total Qty for Ground Floor Level and up to 5th Floor Lvl. 43.08 Sqm.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 35.90 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 35.90 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 28.72 Sqm.
NSI-1.3 Providing & Laying 25 mm Thick Granite Stone and joint to be filled with cement slurry mixed with pigment to match the shade of stone including
rubbing and mirror polishing complete in all respect.
Up to Plinth Level
Total Qty for Ground Floor Level and up to 5th Floor Lvl. 78.96 Sqm.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 65.80 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 65.80 Sqm.
Item Description Unit Nos Length Breadth Height Qty Remarks
No.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 52.64 Sqm.
Providing and Laying skirting of 75mm to 100mm height with 18 to 20mm thick Granite stone and joint to be filled with cement slurry mixed with
NSI-1.4
pigment to match the shade of stone including rubbing and polishing, etc., complete in all respect.
Up to Plinth Level
0.00
Total Qty 2.00 Sqm.
Total Qty for Ground Floor Level and up to 5th Floor Lvl. 17.94 Sqm.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 14.95 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 14.95 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 11.96 Sqm.
NSI-2 Repairing above tile skirting with 12 to 15 mm thick cement mortar 1:6 (1 cement : 6 coarse sand) maximum up to 75 mm height from top of
skirting to Internal walls Neatly finished for all heights and at all floors.
Total Qty for 1st Floor Level and up to 5th Floor Lvl. 2731.20 Rmt.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 2731.20 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 2184.96 Sqm.
Providing and Laying 12 to15 mm thick cement plaster in Cement mortar 1:6 (1 cement : 3 fine sand and 3 coarse sand) to Internal walls Neatly
NSI-3 finished on RCC & Masonary surfaces including jambs, pattas grooves etc. in all positions including necessary scaffolding etc complete for all
heights and at all floors.
Toilet -T1 Wall Plaster Above Tiles Sqm 8 2.150 0.335 5.76
Sqm 8 1.550 0.335 4.15
Toilet -T2 Wall Plaster Above Tiles Sqm 8 2.035 0.335 5.45
Sqm 8 1.500 0.335 4.02
Less for V1 Sqm -8 0.600 0.335 (1.61)
0.00
Total Qty 36.63 Sqm.
Total Qty for 1st Floor Level and up to 5th Floor Lvl. 183.15 Sqm.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 183.15 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 183.15 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 146.52 Sqm.
NSI-4 Fixing of single or double bowl Stainless steel sink of any size with or without drain board with CI/MS brackets, waste jali and P.V.C. waste pipe
up to the floor trap & Steel Reinforcement cutting, shifting of sink hole, Sink hole repair (if required) in all respect complete.
Providing & laying IPS flooring (as base for Vinyle flooring) or any other location as specified by Engineer-In-Charge of 25mm thickness with
NSI-5 cement concrete nominal mix of proportion 1:2:4 (cement : Sand : Aggregate) in correct level / slope at all levels as per architectural drawings
including mixing of concrete in mixer, lifting, shifting to the work location, compacting / vibrating, finishing smooth to the satisfaction of the
Engineer-In-Charge, curing, and cleaning the surface etc. complete. (Mode of measurements :Plan area of Flooring shall be measured for payment)
Total Qty for 1st Floor Level and up to 5th Floor Lvl. 82.95 Sqm.
IPS in flat 705 by instructed PM 1 2.45 0.55 1.35
1 1.320 0.550 0.73
85.03
Total Qty for From 6th Floor Level to 10th Floor Lvl. 82.95 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 82.95 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 66.36 Sqm.
Providing and fixing wooden moulded beading to door and window frames with iron screws, plugs and priming coat on unexposed surface etc.,
NSI-6 complete in all respect as per design & drawing with satisfaction of engineer in charge.
2nd class red meranti wood
35 x 12mm.
Total Qty for 1st Floor Level and up to 5th Floor Lvl. 1243.00 Sqm.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 1243.00 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 1243.00 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 994.40 Sqm.
Item Description Unit Nos Length Breadth Height Qty Remarks
No.
Providing and Laying stone in specified size (in single piece) of stone slab in treads and risers of steps as per design and pattern shown in
drawings laid over 20mm average thick cement morter 1:3 (1 cement : 3 coarse sand) jointed with cement slurry mixed with pigment to match
the shade of slab including chamfering, corner /edge grinding and mirror polishing, making nosing as per profile in steps, rubbing and mirror
polishing, drilling holes and grouting for fixing of staircase railing etc. complete as per specification and drawing with satisfaction of engineer in
charge.for all floors & all heights in same floor.
NSI-1.1 Treads
With 18 to 20mm thick Granite Stone and joint to be filled with cement slurry mixed with pigment to match the shade of stone including rubbing
and mirror polishing, etc., complete in all respect.
Up to Plinth Level
Total Qty for Ground Floor Level and up to 5th Floor Lvl. 70.50 Sqm.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 58.75 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 58.75 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 47.00 Sqm.
NSI-1.2 With
18 to 20mm thick Granite Stone and joint to be filled with white cement slurry mixed with pigment to match the shade of stone including
rubbing and mirror polishing complete. for all floors & all heights in same floor.
Up to Plinth Level
Total Qty for Ground Floor Level and up to 5th Floor Lvl. 43.08 Sqm.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 35.90 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 35.90 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 28.72 Sqm.
NSI-1.3 Providing & Laying 25 mm Thick Granite Stone and joint to be filled with cement slurry mixed with pigment to match the shade of stone including
rubbing and mirror polishing complete in all respect.
Up to Plinth Level
0.00
Total Qty 10.21 Sqm.
Total Qty for Ground Floor Level and up to 5th Floor Lvl. 78.96 Sqm.
Total Qty for 6th Floor Lvl. To 10th Floor Lvl. 65.80 Sqm.
Total Qty for 11th Floor Lvl. To 15th Floor Lvl. 65.80 Sqm.
Total Qty for 16th Floor Lvl. To 19th Floor Lvl. 49.60 Sqm.
Item Description Unit Nos Length Breadth Height Qty Remarks
No.
Providing and Laying skirting of 75mm to 100mm height with 18 to 20mm thick Granite stone and joint to be filled with cement slurry mixed with
NSI-1.4 pigment to match the shade of stone including rubbing and polishing, etc., complete in all respect.
Up to Plinth Level
Total Qty for Ground Floor Level and up to 5th Floor Lvl. 17.94 Sqm.
Total Qty for 6th Floor Lvl. To 10th Floor Lvl. 14.95 Sqm.
Total Qty for 11th Floor Lvl. To 15th Floor Lvl. 14.95 Sqm.
Total Qty for 11th Floor Lvl. To 15th Floor Lvl. 9.10 Sqm.
NSI-2 Repairing above tile skirting with 12 to 15 mm thick cement mortar 1:6 (1 cement : 6 coarse sand) maximum up to 75 mm height from top of
skirting to Internal walls Neatly finished for all heights and at all floors.
UNIT -01, 02, 03, 04, 05, 06, 07 & 08 Sqm. 16 3.026 48.42
Sqm. -8 1.700 (13.60)
Sqm 2 0.480
Sqm 1 1.330
Sqm 2 0.300
Sqm 2 0.300
Sqm 2 3.000
Sqm 2 0.310
Sqm 2 1.350
Sqm 1 0.230
Sqm 1 4.050
Sqm 1 2.380
Sqm 2 0.230
Sqm 2 2.180
Sqm 1 19.170
Fire Staircase Sqm 1 18.240
Common Staircase Sqm 1 11.670
0.00
Total Qty 468.73 Sqm.
Total Qty for 2nd Floor Level and up to 5th Floor Lvl. 1874.92 Rmt.
Item Description Unit Nos Length Breadth Height Qty Remarks
No.
From 6th Floor Level to 10th Floor Lvl.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 2343.65 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 2343.65 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 1874.92 Sqm.
Providing and Laying 12 to15 mm thick cement plaster in Cement mortar 1:6 (1 cement : 3 fine sand and 3 coarse sand) to Internal walls Neatly
NSI-3 finished on RCC & Masonary surfaces including jambs, pattas grooves etc. in all positions including necessary scaffolding etc complete for all
heights and at all floors.
Total Qty for 1st Floor Level and up to 5th Floor Lvl. 188.50 Sqm.
Total Qty for From 6th Floor Level to 10th Floor Lvl. 188.50 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 188.50 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 150.80 Sqm.
Providing & laying IPS flooring (as base for Vinyle flooring) or any other location as specified by Engineer-In-Charge of 25mm thickness with
NSI-5 cement
concrete nominal mix of proportion 1:2:4 (cement : Sand : Aggregate) in correct level / slope at all levels as per architectural drawings
including mixing of concrete in mixer, lifting, shifting to the work location, compacting / vibrating, finishing smooth to the satisfaction of the
Engineer-In-Charge, curing, and cleaning the surface etc. complete. (Mode of measurements :Plan area of Flooring shall be measured for payment)
Total Qty for 1st Floor Level and up to 5th Floor Lvl. 82.95 Sqm.
Item Description Unit Nos Length Breadth Height Qty Remarks
No.
IPS in CUB board sqm 16 0.600 0.950 9.12
92.07
Total Qty for From 6th Floor Level to 10th Floor Lvl. 82.95 Sqm.
Total Qty for From 11th Floor Level to 15th Floor Lvl. 82.95 Sqm.
Total Qty for From 16th Floor Level to 19th Floor Lvl. 66.36 Sqm.
NSI-4 Fixing of single or double bowl Stainless steel sink of any size with or without drain board with CI/MS brackets, waste jali and P.V.C. waste pipe
up to the floor trap & Steel Reinforcement cutting, shifting of sink hole, Sink hole repair (if required) in all respect complete.
Qty. Amount
Sr.
Brief Description of Item Unit Average rate Remarks
No. Cumulative Previous This Cumulative Previous This
Bill Bill Bill Bill Bill Bill
S. No. Description Stone Unit Quantity Basic Rate As Procurement After Add Difference After Add: Add WCT @ Final Difference in
Remarks
Type/Name Excucated Per Contract Rate VAT@14.5% Rate C.P. & O.H. @ 4.16 % (G) Difference in Amount (+ or
On (B) 15 % on (D ) Rate(+ or - ) -)
A B C D F G H M
Upto June'17
Stone Work in Lift Lobby & Staircase
1 P-white Granite P White Sqm. 245.83 1000 591.80 677.61 -322.39 -370.75 -15.42 -386.17 -94932.28
2 P-white Granite P White Sqm. 65.00 1000 629.46 720.73 -279.27 -321.16 -13.36 -334.52 -21743.72
3 P-white Granite P White Sqm. 3596.96 1000 624.08 714.57 -285.43 -328.24 -13.65 -341.90 -1229791.83
Stone Work on Kitchen Counters
3 R-Black Granite R Black Sqm. 110.55 1600 699.40 800.81 -799.19 -919.07 -38.23 -957.30 -105829.31
3 R-Black Granite R Black Sqm. 296.56 1600 860.80 985.62 -614.38 -706.54 -29.39 -735.93 -218248.51
From July'17
Stone Work in Lift Lobby & Staircase
1 P-white Granite P White Sqm. 861.75 1000 624.08 -279.00 -320.85 -320.85 -276492.49
2 R-Black Granite R Black Sqm. 450.13 1000 860.80 -139.20 -160.08 -160.08 -72056.81
Stone Work on Kitchen Counters
8 R-Black Granite R Black Sqm. 190.94 1600 860.80 -614.00 -706.10 -706.10 -134822.73
1 Tile Work
Flooring 600 x 600 mm. sqm 373.58 373.58 0.907 338.83 50.00 78.00 28.00
Flooring 300 x 300 mm. sqm 1,796.15 1,796.15 0.907 1,629.11 50.00 78.00 28.00
Skirting 600 x 600/300 x 300 mm. sqm 47.59 47.59 0.529 25.17 50.00 78.00 28.00
Dado 300 x 450 mm. sqm 87.50 87.50 0.529 46.29 50.00 78.00 28.00
Flooring & Dado 200 x 300 mm. sqm 100.79 100.79 0.529 53.32 50.00 78.00 28.00
B Stone Work
Lobby Flooring sqm 975.68 975.68 0.907 884.94 50.00 78.00 28.00
Lobby Skirting sqm 102.10 102.10 0.529 54.01 50.00 78.00 28.00
Lobby Cladding sqm 373.44 373.44 0.544 203.20 50.00 78.00 28.00
Staircase Tread sqm 216.92 216.92 0.544 118.03 50.00 78.00 28.00
Staircase Riser sqm 132.60 132.60 0.544 72.15 50.00 78.00 28.00
Staircase Mid Landing sqm 237.37 237.37 0.544 129.16 50.00 78.00 28.00
Staircase Skirting sqm 52.38 52.38 0.544 28.50 50.00 78.00 28.00
Kitchen Counter Flooring sqm 216.28 216.28 0.907 196.17 50.00 78.00 28.00
C Screeding
Lobby (25 mm Thick) sqm 1,554.98 1,554.98 0.393 610.92 50.00 78.00 28.00
Balcony Screeding (50 mm Thick) sqm 58.72 58.72 0.786 46.14 50.00 78.00 28.00
D PLASTER WORK
12-15mm thick Wall Plaster sqm 565.50 565.50 0.306 173.04 50.00 78.00 28.00
(Mortar 1:6)
Skirting Repair 12-15mm thick Wall sqm 843.71 843.71 0.306 258.18 50.00 78.00 28.00
Plaster (Mortar 1:6)
I.P.S. (1:2:4) -60 to 75 mm Thick sqm 16.59 16.59 1.061 17.60 50.00 78.00 28.00
From 11th RA bill
12th RA bill
1 Tile Work
Flooring 600 x 600 mm. sqm (712.15) (712.15) 0.907 (645.92) 50.00 65.00 15.00
Flooring 300 x 300 mm. sqm - - 0.907 - 50.00 65.00 15.00
Skirting 600 x 600/300 x 300 mm. sqm - - 0.529 - 50.00 65.00 15.00
Dado 300 x 450 mm. sqm - - 0.529 - 50.00 65.00 15.00
Flooring & Dado 200 x 300 mm. sqm - 0.529 - 50.00 65.00 15.00
B Stone Work
Lobby Flooring sqm - - 0.907 - 50.00 65.00 15.00
Lobby Skirting sqm - 0.529 - 50.00 65.00 15.00
Lobby Cladding sqm - - 0.544 - 50.00 65.00 15.00
Staircase Riser sqm - 0.544 - 50.00 65.00 15.00
Staircase Mid Landing sqm - 0.544 - 50.00 65.00 15.00
Staircase Skirting sqm - - 0.544 - 50.00 65.00 15.00
Kitchen Counter Flooring sqm - - 0.907 - 50.00 65.00 15.00
C Screeding
Lobby (25 mm Thick) sqm - - 0.393 - 50.00 65.00 15.00
Balcony Screeding (50 mm Thick) sqm - - 0.786 - 50.00 65.00 15.00
D PLASTER WORK
12-15mm thick Wall Plaster sqm - 0.306 - 50.00 65.00 15.00
(Mortar 1:6)
Skirting Repair 12-15mm thick Wall sqm - 0.306 - 50.00 65.00 15.00
Plaster (Mortar 1:6)
I.P.S. (1:2:4) -60 to 75 mm Thick sqm - 1.061 - 50.00 65.00 15.00
Total Amount
Amount (Rs.)
30,703.00
7,587.67
6,119.22
14,090.27
-
4,440.67
-
226.84
97.68
59.81
216.78
32.26
2,273.45
2,920.19
3,532.52
9,487.34
45,614.96
704.85
1,296.05
1,492.90
24,778.24
1,512.24
5,689.68
3,304.94
2,020.26
3,616.51
798.05
5,492.65
17,105.75
1,291.91
4,845.20
7,228.94
492.75
(9,688.80)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
199,385.00
Sr.
No. Description Amount Remarks
Total 172456
FINISHING WORKS OF TOWER -D1 & D-5 OF NIRALA ASPIRE (PHASE - I) AT GREATER NOIDA WEST
Total Qty
Executed
Total Qty Total Qty Total Qty TotalQty. TotalQty. +(5% or 13%
Received Issue to J.K. Balance In J.K. Qty of wastage on Avg. Rate in
Sr. Description Location by NHPL Construction Construction Theoretical Tile Theoretical theoretical Total Diff. Sqmt Deducted Remarks
No. (Unit by NHPL Store/Site Consumption Consumption in Sqmt Amounts
(Unit in Box ) Sqmt/Box (in Sqmt ) Consumption (Avg. Ratex1.5)
in Box ) (Unit in Box ) (Unit in Box ) of material )
( in.
Sqmt )
9 IVORY PLUS Bed, M. Bed Room, 11952 11952 1.44 17210.88 1639.96 15570.92 578.955 9,014,859.96
VITRIFIED S/S CENGRES & ORIENT Living, Kitchen Floor
Tiles 200 x 300 mm.
10 Over Head Water Tank Over Head Water Tank 287 287 0.72 206.64 215.65 -9.01 139.93
J.K. Const.
Sr. Description Isssue Silp no (Cement Rate Amounts Remarks
No.
PPC )
1 Upto 31.07.2016 1700 240 408000
2 01.08.2016 to 31.08.2016 500 240 120000
3 01.09.2016 to 30.09.2016 1350 240 324000
4 01.10.2016 to 20.11.2016 1500 240 360000
5 21.11.2016 to 31.01.2017 1780 240 427200
6 01.02.2017 to 06.04.2017 1350 240 324000
7 07.04.2017 to 31.05.2017 250 240 60000
8 01.06.2017 to 30.06.2017 925 240 222000
2245200
9 01.07.2017 to 25.08.2017 250 240 60000
10 26.08.2017 to 30.11.2017 1080 240 259200
11 01.12.2017 to 20.02.2018 465 240 111600
Total 11150 430800
2676000
Total 27198
Total 2084
Nirala Housing Pvt. Ltd.
Name of Contractor : J.K. Construction Co.
FINISHING WORKS OF TOWER D1 & D2 OF NIRALA ASPIRE (PHASE - I) AT GREATER NOIDA WEST
FINISHING WORKS OF TOWER D1 & D2 OF NIRALA ASPIRE (PHASE - I) AT GREATER NOIDA WEST
2 Malba Shifting by M/s. Madan Pal upto 5th RA 3250 Old Work Order
2 Malba Shifting by M/s. Madan Pal upto 8th 18790 Upto Sep'17
4 Labour Supplied By M/s. Mahesh Associates 12th RA Bill 35478 Upto Aug'17