Académique Documents
Professionnel Documents
Culture Documents
Signature
(Signed) (Signed) (Signed)
Pham Thi Hong Hanh Nguyen Van Duong Dương Hùng Văn
Phó phòng ATCL Trưởng phòng KT Giám đốc
Name
Deputy HSEQ Manager Technical Manager Director
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
1. CONTENTS
3. Planning 15-17
- Risk management on occupational health, safety and environment.
- Identification and accessment of legal and mandatory HSE
requirements.
- HSEQ Objectives
5
- Planning of HSEQ Objectives
4. Responsibility, authority and Communication 17-18
- Responsibility and authority
- Management Representative
- Internal communication
- External communication
- Consultation and communication of HSEQ management system’s
requirements
5. Management review 18
Resource management 19-22
1. Human resources
6 2. Infrastructure
3. Working environment
4. Ocupational health
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 3/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 4/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
Abbreviation Definition
PTSC Petroleum Technical Services Corporation
POS PTSC Offshore Services Co., Ltd.
HSEQ Manual Health - Safety - Environment - Quality Manual
Interested parties: Peerson or group concerned with or affected by the operation and
performance of POS, such as customers, owner, partners, national
or local authorities, social / environmental bodies, surrounding
community or POS staff, ect.
HSE: Health, Safety and Environment
Project: Whole activities to implement the contracts between POS and its
partners or contracts between PTSC and its partner which assign
POS to manage and implement
Supplier: An individual, company or other legal entity that carries out work
or performs services pursuant to a contract for service. In this
document, the term contractor includes all subcontractors.
Audit: A systematic and independent examination or review of all or part
of a Project or operation to determine whether activities and related
results comply with Company established systems and whether
these systems have been implemented effectively and are suitable to
achieve the objectives.
Safety: A state in which the risk of harm (to persons) or damage is limited
to an acceptable level
Hazard Any agent, source or situation with the potential to cause injury,
damage, loss or adverse environmental impact.
Job Safety Analysis An analysis of the tasks undertaken in a job or process to ensure any
risk associated with all steps are identified and controlled.
Risk Assessment An assessment or analysis of hazard that will result in loss with
definable consequences, and actions to eliminate or mitigate the
consequence.
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 6/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
PTSC Offshore Services has established a logical management system in order to:
- Increase revenue and profit by speed up the management efficiency and optimize the
operation and business process.
- Eleminate or mitigate the risk of safety and occupational health’s employees and interested
parties which caused by POS’s operations.
- Prevent the environmental impact that raise from POS’s bussiness operations.
- Be the foundation of continual improvement action to satisfy the requirement of customer,
employee’s benefit, do not cause the bad effect to environment and social.
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 7/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 8/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
HSEQ Manual
Process Procedures,
Operational control & audit
Procedures used within POS’s divisions
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 9/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
HSEQ Manual may be sent to customers, authority bodies, certificate issuing authorities or
concerned parties. Distribution of HSEQ Manual to external organizations/ individuals is only
carried out beyond the official approval in writing of Board of Directors.
Document of Layer II: Management system procedures, Operation control procedure and Work
instruction to control the operations of all departments and the workshop
Documents of this layer indicate how to control activities of PTSC Offshore Services and
provide work method to any work releases. These documents aim to ensure the daily work
stability of POS’s people and equipment in term of quality and safety, and environment
Users of documents are those who directly get involved in work activities.
Documents of Layer III:
HSEQ documentation are evidences recording the outputs of jobs/works performance in
accordance with procedures and instructions such as Form filled, reports, memorandums of
meeting and records of operation working.
Legal documents, regulations, documents of external origin (from Petro Vietnam, PTSC,
competent authorities of the State) are maintained and preserved by the company so as to serve
Company's activities and comply with requirements by applicable laws.
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 10/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
Quality & HSE policy of POS is popularized and applied to all employees. PTSC Offshore
Services Co., Ltd establish the HSE target and HSE management method base on HSE policy
and the practical operations of POS.
5.3. Planning
POS Management system is set up base on analysising all processes of the company as well as
corollary risks to human health and safety, environment or legal requirements
Processess are identified through defining inputs, outputs, risks, resources and adquate
operational control measurements
5.3.1. HSE Risk management
Risk management principles as incorporated in the POS philosophy are fundamental to the POS
HSEMS and shall be adopted to ensure hazards are identified, assessed and managed in all
Divisions and Projects. No matter how small the risk, assessment and control must be a priority.
Following the completion of the hazard identification process there is the need to establish
priorities for action as not all hazards present the same level of risk.
When determining priorities it is necessary to consider the most likely consequence(s) of the
sequence of events, the likelihood or probability that the consequence will occur once the
exposure to the hazard occurs and which controls need to be established to reduce the risk to as
low as reasonably practicable .The POS risk assessment matrix is a method for ranking hazards.
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 11/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
HSEQ Dept. co-ordinate with related departments defining the safety, health and environment’s
risk assessment for POS bussiness operations and for the job POS implement in the first time.
5.3.1.1. Hazard Identification
The hazard identification process generally involves a systematic review of an area, process or
operation against selected key headings. This organised approach ensures no areas are
overlooked and every possible hazard is identified. The resulting documentation must then be
distributed through the project to relevant parties so they can incorporate the required actions
into their safe working systems or procedures.
When determining priorities it is necessary to consider the most likely consequence(s) of the
sequence of events, the likelihood or probability that the consequence will occur once the
exposure to the hazard occurs and which controls need to be established to reduce the risk to as
low as reasonably practicable .The POS show a method for ranking hazards in Risk assessment
Form (annex 4), Evaluation of environmental aspects and impacts matrix (annex 5).
5.3.1.3. Risk Management
The final phase of the risk management process is risk control. The following hierarchy of risk
control establishes the order of review for effective control measures:
1. Elimination (Remove the hazard, ie take out of service)
2. Substitution (ie Replace with a less dangerous or hazardous procedure or chemical)
3. Engineering controls (eg. alarms, barriers, bunding, guards, noise hoods, mechanical
extraction ventilation, fire deluge, etc.)
4. Administrative controls (eg. training, procedures, work rotation)
5. PPE (eg. head, eye, hand, foot, respiratory protection)
Control measures must be documented and incorporated into the various work processes and
procedures. JSA’s or safe work systems need to take into account the relevant control measures,
and any new hazards introduced as a result of the Risk Reviews.
Related document:
- Procedure for Risk identification and assessment (POS-HSE-PR01)
- Procedure for Risk analysis (POS-HSE-PR02)
- Identification and evaluation of Environmental aspects and impacts procedure
(POS-HSE-PR41)
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 12/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
Divisional HSE performance targets shall be established annually by the Division HSE
Committee targeted to achieve annual Corporate goals.
HSEQ Dept. is in charge of collect and classify the implementing Quality objective and HSE
Target of POS per 6 months and one year periodically, report to QMR and Board of Director to
have the corrective or adjustment action timely.
The HSEQ target implementing report is a content in Management Review meetings.
Related document
- Department’s function and responsibility (POS-QUA-PR02)
- Organization Chart, Job description (POS-QUA-PR08)
- Safety management organization (POS-HSE-PR05)
- Decision of PTSC’s Director regarding the approval of organisation chart and personnel
assigned to POS.
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 14/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
Official meetings shall be organised with attendance of Company’s management to review the
suitability and effectiveness of the QMS in compliance with ISO 9001:2000 standards. The
management review is held annually beyond the internal quality audit or ad-hoc meetings
whenever necessary.
The inputs of review meetings base on the reports of operations performance from related
departments, results from internal or external audits, results from preventive, corrective and
improved actions, performance of quality objectives, situations of product and service quality
...etc.
Related documents:
- Management review procedure (POS-QUA-PR05)
6. RESOURCES MANAGEMENT
To achieve quality objectives, POS Management shall determine and fully provide sources
needed at all times. The identified sources include:
- People
- Workshops, equipment, tools, materials,
6.2 Infrastructure
All machine, equipment and tools are identified and managed by the persons “responsible for
materials" in the company. The management is performed through the list and historical record
of equipment at each department.
According to these lists, the persons-in-charge will set up a schedule in terms of time,
maintenance, repair to maximize the capacity and accuracy of machine and equipments during
operations process.
Purchasing plan of machine and equipment that help to improve the company production
productivity shall be reviewed and planned by Board of Directors for each type of equipment or
periodic maintenance. Such purchased items shall always meet standards of the industry, legal
regulation and related convention.
Related documents:
- Equipment management procedure (POS-ENG-PR01)
- Material & equipment procurement procedure (POS-PRO-PR01)
Related documents:
- HSE Procedures (POS-HSE-PR…)
- Staff of the month program
- Hazob progarm
- Kaizen Program
- 5S Program
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 16/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
Employees must present themselves for work in a fit state to perform their duties.
Persons suffering from any condition that may reduce or inhibit their capacity to perform their
work safely including being under the influence of alcohol, illegal drugs or other prohibited
substances are in breach of the POS’s Policy. Education and training will be provided on projects
to outline the physical, psychological and social implications of issues affecting the fitness of
mind and body.
6.4.2. Health Management
Projects are required to identify and implement a proactive occupational health program
consistent with the local environment and legislation. Where elimination is not practicable, all
statutory requirements and industry best practice procedures shall be implemented to manage
and minimize exposure. Details shall be included in the SMP and include the following where
necessary:
Health checks / vaccinations particularly for those working in high health risk countries or
environments
Pre-employment medicals
Monitoring of the work environment for health hazards
Monitoring of personnel who may be exposed to particular hazards
Medical examinations shall be performed by Company nominated doctors / medical
centres, where practicable. The records are to remain strictly confidential under the control
of the Human Resources department.
6.4.3. Injury/Illness Management
The POS’s injury management policy states a firm commitment to the rehabilitation of POS
employees who suffer disability through work-related injury or illness and to ensure injured
employees are assisted in their recovery and early return to work. Should legislation apply that
has different or more stringent requirements, these shall be incorporated in the SMP.
On all projects, contact shall be made with local medical and rehabilitation providers, to inform
them of POS injury management procedures and available suitable duties should they be
required for the rehabilitation process.
The SMP shall specify the local procedures and resources to be maintained to stabilize and treat
personnel who suffer injury or illness on Division sites. This shall include as a minimum:
Notification to the HSEQ Manager
First aid resources sufficient for foreseeable injuries
Attention of an occupational health nurse, paramedic or doctor for on site treatment of
serious injuries
Emergency evacuation (medivac) procedures for emergency medical treatment
Prompt information by competent personnel to relatives of the person injured.
Related documents:
- Office Emergency Response Plan (POS-ERP-01)
- Employee Health Management procedure (POS-HSE-PR17)
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 17/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
7. PRODUCT REALIZATION
7.1 Planning of service realization
In daily operations, the acceptance of requirements on service quality is clearly stipulated in
existing procedures and work instructions.
Requirements on service quality are reflected through customer’s expectation, laws, conventions,
statutes, and etc. These requirements are normative standards to accept service products.
Activities of monitoring, reviewing, testing needed to the services are presented in details in
operating control procedureand review procedure of each production units.
Records on review are prescribed under format of “Review Report” and inclusive of place and
time of storage so as to provide evidences of implementation processes and created services to
meet various requirements.
For major contracts, projects or each quality objectives, A formal document called “Quality
Plan” are composed for the implementation.
Quality Plan encompasses:
- Steps of work to be done.
- Responsibilities of performance and completed date for each step.
- Review contents, auditors and required standards.
Related documents:
- Anual quality plan
- Anual HSE plan
7.2 Customer-related processes
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 18/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
Related files shall be recorded at Commercial Departments or at any Departments where the
service orders are placed on.
PTSC POS will settle the above review only if the notice of services are delivered from
Commercial Department or any Department receiving service orders.
The purchasing affairs will be carried out by PTSC Offshore Services Co., Ltd. or “mother”
company PTSC.
7.3.1 Purchasing process
PTSC Offshore Services Co., Ltd considers the quality of bought products or services as the
most importance factor no matter how they are purchased.
The assessment and selection of suppliers shall be made on the basis of:
- Procedure for assessing and selecting suppliers & sub-contractors (POS-HSE-PR12),
the company ps a list of competent Suppliers who are officially invited to offer their
quotations for service required. Those quotations shall be evaluated in compliance with
the State regulations.
- Each phase of products or services provided by Suppliers/Sub-contractors shall be
evaluated as the assessment basic for the next selection.
All documents related to reviewing, managing Suppliers or Sub-contractors shall be filed at
Technical Department, Commercial Department, Planning & Operations Department and Safety
& Quality Department and used as reference document for the incoming selection.
7.3.2 Purchasing information
Data on goods or services to be bought will be shown under “Purchase order” or “Contract”
Purchased order will be settled by related Departments in lines of applicable standards and must
be subject to the Director’s approval
For major contracts, PTSC Offshore Services Co., Ltd shall provide technical consultation to
PTSC.
In such cases, the evaluation of products or services that need to be bought must be done by a
council comprised of experts from related fields and appointed by the Director. Evaluation
documents shall be recorded.
7.3.3 Inspection and certification of bought products
Goods and services bought must be accompanied with quality certifications. Important goods or
materials shall be inspected by competent inspection authority prior importation accepted.
Quality of service that the company uses from the supplier shall be inspected and assessed by
independent agency or by experts, customers of the company as well as by the company’s
relevant departments.
Backgrounds for inspection are technical specifications that have been sent to suppliers when
tendering or invitation for bids.
PTSC Offshore Services Co., Ltd may carry out an inspection at the Supplier’s facilities if
required. Should the company’s clients found that they need to inspect the facilities of
company’s Suppliers, the Commercial Department shall take the accountability to have this done
and have this content included into the contracts.
Related documents:
- Material & equipment procurement procedure (POS-PRO-PR01)
- Supplier assessment and selection procedure (POS-QUA-PR12)
- Material management and distribution procedure (POS-LOG-PR01)
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 20/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
Related documents:
- Project management procedure (POS-OPR-PR02
- Procedure for O&M service supply and management (POS-OPR-PR03)
- Procedure for manpower service supply and management (POS-OPR-PR07)
- Procedure for engineering design execution and control (POS-ENG-PR04)
- Specific HSE procedures
Related documents:
- Procedure for customer satisfaction monitoring & measurement (POS-QUA-PR01)
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 21/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
The traceability of any products or services provided by PTSC Offshore Services Co., Ltd shall
be identified in corespondance to monitoring requirements presented in files of services supply
process.
Related documents:
- Material identification and traceability procedure (POS-LOG-PR03)
7.6.Customers’ properties
Properties of customers include various kinds of materials brought to POS’s facilities to carry
out the services rendered.
Properties of customers may be preserved at POS’s warehouses or any working areas controlled
by POS
Delivery report of customer’s properties will be compulsorily kept and filed in full.
Any losses, damages or non-compliance with purpose of utilization are notified to the customers
with appropriate solution.
7.7 Preservation of products
Depending on each kind of services supply, PTSC Offshore Sevices Co., Ltd will arrange the
offloading, packing, storage and preservation of products (including properties of clients and
PTSC Offshore Services Co., Ltd as well) throughout the internal process and the delivery of
goods to sites appointed by the customer.
Related documents:
- Project management procedure POS-OPR-PR02)
- Procedure for O&M service supply and management (POS-OPR-PR03)
- Material management and distribution procedure (POS-LOG-PR01)
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 22/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
Measures for implementing the processes of monitoring, measuring, analysis and improvement
aim to make:
- Services provided by PTSC Offshore Services Co., Ltd always meet customers’
requirements
- QMS always in line with production conditions and capacity of service supply
- Effectiveness of QMS is regularly maintained and improved.
Related documents:
- Procedure for receiving and processing client's feedback (POS-QUA-PR04)
- Customer forum record
- Customer feedback
Related documents:
- Internal audit procedure (POS-QUA-PR06)
Related documents:
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 23/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
Related documents:
- Project management procedure (POS-OPR-PR02)
- Procedure for manpower service supply and management (POS-OPR-PR07)
- Procedure for engineering design execution and control (POS-QUA-PR06)
- Procedure for O&M service supply and management (POS-OPR-PR03)
- Procedure for M&M workshop execution management (POS-OPR-PR06)
- Quality control procedure (POS-QUC-PR01)
Related documents:
- Procedure for controlling nonconforming products (POS-QUA-PR10)
- Procedure for receiving and processing client's feedback (POS-QUA-PR04)
SMP’s and EMP’s shall specify the requirements for reporting and investigating HSE incident,
and injury. The classifications and definitions of various types of HSE incidents and injuries is
standardised throughout the Division to ensure a consistent approach.
Related documents
- Non conformity, accident/incident report, (POS-HSE-PR1)
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 24/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
8.2.3 Investigation
The POS investigation level matrix ensures that incidents and injuries are adequately
investigated in accordance with the actual or potential consequences of the event. An
investigation team is assigned to identify immediate and underlying causes and system
inadequacies and establish corrective actions to prevent a recurrence.
All accident/incident investigation reports will be recorded in data base of POS Both lead and
lag indicators are recorded in POS to allow trend analysis, feedback to employees and
identification of areas to be addressed in the HSE Improvement Programs.
The HSE department is responsible for consolidating data from the various Department and
submitting a monthly report to the Board of Directors. All levels of management are responsible
for the regular review of HSE performance and trends during monthly HSE committee meetings.
Related documents
- Investigation and Analysis (POS-HSE-PR12)
The ERP shall identify the roles and responsibilities of all persons and if required also shall
conform to Client emergency arrangements and local requirements.
Project Managers are responsible for adequate provision of ERP resources, including an
emergency response team (ERT). A schedule of emergency training, drills and exercises shall be
developed on all projects in order to test and maintain the effectiveness of the communication
systems, facilities, ERT’s and the ERP.
Related documents
- Contigency plan for office (POS-ERP-01)
- Contigency plan for Workshop (POS-ERP-02)
Related documents
- Data collection and analyzing instruction
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 25/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
Related documents:
- Corrective action procedure (POS-QUA-PR07)
- Preventive and improvement action procedure (POS-QUA-PR09)
- Kaizen program
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 26/27
POS MANAGEMENT SYSTEM CODE: POS-QUA-MN01
APPENDIX
App.1: POS organization chart
App. 2: POS HSE organization chart
App. 3: Risk assessment matrix
App. 4: Environmental impact / aspect assessment matrix
App. 5: POS document registration (incomplying with ISO 9001:2008, ISO 14001:2004,
OHSAS 18001:2007)
THIS DOCUMENT IS UNCONTROLLED IN HARD COPY FORMAT, REFER TO LOCAL NETWORK FOR LATEST REVISION
Effective date: 25/7/2013 Rev.: 04 Page: 27/27