Forecast indicated that wave height will not exced 2.0m in height for next 24hrs (from the star of the
Visual inspection has been performed on topsides and touch-up areas have after its installation
attach if necessary
Crane mats are material barge are positioned based on the approved installation sequence drawings
Rigging has been cheched after attached to jacket (securely attached) based on the aproved installation
Sequence drawings
REMARKS
RECEIPT
PRE-CONCRETING
FORMWORK REINFORCEMENT
Item Details (if any) YES NO N/A Item Details (if any) YES NO N/A
Drawings IFC Drawings IFC
Survey Request Rebar condition
Survey Approval Epoxy coated rebar’s
Cleanliness/ Surface Size, number, length
Mortar tight Spacing per DWG
Form oil Rebar per DWG
Braces & Tie rods Splices per DWG
Haunches Cleanliness
Drip Strip Rebar wire secured
Blockouts Cover
Steel Plates Chairs
Embeds secured Bending compliant
Embeds protected Welding compliant
Others Lifting points
ACCEPTANCE
I have verified the formwork and reinforcing steel placement I have witnessed and/or being notified of the concreting of the structure
Concreting Post-Concreting
Date: Time: Formwork Release Date: Time
Item Details (if any) YES NO N/A Item Details (if any) YES NO N/A
Pre-pour notification Curing in place
Batch Plant notice Surface finish
Laboratory notice Strip of forms
Vibrator conditions Visual inspection
Concrete placing No cracks
Pouring Rate No honeycomb
Pre-cast element is
Levels achieved properly identified &
stored
Forms secured Survey report
Construction Joints Tolerances achieved
LEGEND : N/A : Non-Applicable
ACCEPTANCE FOR STORAGE
FIELD Eng. Name Sign Title Date
REMARKS
INSPECTION
REMARKS
INSPECTION
PRE-FABRICATION CHECKS
VERIFY ALL ITEMS Leg: Leg: Leg: Leg
DESCRIPTION Y N Sign
Crane (and all its components) has been pre-inspected and pre-tested?
RECEIPT
erection drawing:
INSPECTIONS
CERTIFICAT OF CONFORMANCE
This is to certify that the above-noted re-shores have been inspected and found to be in accordance with the
latest approved erection drawings and all supplementary information and is ready for placement of concrete
DATE CAST DATE TESTED AGE AT TEST COMPRESSIVE OR FLEXURAL VERIFIED APPROVES DATE
SURFACE PREPARATION
DESCRIPTION Y N COMMENTS
Surface preparation
A transparent adhesive tape test shall be performed in accordance with ISO
8502-3 just prior to coating application. The maximum allowed degree of dust
is ISO 8502-3 class 2. Dust contamination above this level shall be removed.
The anchor profile shall be measured using Testex "Press-O-Film" Replication
Tape in accordance with NACE RP 0287-95. Tape shall be attached to report.
Oil, grease or other surface contaminants shall be removed by biodegradable
detergents or solvent cleaning
The residual chloride salt content shall be measured. The maximum allowable
chloride ion content is 10 μg/cm2 NaCl.
DESCRIPTION Y N COMMENTS
Wet film thickness (WFT) measurements shall be determined following the
procedure in ASTM D4414 Procedure A or ISO 2808 Method 1a. Frequency of
measurement of wet film thickness shall be at least one measurement (three
individual readings) per every half-hour of coating operation (per operator).
Cure of inorganic zinc primers shall be tested by burnishing the surface with a
coin or other blunt metal object. Properly cured inorganic zinc primers shall be
hard and take on a bright zinc metal appearance without chipping or flaking.
Inspection of inorganic zinc cure shall be performed once per 10 m².
Coating shall be dry, clean and free of dry spray before dry film thickness
measurements are made.
Dry Film Thickness (DFT) shall be measured, per SSPC-PA 2 or ISO 2808,
Method 6a, and recorded for each coat at the frequency stated in SSPC-PA-2.
At least one determination (i.e., 15 individual measurements) per coat shall be
made.
Approved DFT gauge is the Type 2 – constant pressure electromagnetic
probegauge in SSPC-PA 2.
DFT gauges shall be calibrated at the beginning and end of each work shift
according to manufacturer’s calibration procedure.
The average of the spot measurements for each 10 m2 area shall not be less than
the minimum thickness specified in ASTM D4414 Procedure A or ISO 2808
Method 1a. No single spot measurement in any 10 m2 area shall be less than
80% of the specified minimum thickness.
DESCRIPTION Y N COMMENTS
The average of the spot measurement measurements for each 10 m2 area shall
not be more than the specified maximum thickness. No single spot
measurement in any 10 m2 area shall be more than 120% of the specified
maximum thickness.
DESCRIPTION Y N COMMENTS
Adhesion tests shall be subject to witness by owner and shall be performed on
finished coatings by making and “x” cut into the coating film to the substrate
and by lifting the coating with a knife. Frequency of testing shall be one test per
In areas where less than 100% of the coating surface is tested, the holiday
COMMENTS
RECEIPT
Field Eng. Name: Sign Title: Date:
Drawing (s)Nº:
PRE-INSTALLATION INSPECTION
DESCRIPTION Y N COMMENTS
All fasteners are being stored in their original containers so that they
are protected from dirt and moisture or intermixing of lots.
Do all delivered fastener assemblies have approved manufacturer’s
DESCRIPTION Y N COMMENTS
Each bolting crew member fully understands the bolt tightening
procedure to be used.
Are only enough fasteners that can be used during a work shift being
removed from storage and are all unused fasteners being returned to
storage in their original containers at the end of each work shift?
Has installation been monitored to ensure that the installation method See IFC Drawings
Bolt Ø -
Bolt Length –
Manufacturer ID -
COMMENTS
RECEIPT
SPECIFICATIONS TO VERIFY
MIXING
Has mixing been done following manufacture’s recommendations to attain
appropriate consistency?
The minimum recommended ambient temperatures are according to
manufacture’s recommendations at time of application.
APPLICATION
Has application being performed according to manufacture’s
recommendations?
CURING
Is curing in place and applied as per manufacture’s recommendations and
specifications?
OTHERS (Specify)
ENGINEERING NOTES
APPROVAL
Drawing (s)Nº:
VERIFICATIONS
DESCRIPTION Y N COMMENTS
Local weather conditions are not going to cause danger to the load or operating
personnel.
Trailer configuration
Environmental data
Wind restrictions
Name of barge
Mooring equipment
General conditions
Load out path clear onshore
VERIFICATIONS
DESCRIPTION Y N COMMENTS
Seafastening
witnessed
Installation
Forecast indicates that wave height will not exceed 2.0 m in height for next
The bearing surfaces have been inspected and all debris have been removed in
the area.
Crane (and all its components) has been pre-inspected and pre-tested.
Crane barge and material barge are positioned based on the approved
Rigging has been checked after attaching to trestles (securely attached) based
Drawing (s)Nº:
VERIFICATIONS
DESCRIPTION Y N Sign
Survey approval has been obtained for the proper camber before splice welding.
Dimensional tolerance inspections including weld fit-up, alignment, length, straightness, girder
square to each other in horizontal and vertical planes prior to welding have been carried out.
Area of work is well protected against any factor that could affect the quality of the weld – water,
wind, etc.
Welding machines and all equipment used in the welding process (es) have up-to-date and/or
Observed joint preparation, assembly, welding techniques and performance of each welder.
Inspect size, length, contour and location of all welds with the appropriate gauge.
Visual inspections for cracks, through fusion, crater cross section, weld profile, time of
inspection, undersized weld, undercut, porosity, and stray arcs – inadvertent arc strikes.
FOR SUBCONTRACTORS
GENERAL INFORMATION
GENERAL NOTES
Three (3) copies of the following documents shall be received from the subcontractor by
DOCUMENTATION
Requirements Y N Notes
include final red lines for the shop drawings, Nest tapes & Cut sheets.
RECEIPT
PRE-CONCRETING
FORMWORK REINFORCEMENT
Item Details (if any) YES NO N/A Item Details (if any) YES NO N/A
Drawings IFC Drawings IFC
Survey Request Rebar condition
Survey Approval Epoxy coated rebar’s
Cleanliness/ Surface Size, number, length
Mortar tight (no gaps) Spacing per DWG
Form oil Rebar per DWG
Braces & Tie rods Splices per DWG
Haunches Cleanliness
Drip Strip Rebar wire secured
Blockouts Cover
Steel Plates Chairs
Embeds secured Bending compliant
Embeds protected Welding compliant
Others Lifting points
ACCEPTANCE
I have verified the formwork and reinforcing steel placement I have witnessed and/or being notified of the concreting of the structure
described herein above. described herein above.
Field Engineer : __________________________________ Owner Representative : ____________________________________________
Date _______________________ Date _____________________ Time____________________
Concreting Post-Concreting
Date: Time: Formwork Release Date: Time
Item Details (if any) YES NO N/A Item Details (if any) YES NO N/A
Pre-pour notification Curing in place
Batch Plant notice Surface finish
Laboratory notice Strip of forms
Vibrator conditions Visual inspection
Concrete placing No cracks
Pouring Rate No honeycomb
Levels achieved Survey request
Forms secured Survey report
Construction Joints Tolerances achieved
LEGEND : N/A : Non-Applicable
ACCEPTANCE
FIELD Eng. Name Sign Title Date
Forecast indicates that wave height will not exceed 2.0 m in height for next 24hrs
The seabed has been inspected and all debris have been removed in the area.
Seals greased
Crane (and all its components) has been pre-inspected and pre-tested.
Crane barge and material barge are positioned based on the approved installation sequence drawings.
Visual inspection has been performed on jackets and required touch-up areas have been marked after
its installation (attach pictures if necessary).
RECEIPT
DESCRIPTION
General Notes:
RECEIPT-BY Owner'Sqa
DETAIL OF REQUEST
Requested By: Date of Request:
SURVEY RECEIPT
SURVEY APPROVAL
IMPORTANT: ATTACH TO THIS REPORT A COPY OF THE SURVEY DATA BOOK AND SIGN FOR APPROVAL
VERIFICATIONS YES NO
HOOK BASE HOLDING DOWN BOLTS
Holding down bolts are installed as indicated on drawings, using templates supplied by Harbour and Marine engineering.
Bolts are installed vertically and checked for square in layout. Obtain survey approval.
Bolt threads are protected from damage during and after installation.
Fill in the Pre-pour inspection report and the 24-hr pre-pour notice
All conduits and/or exits for Capstan power, Comms and grounding are placed according to SNC requirements.
Obtain survey approval for right shim depth to attain proper elevation & leveling of the Hook Base Unit.
The hook base is to be installed on its designated dolphin in accordance with the base labeling.
Rigging has been checked after attaching to Hook Base (securely attached) based on the approved installation sequence
drawings.
Visual inspection has been performed on Hook base and required touch-up areas have been marked after its installation
The bolts, sides and underside of base plate are clean of all rust, oil, grease and dirt, free of laitance and loose particles
Surface is maintained 24-hour saturated with water, clean and free from oil, grease and dirt prior to grouting
DO NOT grout unless the surfaces to be grouted are at a temperature between 5 oC and 20 oC. Obtain the grout
manufacturer’s recommendations if grouting must be carried out in extremes of temperature (below 10 °C or above 20 °C).
Machinery operating nearby does not transmit vibration to the equipment being grouted until grout has been placed and
The formwork is strong, tight to prevent leakage and movement of the grout.
All bolt threads are clean before fastening nuts, apply anti-seize grease to threads. Install fasteners and fully tighten nuts
Installation of the quick release hooks is performed according to Engineering installation manual.
Visual inspection has been performed on Hook base and required touch-up areas have been marked after its installation
(attach pictures if necessary).
RECEIPT
Date
Date
PROES
INSTALLATION OF BEARING ASSEMBLIES CHECKLIST
SPECIFICATION TO VERIFY Y
2. Surfaces beneath bearings are within tolerances, clean, free of debris and/or grease that
3. Have cross beams been checked for correct elevation and level within required
4. Proper placement and alignment of bearings have been established and checked.
5. Full contact between the sole plate and bottom flange of the girder and between bearing
been checked
SIGN-OFF AREA
Date:
PROES
FIELD WELDING CHECKLIST
Structure Name:
VERIFICATION
Requirements Y N
Has the material receiving inspection report been filed for material
acceptance?
Are the guardrails and handrails installed in the right location? (see
installation drawings)
Are the guardrails and handrails end offsets correct according to the
installation drawings?
Have the rail sections been lapped correctly? (see installation drawings)
Is the guardrail height above T.O.C correct: 525 mm to center line?
Have all the fire hose connection platforms been installed in the right
Are plate washers on guardrail post bolts being installed according to plans?
Have all paint touch ups been treated according to the approved method?
COMMENTS
SIGN-OFF
Date
PROES
EXPANSION JOINTS INSTALLATION CHECKLIST
Structure Name:
VERIFICATION
DESCRIPTION Y N
Has the material receiving inspection report been filed for material
acceptance?
Check the drawing for temperature setting of joint.
Install the embedded angles on the right orientation –known better as armor
plates.
Support properly.
CHECKED DATE
Date
Date
PROES
GRATING INSTALLATION CHECKLIST
Structure Name:
VERIFICATION
SPECIFICATION TO VERIFY Y N N/A
Has the material receiving inspection report been filed for material
acceptance?
For metal support: make sure the ‘L’ section is not twisted or tilted and
The angles are installed and properly secured against movement during
concrete placement.
Mantain the proper width to accommodate grating along its bearing length.
SIGN-OFF
Date:
PROES
GROUT PLACEMENT CHECKLIST
Project name: Project Nº:
11. Grout sampling for testing was taken by a Third Party Inspector.
LEGEND: N/A= NON-APPLICABLE
Comments:
APPROVAL
Date:
PROES
Instal the as pererection drawings and adjust chain length by using the turnbuckles.
Have the nuts been torqued to specifications after epoxy grout is 7 days pld and Fender bolt tensioning
RECEIPT
MENT
YES NO N/A
OUTING
Time
YES NO N/A
YES NO
Activity
HP WP
2 X
1 X
Grout Mix Design acceptance
2 X
5
Concrect & Grout Testing- 1 X
Laboratory
6 Formwork 1 X
2 X
Submit manufactur's name andspecification for a grout suitable for the conditions and
use.
All factory packaged grout shall be stored according to the fabricator's documentes
procedures.
Inspection of from conformance with the purchase order.From ties,liner and release
agents have to beinspected.
Submit all Shop drawings for fabrication P.Eng scaled -If required.
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Prior to commencing
construction Data sheet
on reciept
Inspection Report
on reciept
Prior to commencing
construction Certificat
on reciept
Inspection Report
on reciept
REVIEWED BY:
SIGNATURE:
DATE:
Activity
HP WP
3 X
4 X
5 X
1 X
8 Drain
2 X
3
INSPECTION AND TESTING PLAN
Inspection of steel plates for conformance with purchase order and approved drawings
Submit Technical data sheets for pipes, filter fabric and drain rock.
Inspection of pipes, filter fabric,drain rockof conformance with the purchase order-where
applicable.
I.T.P.Nº:
STEP Nº:
REVISION:
100% Certificates
on reciept
Inspection Report
on reciept
on receipt
Inspection Report
on reciept
REVIEWED BY:
SIGNATURE:
DATE:
Activity
HP WP
1 X
2 X
3 X
1 X
8 Drain
2 X
3
INSPECTION AND TESTING PLAN
Perform inspection on the packagins, and the provision for any other
necessary protection-fender bumpers-, of all loose and vulnerable parts.
Non-Applicable
Non-Applicable
REVIEWED BY:
SIGNATURE:
DATE:
I.P.T.TITLE: Field Paint Touch ups
STEP TITLE: Source Acceptance
Activity
HP WP
1 X
1 Materials
2 X
2 Personal 1 X
Qualifications
2 X
3 X
3 Equipment 1 X
4 Submittals 1 X
I.P.T.TITLE: Field Paint Touch ups
STEP TITLE: Source Acceptance
Activity
HP WP
1 Surface Preparation
& Testing
Approved paint shall meet the requirements of Civil 08 and paint manufacturer
specifications.
The Coating Applicator Qualification will be granted to each operator who demonstrates
knowledge of relevant sections of this specification and show competence by successfully
completing a test and performing project related tasks using approved procedures. The test
shall be based on the NACE "Guide to Qualification of Tradesman Industrial Painters".
Surface preparation equipment and coating application equipment shall be adequate and
properly maintained for the intended work.
100% Certifications
100% Certification
100% Qualification
100% Certification
100% Non-Applicable
100% Procedure
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Activity
HP WP
2 X
2 X
2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X
I.T.P. TITLE : Cast-in-Place Concrete Contract
STEP TITLE : Pre-Construction
Activity
HP WP
10 X
11 X
12 X
13 X
2 X
3 X
7 Batch Plant 1 X
2 X
3 X
Activity
HP WP
9 Miscellaneous Metals 1 X
2 X
3 X
4 X
10 Formwork 1 X
INSPECTION AND TESTING PLAN
Review and submit the Fine and Coarse Aggregate Sieve Analysis
Inspect for Resistence to Degradation of Fine Aggregates by Abrasion and Impact in the
Micro-Deval Apparatus
INSPECTION AND TESTING PLAN
Inspect for the Potential Expansitivity of Aggregate Change due to Alkali Aggregate
Reactivity in Concrete (AAR)
Inspect for the Petrographic Analysis of Coarse and Fine Aggregate for Use in Concrete
Inspect for the Resistence to Degradation of Small and Large Coarse Aggregates by Abrasion
and Impact in the Los Angeles Machine
Supplier Certification
14 days in advance
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Before Fabrication
100% Certification
100% Certification
1 Formwork 1
2 Reinforcing Steel 1 1
3 Miscellaneous Metals 1
5 Pre-pour Inspection 1 X
2 X
3 X
I.T.P. TITLE : Cast-in-Place Concrete Contract
STEP TITLE : -Construction
Activity
HP WP
4 X
5 X
6 X
8 Concrete Placing 1 X
2 X
9 Curing 1 X
10 Concrete Testing-Laboratory 1 X
11 As-built 1
INSPECTION AND TESTING PLAN
rete Contract
Use approved Rebar placing drawings - Shop drawings & Perform the MRIR.
Obtain Survey Request to verify the initial, final alignments, levels, layout of
all embeds and structural elements. Obtain KWS Survey Approval to ensure
that all items are properly aligned and leveled prior, during and after placing
concrete.
rete Contract
Concrete finish
Curing shall begin immediately following the placing and finishing operations
and shall provide the temperature and moisture conditions for the period of
time necessary for concrete to develop its strength, durability, and other
properties.
Review and submit test results for the Compressive Strength of Cylindrical
Concrete Specimens
100%
100%
100%
100%
Through Operations
100%
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
100%
2 Formwork 1 X
3 Miscellaneous Metals 1 X
4 Lifting anchors 1 X
5 Gasketing material 1 X
6 Batch Plant 1 X
1 Formwork 1
2 Reinforcing Steel 1
5 Pre-pour Inspection 1 X
8 Concrete Placing 1 X
2 X
9 Curing 1 X
I.T.P. TITLE : Pre-Cast Concrete
STEP TITLE :Construction
Steelwork items shall be fabricated in accordance with the contract drawings. Fabrication and
galvanization of miscellaneous metals
Lifting anchors shall be of the type being approved by engineering design. Receive and store
lifting anchors according to manufacture's recommendation.
Gasketing material shall be of the type and material being approved by engineering design.
Receive and store gasketing material according to manufacture's recommendation.
Mix design and its materials -aggregates, cementious materials, water, chemical admixturesfor
each proposed mix as well as its Trial Mixes shall conform to the requirements as outlined design submitted, 1 review
Use approved Rebar placing drawings- Shop drawings & Perform the MRIR.
Use IFC-drawings for the positioning of the embedments & anchor bolts.
Perform the MRIR.
Obtain Survey Request to verify the initial, final alignments, levels, layout of
all neccesary items and structural elements to subsequently obtain KWS
Survey Approval to ensure that all items are properly aligned and leveled
prior to placing concrete.
All materials and products shall be clearly identified and approved for
delivery prior to its loading and transportation.
Submit to the QA/QC department the dimensional review records of each precast
deck panel clearly identified.
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
100%
Prior to commencing
construction
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
100% Supplier
100%
100%
Through Operations
100%
100%
100%
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Prior to storage
Through Operations
Prior to loadout
I.T.P. TITLE : Structural Steel Bolting
STEP TITLE :Construction
1 Material Receiving
3 Installation of fasteners in
connections
INSPECTION AND TESTING PLAN
Implement the structural steel bolting procedure for the installation of Bolting procedure,
fasteners in connections.
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Materials 1 X
2 X
2 Equipment 1 X
3 Submittals 1 X
''HP'' Hold Point: Activity may not proceed until inspection / Verification has been completed
''WP'' : Owner may witness at any time during construcction
INSPECTION AND TESTING PLAN
Supply a tension measuring device capable of testing bolt torque and tension, impact
wrenches and inspection torque wrench. Provide calibration certificate for tension measuring
device current to within 6 months of use.
tivity may not proceed until inspection / Verification has been completed
witness at any time during construcction
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
100%
INSPECTION AND TESTING PLAN
2 Equipment 1 X Supply a tension measuring device capable of testing bolt torque and tension, impact
wrenches and inspection torque wrench. Provide calibration certificate for tension measuring
device current to within 6 months of use.
100%
I.T.P. TITLE : Field Welding
STEP TITLE :Source approval & Construction
1 Submittals 1 X
2 X
3 X
4 X
X
5
6 X
2 Field Welding 1 X
INSPECTION AND TESTING PLAN
All field welding on structural and mechanical components shall be done by a company
certified
All welding shall conform to W59 and be performed as per the companies approved CWB
welding procedure.
The welding sub contractor shall provide evidence that all welders and welding operators are
currrently qualified by the CWB at the time of welding in the procedures and processes
All welding machines and welding equipment to have been calibrated, current to within 6
months.
Submit qualification of NDT company, NDT procedures and calibration of all testing
and inspection equipment.
Submit NDT summary for all welds. Visual inspection, MPI, UT or RT as required.
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
1 Material Receiving 1 X
2 Submittals 1 X
2 X
3 X
4 X
4 Survey 1 X
INSPECTION AND TESTING PLAN
Perform & record visual inspections on all items included on the detailed packing lists.
Revise hand-over documentation requirements for subcontractors.
The current test certificates and inspections for cranes, copies of the current test certificates
for slings, shackles, chains, link hooks and any part used with cranes and lifting appliances.
•Marine documents for installation spreads • Certificates of diving equipment and diving
Install piles in their proper orientation in the appropiate jacket leg as outlined in the current
installation procedure & contract drawings.
Advance main piles to designated design elevation without causing excessive deformation to
the tip.
Obtain survey approval for the final location of jacket & submit
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
100%
Inspection Report
1 Submittals 1 X
2 X
3 X
4 X
5 X
6 X
7 X
2 Survey 1 X
3 Drilling 1
2 X
3 X
INSPECTION AND TESTING PLAN
Submit the drilling procedure indicating the sequence of drilling operations to be followed.
The current test certificates and inspections for cranes and any lifting applicances.
Furthermore, for lifting equipment, load tests shall be carried out by appropiate skilled and
qualified personnel and witnessed by Third party authorities.
Copies of the current test certificates for slings, shackles, chains, link hooks and any part used
with cranes and lifting appliances, stating the manufacturer, the lengths & diameter (slings),
the type & capacity (shackles) and the safe working load & breaking strength (slings,
shackle).
Welding & NDT procedures for all temporary falsework, temporary supports & temporary
bracing.
•Marine documents for installation spreads, • Calibration certificates for all survey
equipment (if applicable).
Additional level checks shall be carried out as follows -IF APPLICABLE: • Before and after
drilling of each socket.
100%
Field reports, Rock socket
acceptance & recommendation for
100% pile cut-off
I.T.P. TITLE : Installation
STEP TITLE :Drilling Operations
Submittals 1 X
2 X
3 X
4 X
5 X
6 X
7 X
INSPECTION AND TESTING PLAN
Shop drawings for each type of bearing showing all details of the bearing Before fabrication
assemblies and proposed material.
Material certification
Material certification
Material certification
Material certification
Manufacture's Certification
Conformance Certificate
I.T.P. TITLE : Bearing Assemblies
STEP TITLE :Supply and Installation of elastomeric bearning
1 Material Receiving 1 x
2 Installation 1
4 Bolt Tensioning 1 x
INSPECTION AND TESTING PLAN
ric bearning
Inspect elastomeric bearings' components for conformance with the purchase Prior to installation
order, approved drawings. Store and protect the bearings during handling,
transportation and installation according to manufacture's recommendations.
Bearings shall be set to the dimensions and tolerances as outlined on the 100%
construction drawings.
Install bolts and inspect their tensioning according to the bolting procedure 100%
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
r to installation
I.T.P. TITLE : Miscellaneous Metals
STEP TITLE :Fabrication
1 Shop Drawings 1 X
2 X
2 Materials 1 X
3 Fabrication 1 X
2 X
3 X
INSPECTION AND TESTING PLAN
Shop drawings shall show all information necessary for the fabrication of the miscellaneous
metals.
Galvanization
100% Drawings
100% Drawings
100% Certificates
100% Certificates
1 Material Rece 1 X
2 Installation
1
2
INSPECTION AND TESTING PLAN
Record MRIR & perform visual inspections on all items included on the detailed packing lists
as well as coatings. Store items as per manufacture's recommendations.
Install and position the miscellaneous metals to the tolerances as outlined in the current
installation drawings.
All field welds and damaged galvanized coatings shall be repaired and painted with two coats
of Zinga
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
100%
I.T.P. TITLE : Pre-Cast Concrete
STEP TITLE: Loadout, Seafastening, Transportation & Installation
Group #
Line #
points title
HP WP
2 Loadout Procedure 1 X
2 X
3 Seafastening 1 X
4 Transportation 1 X
All materials and products shall be repaired, clearly prepared and approved
for delivery prior to its loading and transportation according to the approved
material and procedure.
Any equipment used for personnel transfer shall be tested every 6 months and
baskets shall be tested every 3 months.
Install previously the 10-mm gasketing material on the jackets' support girders
according to manufature's recommendations as per latest IFC drawings.
IFC Drawings
Install the precast elements on the rigth location according to the IFC
drawings.
''HP'' Hold Point: Activity may not proceed until inspection / Verification has been completed
''WP'' : Owner may witness at any time during construcction
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Inspection Reports
1 Submittals 1 X
2 X
3 X
4 X
5 X
Submit to Canaport LNG the seafastening design including its: shop drawings, installation &
removal procedures.
Record MRIR & perform visual inspections on all items included on the detailed packing lists
as well as coatings. Store structural elements as per manufacture's recommendations.
''HP'' Hold Point: Activity may not proceed until inspection / Verification has been completed
''WP'' : Owner may witness at any time during construcction
''HP'' Hold Point: Activity may not proceed until inspection / Verification has been completed
''WP'' : Owner may witness at any time during construcction
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Non-Applicable
Procedure
Inspection Report
Inspection Reports
I.T.P. TITLE : Catwalk Installation
STEP TITLE: Positioning
Group #
Line #
points title
HP WP
1 Catwalk Release 1 X
2 Submittals 1 X
2 X
3 X
4 X
5 X
6 X
2 X
3 X
4 As built 1 X
INSPECTION AND TESTING PLAN
Perform Final Inspection Report for splicing of Jetty Catwalks & record visual inspections on
all items included on the detailed packing lists as well as coatings for reparations.
The current test certificates and inspections for cranes and any lifting appliances.
Furthermore, for lifting equipment, load tests shall be carried out by appropiate skilled and
qualified personnel and witnessed by Third party authorities.
Copies of the current test certificates for slings, shackles, chains, link hooks and any part used Prior to loadou
with cranes and lifting appliances, stating the manufacturer, the lengths & diameter (slings),
the type & capacity (shackles) and the safe working load & breaking strength (slings,
shackle).
Welding & NDT procedures for all temporary falsework, temporary supports & temporary
bracing -IF APPLICABLE.
Inspect rigging, Install and position the catwalks to the tolerances as outlined in the current
installation procedure. Obtain survey approval for the final location. Submit as built records.
''HP'' Hold Point: Activity may not proceed until inspection / Verification has been completed
''WP'' : Owner may witness at any time during construcction
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Inspection Reports
I.T.P. TITLE : Installation
STEP TITLE: Concreting & Grouting Operations
Group #
Line #
points title
HP WP
2 Batch Plant 1 X
4 Procedure 1 X
5 Survey 1 X
3 X
8 Conformance Report 1 X
INSPECTION AND TESTING PLAN
ting Operations
Mix design for each proposed mix as well as its Trial Mixes shall conform to the
requirements as outlined in ITP-0005. Grout material for cold weather applications must be
approved by engineering design.
Submit the Tremie concrete and Grouting procedure indicating the sequence of operations to
be followed. Indicate the course of action to be adopted in the event of interruption of any
stage due to loss of concrete or grout into the formation or failure of batch plant or equipment.
The procedure shall include methods of measuring concrete and grout consistencies at all
stages.
Additional level checks shall be carried out as follows: • Before grouting starts • After
completion of grouting - IF APPLICABLE.
After insertion of the anchor pin KWS shall ensure that it is kept centralised and immobile
until concreting and grouting are completed following the approved procedures.
Cube samples shall be taken during concreting/grouting of each rock socket, jacket leg and
annulus. Samples shall be taken from the mixing tank only after attaining the required
density. Concrete/Grout density checks are to be made at the mixing tank.
24 hours compression test will be carried out by compression testing machine and the results
of these tests will be submitted to the Canaport LNG -IF APPLICABLE.
7 days and 28 days compression tests will be carried out at a shore based laboratory having
compression testing facilities. Such tests will be witnessed by certification agency. The exact
interval between pumping and testing shall be noted in each case.
Concrete and/or Grout strength shall be met as per jacket's pile assembly IFC drawing.
100% Asbuilt
100%
100% Field Placement Reports,
Compression Test Reports
100%
100%
Line #
points title (features, criteria)
HP WP
2 x
3 x
4 x
5 x
6 x
5 Formwork 1 x
INSPECTION AND TESTING PLAN
Reference Frequency
Documents
Results on the hook shock test up to the maximum design load then quick released under the
nominal load.
Steel certificates for the quick release hooks that confirm resistance to the test pull and x-ray
examinations performed at 100%
Certificate of insulation for the quick release hook mounting base and anchor bolts to
prevent electrical contact with the jetty.
Assembly Details including: Detailed procedures for offloading members upon delivery,
Details of temporary storage and support of members on site prior to erection.
Perform & record visual inspections on the display boards, display board pedestal with
electric rotator, remote release console, equipment rack, computers, current sensor mounting
stand, weather station & visibility sensor mounting stand, lasers, 125T quick release hooks.
Revise hand-over documentation requirements for subcontractors. Store all items as per
manufacture's recommendations.
Bend rebar for concrete block for mooring hook according ot the latest IFC drawings. Submit
shop drawings and the Mill Certificates of received reinforcing steel according to CAN/CSA
Perform & record visual and dimensional inspections on received holding down bolts. Submit
material fabrication and certification as per manufacture's data book
Reinforcing steel, concrete mix design, concrete materials -aggregates, cementious materials,
water, chemical admixtures-, batch plant, concrete testing - field & laboratory- shall conform
''HP'' Hold Point: Activity may not proceed until inspection / Verification has been completed
''WP'' : Owner may witness at any time during construcction
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
On arrival
1 Survey 1 X
2 Loadout procedure 1 X
2 X
3 Installation procedure 1 X
2 X
3 X
4 X
5 Installation 1 X
7 Bolting 1 X
8 As-built 1 X
points title
HP WP
9 On-site Testing 1 X
10 System Integration 1 X
INSPECTION AND TESTING PLAN
Obtain survey as-builts on the location of the mooring dolphin jackets required for the layout
of holding down bolts of the mooring hooks.
The current test certificates and inspections for cranes and any lifting appliances.
Copies of the current test certificates for slings, shackles, chains, link hooks and any part used
with cranes and lifting appliances, stating the manufacturer, the lengths & diameter (slings),
the type & capacity (shackles) and the safe working load & breaking strength (slings,
shackle).
Submit the mooring hook's offshore installatIon procedure including the following: All
installation sequence drawings of the offshore structures.
Install rebar for mooring hooks as per IFC shop drawings to fit into each mooring dolphin's
block formwork.
Install holding down bolts for mooring hooks according to the latest IFC formwork and design
drawings. Perform visual and dimensional inspections on steel templates for holding down
bolts.
Obtain survey approval for the final alignment and positioning of holding down bolts.
Obtain survey approval for the final location. Submit to the QA/QC department the as-built
records.
''HP'' Hold Point: Activity may not proceed until inspection / Verification has been completed
''WP'' : Owner may witness at any time during construcction
Test the SmartHook Mooring Load Monitoring System in accordance with the Factory
Acceptance Test.
Integrate the mooring hooks with the fender monitoring system, environmental monitoring
system and the berthing velocity monitoring system.
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Before loadout
Propietary formwork
100% system/general arrangement
drawings
100%
100%
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Line #
points title
HP WP
1 Fender Supports 1 X
2 Fender Protectors 1 X
3 Air-Block Fenders 1 X
4 Spare Parts 1 X
8 Epoxy 1 X
9 Repair kits 1 X
10 Bolting Equipment 1 X
points title
HP WP
Epoxy-Resin-Base Grout
System
INSPECTION AND TESTING PLAN
Perform & record visual inspections on all items included on the detailed packing lists.
Receive and review hand-over documentation requirements from subcontractors.
Perform & record visual inspections on all items included on the detailed packing lists.
Receive and review hand-over documentation requirements from subcontractors.
Perform & record visual inspections on all items included on the detailed packing lists as well
as manufacture's name, fender size, manufacturing date or date code, fender serial number &
initial or rated internal pressure. Receive and review hand-over documentation requirements
from subcontractors.
Perform visual inspections and verify types and quatities of all spare parts listed on the
vendor approved spare part list.
Approved vendor
Perform & record visual inspection on full thread rods 2½”×12’, heavy hex. nuts 2½” &
2½”×5/16" thk. washers
Perform & record visual inspections on all items included on the detailed packing lists as well
as hot-dip galvanized coatings. Receive and review hand-over documentation requirements
for subcontractors.
Perform & record visual inspections on all items included on the detailed packing lists for all
the electrical instrumentation for the pressure monitoring system.
Perform & record visual inspections on the fast weld epoxy putty from polymer systems inc.
Perform & record visual inspections on all items included on the detailed packing lists for the
two repair kits.
Supply impact wrenches and inspection torque wrench and calibration certificate for such
devices current to within 6 months of use.
''HP'' Hold Point: Activity may not proceed until inspection / Verification has been completed
''WP'' : Owner may witness at any time during construcction
Review and submit acceptance for FIVE STAR® ROCKWATER RockEpoxy® 21 grout
System according to ASTM C 881 Standard Specification for Epoxy-Resin-Base Bonding
Systems.
ASTM C 881 100% Five Star®
Five Star® Manufacturer Data
Sheet
12 Reinforcing Steel acceptance 1 X
Bend rebar according to survey as-builts on the location of the fender supports & shim depth
required for the final alignment of the air block fenders. Submit rebar cage shop drawings and
the Mill Certificates of received reinforcing steel according to CAN/CSA G30.18-M, G30.3-
M and G30.5-M.
C04-1.4,SPE-001,
SPE-0002 art. 3.4
Prior to use materials
KWS Survey,
Supplier
Shop drawings, Mill Certificates
2 X Epoxy-coated reinforcing steel according to the requirements of ASTM A775M and D3963M.
C04-1.4,
SPE-0002 art. 3.5
Prior to use materials Supplier Certificate
13
Formwork - Design &
Fabrication
1X
Submit all Formwork drawings and calculations for fabrication -CAN/CSA-S269.3- P.Eng
sealed -AS APPLICABLE.
SPE-0001, SPE-
0002 art. 2.2, 2.3,
3.9, 4.2, 5.8
Prior to installation KWS
Design calculation report /
Propietary formwork system
drawing
14
Testing Agency Qualifications -
Field & Laboratory
1X
Testing Service certification from a Qualified testing firm according to the latest edition of
CSA A283-06.
CSA A283-06
Prior to commencing
construction
3rd Party Insp. Certificate
15
Panel Grout Material - Field &
Test specimens Testing
1X
Field & Laboratory tests shall conform to the requirements as outlined in the material data
sheet.
Five Star®
Manufacturer Data
Sheet
100% KWS
Five Star® Manufacturer Data
Sheet
CP-04-MA-ITP-0015 - Fenders Assembly R(01)
''HP'' Hold Point: Activity may not proceed until inspection / Verification has been completed
''WP'' : Owner may witness at any time during construcction
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION:
Upon arrival
Fabrication Dossiers
Upon arrival
Upon arrival
Upon arrival
Upon arrival
Upon arrival
Upon arrival
Contact Nº:
I.T.P.Nº:
STEP Nº:
REVISION: