PERKIRAAN ANGGARAN KEBUTUHAN BUAT PEMBANGUNAN GEDUNG RA

(TARGET 30 DESEMBER 2018)

TAHAP PENGECORAN

NO NAMA BARANG JUMLAH SATUAN HARGA TOTAL


1 BONDEK @ 5 METER 12 Lembar 500,000 6,000,000
2 WIREMESH Uk. 8 5 lembar 570,000 2,850,000
3 PASIR COR 1 truk 1,200,000 1,200,000
4 SPLIT 1 truk 1,200,000 1,200,000
5 SEMEN 50 sak 56,000 2,800,000
6 KONSUMSI
A. MAKAN @ 2 Kali 40 buah 25,000 1,000,000
B. KUEH-KUEH 5 Bungkus 50,000 250,000
C. MINUMAN 2 DUS 25,000 50,000
D. BUAH-BUHA 4 KG 40,000 160,000
7 UPAH TUKANG 4 OK 100,000 400,000

JUMLAH 15,910,000

TAHAP FINISHING
1 PASIR PASANG 1 TRUK 1,400,000 1,400,000
2 SEMEN 10 SAK 56,000 560,000
3 KERAMIK 50 DUS 63,000 3,150,000
4 CAT TEMBOK 2 PEL 325,000 650,000
5 PARALON 8 BTG 60,000 480,000
6 KABEL 1 ROLL 325,000 325,000
BOHLAM 6 BUAH 45,000 270,000
CANGKOKAN 6 BUAH 15,000 90,000
STOP KONTAK/SAMBUNGAN 4 BUAH 5,000 20,000
NCB 1 BUAH 35,000 35,000
5 UPAH PEKERJA @ 4 org 30 Hari 280,000 8,400,000
6 LAIN-LAIN TAK TERDUGA 10 PERSEN 1,538,000 1,538,000 15,380,000
JUMLAH 16,918,000

TOTAL PERKIRAAN BIAYA 32,828,000