S.NO LOCATION ENGINEER SUPERVISOR


1 ADMIN (INTERNAL) RAMESH &NAGARAJU S.BASU MATHREY

ADMIN (EXTERNAL) SURESH &VINOD

2 STORAGE CUBICLES ANOOP&SRINU(QC) MADHU

3 GATE COMPLEX SURENDER

4 SUB STATION SURENDER

5 WATCH TOWERS GATTAIAH HITESH(CONCRETE)


PRUDVI(MASONARY)

6 CHAIN LINK FENCING RAMARAO

7 O.H.T HITESH
8 BARRACK VINOD

9 U.G.T

10 ROADS& BRIDGE GATTAIAH &SRINU

11 ELECRTICAL SURESH&SAMPATH

12 MATERIAL SHIFTING CHANDAN


13 R.R.STONES COLLECTING CHIRANJITH
TOTAL

*M-MASON
*L-LABOUR
ACTION PLAN FOR TOMMRROW(10-08-2018)
REQUIRED
TASK MASON LABOUR MACHINERY M-30
LIFT
2 4
ELECTRICAL PATCHES
CLADDING AT JAMBS
TERRACE SCREED 4 10
HOUSE KEEPING 6
A.C.P (BATH ROOM LOWERS )
FALSE CEILING
PAINT FINAL COAT IN G.F
GRILLS FIXING IN F.F (2 NO'S)
H.V.A.C

P.C.C.IN PLINTH
DRESSING &P.C..C. IN WALK WAY 2 12 JCB

DOZER & ROLLER


SITE DEVELOPMENT
TILES IN WALK WAY
FLAG POST WORK(GRANITE WORK)

TOUCHUPS FOR AHU-1&2


DRAIN FINISHINGS
4 10
GRAVEL FILLING IN BERMS J.C.B& TRACTOR
HOUSE KEEPING
PRECAST SLABS FIXING
HVAC

MANHOLE COVERS PRE CASTING


ACID WASH 1 6
DRESSING
A.C.P.

PLINTH
TOUCHUPS

NO:7-PLASTERINGS
NO:8-PLASTERINGS
NO:9-PLASTERINGS

BOX COULMN FIXING FOR C.L.F.GATE 1 2


BARBED WIRE FIXING

REINFORCEMENT IN WALL
D.I.LINE

WATER PROOFING

PITCHING
R.R.MASONARY FOR DRAINS STONES
KERBSTONES FIXING 2 4
GRAVEL FILLING IN ALL DIVIDERS& BERMS
LEVELLING J.C.B.

WIRING
DRESSING FOR POLES 4

6
4 J.C.B.
16 68 0.00
8-2018)
UIRED
M-25 M-20 M-7.5 ENGAGED GANGS REMARKS

DINESH
30.00 8.40 Mtr LVL

NAZIR
ALOK GUPTA
RAMNATH YADAV
SALAUDDIN
RAMARAO(I COOL)

TILES NOT REACHED TO SITE


DINESH

RAMARAO(I COOL)

NAZIR ABSENT

MALLESH

GUDDU&PRADEEP

JANGAIAH

TAPAN
PIDILITE

VEERAIAH
ANJANEYULU ,CHENNAIH& RAVI STONES SHORTAGE
STONES SHORTAGE
RAHUL REDDY
NARSAIAH(RS.1300/- PER PAIR BATCH)