POWER IMPRINT BUILDERS AND TR

DESIGN • ENGINEERING • CORP. CONSTRUCTION • CO


Room 2 Philexcel Business Arcade 1, Philexcel Business Park, M. Ro

MECHANICAL WORKS WEIGHTED PER

S.No. Item Description

A. BOILER & AUXILIARIES

1 Anchor Bolt Checking, Alignment & Inspection

2 Structural Fabrication

3 Structural Erection

4 Installation of Steam Drum & Mud Drum

5 Installation of Water Walls

6 Installation of Buckstay

7 Installation of Bank Tubes

8 Installation of Headers

9 Installation of Air Pre Heater

10 Installation of Economizer

11 Installation of Primary and Secondary Super heater

12 Installation of Traveling Grates

13 Installation of Chutes Undergrits Collector

14 Installation of Boiler Roofing

15 Installation of Dearator system

16 Installation of CBD and IBD tanks and Piping System

17 Installation of Boiler Feed Pumps

18 Installation of Piping System and Auxillaries

19 Installation of Soot Blower and Auxillaries

20 Installation of Integral Pipings

21 Installation of Boiler House Pipings

22 Installation of Ductings
MECHANICAL WORKS WEIGHTED PER

S.No. Item Description

23 Installation of PA Fan

24 Installation of SA Fan

25 Installation of IDF

26 Full Welding Job

27 Installation of Boiler Inverted Silo

28 Installation of Bed Ash and Fly Ash System and Silos

29 Installation Fuel feeding

30 Installation of Fuel Handling Conveying System

31 NDT/ Radiographic test, Kerosene Test, Smoke Test and Hydrostatic test

32 Installation of ESP (full Package)

33 Installation of Chimney

34 Refractories, Cladding & Insulation

35 Grouting Works & Supply


MECHANICAL WORKS WEIGHTED PER

S.No. Item Description

B. TURBINE & BALANCE OF PLANT

1 Checking of Foundation and Embedded Plates

2 Installation of EOT Crane and Rails

3 Installation of Packer Plates

4 Installation of Turbine and Gearbox

5 Installation of Generator

6 Installation of Lube Oil Cooler

7 Installation of Oil Filter

8 Installation of Ejector

9 Installation of Gland Vent Condenser

10 Installation of Auxiliary Cooling Tower

11 Installation of Overhead Oil Tank

12 Installation of CEP Pumps

13 Installation of Condensate Pipings to Deaerator

14 Installation of Lube Oil Pipings

15 Installation of Bleed Pipings to Deaerator

16 Installation of Main Steam Line

17 Installation of Dumping Line

18 Installation of Warm-up Vent Line and De-superheating Line

19 Installation of Cooling Water Piping System from ACC to Condenser and viceversa

Installation of Auxiliary Cooling Water Line to Lube Oil, Boiler Feed Pump, Generator, IBD
20 Tanks

21 Installation of Piping Drain System

22 Installation of Air Compressor

23 Installation of Air Lines

24 Installation of Utility Lines

25 Installation of DG set
MECHANICAL WORKS WEIGHTED PER

S.No. Item Description

26 Installation of Fire Fighting Package

27 Equipment Alignment

28 Installation of Water Treatment Plant Package

29 Installation of Water Storage Tanks

30 Installation of ACC Package

31 Grouting Works & Supply

32 NDT/ Radiographic test, Hydrostatic test, Acid Cleaning or Picking for Lube Oil System

C COMMISSIONING WORKS

TOTAL

SCOPE OF SUPPLY: Labor, Tools, Equipments, Consumables, Temfacil, Project Management and Supervision
NOT INCLUDED: Power and Water Supply
ILDERS AND TRADING PHILS.
G • CORP.
CONSTRUCTION • CONSULTANCY
s Arcade 1, Philexcel Business Park, M. Roxas Highway, Clark Freeport Zone

ECHANICAL WORKS WEIGHTED PERCENTAGE

Percentage Previous Percentage Present Accomplished


(%) (%) (%)

57.01% 6.07% 8.53%

0.25% 0.25%

2.50% 2.00%

3.70% 1.85% 0.93%

6.10% 6.10%

2.50%

0.40%

0.40% 0.01%

0.30%

0.40%

1.70%

1.23%

1.70%

0.55%

0.55%

1.10%

0.40%

0.45%

5.20%

0.65%

0.35%

0.28%

2.20%
ECHANICAL WORKS WEIGHTED PERCENTAGE

Percentage Previous Percentage Present Accomplished


(%) (%) (%)

0.19%

0.16%

0.42%

1.80% 0.90%

0.50%

1.20%

2.30%

2.40%

1.73%

5.50% 1.95% 0.55%

1.80%

6.00%

0.10% 0.02% 0.04%


ECHANICAL WORKS WEIGHTED PERCENTAGE

Percentage Previous Percentage Present Accomplished


(%) (%) (%)

23.85%

0.15% 0.05% 0.05%

0.70%

0.15%

4.00%

3.10%

0.10%

0.08%

0.10%

0.80%

0.13%

0.10%

0.90%

0.90%

0.09%

0.50%

0.80%

0.10%

0.10%

0.10%

0.10%

0.10%

0.20%

0.20%

0.10%

0.20%
ECHANICAL WORKS WEIGHTED PERCENTAGE

Percentage Previous Percentage Present Accomplished


(%) (%) (%)

0.70%

0.40%

1.50%

0.50%

5.80%

0.10%

1.05%

Management and Supervision