PLTU BUNTOK 2X7MW NO T3125 - CA/C/T0502-01-RV.

FOUNDATION CALCULATION

Estimate Pile Number of DM Water Treatment Foundation and Check Pile Cap Bearing Capacity

1 QUALITY OF MATERIAL

1 Concrete C-30 ( compressive strength at 28 days ) 300 Kg/cm2

Deformed reinforcing
2 yield strength 4000 Kg/cm2
steel bar (fy)
Plain reinforcing
3 yield strength 2400 Kg/cm2
steel bar (fy)
C-50 ( compressive strength at 28 days ) 500 Kg/cm2
4 Pile dia 400 mm
Class A ( Axle Load Allowable 110 ton

2 PILE CAPACITY

3 FOUNDATION WITH SPUN PILE

Width B = 1800 mm
Length L = 1800 mm
Thickness Slab T = 600 mm
Depth D = 800 mm
F = 200 mm
Concrete Cover d' = 70 mm
Rebar Size f = 19 mm
Efective width, d = T-d'-0.5 f = 521 mm
Pedestal l = 500 mm
b = 800 mm
Square Pile 400 mm x 400 mm
Design Pile Bearing Capacity = 84 ton

1
PLTU BUNTOK 2X7MW NO T3125 - CA/C/T0502-01-RV.A

3.1 Reaction max from Stad Pro

Fx = 4922 kg
Fy = 36548 kg
Fz = 11065 kg

3.2 Estimate the number of Pile :


Design Single Pile Bearing Capacity P comp all. = 84.177 ton ( see tabel )
Axial Concrete Compressive Strength fc' = 29 mpa
Yield strength deformed bar fy = 392 mpa
For design use the maximum load P max = 36548 kg
= 36.548 ton
Selfweight of Pile Cap
Pile Cap = 1.8 x 1.8 x 0.6 x 2.4 = 4.6656
Pedestal = 0.50 x 0.80 x 0.4 x 2.4 = 0.384
Soil = 1.8 x 1.8 x 0.4 x 1 = 1.296
- 0.50 x 0.50 x 0.4 x 1.0 = -0.1
6.2456

Total ( Pv ) = 36.548 + 6.2456 = 42.79 ton

Pv max = Pv
n
n = 1 ( pile number )
= 42.79
1
Pv max = 42.79 ton 5.3492
P comp. all / P = 84.18 / 42.79
= 1.967046 > 1.0 … (OK)

3.3 Check Sliding of Pile :


d = friction coeff. = 0.45
Hall = 3.2 ( see tabel )
Hall total = n ( *Hall)
= 1 * ( 3.2 )
= 3.200 ton
P = 42.79 ton
H lateral max = 11.07 ton
(P*d + H all )
/ Lateral
= ((42.79 * 0.45 ) + 3.2 ) / 11.07
= 2.029563 > 2 ….(OK) ( Book II 4.5.2.8 )

3.4 Pile Cap Reinforcement


fy = 392 mpa
fc' = 29 mpa

r min = 1.4 / fy
= 1.4 / 392
= 0.0036

2
PLTU BUNTOK 2X7MW NO T3125 - CA/C/T0502-01-RV.A

r max = 0.75 * rb
0.85*b1*f'c 600
= 0.75 x x{ }
fy 600 + fy
= 0.75 x 0.85 * 0.85 *29 x 600
392 600 +392
= 0.75 x 0.053 x 0.60
= 0.024
As min = r min * B * d r min = 0.0036
= 33.5 cm2
As req = 33.46 cm2 used D 16
(17 D16 - 100 )

3.5 Shringkage Reinforcement


t = T /2
= 600 / 2 = 300 mm
As req = 0.0018 * b * t
= 540 mm
use D 13 A f 13 mm = 0.25 * p * d2
= 132.67 mm2
s = A x 1000 = ( 132.67* 1000 ) / 540
As req = 246 mm ~ 200 mm
Shringkage Reinforcement = D13 ~ 200 mm

3.6 Pedestal Reinforcement


P tot = 42793.60 kg

P tot = f 0.8 * ( 0.85 *fc'*(Ag-As) + As*fy)


lw
{P tot /(0.65*0.8)}-0.85fc'Ag
As =
fy - 0.85fc'
bw
l = 0.50 m As = -145.35 cm2
b = 0.50 m

Ag = 0.25 m2 = 2500 cm2 = 250000 mm2

As min = 1 % * Ag
= 25 cm2
As req = Max ( AS min, AS1 )
As req = 25.00 cm2 Use D 16
= 16 D16

Stirups
H lateral = Vu =Fx Vu = 4922.0 kg
= 4.92 ton
Nu = Fy Nu = 36548.0 kg

3
PLTU BUNTOK 2X7MW NO T3125 - CA/C/T0502-01-RV.A

Use f 10 - 150
S = 150 mm

Vc = (1+(Nu/14Ag)) 1
/6 fc'1/2 bw d Nu , Ag in (N/mm2)
= 22.30 ton

At = 2.1/4. p p 2 = 157.080 mm2


Avmin1 = 0.064*f'c^0.5*bw*s/fy = 65.94 mm2
Avmin2 = 0.33*bw*s/fy = 63.14 mm2

Av = max (At, Av min1, Av min2) 157.08 mm2

Vs = Av. Fy.d
s
Vs = 164200.58 N = 16.42 ton

Vn = Vc + Vs
= 38.72 ton

Vn > Vu/ p ,p = 0.75


38.72 ton > 6.56 ton ………… OK