B BAHAN/MATERIAL
1 Aluminium Foil m2 15,000.00 15.000/M2
2 Alcubond m2 500,000.00 500.000-525.000/M2
3 Amplas Biasa Lbr 3,500.00 3.500 / Lbr
4 Amplas Niken Lbr 5,000.00 5.000-5.500 / Lbr
5 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr 40,000.00 40.000/Lbr
6 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr 50,000.00 50.000/Lbr
7 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr 76,000.00 76.000/Lbr
8 Atap Aluminium Zincalume, tebal 0,25 mm Lbr 56,000.00 56.000/Lbr
9 Atap Aluminium Zincalume, tebal 0,3 mm Lbr 78,000.00 78.000/Lbr
10 Atap Aluminium Zincalume, tebal 0,4 mm Lbr 88,000.00 88.000/Lbr
11 Atap Aluminium Gelombang tebal 0,5 mm Lbr 105,000.00 105.000/Lbr
12 Atap Fiber warna"Polycarbonat" tbl. 4-5 mm m2 65,000.00 65.000-65.500/M2
13 Atap Genteng Beton Lokal buah 3,000.00 3000/ buah
14 Atap Genteng Beton buah 3,900.00 3900-4000/ buah
15 Atap Genteng Beton Cisangkan buah 6,000.00 5500-6500/ buah
16 Atap Genteng Buleleng buah 1,700.00 1700/ buah
17 Atap Genteng Keramik biasa berglazur buah 7,300.00 7300/ buah
18 Atap Genteng Keramik Berglazur Natural buah 9,000.00 9000-9250/ buah
19 Atap Genteng Keramik sejenis Berglazur warna buah 13,500.00 12000-15000/ buah
20 Atap Genteng Metal Biasa (88 cm X 77 cm) m2 30,000.00 27.000-32.000/M2
21 Atap Genteng Metal Warna (120 cm X 76 cm) m2 72,000.00 72.000/M2
22 Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80cm) m2 138,000.00 138.000/M2
23 Atap Genteng Metal Zincalume berpasir (77cmX100cm) m2 78,000.00 78.000/M2
24 Atap Genteng Metal Zincalume berpasir biasa m2 67,000.00 67.000/M2
25 Atap Genteng Kodok buah 700.00 700-750/ Buah
26 Atap Onduline m2 80,000.00 80.000/ M2
27 Asbes polos 100 x 100 tbl = 4 mm Lbr 18,500.00 18.000-19.000 / Lbr
28 Asbes Gelombang Kecil, lebar 80 cm m2 29,500.00 29.500/M2
29 Asbes Gelombang Kecil, lebar 105 cm m2 30,500.00 30.500/M2
30 Asbes Gelombang Besar, lebar 105 cm m2 33,500.00 33.500/M2
31 Asbes Gelombang motif genteng m2 24,250.00 24.250/M2
32 Aquaproof kg 43,000.00 42.000-47.000/ Kg
33 Bak Cuci Stainless Steel buah 180,000.00 180.000-270.000/ Buah
34 Bak Cuci Teraso buah 100,000.00 100.000/ Buah
35 Bak Fibreglass buah 310,000.00 310.000-325.00/ Buah
36 Bak Teraso buah 180,000.00 180.000/ Buah
37 Bambu dia. 6-8 cm/6m Btg 45,000.00 45.000/ Btg
38 Batako buah 2,500.00 2200-2500/ Buah
39 Batu Andesit hitam kecoklatan m2 250,000.00 250.000/ M2
40 Batu alam kecoklatan (Sangarong) m2 185,000.00 180.000-190.000/ M2
41 Batu Bata lobang m3 441,830.00 430.100-453.560/M3
42 Batu Bata Kecil buah 700.00 600-800/ Buah
43 Batu Bata Lobang buah 600.00 560-600/ Buah
44 Batu Candi hitam m2 200,000.00 200.000-250.000/ M2
45 Batu Kali m3 360,000.00 360.000/ M3
46 Batu Kali tempel m2 62,500.00 60.000-65.000/ M2
47 Batu Karang Pilang m2 500,000.00 500.000/ M2
48 Batu Kerikil m3 350,000.00 350.000/ M3
49 Batu Koral beton m3 310,000.00 300.000-350.000/ M3
50 Batu Koral Jagung m3 350,000.00 260.000-320.000/ M3
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
51 Batu Krokos m3 350,000.00 350.000/ M3
52 Batu Palimanan kuning/hijau m2 130,000.00 130.000-150.000/ M2
53 Batu Palimanan kuning/hijau + bevel m2 150,000.00 150.000/ M2
54 Batu Pecah 0.5 - 1 (screen) m3 275,000.00 265.000-285.000/ M3
55 Batu Abu 0.00 - 0.5 (filler) m3 275,000.00 265.000-285.000/ M3
56 Batu Pecah 1.3 - 1.9 (spilt) m3 380,000.00 380.000-400.000/ M3
57 Batu Pecah 2/3 m3 400,000.00 400.000-415.000/ M3
58 Batu Pecah 3/5 m3 390,000.00 390.000/ M3
59 Batu Pecah 5/7 m3 390,000.00 390.000/ M3
60 Batu Marmer m2 258,000.00 258.000/ M2
61 Batu Roster / Terawang biasa buah 2,500.00 2.500/ Buah
62 Besi dia. 5 mm Batang 14,000.00 14.000-16.500/ Batan
63 Besi dia. 6 mm KS Batang 18,000.00 18.000-25.000/ Batang
64 Besi dia. 8 mm KS TI Batang 41,000.00 41.000-42.000/ Batang
65 Besi dia. 10 mm KS TI Batang 63,000.00 61.000-64.000/ Batang
66 Besi dia. 12 mm KS TI Batang 91,000.00 90.000-94.000/ Batang
67 Besi dia. 14 mm KS TI Batang 100,000.00 100.000/ Batang
68 Besi dia. 16 mm KS TI Batang 162,000.00 162.000/ Batang
69 Besi dia. 19 mm KS TI Batang 228,000.00 228.000/ Batang
70 Besi Beton Polos kg 11,200.00 11.200/ kg
71 Besi Baja Profil WF, I dan H kg 12,000.00 12.000/ kg
72 Besi Baja Konstruksi ( CNP, INP,dan besi L) kg 12,500.00 12.000-13.000/ kg
73 Besi Beam Clamp dan Plat Siku m2 22,500.00 21.000-24.000/ kg
74 Besi Hollow baja 20 X 40, tb. 2mm Batang 107,000.00 94.000-107.000/ Btg
75 Besi Hollow baja 40 X 40, tb. 2mm Batang 138,000.00 125.000-138.000/ Btg
76 Besi Hollow baja 30 X 60, tb. 2mm Batang 195,000.00 160.000-200.000/ Btg
77 Besi Hollow Plafond 2 X 4 Batang 22,000.00 21.000-22.500/ Btg
78 Besi Strip kg 7,500.00 7.000-8.000/ kg
79 Besi Strip 2 X 3 M' 3,250.00 3.250/ M'
80 Beton Ready Mix K - 125 m3 650,000.00 640.000-660.000/ M3
81 Beton Ready Mix K - 175 m3 690,000.00 680.000-700.000/ M3
82 Beton Ready Mix K - 225 m3 705,000.00 700.000-710.000/ M3
83 Beton Ready Mix K - 250 m3 745,000.00 740.000-750.000/ M3
84 Beton Ready Mix K - 275 m3 770,000.00 770.000-780.000/ M3
85 Beton Ready Mix K - 300 m3 785,000.00 780.000-790.000/ M3
86 Beton Ready Mix K - 350 m3 810,000.00 800.000-810.000/ M3
87 Beton Ready Mix K - 400 m3 855,000.00 850.000-860.000/ M4
88 Bubungan Asbes Gelombang Besar m' 22,750.00 22.750/M2
89 Bubungan Asbes Gelombang Kecil m' 21,000.00 21.000/M2
90 Bubungan/Nok Genteng Beton Buah 5,500.00 5.500/Buah
91 Bubungan Genteng Buleleng Buah 2,500.00 2500-2500/ buah
92 Bubungan/ Nok genteng Keramik biasa berglazur Buah 6,500.00 6.000-7.000/Buah
93 Bubungan/Nok genteng Keramik sejenis berglazur Buah 12,500.00 12.000-13.000/Buah
94 Bubungan gtg Keramik sejenis warna berglazur Buah 17,500.00 17.000-18.000/Buah
95 Bubungan/Nok Genteng Metal/aluminium M' 23,500.00 21.000-26.000/M'
96 Bubungan Genteng Kodok Buah 1,875.00 1.750-2.000/Buah
97 Cat Dasar kg 24,000.00 24.000/ Kg
98 Cat Antara kg 19,000.00 18.000-20.000/ Kg
99 Cat Kayu dan Besi Anti Rayap kg 23,000.00 22.000-24.000/ Kg
100 Cat Khusus Glossy dan Quick Drying kg 20,500.00 20.000-21.000/ Kg
101 Cat Minyak warna (biasa) mutu C kg 29,000.00 29.000/ Kg
102 Cat Minyak mutu B kg 40,000.00 56.000/ Kg
103 Cat Minyak Semprot kg 50,000.00 50.000/ Kg
104 Cat Meni Besi kg 37,000.00 37.000/ Kg
105 Cat Meni Besi /kayu/ Flincote kg 32,250.00 40.000/ Kg
106 Cat Penutup kg 72,500.00 70.000-75.000/ Kg
107 Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) kg 9,500.00 9.500/ Kg
108 Cat Tembok mutu B (Catylax,vinilex, dan sejenis) kg 15,000.00 15.280-16.000/ Kg
109 Cat Tembok mutu B, Anti Lumut dan Jamur kg 17,500.00 17.000/ Kg
110 Cat Tembok mutu A (Mowilex,Kemtone,Dulux,dll) kg 70,000.00 70.000/ Kg
111 Closed Duduk Setara (sejenis standar KIA) unit 1,250,000.00 1250.000-1250.000/ Unit
112 Closed Duduk Standar (sejenis Ex.TOTOC721FV1) unit 2,100,000.00 2.100.000/ Unit
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
113 Closed Duduk Halmar unit 3,062,000.00 3.062.000/ Unit
114 Closed Duduk mutu C unit 1,715,000.00 1.715.000/Unit
115 Closed Duduk mutu A unit 4,270,000.00 4.270.000/ Unit
116 Closed Duduk mutu B unit 2,593,000.00 2.593.000/ Unit
117 Closed Duduk standar unit 2,151,000.00 2.151.000/ Unit
118 Closet Duduk / Monoblok bh 400,000.00 400.000/ Buah
119 Closet Jongkok Porselen / biasa buah 80,000.00 75.000-85.000/ Buah
120 Closet Jongkok Teraso buah 25,000.00 25.000/ Buah
121 Closed Jongkok Standart / sejenis (mutu B) unit 145,000.00 145.000/ Unit
122 Closed Jongkok sejenis ( mutu A) Unit 200,000.00 200.000/ Unit
123 Shower Spray TX 403 SV 3 buah 325,000.00 325.000/ Buah
124 Coneblock biasa tebal 6 cm buah 1,300.00 1.300/ Buah
125 Coneblock warna tebal 6 cm buah 1,500.00 1.500/ Buah
126 Coneblock biasa tebal 8 cm buah 1,800.00 1.800/ Buah
127 Coneblock warna tebal 8 cm buah 2,000.00 2.000/ Buah
128 Cornice (bubuk Semen putih utk gypsum) kg 5,000.00 5.000/ Kg
129 Dempul Jadi kg 12,500.00 12000-12500/ Kg
130 Dempul Ross Polac kg 21,250.00 85000/ 4 Kg
131 Dempul Isamu kg 40,000.00 40.000/Kg
132 Dolken Kayu dia. 8 - 10/400 cm m3 275,000.00 275.000/M3
133 Door Closer buah 380,000.00 380.000/ Buah
134 Door Holder buah 30,000.00 20.000-40.000/ Buah
135 Door Stoper buah 300,000.00 300.000/ Buah
136 Door Stop buah 22,000.00 22.000/ Buah
137 Ember hitam buah 5,000.00 3.500-5.000/ Buah
138 Engsel Biasa buah 6,000.00 5.000-6.000/ Buah
139 Engsel Kuningan 4" buah 10,000.00 10.000-22.000/ Buah
140 Engsel Pintu buah 10,000.00 10.000-22.000/ Buah
141 Epoxi kg 42,500.00 40.000-45.000/ Kg
142 Eternit 100 x 100 tebal 2,7 mm Lbr 12,000.00 11.000-12.000/ Lbr
143 Eternit 100 x 100 tebal 3,5 mm Lbr 14,000.00 14.000/ Lbr
144 Filler m3 172,500.00 170.000-175.000/M3
145 Fitting plafond listrik buah 5,000.00 5000/Buah
146 Glass Block buah 17,000.00 17.000/Buah
147 Grendel/Slot Tanam 4" buah 72,500.00 70.000-75.000/Buah
148 Grendel biasa buah 13,500.00 12.000-15.000/Buah
149 Gypsum Board ( 120 x 240 x 9 ) mm lbr 60,000.00 57.000-60.000/ Lbr
150 Hordeng Horizontal Blind (aluminium) m2 87,500.00 85000-90000/ M2
151 Hordeng Vertikal Blind m3 90,000.00 85000-90000/ M2
152 Ijuk Kg 7,000.00 7000/ Kg
153 Jendela Aluminium + Kaca Reyband 5 mm m2 675,000.00 675.000/ M2
154 Jendela Besi m2 250,000.00 200.000-300.000/ M2
155 Jendela Bingkai Nako 100 cm X 70 cm Unit 75,000.00 75.000/ M2
156 Jendela Bingkai Nako m2 95,000.00 95.000/ M2
157 Kabel NYA 1,5 mm m' 3,500.00 3.500/ M'
158 Kabel NYA 2,5 mm m' 3,000.00 4.000/ M'
159 Kabel NYA 4.0 mm m' 4,500.00 4.500/ M'
160 Kabel NYM 2 X 1,5 mm m' 4,500.00 4.000-5.000/ M'
161 Kabel NYM 2 X 2,5 mm m' 7,250.00 6.000-8.000/ M'
162 Kabel NYM 2 X 4,0 mm m' 14,500.00 14.000-15.000/ M'
163 Kaca Cermin 3 mm m2 120,000.00 120.000-120.000/ M2
164 Kaca Cermin 5 mm m2 3,400,000.00 325.000-350.000/ M2
165 Kaca Patri m2 1,200,000.00 1.150.000-1.250.000/ M2
166 Kaca Bening 3 mm m2 65,000.00 62.500-65.000/ M2
167 Kaca Bening 4 mm m2 95,000.00 75.000-90.000/ M2
168 Kaca Bening 5 mm m2 122,500.00 120.000-125.000/ M2
169 Kaca Bening 8 mm m2 165,000.00 165.000-170.000/ M2
170 Kaca Bening 10 mm m2 200,000.00 200.000/ M3
171 Kaca Buram 12 mm m2 350,000.00 350.000/ M2
172 Kaca Rayband 5 mm m2 142,500.00 140.000-145.000/ M2
173 Kaca Buram/Es 5 mm m2 90,000.00 90.000/ M2
174 Bingkai Kaca Nako Set 25,000.00 25.000/ M2
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
175 Kaca Naco 6 daun Set 127,500.00 125.000-130.000/ Set
176 Kaca Naco 8 daun Set 142,500.00 140.000-145.000/Set
177 Kaca Naco Rayben 5 mm, 6 daun Set 167,500.00 165.000-170.000/Set
178 Kaca Naco Rayben 5 mm, 8 daun Set 177,500.00 175.000-180.000/Set
179 Kait angin Jendela Buah 12,500.00 12500
180 Kalsiboard 3,5 mm (120 cm X 240 cm) Kpg 49,000.00 49.000/ Kpg
181 Kalsiboard 4,5 mm (120 cm X 240 cm) Kpg 53,000.00 53.000/ Kpg
182 Kapur kg 4,000.00 3.000-3.000/ Kg
183 Karpet tebal 6 mm m2 68,750.00 250.000-300.000/ Roll
184 Kawat Beton kg 20,000.00 16.000-20.000/ Kg
185 Kawat Burung m2 20,000.00 20.000/ M2
186 Kawat Duri m' 13,000.00 13.000/ M'
187 Kawat Harmonika m2 35,000.00 35.000/ M2
188 Kawat Jaring pagar lbr 25,000.00 25.000/ lbr
189 Kawat Kassa m2 10,000.00 10.000/ M2
190 Kawat Las Dos 100,000.00 100.000/ Dos
191 Kawat Nyamuk m2 22,000.00 22.000/ M2
192 Kawat Seng Polos kg 15,500.00 15.000 - 16.000/ Kg
193 Kayu Gelam dia. 6-8 btg 15,000.00 15.000-16.00/ Batang
194 Kayu Gelam dia. 10-12 btg 17,000.00 17.000-18.000/ Batang
195 Kayu Hek btg 12,500.00 12.500/ Batang
196 Kayu Lis 1/3 m' 4,000.00 4.000-5.000/ Btg
197 Kayu Lis 1/4 m' 5,000.00 5.000-6.000/ Btg
198 Kayu Lis Profil kecil m' 1,500.00 5.000-7.000/ Btg
199 Kayu Lis Profil sedang m' 3,000.00 9.000-15.000/ Btg
200 Kayu Lis Profil besar m' 6,500.00 25.000-27.000/ Btg
201 Kayu Mosaik 30 x 30 cm Buah 5,500.00 5.000-6.000/Buah
202 Kayu Kaso 5/7 kelas III (Meranti dan sejenis) Btg 55,000.00 55.000/Btg
203 Kayu Kelas I (Unglen, Jati) m3 7,500,000.00 7.500.000-8.500.000/ M3
204 Kayu Kelas II (Petanang dan sejenis) m3 5,000,000.00 5.500.000-6.500.000/ M3
205 Kayu Kelas III (Meranti dan sejenis) m3 2,500,000.00 2.500.000-3.000.000/ M3
206 Kayu Papan 3/20 Kls. III m3 2,500,000.00 2.500.000/ M3
207 Kayu Kelas IV (Racuk dan sejenis) m3 1,500,000.00 1.500.000/ M3
208 Kayu Papan kelas IV keping 30,000.00 30.000-35.000/ Kpg
209 Kayu Racuk m3 1,500,000.00 1.500.000/ M3
210 Kayu Reng btg 20,000.00 20.000/ Batang
211 Keramik lantai/dinding 20 x 20/25 cm putih polos Kotak 40,000.00 40.000/ ktk
Keramik lantai/dinding 20 x 20/25 cm putih polos buah 1,840.00 1.200-1.400/ Buah
212 Keramik lantai 20 x 20 cm warna, mutu C Kotak 35,000.00 35.000/ ktk
Keramik lantai 20 x 20 cm warna, mutu C buah 1,400.00 1.400-1.600/ Buah
213 Keramik lantai 20 x 20 cm warna, mutu B Kotak 50,000.00 38.000-60.000/ ktk
Keramik lantai 20 x 20 cm warna, mutu B buah 2,000.00 1.400-1.600/ Buah
214 Keramik dinding 20 x 25 cm warna Kotak 45,000.00 40.000-50.000/ ktk
Keramik dinding 20 x 25 cm warna buah 2,250.00 2.250/ Buah
215 Keramik lantai 20 x 25 cm warna, mutu B Kotak 50,000.00 40.000-50.000/ ktk
Keramik lantai 20 x 25 cm warna, mutu B buah 2,500.00 2.500/ Buah
216 Keramik lantai 30 x 30 cm warna Kotak 45,000.00 40.000-50.000/ ktk
Keramik lantai 30 x 30 cm warna buah 5,000.00 5.000/ Buah
217 Keramik lantai 30 x 30 cm putih polos Kotak 32,000.00 33.000-35.000/ ktk
Keramik lantai 30 x 30 cm putih polos buah 4,000.00 3.600/ Buah
218 Keramik lantai 40 x 40 cm warna mutu C Kotak 51,000.00 51.000/ ktk
Keramik lantai 40 x 40 cm warna mutu C buah 8,500.00 8.500/ Buah
219 Keramik lantai 40 x 40 cm warna mutu B Kotak 93,000.00 93.000/ ktk
Keramik lantai 40 x 40 cm warna mutu B buah 15,500.00 15.500/ Buah
220 Keramik lantai motif kayu (kasar) mutu A Kotak 54,000.00 54.000-115.000/ ktk
221 Klem Talang Paralon Buah 2,500.00 2.000 - 2.500/ Buah
222 Klem kabel listrik biasa Buah 75.00 50 - 100/ Buah
223 Klem kabel listrik Buah 2,750.00 2.500 - 3.000/ Buah
224 Korosin Ltr 2,000.00 2.000 - 2.000/ Ltr
225 Kran Air buah 8,500.00 7.000 - 10.000/ Buah
226 Kuas 3"-4" buah 8,000.00 8.000/ Buah
227 Kunci Gembok buah 7,000.00 7.000/ Buah
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
228 Kunci Lemari buah 7,000.00 12.000/ Buah
229 Kunci Pintu Kamar Tidur (Hotel) buah 450,000.00 450.000/ Buah
230 Kunci Pintu KM/WC (lux) buah 360,000.00 360.000/ Buah
231 Kunci Selot buah 12,500.00 12.500/ Buah
232 Kunci Tanam biasa mutu C buah 25,000.00 20.000-25.000/ Buah
233 Kunci Tanam 2 slaag biasa buah 50,000.00 70.000-75.000/ Buah
234 Kunci Tanam 2 slaag mutu B buah 85,000.00 90.000/ Buah
235 Kunci Tanam Kamar Mandi buah 22,500.00 20.000-25.000/ Buah
236 L.bow listrik buah 2,500.00 2.500/ Buah
237 Lampu Down Light buah 37,500.00 25.000-50.000/ Buah
238 Lampu Hologen 50 watt buah 9,000.00 8.000-10.000/ Buah
239 Lampu Hologen 150 watt buah 37,500.00 35.000-40.000/ Buah
240 Lampu Hologen Box buah 30,000.00 25.000-35.000/ Buah
241 Lampu TL 10 Watt buah 45,000.00 45.000-45.000/ Buah
242 Lampu TL 20 Watt buah 65,000.00 60.000-70.000/ Buah
243 Lampu TL 40 Watt (bambu) buah 75,000.00 70.000-80.000/ Buah
244 Lampu Pijar 25 Watt Putih buah 11,000.00 10.000-12.000/ Buah
245 Lampu Pijar 40 Watt Putih buah 12,000.00 12.000/ Buah
246 Lantai Granit 30/30 Buah 17,100.00 180.000-200.000/ M2
247 Lantai Granit 40/40 Buah 36,800.00 225.000-235.000/ M2
248 Lantai Granit 60/60 Buah 104,400.00 285.000-295.000/ M2
249 Lantai Kayu Panil Gracewood m2 352,500.00 350.000-355.000/ M2
250 Las dop listrik Buah 1,000.00 1.000/ buah
251 Lem Kayu ltr 12,000.00 12.000/ Buah
252 Lem Vinyl Kg 7,000.00 7.000/ Kg
253 List Gypsum Besar m' 19,000.00 18.000-20.000/ Buah
254 List Gypsum Kecil m' 14,000.00 13.000-15.000/ Buah
255 Mangkok Saklar listrik Buah 900.00 800 - 1.000/ buah
256 MCB Buah 15,000.00 15.000-15.000/ Buah
257 MCB Box isi 4 grup Buah 17,500.00 15.000-20.000/ Buah
258 MCB Box isi 8 grup Buah 32,500.00 30.000-35.000/ Buah
259 Melamic Clear kg 52,500.00 52.500/Kg
260 Melamic Gloss/dop (Finishing) kg 52,500.00 52.500/Kg
261 Mill kg 29,500.00 29.000-30.000/Kg
262 Minyak Bekisting liter 10,000.00 9.000-10.000/ Ltr
263 Minyak Cat liter 5,000.00 5.000/ Ltr
264 Minyak solar untuk industri / Minyak aspal liter 4,200.00 4.200/Ltr
265 Minyak Gardan liter 15,500.00 15.000-16.000/Ltr
266 Minyak Hidrolik liter 23,500.00 23.000-24.000/Ltr
267 Minyak Selinder liter 15,500.00 15.000-16.000/Ltr
268 Mozaik kayu lantai Uk. 30 x 30 cm buah 7,500.00 7.000-8.000/Buah
269 Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Unit 310,000.00 310.000-310.000/Unit
270 Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Unit 340,000.00 310.000-310.000/Unit
271 Paku Biasa bermacam ukuran 2" - 5" kg 15,000.00 13.000-15.000/Kg
272 Paku Biasa 1/2" - 1" kg 18,000.00 13.000-19.000/Kg
273 Paku Sumbat buah 475.00 450-500/Buah
274 Paku Beton buah 550.00 400-600/Buah
275 Paku Gypsum kg 25,000.00 25.000/Kg
276 Paku Seng,Asbes kg 20,000.00 17.500-25.000/Kg
277 Paku Asbes buah 475.00 25000-45000/Kg
278 Paku Sekrup 3,5" Kg 45,000.00 44.000-46.000/Kg
279 Paku Sekrup 3,5" buah 450.00 440-460/Buah
280 Parquet Jati m2 385,000.00 375.000-395.000/M2
281 Pasir Beton / Pasang m3 85,000.00 80.000-85.000/M3
282 Pasir Urug m3 75,000.00 75.000-80.000/M3
283 Pewarna nat Bks 8,500.00 8.500-9.000/Bks
284 Pintu Alluminium m2 575,000.00 575.000/M2
285 Pintu Besi Baja m2 1,750,000.00 1.500.000-2.000.000/M2
286 Pintu Lipat m2 337,500.00 275.000-400.000/M2
287 Pintu PVC lengkap Unit 185,000.00 185.000- 187.000/Unit
288 Pipa besi medium 2 mm & 1/2", pjg 6 m M' 11,250.00 11.250/m'
289 Pipa besi medium 2 mm & 3/4", pjg 6 m M' 14,583.33 14.583,33/m'
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
290 Pipa besi medium 2 mm & 1", pjg 6 m M' 17,833.33 17.833,33/m'
291 Pipa besi medium 2 mm & 1,5", pjg 6 m M' 24,833.33 24.833,33/m'
292 Pipa besi medium 2 mm & 2", pjg 6 m M' 31,666.67 31.666,67/m'
293 Pipa besi medium 2 mm & 2,5", pjg 6 m M' 31,666.67 31.666,67/m'
294 Pipa besi medium 2 mm & 3", pjg 6 m M' 49,250.00 49.250/m'
295 Pipa besi medium 2 mm & 4", pjg 6 m M' 65,500.00 65.500/m'
296 Pipa paralon listrik 5/8" Btg 4,500.00 10.000/Btg
297 Pipa PVC & 1/2" mutu A (Wavin dan sejenis) Btg 3,750.00 12.000-15.000/Btg
298 Pipa PVC biasa & 1/2" mutu B Btg 2,000.00 8.000/Btg
299 Pipa PVC & 3/4" mutu A (Wavin dan sejenis) Btg 5,375.00 21.500/Btg
300 Pipa PVC & 3/4" mutu B Btg 3,000.00 18.000/Btg
301 Pipa PVC & 1" mutu A (Wavin dan sejenis) Btg 7,375.00 29.500/Btg
302 Pipa PVC & 1" mutu B Btg 3,750.00 15.000/Btg
303 Pipa PVC & 1.5" mutu A (Wavin dan sejenis) Btg 12,750.00 51.000/Btg
304 Pipa PVC & 1.5" mutu B Btg 7,750.00 31.000-33.000/Btg
305 Pipa PVC & 2" mutu A ( Wavin dan sejenis) Btg 16,000.00 64.000-66.000/Btg
306 Pipa PVC & 2" mutu B Btg 10,000.00 40.000-42.000/Btg
307 Pipa PVC & 3" mutu A (Wavin dan sejenis) Btg 31,500.00 126.000-128.000/Btg
308 Pipa PVC & 3" mutu B Btg 17,000.00 68.000-70.000/Btg
309 Pipa PVC & 4" mutu A ( Wavin dan sejenis) Btg 52,250.00 209.000-211.000/Btg
310 Pipa PVC & 4" mutu B Btg 26,750.00 107.000-109.000/Btg
311 Pipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis) Btg 121,500.00 486.000-488.000/Btg
312 Pipa Stainless 2", tebal 1 mm M' 75,000.00 75.000/Btg
313 Pipa Stainless 2", tebal 0.8 mm M' 60,000.00 60.000/Btg
314 Pipa Stainless 2,5", tebal 1 mm M' 85,000.00 85.000/Btg
315 Pipa Stainless 2,5", tebal 1.2 mm M' 75,000.00 75.000/Btg
316 Plamir Tembok kg 27,500.00 27.000- 28.000/Kg
317 Plamir Kayu kg 22,000.00 23.000- 25.000/Kg
318 Plat stainless, tebal 1 mm, uk. 244 cm X 122 cm Lbr 1,550,000.00 1.550.000/Lbr
319 Plint keramik 10 x 30 cm warna buah 3,500.00 3.500/Buah
320 Plint keramik 10 x 40 cm warna buah 11,000.00 11.000/Buah
321 Plint Ubin PC Abu-abu 15 x 20 cm buah 725.00 700-750/Buah
322 Plint Ubin PC Abu-abu 10 x 30 cm buah 775.00 750-800/Buah
323 Plint Ubin PC Abu-abu 10 x 40 cm buah 825.00 800-850/Buah
324 Plywood warna/Jabarwood Lbr 85,000.00 80.000-90.000/Lbr
325 Plywood Jati 3 mm Lbr 110,000.00 100.000-110.000/Lbr
326 Plywood Sungkay 3 mm/ megatick Lbr 110,000.00 110.000/Lbr
327 Plywood 3 mm Lbr 42,000.00 39.000-45.000/Lbr
328 Plywood 4 mm Lbr 55,000.00 49.000-56.000/Lbr
329 Plywood 6 mm Lbr 85,000.00 70.000-87.500/Lbr
330 Plywood 9 mm Lbr 110,000.00 110.000-145.000/Lbr
331 Plywood 12 mm Lbr 147,500.00 145.000-150.000/Lbr
332 Plywood 20 mm Lbr 177,500.00 175.000-180.000/Lbr
333 Politur dasar ltr 27,000.00 26.000-28.000/Ltr
334 Politur Jadi ltr 45,000.00 45.000/Ltr
335 Porselin Putih Uk. 10 x 10 cm buah 400.00 300-500/Buah
336 Porselin Warna Uk. 10 x 10 cm buah 775.00 750-800/Buah
337 Rangka Atap baja ringan untuk atap genteng, genteng m2 195,000.00 195.000-200.000/M2
keramik, beton, dll + pemasangan
338 Rangka Atap baja ringan untuk atap seng metal, atap m2 165,000.00 165.000-180.000/M2
asbes, aluminium, sirap, dll + pemasangan
339 Rangka Atap baja ringan bentuk joglo/bertumpuk/ m2 215,000.00 200.000-230.000/M2
khusus + pemasangan
340 Rangka Atap baja ringan "Pryda" untuk atap Pelana, m2 195,000.00 195.000-200.00/M2
Metal dan keramik + pemasangan
341 Rangka Atap baja ringan "Pryda" untuk atap Perisai, m2 215,000.00 200.000-230.000/M2
Metal dan keramik + pemasangan
342 Rangka Atap baja ringan "Pryda" untuk atap Joglo, m2 250,000.00 250.000-270.000/M2
Metal dan keramik + pemasangan
343 Rel Pintu Dorong Unit 195,000.00 190.000-200.000/M2
344 Rolling Door Standar, t=4 mm, (minimal pas. 7 M2) m2 540,000.00 540.000/M2
345 Rolling Door Standar, t=5 mm, (minimal pas. 7 M2) m2 595,000.00 595.000/M2
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
346 Sanding Sealer Impra (Cat dasar) Kg 35,000.00 35.000-35.000/Kg
347 Seal Tape buah 3,000.00 3.000/Buah
348 Semen ( 50 kg ) Zak 65,000.00 62.000-66.000 / Zak
349 Semen Portland ( PC ) kg 1,300.00 1.500 /Kg
350 Semen Putih (40 kg) Zak 85,000.00 85.000-110.000 / Zak
351 Semen Putih Kg 2,125.00 1.750-1.875 /Kg
352 Semen Merah m3 35,000.00 35.000 / M3
353 Semen Nat Bks 9,000.00 9.000 / Bks
354 Seng Gelombang, lebar 70 cm m2 6,750.00 6.500 - 7.000 / kaki
355 Seng Plat 120 cm X 240 cm lbr 87,500.00 85.000 - 90.000 / Lbr
356 Seng Plat 33 cm M' 12,000.00 12.000 / M'
357 Seng Plat 38 cm M' 12,500.00 12.000 - 13.000 / M'
358 Seng Plat 45 cm M' 16,000.00 16.000 - 16.000 / M'
359 Seng Plat 55 cm M' 18,250.00 18.000 - 18.250 / M'
360 Seng Plat 88 cm M' 28,000.00 28.000 / M'
361 Seng Plat 92 cm M' 28,000.00 28.000 - 30.000 / M'
362 Sabun Kg 10,000.00 10.000 - 10.000 / Kg
363 Soda Api Kg 29,000.00 29.000-30.000 / Kg
364 Soft Board ( 120 x 240 ) mm lbr 65,000.00 65.000/ Lbr
365 Saklar Tunggal biasa Buah 5,500.00 5.000-6.000/ Buah
366 Saklar Ganda biasa Buah 8,000.00 7.000-9.000/ Buah
367 Saklar Tunggal National Buah 17,000.00 16.000-18.000/ Buah
368 Saklar Ganda National Buah 34,000.00 32.000-35.000/ Buah
369 Scafolding tg 1,77 m X 1,77 m Unit 650,000.00 650.000/Unit
370 Roda Scafolding 4 buah Unit 350,000.00 350.000/Unit
371 Smartruss/baja ringan sejenis Aluminium Magnesium
- Lysaght Smartruss/sejenis C 75.100 M' 18,000.00 18.000/M'
- Lysaght Smartruss/sejenis C 75.75 M' 15,000.00 15.000/M'
- Reng U T S 40 M' 13,000.00 13.000/M'
- Screw / Dynabolt Buah 1,500.00 1.500/Buah
- Valery Gutter Talang Jurai M' 100,000.00 100.000/M'
- Strap Bracing M' 10,000.00 10.000/M'
372 Stop Kontak biasa Buah 6,000.00 5.000-7.000/ Buah
373 Stop kontak AC Buah 47,500.00 45.000-50.000/ Buah
374 Sunscreen Aluminium M2 325,000.00 300.000-350.000/ M2
375 T.Duss listrik Buah 750.00 750 /buah
376 Talang Paralon, pjg 4 m btg 41,500.00 41.000 - 42.000 /btg
377 Tali Ijuk Kg 10,000.00 10.000 /Kg
378 Ijuk m3 21,000.00 21.000 /M3
379 Tanah Liat/Urug m3 50,000.00 250.000 / 5 M3
380 Tanah Puru m3 51,600.00 255.000-258.000 / 5 M3
381 Tanah Sirtu m3 60,000.00 65.000 / M3
382 Taekwood 3 mm m2 29,100.00 29.100 / M2
383 Taekwood 4 mm biasa m2 31,500.00 31.000 - 32.000 / M2
384 Ter / Residu liter 3,600.00 18.000 / 5 Ltr
385 Textil Tape roll 6,000.00 6.000 - 6.000 /roll
386 Thinner biasa Liter 13,250.00 53.000 /4 Ltr
387 Thinner Cat Glossy (Cobra dan sejenis) Liter 17,600.00 88.000 /5 Ltr
388 Urinoir buah 1,217,000.00 1.217.000 /Unit
389 Urinoir mutu A unit 1,400,000.00 1.400.000 /Unit
390 Vernis ltr 35,000.00 35.000 /Ltr
391 Vernis Batu Kg 95,000.00 95.000 /Kg
392 Wallpaper m2 50,000.00 250.000-300.000 /roll
393 Wastafel biasa buah 210,000.00 210.000-400.000 /Buah
394 Wastafel Halmar unit 250,000.00 250.000 /Buah
395 Wastafel mutu A unit 450,000.00 450.000 /Buah
396 Wood Filler Impra (dempul) Klg 25,000.00 22.000-25.000 /Klg
397 Wood Stain Impra (cat pewarna) Klg 50,000.00 50.000/Klg
C PERALATAN
1 Compresor jam 156,000.00 156,000.00
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
2 Concrete Mixer jam 43,750.00 350.000/8 Jam
3 Concrete Pump jam 285,714.29 2.000.000/hari/ 7 jam
4 Concrete Vibrator jam 24,200.00 24,200.00
5 Dump Truck jam 319,000.00 319,000.00
6 Excavator jam 654,500.00 654,500.00
7 Filter jam 44,000.00 44,000.00
8 Genset jam 11,000.00 11,000.00
9 Grader jam 517,000.00 517,000.00
10 Loader jam 412,500.00 412,500.00
11 Pneumatic Tired Roller jam 401,500.00 401,500.00
12 Tandem Roller jam 264,000.00 264,000.00
13 Flatbed Truck 3,5 ton jam 247,500.00 247,500.00
14 Water Tank Truck jam 330,000.00 330,000.00
15 Generator jam 38,500.00 38,500.00
16 Alat Bantu jam 90,000.00 90.000-100.000/jam
17 Roller 3 roda jam 181,500.00 181,500.00
18 Sprayer, Selfprof jam 154,000.00 154,000.00
19 Buldozer jam 709,500.00 709,500.00
20 Scaffolding 177cm X 177 cm, Tg. 177 cm Set/Bulan 75000-100.000 75000-100.000
21 Stone Crusher (Pemecah batu) jam 858,000.00 858,000.00
22 Pengaduk beton jam 120,000.00 120,000.00
23 Stemper jam 31,250.00 250.000/8 jam
24 Roller, Vibrator Pneu jam 99,000.00 99,000.00
25 Water Pump jam 23,650.00 23,650.00
D SERVICE
1 AC Window/Split/Multi Ls 60,000.00 60,000.00
2 Dispenser Ls 50,000.00 50,000.00
3 Kulkas/Freezer Ls 50,000.00 50,000.00
4 Kompor Gas 2T Ls 50,000.00 50,000.00
5 Kompor Gas 4T Ls 75,000.00 75,000.00
6 Mesin Cuci Ls 50,000.00 50,000.00
7 Pompa Air Ls 50,000.00 50,000.00
8 Instalasi listrik Ls 60,000.00 60,000.00
Tim Survey,
A UPAH
1 Kepala Tukang Oh 110,000.00 137,500.00 110,000.00
2 Tukang Oh 90,000.00 112,500.00 90,000.00
3 Mandor Oh 110,000.00 137,500.00 110,000.00
4 Pekerja Tidak Terlatih Oh 65,000.00 81,250.00 65,000.00
5 Pekerja Terlatih Oh 75,000.00 93,750.00 75,000.00
B BAHAN/MATERIAL
1 Aluminium Foil m2 18,500.00 23,125.00 18,500.00
2 Alcubond m2 650,000.00 812,500.00 650,000.00
3 Amplas Biasa Lbr 3,500.00 4,375.00 3,500.00
4 Amplas Niken Lbr 6,500.00 8,125.00 6,500.00
5 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr 43,000.00 53,750.00 43,000.00
6 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr 60,000.00 75,000.00 60,000.00
7 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr 83,000.00 103,750.00 83,000.00
8 Atap Aluminium Zincalume, tebal 0,25 mm Lbr 62,000.00 77,500.00 62,000.00
9 Atap Aluminium Zincalume, tebal 0,3 mm Lbr 62,500.00 78,125.00 62,500.00
10 Atap Aluminium Zincalume, tebal 0,4 mm Lbr 76,000.00 95,000.00 76,000.00
11 Atap Aluminium Gelombang tebal 0,5 mm Lbr 100,000.00 125,000.00 100,000.00
12 Atap Fiber warna"Polycarbonat" tbl. 4-5 mm m2 80,000.00 100,000.00 80,000.00
13 Atap Genteng Beton Lokal buah 4,200.00 5,250.00 4,200.00
14 Atap Genteng Beton buah 5,700.00 7,125.00 5,700.00
15 Atap Genteng Beton Cisangkan buah 7,500.00 9,375.00 7,500.00
16 Atap Genteng Buleleng buah 2,300.00 2,875.00 2,300.00
17 Atap Genteng Keramik biasa berglazur buah 8,000.00 10,000.00 8,000.00
18 Atap Genteng Keramik Berglazur Natural buah 12,000.00 15,000.00 12,000.00
19 Atap Genteng Keramik sejenis Berglazur warna buah 17,000.00 21,250.00 17,000.00
20 Atap Genteng Metal Biasa (88 cm X 77 cm) m2 32,000.00 40,000.00 32,000.00
21 Atap Genteng Metal Warna (120 cm X 76 cm) m2 40,000.00 50,000.00 40,000.00
22 Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80cm) m2 160,000.00 200,000.00 160,000.00
23 Atap Genteng Metal Zincalume berpasir (77cmX100cm) m2 85,000.00 106,250.00 85,000.00
24 Atap Genteng Metal Zincalume berpasir biasa m2 60,000.00 75,000.00 60,000.00
25 Atap Genteng Kodok buah 1,000.00 1,250.00 1,000.00
26 Atap Onduline m2 58,500.00 73,125.00 58,500.00
27 Asbes polos 100 x 100 tbl = 4 mm Lbr 24,000.00 30,000.00 24,000.00
28 Asbes Gelombang Kecil, lebar 80 cm m2 25,000.00 31,250.00 25,000.00
29 Asbes Gelombang Kecil, lebar 105 cm m2 32,000.00 40,000.00 32,000.00
30 Asbes Gelombang Besar, lebar 105 cm m2 35,000.00 43,750.00 35,000.00
31 Asbes Gelombang motif genteng m2 33,500.00 41,875.00 33,500.00
32 Aquaproof kg 260,000.00 325,000.00 260,000.00
33 Bak Cuci Stainless Steel buah 193,000.00 241,250.00 193,000.00
34 Bak Cuci Teraso buah 325,000.00 406,250.00 325,000.00
35 Bak Fibreglass buah 180,000.00 225,000.00 180,000.00
36 Bak Teraso buah 180,000.00 225,000.00 180,000.00
37 Bambu dia. 6-8 cm/6m Btg 50,000.00 62,500.00 50,000.00
38 Batako buah 2,600.00 3,250.00 2,600.00
39 Batu Andesit hitam kecoklatan m2 190,000.00 237,500.00 190,000.00
40 Batu alam kecoklatan (Sangarong) m2 185,000.00 231,250.00 185,000.00
41 Batu Bata lobang m3 512,000.00 640,000.00 512,000.00
42 Batu Bata Kecil buah 1,250.00 1,562.50 1,250.00
43 Batu Bata Lobang buah 725.00 906.25 725.00
44 Batu Candi hitam m2 225,000.00 281,250.00 225,000.00
45 Batu Kali m3 350,000.00 437,500.00 350,000.00
46 Batu Kali tempel m2 93,000.00 116,250.00 93,000.00
47 Batu Karang Pilang m2 594,000.00 742,500.00 594,000.00
48 Batu Kerikil m3 400,000.00 500,000.00 400,000.00
49 Batu Koral beton pecah split 0 s/d 5 mm m3 421,683.00 589,603.75 471,683.00
50 Batu Koral Jagung m3 400,000.00 500,000.00 400,000.00
51 Batu Krokos m3 375,000.00 468,750.00 375,000.00
52 Batu Palimanan kuning/hijau m2 168,000.00 210,000.00 168,000.00
53 Batu Palimanan kuning/hijau + bevel m2 168,000.00 210,000.00 168,000.00
54 Batu Pecah 0.5 - 1 (screen) m3 330,000.00 412,500.00 330,000.00
55 Batu Abu 0.00 - 0.5 (filler) m3 330,000.00 412,500.00 330,000.00
-9-
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
- 10 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
- 11 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
- 12 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
- 13 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
- 14 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
C PERALATAN
1 Compresor jam 112,015.00 123,216.50 112,015.00
2 Concrete Mixer jam 178,710.00 196,581.00 178,710.00
3 Concrete Pump jam 114,560.00 126,016.00 114,560.00
4 Concrete Vibrator jam 40,000.00 44,000.00 40,000.00
5 Dump Truck 3,5 ton jam 312,000.00 343,200.00 312,000.00
6 Excavator jam 865,555.00 952,110.50 865,555.00
7 Filter jam
8 Genset jam 350,000.00 385,000.00 350,000.00
9 Grader jam
10 Loader jam
11 Pneumatic Tired Roller jam
12 Tandem Roller jam
13 Flatbed Truck 3,5 ton jam 225,000.00 247,500.00 225,000.00
14 Water Tank Truck jam
15 Generator jam
16 Alat Bantu jam 75,000.00 82,500.00 75,000.00
17 Roller 3 roda jam
18 Sprayer, Selfprof jam 140,000.00 154,000.00 140,000.00
19 Buldozer jam
20 Scaffolding 177cm X 177 cm, Tg. 177 cm Set/Bulan 95,000.00 104,500.00 95,000.00
21 Stone Crusher (Pemecah batu) jam
22 Pengaduk beton/Molen jam 100,000.00 110,000.00 100,000.00
23 Stemper jam 150,000.00 165,000.00 150,000.00
24 Roller, Vibrator Pneu jam
25 Water Pump jam 250,000.00 275,000.00 250,000.00
- 15 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
D SERVICE
1 AC Window/Split/Multi Ls 60,000.00 66,000.00 60,000.00
2 Dispenser Ls 50,000.00 55,000.00 50,000.00
3 Kulkas/Freezer Ls 50,000.00 55,000.00 50,000.00
4 Kompor Gas 2T Ls 50,000.00 55,000.00 50,000.00
5 Kompor Gas 4T Ls 75,000.00 82,500.00 75,000.00
6 Mesin Cuci Ls 50,000.00 55,000.00 50,000.00
7 Pompa Air Ls 50,000.00 55,000.00 50,000.00
8 Instalasi listrik Ls 85,000.00 93,500.00 85,000.00
- 16 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
I PEKERJAAN PERSIAPAN
1.1 1 M' Pagar Sementara dari Kayu Tinggi 2 Meter
a. Bahan
1.250 Btg Kayu Gelam dia. 6-8 8,000.00 10,000.00 10,000.00
2.500 Kg Semen Portland 1,250.00 3,125.00 3,125.00
0.005 M3 Pasir Beton 92,500.00 462.50 462.50
0.009 M3 Koral Beton 421,683.00 3,795.15 3,795.15
0.072 M3 Kayu 5/7 kelas IV 1,500,000.00 108,000.00 108,000.00
0.060 Kg Paku Biasa 2"-5" 15,000.00 900.00 900.00
0.400 Lt Teer/Residu 45,000.00 18,000.00 18,000.00
144,282.65 144,282.65
b. Tenaga
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
48,400.00 48,400.00
b. Tenaga
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
48,400.00 48,400.00
1.3 1 M' Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter
a. Bahan
1.000 Btg Kayu Gelam dia. 6-8 8,000.00 8,000.00 8,000.00
2.000 Kg Semen Portland 1,250.00 2,500.00 2,500.00
25.000 Kg Kawat Duri 15,000.00 375,000.00 375,000.00
0.005 M3 Pasir Beton 92,500.00 462.50 462.50
0.009 M3 Koral Beton 421,683.00 3,795.15 3,795.15
0.060 Kg Paku Biasa 2"-5" 15,000.00 900.00 900.00
390,657.65 390,657.65
b. Tenaga
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
41,900.00 41,900.00
b. Tenaga
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.005 Oh Mandor 110,000.00 550.00 550.00
17,150.00 17,150.00
- 17 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
a. Bahan
1.700 Btg Kayu Gelam dia. 6-8 8,000.00 13,600.00 13,600.00
0.210 M3 Kayu 1,500,000.00 315,000.00 315,000.00
0.300 Kg Paku Biasa 15,000.00 4,500.00 4,500.00
10.500 Kg Semen Portland 1,250.00 13,125.00 13,125.00
0.030 M3 Pasir Beton 92,500.00 2,775.00 2,775.00
0.050 M3 Koral Beton 421,683.00 21,084.15 21,084.15
1.500 Lbr Seng Gelombang BJLS 7,425.00 11,137.50 11,137.50
381,221.65 381,221.65
b. Tenaga
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
272,500.00 272,500.00
Jumlah 381,221.65 272,500.00 653,721.65
b. Tenaga
1.500 Oh Tukang Kayu 90,000.00 135,000.00 135,000.00
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
0.150 Oh Kepala Tukang 110,000.00 16,500.00 16,500.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
222,000.00 222,000.00
Jumlah 455,925.00 222,000.00 677,925.00
- 18 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
272,500.00 272,500.00
Jumlah 439,084.15 272,500.00 711,584.15
b. Tenaga
0.300 Oh Tukang Kayu 90,000.00 27,000.00 27,000.00
0.002 Oh Mandor 110,000.00 165.00 165.00
27,165.00 27,165.00
b. Tenaga
0.017 Oh Tukang Kayu 90,000.00 1,530.00 1,530.00
0.002 Oh Kepala Tukang 110,000.00 220.00 220.00
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
19,430.00 19,430.00
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
70,500.00 70,500.00
b. Tenaga
0.042 Oh Pekerja 65,000.00 2,730.00 2,730.00
0.004 Oh Kepala Tukang 110,000.00 440.00 440.00
0.042 Oh Tukang 90,000.00 3,780.00 3,780.00
0.002 Oh Mandor 110,000.00 220.00 220.00
7,170.00 7,170.00
- 19 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
- 20 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
130,800.00 130,800.00
II PEKERJAAN TANAH
a. Tenaga
0.735 Oh Pekerja 65,000.00 47,775.00 47,775.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.073 Oh Mandor 110,000.00 8,030.00 8,030.00
55,805.00 55,805.00
Jumlah 55,805.00 55,805.00
2.4 1 M3 Galian Tanah Keras Sedalam 1 Meter
a. Tenaga
0.625 Oh Pekerja 65,000.00 40,625.00 40,625.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.062 Oh Mandor 110,000.00 6,820.00 6,820.00
47,445.00 47,445.00
- 21 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
a. Tenaga
0.500 Oh Pekerja 65,000.00 32,500.00 32,500.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
38,000.00 38,000.00
Jumlah 38,000.00 38,000.00
a. Bahan
1.200 M3 Pasir Urug 65,000.00 78,000.00 78,000.00
78,000.00 78,000.00
b. Tenaga
0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
20,600.00 20,600.00
b. Tenaga
1.000 M3 Upah dan Pemadatan 6,600.00 6,600.00 6,600.00
6,600.00 6,600.00
Jumlah 506,019.60 6,600.00 512,619.60
- 22 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 904,045.00 166,350.00 1,070,395.00
b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 758,247.50 166,350.00 924,597.50
a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 350,000.00 385,000.00 385,000.00
202.000 Kg Semen Portland 1,250.00 252,500.00 252,500.00
0.485 M3 Pasir Pasang 92,500.00 44,862.50 44,862.50
682,362.50 682,362.50
b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
- 23 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 583,142.50 166,350.00 749,492.50
3.8 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 8 Ps
a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 350,000.00 385,000.00 385,000.00
91.000 Kg Semen Portland 1,250.00 113,750.00 113,750.00
0.561 M3 Pasir Pasang 92,500.00 51,892.50 51,892.50
550,642.50 550,642.50
b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 550,642.50 166,350.00 716,992.50
a. Bahan
0.450 M3 Batu Belah 15/20 cm / batu kali 350,000.00 157,500.00 157,500.00
280.000 Kg Semen Portland 1,250.00 350,000.00 350,000.00
0.450 M3 Pasir Beton 92,500.00 41,625.00 41,625.00
0.670 M3 Koral Beton 421,683.00 282,527.61 282,527.61
831,652.61 831,652.61
b. Tenaga
2.380 Oh Pekerja 65,000.00 154,700.00 154,700.00
0.300 Oh Tukang Batu 90,000.00 27,000.00 27,000.00
0.030 Oh Kepala Tukang 110,000.00 3,300.00 3,300.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
193,800.00 193,800.00
Jumlah 831,652.61 193,800.00 1,025,452.61
3.10 1 M' Pembuatan Tiang Pancang (40 x 40) cm, Beton Bertulang
a. Bahan
0.019 M3 Pasir Urug 65,000.00 1,235.00 1,235.00
0.094 M3 Pasir Beton 92,500.00 8,695.00 8,695.00
0.150 M3 Koral Beton 421,683.00 63,252.45 63,252.45
60.500 Kg Semen Portland 1,250.00 75,625.00 75,625.00
45.000 Kg Besi Beton 19,000.00 855,000.00 855,000.00
0.900 Kg Kawat Beton 18,000.00 16,200.00 16,200.00
0.032 M3 Kayu Kaso 5/7 1,500,000.00 48,000.00 48,000.00
0.120 Kg Paku 15,000.00 1,800.00 1,800.00
0.090 Ltr Minyak Bekisting 12,000.00 1,080.00 1,080.00
0.240 Kg Plamir Tembok 8,000.00 1,920.00 1,920.00
1,072,807.45 1,072,807.45
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
0.670 Oh Tukang Batu 90,000.00 60,300.00 60,300.00
0.067 Oh Kepala Tukang 110,000.00 7,370.00 7,370.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
138,170.00 138,170.00
21.228
Jumlah 1,072,807.45 138,170.00 1,210,977.45
3.11 1 M Pembuatan Tiang Pancang (25x25) cm/ Dia 30, Beton Bertulang
a. Bahan
0.011 M3 Pasir Urug Darat 65,000.00 715.00 715.00
0.037 M3 Pasir Beton 92,500.00 3,422.50 3,422.50
0.085 M3 Koral Beton 421,683.00 35,843.06 35,843.06
21.250 Kg Semen Portland 1,250.00 26,562.50 26,562.50
11.500 Kg Besi Beton 19,000.00 218,500.00 218,500.00
0.375 Kg Kawat Beton 18,000.00 6,750.00 6,750.00
0.017 M3 Kayu Kaso 5/7 1,500,000.00 25,500.00 25,500.00
0.042 Kg Paku 15,000.00 622.50 622.50
0.040 Ltr Minyak Bekisting 12,000.00 480.00 480.00
0.105 Kg Plamir Tembok 8,000.00 840.00 840.00
319,235.56 319,235.56
- 24 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.445 Oh Pekerja 65,000.00 28,925.00 28,925.00
0.298 Oh Tukang Batu 90,000.00 26,775.00 26,775.00
0.028 Oh Kepala Tukang 110,000.00 3,025.00 3,025.00
0.021 Oh Mandor 110,000.00 2,310.00 2,310.00
61,035.00 61,035.00
Jumlah 319,235.56 61,035.00 380,270.56
IV PEKERJAAN DINDING
4.1 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 1 Ps
a. Bahan
140.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 175,000.00
64.030 Kg Semen Portland 1,250.00 80,037.50 80,037.50
0.059 M3 Pasir Pasang 92,500.00 5,457.50 5,457.50
260,495.00 260,495.00
b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
65,750.00 65,750.00
b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
65,750.00 65,750.00
Jumlah 236,775.00 65,750.00 302,525.00
- 25 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
- 26 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00
Jumlah 114,702.50 32,550.00 147,252.50
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00
Jumlah 69,615.00 32,550.00 102,165.00
- 27 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00
b. Tenaga
0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
31,250.00 31,250.00
a. Bahan
12.500 Bh Bataco 10 X 20 X 40 2,600.00 32,500.00 32,500.00
0.019 Zak Semen Portland (PC) 62,000.00 1,202.80 1,202.80
0.023 M3 Pasir Pasang 92,500.00 2,081.25 2,081.25
35,784.05 35,784.05
b. Tenaga
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.450 Oh Pekerja 65,000.00 29,250.00 29,250.00
44,400.00 44,400.00
Jumlah 35,784.05 44,400.00 80,184.05
V PEKERJAAN PLESTERAN
5.1 1 M2 Plesteran 1 Pc : 1 Ps, Tebal 15 mm
a. Bahan
12.920 Kg Semen Portland 1,250.00 16,150.00 16,150.00
0.013 M3 Pasir Pasang 92,500.00 1,202.50 1,202.50
17,352.50 17,352.50
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 17,352.50 29,250.00 46,602.50
- 28 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
a. Bahan
4.320 Kg Semen Portland 1,250.00 5,400.00 5,400.00
0.022 M3 Pasir Pasang 92,500.00 2,035.00 2,035.00
7,435.00 7,435.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 7,435.00 29,250.00 36,685.00
a. Bahan
3.680 Kg Semen Portland 1,250.00 4,600.00 4,600.00
0.023 M3 Pasir Pasang 92,500.00 2,127.50 2,127.50
6,727.50 6,727.50
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 6,727.50 29,250.00 35,977.50
- 29 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 8,402.50 29,250.00 37,652.50
a. Bahan
0.009 M3 Semen Merah 38,000.00 342.00 342.00
0.009 M3 Pasir Pasang 92,500.00 832.50 832.50
1,174.50 1,174.50
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 1,174.50 29,250.00 30,424.50
a. Bahan
10.800 Kg Semen Portland 1,250.00 13,500.00 13,500.00
0.026 M3 Pasir Pasang 92,500.00 2,405.00 2,405.00
15,905.00 15,905.00
- 30 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
37,825.00 37,825.00
Jumlah 15,905.00 37,825.00 53,730.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
37,825.00 37,825.00
Jumlah 13,440.00 37,825.00 51,265.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
37,825.00 37,825.00
Jumlah 2,007.00 37,825.00 39,832.00
5.19 1 M2 Berapen 1 Pc : 5 Ps, Tebal 15 mm
a. Bahan
5.670 Kg Semen Portland 1,250.00 7,087.50 7,087.50
0.023 M3 Pasir Pasang 92,500.00 2,127.50 2,127.50
9,215.00 9,215.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.070 Oh Tukang Batu 90,000.00 6,300.00 6,300.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.008 Oh Mandor 110,000.00 880.00 880.00
17,700.00 17,700.00
Jumlah 9,215.00 17,700.00 26,915.00
a. Bahan
9.300 Kg Semen Portland 1,250.00 11,625.00 11,625.00
0.018 M3 Pasir Pasang 92,500.00 1,665.00 1,665.00
13,290.00 13,290.00
- 31 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.260 Oh Pekerja 65,000.00 16,900.00 16,900.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
38,530.00 38,530.00
Jumlah 13,290.00 38,530.00 51,820.00
a. Bahan
4.320 Kg Semen Portland 1,250.00 5,400.00 5,400.00
0.016 M3 Pasir Pasang 92,500.00 1,480.00 1,480.00
6,880.00 6,880.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.070 Oh Tukang Batu 90,000.00 6,300.00 6,300.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.008 Oh Mandor 110,000.00 880.00 880.00
17,700.00 17,700.00
Jumlah 6,880.00 17,700.00 24,580.00
5.24 1 M3 Perekat
a. Bahan
10.588 Zak Semen Portland 62,000.00 656,456.00 656,456.00
1.080 M3 Pasir Pasang 92,500.00 99,900.00 99,900.00
756,356.00 756,356.00
Jumlah 756,356.00 756,356.00
a. Bahan
0.060 Kg Semen Portland 62,000.00 3,720.00 3,720.00
0.024 M3 Pasir Pasang 92,500.00 2,220.00 2,220.00
5,940.00 5,940.00
b. Tenaga
1.200 Oh Tukang Batu 90,000.00 108,000.00 108,000.00
0.120 Oh Kepala Tukang 110,000.00 13,200.00 13,200.00
0.600 Oh Pekerja 65,000.00 39,000.00 39,000.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
163,500.00 163,500.00
Jumlah 5,940.00 163,500.00 169,440.00
VI PEKERJAAN KAYU
6.1 1 M3 Pasang Kusen Pintu dan Jendela K.kls. I (Kayu Jati, Unglen)
a. Bahan
1.100 M3 Kayu Jati, Balok ( Kayu kelas I) 8,250,000.00 9,075,000.00 9,075,000.00
9,075,000.00 9,075,000.00
b. Tenaga
6.000 Oh Pekerja 65,000.00 390,000.00 390,000.00
20.000 Oh Tukang Kayu 90,000.00 1,800,000.00 1,800,000.00
2.000 Oh Kepala Tukang 110,000.00 220,000.00 220,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
2,443,000.00 2,443,000.00
- 32 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
6.000 Oh Pekerja 65,000.00 390,000.00 390,000.00
18.000 Oh Tukang Kayu 90,000.00 1,620,000.00 1,620,000.00
2.000 Oh Kepala Tukang 110,000.00 220,000.00 220,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
2,263,000.00 2,263,000.00
Jumlah 7,800,000.00 2,263,000.00 10,063,000.00
6.3 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelas III 6,943,470.00
a. Bahan
1.200 M3 Kayu Kls. III 3,300,000.00 3,960,000.00 3,960,000.00
3,960,000.00 10,903,470.00
b. Tenaga
6.000 Oh Pekerja 65,000.00 390,000.00 390,000.00
18.000 Oh Tukang Kayu 90,000.00 1,620,000.00 1,620,000.00
2.000 Oh Kepala Tukang 110,000.00 220,000.00 220,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
2,263,000.00 2,263,000.00
Jumlah 3,960,000.00 2,263,000.00 6,223,000.00
b. Tenaga
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
1.050 Oh Tukang Kayu 90,000.00 94,500.00 94,500.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.018 Oh Mandor 110,000.00 1,980.00 1,980.00
130,780.00 130,780.00
b. Tenaga
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
1.050 Oh Tukang Kayu 90,000.00 94,500.00 94,500.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.018 Oh Mandor 110,000.00 1,980.00 1,980.00
130,780.00 130,780.00
Jumlah 54,750.00 130,780.00 185,530.00
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
2.500 Oh Tukang Kayu 90,000.00 225,000.00 225,000.00
0.250 Oh Kepala Tukang 110,000.00 27,500.00 27,500.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
323,000.00 323,000.00
Jumlah 330,000.00 323,000.00 653,000.00
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
2.500 Oh Tukang Kayu 90,000.00 225,000.00 225,000.00
0.250 Oh Kepala Tukang 110,000.00 27,500.00 27,500.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
323,000.00 323,000.00
- 33 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.800 Oh Pekerja 65,000.00 52,000.00 52,000.00
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.040 Oh Mandor 110,000.00 4,400.00 4,400.00
258,400.00 258,400.00
Jumlah 227,500.00 258,400.00 485,900.00
b. Tenaga
0.800 Oh Pekerja 65,000.00 52,000.00 52,000.00
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.040 Oh Mandor 110,000.00 4,400.00 4,400.00
258,400.00 258,400.00
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
3.000 Oh Tukang Kayu 90,000.00 270,000.00 270,000.00
0.300 Oh Kepala Tukang 110,000.00 33,000.00 33,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
401,000.00 401,000.00
Jumlah 528,000.00 401,000.00 929,000.00
- 34 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
a. Bahan
0.020 M3 Kayu Kelas II 6,500,000.00 127,400.00 127,400.00
1.000 Lbr Plywood Sungkai 3 mm 110,000.00 110,000.00 110,000.00
0.300 Ltr Lem Kayu 20,000.00 6,000.00 6,000.00
0.030 Kg Paku Biasa 1/2" - 1" 18,000.00 540.00 540.00
243,940.00 243,940.00
b. Tenaga
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.600 Oh Pekerja 65,000.00 39,000.00 39,000.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
244,300.00 244,300.00
Jumlah 243,940.00 244,300.00 488,240.00
a. Bahan
1.100 M3 Kayu Kls. III, Balok 3,300,000.00 3,630,000.00 3,630,000.00
15.000 Kg Besi Strip 10,000.00 150,000.00 150,000.00
0.800 Kg Paku Biasa 2" - 5" 15,000.00 12,000.00 12,000.00
3,792,000.00 3,792,000.00
b. Tenaga
4.000 Oh Pekerja 65,000.00 260,000.00 260,000.00
12.000 Oh Tukang Kayu 90,000.00 1,080,000.00 1,080,000.00
1.200 Oh Kepala Tukang 110,000.00 132,000.00 132,000.00
0.200 Oh Mandor 110,000.00 22,000.00 22,000.00
1,494,000.00 1,494,000.00
Jumlah 3,792,000.00 1,494,000.00 5,286,000.00
- 35 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.005 Oh Mandor 110,000.00 550.00 550.00
17,150.00 17,150.00
kayu kls. III, untuk genteng kodok/biasa 41,850.00 17,150.00 59,000.00
kayu kls. III, untuk genteng beton 48,450.00 17,150.00 65,600.00
- 36 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
a. Bahan
0.023 M3 Kayu Kls. III 3,300,000.00 75,900.00 75,900.00
0.150 Kg Paku Biasa 2" - 5" 15,000.00 2,250.00 2,250.00
78,150.00 78,150.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.300 Oh Tukang Kayu 90,000.00 27,000.00 27,000.00
0.030 Oh Kepala Tukang 110,000.00 3,300.00 3,300.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
44,400.00 44,400.00
Jumlah 78,150.00 44,400.00 122,550.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.350 Oh Tukang Kayu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
52,975.00 52,975.00
Jumlah 225,750.00 52,975.00 278,725.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.350 Oh Tukang Kayu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
52,975.00 52,975.00
- 37 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.110 Oh Pekerja 65,000.00 7,150.00 7,150.00
0.220 Oh Tukang Kayu 90,000.00 19,800.00 19,800.00
0.022 Oh Kepala Tukang 110,000.00 2,420.00 2,420.00
0.005 Oh Mandor 110,000.00 550.00 550.00
29,920.00 29,920.00
- 38 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
6.38 1 M' Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Kls. III
a. Bahan
0.009 M3 Kayu Kls. III 3,300,000.00 29,040.00 29,040.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00 900.00
29,940.00 29,940.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
22,100.00 22,100.00
Jumlah 29,940.00 22,100.00 52,040.00
a. Bahan
0.020 M3 Kayu Kls. III, Balok 3,300,000.00 64,350.00 64,350.00
0.007 M3 Kayu Kls. III, Papan 3,300,000.00 23,100.00 23,100.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00 1,500.00
88,950.00 88,950.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.450 Oh Tukang Kayu 90,000.00 40,500.00 40,500.00
0.045 Oh Kepala Tukang 110,000.00 4,950.00 4,950.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
63,450.00 63,450.00
Jumlah 88,950.00 63,450.00 152,400.00
6.42 1 M2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas III
a. Bahan
0.020 M3 Kayu Kelas III, Balok 3,300,000.00 64,350.00 64,350.00
0.007 M3 Kayu Kelas III, Papan 3,300,000.00 23,100.00 23,100.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00 1,500.00
0.560 Ltr Lem Kayu 20,000.00 11,200.00 11,200.00
1.000 Lbr Plywood 4' x 8' x 4 mm 68,000.00 68,000.00 68,000.00
168,150.00 168,150.00
- 39 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.600 Oh Tukang Kayu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
74,700.00 74,700.00
Jumlah 168,150.00 74,700.00 242,850.00
6.47 1 M2 Pasang lapis plywood Sungkay tanpa rangka, politur dan lis profil
a. Bahan
0.360 Kpg Plywood Sungkay 3 mm 110,000.00 39,600.00 39,600.00
0.050 Kg Paku 1/2" - 1 " 18,000.00 900.00 900.00
40,500.00 40,500.00
b. Tenaga
0.075 Oh Tukang Kayu 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 825.00 825.00
0.025 Oh Pekerja 65,000.00 1,625.00 1,625.00
0.001 Oh Mandor 110,000.00 143.00 143.00
9,343.00 9,343.00
40,500.00 9,343.00 49,843.00
- 40 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
6.48 1 M2 Pasang lapis plywood Sungkay + list kayu, tanpa rangka dan politur
a. Bahan
0.360 Kpg Plywood Sungkay 3 mm 110,000.00 39,600.00 39,600.00
0.250 LS List kayu 2,500.00 625.00 625.00
0.150 Kg Paku 1/2" - 2 " 18,000.00 2,700.00 2,700.00
2.000 Lbr Amplas 3,500.00 7,000.00 7,000.00
49,925.00 49,925.00
b. Tenaga
0.096 Oh Tukang Kayu 90,000.00 8,640.00 8,640.00
0.010 Oh Kepala Tukang 110,000.00 1,045.00 1,045.00
0.046 Oh Pekerja 65,000.00 2,990.00 2,990.00
0.002 Oh Mandor 110,000.00 253.00 253.00
12,928.00 12,928.00
49,925.00 12,928.00 62,853.00
a. Bahan
0.020 M3 Kayu Kelas II 6,500,000.00 126,750.00 126,750.00
0.007 M3 Kayu Kelas II, Papan 3,300,000.00 23,100.00 23,100.00
0.100 Kg Paku Biasa 2"-5" 15,000.00 1,500.00 1,500.00
1.000 Lbr Plywood Sungkai 110,000.00 110,000.00 110,000.00
0.050 Kg Paku Plywood 18,000.00 900.00 900.00
262,250.00 262,250.00
b. Tenaga
0.600 Oh Tukang Kayu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
74,700.00 74,700.00
- 41 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 686,107.02 141,300.00 827,407.02
a. Bahan
173.000 Kg Semen Portland 1,250.00 216,250.00 216,250.00
0.570 M3 Pasir Beton 92,500.00 52,725.00 52,725.00
0.870 M3 Koral Beton 421,683.00 366,864.21 366,864.21
635,839.21 635,839.21
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 635,839.21 141,300.00 777,139.21
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 771,139.70 141,300.00 912,439.70
- 42 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 786,978.10 141,300.00 928,278.10
a. Bahan
440.000 Kg Semen Portland 1,250.00 550,000.00 550,000.00
0.500 M3 Pasir Beton 92,500.00 46,250.00 46,250.00
0.800 M3 Koral Beton Pecah Split 468,000.00 374,400.00 374,400.00
2.460 Gln Rapidrant - - -
970,650.00 970,650.00
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
- 43 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
7.13 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 4 Split
a. Bahan
291.000 Kg Semen Portland 1,250.00 363,750.00 363,750.00
0.470 M3 Pasir Beton 92,500.00 43,475.00 43,475.00
0.930 M3 Koral Beton pecah Split 468,000.00 435,240.00 435,240.00
842,465.00 842,465.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
275,350.00 275,350.00
Jumlah 842,465.00 275,350.00 1,117,815.00
a. Bahan
400.000 Kg Semen Portland 1,250.00 500,000.00 500,000.00
0.480 M3 Pasir Beton 92,500.00 44,400.00 44,400.00
0.800 M3 Koral Beton 2/3 Split 471,683.00 377,346.40 377,346.40
921,746.40 921,746.40
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
275,350.00 275,350.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
275,350.00 275,350.00
Jumlah 1,062,125.16 275,350.00 1,337,475.16
- 44 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.007 Oh Pekerja 65,000.00 455.00 455.00
0.007 Oh Tukang Besi 90,000.00 630.00 630.00
0.001 Oh Kepala Tukang 110,000.00 77.00 77.00
0.000 Oh Mandor 110,000.00 33.00 33.00
1,195.00 1,195.00
Jumlah 20,220.00 1,195.00 21,415.00
b. Tenaga
0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00
0.260 Oh Tukang Kayu 90,000.00 23,400.00 23,400.00
0.026 Oh Kepala Tukang 110,000.00 2,860.00 2,860.00
0.005 Oh Mandor 110,000.00 550.00 550.00
46,310.00 46,310.00
a. Bahan
0.020 M3 Kayu Kls. IV 1,500,000.00 30,000.00 30,000.00
0.500 Btg Hek 9,000.00 4,500.00 4,500.00
0.200 Kg Paku Biasa 2"- 5" 15,000.00 3,000.00 3,000.00
37,500.00 37,500.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.165 Oh Tukang Kayu 90,000.00 14,850.00 14,850.00
0.017 Oh Kepala Tukang 110,000.00 1,815.00 1,815.00
0.003 Oh Mandor 110,000.00 330.00 330.00
26,745.00 26,745.00
- 45 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
7.24 1 M2 Pasang Bekisting Untuk Balok (Untuk bangunan gedung)
a. Bahan
0.040 M3 Kayu Kls. IV 1,500,000.00 60,000.00 60,000.00
0.400 Kg Paku Biasa 2"- 5" 15,000.00 6,000.00 6,000.00
0.018 M3 Balok Kayu Kls. IV 1,500,000.00 27,000.00 27,000.00
2.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 16,000.00 16,000.00
109,000.00 109,000.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.330 Oh Tukang Kayu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
54,790.00 54,790.00
Jumlah 109,000.00 54,790.00 163,790.00
7.26 1 M2 Pasang Bekisting Untuk Lantai, plat dak (untuk bangunan gedung)
a. Bahan
0.040 M3 Kayu Kls. IV 1,500,000.00 60,000.00 60,000.00
0.400 Kg Paku Biasa 2"- 5" 15,000.00 6,000.00 6,000.00
0.015 M3 Balok Kayu Kls.IV 1,500,000.00 22,500.00 22,500.00
6.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 48,000.00 48,000.00
136,500.00 136,500.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.330 Oh Tukang Batu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
54,790.00 54,790.00
Jumlah 136,500.00 54,790.00 191,290.00
- 46 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.330 Oh Tukang Kayu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
54,790.00 54,790.00
Jumlah 89,500.00 54,790.00 144,290.00
7.30 1 M3 Beton Ready Mix K 175 dengan pengangkutan
a. Bahan
1.020 M3 Beton Ready Mix K 175 850,000.00 867,000.00 867,000.00
867,000.00 867,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
1.000 Ls Pengangkutan dan mobilisasi mobil Pick up 15,583.33 15,583.33 15,583.33
166,269.70 166,269.70
a. Bahan
1.020 M3 Beton Ready Mix K 175 850,000.00 867,000.00 867,000.00
867,000.00 867,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37
Jumlah 867,000.00 150,686.37 1,017,686.37
a. Bahan
1.020 M3 Beton Ready Mix K 225 900,000.00 918,000.00 918,000.00
918,000.00 918,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37
- 47 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
7.36 1 M3 Beton Ready Mix K 275 dengan pengangkutan
a. Bahan
1.020 M3 Beton Ready Mix K 275 1,000,000.00 1,020,000.00 1,020,000.00
1,020,000.00 1,020,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
1.000 Ls Pengangkutan dan mobilisasi mobil Pick up 15,583.33 15,583.33 15,583.33
166,269.70 166,269.70
Jumlah 1,020,000.00 166,269.70 1,186,269.70
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
1.000 Ls Pengangkutan dan mobilisasi mobil Pick up 15,583.33 15,583.33 15,583.33
166,269.70 166,269.70
Jumlah 1,071,000.00 166,269.70 1,237,269.70
a. Bahan
1.020 M3 Beton Ready Mix K 350 1,100,000.00 1,122,000.00 1,122,000.00
1,122,000.00 1,122,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
1.000 Ls Pengangkutan dan mobilisasi mobil Pick up 15,583.33 15,583.33 15,583.33
166,269.70 166,269.70
Jumlah 1,122,000.00 166,269.70 1,288,269.70
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37
Jumlah 1,122,000.00 150,686.37 1,272,686.37
- 48 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
7.42 1 M' Pasang Kayu Mal Bekisting untuk Beton Ready Mix jalan
a. Bahan
0.500 Kpg Papan Kayu Kls. IV 16,500.00 8,250.00 8,250.00
0.200 Kg Paku Biasa 2"- 5" 15,000.00 3,000.00 3,000.00
0.009 M3 Balok Kayu Kls. IV 1,500,000.00 13,500.00 13,500.00
24,750.00 24,750.00
b. Tenaga
0.160 Oh Pekerja 65,000.00 10,400.00 10,400.00
0.165 Oh Tukang Kayu 90,000.00 14,850.00 14,850.00
0.017 Oh Kepala Tukang 110,000.00 1,815.00 1,815.00
0.003 Oh Mandor 110,000.00 330.00 330.00
27,395.00 27,395.00
b. Tenaga
3.900 Oh Pekerja 65,000.00 253,500.00 253,500.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
1.040 Oh Tukang Kayu 90,000.00 93,600.00 93,600.00
1.050 Oh Tukang Besi 90,000.00 94,500.00 94,500.00
0.245 Oh Kepala Tukang 110,000.00 26,950.00 26,950.00
0.165 Oh Mandor 110,000.00 18,150.00 18,150.00
518,200.00 518,200.00
- 49 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
a. Bahan
0.270 M3 Kayu Kls. IV 1,500,000.00 405,000.00 405,000.00
2.000 Kg Paku Biasa 2"- 5" 15,000.00 30,000.00 30,000.00
100.000 Kg Besi Beton Polos 19,000.00 1,900,000.00 1,900,000.00
3.000 Kg Kawat Beton 18,000.00 54,000.00 54,000.00
323.000 Kg Semen Portland 1,250.00 403,750.00 403,750.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
3,169,762.74 3,169,762.74
b. Tenaga
4.850 Oh Pekerja 65,000.00 315,250.00 315,250.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
1.560 Oh Tukang Kayu 90,000.00 140,400.00 140,400.00
1.400 Oh Tukang Besi 90,000.00 126,000.00 126,000.00
0.331 Oh Kepala Tukang 110,000.00 36,410.00 36,410.00
0.170 Oh Mandor 110,000.00 18,700.00 18,700.00
668,260.00 668,260.00
Jumlah 3,169,762.74 668,260.00 3,838,022.74
7.48 1 M3 Membuat Kolom Beton Bertulang ( 300 Kg Besi + Bekisting )
a. Bahan
0.400 M3 Kayu Kls. IV 1,500,000.00 600,000.00 600,000.00
4.000 Kg Paku Biasa 2"- 5" 15,000.00 60,000.00 60,000.00
300.000 Kg Besi Beton Polos 19,000.00 5,700,000.00 5,700,000.00
4.500 Kg Kawat Beton 18,000.00 81,000.00 81,000.00
323.000 Kg Semen Portland 1,250.00 403,750.00 403,750.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.150 M3 Kayu Balok Kls. IV 1,500,000.00 225,000.00 225,000.00
20.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 160,000.00 160,000.00
b. Tenaga 7,606,762.74 7,606,762.74
7.300 Oh Pekerja 65,000.00 474,500.00 474,500.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
3.300 Oh Tukang Kayu 90,000.00 297,000.00 297,000.00
2.100 Oh Tukang Besi 90,000.00 189,000.00 189,000.00
0.570 Oh Kepala Tukang 110,000.00 62,700.00 62,700.00
0.250 Oh Mandor 110,000.00 27,500.00 27,500.00
1,082,200.00 1,082,200.00
Jumlah 7,606,762.74 1,082,200.00 8,688,962.74
7.49 1 M3 Membuat Kolom Beton Bertulang ( 200 Kg Besi + Bekisting )
a. Bahan
0.400 M3 Kayu Kls. IV 1,500,000.00 600,000.00 600,000.00
4.000 Kg Paku Biasa 2"- 5" 15,000.00 60,000.00 60,000.00
200.000 Kg Besi Beton Polos 19,000.00 3,800,000.00 3,800,000.00
4.500 Kg Kawat Beton 18,000.00 81,000.00 81,000.00
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.150 M3 Kayu Balok Kls. IV 1,500,000.00 225,000.00 225,000.00
20.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 160,000.00 160,000.00
5,593,012.74 5,593,012.74
b. Tenaga
7.300 Oh Pekerja 65,000.00 474,500.00 474,500.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
3.300 Oh Tukang Kayu 90,000.00 297,000.00 297,000.00
2.100 Oh Tukang Besi 90,000.00 189,000.00 189,000.00
0.570 Oh Kepala Tukang 110,000.00 62,700.00 62,700.00
0.250 Oh Mandor 110,000.00 27,500.00 27,500.00
1,082,200.00 1,082,200.00
Jumlah 5,593,012.74 1,082,200.00 6,675,212.74
7.50 1 M3 Membuat Kolom Beton Bertulang ( 100 Kg Besi + Bekisting )
a. Bahan
0.400 M3 Kayu Kls. IV 1,500,000.00 600,000.00 600,000.00
4.000 Kg Paku Biasa 2"- 5" 15,000.00 60,000.00 60,000.00
100.000 Kg Besi Beton Polos 19,000.00 1,900,000.00 1,900,000.00
4.500 Kg Kawat Beton 18,000.00 81,000.00 81,000.00
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.150 M3 Kayu Balok Kls. IV 1,500,000.00 225,000.00 225,000.00
20.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 160,000.00 160,000.00
3,693,012.74 3,693,012.74
b. Tenaga
7.300 Oh Pekerja 65,000.00 474,500.00 474,500.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
3.300 Oh Tukang Kayu 90,000.00 297,000.00 297,000.00
2.100 Oh Tukang Besi 90,000.00 189,000.00 189,000.00
0.570 Oh Kepala Tukang 110,000.00 62,700.00 62,700.00
0.250 Oh Mandor 110,000.00 27,500.00 27,500.00
1,082,200.00 1,082,200.00
Jumlah 3,693,012.74 1,082,200.00 4,775,212.74
- 50 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
- 51 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
5.600 Oh Pekerja 65,000.00 364,000.00 364,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
2.640 Oh Tukang Kayu 90,000.00 237,600.00 237,600.00
1.050 Oh Tukang Besi 90,000.00 94,500.00 94,500.00
0.400 Oh Kepala Tukang 110,000.00 44,000.00 44,000.00
0.193 Oh Mandor 110,000.00 21,230.00 21,230.00
792,830.00 792,830.00
Jumlah 4,397,512.74 792,830.00 5,190,342.74
7.57 1 M' Membuat Kolom Penguat Beton Bertulang (11x11)cm + bekisting (kolom praktis)
a. Bahan
0.002 M3 Kayu Kls. IV 1,500,000.00 3,000.00 3,000.00
0.010 Kg Paku Biasa 2"- 5" 15,000.00 150.00 150.00
3.000 Kg Besi Beton Polos 19,000.00 57,000.00 57,000.00
0.450 Kg Kawat Beton 18,000.00 8,100.00 8,100.00
4.000 Kg Semen Portland 1,250.00 5,000.00 5,000.00
0.006 M Pasir Beton
3
92,500.00 555.00 555.00
0.009 M3 Koral Beton 421,683.00 3,795.15 3,795.15
77,600.15 77,600.15
b. Tenaga
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.020 Oh Tukang Batu 90,000.00 1,800.00 1,800.00
0.020 Oh Tukang Kayu 90,000.00 1,800.00 1,800.00
0.020 Oh Tukang Besi 90,000.00 1,800.00 1,800.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.003 Oh Mandor 110,000.00 330.00 330.00
10,290.00 10,290.00
Jumlah 77,600.15 10,290.00 87,890.15
7.58 1 M' Membuat Ring Balok Beton Bertulang ( 10 x 15 ) cm
a. Bahan
0.003 M3 Kayu Kls. IV 1,500,000.00 4,500.00 4,500.00
0.020 Kg Paku Biasa 2"- 5" 15,000.00 300.00 300.00
3.600 Kg Besi Beton Polos 19,000.00 68,400.00 68,400.00
0.050 Kg Kawat Beton 18,000.00 900.00 900.00
5.500 Kg Semen Portland 1,250.00 6,875.00 6,875.00
0.009 M3 Pasir Beton 92,500.00 832.50 832.50
0.015 M3 Koral Beton 421,683.00 6,325.25 6,325.25
88,132.75 88,132.75
- 52 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.033 Oh Tukang Batu 90,000.00 2,970.00 2,970.00
0.033 Oh Tukang Kayu 90,000.00 2,970.00 2,970.00
0.033 Oh Tukang Besi 90,000.00 2,970.00 2,970.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.005 Oh Mandor 110,000.00 550.00 550.00
17,060.00 17,060.00
Jumlah 88,132.75 17,060.00 105,192.75
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.330 Oh Tukang Batu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
54,790.00 54,790.00
7.60 1 M3 Beton Ready Mix K-175 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai)
a. Bahan
1.020 M3 Beton Ready Mix K-175 850,000.00 867,000.00 867,000.00
867,000.00 867,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
0.167 M3 Concrete Pump 114,560.00 19,093.72 19,093.72
169,780.09 169,780.09
Jumlah 867,000.00 169,780.09 1,036,780.09
7.61 1 M3 Beton Ready Mix K-175 untuk Kolom, Balok, Plat Lantai, tangga tanpa Concrete Pump (belalai)
a. Bahan
1.020 M3 Beton Ready Mix K-175 850,000.00 867,000.00 867,000.00
867,000.00 867,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37
Jumlah 867,000.00 150,686.37 1,017,686.37
7.62 1 M Beton Ready Mix K-225 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai)
3
a. Bahan
1.020 M3 Beton Ready Mix K-225 900,000.00 918,000.00 918,000.00
918,000.00 918,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
0.167 M3 Concrete Pump 114,560.00 19,093.72 19,093.72
169,780.09 169,780.09
Jumlah 918,000.00 169,780.09 1,087,780.09
7.63 1 M3 Beton Ready Mix K-225 untuk Kolom, Balok, Plat Lantai, tangga tanpa Concrete Pump (belalai)
a. Bahan
1.020 M3 Beton Ready Mix K-225 900,000.00 918,000.00 918,000.00
918,000.00 918,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37
- 53 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
7.64 1 M3 Beton Ready Mix K-275 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai)
a. Bahan
1.020 M3 Beton Ready Mix K-275 1,000,000.00 1,020,000.00 1,020,000.00
1,020,000.00 1,020,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
0.167 M3 Concrete Pump 114,560.00 19,093.72 19,093.72
169,780.09 169,780.09
Jumlah 1,020,000.00 169,780.09 1,189,780.09
VIII PEKERJAAN PENUTUP ATAP
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.075 Oh Tukang Kayu 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.008 Oh Mandor 110,000.00 880.00 880.00
18,260.00 18,260.00
Jumlah 25,000.00 18,260.00 43,260.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.075 Oh Tukang Kayu 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.008 Oh Mandor 110,000.00 880.00 880.00
18,260.00 18,260.00
- 54 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
8.6 1 M' Pasang Bubung Genteng Keramik biasa berglazzur
a. Bahan
4.000 Bh Genteng Bubung Keramik lokal 10,000.00 40,000.00 40,000.00
8.000 Kg Semen Portland 1,250.00 10,000.00 10,000.00
0.032 M3 Pasir Pasang 92,500.00 2,960.00 2,960.00
52,960.00 52,960.00
b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.002 Oh Mandor 110,000.00 220.00 220.00
46,420.00 46,420.00
Jumlah 52,960.00 46,420.00 99,380.00
8.7 1 M' Pasang Bubung Genteng Keramik KIA Natural atau sejenis
a. Bahan
3.000 Bh Genteng Bubung Keramik KIA Natural atau sejenis 20,000.00 60,000.00 60,000.00
8.000 Kg Semen Portland 1,250.00 10,000.00 10,000.00
0.032 M3 Pasir Pasang 92,500.00 2,960.00 2,960.00
72,960.00 72,960.00
b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.002 Oh Mandor 110,000.00 220.00 220.00
46,420.00 46,420.00
Jumlah 72,960.00 46,420.00 119,380.00
8.8 1 M' Pasang Bubung Genteng Keramik KIA Warna atau sejenis
a. Bahan
3.000 Bh Genteng Bubung Keramik KIA Warna atau sejenis 25,000.00 75,000.00 75,000.00
8.000 Kg Semen Portland 1,250.00 10,000.00 10,000.00
0.032 M3 Pasir Pasang 92,500.00 2,960.00 2,960.00
87,960.00 87,960.00
b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.002 Oh Mandor 110,000.00 220.00 220.00
46,420.00 46,420.00
a. Bahan
1.000 M2 Fiber warna Polycarbon 80,000.00 80,000.00 80,000.00
0.050 Kg Paku Biasa 1/2" - 1" 18,000.00 900.00 900.00
80,900.00 80,900.00
b. Tenaga
0.140 Oh Pekerja 65,000.00 9,100.00 9,100.00
0.067 Oh Tukang Kayu 90,000.00 6,030.00 6,030.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.007 Oh Mandor 110,000.00 770.00 770.00
16,670.00 16,670.00
a. Bahan
1.100 M2 Asbes Gelombang kecil lebar 80 cm 25,000.00 27,500.00 27,500.00
0.120 Kg Paku Pancing 22,000.00 2,640.00 2,640.00
30,140.00 30,140.00
b. Tenaga
0.140 Oh Pekerja 65,000.00 9,100.00 9,100.00
0.067 Oh Tukang Kayu 90,000.00 6,030.00 6,030.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.007 Oh Mandor 110,000.00 770.00 770.00
16,670.00 16,670.00
Jumlah 30,140.00 16,670.00 46,810.00
- 55 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.140 Oh Pekerja 65,000.00 9,100.00 9,100.00
0.067 Oh Tukang Kayu 90,000.00 6,030.00 6,030.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.007 Oh Mandor 110,000.00 770.00 770.00
16,670.00 16,670.00
b. Tenaga
0.140 Oh Pekerja 65,000.00 9,100.00 9,100.00
0.067 Oh Tukang Kayu 90,000.00 6,030.00 6,030.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.007 Oh Mandor 110,000.00 770.00 770.00
16,670.00 16,670.00
b. Tenaga
0.140 Oh Pekerja 65,000.00 9,100.00 9,100.00
0.067 Oh Tukang Kayu 90,000.00 6,030.00 6,030.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.007 Oh Mandor 110,000.00 770.00 770.00
16,670.00 16,670.00
Jumlah 41,140.00 16,670.00 57,810.00
b. Tenaga
0.084 Oh Pekerja 65,000.00 5,460.00 5,460.00
0.125 Oh Tukang Kayu 90,000.00 11,250.00 11,250.00
0.013 Oh Kepala Tukang 110,000.00 1,430.00 1,430.00
0.004 Oh Mandor 110,000.00 440.00 440.00
18,580.00 18,580.00
Jumlah 29,450.00 18,580.00 48,030.00
b. Tenaga
0.084 Oh Pekerja 65,000.00 5,460.00 5,460.00
0.125 Oh Tukang Kayu 90,000.00 11,250.00 11,250.00
0.013 Oh Kepala Tukang 110,000.00 1,430.00 1,430.00
0.004 Oh Mandor 110,000.00 440.00 440.00
18,580.00 18,580.00
Jumlah 30,000.00 18,580.00 48,580.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
24,200.00 24,200.00
- 56 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
8.17 1 M2 Pasang Atap Genteng Beton
a. Bahan
11.000 Bh Genteng Beton 5,700.00 62,700.00 62,700.00
0.030 Kg Paku Biasa 2" - 5" 15,000.00 450.00 450.00
63,150.00 63,150.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
24,200.00 24,200.00
Jumlah 63,150.00 24,200.00 87,350.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 110.00 110.00
23,210.00 23,210.00
Jumlah 35,640.00 23,210.00 58,850.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 110.00 110.00
23,210.00 23,210.00
Jumlah 166,200.00 23,210.00 189,410.00
a. Bahan
1.020 M2 Genteng Metal warna 40,000.00 40,800.00 40,800.00
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
43,800.00 43,800.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 110.00 110.00
23,210.00 23,210.00
- 57 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
8.23 1 M' Pasang Nok Genteng Beton
a. Bahan
3.500 Bh Nok Genteng Beton 6,000.00 21,000.00 21,000.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00 750.00
10.800 Kg Semen Abu-abu 1,250.00 13,500.00 13,500.00
0.032 M3 Pasir Pasang 92,500.00 2,960.00 2,960.00
1.000 Kg Semen Warna 12,000.00 12,000.00 12,000.00
50,210.00 50,210.00
b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
48,400.00 48,400.00
Jumlah 50,210.00 48,400.00 98,610.00
b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
48,400.00 48,400.00
Jumlah 59,710.00 48,400.00 108,110.00
a. Bahan
1.100 Bh Nok Genteng Metal 30,000.00 33,000.00 33,000.00
0.050 Kg Paku Biasa 1/2" - 1" 18,000.00 900.00 900.00
33,900.00 33,900.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.150 Oh Tukang Kayu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
32,830.00 32,830.00
Jumlah 33,900.00 32,830.00 66,730.00
b. Tenaga
0.120 Oh Pekerja 65,000.00 7,800.00 7,800.00
0.060 Oh Tukang Kayu 90,000.00 5,400.00 5,400.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.006 Oh Mandor 110,000.00 660.00 660.00
14,520.00 14,520.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.070 Oh Tukang Kayu 90,000.00 6,300.00 6,300.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.006 Oh Mandor 110,000.00 660.00 660.00
17,590.00 17,590.00
- 58 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.750 Oh Tukang Kayu 90,000.00 67,500.00 67,500.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.006 Oh Mandor 110,000.00 660.00 660.00
78,790.00 78,790.00
Jumlah 105,900.00 78,790.00 184,690.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
1.000 Oh Tukang Kayu 90,000.00 90,000.00 90,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
98,700.00 98,700.00
Jumlah 37,800.00 98,700.00 136,500.00
(F1) a. Bahan
1.100 M3 Kayu Kelas II 6,500,000.00 7,150,000.00 7,150,000.00
0.250 Kg Paku 15,000.00 3,750.00 3,750.00
7,153,750.00 7,153,750.00
b. Tenaga
15.000 Oh Tukang 90,000.00 1,350,000.00 1,350,000.00
1.500 Oh Kepala Tukang 110,000.00 165,000.00 165,000.00
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.250 Oh Mandor 110,000.00 27,500.00 27,500.00
1,549,000.00 1,549,000.00
- 59 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
IX PEKERJAAN LANGIT-LANGIT
9.1 1 M2 Langit-langit Asbes/Eternit ( 1,00 x 1,00 ) m, Tebal 2,7 mm
a. Bahan
1.100 Lbr Asbes/Eternit Tebal 2,7 mm 23,000.00 25,300.00 25,300.00
0.010 Kg Paku 18,000.00 180.00 180.00
25,480.00 25,480.00
b. Tenaga
0.030 Oh Pekerja 65,000.00 1,950.00 1,950.00
0.070 Oh Tukang Kayu 90,000.00 6,300.00 6,300.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.002 Oh Mandor 110,000.00 165.00 165.00
9,185.00 9,185.00
Jumlah 25,480.00 9,185.00 34,665.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 21,060.00 15,035.00 36,095.00
a. Bahan
0.012 M3 Kayu Kls. II, Balok 6,500,000.00 78,000.00 78,000.00
0.060 Kg Paku Biasa 15,000.00 900.00 900.00
1.100 M2 Asbes / Eternit tebal 2,7 mm 23,000.00 25,300.00 25,300.00
1.100 M2 Asbes / Eternit tebal 3,5 mm 27,000.00 29,700.00 29,700.00
Tebal 2,7 mm 104,200.00 104,200.00
Tebal 3,5 mm 108,600.00 108,600.00
b. Tenaga
0.180 Oh Pekerja 65,000.00 11,700.00 11,700.00
0.320 Oh Tukang Kayu 90,000.00 28,800.00 28,800.00
0.032 Oh Kepala Tukang 110,000.00 3,520.00 3,520.00
0.009 Oh Mandor 110,000.00 990.00 990.00
45,010.00 45,010.00
1 M2 Eternit tebal 2,7 mm, rangka kayu kls. II 104,200.00 45,010.00 149,210.00
1 M2 Eternit tebal 3,5 mm, rangka kayu kls. II 108,600.00 45,010.00 153,610.00
- 60 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.180 Oh Pekerja 65,000.00 11,700.00 11,700.00
0.320 Oh Tukang Kayu 90,000.00 28,800.00 28,800.00
0.032 Oh Kepala Tukang 110,000.00 3,520.00 3,520.00
0.009 Oh Mandor 110,000.00 990.00 990.00
45,010.00 45,010.00
1 M2 Eternit tebal 2,7 mm, rangka kayu kls. III 65,800.00 45,010.00 110,810.00
1 M2 Eternit tebal 3,5 mm, rangka kayu kls. III 70,200.00 45,010.00 115,210.00
1 M2 Kalsiboard tebal 3,5 mm, rangka kayu kls. II 98,700.00 59,435.00 158,135.00
1 M2 Kalsiboard tebal 4,5 mm, rangka kayu kls. II 99,780.00 59,435.00 159,215.00
1 M2 Kalsiboard tebal 3,5 mm, rangka kayu kls. III 60,300.00 59,435.00 119,735.00
1 M2 Kalsiboard tebal 4,5 mm, rangka kayu kls. III 61,380.00 59,435.00 120,815.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 15,660.00 15,035.00 30,695.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 25,020.00 15,035.00 40,055.00
- 61 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
a. Bahan
0.360 Lbr Plywood 4' x 8' x 12 mm 160,000.00 57,600.00 57,600.00
0.030 Kg Paku 18,000.00 540.00 540.00
58,140.00 58,140.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
a. Bahan
1.000 M2 Teakwood 4' x 8' x 3 mm 36,000.00 36,000.00 36,000.00
0.030 Kg Paku 18,000.00 540.00 540.00
36,540.00 36,540.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 36,540.00 15,035.00 51,575.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 40,540.00 15,035.00 55,575.00
- 62 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.270 Oh Pekerja 65,000.00 17,550.00 17,550.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.040 Oh Kepala Tukang 110,000.00 4,400.00 4,400.00
0.014 Oh Mandor 110,000.00 1,485.00 1,485.00
59,435.00 59,435.00
1 M2 Plywood tebal 3 mm, rangka kayu kls. III 55,620.00 59,435.00 115,055.00
1 M2 Plywood tebal 4 mm, rangka kayu kls. III 64,980.00 59,435.00 124,415.00
1 M2 Plywood tebal 6 mm, rangka kayu kls. III 72,180.00 59,435.00 131,615.00
1 M2 Plywood tebal 9 mm, rangka kayu kls. III 85,500.00 59,435.00 144,935.00
1 M2 Plywood tebal 12 mm, rangka kayu kls. III 98,100.00 59,435.00 157,535.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.600 Oh Tukang Kayu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
74,700.00 74,700.00
Jumlah 198,150.00 74,700.00 272,850.00
9.19 1 M2 Langit-langit Soft Board
a. Bahan
0.350 Lbr Soft Board 4' x 8' x 4 mm 67,500.00 23,625.00 23,625.00
0.030 Kg Paku Biasa 18,000.00 540.00 540.00
23,625.00 23,625.00
b. Tenaga
0.600 Oh Pekerja 65,000.00 39,000.00 39,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.003 Oh Mandor 110,000.00 330.00 330.00
49,430.00 49,430.00
Jumlah 23,625.00 49,430.00 73,055.00
- 63 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
9.21 1 M2 Langit-langit Gypsum Board, Tebal 9 mm
a. Bahan
0.364 Lbr Gypsum Board ( 120 x 240 x 9 ) mm 63,000.00 22,932.00 22,932.00
0.300 Kg Cornes 7,000.00 2,100.00 2,100.00
0.025 roll Textile Tape 6,850.00 171.25 171.25
0.110 Kg Paku Sekrup 45,000.00 4,950.00 4,950.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00
0.040 Kg Paku Gypsum 25,000.00 1,000.00
32,053.25 30,153.25
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.050 Oh Tukang Kayu 90,000.00 4,500.00 4,500.00
0.005 Oh Kepala Tukang 110,000.00 550.00 550.00
0.005 Oh Mandor 110,000.00 550.00 550.00
12,100.00 12,100.00
Jumlah 32,053.25 12,100.00 44,153.25
b. Tenaga
0.260 Oh Pekerja 65,000.00 16,900.00 16,900.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.040 Oh Kepala Tukang 110,000.00 4,400.00 4,400.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
58,730.00 58,730.00
1 M2 Gypsum Board 9 mm, rangka kayu kls. III 71,653.25 58,730.00 130,383.25
1 M2 Gypsum Board 9 mm, rangka kayu kls. II 110,053.25 58,730.00 168,783.25
X PEKERJAAN SANITASI
- 64 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
1.500 Oh Tukang Batu 90,000.00 135,000.00 135,000.00
1.500 Oh Kepala Tukang 110,000.00 165,000.00 165,000.00
0.160 Oh Mandor 110,000.00 17,600.00 17,600.00
382,600.00 382,600.00
Jumlah 168,425.00 382,600.00 551,025.00
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
1.500 Oh Tukang Batu 90,000.00 135,000.00 135,000.00
0.300 Oh Kepala Tukang 110,000.00 33,000.00 33,000.00
0.110 Oh Mandor 110,000.00 12,100.00 12,100.00
245,100.00 245,100.00
Jumlah 49,175.00 245,100.00 294,275.00
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
1.000 Oh Tukang Batu 90,000.00 90,000.00 90,000.00
0.100 Oh Kepala Tukang 110,000.00 11,000.00 11,000.00
0.100 Oh Mandor 110,000.00 11,000.00 11,000.00
177,000.00 177,000.00
b. Tenaga
1.200 Oh Pekerja 65,000.00 78,000.00 78,000.00
1.450 Oh Tukang Batu 90,000.00 130,500.00 130,500.00
0.150 Oh Kepala Tukang 110,000.00 16,500.00 16,500.00
0.100 Oh Mandor 110,000.00 11,000.00 11,000.00
236,000.00 236,000.00
Jumlah 512,425.00 236,000.00 748,425.00
b. Tenaga
2.100 Oh Pekerja 65,000.00 136,500.00 136,500.00
0.750 Oh Tukang Batu 90,000.00 67,500.00 67,500.00
0.070 Oh Kepala Tukang 110,000.00 7,700.00 7,700.00
0.110 Oh Mandor 110,000.00 12,100.00 12,100.00
223,800.00 223,800.00
Jumlah 188,425.00 223,800.00 412,225.00
- 65 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
1.800 Oh Pekerja 65,000.00 117,000.00 117,000.00
2.700 Oh Tukang Batu 90,000.00 243,000.00 243,000.00
0.540 Oh Kepala Tukang 110,000.00 59,400.00 59,400.00
0.110 Oh Mandor 110,000.00 12,100.00 12,100.00
431,500.00 431,500.00
Jumlah 212,400.00 431,500.00 643,900.00
10.8 Memasang 1 Buah Bak Mandi Porselin Batu Bata Volume 0,30 m3
a. Bahan
0.400 M3 Batu Bata 512,000.00 204,800.00 204,800.00
120.000 Kg Semen Portland 1,250.00 150,000.00 150,000.00
0.300 M3 Pasir Pasang 92,500.00 27,750.00 27,750.00
360.000 Bh Porselen ( 11 x 11 ) cm 700.00 252,000.00 252,000.00
6.000 Kg Semen Nat 12,000.00 72,000.00 72,000.00
706,550.00 706,550.00
b. Tenaga
6.000 Oh Pekerja 65,000.00 390,000.00 390,000.00
3.000 Oh Tukang Batu 90,000.00 270,000.00 270,000.00
0.300 Oh Kepala Tukang 110,000.00 33,000.00 33,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
726,000.00 726,000.00
Jumlah 706,550.00 726,000.00 1,432,550.00
10.11 Memasang 1 M' Pipa Penyalur Air Limbah Jenis Pipa Tanah, dia. 15 cm
a. Bahan
1.600 M' Pipa Tanah (Paralon) dia. 15 cm 123,750.00 198,000.00 198,000.00
0.680 Kg Semen Portland 1,250.00 850.00 850.00
0.013 M3 Pasir Pasang 92,500.00 1,202.50 1,202.50
0.011 M3 Pasir Urug 65,000.00 715.00 715.00
200,767.50 200,767.50
b. Tenaga
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.030 Oh Tukang Batu 90,000.00 2,700.00 2,700.00
0.003 Oh Kepala Tukang 110,000.00 330.00 330.00
0.003 Oh Mandor 110,000.00 275.00 275.00
7,205.00 7,205.00
Jumlah 200,767.50 7,205.00 207,972.50
10.12 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30)
cm, Tinggi 35 cm
a. Bahan
0.145 M3 Batu Bata 512,000.00 74,240.00 74,240.00
44.000 Kg Semen Portland 1,250.00 55,000.00 55,000.00
0.070 M3 Pasir Pasang 92,500.00 6,475.00 6,475.00
0.070 M3 Batu Kerikil 400,000.00 28,000.00 28,000.00
1.600 Kg Besi Beton 19,000.00 30,400.00 30,400.00
0.060 M3 Pasir Beton 92,500.00 5,550.00 5,550.00
199,665.00 199,665.00
- 66 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
3.200 Oh Pekerja 65,000.00 208,000.00 208,000.00
1.015 Oh Tukang Batu 90,000.00 91,350.00 91,350.00
0.002 Oh Kepala Tukang 110,000.00 165.00 165.00
0.016 Oh Mandor 110,000.00 1,760.00 1,760.00
301,275.00 301,275.00
Jumlah 199,665.00 301,275.00 500,940.00
10.13 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45)
cm, Tinggi 50 cm
a. Bahan
0.250 M3 Batu Bata 512,000.00 128,000.00 128,000.00
77.000 Kg Semen Portland 1,250.00 96,250.00 96,250.00
0.130 M3 Pasir Pasang 92,500.00 12,025.00 12,025.00
0.020 M3 Batu Kerikil 400,000.00 8,000.00 8,000.00
2.600 Kg Besi Beton 19,000.00 49,400.00 49,400.00
0.090 M3 Pasir Beton 92,500.00 8,325.00 8,325.00
302,000.00 302,000.00
b. Tenaga
1.420 Oh Pekerja 65,000.00 92,300.00 92,300.00
0.473 Oh Tukang Batu 90,000.00 42,570.00 42,570.00
0.047 Oh Kepala Tukang 110,000.00 5,170.00 5,170.00
0.071 Oh Mandor 110,000.00 7,810.00 7,810.00
147,850.00 147,850.00
Jumlah 302,000.00 147,850.00 449,850.00
10.14 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60)
cm, Tinggi 65 cm
a. Bahan
0.371 M3 Batu Bata 512,000.00 189,952.00 189,952.00
114.000 Kg Semen Portland 1,250.00 142,500.00 142,500.00
0.184 M3 Pasir Pasang 92,500.00 17,020.00 17,020.00
0.033 M3 Batu Kerikil 400,000.00 13,200.00 13,200.00
4.850 Kg Besi Beton 19,000.00 92,150.00 92,150.00
0.120 M3 Pasir Beton 92,500.00 11,100.00 11,100.00
465,922.00 465,922.00
b. Tenaga
2.160 Oh Pekerja 65,000.00 140,400.00 140,400.00
0.720 Oh Tukang Batu 90,000.00 64,800.00 64,800.00
0.100 Oh Tukang Gali 90,000.00 9,000.00 9,000.00
0.072 Oh Kepala Tukang 110,000.00 7,920.00 7,920.00
0.108 Oh Mandor 110,000.00 11,880.00 11,880.00
234,000.00 234,000.00
Jumlah 465,922.00 234,000.00 699,922.00
a. Bahan
1.200 M' Pipa Galvanis 18,500.00 22,200.00 22,200.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 6,475.00 6,475.00
28,675.00 28,675.00
b. Tenaga
0.054 Oh Pekerja 65,000.00 3,510.00 3,510.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.027 Oh Mandor 110,000.00 2,970.00 2,970.00
15,570.00 15,570.00
Jumlah 28,675.00 15,570.00 44,245.00
b. Tenaga
0.054 Oh Pekerja 65,000.00 3,510.00 3,510.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.027 Oh Mandor 110,000.00 2,970.00 2,970.00
15,570.00 15,570.00
- 67 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.054 Oh Pekerja 65,000.00 3,510.00 3,510.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.027 Oh Mandor 110,000.00 2,970.00 2,970.00
15,570.00 15,570.00
b. Tenaga
0.108 Oh Pekerja 65,000.00 7,020.00 7,020.00
0.180 Oh Tukang Batu 90,000.00 16,200.00 16,200.00
0.018 Oh Kepala Tukang 110,000.00 1,980.00 1,980.00
0.005 Oh Mandor 110,000.00 594.00 594.00
25,794.00 25,794.00
b. Tenaga
0.108 Oh Pekerja 65,000.00 7,020.00 7,020.00
0.180 Oh Tukang Batu 90,000.00 16,200.00 16,200.00
0.018 Oh Kepala Tukang 110,000.00 1,980.00 1,980.00
0.005 Oh Mandor 110,000.00 594.00 594.00
25,794.00 25,794.00
Jumlah 168,175.00 25,794.00 193,969.00
a. Bahan
1.200 M' Pipa PVC 4,000.00 4,800.00 4,800.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 1,400.00 1,400.00
6,200.00 6,200.00
b. Tenaga
0.036 Oh Pekerja 65,000.00 2,340.00 2,340.00
0.060 Oh Tukang Batu 90,000.00 5,400.00 5,400.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.002 Oh Mandor 110,000.00 198.00 198.00
8,598.00 8,598.00
Jumlah 6,200.00 8,598.00 14,798.00
- 68 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.036 Oh Pekerja 65,000.00 2,340.00 2,340.00
0.060 Oh Tukang Batu 90,000.00 5,400.00 5,400.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.002 Oh Mandor 110,000.00 198.00 198.00
8,598.00 8,598.00
Jumlah 11,625.00 8,598.00 20,223.00
b. Tenaga
0.054 Oh Pekerja 65,000.00 3,510.00 3,510.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.003 Oh Mandor 110,000.00 297.00 297.00
12,897.00 12,897.00
Jumlah 25,381.25 12,897.00 38,278.25
b. Tenaga
0.081 Oh Pekerja 65,000.00 5,265.00 5,265.00
0.135 Oh Tukang Batu 90,000.00 12,150.00 12,150.00
0.014 Oh Kepala Tukang 110,000.00 1,485.00 1,485.00
0.004 Oh Mandor 110,000.00 451.00 451.00
19,351.00 19,351.00
Jumlah 80,600.00 19,351.00 99,951.00
- 69 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.050 Oh Pekerja 65,000.00 3,250.00 3,250.00
0.500 Oh Tukang Batu 90,000.00 45,000.00 45,000.00
0.050 Oh Kepala Tukang 110,000.00 5,500.00 5,500.00
0.003 Oh Mandor 110,000.00 275.00 275.00
54,025.00 54,025.00
Jumlah 379,625.00 54,025.00 433,650.00
b. Tenaga
0.010 Oh Pekerja 65,000.00 650.00 650.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.005 Oh Mandor 110,000.00 550.00 550.00
11,300.00 11,300.00
Resapan
0.750 M3 Koral Beton 421,683.00 316,262.25 316,262.25
1.000 M3 Pasir Pasang 92,500.00 92,500.00 92,500.00
4.000 M' Pipa dia. 4" 52,000.00 208,000.00 208,000.00
2.000 Bh Buis Beton dia. 50 cm 75,000.00 150,000.00 150,000.00
10.000 Kg Ijuk 9,000.00 90,000.00 90,000.00
3,927,144.06 3,927,144.06
Jumlah 3,927,144.06 3,927,144.06
b. Tenaga
0.006 Oh Tukang Besi 90,000.00 540.00 540.00
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.000 Oh Mandor 110,000.00 33.00 33.00
5,133.00 5,133.00
Jumlah 22,060.00 5,133.00 27,193.00
b. Tenaga
0.650 Oh Tukang Besi Konstruksi 90,000.00 58,500.00 58,500.00
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.065 Oh Kepala Tukang 110,000.00 7,150.00 7,150.00
0.032 Oh Mandor 110,000.00 3,520.00 3,520.00
111,420.00 111,420.00
Jumlah 1,950,000.00 111,420.00 2,061,420.00
- 70 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
11.4 1 m2 Pasang Jendela Besi
a. Bahan
1.000 M2 Jendela Besi 300,000.00 300,000.00 300,000.00
300,000.00 300,000.00
b. Tenaga
1.050 Oh Tukang Besi Konstruksi 90,000.00 94,500.00 94,500.00
1.050 Oh Pekerja 65,000.00 68,250.00 68,250.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.005 Oh Mandor 110,000.00 577.50 577.50
174,877.50 174,877.50
Jumlah 300,000.00 174,877.50 474,877.50
b. Tenaga
0.800 Oh Tukang Besi Konstruksi 90,000.00 72,000.00 72,000.00
0.080 Oh Pekerja 65,000.00 5,200.00 5,200.00
0.080 Oh Kepala Tukang 110,000.00 8,800.00 8,800.00
0.004 Oh Mandor 110,000.00 440.00 440.00
86,440.00 86,440.00
Jumlah 375,000.00 86,440.00 461,440.00
a. Bahan
1.000 Btg Besi Holo 30/30 140,000.00 140,000.00 140,000.00
140,000.00 140,000.00
b. Tenaga
0.800 Oh Tukang Besi Konstruksi 90,000.00 72,000.00 72,000.00
0.080 Oh Pekerja 65,000.00 5,200.00 5,200.00
0.080 Oh Kepala Tukang 110,000.00 8,800.00 8,800.00
0.004 Oh Mandor 110,000.00 440.00 440.00
86,440.00 86,440.00
Jumlah 140,000.00 86,440.00 226,440.00
b. Tenaga
1.500 Oh Tukang Besi Konstruksi 90,000.00 135,000.00 135,000.00
1.050 Oh Pekerja 65,000.00 68,250.00 68,250.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.005 Oh Mandor 110,000.00 572.00 572.00
215,372.00 215,372.00
Jumlah 585,000.00 215,372.00 800,372.00
b. Tenaga
1.050 Oh Tukang Besi Konstruksi 90,000.00 94,500.00 94,500.00
1.050 Oh Pekerja 65,000.00 68,250.00 68,250.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.005 Oh Mandor 110,000.00 572.00 572.00
174,872.00 174,872.00
Jumlah 640,000.00 174,872.00 814,872.00
Bahan
1.000 M2 Vertikals Blinds 95,000.00 95,000.00 95,000.00
95,000.00 95,000.00
- 71 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.350 Oh Tukang Kayu 90,000.00 31,500.00 31,500.00
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.002 Oh Mandor 110,000.00 192.50 192.50
58,292.50 58,292.50
Jumlah 95,000.00 58,292.50 153,292.50
b. Tenaga
0.350 Oh Tukang Kayu 90,000.00 31,500.00 31,500.00
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.002 Oh Mandor 110,000.00 192.50 192.50
58,292.50 58,292.50
Jumlah 92,000.00 58,292.50 150,292.50
b. Tenaga
1.200 Oh Tukang Las 90,000.00 108,000.00 108,000.00
1.200 Oh Pekerja 65,000.00 78,000.00 78,000.00
0.012 Oh Kepala Tukang 110,000.00 1,320.00 1,320.00
0.001 Oh Mandor 110,000.00 66.00 66.00
187,386.00 187,386.00
a. Bahan
1.100 M2 Kawat Harmonika 39,000.00 42,900.00 42,900.00
0.020 Kg Paku Biasa 1/2" - 1" 18,000.00 360.00 360.00
0.002 M3 Kayu Kls.III, Papan 3,300,000.00 5,940.00 5,940.00
49,200.00 49,200.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 55.00 55.00
16,655.00 16,655.00
Jumlah 49,200.00 16,655.00 65,855.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 55.00 55.00
16,655.00 16,655.00
Jumlah 26,100.00 16,655.00 42,755.00
11.15 1 m2 Pasang Kawat Kassa
a. Bahan
1.100 M2 Kawat Kassa 15,000.00 16,500.00 16,500.00
0.020 Kg Paku Biasa 1/2" - 1" 18,000.00 360.00 360.00
0.002 M3 Kayu Kls.III, Papan 3,300,000.00 5,940.00 5,940.00
22,800.00 22,800.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 55.00 55.00
16,655.00 16,655.00
Jumlah 22,800.00 16,655.00 39,455.00
- 72 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
11.16 1 m2 Pasang Kawat Burung
a. Bahan
1.100 M2 Kawat Burung 20,000.00 22,000.00 22,000.00
0.020 Kg Paku Biasa 1/2" - 1" 18,000.00 360.00 360.00
0.002 M3 Kayu Kls.III, Papan 3,300,000.00 5,940.00 5,940.00
28,300.00 28,300.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 55.00 55.00
16,655.00 16,655.00
Jumlah 28,300.00 16,655.00 44,955.00
a. Bahan
1.100 M2 Jendela Nako 135,000.00 148,500.00 148,500.00
0.020 Kg Paku Biasa 1/2" - 1" atau Sekrup 18,000.00 360.00 360.00
0.025 Kg Besi Strip 10,000.00 250.00 250.00
149,110.00 149,110.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.001 Oh Mandor 110,000.00 110.00 110.00
33,310.00 33,310.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.001 Oh Mandor 110,000.00 137.50 137.50
48,637.50 48,637.50
Jumlah 95,450.00 48,637.50 144,087.50
b. Tenaga
0.040 Oh Pekerja 65,000.00 2,600.00 2,600.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.001 Oh Mandor 110,000.00 137.50 137.50
41,487.50 41,487.50
11.20 1 m' Pasang Talang 1/2 Lingkaran Dia. 10 cm, Seng BJLS
a. Bahan
0.300 Lbr Seng Plat 3' x 6' bjls 106,000.00 31,800.00 31,800.00
0.100 Kg Paku Biasa 1/2" - 1" 18,000.00 1,800.00 1,800.00
0.019 M3 Kayu Kls.III, Papan 3,300,000.00 62,700.00 62,700.00
0.500 Kg Besi Strip 10,000.00 5,000.00 5,000.00
101,300.00 101,300.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.250 Oh Tukang Kayu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.001 Oh Mandor 110,000.00 137.50 137.50
35,137.50 35,137.50
- 73 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
XII PEKERJAAN KUNCI DAN KACA
b. Tenaga
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.600 Oh Tukang Kayu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.003 Oh Mandor 110,000.00 330.00 330.00
64,830.00 64,830.00
Jumlah 90,000.00 64,830.00 154,830.00
b. Tenaga
0.005 Oh Pekerja 65,000.00 325.00 325.00
0.500 Oh Tukang Kayu 90,000.00 45,000.00 45,000.00
0.005 Oh Kepala Tukang 110,000.00 550.00 550.00
0.003 Oh Mandor 110,000.00 275.00 275.00
46,150.00 46,150.00
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 18,000.00 16,207.50 34,207.50
- 74 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 15,000.00 16,207.50 31,207.50
- 75 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
12.14 1 m2 Pasang Kaca, Tebal 3 mm
a. Bahan
1.100 M2 Kaca Tebal 3 mm 65,000.00 71,500.00 71,500.00
71,500.00 71,500.00
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 71,500.00 16,207.50 87,707.50
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 121,000.00 16,207.50 137,207.50
a. Bahan
1.100 M2 Kaca Polos 200,000.00 220,000.00 220,000.00
220,000.00 220,000.00
b. Tenaga
0.017 Oh Pekerja 65,000.00 1,072.50 1,072.50
0.165 Oh Tukang Kayu/kaca 90,000.00 14,850.00 14,850.00
0.017 Oh Kepala Tukang 110,000.00 1,815.00 1,815.00
0.001 Oh Mandor 110,000.00 88.00 88.00
17,825.50 17,825.50
b. Tenaga
0.025 Oh Pekerja 65,000.00 1,625.00 1,625.00
0.250 Oh Tukang Kayu/kaca 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.001 Oh Mandor 110,000.00 137.50 137.50
27,012.50 27,012.50
Jumlah 431,250.00 27,012.50 458,262.50
12.18 1 m2 Pasang Kaca Cermin, Tebal 3 mm
a. Bahan
1.100 M2 Kaca Cermin Tebal 3 mm 124,000.00 136,400.00 136,400.00
136,400.00 136,400.00
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 136,400.00 16,207.50 152,607.50
- 76 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 1,760,000.00 16,207.50 1,776,207.50
a. Bahan
11.870 Bh Ubin Granito 30 x 30 cm 20,500.00 243,335.00 243,335.00
10.000 Kg Semen Portland 1,250.00 12,500.00 12,500.00
0.022 M3 Pasir Pasang 92,500.00 1,988.75 1,988.75
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
275,823.75 275,823.75
b. Tenaga
0.260 Oh Pekerja 65,000.00 16,900.00 16,900.00
0.125 Oh Tukang Batu 90,000.00 11,250.00 11,250.00
0.013 Oh Kepala Tukang 110,000.00 1,375.00 1,375.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
30,955.00 30,955.00
Jumlah 275,823.75 30,955.00 306,778.75
- 77 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.120 Oh Tukang Batu 90,000.00 10,800.00 10,800.00
0.012 Oh Kepala Tukang 110,000.00 1,320.00 1,320.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
29,745.00 29,745.00
Jumlah 326,400.00 29,745.00 356,145.00
b. Tenaga
0.080 Oh Pekerja 65,000.00 5,200.00 5,200.00
0.040 Oh Tukang Batu 90,000.00 3,600.00 3,600.00
0.004 Oh Kepala Tukang 110,000.00 440.00 440.00
0.004 Oh Mandor 110,000.00 440.00 440.00
9,680.00 9,680.00
b. Tenaga
0.800 Oh Pekerja 65,000.00 52,000.00 52,000.00
0.040 Oh Tukang Batu 90,000.00 3,600.00 3,600.00
0.004 Oh Kepala Tukang 110,000.00 440.00 440.00
0.004 Oh Mandor 110,000.00 440.00 440.00
56,480.00 56,480.00
- 78 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.030 Oh Tukang Batu 90,000.00 2,700.00 2,700.00
0.003 Oh Kepala Tukang 110,000.00 330.00 330.00
0.003 Oh Mandor 110,000.00 330.00 330.00
7,260.00 7,260.00
Jumlah 54,750.00 7,260.00 62,010.00
b. Tenaga
0.900 Oh Pekerja 65,000.00 58,500.00 58,500.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
68,085.00 68,085.00
b. Tenaga
0.900 Oh Pekerja 65,000.00 58,500.00 58,500.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
68,085.00 68,085.00
b. Tenaga
0.900 Oh Pekerja 65,000.00 58,500.00 58,500.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
68,085.00 68,085.00
Jumlah 31,612.42 68,085.00 99,697.42
- 79 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 188,610.00 78,950.00 267,560.00
b. Tenaga
0.090 Oh Pekerja 65,000.00 5,850.00 5,850.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
15,435.00 15,435.00
Jumlah 34,298.50 15,435.00 49,733.50
13.18 1 m2 Pasang Plint Keramik Artistik Ukuran 5 x 20 cm
a. Bahan
5.000 Bh Plint Keramik Artistik 5 x 20 cm 6,100.00 30,500.00 30,500.00
0.850 Kg Semen Portland 1,250.00 1,062.50 1,062.50
0.002 M3 Pasir Pasang 92,500.00 203.50 203.50
0.080 Kg Semen Warna 12,000.00 960.00 960.00
32,726.00 32,726.00
b. Tenaga
0.090 Oh Pekerja 65,000.00 5,850.00 5,850.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
15,435.00 15,435.00
Jumlah 32,726.00 15,435.00 48,161.00
- 80 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
a. Bahan
25.000 Bh Ubin Keramik 20 x 20 cm 2,080.00 52,000.00 52,000.00
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
88,110.00 88,110.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 88,110.00 78,950.00 167,060.00
a. Bahan
20.000 Bh Ubin Keramik 25 x 20 cm 3,400.00 68,000.00 68,000.00
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
104,110.00 104,110.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 104,110.00 78,950.00 183,060.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 84,105.20 78,950.00 163,055.20
- 81 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
13.24 1 m2 Pasang Lantai Keramik Warna Ukuran 40 x 40 cm
a. Bahan
6.250 Bh Keramik Warna 40 x 40 cm mutu C 8,320.00 52,000.00 52,000.00
6.250 Bh Keramik Warna 40 x 40 cm mutu B 10,400.00 65,000.00 65,000.00
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
Mutu C 88,110.00 88,110.00
Mutu B 101,110.00 101,110.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
- 82 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
1.050 M2 Parquet Jati 385,000.00 404,250.00 404,250.00
0.600 Kg Lem Vinyl 8,500.00 5,100.00 5,100.00
409,350.00 409,350.00
b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.033 Oh Mandor 110,000.00 3,575.00 3,575.00
81,175.00 81,175.00
Jumlah 409,350.00 81,175.00 490,525.00
a. Bahan
100.000 Bh Porselin 11 x 11 cm, Putih 700.00 70,000.00 70,000.00
9.300 Kg Semen Abu-abu 1,250.00 11,625.00 11,625.00
0.018 M3 Pasir Pasang 92,500.00 1,665.00 1,665.00
1.500 Kg Semen Puith 2,000.00 3,000.00 3,000.00
86,290.00 86,290.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.500 Oh Tukang Batu 90,000.00 45,000.00 45,000.00
0.050 Oh Kepala Tukang 110,000.00 5,500.00 5,500.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
94,100.00 94,100.00
Jumlah 86,290.00 94,100.00 180,390.00
a. Bahan
100.000 Bh Porselin 11 x 11 cm warna/setara disesuaikan 1,000.00 100,000.00 100,000.00
9.300 Kg Semen Abu-abu 1,250.00 11,625.00 11,625.00
0.018 M3 Pasir Pasang 92,500.00 1,665.00 1,665.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
131,290.00 131,290.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.500 Oh Tukang Batu 90,000.00 45,000.00 45,000.00
0.050 Oh Kepala Tukang 110,000.00 5,500.00 5,500.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
94,100.00 94,100.00
Jumlah 131,290.00 94,100.00 225,390.00
a. Bahan
1.020 M2 Marmer 300,000.00 306,000.00 306,000.00
2.000 Bh Paku Pancing 60 x 230 - - -
12.440 Kg Semen Abu-abu 1,250.00 15,550.00 15,550.00
0.025 M3 Pasir Pasang 92,500.00 2,312.50 2,312.50
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
341,862.50 341,862.50
b. Tenaga
0.720 Oh Pekerja 65,000.00 46,800.00 46,800.00
0.650 Oh Tukang Batu 90,000.00 58,500.00 58,500.00
0.065 Oh Kepala Tukang 110,000.00 7,150.00 7,150.00
0.035 Oh Mandor 110,000.00 3,850.00 3,850.00
116,300.00 116,300.00
Jumlah 341,862.50 116,300.00 458,162.50
- 83 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 260,675.00 78,950.00 339,625.00
b. Tenaga
0.120 Oh Pekerja 65,000.00 7,800.00 7,800.00
0.120 Oh Tukang Batu 90,000.00 10,800.00 10,800.00
0.012 Oh Kepala Tukang 110,000.00 1,320.00 1,320.00
0.006 Oh Mandor 110,000.00 660.00 660.00
20,580.00 20,580.00
Jumlah 22,050.00 20,580.00 42,630.00
- 84 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.160 Oh Tukang Batu 90,000.00 14,400.00 14,400.00
0.076 Oh Kepala Tukang 110,000.00 8,360.00 8,360.00
0.025 Oh Mandor 110,000.00 2,750.00 2,750.00
41,760.00 41,760.00
Bata lobang 62,136.00 41,760.00 103,896.00
Bata merah/kecil 107,223.50 41,760.00 148,983.50
b. Tenaga
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
0.018 Oh Mandor 110,000.00 1,925.00 1,925.00
24,675.00 24,675.00
Coneblock biasa, tbl 8 cm 131,750.00 24,675.00 156,425.00
Coneblock warna, tbl. 8 cm 159,250.00 24,675.00 183,925.00
a. Bahan
0.050 Kg Sabun 11,200.00 560.00 560.00
560.00 560.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
Oh Tukang Cat 90,000.00 - -
Oh Kepala Tukang 110,000.00 - -
0.003 Oh Mandor 110,000.00 275.00 275.00
10,025.00 10,025.00
Jumlah 560.00 10,025.00 10,585.00
- 85 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
14.3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
a. Bahan
0.050 Kg Sabun 11,200.00 560.00 560.00
560.00 560.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
Oh Tukang Cat 90,000.00 - -
Oh Kepala Tukang 110,000.00 - -
0.003 Oh Mandor 110,000.00 275.00 275.00
10,025.00 10,025.00
Jumlah 560.00 10,025.00 10,585.00
a. Bahan
0.050 Kg Sabun 11,200.00 560.00 560.00
560.00 560.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
Oh Tukang Cat 90,000.00 - -
Oh Kepala Tukang 110,000.00 - -
0.003 Oh Mandor 110,000.00 275.00 275.00
10,025.00 10,025.00
Jumlah 560.00 10,025.00 10,585.00
14.5 1 m2 Mendempul dan Menggosok Kayu
a. Bahan
0.080 Kg Dempul Jadi 20,000.00 1,600.00 1,600.00
0.020 Kg Minyak Cat 6,000.00 120.00 120.00
0.010 Kg Batu Apung 2,000.00 20.00 20.00
1,740.00 1,740.00
b. Tenaga
0.040 Oh Pekerja 65,000.00 2,600.00 2,600.00
0.040 Oh Tukang Cat 90,000.00 3,600.00 3,600.00
0.004 Oh Kepala Tukang 110,000.00 440.00 440.00
0.003 Oh Mandor 110,000.00 275.00 275.00
6,915.00 6,915.00
Jumlah 1,740.00 6,915.00 8,655.00
a. Bahan
0.150 Kg Plamir 17,000.00 2,550.00 2,550.00
0.170 Kg Cat Dasar 32,000.00 5,440.00 5,440.00
0.170 Kg Cat Penutup 82,000.00 13,940.00 13,940.00
21,930.00 21,930.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.075 Oh Tukang Cat 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 825.00 825.00
0.003 Oh Mandor 110,000.00 275.00 275.00
12,400.00 12,400.00
Jumlah 21,930.00 12,400.00 34,330.00
- 86 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
Oh Tukang Cat 90,000.00 - -
Oh Kepala Tukang 110,000.00 - -
0.006 Oh Mandor 110,000.00 660.00 660.00
7,160.00 7,160.00
Jumlah 15,750.00 7,160.00 22,910.00
a. Bahan
0.150 Ltr Vernis 25,000.00 3,750.00 3,750.00
0.050 Kg Dempul 20,000.00 1,000.00 1,000.00
0.100 Lbr Ampelas 3,500.00 350.00 350.00
0.010 Bh Kuas 12,500.00 125.00 125.00
5,225.00 5,225.00
b. Tenaga
0.160 Oh Pekerja 65,000.00 10,400.00 10,400.00
0.160 Oh Tukang Cat 90,000.00 14,400.00 14,400.00
0.016 Oh Kepala Tukang 110,000.00 1,760.00 1,760.00
0.003 Oh Mandor 110,000.00 275.00 275.00
26,835.00 26,835.00
Jumlah 5,225.00 26,835.00 32,060.00
- 87 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
a. Bahan
0.100 Kg Meni Besi 42,000.00 4,200.00 4,200.00
0.010 Bh Kuas 12,500.00 125.00 125.00
0.002 M3 Perancah Kayu/Gelam dia. 8 290,000.00 580.00 580.00
4,905.00 4,905.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.225 Oh Tukang Cat 90,000.00 20,250.00 20,250.00
0.023 Oh Kepala Tukang 110,000.00 2,475.00 2,475.00
0.008 Oh Mandor 110,000.00 825.00 825.00
39,800.00 39,800.00
Jumlah 4,905.00 39,800.00 44,705.00
14.16 10 m2 Cat Semprot minyak Chames Stones ( 1/2 Ducco )
a. Bahan
7.560 Kg Cat Kilat 40,000.00 302,400.00 302,400.00
5.320 Ltr Thinner 12,000.00 63,840.00 63,840.00
5.000 Kg Ross Polac 28,000.00 140,000.00 140,000.00
4.000 Kg Isamu 48,000.00 192,000.00 192,000.00
4.000 Kg Epoxi 50,000.00 200,000.00 200,000.00
4.000 Lbr Amplas Niken 6,500.00 26,000.00 26,000.00
1.000 Ls Alat Bantu / Compressor 5,500.00 5,500.00 5,500.00
929,740.00 929,740.00
b. Tenaga
8.000 Oh Tukang Cat 90,000.00 720,000.00 720,000.00
0.800 Oh Kepala Tukang 110,000.00 88,000.00 88,000.00
4.000 Oh Pekerja 65,000.00 260,000.00 260,000.00
0.200 Oh Mandor 110,000.00 22,000.00 22,000.00
1,090,000.00 1,090,000.00
Jumlah 929,740.00 1,090,000.00 2,019,740.00
Untuk 1 M2 Jumlah 92,974.00 109,000.00 201,974.00
- 88 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Upah
1.000 ls Tukang Instalasi listrik 85,000.00 85,000.00 85,000.00
85,000.00 85,000.00
Jumlah 104,740.00 85,000.00 189,740.00
b. Upah
1.000 ls Tukang Instalasi listrik 85,000.00 85,000.00 85,000.00
85,000.00 85,000.00
a. Bahan
1.150 Kg Besi Baja IWF 15,750.00 18,112.50
b. Tenaga
0.060 Oh Pekerja 75,000.00 4,500.00
0.060 Oh Tukang Las Konstruksi 90,000.00 5,400.00
0.006 Oh Kepala Tukang 110,000.00 660.00
0.003 Oh Mandor 110,000.00 330.00
- 89 -
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
FITRI HANDAYANI
DAFTAR VOLUME PEKERJAAN
(061630100055)/ 4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
FITRI HANDAYANI
DAFTAR VOLUME PEKERJAAN
(061630100055)/ 4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
VI PEKERJAAN PLAFOND
1. Pek. Plafond Gypsum (CH +3.00) 76.9 m2 Rp 153,283.25 Rp 11,787,481.93
2. Pek. Plafond Gypsum WR (CH +3.00) 5.6 m2 Rp 153,283.25 Rp 858,386.20
3. Pek. Plafond Gypsum (CH.+2,23) 3.65 m2 Rp 153,283.25 Rp 559,483.86
4. Pek. Overstek Plafond 9.1748 m2 Rp 153,283.25 Rp 1,406,343.16
5. Pek. Listplank Plafond Dlm Gypsum (CH +3.00) 82.83 m' Rp 7,260.00 Rp 601,345.80
6. Pek. Listplank Plafond Dlm Gypsum WR (CH +3.00) 13.66 m' Rp 6,210.00 Rp 84,828.60
7. Pek. Listplank Luar Gypsum (CH.+2,23) 13.08 m' Rp 6,210.00 Rp 81,226.80
8. Pek. Lisplank Plafond Luar 40 m' Rp 6,210.00 Rp 248,400.00
Rp 15,627,496.35
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 Rp 89,130.00 Rp 3,641,762.67
2. Pek. Timbunan Pasir Lantai 7.866 m 3
Rp 98,600.00 Rp 775,587.60
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 Rp 24,580.00 Rp 77,340.97
4. Pek. Keramik Granite Tile 60x60 81.4 m2 Rp 419,943.75 Rp 34,183,421.25
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 Rp 330,469.75 Rp 1,850,630.60
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 Rp 409,625.75 Rp 8,036,857.22
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 Rp 35,367.50 Rp 77,101.15
8 Pek. Plint Keramik 8.283 m Rp 62,010.00 Rp 513,628.83
Rp 49,156,330.29
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.667 m3 Rp 6,223,000.00 Rp 4,153,790.27
2. Daun Pintu 3.075 m2 Rp 583,000.00 Rp 1,792,725.00
3 Daun Jendela 2.395 m 2
Rp 438,900.00 Rp 1,051,165.50
4 Engsel Pintu 9 buah Rp 34,207.50 Rp 307,867.50
5 Engsel Jendela 18 buah Rp 40,805.00 Rp 734,490.00
6 Kunci Pintu 6 buah Rp 154,830.00 Rp 928,980.00
7 Kait Angin 6 buah Rp 31,207.50 Rp 187,245.00
8 Handle Pintu 12 buah Rp 84,025.00 Rp 1,008,300.00
Rp 10,164,563.27
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah Rp 190,560.00 Rp 190,560.00
2. MCB 3 buah Rp 44,000.00 Rp 132,000.00
3. Lampu Downlight (18 watt) 26 buah Rp 127,500.00 Rp 3,315,000.00
4. Lampu Pijar (18 watt) 8 buah Rp 111,000.00 Rp 888,000.00
5. Lampu Pijar (12 watt) 2 buah Rp 97,000.00 Rp 194,000.00
6. Saklar Tunggal 5 buah Rp 146,860.00 Rp 734,300.00
7. Saklar Ganda 6 buah Rp 239,360.00 Rp 1,436,160.00
8. Stopkontak 15 buah Rp 189,740.00 Rp 2,846,100.00
9. Instalasi AC 4 buah Rp 2,850,000.00 Rp 11,400,000.00
10. Exhause 2 buah Rp 229,900.00 Rp 459,800.00
11. Outlet Televisi 4 buah Rp 2,200,000.00 Rp 8,800,000.00
12. Stopkontak AC 4 buah Rp 492,000.00 Rp 1,968,000.00
Rp 32,363,920.00
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit Rp 400,000.00 Rp 400,000.00
2. Stop kran 3 buah Rp 18,387.50 Rp 55,162.50
3. Kran Air (KR) 1 buah Rp 21,387.50 Rp 21,387.50
4. Floor Drain (FD) 2 buah Rp 49,300.00 Rp 98,600.00
5. Shower 2 unit Rp 244,225.00 Rp 488,450.00
6. Closet Duduk 2 unit Rp 2,716,210.00 Rp 5,432,420.00
7. Kitchen Sink (KS) 1 unit Rp 250,415.00 Rp 250,415.00
8. Meteran Air 1 buah Rp 115,000.00 Rp 115,000.00
9. Water Heater 2 unit Rp 1,450,000.00 Rp 2,900,000.00
10. Roof Drain (RD) 4 buah Rp 61,300.00 Rp 245,200.00
Jumlah Harga
No. Uraian Pekerjaan
(Rp)
I PEKERJAAN PERSIAPAN Rp 20,602,136.14
II PEKERJAAN PONDASI Rp 37,549,997.75
III PEKERJAAN DINDING Rp 76,719,998.95
IV PEKERJAAN BETON Rp 90,838,021.13
V PEKERJAAN ATAP Rp 47,157,013.41
VI PEKERJAAN PLAFOND Rp 15,627,496.35
VII PEKERJAAN LANTAI Rp 49,156,330.29
VII PEKERJAAN PINTU DAN JENDELA Rp 10,164,563.27
IX PEKERJAAN LISTRIK Rp 32,363,920.00
X PEKERJAAN SANITASI Rp 25,908,680.29
XI PEKERJAAN FINISHING Rp 24,913,595.39
TOTAL Rp 431,001,752.97
PPN (10%) Rp 43,100,175.30
Grand Total Rp 474,101,928.26
DIBULATKAN Rp 475,000,000.00
TERBILANG
Empat Ratus Tujuh Puluh Lima Juta Rupiah
BOBOT
4.780059
8.712261
17.80039
21.07602
10.94126
3.625854
11.40513
2.358358
7.509
6.01127
5.780393
100
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0 0
2. Pek. Pondasi Batu Kali
Batu Belah 15/20 cm / batu kali 33.708 M3 1.100 37.079
Semen Portland 33.708 Kg 202.000 6,809.016
Pasir Pasang 33.708 M3 0.485 16.348
3. Pek. Anstampang Pondasi
Batu Belah 15/20 cm / batu kali 7.637 M3 1.100 8.401
Semen Portland 7.637 Kg 202.000 1,542.674
Pasir Pasang 7.637 M3 0.485 3.704
4. Pek. Urugan Pasir di Bawah Pondasi
Pasir Urug 3.819 M3 1.200 4.583
5. Pek. Timbunan Kembali Galian Pondasi 18.252 M3 0
FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom
Semen Portland 3.8815 Kg 232.000 900.508
Pasir Beton 3.8815 M3 0.520 2.018
Koral Beton 3.8815 M 3
0.780 3.028
2. Pek. Beton Sloof
Semen Portland 3.2391 Kg 232.000 751.471
Pasir Beton 3.2391 M3 0.520 1.684
Koral Beton 3.2391 M3 0.780 2.526
3. Pek. Beton Ring Balok
Semen Portland 2.996 Kg 232.000 695.072
Pasir Beton 2.996 M3 0.520 1.558
Koral Beton 2.996 M3 0.780 2.337
4. Pek. Beton Balok
Semen Portland 1.4361 Kg 232.000 333.175
Pasir Beton 1.4361 M 3
0.520 0.747
Koral Beton 1.4361 M3 0.780 1.120
5. Pek. Beton Dak
Semen Portland 1.6225 Kg 232.000 376.420
Pasir Beton 1.6225 M3 0.520 0.844
Koral Beton 1.6225 M 3
0.780 1.266
6. Pek. Beton Kanopi
Semen Portland 0.827 Kg 232.000 191.864
Pasir Beton 0.827 M3 0.520 0.430
Koral Beton 0.827 M3 0.780 0.645
Pek. Tulangan
1. Berat Tulangan Ǿ 12
Besi Beton ( Polos / Ulir ) 31.016064 Kg 1.050 32.567
Kawat Beton 31.016064 Kg 0.015 0.465
2. Berat Tulangan Ǿ 10
Besi Beton ( Polos / Ulir ) 1034.092 Kg 1.050 1,085.797
Kawat Beton 1034.092 Kg 0.015 15.511
3. Berat Tulangan Ǿ 8
Besi Beton ( Polos / Ulir ) 244.095385 Kg 1.050 256.300
Kawat Beton 244.095385 Kg 0.015 3.661
4. Berat Tulangan Ǿ 6
Besi Beton ( Polos / Ulir ) 248.91972 Kg 1.050 261.366
Kawat Beton 248.91972 Kg 0.015 3.734
5. Berat Tulangan D 10
Besi Beton ( Polos / Ulir ) 378.35674 Kg 1.050 397.275
Kawat Beton 378.35674 Kg 0.015 5.675
Pek. Perancah
1. Pek. Beton Kolom
Kayu Kls. IV 61.241 M3 0.040 2.450
Paku Biasa 2"- 5" 61.241 Kg 0.400 24.496
Balok Kayu Kls. IV 61.241 M3 0.015 0.919
Kayu Gelam dia. 6-8 cm 61.241 Btg 2.000 122.482
2. Pek. Beton Sloof
Kayu Kls. IV 40.6835 M3 0.045 1.831
FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan
- Hot dipped Galvalume Steel G550-75x33 Z75 (T.075) 87.7718 M' 2.1 184.32078
- Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) 87.7718 M' 1.2 105.32616
- Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) 87.7718 M' 6.2 544.18516
- Screw / Dynabolt 87.7718 bh 30 2633.154
- Valery Gutter Talang Jurai 87.7718 M' 0.03 2.633154
- Strap Bracing 87.7718 M' 0.7 61.44026
- Alunium Foil Model Karung 87.7718 M2 1.1 96.54898
2. Pek. Penutup Atap
Genteng Keramik biasa/lokal 87.7718 Bh 18.000 1579.8924
3. Pek. Nok
Nok Standar 1.02 M' 1.200 1.224
Paku Hak Panjang 15 cm 1.02 Kg 0.040 0.0408
4. Pek. Jurai Luar
Genteng Bubung Keramik KIA Natural atau sejenis 29.72 Bh 3.000 89.16
Semen Portland 29.72 Kg 8.000 237.76
Pasir Pasang 29.72 M3 0.032 0.95104
5. Pek. Jurai Dalam
Genteng Bubung Keramik KIA Natural atau sejenis 6.16 Bh 3.000 18.48
Semen Portland 6.16 Kg 8.000 49.28
Pasir Pasang 6.16 M3 0.032 0.19712
6. Pek. Listplank
Kayu Kls. II 35.9 M3 0.011 0.3949
Paku Biasa 2" - 5" 35.9 Kg 0.050 1.795
VI PEKERJAAN PLAFOND
1. Pek. Plafond Gypsum (CH +3.00)
Besi hollow galvanis 2/4 76.9 Btg 2.500 192.25
Cornes 76.9 Kg 0.300 23.07
Textile Tape 76.9 roll 0.025 1.9225
Paku Sekrup 76.9 Kg 0.110 8.459
Paku Biasa 2" - 5" 76.9 Kg 0.060 4.614
Paku Gypsum 76.9 Kg 0.040 3.076
FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
IX PEKERJAAN LISTRIK
1. Box MCB
Pipa listrik 5/8" 1 btg 3.000 3
Kabel NYA 2,5 mm 1 m' 15.000 15
T Duss 1 Buah 1.000 1
L Bow 1 Buah 2.000 2
Klem biasa 1 Buah 24.000 24
2. MCB
MCB 3 Buah 1.000 3
3. Lampu Downlight (18 watt)
Lampu Downlight 18 watt 26 Buah 1.000 26
4. Lampu Pijar (18 watt)
Lampu Pijar 18 watt 8 Buah 1.000 8
5. Lampu Pijar (12 watt)
Lampu Pijar 12 watt 2 Buah 1.000 2
6. Saklar Tunggal
Pipa listrik 5/8" 5 btg 3.000 15
Kabel NYA 1,5 mm 5 m' 24.000 120
T Duss 5 Buah 3.000 15
L Bow 5 Buah 4.000 20
Las dop 5 Buah 3.000 15
FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
X PEKERJAAN SANITASI
1. Pompa Air Bersih
Pompa Air Bersih 1 unit 1.000 1
2. Stop kran
Stop kran 3 Bh 1.000 3
Seal Tape 3 Bh 0.025 0.075
3. Kran Air (KR)
Kran Air 1 Bh 1.000 1
Seal Tape 1 Bh 0.025 0.025
4. Floor Drain (FD)
Floor Drain 2 Bh 1.000 2
5. Shower
Shower 2 Bh 1.000 2
Perlengkapan ( 12 % Harga Shower) 2 0
Semen Portland 2 Kg 6.000 12
Pasir Pasang 2 M3 0.010 0.02
6. Closet Duduk
Kloset Duduk ex toto 2 Bh 1.000 2
Perlengkapan ( 6 % Harga Kloset )
7. Kitchen Sink (KS)
FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam
Plamir 322.147 Kg 0.100 32.2147
Cat Dasar 322.147 Kg 0.100 32.2147
Cat Penutup 2 Kali, mutu B 322.147 Kg 0.260 83.75822
2. Cat Dinding Baru Luar
Plamir 134.078 Kg 0.100 13.40775
Cat Dasar 134.078 Kg 0.100 13.40775
Cat Penutup 2 Kali, mutu B anti lumut/jamur 134.078 Kg 0.260 34.86015
3. Cat Pagar
Plamir 265.200 Kg 0.100 26.52
Cat Dasar 265.200 Kg 0.100 26.52
Cat Penutup 2 Kali, mutu B anti lumut/jamur 265.200 Kg 0.260 68.952
4. Cat Daun Pintu
Cat Meni 3.075 Kg 0.200 0.615
Plamir 3.075 Kg 0.150 0.46125
Cat Dasar 3.075 Kg 0.170 0.52275
Cat Penutup 2 Kali 3.075 Kg 0.260 0.7995
5 Cat Daun Jendela
Cat Meni 2.395 Kg 0.200 0.479
Plamir 2.395 Kg 0.150 0.35925
Cat Dasar 2.395 Kg 0.170 0.40715
Cat Penutup 2 Kali 2.395 Kg 0.260 0.6227
6 Cat Kusen Pintu dan Jendela
Cat Meni 29.530 Kg 0.200 5.906
Plamir 29.530 Kg 0.150 4.4295
Cat Dasar 29.530 Kg 0.170 5.0201
Cat Penutup 2 Kali 29.530 Kg 0.260 7.6778
7 Cat Plafond Dalam
Plamir 82.500 Kg 0.100 8.25
Cat Dasar 82.500 Kg 0.100 8.25
Cat Penutup 2 Kali, mutu B 82.500 Kg 0.260 21.45
8 Cat Plafond Luar
Plamir 12.824 Kg 0.100 1.2824
Cat Dasar 12.824 Kg 0.100 1.2824
Cat Penutup 2 Kali, mutu B anti lumut/jamur 12.824 Kg 0.260 3.33424
9 Cat Listplank
Cat Meni 35.900 Kg 0.200 7.18
Plamir 35.900 Kg 0.150 5.385
Cat Dasar 35.900 Kg 0.170 6.103
FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Galian Tanah Rp -
Urugan Kembali Rp -
Pas. Batu Bata 1 : 3 Rp -
Beton Tumbuk 1 : 3 : 5 Rp -
Plesteran 1 : 2 Rp -
Plat Beton bertulang (besi 100kg,1/2 dinding)1 : 2 : 3 Rp -
Pipa Hawa 2" Rp -
Rp -
Rp -
Rp -
Rp -
Rp 589,691,183.67
Rp (158,689,430.70)
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
TOTAL BOBOT
RENCANA 2.39 6.75 4.36 5.27 5.27 5.27 8.24 2.97 2.97 2.97 2.97 8.44 7.28 5.61 3.8 3.8 1.18 3.68 4.01 4.01 1.5 3.43 1.93 1.93
RENCANA KUMULATIF 2.39 9.14 13.5 18.8 24 29.3 37.5 40.5 43.5 46.4 49.4 57.8 65.1 70.7 74.5 78.3 79.5 83.2 87.2 91.2 92.7 96.1 98.1 100
REALISASI 2.15 6.11 5.23 5.27 6.32 6.32 5.83 2.67 3.56 3.56 3.56 7.25 7.28 5.23 5.7 2.28 1.18 3.43 4.21 4.06 1.8 3.51 2.31 1.16
REALISASI KUMULATIF 2.15 8.26 13.5 18.8 25.1 31.4 37.2 39.9 43.5 47 50.6 57.8 65.1 70.4 76.1 78.3 79.5 83 87.2 91.2 93 96.5 98.8 100
DEVIASI -0.24 -0.87 0 0 1.05 2.11 -0.3 -0.59 0 0.59 1.19 0 0 -0.38 1.52 0 0 -0.25 -0.05 0 0.3 0.39 0.77 0
FITRI HANDAYANI
(061630100055)/4SA KURVA S
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
FITRI HANDAYANI
(061630100055)/4SA KURVA S
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m 2
0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m 3
0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m 2
0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m 2
0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m 2
0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m 2
0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m 3
0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 0 0 0 0
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 0 0 0 0
3. Pek. Plesteran Dalam 322.147 m 2
3.6175989292 0 0 0 0
17.8003913954 0
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 0 25 25 0.181986841
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 0 25 25 0.1518674679
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 0 25 25 0.1404695545
4. Pek. Beton Balok 1.4361 m3 0.2693302099 0 25 25 0.0673325525
5. Pek. Beton Dak 1.6225 m3 0.3042881871 0 25 25 0.0760720468
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 0 25 25 0.0387744732
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 0 25 25 0.0385270481
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 0 25 25 1.2845121875
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 0 25 25 0.3032065783
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 0 25 25 0.3091991951
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 0 25 25 0.4699812432
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 0 25 25 0.5612196194
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 0 25 25 0.2791905631
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 0 25 25 0.3392263314
4. Pek. Perancah Balok 23.824 m2 0.9053635938 0 25 25 0.2263408985
5. Pek. Perancah Dak 16.785 m2 0.7449627821 0 25 25 0.1862406955
6. Pek. Perancah Pondasi Batu Kali 95.661 m 2
2.4594320875 0 25 25 0.6148580219
21.0760212712 5.2690053178
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m 2
0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m 3
0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m 2
0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 15 15 30 2.8783781609
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 15 15 30 1.376459579
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 15 15 30 1.0852796788
17.8003913954 5.3401174186
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m 3
0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m 2
0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
17.8003913954 12.4602739768
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m 3
0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m 2
1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m 2
2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 50 50 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 50 50 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 50 50 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 50 50 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 50 50 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 50 50 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 50 50 1.3674517382
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 50 50 0.0995803606
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 50 50 0.0649050565
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 50 50 0.1631481952
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 50 50 0.06976141
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 50 50 0.0098408648
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 50 50 0.0094230243
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 50 50 0.0288165881
3.6258544756 1.8129272378
VII PEKERJAAN LANTAI
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m 2
0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m 2
0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 65.1229173949
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m 2
1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 50 50 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 50 50 100 0.1991607213
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m 3
0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m 2
3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m 3
0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m 2
2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
100 79.5201581643
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m 3
0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m 2
3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 100 0 100 0.129810113
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m 3
0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m 2
1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
2.3583577561 2.3583577561
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 30 40 70 0.0309492941
2. MCB 3 buah 0.0306263256 30 40 70 0.0214384279
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 30 40 70 0.5383968822
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 30 40 70 0.1442221512
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 30 40 70 0.0315079925
6. Saklar Tunggal 5 buah 0.1703705368 30 40 70 0.1192593757
7. Saklar Ganda 6 buah 0.333214422 30 40 70 0.2332500954
8. Stopkontak 15 buah 0.6603453421 30 40 70 0.4622417395
9. Instalasi AC 4 buah 2.6450008432 30 40 70 1.8515005902
10. Exhause 2 buah 0.1066817007 30 40 70 0.0746771905
11. Outlet Televisi 4 buah 2.0417550368 30 40 70 1.4292285258
12. Stopkontak AC 4 buah 0.4566106719 30 40 70 0.3196274703
7.5089996218 5.2562997352
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 20 20 0.0185614094
2. Stop kran 3 buah 0.0127986718 0 20 20 0.0025597344
3. Kran Air (KR) 1 buah 0.0049622768 0 20 20 0.0009924554
4. Floor Drain (FD) 2 buah 0.0228769371 0 20 20 0.0045753874
5. Shower 2 unit 0.1133290054 0 20 20 0.0226658011
6. Closet Duduk 2 unit 1.2604171474 0 20 20 0.2520834295
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 20 20 0.0116201384
8. Meteran Air 1 buah 0.026682026 0 20 20 0.0053364052
9. Water Heater 2 unit 0.6728510917 0 20 20 0.1345702183
10. Roof Drain (RD) 4 buah 0.0568907199 0 20 20 0.011378144
11. Bak Kontrol 3 buah 0.3486807164 0 20 20 0.0697361433
12. Septicktank 1 unit 0.9111666099 0 20 20 0.182233322
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 20 20 0.1108721987
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 20 20 0.0422567357
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 20 20 0.073420784
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 20 20 0.0815374215
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 20 20 0.0253787119
Minggu Ke : 21
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 100 0 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m 2
7.9311559674 100 0 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 100 0 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 100 0 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 100 0 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 100 0 100 0.1191709376
11.4051346536 11.4051346536
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 100 0 100 0.9637525234
2. Daun Pintu 3.075 m2 0.4159437839 100 0 100 0.4159437839
3 Daun Jendela 2.395 m2 0.2438889152 100 0 100 0.2438889152
4 Engsel Pintu 9 buah 0.071430684 100 0 100 0.071430684
5 Engsel Jendela 18 buah 0.1704146201 100 0 100 0.1704146201
6 Kunci Pintu 6 buah 0.2155397266 100 0 100 0.2155397266
7 Tunjang Angin 6 buah 0.0434441388 100 0 100 0.0434441388
8 Handle Pintu 12 buah 0.233943364 100 0 100 0.233943364
2.3583577561 2.3583577561
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 100 0 100 0.0442132773
2. MCB 3 buah 0.0306263256 100 0 100 0.0306263256
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 100 0 100 0.7691384031
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 100 0 100 0.2060316446
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 100 0 100 0.0450114179
6. Saklar Tunggal 5 buah 0.1703705368 100 0 100 0.1703705368
7. Saklar Ganda 6 buah 0.333214422 100 0 100 0.333214422
8. Stopkontak 15 buah 0.6603453421 100 0 100 0.6603453421
9. Instalasi AC 4 buah 2.6450008432 100 0 100 2.6450008432
10. Exhause 2 buah 0.1066817007 100 0 100 0.1066817007
11. Outlet Televisi 4 buah 2.0417550368 100 0 100 2.0417550368
12. Stopkontak AC 4 buah 0.4566106719 100 0 100 0.4566106719
7.5089996218 7.5089996218
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 50 30 80 0.0742456377
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 100 0 100 0.8449530994
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 100 0 100 0.1799499874
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 100 0 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 100 0 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 100 0 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 100 0 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m 2
0.0178888252 100 0 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 100 0 100 0.1191709376
11.4051346536 11.4051346536
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 100 0 100 0.9637525234
2. Daun Pintu 3.075 m 2
0.4159437839 100 0 100 0.4159437839
3 Daun Jendela 2.395 m2 0.2438889152 100 0 100 0.2438889152
4 Engsel Pintu 9 buah 0.071430684 100 0 100 0.071430684
5 Engsel Jendela 18 buah 0.1704146201 100 0 100 0.1704146201
6 Kunci Pintu 6 buah 0.2155397266 100 0 100 0.2155397266
7 Tunjang Angin 6 buah 0.0434441388 100 0 100 0.0434441388
8 Handle Pintu 12 buah 0.233943364 100 0 100 0.233943364
2.3583577561 2.3583577561
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 100 0 100 0.0442132773
2. MCB 3 buah 0.0306263256 100 0 100 0.0306263256
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 100 0 100 0.7691384031
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 100 0 100 0.2060316446
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 100 0 100 0.0450114179
6. Saklar Tunggal 5 buah 0.1703705368 100 0 100 0.1703705368
7. Saklar Ganda 6 buah 0.333214422 100 0 100 0.333214422
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m 2
1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 100 0 100 0.0442132773
2. MCB 3 buah 0.0306263256 100 0 100 0.0306263256
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 100 0 100 0.7691384031
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 100 0 100 0.2060316446
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 100 0 100 0.0450114179
6. Saklar Tunggal 5 buah 0.1703705368 100 0 100 0.1703705368
7. Saklar Ganda 6 buah 0.333214422 100 0 100 0.333214422
8. Stopkontak 15 buah 0.6603453421 100 0 100 0.6603453421
9. Instalasi AC 4 buah 2.6450008432 100 0 100 2.6450008432
10. Exhause 2 buah 0.1066817007 100 0 100 0.1066817007
11. Outlet Televisi 4 buah 2.0417550368 100 0 100 2.0417550368
12. Stopkontak AC 4 buah 0.4566106719 100 0 100 0.4566106719
7.5089996218 7.5089996218
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 100 0 100 0.0928070471
2. Stop kran 3 buah 0.0127986718 100 0 100 0.0127986718
3. Kran Air (KR) 1 buah 0.0049622768 100 0 100 0.0049622768
4. Floor Drain (FD) 2 buah 0.0228769371 100 0 100 0.0228769371
5. Shower 2 unit 0.1133290054 100 0 100 0.1133290054
6. Closet Duduk 2 unit 1.2604171474 100 0 100 1.2604171474
7. Kitchen Sink (KS) 1 unit 0.0581006918 100 0 100 0.0581006918
8. Meteran Air 1 buah 0.026682026 100 0 100 0.026682026
9. Water Heater 2 unit 0.6728510917 100 0 100 0.6728510917
10. Roof Drain (RD) 4 buah 0.0568907199 100 0 100 0.0568907199
11. Bak Kontrol 3 buah 0.3486807164 100 0 100 0.3486807164
12. Septicktank 1 unit 0.9111666099 100 0 100 0.9111666099
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 100 0 100 0.5543609936
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 100 0 100 0.2112836784
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 100 0 100 0.3671039199
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 100 0 100 0.4076871075
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 100 0 100 0.1268935593
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 100 0 100 0.4282045206
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m 3
0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m 2
3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m 3
0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi
Pekerja 59.786 Oh 0.400 23.914
Tukang Gali 59.786 - - -
Kepala Tukang 59.786 - - -
Mandor 59.786 Oh 0.040 2.391
2. Pek. Pondasi Batu Kali
Pekerja 33.708 Oh 1.500 50.562
Tukang Batu 33.708 Oh 0.600 20.225
Kepala Tukang 33.708 Oh 0.060 2.022
Mandor 33.708 Oh 0.075 2.528
3. Pek. Anstampang Pondasi
Pekerja 7.637 Oh 1.500 11.456
Tukang Batu 7.637 Oh 0.600 4.582
Kepala Tukang 7.637 Oh 0.060 0.458
Mandor 7.637 Oh 0.075 0.573
4. Pek. Urugan Pasir di Bawah Pondasi
Pekerja 3.819 Oh 0.300 1.146
Tukang Gali 3.819 - - -
Kepala Tukang 3.819 - - -
Mandor 3.819 Oh 0.010 0.038
5. Pek. Timbunan Kembali Galian Pondasi
Pekerja 18.252 Oh 0.192 3.504
Tukang Gali 18.252 - -
Kepala Tukang 18.252 - -
Mandor 18.252 Oh 0.019 0.347
IV PEKERJAAN BETON
1. Pek. Beton Kolom
Pekerja 3.8815 Oh 1.650 6.404
Tukang Batu 3.8815 Oh 0.250 0.970
Kepala Tukang 3.8815 Oh 0.025 0.097
Mandor 3.8815 Oh 0.080 0.311
2. Pek. Beton Sloof
Pekerja 3.2391 Oh 1.650 5.344515
Tukang Batu 3.2391 Oh 0.250 0.809775
Kepala Tukang 3.2391 Oh 0.025 0.0809775
Mandor 3.2391 Oh 0.080 0.259128
3. Pek. Beton Ring Balok
Pekerja 2.996 Oh 1.650 4.9434
Tukang Batu 2.996 Oh 0.250 0.749
Kepala Tukang 2.996 Oh 0.025 0.0749
Mandor 2.996 Oh 0.080 0.23968
4. Pek. Beton Balok
Pekerja 1.4361 Oh 1.650 2.369565
Tukang Batu 1.4361 Oh 0.250 0.359025
Kepala Tukang 1.4361 Oh 0.025 0.0359025
Mandor 1.4361 Oh 0.080 0.114888
5. Pek. Beton Dak
Pekerja 1.6225 Oh 1.650 2.677125
Tukang Batu 1.6225 Oh 0.250 0.405625
Kepala Tukang 1.6225 Oh 0.025 0.0405625
Mandor 1.6225 Oh 0.080 0.1298
6. Pek. Beton Kanopi
Pekerja 0.827 Oh 1.650 1.36455
Tukang Batu 0.827 Oh 0.250 0.20675
Kepala Tukang 0.827 Oh 0.025 0.020675
Mandor 0.827 Oh 0.080 0.06616
Pek. Tulangan
1. Berat Tulangan Ǿ 12
Pekerja 31.016064 Oh 0.007 0.217112448
Tukang Besi 31.016064 Oh 0.007 0.217112448
Kepala Tukang 31.016064 Oh 0.001 0.0217112448
Mandor 31.016064 Oh 0.000 0.0093048192
2. Berat Tulangan Ǿ 10
Pekerja 1034.092 Oh 0.007 7.238644
Tukang Besi 1034.092 Oh 0.007 7.238644
Kepala Tukang 1034.092 Oh 0.001 0.7238644
Mandor 1034.092 Oh 0.000 0.3102276
3. Berat Tulangan Ǿ 8
Pekerja 244.09539 Oh 0.007 1.708667695
Tukang Besi 244.09539 Oh 0.007 1.708667695
Kepala Tukang 244.09539 Oh 0.001 0.1708667695
Mandor 244.09539 Oh 0.000 0.0732286155
4. Berat Tulangan Ǿ 6
Pekerja 248.91972 Oh 0.007 1.74243804
Tukang Besi 248.91972 Oh 0.007 1.74243804
Kepala Tukang 248.91972 Oh 0.001 0.174243804
Mandor 248.91972 Oh 0.000 0.074675916
5. Berat Tulangan D 10
Pekerja 378.35674 Oh 0.007 2.64849718
Tukang Besi 378.35674 Oh 0.007 2.64849718
Kepala Tukang 378.35674 Oh 0.001 0.264849718
Mandor 378.35674 Oh 0.000 0.113507022
Pek. Perancah
1. Pek. Beton Kolom
Pekerja 61.241 Oh 0.300 18.3723
Tukang Kayu 61.241 Oh 0.330 20.20953
Kepala Tukang 61.241 Oh 0.033 2.020953
Mandor 61.241 Oh 0.006 0.367446
2. Pek. Beton Sloof 0
Pekerja 40.6835 Oh 0.300 12.20505
Tukang Kayu 40.6835 Oh 0.260 10.57771
Kepala Tukang 40.6835 Oh 0.026 1.057771
Mandor 40.6835 Oh 0.005 0.2034175
3. Pek. Beton Ring Balok
Pekerja 35.706 Oh 0.320 11.42592
Tukang Kayu 35.706 Oh 0.330 11.78298
Kepala Tukang 35.706 Oh 0.033 1.178298
Mandor 35.706 Oh 0.006 0.214236
4. Pek. Beton Balok
Pekerja 23.824 Oh 0.320 7.62368
Tukang Kayu 23.824 Oh 0.330 7.86192
Kepala Tukang 23.824 Oh 0.033 0.786192
Mandor 23.824 Oh 0.006 0.142944
5. Pek. Beton Dak
Pekerja 16.785 Oh 0.320 5.3712
Tukang Batu 16.785 Oh 0.330 5.53905
Kepala Tukang 16.785 Oh 0.033 0.553905
Mandor 16.785 Oh 0.006 0.10071
6. Pek. Pondasi Batu Kali
Pekerja 95.661 Oh 0.300 28.6983
Tukang Kayu 95.661 Oh 0.260 24.87186
Kepala Tukang 95.661 Oh 0.026 2.487186
Mandor 95.661 Oh 0.005 0.478305
7. Pek. Dinding
8. Pek. Kanopi
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan
Tukang Terampil 87.7718 Oh 0.100 8.77718
Tukang biasa 87.7718 Oh 0.100 8.77718
Kepala Tukang 87.7718 Oh 0.050 4.38859
Mandor 87.7718 Oh 0.010 0.877718
2. Pek. Penutup Atap
Pekerja 87.7718 Oh 0.150 13.16577
Tukang Kayu 87.7718 Oh 0.075 6.582885
Kepala Tukang 87.7718 Oh 0.008 0.7021744
Mandor 87.7718 Oh 0.008 0.7021744
3. Pek. Nok
Pekerja 1.02 Oh 0.100 0.102
Tukang Kayu 1.02 Oh 1.000 1.02
Kepala Tukang 1.02 Oh 0.010 0.0102
Mandor 1.02 Oh 0.010 0.0102
4. Pek. Jurai Luar
Pekerja 29.72 Oh 0.400 11.888
Tukang Kayu 29.72 Oh 0.200 5.944
Kepala Tukang 29.72 Oh 0.020 0.5944
Mandor 29.72 Oh 0.002 0.05944
5. Pek. Jurai Dalam
Pekerja 6.16 Oh 0.400 2.464
Tukang Kayu 6.16 Oh 0.200 1.232
Kepala Tukang 6.16 Oh 0.020 0.1232
Mandor 6.16 Oh 0.002 0.01232
6. Pek. Listplank
Pekerja 35.9 Oh 0.110 3.949
Tukang Kayu 35.9 Oh 0.220 7.898
Kepala Tukang 35.9 Oh 0.022 0.7898
Mandor 35.9 Oh 0.005 0.1795
VI PEKERJAAN PLAFOND
1. Pek. Plafond Gypsum (CH +3.00)
Pekerja 76.9 Oh 0.260 19.994
Tukang Kayu 76.9 Oh 0.400 30.76
Kepala Tukang 76.9 Oh 0.040 3.076
Mandor 76.9 Oh 0.013 0.9997
2. Pek. Plafond Gypsum WR (CH +3.00)
Pekerja 5.6 Oh 0.260 1.456
Tukang Kayu 5.6 Oh 0.400 2.24
Kepala Tukang 5.6 Oh 0.040 0.224
Mandor 5.6 Oh 0.013 0.0728
3. Pek. Plafond Gypsum (CH.+2,23)
Pekerja 3.65 Oh 0.260 0.949
Tukang Kayu 3.65 Oh 0.400 1.46
Kepala Tukang 3.65 Oh 0.040 0.146
Mandor 3.65 Oh 0.013 0.04745
4. Pek. Overstek Plafond
Pekerja 9.1748 Oh 0.260 2.385448
Tukang Kayu 9.1748 Oh 0.400 3.66992
Kepala Tukang 9.1748 Oh 0.040 0.366992
Mandor 9.1748 Oh 0.013 0.1192724
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00)
Pekerja 82.83 Oh 0.021 1.73943
Tukang Kayu 82.83 Oh 0.021 1.73943
Kepala Tukang 82.83 Oh 0.002 0.16566
Mandor 82.83 Oh 0.001 0.08283
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00)
Pekerja 13.66 Oh 0.021 0.28686
Tukang Kayu 13.66 Oh 0.021 0.28686
Kepala Tukang 13.66 Oh 0.002 0.02732
Mandor 13.66 Oh 0.001 0.01366
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23)
Pekerja 13.08 Oh 0.021 0.27468
Tukang Kayu 13.08 Oh 0.021 0.27468
Kepala Tukang 13.08 Oh 0.002 0.02616
Mandor 13.08 Oh 0.001 0.01308
8. Pek. Lisplank Plafond Luar
Pekerja 40 Oh 0.021 0.84
Tukang Kayu 40 Oh 0.021 0.84
Kepala Tukang 40 Oh 0.002 0.08
Mandor 40 Oh 0.001 0.04
IX PEKERJAAN LISTRIK
1. Box MCB
Tukang Instalasi listrik 1 ls 1.000 1
2. MCB
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0
2. Stop kran
Pekerja 3 Oh 0.010 0.03
Tukang Batu 3 Oh 0.100 0.3
Kepala Tukang 3 Oh 0.010 0.03
Mandor 3 Oh 0.005 0.015
3. Kran Air (KR)
Pekerja 1 Oh 0.010 0.01
Tukang Batu 1 Oh 0.100 0.1
Kepala Tukang 1 Oh 0.010 0.01
Mandor 1 Oh 0.005 0.005
4. Floor Drain (FD)
Pekerja 2 Oh 0.010 0.02
Tukang Batu 2 Oh 0.100 0.2
Kepala Tukang 2 Oh 0.010 0.02
Mandor 2 Oh 0.005 0.01
5. Shower
Pekerja 2 Oh 1.000 2
Tukang Batu 2 Oh 1.000 2
Kepala Tukang 2 Oh 0.100 0.2
Mandor 2 Oh 0.100 0.2
6. Closet Duduk
Pekerja 2 Oh 3.300 6.6
Tukang Batu 2 Oh 1.100 2.2
Kepala Tukang 2 Oh 0.001 0.002
Mandor 2 Oh 0.160 0.32
7. Kitchen Sink (KS)
Pekerja 1 Oh 0.030 0.03
Tukang Batu 1 Oh 0.300 0.3
Kepala Tukang 1 Oh 0.030 0.03
Mandor 1 Oh 0.002 0.0015
8. Meteran Air 1 buah 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam
Pekerja 322.147 Oh 0.020 6.44294
Tukang Cat 322.147 Oh 0.063 20.295261
Kepala Tukang 322.147 Oh 0.006 2.0295261
Mandor 322.147 Oh 0.003 0.8053675
2. Cat Dinding Baru Luar
Pekerja 134.078 Oh 0.020 2.68155
Tukang Cat 134.078 Oh 0.063 8.4468825
Kepala Tukang 134.078 Oh 0.006 0.84468825
Mandor 134.078 Oh 0.003 0.33519375
3. Cat Pagar
Pekerja 265.200 Oh 0.020 5.304
Tukang Cat 265.200 Oh 0.063 16.7076
Kepala Tukang 265.200 Oh 0.006 1.67076
Mandor 265.200 Oh 0.003 0.663
4. Cat Daun Pintu
Pekerja 3.075 Oh 0.070 0.21525
Tukang Cat 3.075 Oh 0.009 0.027675
Kepala Tukang 3.075 Oh 0.006 0.01845
Mandor 3.075 Oh 0.003 0.0076875
5 Cat Daun Jendela
Pekerja 2.395 Oh 0.070 0.16765
Tukang Cat 2.395 Oh 0.009 0.021555
Kepala Tukang 2.395 Oh 0.006 0.01437
Mandor 2.395 Oh 0.003 0.0059875
6 Cat Kusen Pintu dan Jendela
Pekerja 29.530 Oh 0.070 2.0671
Tukang Cat 29.530 Oh 0.009 0.26577
Kepala Tukang 29.530 Oh 0.006 0.17718
Mandor 29.530 Oh 0.003 0.073825
7 Cat Plafond Dalam
Pekerja 82.500 Oh 0.020 1.65
Tukang Cat 82.500 Oh 0.063 5.1975
Kepala Tukang 82.500 Oh 0.006 0.51975
Mandor 82.500 Oh 0.003 0.20625
8 Cat Plafond Luar
Pekerja 12.824 Oh 0.020 0.25648
Tukang Cat 12.824 Oh 0.063 0.807912
Kepala Tukang 12.824 Oh 0.006 0.0807912
Mandor 12.824 Oh 0.003 0.03206
9 Cat Listplank
Pekerja 35.900 Oh 0.070 2.513
Tukang Cat 35.900 Oh 0.009 0.3231
Kepala Tukang 35.900 Oh 0.006 0.2154
Mandor 35.900 Oh 0.003 0.08975
10 Cat Listplank Plafond Dalam
Pekerja 109.570 Oh 0.070 7.6699
Tukang Cat 109.570 Oh 0.009 0.98613
Kepala Tukang 109.570 Oh 0.006 0.65742
Mandor 109.570 Oh 0.003 0.273925
11 Cat Listplank Plafond Luar
Pekerja 40.000 Oh 0.070 2.8
Tukang Cat 40.000 Oh 0.009 0.36
Kepala Tukang 40.000 Oh 0.006 0.24
Mandor 40.000 Oh 0.003 0.1