Académique Documents
Professionnel Documents
Culture Documents
Attachments
YESTERDAY!!
Background
Historically
Mostly Wired Attachments
o Contracts in place with Attachers
o Permits
o Approvals
o Make-ready
o Field Verification
o Annual Rent Invoicing
Today’s Environment
o Rush to Deploy 5G
o Companies are responding to Competitive pressures to upgrade plant
o Many Companies Deploying Small Cell Antennas are Well Funded
o Congress, FCC and Some State are applying pressure to lower rates and
reduce time frames to attach
Legislative Update - Georgia
HB 518 – Rights-of-Way: Compensation of
Telecommunications Equipment
o By: Representatives Hawkins of the 27th, Parsons of the 44th,
Maxwell of the 17th, and Pruett of the 149th
o House Committee - Energy, Utilities & Telecommunications
Currently:
o Companies with Retails Customers
3% Gross Revenues
o Companies without Retail End Use Customers
$1k or $5k per linear mile
Legislative Update - Georgia
HB 518 – Continued
Proposed:
o Companies with Retails Customers
3% Gross Revenues
o Companies with Wholesale Customers
3% Gross Revenues
o No End-Use Customers
$500 per linear mile
Legislative Update - Georgia
SB 232 – Facilitating Internet Broadband Rural Expansion
(FIBRE) Act
o By: Senators Gooch of the 51st, Wilkinson of the 50th,
Harper of the 7th, Lucas of the 26th, Burke of the 11th
and others
o Senate Committee - Regulated Industries and Utilities
Proposes
o Preempts Home Rule Authority
o Presumes application is reasonable
o Permits do not expire
o Requires that collocation work begin within 1 year
o Structure or Facility work begin in 2 years
Legislative Update
HB 533 – Broadband Infrastructure Leads to Development
(BILD) Act
o House Committee - Energy, Utilities & Telecommunications
Proposes
o Limits the ability of local governing authorities to prohibit, regulate,
or charge for the collocation of small wireless facilities in public
rights of way under certain circumstances
o Provide the Public Service Commission with the jurisdiction to
determine disputes
o Provides for related matters
o Repeals conflicting laws
Called for Sub-committee Hearing
o October 24th
Other Bills – Other States
5G Technology
and the
Internet of Things (IoT)
What is 5G Technology
It’s Faster
(10 x Faster than current 4G)
It’s Quicker
(Applications Respond Instantly)
It’s Easier to Access
(Billions of Devices can connect)
It’s Scalable
(Smart Cities will be built on its technology)
The Economic Benefits of 5G
Small Cell
Advantages
• Increases data
capacity
• Extends coverage
• Creates a “Reactive” vs
“Proactive” environment
Antenna cables,
connectors, power,
grounding, hardware,
banding
After
Before
5G wireless is
coming
Any City USA to your City.
Is your City
ready?
Problem #1:
Little coordination and
planning between
cities, MNOs and
utilities to build out 5G.
Problem #2:
This is what your City
may look like in 5-10
years if Problem #1
isn’t solved today.
Location Priorities:
1. Electric Distribution Poles
2. Electric Transmission
Poles
3. Electric Substations
4. City Street Lights
5. Traffic Lights
6. Parking Lot Lights
7. Billboards
8. Buildings/Rooftops
9. Private Property
Muni-Utility / ePole Deployment Example
Marietta Historic Boundary
Head-end
Antenna above
Energized space
Capable of serving
multiple MNOs
Pole-mounted
Shroud in Comms
space serving
multiple MNOs
Municipality Enersphere
1. Approve ESC composite pole and ePole 1. Contributes composite pole (~$3K -
configurations including pole-top antenna and pole- $4K value)
mounted shroud or enclosure for in-line tangent and
secondary utility pole replacements, including some 2. Finances up to $3000 of municipal
street light poles devices (Wi-Fi, camera, sensors,
beacons, etc.)
2. Execute SJUA with ESC that authorizes ePole
installs and pole replacements on Municipal-owned 3. Secures Lease Agreements with
Property, Easements and RoW MNOs and other Service Providers
3. Establish a wireless ordinance or small cell 4. Prepares and submits required SJUA
infrastructure criteria documents to Municipality & Utility
4. Cooperate with ESC to select best small cell location 5. Pays License Fee to Municipality
(New install or pole replacement) equal to 10% of lease revenue
received by ESC per ePole
5. Expedite:
a) Municipal and utility permitting processes
b) Make-ready work for installations & replacements
c) Provisioning and restoration of electric power
d) Cooperate with ESC to provision dark fiber transport
Questions?
Dave Lasier
President, Enersphere Communications
404-786-6455 dlasier@enersphere.com
BACKUP SLIDES
SB
5711
HF S 0342
739 ACT
20 SB 536
LB SF
431 HB 1620 SB 6687
389 SB SB
SB
HB 331 213 HB 139
SB 1193 SB 1451 HB
SB 2196
649 656
2131
SB 310
HB
2365
HB
533
SB
1004
HB
687
Densification example in 3rd Tier Market
(Dark fiber / Colocation Strategy)
Fiber transport to
the ePole
(CRAN or DAS)
10/26/201
7
Small Cell Coverage (1W-1900 MHz– Directional antennas)
10/26/201
7
ePole Coverage (30W- 1900 MHz- Tri-sector)
10/26/201
7
Pole Attachment Service
32 Cities
Pole Replacements
o No notice given
o No reimbursements
o Overbuilding TELCO
Slow transfers
Permitting
Agreements in place
o Application form
o Requirements for submittals
o Fees & Reimbursements
o Permit process flow and time frames
Permitting
CATV and Telco need to submit a permit for new
attachments and overlashings. Some agreements call
for notice instead of submitting a permit
o Update mapping
Permitting – Process flow
Submit Application
for Pole Attachment
Licensee
Application
Denied
Application
Received From
Customer Licensee No
Modifies
Application?
Power Note
Application Is No
Company Checked for Application Discrepancies
and return to
Completeness Complete?
Licensee
No
Perform Make
Yes Ready Work
Costs
Prepare cost estimate Approved
Application & send to Licensee ?
Surveyed &
Designed
Yes
Is Make Yes
Ready
Required
? Application / Work
Request Approval
No
Permitting
Make sure you are reimbursed
o Collect the application fee from CATV/Fiber
o Cannot overbuild
o Notice required
30 – 60 days depending on agreement
Can be written or through NJUNS
Pole Change Outs/Relocations/Removals
Notify attachers
o When project is in the design phase or planning stage
Beautification projects
Line moves/upgrades
o Before starting a groundline inspection
Attachers
o 30 + days to move or, in some cases, Power can move
while at pole
Pole Change Outs/Relocations/Removals
Reimbursements/Fees
Utilize NJUNS
o Instant notification to attachers
o Can track completed work easily
o Keeps a record of notification
Transfers
Remediation options
o If agreement and attacher allow, transfer power and
CATV
o Charge fees if applicable
Late Transfer fees
Trip Charges
Pole Removal cost recovery
o Hold permits
o Meet with attachers
o Escalate to management
Summary
Communication is Key