LEGEND:- TCP/IP 100 Mbps FO LINK HWS- Human Machine Interface Work Station GPS - Global Positioning System

TCP/IP 1Gbps FO LINK ENGINEERING PC/HMI- ENGINEERING PC/Human NOTE:-


DCC KM-2 BUILDING DGCC TCP/IP Cu (IEC-104 Protocol) INTERFACE Machine Interface Maximum Nos of devices in single
VGA CABLE FOR HWS PC Gateway - Communication Interface Loop are 27
GPS COAXIAL CABLE For DCC/DGCC Interface
TCP/IP BASED Cu INTERFACE (SNTP/FTP/RAP) Max. Capability of SCS System = 180 IEDs/
IMS-Integrated Monitoring System 10000 Master Values, 20000 Slave Values
TCP/IP CU LINK PDM-Partial Discharge Monitoring System
Multi Mode Armoured FO Cable TMS-Transformer Monitoring System Spare Capacity available = 129 IEDs
CONTROL DESK Single Mode Armoured FO Cable CMS-Condition Monitoring System
KAHRAMAA KEY BOARD PS2
PMR-Post Mortem Report
KVM INTERFACE
MONITOR-1 MONITOR-2
RJ45 VIDEO VGA
TELECOM PANEL MOUSE PS2
RAP-Remote Access Protocol
UPS-1 UPS-2
AC
AC SUPPLY FROM UPS RSG2488 -Ruggedcom IEC 61850 Switch
DC SUPPLY FROM DCDB

DGCC IEC 60870-5-104 STANDBY


DCC - Distribution Control Center

DGCC IEC 60870-5-104 MAIN

DCC IEC 60870-5-104 MAIN


DCC IEC 60870-5-104 STANDBY
DC

GPS ANTENNA UPS-1


UPS SUPPLY SOURCE 1 DGCC - Doha Grid Control Center LC 100mbps RJ45
UPS-2
UPS SUPPLY SOURCE 2 SCS-Substation Control System RX1500 PORTS PORTS
FUJITSU FUJITSU
DC1 & DC2 BBP - Busbar Panel USED FREE USED FREE
SURGE/VOLTAGE
PROTECTOR-P-TRON
AVR - Automatic Voltage Regulator ROUTER/FIREWALL-5 (CONTROL DESK) 0 0 5 1
DC1 RTCC - Remote Tap Changing Circuit ROUTER/FIREWALL-1 (CP1) 0 0 5 1
GPS
DC2 LSP - Load Shedding Panel ROUTER/FIREWALL-2 (CP1) 0 0 5 1
TIME SERVER
CAP - Common Alarm Panel ROUTER/FIREWALL-3 (CP2) 4 2 0 0
-A806 MEINBERG M300 ANTENNA
CONTROL DC OPP - Optical Patch Panel
UPS-2

140.80.109.25 194.168.109.1
ROUTER/FIREWALL-4 (CP2) 4 2 0 0
LAN 0 LAN 1 LAN 2 LAN 3 LAN 4 LAN 5
Schneider

PMR
RAP
CONTROL DESK Protocol between Bay IED ( BCU & Numerical Relays) - RSTP
P1 P3
P1 P3 (SCS+CP2) ESW2 S5 P2 Protocol between Bay IED ( BCU & Numerical Relays) to Station LAN (Server, Gateway) - RSTP LC 100mbps LC 1000mbps ST 100mbps RJ45
-A800 SIMATIC IPC 847D M1 M2 K M K
V
-A801 SIMATIC IPC 847D UPS-1
(SCS+CP2) ESW2 S5 P1
Protocol between Third Party IED to Station LAN (Server, Gateway) - RSTP ( Tapcon,Micom) RSG2488 PORTS PORTS PORTS PORTS
(SCS+CP1)ESW2 S3 P3
(SCS+CP1)ESW1 S5 P1
STATION SERVER FIREWALL-5 P5
Protocol between Ethernet Switches at the Station Level - RSTP
UPS-1

HWS
UPS-2
M
P2
UPS-2
USED FREE USED FREE USED FREE USED FREE
140.80.109.1

Protocol between Server and HMI Workstation - Siemens Properitery


P2 140.80.109.10 P4 P4 ESW1 7 3 9 3 2 2 1 1
FO cable used for Loop-7 is with ST-LC port ESW2 7 3 9 3 2 2 1 1
OPP-5 to 8 are used for Telecom Services. Actual Number of IEDs in the Substation -51
P1 P2 P3 P4 P5 P6 P7 P8
-A805
UPS-2

Data exchange between KM/Q-Rail and KM/LUSAIL-LRT substation is on IEC-60870-5-104 Laptop shall be provided as per project specification
P1 P3
K -A801 SIMATIC IPC 847D UPS-1

V GATEWAY 1 FIREWALL-1 P1
M
UPS-2
P2 140.80.109.2
P4
OPP-1
P1 P3
K -A802 SIMATIC IPC 847D
CONTROL DESK
UPS-1

V GATEWAY 2 TO 33KV Q-RAIL OPP-1


FIREWALL-2 P1
M
UPS-2
P2 140.80.109.3
P4

MONITOR-1 MONITOR-2 (SCS+CP1) ESW1 S5 P2 OPP-2


(SCS+CP1) ESW1 S5 P3
UPS-1 UPS-2

(SCS+CP1) ESW1 S5 PP4


TO 33KV LUSAIL-LRT OPP-1
(SCS+CP1) ESW1 S3 P1
DCC IEC 60870-5-104 STANDBY
DGCC IEC 60870-5-104 MAIN

UPS-1

1 2 3 4 1 2 1 2 3 4 1 2 3 4
S1 S7 S5 S3 OPP-3
-A802 RSG2488 ESW1
140.80.109.16
FUJITSU FUJITSU S6 S4 S2 S8
1 2 3 4 1 2 3 4 1 2 3 4 1 2 UPS-2 TO 33KV Q-RAIL OPP-3
Provision for connecting Laptop

DGCC IEC 60870-5-104 STANDBY


DCC IEC 60870-5-104 MAIN
OPP-4

UPS-1

1 2 3 4 1 2 1 2 3 4 1 2 3 4 TO 33KV LUSAIL-LRT -3
(SCS+CP1)ESW1 S4 P1

S1 S8 S5 S4
-A803 RSG2488 ESW2
140.80.109.17

CONTROL DESK 5 6
UPS-1
S3 S2 S7 S6
1 2 3 4 1 2 3 4 1 2 1 2 3 4 UPS-2
OPP-5
-A803
3 ROUTER/FIREWALL-1 1 GATEWAY 1
P1 P3 RX1500
4 2
-A801 SIMATIC IPC 847D M1 M2 K M
UPS-1 TO 33KV Q-RAIL OPP-5
ENGINEERING PC/HMI UPS-2

UPS-2

P2 140.80.109.15 P4
(SCS+CP1)ESW2 S3 P2

UPS-1

5 6
-A804 UPS-1 OPP-6
3 ROUTER/FIREWALL-2 1 GATEWAY 2 3 4
PMR
RAP

RX1500 -A804
STATION SERVER 4 2 1 ROUTER/FIREWALL-3
(SCS+CP1) ESW1 S2 P2 RX1500
2 TO 33KV LUSAIL-LRT OPP-5
UPS-2
UPS-1

5 6 5 6
RAP
SCS PANEL 1
UPS-2
-A802
3 ROUTER/FIREWALL-5 1
4
RX1500
2
PMR
140.80.109.18 OPP-7
UPS-2

UPS-1

3 4
-A805 TO 33KV Q-RAIL OPP-7
1 ROUTER/FIREWALL-4
(SCS+CP1) ESW1 S2 P1 RX1500
2
5 6 UPS-2

OPP-8

TO 33KV LUSAIL-LRT OPP-7

SCS PANEL 2 COMMON ALARM PANEL

INTERFACE ROOM
AC

FUJITSU

UPS-1

IMS PC
UPS-2
CMS

nd
JAFCO BUILDING (2 FLOOR)
AL RAWDAT KHAIL STREET
UPS-1
AL MUNTAZAH, P.O. BOX 23103
TMS CONTROLLER DOHA, QATAR
UPS-2 TEL: +974 44351612 FAX: +974 44352320
WWW.WSPGROUP.COM / WWW.PBWORLD.COM

RJ45
-A804 RSG2488ESW1 S2 P4

ST
UPS-1

-A801
3 ROUTER/FIREWALL-6 1
RX1500
4 2
-A805 RSG2488ESW2 S2 P4

RJ45

ST
PDM CONTROLLER
5 6 UPS-2

INTEGRATED MONITORING STATION (TRANSMISSION & DISTRIBUTION DIVISION)


P.O.Box 90 Al-Khobar 31952
P.O.Box 23949
BARWA Commercial Avenue (BCA),

(IMS)
Kingdom of Saudi Arabia SAFWA - Type-2, Block-21,
Industrial Area Road,
Tel : (03) 8828008/8825700
Doha - Qatar

132kV RTCC 132kV RTCC


Fax : (03) 8826678 Tel : +974 40052300
Fax : +974 40016479
www.nccprojects.com

PANEL 1 PANEL 2 Metering Panel


LEGEND:- TCP/IP 100 Mbps FO LINK HWS- Human Machine Interface Work Station GPS - Global Positioning System
TCP/IP 1Gbps FO LINK ENGINEERING PC/HMI- ENGINEERING PC/Human NOTE:-
** Q-Rail Control Center
TCP/IP Cu (IEC-104 Protocol) INTERFACE Machine Interface Maximum Nos of devices in single
VGA CABLE FOR HWS PC Gateway - Communication Interface Loop are 27
GPS COAXIAL CABLE For Q-Rail Interface
TCP/IP BASED Cu INTERFACE (SNTP/FTP/RAP) Max. Capability of SCS System = 180 IEDs/
RSG2488 -Ruggedcom IEC 61850 Switch 10000 Master Values, 20000 Slave Values
TCP/IP CU LINK Q-Rail - Qatar Rail
Multi Mode Armoured FO Cable SCS-Substation Control System Spare Capacity available = 91 IEDs
CONTROL DESK Single Mode Armoured FO Cable CAP - Common Alarm Panel
** Q-Rail KEY BOARD PS2
OPP - Optical Patch Panel
KVM INTERFACE
MONITOR-1 MONITOR-2
RJ45 VIDEO VGA
TELECOM PANEL
CP - Control Panel
MOUSE PS2

AC SUPPLY FROM UPS LC 100mbps RJ45


AC
Lusail - Lusail LRT RX1500 PORTS PORTS

Q- RAIL IEC 60870-5-104 STANDBY

Q- RAIL IEC 60870-5-104 STANDBY


UPS-1 UPS-2

DC SUPPLY FROM DCDB

Q- RAIL IEC 60870-5-104 MAIN

Q- RAIL IEC 60870-5-104 MAIN


DC
QRail - Qatar Rail USED FREE USED FREE
GPS ANTENNA
UPS-1
UPS SUPPLY SOURCE 1 ROUTER/FIREWALL-1 (CP1) 0 0 5 1
UPS-2
UPS SUPPLY SOURCE 2 ROUTER/FIREWALL-2 (CP1) 0 0 5 1
FUJITSU FUJITSU
DC1 & DC2 ROUTER/FIREWALL-3 (CP2) 4 2 0 0
SURGE/VOLTAGE ROUTER/FIREWALL-4 (CP2) 4 2 0 0
PROTECTOR-P-TRON
DC1
GPS DC2
TIME SERVER
-A806 MEINBERG M300 ANTENNA UPS-2

CONTROL DC
140.80.108.25 LC 100mbps LC 1000mbps ST 100mbps RJ45
LAN 0 LAN 1 LAN 2 LAN 3 LAN 4 LAN 5
Protocol between Bay IED ( BCU & Numerical Relays) - RSTP RSG2488 PORTS PORTS PORTS PORTS
CONTROL DESK Protocol between Bay IED ( BCU & Numerical Relays) to Station LAN (Server, Gateway) - RSTP USED FREE USED FREE USED FREE USED FREE
Protocol between Third Party IED to Station LAN (Server, Gateway) - RSTP ( Tapcon,Micom) ESW1 8 2 9 3 0 0 1 1
P1 P3 P1 P3
-A800 SIMATIC IPC 847D M1 M2 K M
K -A801 SIMATIC IPC 847D UPS-1
Protocol between Ethernet Switches at the Station Level - RSTP ESW2 8 2 9 3 0 0 2 2
(SCS+CP1)ESW2 S5 P3
(SCS+CP1)ESW1 S5 P1
UPS-1

Protocol between Server and HMI Workstation - Siemens Properitery Actual Number of IEDs in the Substation -89
HWS V STATION SERVER
UPS-2
M

Laptop shall be provided as per project specification


P2
OPP-5 to 8 are used for Telecom Services.
140.80.108.10 P4 P2 140.80.108.1
UPS-2

P4

P1
-A802 SIMATIC IPC 847D
P3 Data exchange between KM/Q-Rail and KM/LUSAIL-LRT substation is on IEC-60870-5-104
K
The FO cable used between EWS & REF630 Relay (mounted in E18 & E28 SWGR) is with ST-LC connector.
UPS-1

V GATEWAY 1 FIREWALL-1 P1
M
P2 140.80.108.2
UPS-2

P4

P1 P3
K -A803 SIMATIC IPC 847D UPS-1

V GATEWAY 2 FIREWALL-2 P1
M
P2 140.80.108.3
UPS-2
OPP-1
P4

TO 132KV OPP-1

CONTROL DESK P1 P2 P3 P4 P5 P6 P7 P8
UPS-2

-A809
OPP-2

MONITOR-1 MONITOR-2
TO 33KV LUSAIL-LRT OPP-2
UPS-1 UPS-2
Q- RAIL IEC 60870-5-104 STANDBY
Q- RAIL IEC 60870-5-104 STANDBY
Q- RAIL IEC 60870-5-104 MAIN

Q- RAIL IEC 60870-5-104 MAIN

UPS-1

1 2 3 4 1 2 1 2 3 4 1 2 3 4 OPP-3
S1 S7 S5 S3
-A804 RSG2488 ESW1
140.80.108.16
S4 S2 S8 TO 132KV OPP-3
FUJITSU FUJITSU 1 2 3 4 1 2 3 4 1 2 UPS-2 UPS-1

3 4
(SCS+CP1) ESW1 S2 P4 -A801
1 ROUTER/FIREWALL-3
(SCS+CP1) ESW2 S2 P4 RX1500
2
OPP-4
5 6 UPS-2

TO 33KV LUSAIL-LRT OPP-4

UPS-1

3 4
(SCS+CP1)ESW1 S4 P1
(SCS+CP1)ESW2 S5 P2

(SCS+CP1) ESW1 S2 P3 -A802


1 ROUTER/FIREWALL-4
(SCS+CP1) ESW2 S2 P3 RX1500 OPP-5
CONTROL DESK 2
5 6 UPS-2
UPS-1

1 2 3 4 1 2 3 4 1 2 3 4 1 2 TO 132KV OPP-5
P1 P3 S5 S3 S4 S7
-A801 SIMATIC IPC 847D M1 M2 K M RSG2488 ESW2
-A805
UPS-1
140.80.108.17
ENGINEERING PC/HMI
UPS-2
S1 S2 S6
1 2 3 4 1 2 3 4 1 2 3 4
P2 140.80.108.15 P4
UPS-2
Provision for connecting Laptop OPP-6

TO 33KV LUSAIL-LRT OPP-6

CONTROL DESK
UPS-1 OPP-7
5 6
-A807
3 ROUTER/FIREWALL-2 1 GATEWAY 2
RX1500 UPS-2

4 2 HP TO 132KV OPP-7

UPS-2

A4 COLOR PRINTER

UPS-1 OPP-8
5 6
-A808
3 ROUTER/FIREWALL-1 1 GATEWAY 1
RX1500
4 2 TO 33KV LUSAIL-LRT OPP-8

SCS PANEL 1 COMMON ALARM PANEL


UPS-2

nd
JAFCO BUILDING (2 FLOOR)
AL RAWDAT KHAIL STREET
AL MUNTAZAH, P.O. BOX 23103
DOHA, QATAR
TEL: +974 44351612 FAX: +974 44352320
WWW.WSPGROUP.COM / WWW.PBWORLD.COM

E18+SWGR E28+SWGR

(TRANSMISSION & DISTRIBUTION DIVISION)


P.O.Box 23949

** QRail / Lusail Scope


P.O.Box 90 Al-Khobar 31952 BARWA Commercial Avenue (BCA),
Kingdom of Saudi Arabia SAFWA - Type-2, Block-21,
Industrial Area Road,
Tel : (03) 8828008/8825700
Doha - Qatar
Fax : (03) 8826678 Tel : +974 40052300
Fax : +974 40016479
www.nccprojects.com
LEGEND:- TCP/IP 100 Mbps FO LINK HWS- Human Machine Interface Work Station GPS - Global Positioning System
TCP/IP 1Gbps FO LINK ENGINEERING PC/HMI- ENGINEERING PC/Human NOTE:-
TCP/IP Cu (IEC-104 Protocol) INTERFACE Machine Interface Maximum Nos of devices in single
** Lusail Control Center VGA CABLE FOR HWS PC Loop are 27
Gateway - Communication Interface
GPS COAXIAL CABLE For Lusail-LRT Interface
TCP/IP BASED Cu INTERFACE (SNTP/FTP/RAP) Max. Capability of SCS System = 180 IEDs/
RSG2488 -Ruggedcom IEC 61850 Switch 10000 Master Values, 20000 Slave Values
TCP/IP CU LINK SCS-Substation Control System
Multi Mode Armoured FO Cable BBP - Busbar Panel Spare Capacity available = 106 IEDs
CONTROL DESK Single Mode Armoured FO Cable CAP - Common Alarm Panel
** Lusail KEY BOARD PS2
OPP - Optical Patch Panel
KVM INTERFACE
MONITOR-1 MONITOR-2
RJ45 VIDEO VGA
TELECOM PANEL MOUSE PS2
Lusail - Lusail LRT
AC SUPPLY FROM UPS LC 100mbps RJ45
AC
QRail - Qatar Rail RX1500 PORTS PORTS

LUSAIL LRT IEC 60870-5-104 STANDBY

LUSAIL LRT IEC 60870-5-104 STANDBY


UPS-1 UPS-2

DC SUPPLY FROM DCDB

LUSAIL LRT IEC 60870-5-104 MAIN

LUSAIL LRT IEC 60870-5-104 MAIN


USED FREE USED FREE
DC

GPS ANTENNA UPS-1


UPS SUPPLY SOURCE 1 ROUTER/FIREWALL-1 (CP1) 0 0 5 1
UPS-2
UPS SUPPLY SOURCE 2 ROUTER/FIREWALL-2(CP1) 0 0 5 1
FUJITSU FUJITSU
DC1 & DC2 ROUTER/FIREWALL-3 (CP2) 4 2 0 0
SURGE/VOLTAGE
PROTECTOR-P-TRON ROUTER/FIREWALL-4 (CP2) 4 2 0 0
DC1
GPS
TIME SERVER DC2
-A806 MEINBERG M300 ANTENNA UPS-2

140.80.107.25 CONTROL DC
LAN 0 LAN 1 LAN 2 LAN 3 LAN 4 LAN 5 LC 100mbps LC 1000mbps ST 100mbps RJ45
PORTS PORTS PORTS PORTS
Protocol between Bay IED ( BCU & Numerical Relays) - RSTP RSG2488
CONTROL DESK USED FREE USED FREE USED FREE USED FREE
Protocol between Bay IED ( BCU & Numerical Relays) to Station LAN (Server, Gateway) - RSTP
ESW1 8 2 9 3 0 0 1 1
P1 P3
P1
-A801 SIMATIC IPC 847D
P3
Protocol between Third Party IED to Station LAN (Server, Gateway) - RSTP ( Tapcon,Micom)
K
ESW2 9 3 9 3 0 0 2 2
Protocol between Ethernet Switches at the Station Level - RSTP
UPS-1

-A800 SIMATIC IPC 847D M1 M2 K M


V STATION SERVER

(SCS+CP1)ESW2 S5 P3
(SCS+CP1)ESW1 S5 P1
UPS-1

Actual Number of IEDs in the Substation -74


HWS M
UPS-2
P2 140.80.107.1
UPS-2

Protocol between Server and HMI Workstation - Siemens Properitery


Laptop shall be provided as per project specification
P2 140.80.107.10 P4
OPP-5 to 8 are used for Telecom Services.
P4

P1 P3
K -A802 SIMATIC IPC 847D UPS-1
Data exchange between KM/Q-Rail and KM/LUSAIL-LRT substation is on IEC-60870-5-104
M
V GATEWAY 1 FIREWALL-1 P1
The FO cable used between EWS & REF630 Relay (mounted in E370, E310 & E320 SWGR SWGR) is with ST-LC connector.
P2
UPS-2
140.80.107.2
P4

P1 P3
K -A803 SIMATIC IPC 847D UPS-1

V GATEWAY 2 FIREWALL-2 P1
M
P2 140.80.107.3
UPS-2

P4 OPP-1

TO 132KV OPP-2

CONTROL DESK
UPS-2
P1 P2 P3 P4 P5 P6 P7 P8
-A809

OPP-2

MONITOR-1 MONITOR-2
LUSAIL LRT IEC 60870-5-104 STANDBY

TO 33KV Q-RAIL OPP-2


LUSAIL LRT IEC 60870-5-104 STANDBY
LUSAIL LRT IEC 60870-5-104 MAIN

LUSAIL LRT IEC 60870-5-104 MAIN

UPS-1 UPS-2

UPS-1

1 2 3 4 1 2 1 2 3 4 1 2 3 4 OPP-3
S1 S7 S5 S3
-A804 RSG2488 ESW1
140.80.107.16
S2 S4 S8 TO 132KV OPP-4
FUJITSU FUJITSU 1 2 3 4 1 2 3 4 1 2 UPS-2 UPS-1

3 4
(SCS+CP1) ESW1 S2 P4 -A801
1 ROUTER/FIREWALL-3
(SCS+CP1) ESW2 S2 P4 RX1500
2
OPP-4
5 6 UPS-2

TO 33KV Q-RAIL OPP-4

UPS-1

3 4
(SCS+CP1)ESW1 S4 P1
(SCS+CP1)ESW2 S5 P2

(SCS+CP1) ESW1 S2 P3 -A802


1 ROUTER/FIREWALL-4
(SCS+CP1) ESW2 S2 P3 RX1500 OPP-5
CONTROL DESK 2
5 6 UPS-2
UPS-1

1 2 3 4 1 2 3 4 1 2 3 4 1 2 TO 132KV OPP-6
P1 P3 S5 S3 S4 S7
-A801 SIMATIC IPC 847D M1 M2 K M RSG2488 ESW2
-A805
UPS-1
140.80.107.17
ENGINEERING PC/HMI
UPS-2
S1 S2 S6 S8
1 2 3 4 1 2 3 4 1 2 3 4 1 2
P2 140.80.107.15 P4
UPS-2
OPP-6

Provision for connecting Laptop


TO 33KV Q-RAIL OPP-6

UPS-1

5 6 CONTROL DESK
OPP-7
-A807
3 ROUTER/FIREWALL-2 1 GATEWAY 2
RX1500
4 2
UPS-2 TO 132KV OPP-8
UPS-2
HP

UPS-1
A4 COLOR PRINTER
5 6
-A808 OPP-8
3 ROUTER/FIREWALL-1 1 GATEWAY 1
RX1500
4 2
TO 33KV Q-RAIL OPP-8
UPS-2

SCS PANEL 1 COMMON ALARM PANEL

nd
JAFCO BUILDING (2 FLOOR)
AL RAWDAT KHAIL STREET
AL MUNTAZAH, P.O. BOX 23103
DOHA, QATAR
TEL: +974 44351612 FAX: +974 44352320
WWW.WSPGROUP.COM / WWW.PBWORLD.COM

E370+SWGR E310+SWGR E320+SWGR

(TRANSMISSION & DISTRIBUTION DIVISION)


P.O.Box 23949

** QRail / Lusail Scope


P.O.Box 90 Al-Khobar 31952 BARWA Commercial Avenue (BCA),
Kingdom of Saudi Arabia SAFWA - Type-2, Block-21,
Industrial Area Road,
Tel : (03) 8828008/8825700
Doha - Qatar
Fax : (03) 8826678 Tel : +974 40052300
Fax : +974 40016479
www.nccprojects.com
nd
JAFCO BUILDING (2 FLOOR)
AL RAWDAT KHAIL STREET
AL MUNTAZAH, P.O. BOX 23103
DOHA, QATAR
TEL: +974 44351612 FAX: +974 44352320
WWW.WSPGROUP.COM / WWW.PBWORLD.COM

(TRANSMISSION & DISTRIBUTION DIVISION)


P.O.Box 23949
P.O.Box 90 Al-Khobar 31952 BARWA Commercial Avenue (BCA),
Kingdom of Saudi Arabia SAFWA - Type-2, Block-21,
Industrial Area Road,
Tel : (03) 8828008/8825700
Doha - Qatar
Fax : (03) 8826678 Tel : +974 40052300
Fax : +974 40016479
www.nccprojects.com
nd
JAFCO BUILDING (2 FLOOR)
AL RAWDAT KHAIL STREET
AL MUNTAZAH, P.O. BOX 23103
DOHA, QATAR
TEL: +974 44351612 FAX: +974 44352320
WWW.WSPGROUP.COM / WWW.PBWORLD.COM

(TRANSMISSION & DISTRIBUTION DIVISION)


P.O.Box 23949
P.O.Box 90 Al-Khobar 31952 BARWA Commercial Avenue (BCA),
Kingdom of Saudi Arabia SAFWA - Type-2, Block-21,
Industrial Area Road,
Tel : (03) 8828008/8825700
Doha - Qatar
Fax : (03) 8826678 Tel : +974 40052300
Fax : +974 40016479
www.nccprojects.com
nd
JAFCO BUILDING (2 FLOOR)
AL RAWDAT KHAIL STREET
AL MUNTAZAH, P.O. BOX 23103
DOHA, QATAR
TEL: +974 44351612 FAX: +974 44352320
WWW.WSPGROUP.COM / WWW.PBWORLD.COM

(TRANSMISSION & DISTRIBUTION DIVISION)


P.O.Box 23949
P.O.Box 90 Al-Khobar 31952 BARWA Commercial Avenue (BCA),
Kingdom of Saudi Arabia SAFWA - Type-2, Block-21,
Industrial Area Road,
Tel : (03) 8828008/8825700
Doha - Qatar
Fax : (03) 8826678 Tel : +974 40052300
Fax : +974 40016479
www.nccprojects.com
KAHRAMAA LUSAIL CITY METRO 132kV

LIST OF CONTENTS

CONTENTS
Sr. No. PAGES

SCS FAT Test Reports

PAINT THICKNESS REPORT


1 9-11

2 GPS MEINBERG TEST REPORT 12


RUGEEDCOM TEST REPORT
3 13-14
RUGEEDCOM ROUTER RX1500 TEST REPORT
4 15-19

5 SCS SIGNAL LIST 20-51


SCS FAT REPORT
6 52-171
FAT & RTR COMMON ALARM PANEL (CAP)
7 172-211

Unrestricted
Final Testreport
- quality check -

Test protocol module LANTIME

Tested by: C. Bruns


Serialnumber: 030111353360
Type: LANTIME M300/GPS/2LNE
Put into operation: 2016-12-12
Date: 2017-01-16

Test of connections

Ethernet interface 10/100MBIT RJ45 1-6 passed


USB interface 1 passed
COM port RS232 9 pin connector 1-2 passed
PPS TTL BNC OUT 1 passed
10MHz TTL BNC OUT 1 passed
Antenna BNC IN 1 passed
Error Time Sync DFK3 OUT 1 passed
Terminal 9 pin connector 1 passed
Optical inspection passed

Final inspection complete


device faultless

FTR: 99c3440587f313b444302c00f2c9ddc6

Meinberg Funkuhren GmbH & Co. KG - Lange Wand 9 - 31812 Bad Pyrmont - Germany
Web: www.meinbergglobal.com - Phone: +49 5281 93090 - eMail: info@meinberg.de