Académique Documents
Professionnel Documents
Culture Documents
1
BYCO PETROLEUM PAKISTAN LTD
HR PROCESSES
2
1. BLUEPRINT AGREEMENT
Signing this document records your agreement to the contents of the Business Blueprint, and
confirms that the remainder of the project can proceed.
Prepared / Verified by :
3
2. LEGEND:
Process Activity
Related to other
Module Decision
Activity step
Document
Decision step
supported by Report or document
information in SAP generated from SAP.
(normally not in
Hardcopy).
4
3. ENTERPRICE STRUCTURE:
Enterprise Structure is either for a company code or for a corporate group grouping on an
enterprise level. The enterprise structure for personnel administration is determined by the
following elements:
3.1 Client
It can either be valid for a company code at the smallest level or for the entire corporate
group.
3.2 Company
It is defined in accounting. Legally required financial statements such as balance sheets and
profit and loss statements are created at the company code level.
Byco is Pakistan’s emerging Energy Company engaged in the businesses of oil refining,
petroleum marketing, chemicals manufacturing and petroleum logistics.
Personnel Area
MARUITIUS PAKISTAN UAE
Personnel Subarea
PORT LOUIS ABU DHABI
5
3.5 PERSONNEL ADMINISTRATION:
For administrative purposes, the employees in an enterprise are divided into two levels. The
highest level is an employee group, the second, an employee subgroup. These levels are
subject to authorization checks, to define remuneration levels or different work schedules.
Employee Group
It is a general division of employees. The employee group defines the relationship between
an employee and the contribution the employee makes to the company in terms of work.
Employee Subgroup
It is a fine division of employee groups according to the position of employees.
Technician Labor
Labor Technician
6
4. ORGANIZATIONAL MANAGEMENT:
Byco organizational structure has been designed to drive business performance
through business units and support divisions.
7
5. TIME MANAGEMENT:
Before the implementation of SAP, the business process time management functions are not
implemented with one another.
AS IS PROCESS TO BE
8
AND FOR THE OVER TIME THE PROCESS WAS
After implementing SAP time management module processes are divided into component
and are integrated with one another and the company personnel sub areas with respect to
code id.
9
1. DAILY WORK SCHEDULE:
The Work Schedule is an essential element of Human Resources. Work schedule will be
defined to every employee according to
The Daily Work Schedule is to be configured as follows to suit the requirement for different
employees
2. TIME RECORDING:
10
TIME RECORDING FOR OVER TIME PROCESS (TO – BE)
3. ABSENCES:
Absences include all Leave types prevalent in BYCO. These leave types are defined as
leaves with Absence Quotas. Accordingly, all Absence Types and Absence Rules carried at
BYCO are shown below.
ABSENCE TYPES
Absence Type Paid / Unpaid Calendar / Full day / < Day
Absence*
Annual Leave Paid Calendar Full day
Sick Leave 100% Paid 30 days Calendar Full day
75% Paid 60 days
Unpaid 30 days
Marriage Leave Paid Absence days Full day
Unpaid Leave Unpaid(*) Calendar Full day
Child Birth Paid Absence days Full day
Hajj leave Paid Calendar Full day
Child birth Paid Absence days Full day
Death Leave Paid Absence days Full day
Exams Leave Paid Absence days Full day
11
4. ABSENCE QUOTA:
5. ATTENDENCES:
When an employee is not at his or her Normal Workplace, but nonetheless is still working
for the enterprise for example business trip, attendance is created. Attendances are divided
into various an attendance types as follows.
ATTENDANCE TYPES
Attendance Type Condition
Meeting Part of the day
Business Trip Open number of days
Training Open number of days
Mission Open number of days
Permission Part of the day
Other Open number of days
12
6. HOLIDAYS:
The Public Holiday Calendar has a central role to play in the scheduling process as well as
in generating Monthly Work Schedules and for Payroll. Public holiday Calendars are defined
at the personnel sub area level to accommodate location specific holidays.
Holiday calendar would have to be created at the beginning of the each Calendar Year and
the Work Schedule would have to be generated accordingly.
13
6. PAYROLL:
Before implementation payroll activity at BYCO is done by the BII payroll department
along with HR and Finance. The payroll department performs all the payroll
calculations based on the inputs given by HR.
Employee increment maintained using Manual procedure.
In BYCO, payroll run takes place at a specific point in time, not only to calculate an
employee’s basic remuneration but also any special payments, overtime payments
that must be effected for the period in question.
Income Tax slabs and its calculations takes places manually and all the deduction
takes place manually.
Payroll take place on 1st to 30th of every month
14
Information will be given to bank by every month 2 days before salary transaction
take place. Salary transaction will happen on 1st of every month.
15
TO – BE PROCESS WILL BE
TO BE PROCESS DESCRIPTION:
The payroll program is run at a specific point in time, not only to calculate an employee’s
basic remuneration but also any special payments, overtime payments or bonuses that must
be effected for the period in question.
Fuel and mobile policy incorporated in internal table. Monthly fuel and mobile allowance
maintenance in customized screen. Retroactive accounting option will be enable for
maintaining the previous payroll period adjustments.
16
6.1 Simulation Payroll:
Payroll administrator runs payroll program in simulation run (test run) and checks the payroll
result before actual run. HR department will run this process to check the correctness of
master data and payroll run. Payroll result for this action is not stored anywhere and it can
only be viewed for the checking purpose.
Master data in that particular payroll area is ‘locked’ to prevent the error during
payroll run by not allowing any user to update or alter any master data while
running the payroll
The system purposes the next payroll period for processing. The control record
maintains information of the last payroll period that has been processed by the
user.
17
7. TRAVEL MANAGEMENT:
Travel management in HUMAN RESOURCE PLANNING lies in the area of employee
travelling expense of business trip, time spends at this trip. SAP at BYCO was implemented
at 2004 before the implementation it as is process are not integrated with each other all was
entered manually in the system.
After implementing SAP the process are integrated to handle employee’s trips in an
organization. It provides integrated functions such as trip planning, trip creation, trip
approval, trip settlement, settlement of travel expenses & expense reimbursement etc.
SAP Travel Management is integrated with two important SAP module Financials (SAP
FICO) and SAP Human Capital Management (SAP HCM).
18
TRAVEL MANAGEMENT PROCESS TO-BE
8. TALENT MANAGEMENT:
Training Needs Analysis (TNA) is the process in which the company identifies training and
development needs of its employees so that they can do their job effectively. It involves a
complete analysis of training needs required at various levels of the organization. Hence the
company growth rate depends on employee training and development. BYCO provides basic
training for employee to get to their jobs and help them to achieve their goals and personnel
development lies in the same module of talent management
19
AS IS PROCESS OF BYCO
SAP Success Factors Talent Management provides a solution for Training and Development
and personnel development both transparent view on your workforce and supports you
throughout all phases along the employee life-cycle, enabling you to align your employees
with your company goals from on boarding to retirement, to attract talents, build
competencies, plan succession and ensure a performance-based compensation.
Recruiting
On boarding
Learning at your Company
Performance and goals
Compensation
Co operation and networking
20
8.1 TALENT MANAGEMENT PROCESS (TO-BE)
1. Starting from maintaining the Training and Event Catalogue which will be divided
based on business area covered by training.
3. Scheduling actual training/event dates along with reserving the required recourses
for the whole period of the training/event.
21
9. PERSONNEL COST PLAINING:
Before the implementation of SAP, budgeting is done by the HR manager by his own All the
process is done according to the renewal create by the employees their sincerity to their
work.
TO – BE PROCESS
22