2 Structural Fabrication
3 Structural Erection
6 Installation of Buckstay
8 Installation of Headers
10 Installation of Economizer
22 Installation of Ductings
MECHANICAL WORKS WEIGHTED PER
23 Installation of PA Fan
24 Installation of SA Fan
25 Installation of IDF
31 NDT/ Radiographic test, Kerosene Test, Smoke Test and Hydrostatic test
33 Installation of Chimney
5 Installation of Generator
8 Installation of Ejector
19 Installation of Cooling Water Piping System from ACC to Condenser and viceversa
Installation of Auxiliary Cooling Water Line to Lube Oil, Boiler Feed Pump, Generator, IBD
20 Tanks
25 Installation of DG set
MECHANICAL WORKS WEIGHTED PER
27 Equipment Alignment
32 NDT/ Radiographic test, Hydrostatic test, Acid Cleaning or Picking for Lube Oil System
C COMMISSIONING WORKS
TOTAL
SCOPE OF SUPPLY: Labor, Tools, Equipments, Consumables, Temfacil, Project Management and Supervision
NOT INCLUDED: Power and Water Supply
ILDERS AND TRADING PHILS.
G • CORP.
CONSTRUCTION • CONSULTANCY
s Arcade 1, Philexcel Business Park, M. Roxas Highway, Clark Freeport Zone
0.25% 0.25%
2.50% 2.00%
6.10% 6.10%
2.50%
0.40%
0.40% 0.01%
0.30%
0.40%
1.70%
1.23%
1.70%
0.55%
0.55%
1.10%
0.40%
0.45%
5.20%
0.65%
0.35%
0.28%
2.20%
ECHANICAL WORKS WEIGHTED PERCENTAGE
0.19%
0.16%
0.42%
1.80% 0.90%
0.50%
1.20%
2.30%
2.40%
1.73%
1.80%
6.00%
23.85%
0.70%
0.15%
4.00%
3.10%
0.10%
0.08%
0.10%
0.80%
0.13%
0.10%
0.90%
0.90%
0.09%
0.50%
0.80%
0.10%
0.10%
0.10%
0.10%
0.10%
0.20%
0.20%
0.10%
0.20%
ECHANICAL WORKS WEIGHTED PERCENTAGE
0.70%
0.40%
1.50%
0.50%
5.80%
0.10%
1.05%