Inspection Plans Parent Child UD table


1. AS-Quenched Hardness Test Result (Heat Treat)
2. Rockwall Hardness (Tensile Test)(Heat Treat) 1. Charpy Impact Results -UD Table 100 -QA
3. Chemical Analysis (Heat Treat) 2. Flattening Test Report -UD table 101 -QA
4. Chemical Analysis (Mill) 3. High Collapse (Heat Treat) - UD 101 -QA
5. Weld Score (Mill) 4. UT CALIBRATION REPORT -UD 102 -OP
6. Rockwall Hardness (Tensile Test) (Mill) 5. Cut off Setup -UD 21 -OP
7. Crush Crop (Mill) 6. In process undercut & ovality Report -UD 22 -OP
8. Seam Anneal Evaluation (Mill) 7. Mill Setup Parameters
9. Crush Crop (Mill-OP) a. UD 103
10. ID Grinding Report (Mill-OP) i. Parent (Header)
1) Key 1 = MSP (Following numbers)
2) Key 2 =
3) Key 3 =
4) Key 4 =
5) Key 5 =
ii. Child ( Form Setting, SQ Setting, Welding Setting, Seam Annealing)
1) Key 1 = a Number
2) Key 2 =
3) Key 3 =
4) Key 4 =
5) Key 5 =
b. UD 23
i. Sizing
1) Key 1 = MSP (Following numbers)
2) Key 2 =
3) Key 3 =
4) Key 4 =
5) Key 5 =
8. Receiving of Coil Inspection Checklist UD 104
a. Key 1 = Coil number(1,2,3,…) (Parent Table and Child Table)