1.4 Bases & Stub Columns Cement 6.31 50kg bag 14.00 $ 88.37
1.2 River sand 1.01 m³ 32.00 $ 32.40
1.3 Concrete stones 1.05 m³ 45.00 $ 47.34
st1 reinforcement steel 132.82 kg 1.50 $ 199.22
Formwork timber $ 71.01
S1 SUBTOTAL $ 12,320.77
B SUPERSTRUCTURE:
CONCRETE WORK & REINFORCEMENT
2.1 concrete columns Cement 2.13 50kg bag 14.00 $ 29.82
2.2 River sand 0.25 m³ 32.00 $ 7.95
2.3 Concrete stones 0.27 m³ 40.00 $ 10.93
reinforcement steel 60.35 kg 1.50 $ 90.53
Formwork timber $ 19.53
S2 SUBTOTAL $ 2,066.27
BRICKWORK:
1.4.1.2 115mm brick wall: Bricks 7,123 0.24 $ 1,709.56
1.1.2 Cement 22.60 50kg bag 12.00 $ 271.23
2.5 Pit sand 4.11 m³ 24.00 $ 98.63
2.0.1 115mm brick force 402.73 m 0.20 $ 80.55
2.0.2 115mm damp proof 55.78 m 0.50 $ 27.89
2.0.7 WINDOW CILL: Bull nose cill bricks 313.00 1.20 $ 375.60
2.1.4 Cement 0.77 50kg bag 12.00 $ 9.20
2.5.1 Pit sand 0.16 m³ 24.00 $ 3.75
2.0.4 230mm Dpc 24.68 m 0.50 $ 12.34
3 METAL WORK
3.0.1 Window & frame W01 (2500x1500mm) 1 170.00 $ 170.00
3.0.2 W02 (2000x1200mm) 4 110.00 $ 440.00
3.0.3 W03 (1500x1200mm) 1 85.00 $ 85.00
3.0.4 W04 (1500x900mm) 2 62.00 $ 124.00
3.0.5 W05 (1000x900mm) 1 41.00 $ 41.00
3.0.6 W06 (500x1100) 2 25.00 $ 50.00
3.0.7 W07 (1750x400mm) 1 35.00 $ 35.00
S3 SUBTOTAL $ 2,370.00
4.2 FLOORING
4.2.1 Floor screed Cement 40.33 50kg bag 11.50 $ 463.80
4.2.2 River sand 6.09 m³ 24.00 $ 146.10
S4 SUBTOTAL $ 4,334.40
5 PAINTING
5.1.1 To internal walls Undercoat 54 litres 5.00 $ 269.47
5.1.2 Finishing coat 58 litres 6.65 $ 387.06
S5 SUBTOTAL $ 1,174.13
6.3 Water closet (WC) White glzd vireous china pan 2 45.00 $ 90.00
1.4.1
1.1.2
1.5.1
1.6.1
1.7
1.2.1
1.3.1
1
1.0.1
1.0.2
2.1
2.2
2.3
2.1.1
2.2.1
2.3.1
2.1.1
2.2.1
2.3.1
2.4
2.5
2.0.1
2.0.2
2.4.1
2.1.3
2.5.2
2.0.3
2.0.4
2.0.5
2.0.6
2.0.7
2.1.4
2.5.1
2.0.4
3
3.0.1
3.0.2
3.0.3
3.0.4
3.0.5
3.0.6
3.1.1
3.2.1
3.1.4
3.1.5
3.3.1
3.3.3
3.3.5
3.3.6
3.3.7
3.3.8
3.3.9
4
4.1.1
4.5
4.1.2
4.1.3
4.1.4
4.1
4.5
roof area 278.22
are 111.92
AMOUNT
$ -