Vous êtes sur la page 1sur 17

Job No Sheet No Rev

04 1
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Job Information
Engineer Checked Approved

Name: Aniruddha Maity


Date: 28-Mar-19

Structure Type SPACE FRAME

Number of Nodes 72 Highest Node 84


Number of Elements 145 Highest Beam 157

Number of Basic Load Cases -2


Number of Combination Load Cases 0

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name

Primary 1 LOAD CASE 1


Primary 2 LOAD CASE 2

Combination Load Cases


There is no data of this type.

Node Displacement Summary


Node L/C X Y Z Resultant rX rY rZ
(mm) (mm) (mm) (mm) (rad) (rad) (rad)
Max X 45 2:LOAD CASE 2 0.723 -0.129 -0.000 0.734 -0.000 -0.000 -0.000
Min X 24 1:LOAD CASE 1 -0.002 -0.230 0.001 0.230 0.000 -0.000 0.000
Max Y 73 1:LOAD CASE 1 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Min Y 46 1:LOAD CASE 1 0.001 -0.329 -0.000 0.329 -0.000 -0.000 -0.000
Max Z 21 1:LOAD CASE 1 0.002 -0.230 0.001 0.230 0.000 -0.000 -0.000
Min Z 69 1:LOAD CASE 1 0.002 -0.230 -0.001 0.230 -0.000 -0.000 -0.000
Max rX 21 1:LOAD CASE 1 0.002 -0.230 0.001 0.230 0.000 -0.000 -0.000
Min rX 69 1:LOAD CASE 1 0.002 -0.230 -0.001 0.230 -0.000 -0.000 -0.000
Max rY 21 2:LOAD CASE 2 0.713 -0.130 0.000 0.725 -0.000 0.000 -0.000
Min rY 69 2:LOAD CASE 2 0.713 -0.130 -0.000 0.725 0.000 -0.000 -0.000
Max rZ 24 1:LOAD CASE 1 -0.002 -0.230 0.001 0.230 0.000 -0.000 0.000
Min rZ 37 2:LOAD CASE 2 0.432 -0.089 -0.000 0.441 -0.000 -0.000 -0.000
Max Rst 46 2:LOAD CASE 2 0.716 -0.235 -0.000 0.754 -0.000 -0.000 -0.000

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 1 of 17
Job No Sheet No Rev
04 2
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Force Detail Summary


Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam end
A.
Axial Shear Torsion Bending
Beam L/C d Fx Fy Fz Mx My Mz
(m) (kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 151 1:LOAD CASE 1 0.000 248.362 -0.003 -0.000 0.000 0.000 0.007
Min Fx 4 2:LOAD CASE 2 0.000 -1.870 10.135 -0.001 -0.000 0.001 -1.082
Max Fy 13 2:LOAD CASE 2 0.000 8.709 14.635 -0.478 0.000 0.982 5.635
Min Fy 44 2:LOAD CASE 2 3.000 0.540 -20.983 0.000 -0.000 0.000 16.416
Max Fz 142 2:LOAD CASE 2 0.000 0.467 0.012 3.056 -0.033 -1.317 0.019
Min Fz 122 2:LOAD CASE 2 3.000 0.467 -0.012 -3.056 0.033 -1.317 0.019
Max Mx 102 2:LOAD CASE 2 0.000 24.623 0.236 0.011 0.167 -0.016 -2.625
Min Mx 32 2:LOAD CASE 2 0.000 24.623 0.236 -0.011 -0.167 0.016 -2.625
Max My 32 1:LOAD CASE 1 3.000 18.476 -2.458 2.459 -0.000 4.176 4.181
Min My 102 1:LOAD CASE 1 3.000 18.476 -2.458 -2.459 -0.000 -4.176 4.181
Max Mz 44 2:LOAD CASE 2 3.000 0.540 -20.983 0.000 -0.000 0.000 16.416
Min Mz 70 2:LOAD CASE 2 3.000 26.778 5.249 -0.000 0.000 -0.000 -9.256

Beam Maximum Moments


Distances to maxima are given from beam end A.
Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
1 5 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.238
Max -ve 0.000 -0.000 1.500 -2.518
2:LOAD CASE 2 Max +ve 0.000 0.000 3.000 4.015
Max -ve 0.000 -4.396
2 6 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.409
Max -ve 0.000 -0.000 1.500 -2.218
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 4.637
Max -ve 0.000 -0.000 0.000 -4.844
3 7 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.238
Max -ve 0.000 -0.000 1.500 -2.518
2:LOAD CASE 2 Max +ve 3.000 6.616
Max -ve 3.000 -0.000 0.000 -5.801
4 9 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.626
Max -ve 0.000 -0.000 1.500 -2.558
2:LOAD CASE 2 Max +ve 0.000 0.001 3.000 13.513
Max -ve 3.000 -0.001 1.000 -6.217
5 10 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.275
Max -ve 0.000 -0.000 1.500 -2.352
2:LOAD CASE 2 Max +ve 0.000 0.000 3.000 14.472
Max -ve 3.000 -0.000 1.000 -5.068
6 11 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.626
Max -ve 0.000 -0.000 1.500 -2.558
2:LOAD CASE 2 Max +ve 0.000 0.001 3.000 15.740
Max -ve 3.000 -0.001 1.000 -5.418

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 2 of 17
Job No Sheet No Rev
04 3
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
7 13 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 5.190
Max -ve 0.000 -0.000 1.750 -2.577
2:LOAD CASE 2 Max +ve 0.000 0.017 3.000 11.998
Max -ve 3.000 -0.009 1.000 -5.750
8 14 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.191
Max -ve 0.000 -0.000 1.500 -2.436
2:LOAD CASE 2 Max +ve 0.000 0.004 3.000 14.021
Max -ve 3.000 -0.005 1.000 -5.153
9 15 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 5.190
Max -ve 0.000 -0.000 1.250 -2.577
2:LOAD CASE 2 Max +ve 0.000 0.009 3.000 16.397
Max -ve 3.000 -0.012 1.000 -5.545
10 17 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 5.787
Max -ve 3.000 -0.000 1.750 -2.597
2:LOAD CASE 2 Max +ve 0.000 0.138 3.000 8.749
Max -ve 3.000 -0.074 1.250 -4.693
11 18 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 4.107
Max -ve 3.000 -0.000 1.500 -2.520
2:LOAD CASE 2 Max +ve 0.000 0.032 3.000 12.037
Max -ve 3.000 -0.042 1.250 -4.776
12 19 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 5.787
Max -ve 3.000 -0.000 1.250 -2.597
2:LOAD CASE 2 Max +ve 0.000 0.058 3.000 14.778
Max -ve 3.000 -0.073 1.000 -5.103
13 21 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 4.181
Max -ve 3.000 -0.000 1.500 -2.967
2:LOAD CASE 2 Max +ve 0.000 0.982 3.000 6.729
Max -ve 3.000 -0.453 1.500 -5.068
14 22 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.046
Max -ve 1.500 -2.580
2:LOAD CASE 2 Max +ve 0.000 0.084 3.000 9.259
Max -ve 3.000 -0.142 1.250 -4.471
15 23 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 4.181
Max -ve 3.000 -0.000 1.500 -2.967
2:LOAD CASE 2 Max +ve 0.000 0.201 3.000 9.095
Max -ve 3.000 -0.237 1.250 -4.849
20 5 3.000 1:LOAD CASE 1 Max +ve 3.000 2.164 3.000 2.194
Max -ve 0.000 -1.950 0.000 -1.981
2:LOAD CASE 2 Max +ve 0.000 0.001 0.000 4.254
Max -ve 3.000 -0.002 3.000 -1.123
21 6 3.000 1:LOAD CASE 1 Max +ve 3.000 2.164 3.000 0.293
Max -ve 0.000 -1.950 0.000 -0.159
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 7.293
Max -ve 0.000 -0.000 3.000 -6.349
22 7 3.000 1:LOAD CASE 1 Max +ve 3.000 2.164 0.000 0.159

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 3 of 17
Job No Sheet No Rev
04 4
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
Max -ve 0.000 -1.950 3.000 -0.293
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 8.032
Max -ve 0.000 -0.000 3.000 -7.246
23 8 3.000 1:LOAD CASE 1 Max +ve 3.000 2.164 0.000 1.981
Max -ve 0.000 -1.950 3.000 -2.194
2:LOAD CASE 2 Max +ve 3.000 0.001 0.000 6.710
Max -ve 0.000 -0.001 3.000 -6.997
24 9 3.000 1:LOAD CASE 1 Max +ve 3.000 2.523 3.000 2.545
Max -ve 0.000 -2.415 0.000 -2.432
2:LOAD CASE 2 Max +ve 0.000 0.003 3.000 0.188
Max -ve 3.000 -0.004 0.000 -0.042
25 10 3.000 1:LOAD CASE 1 Max +ve 3.000 2.523 3.000 0.554
Max -ve 0.000 -2.415 0.000 -0.469
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 7.001
Max -ve 0.000 -0.000 3.000 -6.913
26 11 3.000 1:LOAD CASE 1 Max +ve 3.000 2.523 0.000 0.469
Max -ve 0.000 -2.415 3.000 -0.554
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 8.222
Max -ve 0.000 -0.000 3.000 -8.486
27 12 3.000 1:LOAD CASE 1 Max +ve 3.000 2.523 0.000 2.432
Max -ve 0.000 -2.415 3.000 -2.545
2:LOAD CASE 2 Max +ve 3.000 0.003 0.000 8.743
Max -ve 0.000 -0.002 3.000 -8.869
28 13 3.000 1:LOAD CASE 1 Max +ve 3.000 2.535 3.000 2.592
Max -ve 0.000 -2.598 0.000 -2.645
2:LOAD CASE 2 Max +ve 0.000 0.005 3.000 1.860
Max -ve 3.000 -0.003 1.250 -1.525
29 14 3.000 1:LOAD CASE 1 Max +ve 3.000 2.535 3.000 0.802
Max -ve 0.000 -2.598 0.000 -0.718
2:LOAD CASE 2 Max +ve 0.000 4.822
Max -ve 3.000 -0.001 3.000 -5.324
30 15 3.000 1:LOAD CASE 1 Max +ve 3.000 2.535 0.000 0.718
Max -ve 0.000 -2.598 3.000 -0.802
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 7.047
Max -ve 0.000 -0.000 3.000 -7.829
31 16 3.000 1:LOAD CASE 1 Max +ve 3.000 2.535 0.000 2.645
Max -ve 0.000 -2.598 3.000 -2.592
2:LOAD CASE 2 Max +ve 3.000 0.004 0.000 7.524
Max -ve 0.000 -0.004 3.000 -8.452
32 17 3.000 1:LOAD CASE 1 Max +ve 3.000 4.176 3.000 4.181
Max -ve 0.000 -3.200 0.000 -3.194
2:LOAD CASE 2 Max +ve 0.000 0.016 3.000 5.668
Max -ve 3.000 -0.017 0.000 -2.625
33 18 3.000 1:LOAD CASE 1 Max +ve 3.000 4.176 3.000 0.907
Max -ve 0.000 -3.200 0.000 -0.846

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 4 of 17
Job No Sheet No Rev
04 5
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
2:LOAD CASE 2 Max +ve 3.000 0.008 0.000 1.444
Max -ve 0.000 -0.009 3.000 -2.242
34 19 3.000 1:LOAD CASE 1 Max +ve 3.000 4.176 0.000 0.846
Max -ve 0.000 -3.200 3.000 -0.907
2:LOAD CASE 2 Max +ve 0.000 0.001 0.000 4.237
Max -ve 3.000 -0.000 3.000 -5.304
35 20 3.000 1:LOAD CASE 1 Max +ve 3.000 4.176 0.000 3.194
Max -ve 0.000 -3.200 3.000 -4.181
2:LOAD CASE 2 Max +ve 3.000 0.009 0.000 6.308
Max -ve 0.000 -0.008 3.000 -9.075
36 29 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 4.238
Max -ve 3.000 -0.000 1.500 -2.518
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 4.013
Max -ve 0.000 -0.000 0.000 -4.394
37 30 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 4.409
Max -ve 3.000 -0.000 1.500 -2.218
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 4.638
Max -ve 0.000 -0.000 0.000 -4.844
38 31 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.238
Max -ve 0.000 -0.000 1.500 -2.518
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 6.615
Max -ve 0.000 -0.000 0.000 -5.799
39 33 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 4.626
Max -ve 3.000 -0.000 1.500 -2.558
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 13.510
Max -ve 0.000 -0.000 1.000 -6.216
40 34 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.275
Max -ve 0.000 -0.000 1.500 -2.352
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 14.475
Max -ve 0.000 -0.000 1.000 -5.069
41 35 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.626
Max -ve 0.000 -0.000 1.500 -2.558
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 15.738
Max -ve 0.000 -0.000 1.000 -5.417
42 37 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 5.190
Max -ve 0.000 -0.000 1.750 -2.577
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 12.010
Max -ve 0.000 -0.000 1.000 -5.754
43 38 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.191
Max -ve 0.000 -0.000 1.500 -2.436
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 14.046
Max -ve 0.000 -0.000 1.000 -5.161
44 39 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 5.190
Max -ve 0.000 -0.000 1.250 -2.577
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 16.416

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 5 of 17
Job No Sheet No Rev
04 6
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
Max -ve 0.000 -0.000 1.000 -5.550
45 41 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 5.787
Max -ve 3.000 -0.000 1.750 -2.597
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 8.887
Max -ve 0.000 -0.000 1.250 -4.735
46 42 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 4.107
Max -ve 3.000 -0.000 1.500 -2.520
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 12.156
Max -ve 0.000 -0.000 1.250 -4.799
47 43 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 5.787
Max -ve 0.000 -0.000 1.250 -2.597
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 14.901
Max -ve 0.000 -0.000 1.000 -5.135
48 45 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.181
Max -ve 0.000 -0.000 1.500 -2.967
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 6.868
Max -ve 0.000 -0.000 1.500 -5.093
49 46 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.046
Max -ve 0.000 -0.000 1.500 -2.580
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 9.369
Max -ve 0.000 -0.000 1.250 -4.492
50 47 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 4.181
Max -ve 3.000 -0.000 1.500 -2.967
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 9.217
Max -ve 0.000 -0.000 1.250 -4.859
55 29 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 2.194
Max -ve 3.000 -0.000 0.000 -1.981
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 4.253
Max -ve 0.000 -0.000 3.000 -1.121
56 30 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 0.293
Max -ve 3.000 -0.000 0.000 -0.159
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 7.292
Max -ve 0.000 -0.000 3.000 -6.347
57 31 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 0.159
Max -ve 3.000 -0.000 3.000 -0.293
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 8.031
Max -ve 3.000 -0.000 3.000 -7.245
58 32 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 1.981
Max -ve 3.000 -0.000 3.000 -2.194
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 6.709
Max -ve 3.000 -0.000 3.000 -6.995
59 33 3.000 1:LOAD CASE 1 Max +ve 3.000 2.545
Max -ve 3.000 -0.000 0.000 -2.432
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 0.194
Max -ve 0.000 -0.000 0.000 -0.041

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 6 of 17
Job No Sheet No Rev
04 7
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
60 34 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 0.554
Max -ve 3.000 -0.000 0.000 -0.469
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 7.004
Max -ve 0.000 -0.000 3.000 -6.907
61 35 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 0.469
Max -ve 3.000 -0.000 3.000 -0.554
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 8.226
Max -ve 3.000 -0.000 3.000 -8.483
62 36 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 2.432
Max -ve 3.000 -0.000 3.000 -2.545
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 8.744
Max -ve 3.000 -0.000 3.000 -8.861
63 37 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 2.592
Max -ve 0.000 -0.000 0.000 -2.645
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 1.902
Max -ve 0.000 -0.000 1.250 -1.491
64 38 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 0.802
Max -ve 0.000 -0.000 0.000 -0.718
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 4.874
Max -ve 0.000 -0.000 3.000 -5.339
65 39 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 0.718
Max -ve 3.000 -0.000 3.000 -0.802
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 7.102
Max -ve 3.000 -0.000 3.000 -7.852
66 40 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 2.645
Max -ve 3.000 -0.000 3.000 -2.592
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 7.562
Max -ve 3.000 -0.000 3.000 -8.448
67 41 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.181
Max -ve 0.000 -0.000 0.000 -3.194
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 5.381
Max -ve 0.000 -0.000 0.250 -2.371
68 42 3.000 1:LOAD CASE 1 Max +ve 3.000 0.907
Max -ve 0.000 -0.000 0.000 -0.846
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 1.740
Max -ve 0.000 -0.000 3.000 -2.542
69 43 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 0.846
Max -ve 3.000 -0.000 3.000 -0.907
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 4.487
Max -ve 3.000 -0.000 3.000 -5.558
70 44 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 3.194
Max -ve 3.000 -0.000 3.000 -4.181
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 6.491
Max -ve 3.000 -0.000 3.000 -9.256
71 53 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 4.238

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 7 of 17
Job No Sheet No Rev
04 8
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
Max -ve 3.000 -0.000 1.500 -2.518
2:LOAD CASE 2 Max +ve 3.000 4.015
Max -ve 0.000 -0.000 0.000 -4.396
72 54 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 4.409
Max -ve 3.000 -0.000 1.500 -2.218
2:LOAD CASE 2 Max +ve 0.000 0.000 3.000 4.637
Max -ve 3.000 -0.000 0.000 -4.844
73 55 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.238
Max -ve 0.000 -0.000 1.500 -2.518
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 6.616
Max -ve 0.000 -5.801
74 57 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 4.626
Max -ve 3.000 -0.000 1.500 -2.558
2:LOAD CASE 2 Max +ve 3.000 0.001 3.000 13.513
Max -ve 0.000 -0.001 1.000 -6.217
75 58 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.275
Max -ve 0.000 -0.000 1.500 -2.352
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 14.472
Max -ve 0.000 -0.000 1.000 -5.068
76 59 3.000 1:LOAD CASE 1 Max +ve 3.000 4.626
Max -ve 3.000 -0.000 1.500 -2.558
2:LOAD CASE 2 Max +ve 3.000 0.001 3.000 15.740
Max -ve 0.000 -0.001 1.000 -5.418
77 61 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 5.190
Max -ve 0.000 -0.000 1.750 -2.577
2:LOAD CASE 2 Max +ve 3.000 0.009 3.000 11.998
Max -ve 0.000 -0.017 1.000 -5.750
78 62 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.191
Max -ve 0.000 -0.000 1.500 -2.436
2:LOAD CASE 2 Max +ve 3.000 0.005 3.000 14.021
Max -ve 0.000 -0.004 1.000 -5.153
79 63 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 5.190
Max -ve 0.000 -0.000 1.250 -2.577
2:LOAD CASE 2 Max +ve 3.000 0.012 3.000 16.397
Max -ve 0.000 -0.009 1.000 -5.545
80 65 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 5.787
Max -ve 0.000 -0.000 1.750 -2.597
2:LOAD CASE 2 Max +ve 3.000 0.074 3.000 8.749
Max -ve 0.000 -0.138 1.250 -4.693
81 66 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.107
Max -ve 0.000 -0.000 1.500 -2.520
2:LOAD CASE 2 Max +ve 3.000 0.042 3.000 12.037
Max -ve 0.000 -0.032 1.250 -4.776
82 67 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 5.787
Max -ve 0.000 -0.000 1.250 -2.597

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 8 of 17
Job No Sheet No Rev
04 9
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
2:LOAD CASE 2 Max +ve 3.000 0.073 3.000 14.778
Max -ve 0.000 -0.058 1.000 -5.103
83 69 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.181
Max -ve 0.000 -0.000 1.500 -2.967
2:LOAD CASE 2 Max +ve 3.000 0.453 3.000 6.729
Max -ve 0.000 -0.982 1.500 -5.068
84 70 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.046
Max -ve 0.000 -0.000 1.500 -2.580
2:LOAD CASE 2 Max +ve 3.000 0.142 3.000 9.259
Max -ve 0.000 -0.084 1.250 -4.471
85 71 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.181
Max -ve 0.000 -0.000 1.500 -2.967
2:LOAD CASE 2 Max +ve 3.000 0.237 3.000 9.095
Max -ve 0.000 -0.201 1.250 -4.849
90 53 3.000 1:LOAD CASE 1 Max +ve 0.000 1.950 3.000 2.194
Max -ve 3.000 -2.164 0.000 -1.981
2:LOAD CASE 2 Max +ve 3.000 0.002 0.000 4.254
Max -ve 0.000 -0.001 3.000 -1.123
91 54 3.000 1:LOAD CASE 1 Max +ve 0.000 1.950 3.000 0.293
Max -ve 3.000 -2.164 0.000 -0.159
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 7.293
Max -ve 3.000 -0.000 3.000 -6.349
92 55 3.000 1:LOAD CASE 1 Max +ve 0.000 1.950 0.000 0.159
Max -ve 3.000 -2.164 3.000 -0.293
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 8.032
Max -ve 3.000 -0.000 3.000 -7.246
93 56 3.000 1:LOAD CASE 1 Max +ve 0.000 1.950 0.000 1.981
Max -ve 3.000 -2.164 3.000 -2.194
2:LOAD CASE 2 Max +ve 0.000 0.001 0.000 6.710
Max -ve 3.000 -0.001 3.000 -6.997
94 57 3.000 1:LOAD CASE 1 Max +ve 0.000 2.415 3.000 2.545
Max -ve 3.000 -2.523 0.000 -2.432
2:LOAD CASE 2 Max +ve 3.000 0.004 3.000 0.188
Max -ve 0.000 -0.003 0.000 -0.042
95 58 3.000 1:LOAD CASE 1 Max +ve 0.000 2.415 3.000 0.554
Max -ve 3.000 -2.523 0.000 -0.469
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 7.001
Max -ve 3.000 -0.000 3.000 -6.913
96 59 3.000 1:LOAD CASE 1 Max +ve 0.000 2.415 0.000 0.469
Max -ve 3.000 -2.523 3.000 -0.554
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 8.222
Max -ve 3.000 -0.000 3.000 -8.486
97 60 3.000 1:LOAD CASE 1 Max +ve 0.000 2.415 0.000 2.432
Max -ve 3.000 -2.523 3.000 -2.545
2:LOAD CASE 2 Max +ve 0.000 0.002 0.000 8.743

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 9 of 17
Job No Sheet No Rev
04 10
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
Max -ve 3.000 -0.003 3.000 -8.869
98 61 3.000 1:LOAD CASE 1 Max +ve 0.000 2.598 3.000 2.592
Max -ve 3.000 -2.535 0.000 -2.645
2:LOAD CASE 2 Max +ve 3.000 0.003 3.000 1.860
Max -ve 0.000 -0.005 1.250 -1.525
99 62 3.000 1:LOAD CASE 1 Max +ve 0.000 2.598 3.000 0.802
Max -ve 3.000 -2.535 0.000 -0.718
2:LOAD CASE 2 Max +ve 3.000 0.001 0.000 4.822
Max -ve 3.000 -5.324
100 63 3.000 1:LOAD CASE 1 Max +ve 0.000 2.598 0.000 0.718
Max -ve 3.000 -2.535 3.000 -0.802
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 7.047
Max -ve 3.000 -0.000 3.000 -7.829
101 64 3.000 1:LOAD CASE 1 Max +ve 0.000 2.598 0.000 2.645
Max -ve 3.000 -2.535 3.000 -2.592
2:LOAD CASE 2 Max +ve 0.000 0.004 0.000 7.524
Max -ve 3.000 -0.004 3.000 -8.452
102 65 3.000 1:LOAD CASE 1 Max +ve 0.000 3.200 3.000 4.181
Max -ve 3.000 -4.176 0.000 -3.194
2:LOAD CASE 2 Max +ve 3.000 0.017 3.000 5.668
Max -ve 0.000 -0.016 0.000 -2.625
103 66 3.000 1:LOAD CASE 1 Max +ve 0.000 3.200 3.000 0.907
Max -ve 3.000 -4.176 0.000 -0.846
2:LOAD CASE 2 Max +ve 0.000 0.009 0.000 1.444
Max -ve 3.000 -0.008 3.000 -2.242
104 67 3.000 1:LOAD CASE 1 Max +ve 0.000 3.200 0.000 0.846
Max -ve 3.000 -4.176 3.000 -0.907
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 4.237
Max -ve 0.000 -0.001 3.000 -5.304
105 68 3.000 1:LOAD CASE 1 Max +ve 0.000 3.200 0.000 3.194
Max -ve 3.000 -4.176 3.000 -4.181
2:LOAD CASE 2 Max +ve 0.000 0.008 0.000 6.308
Max -ve 3.000 -0.009 3.000 -9.075
106 5 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.274
Max -ve 0.000 -0.000 1.500 -2.519
2:LOAD CASE 2 Max +ve 0.000 0.000 3.000 0.002
Max -ve 3.000 -0.000 0.000 -0.002
107 6 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.274
Max -ve 0.000 -0.000 1.500 -2.519
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 0.000
Max -ve 3.000 -0.000 3.000 -0.000
108 7 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.274
Max -ve 0.000 -0.000 1.500 -2.519
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 0.000
Max -ve 3.000 -0.000 3.000 -0.000

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 10 of 17
Job No Sheet No Rev
04 11
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
109 8 3.000 1:LOAD CASE 1 Max +ve 3.000 4.274
Max -ve 0.000 -0.000 1.500 -2.519
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 0.001
Max -ve 3.000 -0.000 3.000 -0.002
110 9 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.579
Max -ve 0.000 -0.000 1.500 -2.626
2:LOAD CASE 2 Max +ve 0.000 0.001 3.000 0.006
Max -ve 3.000 -0.000 0.000 -0.005
111 10 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.579
Max -ve 0.000 -0.000 1.500 -2.626
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 0.001
Max -ve 0.000 -0.000 3.000 -0.001
112 11 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.579
Max -ve 0.000 -0.000 1.500 -2.626
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 0.000
Max -ve 0.000 -0.000 3.000 -0.000
113 12 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.579
Max -ve 0.000 -0.000 1.500 -2.626
2:LOAD CASE 2 Max +ve 0.000 0.001 0.000 0.004
Max -ve 3.000 -0.000 3.000 -0.005
114 13 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 5.121
Max -ve 0.000 -0.000 1.750 -2.692
2:LOAD CASE 2 Max +ve 3.000 0.005 3.000 0.010
Max -ve 0.000 -0.009
115 14 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 5.121
Max -ve 0.000 -0.000 1.750 -2.692
2:LOAD CASE 2 Max +ve 3.000 0.013 0.000 0.001
Max -ve 0.000 -0.011 3.000 -0.002
116 15 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 5.121
Max -ve 3.000 -0.000 1.750 -2.692
2:LOAD CASE 2 Max +ve 3.000 0.012 0.000 0.000
Max -ve 0.000 -0.009 3.000 -0.001
117 16 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 5.121
Max -ve 3.000 -0.000 1.750 -2.692
2:LOAD CASE 2 Max +ve 3.000 0.009 0.000 0.007
Max -ve 0.000 -0.004 3.000 -0.008
118 17 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 5.735
Max -ve 0.000 -0.000 1.750 -2.758
2:LOAD CASE 2 Max +ve 3.000 0.065 3.000 0.017
Max -ve 0.000 -0.018
119 18 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 5.735
Max -ve 0.000 -0.000 1.750 -2.758
2:LOAD CASE 2 Max +ve 3.000 0.117 0.000 0.006
Max -ve 0.000 -0.109 3.000 -0.004
120 19 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 5.735

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 11 of 17
Job No Sheet No Rev
04 12
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
Max -ve 0.000 -0.000 1.750 -2.758
2:LOAD CASE 2 Max +ve 3.000 0.105 0.000 0.000
Max -ve 0.000 -0.088 3.000 -0.001
121 20 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 5.735
Max -ve 0.000 -0.000 1.750 -2.758
2:LOAD CASE 2 Max +ve 3.000 0.090 0.000 0.012
Max -ve 0.000 -0.058 3.000 -0.013
122 21 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.176
Max -ve 0.000 -0.000 1.500 -3.137
2:LOAD CASE 2 Max +ve 1.500 1.017 3.000 0.019
Max -ve 3.000 -1.317 0.000 -0.017
123 22 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.176
Max -ve 0.000 -0.000 1.500 -3.137
2:LOAD CASE 2 Max +ve 3.000 0.541 0.000 0.007
Max -ve 0.000 -0.536 3.000 -0.005
124 23 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.176
Max -ve 0.000 -0.000 1.500 -3.137
2:LOAD CASE 2 Max +ve 3.000 0.423
Max -ve 0.000 -0.360 3.000 -0.000
125 24 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.176
Max -ve 0.000 -0.000 1.500 -3.137
2:LOAD CASE 2 Max +ve 3.000 0.362 0.000 0.010
Max -ve 0.000 -0.262 3.000 -0.013
126 29 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.274
Max -ve 0.000 -0.000 1.500 -2.519
2:LOAD CASE 2 Max +ve 3.000 0.000 0.000 0.002
Max -ve 0.000 -0.000 3.000 -0.002
127 30 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.274
Max -ve 0.000 -0.000 1.500 -2.519
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 0.000
Max -ve 0.000 -0.000 0.000 -0.000
128 31 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.274
Max -ve 0.000 -0.000 1.500 -2.519
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 0.000
Max -ve 0.000 -0.000 0.000 -0.000
129 32 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 0.000 4.274
Max -ve 0.000 -0.000 1.500 -2.519
2:LOAD CASE 2 Max +ve 3.000 0.000 3.000 0.001
Max -ve 0.000 -0.000 0.000 -0.002
130 33 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.579
Max -ve 0.000 -0.000 1.500 -2.626
2:LOAD CASE 2 Max +ve 3.000 0.001 0.000 0.006
Max -ve 0.000 -0.000 3.000 -0.005
131 34 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.579
Max -ve 0.000 -0.000 1.500 -2.626

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 12 of 17
Job No Sheet No Rev
04 13
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
2:LOAD CASE 2 Max +ve 0.000 0.000 3.000 0.001
Max -ve 3.000 -0.000 0.000 -0.001
132 35 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.579
Max -ve 0.000 -0.000 1.500 -2.626
2:LOAD CASE 2 Max +ve 0.000 0.000 3.000 0.000
Max -ve 3.000 -0.000 0.000 -0.000
133 36 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.579
Max -ve 0.000 -0.000 1.500 -2.626
2:LOAD CASE 2 Max +ve 3.000 0.001 3.000 0.004
Max -ve 0.000 -0.000 0.000 -0.005
134 37 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 5.121
Max -ve 0.000 -0.000 1.250 -2.692
2:LOAD CASE 2 Max +ve 0.000 0.005 0.000 0.010
Max -ve 3.000 -0.009
135 38 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 5.121
Max -ve 0.000 -0.000 1.250 -2.692
2:LOAD CASE 2 Max +ve 0.000 0.013 3.000 0.001
Max -ve 3.000 -0.011 0.000 -0.002
136 39 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 5.121
Max -ve 0.000 -0.000 1.250 -2.692
2:LOAD CASE 2 Max +ve 0.000 0.012 3.000 0.000
Max -ve 3.000 -0.009 0.000 -0.001
137 40 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 5.121
Max -ve 0.000 -0.000 1.250 -2.692
2:LOAD CASE 2 Max +ve 0.000 0.009 3.000 0.007
Max -ve 3.000 -0.004 0.000 -0.008
138 41 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 5.735
Max -ve 3.000 -0.000 1.250 -2.758
2:LOAD CASE 2 Max +ve 0.000 0.065 0.000 0.017
Max -ve 3.000 -0.018
139 42 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 5.735
Max -ve 3.000 -0.000 1.250 -2.758
2:LOAD CASE 2 Max +ve 0.000 0.117 3.000 0.006
Max -ve 3.000 -0.109 0.000 -0.004
140 43 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 5.735
Max -ve 3.000 -0.000 1.250 -2.758
2:LOAD CASE 2 Max +ve 0.000 0.105 3.000 0.000
Max -ve 3.000 -0.088 0.000 -0.001
141 44 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 5.735
Max -ve 3.000 -0.000 1.250 -2.758
2:LOAD CASE 2 Max +ve 0.000 0.090 3.000 0.012
Max -ve 3.000 -0.058 0.000 -0.013
142 45 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 4.176
Max -ve 3.000 -0.000 1.500 -3.137
2:LOAD CASE 2 Max +ve 1.500 1.017 0.000 0.019

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 13 of 17
Job No Sheet No Rev
04 14
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
Max -ve 0.000 -1.317 3.000 -0.017
143 46 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 4.176
Max -ve 3.000 -0.000 1.500 -3.137
2:LOAD CASE 2 Max +ve 0.000 0.541 3.000 0.007
Max -ve 3.000 -0.536 0.000 -0.005
144 47 3.000 1:LOAD CASE 1 Max +ve 0.000 0.000 3.000 4.176
Max -ve 3.000 -0.000 1.500 -3.137
2:LOAD CASE 2 Max +ve 0.000 0.423
Max -ve 3.000 -0.360 0.000 -0.000
145 48 3.000 1:LOAD CASE 1 Max +ve 3.000 0.000 3.000 4.176
Max -ve 1.500 -3.137
2:LOAD CASE 2 Max +ve 0.000 0.362 3.000 0.010
Max -ve 3.000 -0.262 0.000 -0.013
146 73 1.500 1:LOAD CASE 1 Max +ve 0.000 0.748 1.500 1.997
Max -ve 1.500 -1.990 0.000 -0.741
2:LOAD CASE 2 Max +ve 1.500 0.001 0.000 4.503
Max -ve 0.000 -0.000 1.500 -0.142
147 74 1.500 1:LOAD CASE 1 Max +ve 0.000 0.748 1.500 0.012
Max -ve 1.500 -1.990
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 5.164
Max -ve 1.500 -0.000 1.500 -1.566
148 75 1.500 1:LOAD CASE 1 Max +ve 0.000 0.748
Max -ve 1.500 -1.990 1.500 -0.012
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 5.591
Max -ve 1.500 -0.000 1.500 -2.406
149 76 1.500 1:LOAD CASE 1 Max +ve 0.000 0.748 0.000 0.741
Max -ve 1.500 -1.990 1.500 -1.997
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 4.722
Max -ve 1.500 -0.001
150 77 1.500 1:LOAD CASE 1 Max +ve 1.500 0.000 1.500 1.997
Max -ve 0.000 -0.000 0.000 -0.741
2:LOAD CASE 2 Max +ve 1.500 0.000 0.000 4.503
Max -ve 0.000 -0.000 1.500 -0.141
151 78 1.500 1:LOAD CASE 1 Max +ve 0.000 0.000 1.500 0.012
Max -ve
2:LOAD CASE 2 Max +ve 1.500 0.000 0.000 5.164
Max -ve 0.000 -0.000 1.500 -1.565
152 79 1.500 1:LOAD CASE 1 Max +ve 0.000 0.000
Max -ve 1.500 -0.000 1.500 -0.012
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 5.591
Max -ve 1.500 -0.000 1.500 -2.406
153 80 1.500 1:LOAD CASE 1 Max +ve 0.000 0.000 0.000 0.741
Max -ve 1.500 -0.000 1.500 -1.997
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 4.722
Max -ve 1.500 -0.000

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 14 of 17
Job No Sheet No Rev
04 15
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Beam Maximum Moments Cont...


Beam Node A Length L/C d Max My d Max Mz
(m) (m) (kNm) (m) (kNm)
154 81 1.500 1:LOAD CASE 1 Max +ve 1.500 1.990 1.500 1.997
Max -ve 0.000 -0.748 0.000 -0.741
2:LOAD CASE 2 Max +ve 0.000 0.000 0.000 4.503
Max -ve 1.500 -0.001 1.500 -0.142
155 82 1.500 1:LOAD CASE 1 Max +ve 1.500 1.990 1.500 0.012
Max -ve 0.000 -0.748
2:LOAD CASE 2 Max +ve 1.500 0.000 0.000 5.164
Max -ve 0.000 -0.000 1.500 -1.566
156 83 1.500 1:LOAD CASE 1 Max +ve 1.500 1.990
Max -ve 0.000 -0.748 1.500 -0.012
2:LOAD CASE 2 Max +ve 1.500 0.000 0.000 5.591
Max -ve 0.000 -0.000 1.500 -2.406
157 84 1.500 1:LOAD CASE 1 Max +ve 1.500 1.990 0.000 0.741
Max -ve 0.000 -0.748 1.500 -1.997
2:LOAD CASE 2 Max +ve 1.500 0.001 0.000 4.722
Max -ve 0.000 -0.000

Y
X
Z Load 2 : Displacement

Whole Structure Displacements 0.3mm:1m 2 LOAD CASE 2

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 15 of 17
Job No Sheet No Rev
04 16
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

Y
X
Z Load 1 : Bending Z

Whole Structure Mz 4kNm:1m 1 LOAD CASE 1

Y
X
Z Load 1 : Shear Y

Whole Structure Fy 7kN:1m 1 LOAD CASE 1

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 16 of 17
Job No Sheet No Rev
04 17
Part
Software licensed to
Job Title Building Ref

By Aniruddha Maity Date28-Mar-19 Chd

Client Bengal collage of engineering & technology File building.std Date/Time 28-Mar-2019 19:51

3D Rendered View

Print Time/Date: 28/03/2019 20:19 STAAD.Pro V8i (SELECTseries 6) 20.07.11.33 Print Run 17 of 17

Vous aimerez peut-être aussi