Vous êtes sur la page 1sur 3

Project proposal for summer project

Spicer, Satara
09 April 2019
 Project Number 1:

STUDENT NAME Sheikh Sohail Amir


FACULTY GUIDE Prof. Debabrata Das
PROJECT GUIDE Sagar Desai (Manager – Material & PPC Head, SIPL, Satara Plant)
 This project is being carried out in the Driveshaft manufacturing unit of Spicer India Pvt Ltd. at
Satara, Maharashtra.
BACKGROUND  This project is needed because the company wants to increase the productivity of the employees
and eliminate the manual processes in inventory management, internal material handling and
raw material purchasing.
 The objective of this project is to implement barcode in every raw material which SIPL Satara
OBJECTIVE purchase from tier -2 suppliers and manage the inventory efficiently.
 Automate the goods receipt processes in the SAP ERP from the implemented Barcode.
 In this project we visualize the overall operational flow of a business. This project covers all the
SCOPE
stages of supply chain flow from Tier-2 suppliers to Original equipment manufacturer (OEM).

 This project covers the following subject-


 Industrial engineering and productivity management
ACADEMIC SCOPE  Operations management
 Lean manufacturing
 Operation Research

WORK PLAN

S.No. TASKS START DATE DURATION(DAYS) END DATE

1 Study about overall production process of SIPL Satara plant 02-Apr 3 04-Apr

Study the process flow of raw material handling from supplier to


2 production process and determine the problem occurred in various 05-Apr 4 08-Apr
stages. Also determine the root cause behind these problems.
Determine the unit size and lot size of the raw material purchase from
3 the supplier and calculate the actual bins required for the standard 09-Apr 7 15-Apr
inventory.
Talk with suppliers and make them ready with Barcode and SRM Portal
4 implementation. 12-Apr 19 30-Apr

Selection of 3rd party software and hardware required for the Barcode
5 integration 16-Apr 2 17-Apr

Mapping of raw material part number and location in the inventory.


6 18-Apr 5 22-Apr

Barcode Implementation 1-May 15 15-May


7

8 Result Monitoring and Improvement in the project 16-May 12 27-May


GANTT CHART

2.4.19 12.4.19 22.4.19 2.5.19 12.5.19 22.5.19 1.6.19

Study about overall production process of SIPL Satara plant

Study the process flow of raw material handling from supplier


to production process and determine the problem occurred…

Determine the unit size and lot size of the raw material
purchase from the supplier and calculate the actual bins…

Talk with suppliers and make them ready with Barcode and
SRM Portal implementation.

Selection of 3rd party software and hardware required for the


Barcode integration

Mapping of raw material part number and location in the


inventory.

Barcode Implementation

Result Monitoring and Improvement in the project


Project proposal for summer project
Spicer, Satara
09 April 2019
 Project Number 2:

STUDENT NAME Sheikh Sohail Amir


FACULTY GUIDE Prof. Debabrata Das
PROJECT GUIDE Pravin Nikam (Manager – Production Head, SIPL, Satara Plant)

 This project is being carried out in the Driveshaft manufacturing unit of Spicer India Pvt Ltd. at
Satara, Maharashtra.
BACKGROUND
 This project is needed because the company wants to eliminate the manual booking process in
the SAP ERP after production of finished goods and decrease the material outward time.

OBJECTIVE  The objective of this project is to automate the booking process in SAP ERP.

SCOPE  In this project we visualize the overall operational flow of the material handling in the ERP.

 This project covers the following subject-


ACADEMIC SCOPE  Operations management
 ERP
WORK PLAN

S.No. TASKS START DATE DURATION(DAYS) END DATE

1 Study about overall production process of SIPL Satara plant 02-Apr 3 04-Apr

Study the booking process and identify various problems occurred


2 during the process. 08-Apr 8 15-Apr

Determine the possible solution regarding various business problems


3 occurred during booking 16-Apr 8 23-Apr

Develop the action plan and define the resources and support
4 required. 24-Apr 7 30-Apr

Implementation Plan
5 1-May 14 15-May

Result and Monitoring 16-May 15 30-May


7

GANTT CHART
2-Apr 12-Apr 22-Apr 2-May 12-May 22-May 1-Jun 11-Jun

Study about overall production process of SIPL Satara plant

Study the booking process and identify various problems occurred


during the process.
Determine the possible solution regarding various business problems
occurred during booking
Develop the action plan and define the resources and support
required.
Implementation Plan

Result and Monitoring