Dineshchandra Agrawal Infracon Private Limited


2
3
PROJECT NO. MPRDC_PKG-03_Jobat Nanpur
4
5
Final Summary For BOQ of Structures
6
7
Sr.No Description Unit 8
9
10
1.0 GENERAL / INITIAL WORKS No. 11
1.1 Bore hole for soil investigation including test report etc m 12
13
1.2 Pile load Tests 14
1.2.1 No of Initial load tests for verical loading for1000mm dia Nos. 15
1.2.3 No of Initial Lateral load tests for 1000mm dia Nos. 16
1.2.4 No of routine tests for vertical loading of 1000mm dia Nos. 17
18
2.0 FOUNDATION 19
2.1 Pile Foundation (Bored Cast in situ) 20
2.1.1 No of vertical piles 1000mm dia Nos. 21
22
2.1.2 Boring in Soil for 1000mm dia piles Rm 23
24
2.1.3 Concrete of grade M35 m3 25
26
2.1.4 TMT bars S 500 MT 27
2.1.5 Permanent Steel Liner (6mm thick) MT 28
2.2 Pile Cap 29
2.2.1 Excavation in soil m3 30
31
2.2.2 M15 levelling course m3 32
33
2.2.3 Concrete of grade M35 m3 34
35
2.2.4 TMT bars S 500 MT 36
37
38
2.3.1 Open foundation 39
3
2.2.1 Excavation in soil m 40
41
2.2.2 M15 levelling course m3 42
43
2.2.3 Concrete of grade M40 m3 44
45
2.2.4 TMT bars S 500 MT 46
47
3
2.2.5 M15 PCC Annular Backfilling m 48
2.4 Well foundation 49
2.4.1 Well Cap m3 50
51
2.4.2 Well Steining m3 52
53
3
2.4.3 Well Curb m 54
55
2.4.4 Intermediate Plug m3 56
57
2.4.5 Top Plug m3 58
59
3
2.4.6 Bottom Plug m 60
61
2.4.7 Sand filling m3 62
63
2.4.8 MS Steel in curb MT 64
65
2.4.9 Steel in well foundation MT 66
2.4.10 Sinking well dia 7m 67
0-3 Rm 68
3-10 Rm 69
10-20 Rm 70
20-30 Rm 71
30-40 Rm 72
2.4.10 Sinking well dia 7m 73
0-3 Rm 74
3-10 Rm 75
10-20 Rm 76
20-30 Rm 77
30-40 Rm 78
79
2.4.11 Construction of Temporary island Nos 80
3.0 SUBSTRUCTURE 81
3.1 Piers / Abutment Column/Vertical Walls 82
3.1.1 M40 Concrete m3 83
84
3.1.2 TMT bars S 500 MT 85
86
3.2 Pier caps 87
3.2.1 M40 Concrete m3 88
89
3.2.2 TMT bars S 500 MT 90
91
3.3 Abutment Cap,Dirt wall,Return Wall 92
3.3.1 M40 Concrete m3 93
94
95
96
3.3.2 TMT bars S 500 MT 97
3
3.3.3 Back filling behind abutment m 98
3.4.4 Filter media behind Abutment wall m3 99
3.4.5 Weep holes (75mm dia, PVC pipes) Nos 100
101
3.5 Bearing Pedestal & Seismic Restrainer 102
3
3.5.1 M40 Concrete m 103
104
105
3.5.2 TMT bars S 500 MT 106
3.5.3 Elastomeric pad without steel laminates cm3 107
108
4.0 SUPERSTRUCTURE 109
4.1 Precast 'I' Girder (RCC/Post Tensioned) 110
4.1.1 No. of precast Girders No.s 111
4.1.2 Concrete of grade M50 PSC Beam m3 112
4.1.3 Concrete of grade M40 RCC Beam m3 113
4.1.4 Hight Tensile Steel ( Strands) MT 114
4.1.5 TMT bars S 500 MT 115
4.1.6 Structural Steel Grade E410 MT 116
4.1.7 Concrete of grade M50 PSC Box Girder (Cast In Situ) m3 117
4.1.8 Transverse Hight Tensile Steel ( Strands) (flats 5T15) MT 118
3
4.1.9 Concrete of grade M45 Spine Beam m 119
4.1.10 Concrete of grade M45 Spine Wings m3 120
4.1.11 Concrete of grade M50 in ARCH m3 121
122
4.2 Cast in situ works 123
4.2.1 M40 Concrete m3 124
125
4.2.2 TMT bars S 500 MT 126
127
128
5.0 CRASH BARRIER & Median Parapet 129
5.1 M40 Concrete + TMT bars S 500 (crash Barrier) RM 130
5.2 TMT bars S 500 MT 131
5.3 Pedestrain railing Concrete grade M-30 RM 132
5.4 TMT bars S 500 MT 133
5.5 M40 Concrete (median parapet) m3 134
5.6 TMT bars S 500 MT 135
5.7 Antiglare Screen RM 136
6.0 FRICTION SLAB 137
6.1 M30 Concrete m3 138
6.2 TMT bars S 500 MT 139
6.3 M15 Levelling course m3 140
141
7.0 APPROACH SLAB 142
7.1 M30 Concrete m3 143
7.2 TMT bars S 500 MT 144
7.3 M15 PCC m3 145
146
8.0 WEARING COURSE (STRUCTURE PART) 147
40mm BC mm +Asphaltic concrete 25mm
8.1 m2 148
Construction of footpath cum utility Duct (M-25 grade
8.2 m3 149
Concrete)
TMT bars S 500
8.3 MT 150
9.0 DRAINAGE SYSTEM 151
Drainage spout fabricated in MS and given hot dip Galvanised
9.1 Nos 152
coating
9.2 150 dia GI drain downtake pipe Rm 153
9.3 Runner pipe 150mm PVC Rm 154
155
10.0 BEARINGS 156
10.1 POT/PTFE Sliding Bearing (200T vertical, 50 t horz) No.s 157
10.2 POT/PTFE Sliding Bearing (700T vertical 175 HOR) No.s 158
10.3 POT/PTFE Free Bearing (90T vertical ) No.s 159
10.4 Elastomeric bearing cm3 160
161
11.0 EXPANSION JOINT 162
11.1 Strip Seal type (Total Movement : +/- 35mm) Rm 163
11.2 Filler type jt (Total Movement : +/- 10mm) Rm 164
12.0 Protection 165
12.1 Stone pitching on slopes m3 166
12.2 Filter Media below stone pitching m3 167
3
12.3 Launching Apron m 168
12.4 750 thk. Stone pitching for Flexible Apron m3 169
12.5 150 thk. Flat Stone embedded in 300 thk concrete (M15) for rig m3 170
12.6 M15 PCC for Rigid Apron m3 171
172
13.0 Retaining wall/Median Wall 173
13.1 Excavation in soil m3 174
175
13.2 M15 levelling course m3 176
177
13.3 Concrete of grade M35 in foundation m3 178
179
13.4 Concrete of grade M35 in Wall m3 180
181
13.5 TMT bars S 500 in fdn MT 182
TMT bars S 500 in wall MT 183
184
3
13.6 Curtain Wall M20 Concrete m 185
186
13.7 PCC Levelling below floor appron and curtain wall m3 187
188
Total Area sqm 189
Concrete m3 190
Ratio m3/m2 191
Total Steel t 192
Ratio kg/m3 193