Column Design Check Summary F/F Column/ H-2

Action on Column (Characteristic Loads)

Vertical Load
(Axial load) Sway Moment
Primary Load Case
X-X Y-Y
Ton Ton-M Ton-M Legend
Dead Load, D 142.92 18.09 10.45 D Dead Load
Live Load, L 32.57 1.77 0.89 L Live load
Plant Load, P -2.4 0.055 0.027 P Plant load
Wind Load, W 1.13 0.32 0.24 W Wind load
Seismic Load, S 16.99 2.63 11.67 S Seismic load

Vertical Load Sway Moment


ULS load combination (Axial load) X-X Y-Y
Ton Ton-M Ton-M
Without Plant Load
1.4D+1.6L
1.2D+1.2L+1.2W
1.1(1.2D+0.5L±1.0S)
With Plant Load
1.4D+1.6L
1.2D+1.2L+1.2W
1.1(1.2D+0.5L±1.0S)

Rebar Requirements for the necessary load combination


300mm
Column steel are needed Y
Extra to resist
Total Steel
800 mm

For Axial load column


area
ULS load combination only (Vertical bending due to x
actually
load) horizontal
needed
sway
steel, mm2 steel, mm2 steel, mm2 Y
Without Plant Load
Either 1.4D+1.6L 4159 Plan of
Or 1.2D+1.2L+1.2W 2522 Column C4
Or 1.1(1.2D+0.5L±1.0S) 5837
With Plant Load
Either 1.4D+1.6L 4122
Or 1.2D+1.2L+1.2W 2511
Or 1.1(1.2D+0.5L±1.0S) 5827

Column Rebar
provided in the 2864 mm2
SAPL design
Short Column Design
Column size= 200 800 mm
d= 765 mm
Self weight Lever arm, a= 730 mm
Imposed load
Roof load due to a/c unit fc= 30 N/mm2
Wind Pressure fy= 460 N/mm2
Earthquake load
Axial load,N= 2400 KN
Moment, M= 6 KN-m

Min rebar, 0.4%= 640 mm2


Total rebar= 6 mm2
Rebar for N= 2336.1454 mm2
Rebar for M= 20.537676 mm2

Total rebar= 2356.683 mm2