The 660MW boiler which designed and manufactured by Harbin Boiler Company Ltd
(HBC) for India Talwandi power plant adopts the supercritical boiler technology developed
by HBC itself. The boiler is π type outdoor arrangement supercritical boiler with variable
pressure operation, single intermediate reheat, single furnace, balanced draft, dry ash
removal and total steel frame suspending structure. It has atmospheric flash type startup
system without recirculating pump and adopts tangential firing, low NOx combustion
burners, 24 burners are arranged in 6 layers. The boiler is equipped with 6 BBD4760
double-ended ball mills direct-fired system of Shanghai Heavy Machinery Co.Ltd, under
BMCR condition, 5 mills are in operation 1 mill is standby.
印度Talwandi项目的660MW锅炉是哈尔滨锅炉厂责任有限公司(简称哈锅)采用哈锅
自主开发的超临界锅炉技术设计制造的。该锅炉为变压运行、一次中间再热、单炉膛、平
衡通风、固态排渣、全钢架悬吊结构、露天布置的π型超临界锅炉,采用不带再循环泵的大
气扩容式启动系统,采用新型切圆燃烧方式、低NOx燃烧器,24只燃烧器分6层布置。采用
直吹式制粉系统,配上海重型机器厂有限公司制造的6台BBD4760双进双出磨煤机。锅炉在
BMCR工况下,5运1备。
Page 1 of 7
Pulverizing system Performance Test Procedure of Talwandi 3×660MW Project
PA flow
Total PA flow
Bypass PA flow
Capacity PA flow
Mill output
批注 [l2]: primary air flow at diff. load
Graph 1. PA FLOW vs MILL OUTPUT condition
Page 2 of 7
Pulverizing system Performance Test Procedure of Talwandi 3×660MW Project
Rotating speed 筒体转速 15.3 r/min Recommended weight of ball 推荐装球量 100 t
Reducer 减速机
Lubrication method Forced lubrication
Reduction ratio 速比 i=7.609
润滑型式 强制润滑
度。
8. APPENDIX 附录
APPENDIX I DCS Data Group For Operation Parameters
APPENDIX II Test Conditions check list
Page 4 of 7
Pulverizing system Performance Test Procedure of Talwandi 3×660MW Project
Description Unit
Mill A current 磨 A 电流 A
Inlet air temperature of mill A 磨 A 进口一次风温 ℃
Inlet air press of mill A 磨 A 进口一次风压 kPa
Hot air door opening of mill A 磨 A 热风调门开度 %
Cold air door opening of mill A 磨 A 冷风调门开度 %
Primary air door opening of mill A 磨 A 容量风门开度 %
Bypass air door opening of mill A 磨 A 旁路风门开度 %
A1 side outlet air temperature of mill A 磨 A1 出口温度 ℃
A2 side outlet air temperature of mill A 磨 A2 出口温度 ℃
Coal feeder B output 给煤机 B1 出力 t/h
Coal feeder B output 给煤机 B2 出力 t/h
Mill B current 磨 B 电流 A
Inlet air temperature of mill B 磨 B 进口一次风温 ℃
Inlet air press of mill B 磨 B 进口一次风压 kPa
Hot air door opening of mill B 磨 B 热风调门开度 %
Cold air door opening of mill B 磨 B 冷风调门开度 %
Primary air door opening of mill B 磨 B 容量风门开度 %
Bypass air door opening of mill B 磨 B 旁路风门开度 %
B1 side outlet air temperature of mill B 磨 B1 出口温度 ℃
B2 side outlet air temperature of mill B 磨 B2 出口温度 ℃
Coal feeder C output 给煤机 C1 出力 t/h
Coal feeder C output 给煤机 C2 出力 t/h
Mill C current 磨 C 电流 A
Inlet air temperature of mill C 磨 C 进口一次风温 ℃
Inlet air press of mill C 磨 C 进口一次风压 kPa
Hot air door opening of mill C 磨 C 热风调门开度 %
Cold air door opening of mill C 磨 C 冷风调门开度 %
Primary air door opening of mill C 磨 C 容量风门开度 %
Bypass air door opening of mill C 磨 C 旁路风门开度 %
C1 outlet air temperature of mill C 磨 C1 出口温度 ℃
C2 outlet air temperature of mill C 磨 C2 出口温度 ℃
Coal feeder D output 给煤机 D1 出力 t/h
Page 5 of 7
Pulverizing system Performance Test Procedure of Talwandi 3×660MW Project
Description Unit
Coal feeder D output 给煤机 D2 出力 t/h
Mill D current 磨 D 电流 A
Inlet air temperature of mill D 磨 D 进口一次风温 ℃
Inlet air press of mill D 磨 D 进口一次风压 kPa
Hot air door opening of mill D 磨 D 热风调门开度 %
Cold air door opening of mill D 磨 D 冷风调门开度 %
Primary air door opening of mill D 磨 D 容量风门开度 %
Bypass air door opening of mill D 磨 D 旁路风门开度 %
D1 outlet air temperature of mill D 磨 D1 出口温度 ℃
D2 outlet air temperature of mill D 磨 D2 出口温度 ℃
Coal feeder E output 给煤机 E1 出力 t/h
Coal feeder E output 给煤机 E2 出力 t/h
Mill E current 磨 E 电流 A
Inlet air temperature of mill E 磨 E 进口一次风温 ℃
Inlet air press of mill E 磨 E 进口一次风压 kPa
Hot air door opening of mill E 磨 E 热风调门开度 %
Cold air door opening of mill E 磨 E 冷风调门开度 %
Primary air door opening of mill E 磨 E 容量风门开度 %
Bypass air door opening of mill E 磨 E 旁路风门开度 %
E1 side outlet air temperature of mill E 磨 E1 出口温度 ℃
E2 side outlet air temperature of mill E 磨 E2 出口温度 ℃
Coal feeder F output 给煤机 F1 出力 t/h
Coal feeder F output 给煤机 F2 出力 t/h
Mill F current 磨 F 电流 A
Inlet air temperature of mill F 磨 F 进口一次风温 ℃
Inlet air press of mill F 磨 F 进口一次风压 kPa
Hot air door opening of mill F 磨 F 热风调门开度 %
Cold air door opening of mill F 磨 F 冷风调门开度 %
Primary air door opening of mill F 磨 F 容量风门开度 %
Bypass air door opening of mill F 磨 F 旁路风门开度 %
F1 side outlet air temperature of mill F 磨 F1 出口温度 ℃
F2 side outlet air temperature of mill F 磨 F2 出口温度 ℃
Page 6 of 7
Pulverizing system Performance Test Procedure of Talwandi 3×660MW Project
The above conditions are all OK, test can be carried out.
上述条件满足试验方案的要求,可以开始试验。