Vous êtes sur la page 1sur 15

STRUCTURAL DESIGN CALCULATION

Project .:
MAIN RECEIVING SUB-STATION (MRSS)

Client .:

LOC. NO.: PROJECT NO.: DOCUMENT NO.: REV. NO.:

- - - -
STRUCTURAL DESIGN CALCULATION

Project .:
MAIN RECEIVING SUB-STATION (MRSS)

Client .:

A Issued for Approval S.H.A S.H.A - -

REV Description Prep'd Chk'd App'd Date

TITLE

STRUCTURAL DESIGN CALCULATION

LOC. NO.: PROJECT NO.: DOCUMENT NO.: REV. NO.:

- - - -
ETABS Thu Kha Cho

ETABS v9.7.1 - File: Model-3_For_Design_Report - March 30,2019 8:44


3-D View - N-mm Units
ETABS Thu Kha Cho

ETABS v9.7.1 - File: Model-3_For_Design_Report - March 30,2019 8:47


Plan View - TIE - Elevation 36.04462 Uniform Loads GRAVITY (FINISH) - lb-ft Units
ETABS Thu Kha Cho

ETABS v9.7.1 - File: Model-3_For_Design_Report - March 30,2019 8:47


Plan View - TIE - Elevation 36.04462 Uniform Loads GRAVITY (LIVE) - lb-ft Units
ETABS Thu Kha Cho

ETABS v9.7.1 - File: Model-3_For_Design_Report - March 30,2019 8:46


3-D View Frame Span Loads (WALL) - lb-ft Units
ETABS Thu Kha Cho

ETABS v9.7.1 - File: Model-3_For_Design_Report - March 30,2019 8:48


3-D View Wind Pressure Coeffs (WX) - lb-ft Units
ETABS Thu Kha Cho

ETABS v9.7.1 - File: Model-3_For_Design_Report - March 30,2019 8:48


3-D View Wind Pressure Coeffs (WY) - lb-ft Units
Program ETABS Version 9.6.0.0 File:Model-3_For_Design_Report.LOG

BEGIN ANALYSIS 2019/03/30 08:52:44

MAXIMUM MEMORY BLOCK SIZE (BYTES) = 64.000 MB

ELEMENT FORMATION 08:52:44

NUMBER OF JOINT ELEMENTS FORMED = 723

NUMBER OF SPRING ELEMENTS FORMED = 0

NUMBER OF FRAME ELEMENTS FORMED = 708

NUMBER OF SHELL ELEMENTS FORMED = 640

EQUATION SOLUTION 08:52:45

TOTAL NUMBER OF EQUILIBRIUM EQUATIONS = 4557

APPROXIMATE "EFFECTIVE" BAND WIDTH = 377

NUMBER OF EQUATION STORAGE BLOCKS = 1

MAXIMUM BLOCK SIZE (8-BYTE TERMS) = 1655034

SIZE OF STIFFNESS FILE(S) (BYTES) = 12.644 MB

NUMBER OF EQUATIONS TO SOLVE = 4557

NUMBER OF STATIC LOAD CASES = 9


NUMBER OF ACCELERATION LOADS = 6

NUMBER OF NONLINEAR DEFORMATION LOADS = 0

JOINT OUTPUT 08:52:46

GLOBAL FORCE BALANCE RELATIVE ERRORS

PERCENT FORCE AND MOMENT ERROR AT THE ORIGIN, IN GLOBAL COORDINATES

LOAD FX FY FZ MX MY MZ

DEAD 1.03E-11 1.41E-13 4.63E-12 3.55E-12 7.17E-12 6.38E-12

LIVE 1.48E-11 1.97E-13 6.81E-12 5.20E-12 1.05E-11 9.14E-12

WX 7.10E-10 8.24E-12 7.38E-13 3.35E-12 3.84E-10 4.39E-10

WY 1.23E-11 1.72E-09 1.26E-13 1.24E-09 8.73E-12 1.18E-09

EQX 1.08E-09 1.25E-11 1.42E-12 4.95E-12 5.84E-10 6.68E-10

EQY 1.99E-11 2.88E-09 1.46E-13 2.07E-09 1.43E-11 1.98E-09

WALL 4.96E-12 7.83E-14 3.43E-13 3.94E-13 2.83E-12 3.08E-12

FINISH 1.48E-11 1.97E-13 6.81E-12 5.20E-12 1.05E-11 9.14E-12

TRIBUTAR 1.48E-11 1.96E-13 6.76E-12 5.23E-12 1.04E-11 9.15E-12

ELEMENT JOINT-FORCE OUTPUT 08:52:46

NUMBER OF JOINT ELEMENTS SAVED = 723

NUMBER OF FRAME ELEMENTS SAVED = 708

NUMBER OF SHELL ELEMENTS SAVED = 640


ELEMENT OUTPUT 08:52:46

ANALYSIS COMPLETE 2019/03/30 08:52:46

Program ETABS Version 9.6.0.0 File:Model-3_For_Design_Report.LOG

BEGIN ANALYSIS 2019/03/30 08:52:46

MAXIMUM MEMORY BLOCK SIZE (BYTES) = 64.000 MB

ELEMENT FORMATION 08:52:47

NUMBER OF JOINT ELEMENTS FORMED = 723

NUMBER OF SPRING ELEMENTS FORMED = 0

LOAD RE-SOLUTION 08:52:47

NUMBER OF STATIC LOAD CASES = 9

ELEMENT JOINT-FORCE OUTPUT 08:52:47


NUMBER OF JOINT ELEMENTS SAVED = 723

NUMBER OF FRAME ELEMENTS SAVED = 708

NUMBER OF SHELL ELEMENTS SAVED = 640

ANALYSIS COMPLETE 2019/03/30 08:52:47


ETABS Thu Kha Cho

ETABS v9.7.1 - File: Model-3_For_Design_Report - March 30,2019 8:53


Plan View - TIE - Elevation 432.5354 Longitudinal Reinforcing (ACI 318-05/IBC 2003) - Kip-in Units
ETABS Thu Kha Cho

ETABS v9.7.1 - File: Model-3_For_Design_Report - March 30,2019 8:54


Elevation View - 1 Rebar Percentage (ACI 318-05/IBC 2003) - Kip-in Units