GENERAL INFORMATION

1. Name of Firm M/s. QASIM KHAN & COMPANY,


Engineers & Contractors
2. CORRESPONDENCE OFFICE
152-J, Block-2, P.E.C.H.Society, Karachi-Pakistan.
3. Contact Nos.
(021) 34557927-28 Fax # (021) 34325060
4. Contact Person Muhammad Azam Khan
Cell # 0344-2901007

QUETTA OFFICE
nd
32, 2 . Floor, Regal Plaza, Circular Road, Quetta (Baluchistan).
5. Telephone Contact Muhammad Azam Khan
081-2821984 Managing Partner

6. Facsimile E-mail
081-2821984 qkckhi@gmail.com

7. Place of Incorporation/ Year of Incorporation / Registration


Registration
QUETTA- BALUCHISTAN July, 1977
8. PEC Registration No. Validity of PEC License
C-A/81 (NO LIMIT) Valid till 30-06-2019

NATIONALITY OF OWNERS

NAME
S.No. NATIONALITY
1. Muhammad Azam Khan Pakistani
Managing Partner/Chief Executive
2. Mir Alam Khan Pakistani
Managing Partner/Resident Director
3. Mr. Shamsuddin Khan Pakistani
Partner/Resident Director
4. Mr. Muslim Bhutto Pakistani
Partner/Resident Director
GENERAL CONSTRUCTION EXPERIENCE
HIGHWAYS, ROADS, BRIDGES & OTHER STRUCTURE PROJECTS
(LAST TEN YEAR)

Name of Project Name of Client Contract Value in Million Start Compl.


Cost of Cost of Total Date Date
Road Structure Value of
Work Work Work
Construction and Remodeling of Local 1025.477 -- 1025.477 Feb Dec
12000 Road Landhi Korangi Government Million Million 2018 2018
Karachi Department
Karachi
Construction of Coastal Highway National 829.841 205.526 1075.366 Sept Jan
(N-110) from Gharo to Keti Highway Millions Millions Millions 2009 2014
Bunder Project. Including Three Authority,
Bridges and Culverts Islamabad UPTO
Package-1: Gharo to Mirpur LAST BILL
Sakro.
Reconstruction & Rehabilitation P.D (FERP) 398.690 169.860 568.553 Mar Feb
of (i) Road from Indus Highway Work & Millions Millions 2012 2014
to Bubak via Jaheja Khabrote Services
13. 083 Km (ii) Road from Indus Department
Highway to Bhan Byepass to Govt. of Sindh
Chinni road 24.372 Km District Hyderabad
Jamshoro Contract Package No.
5603
Reconstruction & Rehabilitation P.D (FERP) 142.800 --- 142.800 May May
of Road From Sujawal to Chuhar Work & Millions Millions 2012 2013
Jamali 12.00 Km District Thatta Services
Department
Govt. of Sindh
Hyderabad
Construction of Zhob - Gulkatch Executive Engr. 819.400 321.111 1140.511 Mar Aug
Road (45 KM) & (02) RCC Bridges Provincial B/R Millions Millions Millions 2008 2010
and (50) Culverts at KM-12 & Division
KM-19 District Zhob.
Development of 300’ wide 5th Executive 28.529 --- 28.529 Mar Jan
Avenue between main Road of Engr. Lyari Millions Millions 2009 2010
Boulevard “F” & “G” Development
(Part –II) Hawksbay Scheme – Authority
42, LDA. (LDA) Karachi.
(Contract No. RD-007)
Development of 200’ wide Executive 31.684 --- 31.684 Mar Jan
th th
Boulevard “E” between 6 & 7 Engr. Lyari Millions Millions 2009 2010
Avenue Hawksbay Scheme – 42, Development
LDA Authority
(Contract No. RD-002) (LDA) Karachi.
Construction of (04) Bridges on National --- 180.711 180.711 Dec Dec
National Highway N-5 ZHOB- Highway Millions Millions 2004 2006
MUGHALKOT Section. Authority
GENERAL CONSTRUCTION EXPERIENCE
BUILDINGS & INFRASTRUCTURE DEVELOPMENT PROJECTS

Name of Project Name of Client Cost in Starting Completion


Rs. (M) Date Date
Sector Development Work under DHA City Karachi 794.275 Mar Dec
Short Term Plan Including Roads, Million 2013 2017
Water Supply. Sewerage & Drainage After
Components – Sector-5 (Package-2) V.O.1 Substantially
After V.O.1 Development Works of Completed
Sector-8 (Package-3), 9.26 Km 1612.858
Boundary Wall & Fence of Sector-7 MILLION
Rehabilitation & Construction of Karachi Water 83.486 Nov Nov
Boundary Wall of Mauripur Sewage & Million 2013 2014
Treatment Plant Sewerage Board
(Contract LS-10)
Construction of (60) Bungalows (40) Shaikh Ishrat Aziz 569.000 Mar, Mar
Shops & ( 40) Flats on Sariab Road, S/o Haji Azizuddin Millions 2012 2014
Quetta (Marble Flooring, High Class 53/2, Zarghoon
Fixing, Electrification, Plumbing Road
,Boundary wall, Beautification Quetta (Private)
including Infrastructure
Development, Internal Roads,
Water Supply and Sewerage /
Drainage System etc
Construction of Commercial Plaza’s Shaikh Ishrat Aziz 453.125 Feb, Feb,
on Plot # 1,2,3,4,5 & 6, Phase-IV, S/o Haji Azizuddin Millions 2011 2013
Quetta including Infra - Structure 53/2, Zarghoon
Development, Water Supply, Road
Sewerage / Drainage System Quetta (Private)
Electrification, Plumbing, Fixing,
Marble Flooring Boundary Wall &
other allied works, supervised by
Zahoor Associates
(C.Area = 175,000 Sq. Ft.)
Construction of (40) Double Storied Shaikh Ishrat Aziz 187.125 Jan, Jan,
Bungalows and Flats including Infra- S/o Haji Azizuddin Millions 2006 2008
Structure Development, Water 53/2, Zarghoon
Supply, Sewerage/Drainage System Road
Electrification, Plumbing, Fixing, Quetta (Private)
Marble Flooring, Boundary Wall &
other allied works, at Almo Chowk
Airport Road, Quetta,
(Covered Area= 62,500 Sq. Ft.)
Construction of Residential Building Shaikh Ishrat Aziz 51.250 April, April,
on Plot No. 6 & 7 including Infra- S/o Haji Azizuddin Millions 2005 2006
Structure Development, Water 53/2, Zarghoon
Supply, Sewerage / Drainage System Road
Electrification, Plumbing, Fixing Quetta (Private)
Marble Flooring Boundary wall &
other allied works, Jinnah Town,
Quetta,
GENERAL CONSTRUCTION EXPERIENCE
BUILDINGS & INFRASTRUCTURE DEVELOPMENT PROJECTS

Name of Project Name of Client Cost in Starting Completion


Rs. (M) Date Date
Construction of SWISS PLAZA (G+3) Self Financed / 715.958 Nov, Nov,
Commercial Building, at Jinnah Completed by Millions 2002 2005
Road, Quetta consisting (80 Shops & M/s. Qasim Khan &
100 Offices) including Co.
Electrification, Plumbing and
beautification work etc.
Construction THREE STAR TAJ Shaikh Ishrat Aziz 90.200 Sept. March
MAHAL HOTEL at Model Town, S/o Haji Azizuddin Millions 2002 2004
Quetta (Marble Flooring, 53/2, Zarghoon
Electrification, Plumbing works, Road
Water Supply, Sewerage, Land Quetta (Private)
Grading & other Allied Works etc.)
(Covered Area = 45,000 Sq. Ft.)
Construction of INTERMEDIATE & Executive Engr. 242.733 April April
SECONDARY COMPLEX for Provincial B/R Millions 1992 1994
Afghan Refugees Students at Division,
PASHIN Complete with Boundary PASHIN.
wall, Electrification, Plumbing
Works
(Financed By IDB, Jeddah)
Construction of (27) Bungalows The Chairman 224.360 June, June,
of Category -II, III, IV, V & VI Area Electricity Millions 1990 1991
including Electrification, Plumbing, Board, Wapda,
Boundary wall, Water Supply & Quetta.
Sewerage System And other allied
works.
GENERAL CONSTRUCTION EXPERIENCE
MAJOR WATER SUPPLY / SEWERAGE / CANALS / DAMS & OTHER
IRRIGATION PROJECTS

Name of Project Name of Client Cost in Starting Completion


Rs. (M) Date Date
Construction of New RCC Conduit Karachi Water 1117.683 Nov July
/ Interceptor and other Allied & Million 2013 2017
works from Gujro Nullah to Sewerage Board
Sewage Treatment Plant No.1
(Contract LS-8)
Laying of 600 mm to 1200 mm Karachi Water 577.955 Nov July
Dia RCC Pipe Sewers in District & Million 2014 2017
Central and East of Karachi to Sewerage Board
Enhance Sewage Flow at Sewage
Treatment Plants Under S-III
Project (Contract LS-9)
Rehabilitation / Improvement of Karachi Water & 190.555 Sept., Mar,
Sewerage Pumping Station & Sewerage Board Million 2009 2011
laying Rising main for these (Water
Pumping Stations (Package-I) Sanitation Dept.)
(Option-II) Under Special
Development Plan Lyari.
Rehabilitation & Improvement of Executive Engr. 179.333 Feb, Feb,
Water Supply & Sewerage P.H.E. Deptt. Million 2008 2009
Network including underground Distt. Chaghi.
& overhead Water Tanks in
Chaghi Town, Baluchistan.
Construction of RCC Drains Executive Engr. 85.265 July, July,
for Improvement of Sewerage District Govt. Million 2002 2003
System in Zhob Town. Zhob Town.
Construction of Water Supply & Project Director 450.777 June, Dec,
Sewerage Network, Water Benevolent Million 1990 1991
Treatment facilities For Funds Estate
Baluchistan Civil Servants Housing Baluchistan.
Scheme, Sariab Road, Quetta.
(P/L of GI Pipelines of various
Sizes for water supply & RCC
Pipes for Sewerage Network).
WORKS IN PROGRESS

Starting Completion Total contract


Contract identification Client month month/year amount
/year (planned) Rs. (M)

01 Redevelopment of Planning & Feb Dec 1445.461


Culture and Education Development 2018 2018 Million
Area in Saddar Downtown Department,
Karachi Govt. of Sindh
02 Construction of Parking C&W Jan Jan 977.217
Plaza at Circular Road, Department, 2016 2019 Million
Quetta Quetta
FINANCIAL STATUS
DETAIL OF ASSETS

INFORMATION FROM BALANCE SHEET

Description 2017 2016 2015

Total assets (TA) QKC 2633.695 2092.303 1875.510


Total Liabilities (TL) 279.917 101.493 77.625
Net Worth (NW) 2353.777 1990.810 1797.885
Current Assets (CA) 2580.679 2035.618 1814.749
Current Liabilities (CL) 279.917 5.727 4.166
Total (TR) 7636.974 6016.255 5869.563
Profits before Taxes (PBT) 450.199 440.492 423.874
Profit After Taxes (PAT) 408.78 391.057 378.587

Proposed sources of financing to meet the cash flow of the project.

Source of Financing Amount (Pak Rs.) In


Million
1. Credit Line from Bank Al-Falah Limited, Rs. 1000.000 Million
Jinnah Road Branch, Quetta.
2. Credit Line from The Bank of Khyber, Rs. 400.00 Million
Jinnah Road Branch, Quetta.
Total Credit Line Rs. 1400 Million

ANNUAL TURNOVER DATA FOR THE LAST 3 YEAR


(CONSTRUCTION ONLY)

S.No Year Turnover Rupees In Million


in Pak. Rupees
1. 2017 7636,974,605 7636.974
2. 2016 6016,254,610 6016.255
3. 2015 5869,562,100 5869.563
PLANT & MACHINERY

S.# Description Make/Model/Year of Present Quantity


of Item Manufacturing Condition
1 Dozers Caterpiller D-8N (2002) Excellent 02
04 Nos. Caterpiller D-6 (2003) Excellent 01
Komatsu D-155 (2002) V.Good 01
2 Loaders Caterpiller D-966 (2004) Excellent 02
03 Nos. Komatsu WA-350 (2005) Excellent 01
3 Dump Trucks Hino Japan (2004) Excellent 10
22 Nos. Nissan FS (2004) Excellent 12
4 Excavators Hitachi – EX 200 (2005) Excellent 02
04 Nos. Hitachi – EX 200 (2003) Excellent 01
Hitachi – EX 200 (2004) Excellent 01
5 Motor Graders Caterpillar 140-G (2004) V.Good 01
03 Nos. Caterpillar 140-H (2003) Excellent 01
Komatsu GD-500 (2003) Excellent 01
6 Sheep foot Dynapac CA-302 (2005) Excellent 02
Rollers Local with Tractor (2006) V.Good 01
03 Nos.
7 Vibratory Rollers Dynapac 301-D (2004) Excellent 02
03 Nos. Dynapac CA-500D (2005) Excellent 01
8 Tandem Rollers Doumat (Germany) (2004) V. Good 01
03 Nos. Dynapac –722 (2006) 02

9 P. T. R’s Dynapac CP-225 (2003) Excellent 01


03 Nos. Sakai – TS200 (2004) New 02
10 Concrete ELBA (GERMANY) Excellent 01
Batching Plant EE-30 (2007) New
01 No.
11 Transit Mixer HINO (JAPAN) Excellent 05
05 Nos. FS (2007) New
12 Concrete Mixers Local made (2006) Excellent New 05
08 Nos. Local made (2007) 03
13 Concrete Honda 5 H.P. (2004) Excellent 03
Vibrators
03 Nos.
14 Mobile Crane P&H-20 Tons (2002) V.Good 01
01 No.
15 Asphalt Plant Parker (UK) (1995) Excellent 01
01 No.
16 Paver Finisher Dynapac – 11011 R (2004) Excellent 02
03 Nos. Nigata (Japan) (2003) Excellent 01
S.# Description of Make/Model/Year of Present Quantity
Item Manufacturing Condition
17 Crushing Plant Parker (UK) (2002) Excellent New 01
02 Nos. Local Made (2007) 01
18 Air Compressor General (275 Cft) (2002) Excellent New 01
02 Nos. General (275 Cft) (2007) 01
19 Plate Compactors Local made (2006) Excellent 02
02 Nos.
20 Jack Hammer Caterpiller (2002) V.Good 02
02 Nos. Komatsu (2004) Excellent
21 Low Bed Trucks / Nissan FS (2002) Excellent 01
Low Bed Trailers Nissan FS (2004) Excellent 01
02 Nos.
22 Cargo Trucks Nissan FS (2003) Excellent 05
05 Nos. Hino – Japan (2003) Excellent
23 Tractor with Belarus MT-50 (2003) Excellent 08
Trolley Belarus MT-50 (2005) Excellent
08 Nos.
24 Generator Cat, D-343T 200 KVA (2004) Excellent 02
06 Nos. Dyno – 25 KVA (2004) Excellent 02
Honda 5KW – 200 KW Excellent 02
25 Welding Machine Local Made (2005) Excellent 02
04 Nos. Local Made (2007) Excellent 02
26 Asphalt Cutting Will be Purchased or hired after ---- 01
Machine award of Work.
01 No.
27 Bitumen Local made-200 Gln. (2006) Excellent 02
Distributors
02 Nos.
28 Wheel Borrows Local made (2006) Excellent New 12
20 Nos. Local made (2007) 08
29 Concrete Trolley Local made (2005) Excellent 03
03 Nos.
30 Diesel Tanker Nissan FS (2004) Excellent 01
Water Bozers Hino (Japan) (2005) Excellent 02
04 Nos. Weith Tractor (2002) Excellent 01
31 Scaffolding Pipes Local made (2005) Excellent 100,000 Rft
Local made (2006) Excellent
32 Shuttering Local made (2006) Excellent 250,000 Sft.

33 Rock Cutting Local made (2006) New 01


Machine
01 No.
34 Surveying Sokia (2004) Excellent 01 Set
Instruments Nikon (2003) Excellent 01 Set
02 Nos.
LIST OF TECHNICAL STAFF
Qualification &
S.# Name of Engineer Designation
PEC Registration No
B.E (Civil)-1964
1 Anwar Ali Warsi Project Manager
PEC No. CIV/4687
DAE (CIVIL)-1962
2 Muhammad Shafiullah Khan CALCUTTA TECHNICAL Project Manager
BOARD
B.E (CIVIL)-1981
3 Anwar Jamal Project Engineer
PEC No. CIV/7736
B.E (Civil)-1967
4 Muhammad Iqbal Sandhu Contract Engineer
PEC No. CIV/1238
B.E (CIVIL)-2009
5 Khalid Mehmood Site Engineer
DAE (CIVIL)-2009
6 Zeeshan Shams Site Engineer
B.TECH (CIVIL)-2015
B.E (Electro)-1987
7 Saleem Raza Abbasi Site Engineer
PEC No. ELECTRO/1861
B.E. (ELECTRICAL)
8 Abdul Majeed Electrical Engineer
ELECT/7297 (1988)
B.E. (Electrical) – 1987
9 Siraj Ahmed Sheikh Electrical Engineer
ELECT /1909
B.E, MECHANICAL
10 Ramzan Ali Mechanical Engineer
MECH/12972 (1997)
M. Osman Yousuf B.E, MECHANICAL
11 Plant Engineer
MECH/34910 (2014)
B.E. (AGRI) – 1981
AGRI / 228
12 Rajab Ali Material Engineer
SINDH AGRICULTURE
UNIVERSITY TANDOJAM
13 Fateh Khan DAE (CIVIL)-1984 Chief Construction Supervisor

14 Farmanullah DAE (CIVIL)-2010 Quantity Surveyor

15 Muhammad Chattal DAE (CIVIL)-1996 Surveyor