CALCULATION OF PILE BEARING CAPACITY – AXIAL COMPRESSION & TENSION
PROYEK LUBUK GAUNG PLANT
DB-2 & DB-5
elev. of ground floor : 1.20 m pile cap
elev. of soil surface : 0.00 m COL : 1.50 m pile cap thickness : 1.50 m pile cap COL : -1.50 m depth elev pile head : 1.50 -1.50 m pile tip : 53.50 -53.50 m pile length: 52.00 m
Area borepile pile elev eff. pile Qa Ta
diameter depth pile tip length recomnd recomnd m m m m ton ton