DATA SONDIR / DCPT (Dynamic Cone Penetration Test)

SNI 2827:2008

Titik : S-1 Koordinat GPS (UTM) : X = 439527


Lokasi : Semarang Y = 9197286
Proyek : Jembatan Kali Tuntang Tanggal Survey : 08 September 2017
Elevasi : +0.00 m muka tanah setempat Master Sondir : Waluyo

Depth CN CL Depth CN CL Depth CN CL


(m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm)

(1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6)
(3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif

0.00 0 0 0 0 0 10.20 20.40


0.20 3 5 2 4 4 10.40 20.60
0.40 4 6 2 4 8 10.60 20.80
0.60 6 8 2 4 12 10.80 21.00
0.80 4 6 2 4 16 11.00 21.20
1.00 3 5 2 4 20 11.20 21.40
1.20 2 4 2 4 24 11.40 21.60
1.40 6 8 2 4 28 11.60 21.80
1.60 10 13 3 6 34 11.80 22.00
1.80 4 6 2 4 38 12.00 22.20
2.00 6 8 2 4 42 12.20 22.40
2.20 4 6 2 4 46 12.40 22.60
2.40 3 5 2 4 50 12.60 22.80
2.60 4 6 2 4 54 12.80 23.00
2.80 6 9 3 6 60 13.00 23.20
3.00 5 7 2 4 64 13.20 23.40
3.20 4 7 3 6 70 13.40 23.60
3.40 6 9 3 6 76 13.60 23.80
3.60 3 5 2 4 80 13.80 24.00
3.80 3 5 2 4 84 14.00 24.20
4.00 4 6 2 4 88 14.20 24.40
4.20 3 5 2 4 92 14.40 24.60
4.40 3 5 2 4 96 14.60 24.80
4.60 6 9 3 6 102 14.80 25.00
4.80 5 8 3 6 108 15.00 25.20
5.00 12 18 6 12 120 15.20 25.40
5.20 21 26 5 10 130 15.40 25.60
5.40 30 40 10 20 150 15.60 25.80
5.60 80 95 15 30 180 15.80 26.00
5.80 125 140 15 30 210 16.00 26.20
6.00 175 190 15 30 240 16.20 26.40
6.20 250 250 0 0 240 16.40 26.60
6.40 16.60 26.80
6.60 16.80 27.00
6.80 17.00 27.20
7.00 17.20 27.40
7.20 17.40 27.60
7.40 17.60 27.80
7.60 17.80 28.00
7.80 18.00 28.20
8.00 18.20 28.40
8.20 18.40 28.60
8.40 18.60 28.80
8.60 18.80 29.00
8.80 19.00 29.20
9.00 19.20 29.40
9.20 19.40 29.60
9.40 19.60 29.80
9.60 19.80 30.00
9.80 20.00 30.20
10.00 20.20 30.40
GRAFIK SONDIR / DCPT

Titik : S-1 Koordinat GPS (UTM) X : 439527


Lokasi : Semarang Y : 9197286
Proyek : Jembatan Kali Tuntang Tanggal Survey : 08 September 2017
Elevasi : +0.00 m muka tanah setempat Master Sondir : Waluyo

TEKANAN KONUS (Kg/cm2)


RASIO GESEKAN (%)

50 100 150 200 300 235500 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15


0.00 0.00

1.00 1.00

2.00 2.00

3.00 3.00
KEDALAMAN (m)

KEDALAMAN (m)

4.00 4.00

5.00 5.00

6.00 6.00

240 250

7.00 7.00

8.00 8.00
0 500 1000 1500 2000 2500
GESEKAN LOKAL (Kg/cm2)
JUMLAH HAMBATAN PELEKAT (Kg/cm)
GRAFIK RASIO GESEKAN GRAFIK GESEKAN LOKAL
Grafik Konus Grafik Jumlah Hambatan Pelekat
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVEN/BORED PILE )

Titik : S-1

Diameter (cm) 30 40 50 60 80
Luas Penampang (cm2) 706.858 1256.637 1963.495 2827.433 5026.548
Keliling (cm) 94.248 125.664 157.080 188.496 251.327

Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
0.0 0 0 0.00 0.00 0.00 0.00 0.00
0.2 3 4 0.78 1.36 2.09 2.98 5.23
0.4 4 8 1.09 1.88 2.87 4.07 7.10
0.6 6 12 1.64 2.81 4.30 6.11 10.66
0.8 4 16 1.24 2.08 3.12 4.37 7.51
1.0 3 20 1.08 1.76 2.59 3.58 6.03
1.2 2 24 0.92 1.44 2.06 2.79 4.56
1.4 6 28 1.94 3.22 4.81 6.71 11.46
1.6 10 34 3.00 5.04 7.61 10.71 18.46
1.8 4 38 1.66 2.63 3.81 5.20 8.61
2.0 6 42 2.21 3.57 5.25 7.24 12.16
2.2 4 46 1.81 2.83 4.06 5.50 9.01
2.4 3 50 1.65 2.51 3.53 4.71 7.54
2.6 4 54 1.96 3.03 4.31 5.81 9.42
2.8 6 60 2.54 4.02 5.81 7.92 13.07
3.0 5 64 2.38 3.70 5.28 7.13 11.59
3.2 4 70 2.26 3.43 4.82 6.41 10.22
3.4 6 76 2.85 4.42 6.31 8.52 13.87
3.6 3 80 2.21 3.27 4.48 5.84 9.05
3.8 3 84 2.29 3.37 4.60 5.99 9.25
4.0 4 88 2.60 3.89 5.38 7.09 11.13
4.2 3 92 2.44 3.57 4.85 6.30 9.65
4.4 3 96 2.52 3.67 4.98 6.45 9.85
4.6 6 102 3.34 5.08 7.13 9.50 15.18
4.8 5 108 3.21 4.81 6.67 8.78 13.81
5.0 12 120 5.09 8.04 11.62 15.83 26.14
5.2 21 130 7.40 12.06 17.83 24.69 41.72
5.4 30 150 9.90 16.34 24.35 33.93 57.81
5.6 80 180 22.24 38.03 58.01 82.18 143.09
5.8 125 210 33.41 57.64 88.41 125.73 220.00
6.0 175 240 45.76 79.34 122.08 173.98 305.28
6.2 250 240 63.43 110.75 171.16 244.67 430.94
DATA SONDIR / DCPT (Dynamic Cone Penetration Test)
SNI 2827:2008

Titik : S-2 Koordinat GPS (UTM) : X = 439555


Lokasi : Semarang Y = 9197303
Proyek : Jembatan Kali Tuntang Tanggal Survey : 08 September 2017
Elevasi : +0.00 m muka tanah setempat Master Sondir : Waluyo

Depth CN CL Depth CN CL Depth CN CL


(m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm) (m) (kg/cm2) (kg/cm)

(1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6)
(3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif (3)-(2) (4)x2 komulatif

0.00 0 0 0 0 0 10.20 20.40


0.20 4 6 2 4 4 10.40 20.60
0.40 3 5 2 4 8 10.60 20.80
0.60 3 5 2 4 12 10.80 21.00
0.80 6 8 2 4 16 11.00 21.20
1.00 5 7 2 4 20 11.20 21.40
1.20 3 5 2 4 24 11.40 21.60
1.40 2 4 2 4 28 11.60 21.80
1.60 3 5 2 4 32 11.80 22.00
1.80 9 12 3 6 38 12.00 22.20
2.00 12 16 4 8 46 12.20 22.40
2.20 18 21 3 6 52 12.40 22.60
2.40 30 40 10 20 72 12.60 22.80
2.60 40 50 10 20 92 12.80 23.00
2.80 65 80 15 30 122 13.00 23.20
3.00 70 80 10 20 142 13.20 23.40
3.20 105 120 15 30 172 13.40 23.60
3.40 160 170 10 20 192 13.60 23.80
3.60 250 250 0 0 192 13.80 24.00
3.80 14.00 24.20
4.00 14.20 24.40
4.20 14.40 24.60
4.40 14.60 24.80
4.60 14.80 25.00
4.80 15.00 25.20
5.00 15.20 25.40
5.20 15.40 25.60
5.40 15.60 25.80
5.60 15.80 26.00
5.80 16.00 26.20
6.00 16.20 26.40
6.20 16.40 26.60
6.40 16.60 26.80
6.60 16.80 27.00
6.80 17.00 27.20
7.00 17.20 27.40
7.20 17.40 27.60
7.40 17.60 27.80
7.60 17.80 28.00
7.80 18.00 28.20
8.00 18.20 28.40
8.20 18.40 28.60
8.40 18.60 28.80
8.60 18.80 29.00
8.80 19.00 29.20
9.00 19.20 29.40
9.20 19.40 29.60
9.40 19.60 29.80
9.60 19.80 30.00
9.80 20.00 30.20
10.00 20.20 30.40
GRAFIK SONDIR / DCPT

Titik : S-2 Koordinat GPS (UTM) X : 439555


Lokasi : Semarang Y : 9197303
Proyek : Jembatan Kali Tuntang Tanggal Survey : 08 September 2017
Elevasi : +0.00 m muka tanah setempat Master Sondir : Waluyo

TEKANAN KONUS (Kg/cm2)


RASIO GESEKAN (%)

50 100 150 200 300 235500 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15


0.00 0.00

1.00 1.00

2.00 2.00
KEDALAMAN (m)

KEDALAMAN (m)

3.00 3.00

192 250

4.00 4.00

5.00 5.00
0 500 1000 1500 2000 2500
GESEKAN LOKAL (Kg/cm2)
JUMLAH HAMBATAN PELEKAT (Kg/cm)
GRAFIK RASIO GESEKAN GRAFIK GESEKAN LOKAL
Grafik Konus Grafik Jumlah Hambatan Pelekat
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI (DRIVEN/BORED PILE )

Titik : S-2

Diameter (cm) 30 40 50 60 80
Luas Penampang (cm2) 706.858 1256.637 1963.495 2827.433 5026.548
Keliling (cm) 94.248 125.664 157.080 188.496 251.327

Depth P P P P P
CN JHP
(m) (ton) (ton) (ton) (ton) (ton)
0.0 0 0 0.00 0.00 0.00 0.00 0.00
0.2 4 4 1.02 1.78 2.74 3.92 6.90
0.4 3 8 0.86 1.46 2.21 3.13 5.43
0.6 3 12 0.93 1.56 2.34 3.28 5.63
0.8 6 16 1.72 2.92 4.43 6.26 10.86
1.0 5 20 1.56 2.60 3.90 5.47 9.38
1.2 3 24 1.16 1.86 2.72 3.73 6.23
1.4 2 28 1.00 1.54 2.19 2.94 4.76
1.6 3 32 1.31 2.06 2.97 4.03 6.64
1.8 9 38 2.84 4.72 7.08 9.91 16.99
2.0 12 46 3.69 6.18 9.30 13.04 22.42
2.2 18 52 5.22 8.85 13.41 18.92 32.77
2.4 30 72 8.43 14.38 21.90 30.99 53.88
2.6 40 92 11.16 19.07 29.07 41.17 71.65
2.8 65 122 17.61 30.29 46.38 65.86 115.04
3.0 70 142 19.17 32.89 50.28 71.33 124.42
3.2 105 172 27.98 48.31 74.13 105.44 184.57
3.4 160 192 41.32 71.85 110.75 158.03 277.73
3.6 250 192 62.52 109.55 169.66 242.86 428.53