C8
* CRACKS IN WALLS
3. 12 mm 180.00 KG * CRACKS DUE TO SHRINKAGE OF CONCRETE
C9 B6 B7
M20 REVISION
9"X15" C7 9"X18" 4. 3.8 CUM
REV. DATE DISCRIPTION MADE CHEK. APPR.
1
PRINTS
DATE ISSUED TO COPIES
PROJECT
DRAWING CONTENT
DKP
DKP DKP
I. USE M20 GRADE CONCRETE CONFIRMING I. S. CODE 456 IX. DESHUTTERING PEROID XI. AT MID SPAN OF SUPPORTED BEAMS HAVING SPAN 21'0" ABOVE.
II. USE Fe 500 GRADE STEEL CONFIRMING I.S. CODE 1786 EXCEPT a) VERTICAL FORMWORK TO COLUMN, WALL AND BEAM S = 16 - 24 HRS XII. THE CARE SHALL BE TAKEN BY THE CONTRACTOR WHILE WORKING ON SITE
b) SOFFIT FORMWORK TO SLAB HAVING ABUTTING ADJUCENT BUILDINGS, WE ARE NOT RESPONSIBLE FOR ANY
6MM SHALL BE FE250 GRADE
(PROPS TO BE REFIXED IMMEDIATE AFTER REMOVED OF FORMWORK.) = 3 DAYS DAMAGE IF CAUSED TO ABUTTING BUILDINGS.
SHREYAS TADASARKAR
III. CENTERING DESIGN IS CONTRACTORS RESPONSIBILITY.
c) SOFFIT FORMWORK TO BEAMS XIV.FOR CANTILIVER BEAMS, TOP REINFORCEMENT SHOULD BE ANCHORED BEHIND ARCHITECTS , INTERIOR DESIGNERS.
IV. CLEAR COVERS TO FOOTING = 2" , COLUMN = 134" , BEAM = 1" ,
(PROPS TO BE REFIXED IMMEDIATE AFTER REMOVED OF FORMWORK) = 7 DAYS FOR 7OXDIA OF BAR OR 1.5 X SPAN OF CANTILIVER WHICH EVER IS GREATER. Sant Gora Kumbhar Vasahat, Bapat Camp, Market Yard,
SLAB = 34" ,LINTELS = 34" Kolhapur, Maharashtra.
d) PROPS TO SLAB XV. STRATA SHOULD BE GOT APPROVED BY STR. ENGG. BEFORE CASTING OF CONCRETE.
V. FOR BEAMS HAVING DEPTH MORE THAN 30" PROVIDE SIDE FACE M - 9096306429 , e-mail: tadasarkarshreya@gmail.com
i) SPANNING UPTO 15'0" = 7 DAYS XVI.STEEL SHOULD BE GOT CHEKED BY STR. ENGG. BEFORE CASTING CONCRETE
REINFORCEMENT 8 # @ 12" C/C ON BOTH FACES. XVII.ANY DISCREPANCY BETWEEN THIS DRG/ARCH DRG/SITE CONDITION
ii) SPANNING OVER 15'0" = 14DAYS
VI. LAPS TO COLUMN BAR = 45 X D. LAPS TO SLAB / BEAM = 69 X D. SHOULD BE BROUGHT TO OUR NOTICE BEFORE EXECUTION.
e) PROPS TO BEAM AND ARCH
VII. FOR BEAMS HAVING WIDTH 6" OR LESS ONLY TWO
i) SPANNING UPTO 18'0" = 14 DAYS ( # - TOR SIGN, ST- STRAIGHT BAR, BT- BENT BAR.)
BARS TO BE PROVIDED IN ANY ONE LAYER.
ii) SPANNING OVER 18'0" = 21 DAYS XVIII.(TYP) 12 # 16 READ AS NO. BARS # BAR DIA. D K PATIL DESIGN & CONSULTING ENGINEERS
VIII. FOR BEAMS HAVING WIDTH 9" ONLY THREE
NOTE- THE NUMBER OF PROPS LEFT UNDER,THEIR SIZES & DISPOSITION SHALL BE XIX. AT DISCONTINOUS EDGE OF THE SLAB PROVIDE 8# e 12" C/C AS AN EXTRA TOP
BARS TO BE PROVIDED IN ANY ONE LAYER.
SUCH AS TO BE ABLE TO SAFELY CARRY THE FULL DEAD LOAD OF THE SLAB,BEAM REINFORCEMENT TO THE SLAB. "SHANTAI", Plot No. 80/ 5 , Patil Lane, Gokul
OR ARCH AS THE CASE MAY BE TOGETHER WITH ANY LIVE LOAD LIKELY TO OCCUR XX. ALL LAPS SHOULD BE STAGGERED & NOT MORE THAN 50%. BAR TO BE LAPPED AT
Shirgaon, Karveer, Kolhapur - 416234 (INDIA)