ORDER SUMMARY 1214


Customer: Kinder Morgan

Sales Order: PEND Weeks: 37 Delivery Date: 29-

Order Entry Date: 15-Apr-19 PM Assignation 11-Apr-19 GPS:

Pump Type BB3 Description SM 6x12A - 5 stages

Material S-6 Req. de Mtls de Origen:

Casing Carbon Steel MTR

Impeller 12% Cr MTR

Shaf AISI 4140 MTR

Duplex SS case wear


Case Wear Rings rings w/Stellite MTR

Baseplate

Drawings for Approval N/A Commited Date: OPTION A - RELEASED TO MANUFACTURE - NO H

* 4 complete pump systems


Special Note: * 1 spare pump + motor + seal + coupling + Plan 31[(No baseplates, no instruments (provisions only),
includes primary SFP 31 piping (shipped loose)]

Buy Outs
Applicable Estimated Delivery Brand Short Descripti
(Y/N) Time

API Complete Test (un-witnesse


32 weeks (6 weeks for TECO Canada
dwgs + 1 week for
Driver YES approval + 25 weeks for (NO OTHER VENDOR 1,500 HP / 3,600 RPM 4,000V
ALLOWED) - details, accessories, special feat
delivery). construction adders shown in a

19 weeks (6 weeks for


dwgs + 1 week for John Crane (NO OTHER
Mechanical Seal YES approval + 12 weeks of VENDOR ALLOWED) Single cartridge mechanical se
delivery).

File: 419452842.xlsx Sheet: 1 of 6 Date: 14-May-2015


"Flexibox" brand requested
13 weeks (4 weeks for Metastream TSCS 0500
dwgs + 1 week for John Crane (NO OTHER
Cople: YES approval + 8 weeks of VENDOR ALLOWED) Priced as per GPS: Non-standar
balance, Axial limited end float,
delivery). reduced stiffness for torsio

19 weeks (6 weeks for


dwgs + 1 week for John Crane (NO OTHER
Plan 31 YES approval + 12 weeks of VENDOR ALLOWED) Cyclone separator for
delivery).

19 weeks (6 weeks for


dwgs + 1 week for John Crane (NO OTHER
Plan 65A YES approval + 12 weeks of VENDOR ALLOWED) Plan 65A
delivery).

19 weeks (6 weeks for Water test seals as per JC quote:


dwgs + 1 week for John Crane (NO OTHER
Test Seals YES approval + 12 weeks of VENDOR ALLOWED) cartridge seal c/w code O28 F55
sleeve, collar & flush
delivery).

Pump bearing RTD's and vibration


common NEMA 7 junc
* 2 Vibration Transmitters (Vitec)
without display mounted on the b
per bearing housi
ROSEMOUNT / VITEC (NO
Instrumentation YES 8 - 10 weeks OTHER VENDOR ALLOWED) * 1 RTD (Rosemount) (Pt100, 3
bearing housin
* 1 RTD (Rosemount) (Pt100,
bearing housin
* 1 Casing temperature RTD (R
thermowell

John Calupca
Phone: 770-751-4262 cell: 770-841-5149

2 pumps + 1 spare pump - PPL Greensboro Tank Farm - 6907-A WEST MARK
Incoterm: DAP Contacto:
GREENSBORO, NC 27409

2 pumps - PPL Martinsville Pump Station - VA ROUTE 702 - (Beckham Church Rd) at
Axton, VA 24054

Installment:
20% Approval drawings submitted to KM
30% On date of July 22nd
25% On date of Sept 9th
15% Notification of readiness to ship
10% Upon material receipt and acceptance by KM

File: 419452842.xlsx Sheet: 2 of 6 Date: 14-May-2015


1x radial sleeve bearing
2x anti-friction thrust bearing
1x case gasket
Spare Pats YES 3x labyrinth ring
1x labyrinth ring
2 x mechanical seals

Patterns: Paint
Surface cleaning to SSPC SP-6 Zinc rich epoxy coating
Existance YES System Urethan finish top coating Ruhrpumpen standard blue color

Changes Required NO Color: RP Blue


Relocation Required YES
Performance YES Witness YES 1 hr + vibration check & Dismantling after test

NPSH YES Witness YES

Hydrotest YES Witness YES 4 hour test & seal flush piping (non-witnessed)

Balance YES Witness NO DIN ISO 1940 Grade 2.5

RX YES Witness NO seal/ flush piping

Engineering Analysis Lateral Analysis

Packing

Documentation
Paq. 1 Paq. 2 Paq. 3 Paq. 4 Adicional:

Hard Copy Electronic Documentation in Customer Portal


Originals:
Copies
Documentation Contact
Name E-Mail
Address Tel

Project Team
OSE: Debra Ingram Purchasing: Araceli Rios Documentation:

ISE: Steven Koalenko Product Engineer PEND PLS

Order Entry: Namett Romero Project Engineer: PEND Project Manager:

File: 419452842.xlsx Sheet: 3 of 6 Date: 14-May-2015


Proyect (s)
1400048

29-Dec-19

930274

QTY 5

NO

API Pump:
YES

NACE

NO

O HOLDS

iption

essed) for each motor

0V / 3 Phase / 60 Hz
features, and testing &
n attached quotation

al seal, model 1648

File: 419452842.xlsx Sheet: 4 of 6 Date: 14-May-2015


ed - Equivalent to
500 coupling.
ndard DBSE, ISO G2.5
oat, taper bore. Need
orsional analysis

for Plan 31

ote: Type 8-1 is a single


55 1 O28 O58 1 and SS
ush gland

tion detection wired to


unction box.
tec) (Output: 4-20 mA)
he bearing housing (one
ousing).
00, 3-wire) on thrust
using
00, 3-wire) on radial
using
D (Rosemount) c/w
ell

ARKET STREET -

) at Wade Place Road

File: 419452842.xlsx Sheet: 5 of 6 Date: 14-May-2015


PEND

Juan Carlos Cardenas

Carlos Garcia /
Michael Williams

File: 419452842.xlsx Sheet: 6 of 6 Date: 14-May-2015