PROPOSED PACKING STATION AND ADMINISTRATION BUILDING AT QURIYAT

UNIT RATE IN ( R.O)


ITEM REF. ITEM DESCRIPTION QUANTITY UNIT AMOUNT ( R.O )
IN WORDS IN FIGURES

MECHANICAL INSTALLATIONS
SANITARY INSTALLATION

Soil, Vent and waste pipe installation

M uPVC pipes to BS 5255/1976 including all fittings and


joints, connections and brackets laid under tiles complete
wherever shown in drawing and to the approval of the
Engineer.

A 42 mm diameter 0 m
UPVC pipes to BS 4514/1983, and BS 4660/1973
including all joints, connections cleaning eye, rodding eye
and brackets laid exposed in walls, In shaft above false
ceiling and under tiles complete wherever shown in
drawing and to the approval of the Engineer.

B 82 mm diameter 0 m
C 110 mm diameter 0 m

D 160 mm diameter 0 m
E Vent cowl with weathering apron 80 mm diameter 0 No.

150x150mm uPVC open top trapped floor drain with best


F 0 No.
quality nickel/bronze grating, joints to pipe with cover

150mm dia. Nickel bronze floor cleanout No.

300 mm x 300 mm gully trap of approx. 400 mm depth


set in concrete Grade 30 N/mm², joints to drain pipes
G complete with 300 mm x 300 mm medium duty ductile 0 No.
iron cover and fame

To Collection

5/MEP/1 Miles Engineering Consultancy


PROPOSED PACKING STATION AND ADMINISTRATION BUILDING AT QURIYAT

UNIT RATE IN ( R.O)


ITEM REF. ITEM DESCRIPTION QUANTITY UNIT AMOUNT ( R.O )
IN WORDS IN FIGURES
MECHANICAL INSTALLATION (Cont'd…)
RC Sewage Manholes with 600x600 ductile iron heavy
A duty double seal cover & frame as per the design No.
drawings
Supply, install, connect and test the following
approved sanitary equipment complete with traps,
outlets, plug, waste, chains, angle valves etc., including
all connectors and services

Single bowl single drain Pantry s/s sink complete with


accessories, Angle Valves CP mixer, pop up waste, CP
B bottle trap, CP handle, centre tap hole and overflow. 24 No.

High quality censor operated 560x480 mm counter top


wash basin complete with accessories, Angle Valves CP
C mixer, pop up waste, CP bottle trap, CP handle, centre tap 71 No.
hole and overflow.

Supply, install, connect and test the following approved


sanitary equipment complete with traps, outlets, plug,
D waste, chains, angle valves etc., including all connectors 1 Item
and services

E Toilet paper roll holder 39 No.


F Twin wall mounted type Robe hook 33 No.
G Wall mounted type liquid soap dispenser 36 No.
H Water closet (European type ) 57 No.
I Hand dryer (Sensor operated & anti vandalism features) 9 No.

To Collection

5/MEP/2 Miles Engineering Consultancy


PROPOSED PACKING STATION AND ADMINISTRATION BUILDING AT QURIYAT

UNIT RATE IN ( R.O)


ITEM REF. ITEM DESCRIPTION QUANTITY UNIT AMOUNT ( R.O )
IN WORDS IN FIGURES

MECHANICAL INSTALLATION (Cont'd…)

Chromium plated approved ablution faucet with angle


A 8 No.
valve, hose and spray unit

3000x1000 mm mirror, 6mm thick, bevel edged plywood


B 11 No.
backing, fixed with CP dome headed screw.

1000x800 mm mirror, 6mm thick, bevel edged plywood


C 34 No.
backing, fixed with CP dome headed screw.
COLD WATER INSTALLATION
Supply, install the following thermal insulated copper
pipes work to BS 2871 and fittings to BS 864 / EN-1057,
R-250 including connections up stand and brackets laid
under ceiling or wall concealed, over false ceiling, walls
with wall chase complete, wherever shown in drawings
and or specified and to the approval of the Engineer.

D 15 mm diameter 0 m

E 22 mm diameter 0 m

F 28 mm diameter 0 m

G 35 mm diameter 0 m

H 42 mm diameter 0 m

I 54 mm diameter 0 m

J 67 mm diameter 0 m

To Collection

5/MEP/3 Miles Engineering Consultancy


PROPOSED PACKING STATION AND ADMINISTRATION BUILDING AT QURIYAT

UNIT RATE IN ( R.O)


ITEM REF. ITEM DESCRIPTION QUANTITY UNIT AMOUNT ( R.O )
IN WORDS IN FIGURES

MECHANICAL INSTALLATION (Cont'd…)


HDPE Pipes & fittings

A 63 mm diameter 0 m
HOT WATER INSTALLATION

Supply, install the following thermal insulated copper


pipes work to BS 2871 and fittings to BS 864 / EN-1057,
R-250 including connections up stand and brackets laid
under ceiling or wall concealed, over false ceiling, walls
with wall chase complete, wherever shown in drawings
and or specified and to the approval of the Engineer(.Anti-
corrosive insulation to hot water pipes(provide 19mm
armaflex and cora cloth for above ceiling installations and
2mm thick grease impregnated type covered with
polyester for concealed installaions diameter

B 15 mm diameter 0 m
C 22 mm diameter 0 m

Two layers of Denso tape and PVC film to pipes for cold
water pipes concealed installation, diameter

D 15 mm 0 m
Pipe work Ancillaries
Supply and install the following Isolating valves to BS
5154 series 'B' bronze, wedge gate pattern, screwed joints
with adaptor to pipes etc. wherever shown in drawings
and or specified and as approved by the Engineer.

E 22 mm diameter 0 No.

To Collection

5/MEP/4 Miles Engineering Consultancy


PROPOSED PACKING STATION AND ADMINISTRATION BUILDING AT QURIYAT

UNIT RATE IN ( R.O)


ITEM REF. ITEM DESCRIPTION QUANTITY UNIT AMOUNT ( R.O )
IN WORDS IN FIGURES

MECHANICAL INSTALLATION (Cont'd…)


A 28 mm diameter 0 No.

B 35 mm diameter 0 No.

C 35 mm diameter 0 No.

D 42 mm diameter 0 No.

E 54 mm diameter 0 No.

F 67 mm diameter 0 No.

Equipment and Accessories

Supply and install the following equipment and


accessories as specified, including all connections and
fittings.
Cooking Range
G 19 No.
4m x 3m x 1 m High GRP sectional panel type insulated
water storage tank with float valve, valves and S.S. nuts &
H bolts to approval including epoxy coated base frame on 24 No.
civil pedestals/ foundation all as per the specification &
drawing

Cold water booster pump set mounted on anti- vibration


I pads (01 duty /01 standby ) duty: 1.4 ips @ 2.0 bar 2 No.
pressure vessel :100 ltrs
J Shower Tray 35 No.
50 litter capacity, horizontal type copper tank electrical
K 62 No.
water heater with Angle Valves & safety valve.

To Collection
5/MEP/5 Miles Engineering Consultancy
PROPOSED PACKING STATION AND ADMINISTRATION BUILDING AT QURIYAT

UNIT RATE IN ( R.O)


ITEM REF. ITEM DESCRIPTION QUANTITY UNIT AMOUNT ( R.O )
IN WORDS IN FIGURES

MECHANICAL INSTALLATION (Cont'd…)

A Water meter including 02 valves, strainer 1 Set

Air Vent

B 15 mm diameter 2 No.

C Supply & Installation of cast iron rain water outlets 10 No.

Supply & Installation of 110mm dia.uPVC rain water


D 145 mt
pipes

E 150X150mm nickel bronze grating with uPVC floor gully 1 No.

5mm dia water connection to foot dip area with IV


F
including other accessories

UV water purifier with all necessary connections and


G 1 Item
accessories

Cold Room Refrigation Units

Necessary water, drain and electric connections with


H 1 Item
required valves and other accessories

To Collection

5/MEP/6 Miles Engineering Consultancy


PROPOSED PACKING STATION AND ADMINISTRATION BUILDING AT QURIYAT

UNIT RATE IN ( R.O)


ITEM REF. ITEM DESCRIPTION QUANTITY UNIT AMOUNT ( R.O )
IN WORDS IN FIGURES

MECHANICAL INSTALLATION (Cont'd…)

SUNDRIES

Supports

A Supports, which shall include fixings, anchors, insulating 1 Item


blocks and anti-vibration devices
Identification

B Identification, which shall include plates, discs, labels, 1 Item


charts and colour coding
Testing and commissioning

C Testing and Commissioning, which shall include 1 Item


operating completed installations and providing fuel and
power
Tools and spares item

D Tools and spares, which shall include loose keys and 1 Item
consumable stores
Documents

E Documents, which shall include drawings, operating 1 Item


instructions and maintenance manuals
General requirements

F Co-ordination with other Engineering installations and 1 Item


other Contractors
G Cutting or forming holes, mortices, chases or the like and 1 Item
making good finishing

To Collection

5/MEP/7 Miles Engineering Consultancy


PROPOSED PACKING STATION AND ADMINISTRATION BUILDING AT QURIYAT

UNIT RATE IN ( R.O)


ITEM REF. ITEM DESCRIPTION QUANTITY UNIT AMOUNT ( R.O )
IN WORDS IN FIGURES

MECHANICAL INSTALLATION (Cont'd…)

A Building in or cutting and pinning brackets or the like 1 Item


and making good finishing
Protective painting and decorative painting works

B Removing protective coating or wrapping 1 Item

C Cleaning and polishing exposed surfaces 1 Item

TENDERER'S ADJUSTMENTS

Additional items

The Contractor shall list here and price any items shown
on the Drawings, mentioned in Specification or required
for the satisfactory completion in co-ordination with all
D 1 Item
contract document details related to Mechanical
Installation, but not mentioned herein

To Collection

5/MEP/8 Miles Engineering Consultancy


PROPOSED PACKING STATION AND ADMINISTRATION BUILDING AT QURIYAT

UNIT RATE IN ( R.O)


ITEM REF. ITEM DESCRIPTION QUANTITY UNIT AMOUNT ( R.O )
IN WORDS IN FIGURES

COLLECTION MECHANICAL WORKS

5/MEP/1

5/MEP/2

5/MEP/3

5/MEP/4

5/MEP/5

5/MEP/6

5/MEP/7

5/MEP/8

TOTAL CARRIED TO GRAND SUMMARY-GS

5/MEP/9 Miles Engineering Consultancy